Project Management Handbook 2014. "To Understand the Causes of Things"

Similar documents
SMS0045 Construction Health and Safety Policy and Procedures

DIRECTORATE OF ESTATES & FACILITIES

CAPITAL WORKS GUIDANCE DOCUMENT

PROJECT BRIEF Version (insert number)

Project manager services

2. Subject to any special rules applied by the College's funding bodies, the tendering procedures will be applicable to:

RIBA Plan of Work 2013: Consultation document. You are invited to complete the online questionnaire by 12 August 2012.

PROCUREMENT & LOGISTICS DEPARTMENT

ASBESTOS MANAGEMENT PLAN

Page 97. Executive Head of Asset Planning, Management and Capital Delivery

PROJECT MANAGEMENT FRAMEWORK

GUIDELINES FOR THE MANAGEMENT OF PUBLIC TRANSPORT INVESTMENT PROJECTS DELIVERED BY CONVENTIONAL PROCUREMENT

Delivery Management Guidelines Delivery Process 2 - Project Management

The role will require the management of consultancy and in-house teams in the successful execution of the estates strategy.

A guide to appointing an architect

Department of the Environment and Local Government. Project Management. Public Private Partnership Guidance Note April 2000

INTERNSHIP TRAINING SCHEME

Employer s Information Requirements Version Core Content and Guidance Notes

Wharton Construction Ltd. Quality Manual. Kellaw Road Yarm Road Business Park Darlington DL1 4YA

Guide to Procuring Construction Projects

BOARD NOTICE COUNCIL FOR THE BUILT ENVIRONMENT. Notice No

Consultancy Services Proposal

Procedure. Work Health and Safety Contractor Management. Document number: PRO Rev no. Description Process Owner Approved for issue

Quality Manual. This manual is proprietary and no part thereof shall be copied without written authorisation from the company. Ref: Quality Manual.

South East & London Construction Framework for Major Projects. Invitation to Mini Competition

Internal Audit Report. Chief Executive s Unit. Review of Contract Management

DUTIES and GUIDANCE. for. BOARDS of MANAGEMENT. DEALING with ASBESTOS CONTAINING MATERIALS. before, during & after

Value for Money Unit Local Government Audit Service

GUIDANCE NOTE Building Control (Amendment) Regulations 2014 Procurement Implications for Contracting Authorities

OUTLINE SCOPE OF SERVICES FOR THE ROLE OF INFORMATION MANAGMENT

An Introduction to Asbestos, Legislation and Licensed

TfNSW Standard Requirements TSR T Technical Management

Principal Designer Guidance

RDTL Procurement Best Practice Guide 7: Managing Contracts. RDTL MINISTRY OF FINANCE Procurement Service BEST PRACTICE GUIDE 7: MANAGING CONTRACTS

Part 1 Checklist. Feasibility 2. Investigation 9. Design 18. Construction 26

Code of Practice for Agents Undertaking Renovation Grants

Project Management. Advice on the provision of Local Decontamination Units (LDUs) Decontamination Services

Construction (Design and Management) Regulations 2007

STRATEGIC PLANNING & PLACE BUILDING CONTRACT DIRECTIVE

PROJECT MANAGEMENT PROCESS for MAJOR CAPITAL PROJECTS

Health and Safety Policy

Recruitment and Selection Procedure

University Emergency Management Plan

Capital Works Management Framework Guidance Note. Planning and Control of Capital Costs GN 2.2

CONTRACTS STANDING ORDERS (CSOs) 2015 / 2016 CSO

A Guide to the Design Build Process

IT Re procurement 2013 project governance

PROJECT MANAGEMENT GUIDELINES NATIONAL TRANSPORT AUTHORITY

Thurrock Council JOB PROFILE. Head of Housing Investment and Development

Risk Management in the Tendering Process

Design-Build Process for Project Managers

Head of Lease Terms - Ten Steps to a Successful negotiation

RIBA Plan of Work 2013 Overview

Implementation Plan: Development of an asset and financial planning management. Australian Capital Territory

