Sewer Water Pipeline Replacement with CERTA LOK RESTRAINED JOINT PVC PIPE



Similar documents
Specification for Pipe Bursting Gravity Sewer Mains with HDPE Pipe

1.3.2 Method of construction and restoration of existing water service connections. This shall include:

INSTALLATION OF INSITUFORM LINER

Sewer Line Rehabilitation

SECTION SANITARY SEWER AND STORM DRAIN SYSTEMS

SECTION 6 SANITARY SEWER MAIN 6.01 SCOPE

MANUFACTURER'S CERTIFICATION SCHEDULE 40 PVC PIPE And SCHEDULE 80 PVC PIPE

San Antonio Water System Standard Specifications for Construction ITEM NO POINT REPAIRS AND OBSTRUCTION REMOVALS

SECTION LS 2530 SANITARY SEWERS. A. General: Submit the following in accordance with The General Conditions.

SECTION 21 REHABILITATION OF SANITARY SEWER MAINS BY THE PIPE BURSTING AND TRENCHLESS PIPE REPLACEMENT METHOD

San Antonio Water System Standard Specifications for Construction ITEM NO SLIP-LINING SANITARY SEWERS

SECTION POINT REPAIRS TO SANITARY SEWERS. A. Repairs to existing sewer lines by replacing short lengths of failed pipe.

SECTION STORM DRAIN SYSTEM

DIVISION 4300 STORM DRAINAGE

SECTION HIGH DENSITY POLYETHYLENE (HDPE) PIPE AND FITTINGS FOR WATER DISTRIBUTION AND TRANSMISSION

SECTION POLYVINYL CHLORIDE (PVC) PIPE

Special Specification 7021 Water Main and Sewer Line Replacements

SANITARY SEWER SPECIFICATIONS

LEE S SUMMIT USES PIPE BURSTING TO BROADEN ITS ASSET MANAGEMENT TOOLBOX AND REHABILITATE POTABLE WATER DISTRIBUTION SYSTEM

53.03 MATERIALS FOR SEWER LINER PIPE AND FITTINGS: The following materials are approved for installation in sanitary sewer lines:

DESIGN AND CONSTRUCTION GUIDELINES AND STANDARDS DIVISION 33 UTILITIES SITE UTILITIES

REHABILITATION OF UNDERGROUND SEWER LATERAL PIPES WITH CURED-IN-PLACE-PIPE LINER SECTION 02542

San Antonio Water System Standard Specifications for Construction ITEM NO. 854 SANITARY SEWER LATERALS

DIVISION 2 - SEWERAGE AND DRAINAGE SECTION STORM DRAIN SYSTEMS PART 1 - GENERAL

City of Virginia Beach Public Utilities HRPDC Regional Construction Standards, 5 TH Edition Amendments May 19, 2014

PVC Pipe PVC SCHEDULE 40. Nominal Pipe Size (in.) 1/8. Average I.D. O.D.

SECTION IV - TESTS AND INSPECTIONS PART 1 - GENERAL Testing - General

The checklist utilized by the Authority will be similar to that which is shown below. Project Name: Location: Consulting Engineering Firm:

TABLE OF CONTENTS. Manhole, Frame, and Cover Installation (includes Drop Manhole) Additional Manhole Depth

Bethel Township Municipal Authority (BTMA) RESIDENTIAL SEWER CONNECTION MANUAL

Model Specification 509 DRISCOPLEX 4200 and DRISCOPLEX 4300 Gravity Flow Sanitary Sewer

STANDARD SPECIFICATIONS SECTION CLEANING AND LINING WATER MAINS

INDEX. Sec. No. Items Page Nos.

CHAPTER 6 - SANITARY SEWER

MS-3/2009 HDPE (High Density Polyethylene) Pipe and Fittings Specification for Buried Potable Water

San Antonio Water System Standard Specifications for Construction ITEM 866 SEWER MAIN TELEVISION INSPECTION

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS

SECTION GRAVITY SANITARY SEWERS

City of Balch Springs, Texas. Request for Proposal (RFP ) Pipe Bursting Sewer Line Replacement

SECTION SANITARY SEWER PIPE

ENGINEERED SOLUTIONS. A2 Liner Pipe for Trenchless Technology

SECTION 603 SANITARY SEWER FORCE MAINS

CITY OF BEVERLY RULES AND REGULATIONS - SEWER SYSTEM TESTING. General

Precast Manhole Sections and Castings. These items shall conform to Section 31, "Storm Drain Installation," of these Standard Provisions.

3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees.

PVC Gasketed & Solvent Weld Pipe

A. Contractor shall furnish, to the Engineer, all materials certifications available from the manufacturer for all required materials.

