ASBESTOS BUILDING INSPECTION REPORT. for. Michigan State University Office of Environmental and Occupational Safety East Lansing, Michigan 48823

Asbestos-Containing Material Re-Inspection Report

ASBESTOS BUILDING INSPECTION REPORT. for the. City of East Lansing Waste Water Treatment Plant East Lansing, Michigan

NARRATIVE REPORT. The Asbestos Bulk Sample Results Table includes asbestos sampling data.

ASBESTOS BUILDING INSPECTION

1804 W. Colorado Avenue Colorado Springs CO Fax AlpineConsultInc.com

POTENTIALLY HAZARDOUS MATERIALS BUILDING INSPECTION REPORT. for

ASBESTOS-CONTAINING MATERIAL REPORT

May 23, Mr. Derek Sandgren Helm Properties 1520 Butte House Road, Suite 400 Yuba City, California

Chicago Public Schools 6 Month Asbestos Surveillance Spring

LIMITED ASBESTOS INSPECTION POLICE DEPARTMENT - ROOFING 434 SOUTH 1 ST STREET MONTROSE, COLORADO

UNVERSITY HIGH SCHOOL U W. Gregory St. Normal, IL School Asbestos Management Plan. Supplemental.

Asbestos Survey Former Kraft General Foods Facility 500 Dalton Avenue and 1222 Statesville Avenue Charlotte, North Carolina. H&H Job No.


1200 N. COLORADO WINSLOW, ARIZONA

Chicago Public Schools 6 Month Asbestos Surveillance Fall

Asbestos Management Program

If the address on this form is different than the address of the building, submit a written explanation.

Asbestos Related Data For the Healthcare Facility

HART ENVIRONMENTAL RESOURCES

MARYLAND DEPARTMENT OF THE ENVIRONMENT 1800 Washington Boulevard Baltimore MD

6% Chrysotile NA White floor tile 2 nd Floor 10,000 sq ft Cat 1 2% Chrysotile Poor

SECTION 16 ASBESTOS MANAGEMENT

Photo 1: This photograph shows drywall, joint compound, cove base mastic, carpet adhesive, and ceiling tile in store front No. 1.

SUMMARY OF ASBESTOS CONTAINING MATERIAL IN BUILDINGS AND BULK SAMPLE ANALYSIS

Request for Proposals ASBESTOS ABATEMENT SERVICES. Coffeyville Community College 400 W. 11 th Street Coffeyville, KS 67337

The Richard Stockton University ASBESTOS MANAGEMENT PLAN

ASBESTOS BACKGROUND INFORMATION

OGS LIMITED ASBESTOS & LEAD SURVEY REPORT

Asbestos Management POLICY

Asbestos Building Inspection Report Oak Forest Gun Club 4001 W Fieldcrest Drive Markham, Illinois Project No.:

ASBESTOS CONTAINING MATERIALS (ACM) REFERENCE GUIDE

Asbestos Inspection Project Procedure

ASBESTOS NESHAP DEMOLITION SURVEY

Off white sheetrock May 07 no asbestos found. Bralley Annex sheetrock office/room 106 May 07 removed pipe insulation mechanical room Mar 05 removed

2013 AHERA 3 Year Re-Inspection Report For. Northeast Elementary School 82 Scofieldtown Road Stamford, CT. Performed by

Asbestos Procedures. Asbestos Products

AHERA 3-Year Asbestos Re-Inspection

The Vermont Department of Health When is Asbestos a Public Health Threat? Town Health Officers (THO) Training

Professional Service Industries, Inc Gateway Drive Suite B Cypress, CA Phone 714/ Fax 714/

Click to edit Master title style Maricopa County Asbestos NESHAP Overview. Valerie Brodeur Asbestos NESHAP Inspector

ASBESTOS SURVEY AND ASSESSMENT REPORT

Administrative Procedure. Asbestos

CATALOGUE OF ASBESTOS MATERIALS. City of White Rock White Rock Library Buena Vista Avenue White Rock, BC

2. 40 CFR Part 763; The Asbestos Hazard Emergency Response Act (AHERA), EPA Worker Protection Rule, February 25, 1987.

TRU Asbestos Management

Why was asbestos used?