SUMMER WORKS SCHEME (SWS) 2014

Estates and Facilities Management. Director of Estates and Facilities Management. Professional Services Job Level 7. Chief Financial Officer

TRANSNET PIPELINES. TPL 25 Tarlton Commissioning Plan

Certificate in Building Information Modelling (BIM) - Project Management

Engineering Council of South Africa

ANGUS COUNCIL SUPPLEMENTARY CONDITIONS OF CONTRACT. SC 01 - Contract Performance Guarantee Insurance

JOB DESCRIPTION. TITLE: Corporate Property Manager SALARY RANGE: 55,000-70,000

Project Appraisal and Scrutiny Committee Recommendation. , file storage system and server upgrades

Controlling Our Critical Path: A CDOT Guide to Better Project Management Practices

Project Management Guidelines

Overview of Business Continuity Planning Sally Meglathery Payoff

BEST PRACTICE GUIDE 3: TENDER PROCESSES AND TENDER DOCUMENTS. RDTL MINISTRY OF FINANCE Procurement Service

Rockhampton Office Brisbane Office Tarong Site. Barron Gorge Hydro PS Kareeya Hydro PS Mica Creek PS

1.1 To provide highlight reports for all the Council s corporately significant projects, covering the period up to the end of June 2006.

Directorate of Estates and Campus Services. Estates Development Projects. A client guide to Estates Services project management

OPW HANDBOOK FOR THE CONSULTANTS DIRECT INVITATION LISTS (CDIL)

Project Management Manual Update Transportation Department City of Edmonton

Procurement requirements for reducing waste and using resources efficiently

JOB VACANCIES. Contract Management & Compliance Officer - Property Services Ref: 254

Construction Notification and Start-Up

CONSTITUTION PART 4 CONTRACT PROCEDURE RULES

Check. They re Chartered. Chartered Project Managers

Asbestos Surveys and Removals Progress Report Financial Year 07/08

REACTIVE REPAIRS, CYCLICAL & PLANNED MAINTENANCE POLICY

UNIVERSITY OF LEICESTER ESTATES & FACILITIES MANAGEMENT DIVISION ASBESTOS MANAGEMENT PLAN

Procurement of Goods, Services and Works Policy

BUILDING INFORMATION MODEL (BIM) PROTOCOL

HEALTH & SAFETY POLICY

Introduction to the ITS Project Management Methodology

Dated 2015 (1) THE HALL FOR CORNWALL TRUST. and (2) [ARCHITECT] Appointment of Architect

Post No. : LON074 Grade : Section : Quantity Surveying Location : NPS London Ltd

The Newcastle Upon Tyne Hospitals NHS Foundation Trust. Medical Devices Procurement Procedure

THE UNIVERSITY OF THE WEST INDIES, MONA CAMPUS

Notes. Score. 1 Basic Services 1.1. A few instances; could have been more proactive

This is Document Schedule 5 Part 1 referred to in this Contract SCOTTISH MINISTERS REQUIREMENTS SCHEDULE 5 PART 1 QUALITY MANAGEMENT SYSTEM

Budget Workshop and Financial Update February 2015

Information Commissioner's Office

Australian National Audit Office. Report on Results of a Performance Audit of Contract Management Arrangements within the ANAO

HILLCREST HOUSING ASSOCIATION LIMITED MAINTENANCE POLICY

AUDIT & PERFORMANCE REVIEW COMMITTEE ON 26 TH SEPTEMBER 2007

Policy 7 Management of Asbestos

Interim Guidelines for the Provision of Infrastructure and Capital Investments through Public Private Partnerships:

Invitation to Quote for General Fund Assets Revaluation for Resource Accounting 2015/ /20.