SERVICE LINE EXTENSION AND SERVICE LINE CONNECTION CONDENSED SANITARY SEWER SYSTEM INSTALLATION SPECIFICATIONS

Native InDesign 2890 SaniTite Brochure 1/8" CMYK April 17, 07

SECTION PRECAST CONCRETE UTILITY STRUCTURES

SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)

SECTION DUCTILE IRON PIPE AND FITTINGS

Guideline Specification for the Replacement of Mainline Sewer Pipes By Pipe Bursting

SECTION PUBLIC STORM UTILITY DRAINAGE PIPING

LS 2540 SEWER LATERALS AND INSPECTION TEES

CCU Engineering Specifications. Section PRECAST CONCRETE PRODUCTS

SECTION 1 GENERAL REQUIREMENTS

Section 2100-Trenching and Tunneling

02780 LINER FOR SEWER REHABILITATION

SECTION DUCTILE IRON PIPE AND FITTINGS

The Most Advanced Name in Drainage Systems. Sanitary Sewer Pipe

SECTION XXXXXX TECHNICAL SPECIFICATIONS FOR INSTALLATION OF PROTECTIVE COATINGS FOR MANHOLES, WETWELLS, AND OTHER SANITARY SEWER STRUCTURES

Royal Seal Gasketed Sewer Pipe

SUBDRAINS AND FOOTING DRAIN COLLECTORS. A. Construct subdrains, subdrain cleanouts and outlets, and footing drain collectors.

CLEANING, INSPECTION, AND TESTING OF SEWERS

SECTION 5: SANITARY SEWER SYSTEM DESIGN

Section C-1 Pipes and Fittings

Section 402. STORM SEWERS

SECTION 3 SANITARY SEWER DESIGN

Section SEWER PIPE INSTALLATION AND TESTING

AIR RELEASE, CLEANOUT, AND SEWER MANHOLES

The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.

September 2012 Brunswick County Engineering Department Revision 1.0. Technical Specification GRAVITY SANITARY SEWER SYSTEM

EXHIBIT "A. Technical Specifications for Water and Sewer Service Lines

SECTION ASBESTOS CEMENT PIPE REPAIRS, DEMOLITION, AND DISPOSAL

SECTION POLYVINYL CHLORIDE (PVC) PIPE

812-3 LIMITATIONS: b. No fire hydrant shall be obstructed or used when there is a fire in the area.

SPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO)

Storm Sewer Trenchless Upgrade Alternatives and Recommendations

Wastewater Capital Projects Management Standard Construction Specification

SECTION 812 SEWER LINE, MANHOLE AND WET WELL CLEANING

Price List January 1, 2015

SECTION STORM DRAINAGE SYSTEM

WATER SERVICE 2

SECTION 802 GRAVITY SEWER PIPE

FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation

FY08 SEWER POINT REPAIRS BID TABULATION

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE

The Manitoba Water Services Board SECTION Standard Construction Specifications September 2013 Page 1 of 21

SECTION CLEANING AND CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION OF SEWER PIPE

WATER MAIN CONSTRUCTION TECHNIQUES DEPARTMENT OF PUBLIC WORKS WATER & WASTEWATER DIVISION

SECTION ABANDONMENT OF SEWER MAINS

BEST PRACTICE GUIDELINES FOR CULVERT LINER SELECTION

SECTION 724 PIPE CULVERTS

SECTION STORM DRAINAGE TABLE OF CONTENTS

VERIFICATION TESTING GUIDELINES FOR CONTRACTORS

PROTECTO 401 Price List

City of Regina Standard Construction Specification SECTION 1320 SEWERMAIN TESTING

Transcription:

1.0 GENERAL 1.1 DESCRIPTION This section addresses the procedures to be employed for pipe bursting existing water/sewer pipelines, as identified on the drawings, and replacing with new Restrained Joint PVC pipe. 1.2 QUALIFICATIONS 1.2.1 The contractor shall be trained by TT Technologies to operate GRUNDOBURST pipe bursting equipment and systems. The contractor shall provide certifications of training and proficiency in the use of the equipment. Only the contractor's employees trained by TT Technologies shall operate the GRUNDOBURST equipment. 1.2.2 The contractor shall be trained by the respective manufacturer of the pipe bursting equipment in the use of that machinery. The contractor shall provide certification from the manufacturer that the contractor has been trained and is proficient in the use of the equipment. Only the contractor's employees trained and certified by the manufacturer shall be allowed to operate the equipment during the project. 1.2.3 The contractor must have successfully completed 3,000 feet of pipe bursting which includes one successful static pipe bursting project. Contractor shall submit a list of these projects including the owner, engineer, addresses, phone numbers and dates that said projects were completed with their proposal. 1.3 METHODS The method approved for rehabilitation of existing water mains and sanitary sewers by pipe bursting and installation of new Restrained Joint PVC pipe is TT Technologies, Inc. GRUNDOBURST system, (800) 533-2078) or approved equal. The contractor shall be licensed to use the required technology proposed for this work. Bids, submitted by untrained or inexperienced contractors, will be non-responsive and not allowed. 1.4 EQUIPMENT 1.4.1 Pipe bursting tool shall be static. The bursting action of the tool shall increase the external dimensions sufficiently, causing breakage of the pipe at the same time expanding the surrounding ground. This action shall not only break the pipe, but also create the void into which the burster can be statically pulled which enables forward progress to be made. Simultaneously, the new Restrained Joint PVC pipe, directly attached to the expander, shall also move forward. 1.4.2 The static pulling frame shall be telescopic in design to allow the cutting head to release at the termination of the pull. This also provides minimal trench length by telescopic adjustment. 1.4.3 Quick lock bursting rods are required to guarantee snap lock connections. Quick Lock rods also stabilize cutting wheels at a 90º plane to invert pipe. Threaded bursting rods are not allowed. This insures the same cutting location eliminating threaded rod failures and turning of rods which effect cutting ability of blades. 1.4.4 The unit must maintain automatic thrust and pull back. 1.4.5 The static unit is capable of pipe bursting in two directions from the same excavation. 1.5 SUBMITTALS 1.5.1 Submit manufacturer's specific technical data with complete information on physical properties of pipe and pipe dimensions pertinent to this job. A certificate of "Compliance with Specification" or suitable alternative shall be furnished for all materials to be supplied. 1.5.2 Complete calculations including lists of parameters, all formulas and all other data showing the design of the new pipe. Page 1 of 5 10.18.10 - REV 2.0

1.5.3 Detail drawings and written descriptions of the entire construction procedure to install pipe, bypass sewage flow, pit sizes, pit construction and shoring, dewatering and sewer service reconnections. 1.6 PATENTS The contractor agrees to defend, indemnify and hold harmless the City and the Engineer against all claims, suits, and actions or other damages as a result of negligence of any person or property arising out of patent infringement by the contractor or the contractor's employees, agents, the suppliers, or any tier of subcontractors involved in the work. 2.0 MATERIALS; Certa Lok REstrined Joint PVC Pipe CertainTeed C900/RJTM Engineering Specifications 1.0 Scope This specification covers restrained joint Polyvinyl Chloride (PVC) Pipe, 4" 12", with cast-iron pipe (CI) outside diameters. Pipe is intended for use in pressure-rated potable water delivery systems, as well as in sewer and fire protection piping systems. 2.0 Reference Documents American Society for Testing and Materials (ASTM) ASTM D 1784 Standard Specification for Rigid PVC Compounds and Chlorinated PVC Compounds ASTM D 2837 Standard Test Method for Obtaining Hydrostatic Design Basis for Thermoplastic Pipe Materials ASTM D 3139 Seals ASTM F 477 Standard Specification for Joints for Plastic Pressure Pipes Using Flexible Elastomeric Standard Specification for Elastomeric Seals (Gaskets) for Joining Plastic Pipe American Water Works Association (AWWA) AWWA C900 Standard for Polyvinyl Chloride (PVC) Pressure Pipe and Fabricated Fittings, 4 In. through 12 In. (100 mm through 300 mm), for Water Distribution NSF International NSF 61 Drinking Water System Components Health Effects 2.1 Requirements 2.2 General Products delivered under this specification shall be manufactured only from water distribution pipe and couplings conforming to AWWA C900. The restrained joint pipe system shall also meet all short and long term pressure test requirements of AWWA C900. Pipe, couplings, and locking splines shall be completely non-metallic to eliminate corrosion problems. 2.3 Materials Pipe and couplings shall be made from unplasticized PVC compounds having a minimum cell classification of 12454, as defined in ASTM D 1784. The compound shall qualify for a Hydrostatic Design Basis (HDB) of 4000 psi for water at 73.4 F, in accordance with the requirements of ASTM D 2837. Page 2 of 5 10.18.10 - REV 2.0

2.4 Approvals Restrained joint PVC pipe products shall have been tested and approved by Underwriters Laboratories for continuous use at rated pressures as follows: Joint Water Mains Copies of agency approval reports or product listings shall be provided to the Engineer. Products intended for contact with potable water shall be evaluated, tested, and certified for conformance with NSF 61 by an acceptable certifying organization. 2.5 Dimensions Nominal outside diameters and wall thicknesses of restrained joint pipe shall conform to the requirements of AWWA C900. Restrained joint pipe shall be furnished in 4", 6", 8", 10" and 12" sizes, in Class 235 (DR18) and Class 305 (DR14). Pipe shall be furnished in standard lengths of 20 feet. Dimensions of the pipe are shown as follows: 2.6 Joints Pipe shall be joined using non-metallic couplings to form an integral system for maximum reliability and interchangeability. High-strength, flexible thermoplastic splines shall be inserted into mating, precision machined grooves in the pipe and coupling to provide full 360 restraint with evenly distributed loading. Couplings shall be designed for use at or above the pressure class of the pipe with which they are utilized, and shall incorporate twin elastomeric sealing gaskets meeting the requirements of ASTM F 477. Joints shall be designed to meet the zero leakage test requirements of ASTM D 3139. Page 3 of 5 10.18.10 - REV 2.0