ASBESTOS AWARENESS. Slide #1

STOCKTON UNIVERSITY ASBESTOS - GENERAL AWARENESS TRAINING. For workers and building occupants

Asbestos in the Home and Workplace June 2012

Restoration Specific Asbestos and Lead Based Paint Survey Report Logan Ave Colorado Springs, CO 80909

PRE-DEMOLITION ASBESTOS SURVEY

Approved by: UBC ACT Committee

ASBESTOS INSPECTION REPORT

Safeway 691 Berkeley Shattuck Place Date: May 3, 2007 MDA. Store Data: Interior Construction Materials: Exterior Construction Materials:

June 27, Project GSA Rhonda Rance U.S. General Services Administration 450 Golden Gate Avenue, Floor 4 San Francisco, California 94102

ASBESTOS in state and local government

Title 11, Hawaii Administrative Rules (HAR), Department of Health (DOH), Chapter 501, Asbestos Requirements.

Asbestos Containing Material MANAGEMENT PLAN

2009 Housing Provider Forum. Ontario Environmental & Safety Network Ltd.

Asbestos Management Program (EHS Program Manager 7.5)

Asbestos 2 hr. Awareness

How To Manage Asbestos From Roofing And Siding

SECTION EXISTING HAZARDOUS MATERIALS CONDITIONS

Asbestos Management Plan EC 45 Page 1

ALBERT EINSTEIN COLLEGE of MEDICINE of YESHIVA UNIVERSITY. MANAGING ASBESTOS at EINSTEIN. Prepared by: Department of Environmental Health and Safety

Loss Control TIPS Technical Information Paper Series

WORK PROCEDURES FOR ASBESTOS RELATED ACTIVITIES

DEMOLITION INSPECTION REPORT ASBESTOS CONTAINING MATERIALS

ASBESTOS AWARENESS. Environmental Health And Safety. MAINTENANCE CONTRACTORS

RENOVATION AND DEMOLITION WORK THINGS TO CONSIDER BEFORE WORK BEGINS:ASBESTOS CONTAINING MATERIALS

The Management of Asbestos at the University of Manitoba

NDSU TABLE OF CONTENTS

ASBESTOS and LEAD-BASED PAINT INVESTIGATION TOWN OF ST. PAUL WILLIS BUILDING ST. PAUL, VIRGINIA

Managing Asbestos* *Defined by Asbestos NESHAP 40 CFR 61, subp. M

EXHIBIT A SCOPE OF SERVICES

Building Owners Responsibilities for Asbestos

ASBESTOS MANAGEMENT INTRODUCTION

Characteristics/Applications

Asbestos NESHAP ISSUES AND QUESTIONS

Asbestos Awareness at the University of Toronto

Asbestos Survey. for. Commercial Building TCA Building T-187, Pasco Airport Pasco, Washington. May 1, Project #A2014/0406.

Survey Report: Asbestos and other Designated Substances. MTO - Regional Office (N00724) 1355 John Counter Blvd., Kingston, Ontario

IDENTIFICATION OF ASBESTOS You can t identify asbestos-containing materials with the naked eye. Experienced employees can identify suspected

AHERA ASBESTOS REINSPECTION

IWU PHYSICAL PLANT SAFETY PROGRAM. Toxic and Hazardous Substances, Title 29 Code of Federal Regulations (CFR) Part , Subpart Z Asbestos

June 29, 2015 Project

Airborne asbestos is a serious health hazard.

Asbestos Abatement Work Plan for the Carter Carburetor Superfund Site

UI Procedures for Asbestos Management

Copyright 2013 Kleinfelder. All Rights Reserved

ASBESTOS MANAGEMENT PROGRAM

Control Provisions under the Air Pollution Control Ordinance

ASBESTOS MANAGEMENT PROGRAM

Asbestos WHAT TO DO? Studies of people who were exposed to high levels of asbestos in factories and shipyards, are at increased risk of:

SD No.23 Asbestos Awareness Seminar

University of the Sciences Environmental Health and Radiation Safety (EHRS) Department Q&A ON ASBESTOS

Transcription:

July 13, 1993 REPORT: Complete Building Asbestos Survey TO: FROM: Don Hau, Project Development, 100 Shops Building, 319 15th Avenue SE, Minneapolis, MN 55414 Michael Buck, Asbestos Group, Environmental Health and Safety (EH&S), B-7 U-Tech Building, 1313 5th St. SE, Minneapolis, MN 55414 SUBJECT: Asbestos Material Survey - Blegan Hall EH&S Project No: 202-91-038, 203-92-031, 203-93-102 Client Project No: 203-92-1663 Scope of Work: The survey's scope of work includes the complete building survey of suspect asbestoscontaining materials in Blegan Hall. The scope of this report is limited to the scope of work as defined in the work request dated March 8, 1993. Summary: A complete building asbestos material survey was conducted October 8 through October 31, 1991; also May 10 through May 12, 1993. The purpose of the survey was to identify asbestos-containing materials (ACM) as defined by the Environmental Protection Agency (EPA). Any material that is greater than 1% asbestos is considered to be ACM. The scope of the survey was to identify both friable and nonfriable suspect ACM, identify nonfriable ACM that may become friable under demolition or renovation conditions in Blegan Hall. Project Description: Three hundred seventy-four (374) bulk samples of suspect ACM were collected onsite and two hundred forty-nine (249) analyzed via polarized light microscopy (PLM) by Analytica Environmental, Delta Environmental, and Nova Environmental for asbestos content. Results of analyses are listed in Appendix I of this report. Appendix I is formatted to provide an inventory of suspect ACM, the asbestos content of each material listed, and friability. An explanation of the tables and abbreviations used in the tables is included with Appendix I. Appendix II is a listing of only those suspect materials that tested >1% asbestos. Minnesota Department of Health (MDH) Asbestos Rules regulate only friable ACM (material may be reduced to powder or dust under hand pressure) while the EPA regulates ACM that may become friable under demolition or renovation conditions. The following friable or potentially friable materials tested positive as ACM: (reference sample numbers are shown in brackets) <4" grey fibrous (GF) pipe fitting insulation on fiberglass with tar PI (80) <4" grey fibrous pipe fitting insulation (PFI) on fiberglass PI (81) <4" grey fibrous pipe fitting insulation on fiberglass (FG) PI (82) <4" grey fibrous pipe fitting insulation on white fibrous PI (86)

<4" white fibrous pipe fitting insulation on white/beige powder with tar PI (88) <4" white fibrous (WF) pipe insulation (PI) (89) <4" grey fibrous pipe fitting insulation on white fibrous PI (90) 4-8" grey fibrous pipe fitting insulation on beige/white powder PI (92) 4-8" white fibrous (WF) pipe insulation (PI) (93) 4-8" grey fibrous pipe fitting insulation on white fibrous PI (94) 4-8" grey powder pipe fitting insulation on fiberglass PI (95) 4-8" grey fibrous pipe fitting insulation on fiberglass with tar PI (97) 4-8" white fibrous (WF) pipe insulation (PI) (98) 4-8" grey fibrous pipe fitting insulation on white fibrous PI (99) 4-8" grey fibrous pipe fitting insulation on fiberglass PI (110) 9-14" grey fibrous pipe fitting insulation on white fibrous PI (100) 9-14" white fibrous pipe insulation (101) 9-14" grey fibrous pipe fitting insulation on white fibrous PI (102) 9-14" pink fibrous (PF) pipe insulation (PI) (111) 9-14" white fibrous pipe fitting insulation on pink fibrous PI (112) tank insulation, white fibrous (104) duct insulation, grey fibrous (GF) (106) air handler insulation, white fibrous (108) air handler insulation, white fibrous with tar (109) textured ceiling spray-on (77) 9 x9" floor tile (FT), grey with navy and white specks (1) 9 x9" floor tile, white with grey streaks (3) 9 x 9" floor tile, grey with white specks (5) 9 x9" floor tile, grey with cream specks (7) 12 x12" floor tile, grey with white and black specks (9) 6 x6" floor tile, blue textured (17) 12 x6" floor tile, blue textured (19) 12 x12" floor tile, blue textured (21) 6 x6" floor tile, black textured (23) 12 x6" floor tile, black textured (25) 12 x12" floor tile, black textured (27) 6 x6" floor tile, grey textured (29) 12 x6" floor tile, grey textured (31) 12 x12" floor tile, grey textured (33) 9 x9" floor tile, white with grey and brown streaks (115) The following suspect friable or potentially friable materials tested none detected (ND) as ACM: (reference sample numbers are shown in brackets). <4" fiberglass with tar (FG w/tar) pipe insulation (PI) (79) <4" white fibrous (WF) pipe insulation (PI) (85) 4-8" fiberglass with tar pipe insulation (60) 4-8" beige/white powder (vermiculite) pipe insulation (91) 4-8" fiberglass with tar (FG w/tar) pipe insulation (PI) (96) textured ceiling plaster (73) textured ceiling plaster (74) rough textured plaster (76) sheetrock taping compound (78) floor tile adhesive, black (2) floor tile adhesive, black (8) 12x12" floor tile (FT), light salmon with brown and white streaks (11)