Department of Health PFU & PPP Forum. Benchmarking and market testing in NHS PFI projects. Code of Best Practice

Transcription:

Management Handbook 2014 "To Understand the Causes of Things"

AMENDMENT RECORD This document has been issued and amended as follows: - Isu. Rev. Reason for Issue / revision Date Issued to Team Stakeholders 1 - handbook CD / File Board Managers Quantity Surveyors CDM coordinator Design Team Students Union Residences Accommodation & Sales e p e e e p e p e p e p e p e p e p e p e p e p e p Chaplaincy Facilities & Maintenance Environ & Sustainability ITS inc. Telecoms, AV PCPD: Legal and Compliance Team 1 4 5 6 2

Amendment Log Isu. Rev. Reason for Issue / revision Date Changes Made 1 - Handbook 1 PEP details 8/5/12 PEP details added to Stage C to match check sheet. 4 5 6 2 RIBA work stages 1-7 21/04/14 Update for new RIBA work stages 3

Contents Introduction 4 Stage 1 Initiation (Pre RIBA Work Stages) 7 Stage 2 Outline Scheme (RIBA Work Stage 1) 9 Stage 3 Concept Proposals (RIBA Work Stage 2) 11 Stage 4 Developed Design (RIBA Work Stage 3) 13 Stage 5 Technical Design to Production Information (RIBA Work Stage 4) 15 Stage 6 Tender Action (RIBA Work Stage 5) 17 Stage 7 Construction (RIBA Work Stages 6+7) 19 4

Introduction This document is to be used on all projects under the control of the Capital Development Team and is intended to provide a Process Map for the procurement of projects. These are a series of standard processes and documents which must be utilised and this handbook collates all that information into a single source for ease of reference and a common checklist to ensure key processes and documentation are completed and in place at the relevant stages on a consistent basis. The documentation covers areas such as procurement requirements (Financial Regulations, OJEU etc.), Health and Safety requirements (internal and external sources, CDM etc.) and liaison with other Estates Sections and the wider School. The Process Map sets out the key stages of a project life span and links standard actions required and standard documentation, as noted, for the various stages. The map runs from the initiation of a project, through the RIBA Work Stages 1 to 7 and Post Evaluations. It highlights key actions and documentation required to be taken/produced by internal project/management teams and external consultants. The accompanying charts show the generic process route which is to be followed. The charts detail all stages of a project. Any deviations from the process are to be by exception and reported as necessary. Martyn Fisher Assistant Director, Capital Development May 2014 5

Stage 1 Initiation (Pre RIBA Work Stages) Financial Commitment Line Initial Brief/Aims/ Ambitions/Costs/ Programme/Risks Consultant Appointment Strategy Business Case FC/ESC Approvals Application for Funding Financial Approval GATEWAY ONE Team Set Up Team Meeting Green = Approvals Blue = Meetings Yellow = Documents/Strategy Red = Audits/PB/FGPC Orange = Site works Purple = Design Execution Plan Drafted Director Audit No 1 6

Stage 1 Initiation (Pre RIBA Work Stages) A project requires initiation via the School s Senior Management Steering Committees the Finance Committee (FC)/Estates Strategy Committee (ESC) Documents i) Business Case. Produced by User Department or Estates Supporting documentation confirming acceptance of project business case and FC/ESC approval to proceed (relevant minute) together with approved funding /funding stream. Confirmation required if a bid for funding is necessary and to which body. At this stage a review of the aims and ambitions of the project is required to ensure that estimates are not over-optimistic about cost, time and quality; this review will form the Initial Brief. FC/ESC or other minute confirming project is to proceed. Initial Brief ii) Application for Funding Standard Form to be submitted for approval to the Director of Finance and Facilities, copy submitted to Finance Director, on approval. No expenditure prior to confirmation of budget code. iii) New Works Request Form This is a standard form to be completed by Client/End User for minor works and where the funding is to be via the Department. Form to be returned to Estates for sign off and distribution to relevant section to carry the works forward. New Works Request. iv) Capital Development Standard Filing The Administration Section of Capital Development will manage the setting up of the project filing system in line with the standard hardcopy and electronic format v) Board (PB) Establishment of PB under a relevant Chair. PB No.1 to receive and approve the following: PB required if 1M or more (steering groups may be used for ad hoc projects where appropriate) Document Set i) Standard Agenda ii) Terms of Reference (Standard Terms or revisions with Chairs approval) iii) PB Membership iv) Outline Scope of Initial Brief v) Approved Budget vi) Outline Programme vi) Execution Plan (PEP) The PEP is a controlling document for the project and is to be updated throughout its life-cycle. It will contain all relevant scope information, contact details, scope, programme, etc. The standard template is to be used and adapted as required. vii) Director Audit No.1 Internal audit to ensure all required actions taken and documentation completed Minor Works requests vii) Scope of Capital Development Confirmation required if any external funding bid has been successful and the funding stream has been set up for draw viii) Risk Register down (e.g. ODAR). Capital Development team to assist on preparation of external bids as required. Application for Funding and Manager s CDM Declaration 7