2.7 Workmanship Pipe and couplings shall be homogeneous throughout and free from voids, cracks, inclusions and other defects, and shall be as uniform as commercially practicable in color, density and other physical characteristics. 2.8 Quality Control Every pipe and machined coupling shall pass the AWWA C900 hydrostatic proof test requirements of 2 times the pressure class for 5 seconds. Until such time as UL standards are harmonized with AWWA, UL requirements shall be used, which are 4 times the UL pressure class for 5 seconds (4*150=600psi, 4*200=800psi). 2.9 Marking Pipe and couplings shall be legibly and permanently marked in ink with the following minimum information: Pipe Nominal size (for example, 4") PVC Dimension ratio (for example, DR18) AWWA/UL pressure class (for example, PC 235) AWWA C900-07 (or latest edition) Manufacturer s name or trademark and production record code Seal(mark) of the testing agency verifying the suitability of the pipe Material for potable water service Seal (mark) of the certifying agencies that have tested and approved the pipe for use in fire protection systems Couplings Nominal size (for example, 4") PVC AWWA/UL pressure class (for example, PC 305) AWWA C900-07 (or latest edition) Manufacturer s name or trademark Seal (mark) of the testing agency verifying the suitability of the pipe material for potable water service Seal (mark) of the certifying agencies which have tested and approved the pipe for use in fire protection systems 3.0 Approved Manufacturers C900/RJ PVC restrained joint pipe from CertainTeed Corporation, or approved equal 3.0.1. Material color shall be white, black or whatever is specified with interior of pipe having a light reflective color to allow easier/better viewing for television inspection. 3.0.2. EXECUTION 3.0.3. SAFETY The contractor shall carry out operations in strict accordance with all applicable OSHA Standards. Particular attention is drawn to those safety requirements involving work entry into confined spaces. It shall be the contractor's responsibility to familiarize and its employees with OSHA Standards and regulations pertaining to all aspects of the work. 3.1 INSERTION AND RECEIVING EXCAVATIONS 3.1.1 The location and number of insertion and receiving excavations shall be planned by the contractor and submitted in writing for approval by the Engineer 10 days (or as determined by the Engineer) prior to excavation. Page 4 of 5 10.18.10 - REV 2.0

3.1.2 Before excavation is begun, it will be the responsibility of the contractor to check with the various utility companies and determine the location of existing utilities in the vicinity of the work area. The contractor at no cost to the City, if required, will arrange temporary construction easement and/or right-of-way areas. 3.1.3 Damage to utilities and the resulting repair, temporary service cost, etc., shall be borne by the contractor. Access pits shall be backfilled in accordance with the appropriate specifications. 3.1.4 All excavations shall be properly sheeted/shored in accordance with relevant specifications for trench safety systems. Any damage resulting from improperly shored excavations shall be corrected to the satisfaction of the Engineer with no compensation due to the contractor. 3.1.5 All open excavations shall be kept secure at all times by the use of barricades with appropriate lights and signs, construction tape, covering with steel plates, etc., or as directed by the Engineer. 3.1.6 One or more receiving pits shall be excavated at the end(s) of the water main or sewer pipe to be replaced or at appropriate points within the length of the existing pipe. Pit shall be centered over the existing pipe. 3.1.7 The number of pits for machine and pipe insertion shall be the minimum necessary to most efficiently accomplish the work. The contractor shall give consideration to the use of excavations required for other purposes such as for Water Service reconnection, valve and fire hydrant replacements, or sanitary sewer service reconnections and manhole replacement. 3.1.8 Where Valve excavations or manhole excavations are used as machine or new pipe insertion pits, the contractor shall identify such manholes and replace them at no additional cost to the City if damaged. Any manhole modification or replacement required shall be considered incidental to the installation of the new pipe. 3.1.9 The cost of water main bypassing or diversion pumping around a manhole or insertion pit, if required, from a manhole upstream to a manhole downstream, shall be incidental to the installation of the new pipe. 4.0 MEASUREMENT AND PAYMENT 4.0.1 Payment for the work in this section will lump sum or as stipulated in the contract documents. The price for replacing the water main or sewer pipes by pipe bursting shall be full compensation for all materials, labor, equipment, cost of insertions and retrieval pits, machine pits, pavement removal and replacement, testing, and incidentals required to complete the replacement process. Page 5 of 5 10.18.10 - REV 2.0