floor tile adhesive, yellow (12) 12x12" floor tile, dark salmon with brown streaks (13) floor tile adhesive, yellow (14) 12x12" floor tile, tan with brown & white streaks (15) floor tile adhesive (16) 9x9" floor tile, brown with cream streaks (113) carpet adhesive, gold (52) carpet adhesive, green (53) carpet adhesive, brown (54) 2" black baseboard (35) baseboard adhesive, brown (36) 4" black baseboard (37) baseboard adhesive, yellow (38) 6" brown baseboard (41) baseboard adhesive, brown (42) baseboard adhesive, brown (40) 6" grey baseboard (43) baseboard adhesive, brown (44) 6" pewter baseboard (45) 6" black baseboard (47) baseboard adhesive, brown (48) 6" light grey baseboard (49) 12x12" ceiling tile (CT), white with deep fissures (57) 12x12" ceiling tile (CT), white with dense fissures (58) 12x12" ceiling tile (CT), cream with small pinholes (59) acoustical ceiling tile (CT) adhesive, brown (60) 12x12" ceiling tile (CT), yellow with dense fissures (61) 12x12" ceiling tile, white with deep fissures (62) 12x12" ceiling tile, white with dense fissures (63) 1x2' ceiling tile, yellow with deep fissures (64) 1x2' ceiling tile, yellow with dense fissures (65) 1x2' ceiling tile, white with varying fissures (66) 1x2' ceiling tile, white with dense fissures (67) 1x2' ceiling tile, white with small pinholes (68) 1x2' ceiling tile, white with lengthwise fissures (69) 2x2' ceiling tile, white with fissures and pinholes (71) 2x2' ceiling tile, beige with diagonal pattern (72) 2x2' ceiling tile, white with medium pinholes (73) The following nonfriable with low potential to become friable materials tested positive as ACM: ( reference sample numbers are shown in brackets) duct insulation, fiberglass with tar (FG w/tar) (105) air handler insulation, fiberglass with tar (107) floor tile adhesive, black (6) floor tile adhesive, black (10) floor tile adhesive, black (26) floor tile adhesive, black (113.5) carpet adhesive, yellow (51) grey putty (56)

Observations and Recommendations: The materials that were observed to be in damaged condition are as follows: Room 7 - air handling unit insulation (30 SF), Room 13B - <4" white fibrous pipe insulation (71 LF), <4" grey fibrous pipe fitting insulation (29 EA), Room 13C - 4-8" white fibrous pipe insulation (12 LF), Room 15-4-8" white fibrous pipe insulation (12 LF), Room 52/S52 4-8" grey fibrous pipe fitting insulation (35 EA), Room 264 - <4" white fibrous pipe insulation (15 LF), Room 364 - <4" white fibrous pipe insulation (25 LF). These materials should be patched and repaired or removed by the Asbestos Staff in the Facilities Support Group; Tim Nelson and John Sundsmo. Cost Information: The approximate cost for the removal of all friable and potentially friable ACM is itemized below. These figures are based on the assumption that all friable and potentially friable ACM are going to be removed. MATERIAL TYPE LOW RANGE HIGH RANGE thermal system insulation $132,133.00 $164,554.00 textured ceiling spray-on $49,545.00 $77,070.00 floor tile $23,450.00 $46,900.00 TOTAL $205,128.00 $288,524.00 All ACM removal must be performed by a Minnesota licensed asbestos abatement contractor. All asbestos removal shall be performed within the specified procedures as outlined in the University of Minnesota Technical Specification for Asbestos Abatement. Please note that removal costs are highly variable and dependent on such factors as contractor availability, accessibility of work areas and site specific work plans. EH&S also recommends that throughout the general renovation activities associated with this building, precautions and work practices should be implemented to minimize nuisance dust levels. Dust suppression techniques (misting the air with water and keeping materials wet) should be required of the general contractor. If there is any further information required, or other questions arise regarding this report, please contact Michael Buck at 627-4911. Written By: Michael Buck Environmental Health & Safety Asbestos Group Principal Technician Reviewed By: Roger L. Jeremiah Environmental Health & Safety Asbestos Group Manager cc: Fay Thompson, EH&S

Mike Shields, AKRW