Stage 2 Outline Scheme (RIBA Work Stages 1) CD Briefing Guide Need for Feasibility Study Establish User Group and Rep user Extract the Outline Brief Board Meeting No. 1 Director Audit No 2 Consultant Appointment Strategy Team Meeting Consultant Team Selection and Appointment Outline Scheme Design RIBA Stage 1 Report Team Meeting GATEWAY TWO Financial Regs/ Procurement Reviews Cost Plan Check Quotes Tenders OJEU Fee Bids Quotations Tender OJEU, Process Forms of Appointment Execution Plan Update Green = Approvals Blue = Meetings Yellow = Documents/Strategy Red = Audits/PB/FGPC Orange = Site works Purple = Design 8

Stage 2 Outline Scheme (RIBA Work Stage 1) Document Set The completion of Stage One moves a project into the Preparation Phase (or Feasibility) with the appointment of external consultants for major capital works or in-house resource allocation, as ratified by the Board. Documents i) User Group Establishment of User Group Members directly involved with the proposed project. All roles and responsibilities are to be agreed and formalised and liaison to be set up for approval by the PB. A User Group Leader (Rep user) should be identified as the single point of contact. User Group List and User Group Leader (Rep user) ii) Briefing Guide The User Group members are to be issued with the Briefing Guide, which sets out their responsibilities. This document outlines the actions and decisions required from the Client to establish clarity about the process of procuring the project and the commitment required. iii) Design Team Appointments At this stage the strategy for appointing external consultant teams and LSE internal project teams needs to be set up and agreed with the PB. External consultants have to submit fee tenders or quotations dependant on size of the project budget and status of framework agreements. i) Financial Regulations Limits ii) Financial Regulations check to be made for either action on quotations or tender. iii) Financial Regulations check to be made for OJEU requirements iv) OJEU Forms internal review with Procurement Office v) Check if relevant framework has been set up for consultant appointment for small projects vi) vii) (NOTE: Exceptions to the Financial Regulations are strictly controlled and need sanction from the Board and the circumstances must be clearly defined. Form to be submitted to Director of Finance and Facilities for sign off. iv) Forms of Appointment The use of Standard Forms of Agreement (RIBA, RICS, ACE etc.), if LSE bespoke forms are not used, are to be reviewed and approved by the PB before their issue. v) LSE Inception/Notification Meeting Consultation meetings are to be held with internal support services to discuss the overall scope of the scheme. The meetings are to be held at regular intervals during the life of the project to ensure LSE internal support groups have an understanding of the project, how it will impact on them and how they will need to support or interact on completion. The following attendees are given as examples: Maintenance LSE Fire Consultants Office Management Teaching and Learning Services Security DDA Advisor Health and Safety Advisors Energy Manager / Sustainability Team Head of Space Management IMT including Telecomms Purchasing Notification to Purchasing confirming procurement Inception Meeting Standard Agenda route vi) RIBA Stage 1 Report Exemption to Financial Regulations Form. The following documentation must be included in the Report which is to be presented and signed off by the PB with approval to proceed to the next stage: Document RIBA Stage 1 Report i) Outline Brief ii) Feasibility iii) Design vs Function iv) Outline Design Proposals v) Draft Master Programme vi) Outline Cost Plan Budget Review vii) Outline Risk Register viii) Execution Plan update. vii) Director Audit No.2 Internal audit to ensure all required actions taken and documentation completed 9

Stage 3 Concept Proposals (RIBA Work Stage 2) User Reviews Board Meeting No. 2 Design and Build Procurement Risk Workshop VfM/VE Workshops Cost Plan Check Director Audit No 3 Stage 2 Concept Design Stage 2 Report Outline Design Team Meeting GATEWAY THREE Procurement Workshop Sustainability PEP Update Planning Strategy Green = Approvals Blue = Meetings Yellow = Documents/Strategy Red = Audits/PB/FGPC Orange = Site works Purple = Design 10

Stage 3 Concept Proposals (RIBA Work Stage 2) Completion of Stage 2 releases the scheme to proceed to Concept Proposal Stage which crystallises the scope of the project in terms of design, cost, quality and programme. Consideration of the following is needed at this stage: Brief Design vs Function Review Design Reviews Cost Plan Value for Money and Value Engineering (VfM/VE) Programme Risk Register Procurement Review Sustainability Planning Strategy Documents i) Concept Brief The document will set out the detailed scope of the requirements to meet the users/client needs. The brief will be based on information from the users/client in terms of functional requirements, initial spatial arrangements and overall design quality. Co-ordinated Brief ii) RIBA Work Stage 2 Workshops Document Set i) Design Team Meetings Agenda/Minutes ii) Risk Workshop iii) Procurement Workshop iv) Sustainability Workshop v) VFM/VE Workshops vi) Planning Strategy and Application vii) PEP Update iii) LSE Internal Stakeholder Meeting No.2 A review meeting/meetings are to be held with internal bodies to discuss the overall scope of the scheme, the following attendees are given as examples: Maintenance LSE Fire Consultants Office Management Teaching and Learning Services Security DDA Advisor Health and Safety Advisors Energy Manager / Sustainability Team Head of Space Management IMT including Telecomms Purchasing Internal Stakeholder Meeting Standard Agenda iv) RIBA Work Stage 2 Report The following documentation must be included in the Report which is to be presented and signed off by the PB with approval to proceed to the next stage: Document RIBA Work Stage 2 Report i) Concept Brief ii) Design vs Function iii) Design Proposals iv) Programme v) Cost Plan vi) Outline Risk Register vii) Execution Plan update. viii) Planning Strategy ix) Planning Application Documents (if applicable) vi) Director Audit No.3 Internal audit to ensure all required actions taken and documentation completed All Design Team Appointments to be formalised and executed at this point. 11

Stage 4 Developed Design (RIBA Work Stage 3) Revise Submission Refusal Room Data Sheets/Detailed Brief Notes Planning Application Documents Planning Application Submission Approval Board No 3 Director Audit No 5 User Group Input Risk Reviews VfM/VE Reviews Co-ordinated Brief RIBA Work Stage 3 Developed Design RIBA Work Stage 3 Report Team Meeting GATEWAY FOUR Brief Vs Function Review VfM/VE/Cost Plan Checks Procurement Route PEP Update Green = Approvals Blue = Meetings Yellow = Documents/Strategy Red = Audits/PB/FGPC Orange = Site works Purple = Design 12

Stage 4 Developed Design (RIBA Work Stage 3) The project has now reached a point where the elements of the scheme need to be fully defined to Developed Design Stage and signed off by all parties. All parties need to be aware of the impact of changes after the completion of this stage of the project which may mean abortive work and incur additional fees and impact on the agreed programme. Documents I) Detailed Developed Brief The RIBA Work Stage 3 Concept Design Brief will inform the process of Detailed Developed Design. The Concept Design Brief is enhanced with additional detailed information including detailed room data sheets and detailed user requirements. The performance and life expectancy of elements of the design are to be included at this stage, health and safety, maintenance, facilities management, repair and replacement, also a clear statement on sustainability is required. The final document now becomes the Consolidated Developed Design Brief and is signed off by the PB. The brief will be informed by the room data sheets which will be signed off by the users/client group. Document Set i) Consolidated Brief ii) Room Data sheets II) LSE Internal Stakeholder Meeting No.3 A review meeting to be held with internal bodies to discuss the overall scope of the scheme, the following attendees are given as examples: Maintenance LSE Fire Consultants Office Management Teaching and Learning Services Security DDA Advisor Health and Safety Advisors Energy Manager / Sustainability Team Head of Space Management IMT including Telecomms Standard Agenda III) RIBA Work Stage 3 Report The following documentation must be included in the Report which is to be presented and signed off by the PB with approval to proceed to the next stage: Document Work Stage 3 Report i) Developed Brief ii) Design vs Function iii) Scheme Design Proposals iv) Room Data Sheets v) Detailed Programme vi) Detailed Cost Plan vii) VfM/VE viii) Detailed Risk Register ix) Execution Plan update. x) Planning xi) Procurement xii) Strategies for: - Cleaning - Maintenance - Security - Access (DDA) - IMT - Sustainability including energy, carbon savings and waste management xiii) H&S statement iv) Director Audit No.4 Internal audit to ensure all required actions taken and documentation completed 13

Stage 5 Technical Design to Production Information (RIBA Work Stage 4) VfM/VE Cost plan Checks Design Freeze Design Change Control Cost plan Checks Director Audit No 5 Technical Design RIBA Work Stage 4 RIBA Stage 4 Design Report Team Meeting Tender/ITT Documentation Pre-Tender Cost Report Team Meeting GATEWAY FIVE Design Change Control Board Meeting No. 4 PEP Update Contractor Procurement Procurement Vehicle Purchasing Notification Design Team Review Quotations/ Tender Lists Contractor Shortlists Design Team Review Green = Approvals Financial Regulations OJEU Req s OJEU Action OJEU Selection Blue = Meetings Yellow = Documents/Strategy Red = Audits/PB/FGPC Orange = Site works Purple = Design 14

Stage 5 Technical Design to Production Information (RIBA Work Stage 4) The project has reached the stage where technical design commences and the procurement route needs to be agreed and put in place. A design freeze point must be clearly identified and the implications set out for the Client body regarding scope changes after this point. A Design Change Control system is to be adopted to track any change either from the Design Team or User/Client. Documents i) Technical Design RIBA Work Stage 4 The Design Team will need to collaborate closely and agreements made on responsibilities for producing what information architect, other consultants, contractors or other specialist firms etc. All changes to the design and specifications need to be carefully monitored and controlled, a Design Change Control Form is required to track and agree changes. ii) LSE Internal Stakeholder Meeting No.4 A review to be held with internal bodies to discuss the overall scope of the scheme, the following attendees are given as examples: Maintenance Health and Safety Advisors LSE Fire Consultant Energy Manager / Office Management Sustainability Team Teaching and Learning Head of Space Management Services IMT including Telecomms Security Purchasing DDA Advisor Standard Agenda 15 iii) Stage 4 Report Detailed design vs functional requirements Specifications (proscriptive and performance) Detailed design drawings, schedules etc Document Control Design Change Control Form Co-ordination across disciplines Employer s Requirements (RIBA Work Stage) iv) Design Freeze Detailed Risk Register Detailed Programme Elemental Cost Plan Detailed VfM/VE Internal Stakeholder Meetings (minutes) Procurement PEP update On completion of the technical design all parties are to be formally notified that the project has reached the design freeze stage and all parties are to be made aware of the impact of any changes beyond this stage. Design Freeze Sign Off (PB/User/Design Team) v) Procurement The procurement route will have been agreed at RIBA Work Stage 3 and the stages for proceeding to tender are now enacted. Various checks will be required and the Purchasing Office will be notified and assist in the process through the e-procurement and, where desirable, establishing criteria and scoring responses. Contractor shortlists are to be tabled at the PB for agreement Conditions of the Form of Contract to be reviewed and agreed together with the preliminaries. Document Set i) Financial Regulations Limits ii) Quotation forms iii) Tender Documentation iv) OJEU Requirements v) OJEU Notices vi) Purchasing Notification vii) OJEU Selection Process (agreed and evaluation) viii) Pre-Tender Interviews ix) Selected Tenderer List x) Form of Contract vi) Stage 4 Tender / ITT Information The Design Team deal with all aspects of producing co-ordinated information, drawings, schedules, specifications and the like. Ensure that the team are fully aware of their responsibilities and have a detailed co-ordinated programme of works for this stage with key milestones for co-ordination reviews and cost checks. Requirements for work schedules should have been agreed prior to this stage. The information at this stage will form the basis of the Building Regulations submission, to either an Approved Inspector or Local Authority. vii) Pre-Tender Action Paralleling the Design Team actions the Capital Development Team will set up the requirements for requisite tender procedures, including OJEU requirements if necessary. Financial regulations checks are required at this stage and projects are to have the relevant quotations/tender review in place. Exceptions to the Financial Regulations can be applied for but the circumstances are strictly controlled and must be agreed with the PB/Director of Finance and Facilities/Director of Estates/Director of Capital Development as required. The Purchasing is to be notified of the actions being taken and that OJEU/Tender Action/Quotations are being sought on the project. Checks are to be made on potential contactors to ensure they are suitable for inclusion on tender lists: Pre-tender reviews are to be held with the Design Team during this phase. References D+B Financial Checks Construction Line / LUPC Previous LSE s The Quantity Surveyor if used must produce a Pre-Tender Cost Report before moving on to the Tender Action Stage. viii) Director Audit No.5 Internal audit to ensure all required actions taken and documentation completed

Stage 6 Tender Action (RIBA Work Stage 5) Design Team Review Tender Verification and Cost Post Tender interviews Tender Documentation Pre-Tender Review Tender Issue Mid-tender Interviews if required Tender Return Tender Report Contractor Selection Director Audit No 6 Team Meeting Procurement Office Action Board Number 5 Appoint Contractor GATEWAY SIX PEP Update Green = Approvals Blue = Meetings Yellow = Documents/Strategy Red = Audits/PB/FGPC Orange = Site works Purple = Design 16

Stage 6 Tender Action (RIBA Work Stage 5) On completion of the Tender Documentation it will be collated and checked prior to issue to the selected tender list. It is important that the information and instructions to the tenderers are clear. Documents i) Tender Documentation LSE standard tender forms are to be used on all projects being issued for tender and accessed via the e-procurement system LSE Standard Forms of Tender Set i) ITT Sections 1+2 ii) Form of Tender ii) Tender Breakdown iii) Response to Tender Questionnaire iv) Preliminaries including form of contract to be used v) Standard Set of Appendices Instructions for use of Purchasing e-procurement register iii) Contract Documentation Contract Documentation to be prepared for execution Contract Documentation checklist Insurance documents to be checked Request for contract to be executed by Company Secretary and Pro-Director iv) Director Audit No.6 audit to be undertaken prior to completion of this stage of procurement All tenders are to be given a unique reference number issued by Purchasing Notification is to be given to the Purchasing that a tender is to be issued, who is on the tender list and what the issue and return dates are. The tenderers are to be notified of impending tender issues Identify if mid-tender interviews are required Schedule of site visits to be maintained All tenders are to be returned via the Purchasing e- procurement system No hard copies of tenders are to be issued/returned. ii) Tender Returns Purchasing will log all returns and pass them to the Manager for opening/evaluation including transfer to external consultants. Post-tender interviews are to be held if required The tender return information is then reviewed and checked accordingly for completeness etc., and a Tender Report is then produced together with a recommendation and reported to the PB. Where tenders are over the project budget cost saving options are to be undertaken and reported to the PB. Upon approval to appoint a contractor Purchasing to be notified of successful contractor. All unsuccessful contractors to be notified in writing by Purchasing. Note: it is best practice to have a 10 day standstill period Purchase Order 17

Stage 7 Construction (RIBA Work Stage 6+7) Pre-start Review Director Audit No.7 Meeting Schedules Pre-handover Inspections Post Evaluations/ Audit Pre-contract Meetings Pre-start site inspections Contract Commencement Main Contract Works Practical Completion Client Fit Out Completion User and After Care END Enabling Works Asbestos surveys/ geotech Risk Reviews Cost Reports Progress Reports/ Programme etc Change Control Team PEP Update Green = Approvals Blue = Meetings Yellow = Documents/Strategy Red = Audits/PB/FGPC Orange = Site works Purple = Design 18

Stage 7 Construction (RIBA Work Stages 6 + 7) Prior to the commencement of works on site there are still a series of actions that are required to ensure the project is set up correctly and that the School is ready for the works to commence. This applies more rigorously to works in occupied buildings. Documents i) Planning A Pre-Start Review is to be undertaken with key LSE Staff including the Internal Stakeholder Meeting attendees, occupants of buildings where the works is taking place. A Pre-Contract Meeting will be held with the contractor and his site team together with key LSE Staff who will have an interface with the proposed works. A Pre-Start Site Inspection is required to verify site conditions etc prior to handover to the contractor. Notification is to be given to LSE Finance regarding insurance and cash flow prior to works commencing. All site investigations are now to be completed including any Asbestos survey works and any final geotechnical investigations or demolitions or enabling works. Pre-Start Checklist Pre-Contract Meeting Agenda User/Building Occupant Notification Final Fire Alarm Protocol Sign Off Maintenance/Cleaning Dept. Notification Insurance Notification PEP Update F10 has been completed and submitted Party Wall Notices completed if required Health and Safety Plans in place ii) Director Audit No.7 Final audit prior to commencement of contract works iii) Operations on Site Reporting lines and reporting schedules are required to be set up so effective monitoring of the project is in place Prior to Practical Completion pre-handover inspections to be made with LSE staff who will interface with the project on completion, e.g. FM, IMT, Security, other support. Site Meetings Design Team Reports Programme updates Risk Register updates Cost Reports Change Control Clerk of Works Reports (if appropriate) Inspections (Design Team) Inspections (LSE) Selection of samples VAT Exemption Certificate Schedule Interim Programme and Valuation Certificates Pre-handover inspections Contractor s responsibilities during the Defects Period iv) Practical Completion The Design Team is to liaise with the contractor on the requirements for the formal handover and granting of Practical Completion. This will include inspections of the works, handover of all testing and commissioning certification and the Operational and Maintenance Manuals. A formal handover meeting to be arranged with all parties in attendance and all Client parties are aware of their responsibilities, including FM, IMT, Security, other support Notification is to be given to LSE s insurers Agreement to be made on reporting of defects during the Defects Liability Period O+Ms are in place and Facilities Management / Maintenance Operatives have been briefed accordingly As built drawings have been issued for record Health and Safety File is completed All keys have been issued All security requirements are in place and operational All firefighting equipment is in place All IMT requirements and data points are referenced/live Energy/Carbon information to Sustainability Team SWMP information to Sustainability Team Final Account Process to be established and programme agreed Agreed O+M format (electronic and hardcopy) Insurance Notification Form Schedule of all spares Schedule of all keys/swipe and access cards s Completion Checklist iv) Post Occupation Completion Aftercare Actions Post Evaluations are to be undertaken on all projects to review all aspects of the scheme. Arrangements for independent Audits to be put in place where certification is required for release of any funding retentions by external bodies Procedures to be agreed for monitoring and reporting on defects during Defects Liability Period Capital s Administration to audit filing for completeness Capital s Administration to record and archive Contract Documents and all project filing 19