made easy Robotic cable management Managing the six-axis platform in robotics requires special consideration when designing cabling systems.

Similar documents
The Less is More Approach to Robotic Cable Management

Plastics for Longer Life. The NEW Multi-Axis Energy Chain for Robots. Triflex

multi-axis system ROBOTRAX cable 3D cable carrier system carrier

ELEVATOR TRAVELING CABLE - DESIGN EVOLUTION

Robotics. DressPack Application Equipment & Accessories

Key Design Criteria for High Flex Cable Constructions By Mike Levesque, Dale S. Long, and Ron Crouch of C&M Corporation

Energy Chain Systems ReadyChains Preassembled Cable Carrier Systems ready for installation on your machine

The Quality Connection. High Performance Cable Solutions for the World of Semiconductors

The Quality Connection. High Performance Cable Solutions for the World of Semiconductors

Selecting Robots for Use in Drug Discovery and Testing

The Quality Connection. LEONI Industrial Solutions Custom-Made Cables

LIFE-LINE Safety Cables Continuous Bending Hi-Flex Electrical Cables to Guarantee Safe Cable & Hose Carrier Systems

Precision Miniature Load Cell. Models 8431, 8432 with Overload Protection

Robotic Collision Sensor and/ Axial Compliance Device Protector

Unarmored Variable Frequency Drive (VFD) Cable Termination Guide

IRB 2600ID-15/1.85 Simple integration, high performance

Solving Signal Problems Effective shielding is key to enhancing the reliability and performance of broadcast cables.

SAFETY SAFETY APPAREL 20,000 PSI

USA: 866.LAWSON4U ( ) Canada: lawsonproducts.com. Electrical Industrial and Fleet Solutions

Robot Welding Torch System

Subminiature Load Cell Model 8417

Cables and Accessories Selection Guide

Top Drive Service Loops. Conventional, Enhanced and Superior Solutions for Drilling Applications

Accelerating Light. Copper Cabling Solutions. Category 6A

Reeling. Heavy Duty. Contents

Machine. Tools. .com. Special igus products for. , ReadyChain, Chainflex Cables, Energy Chain Systems

AERIAL FIBER OPTIC CABLE PLACEMENT

BUILT-IN DISHWASHER INSTALLATION INSTRUCTIONS

Intelligent Cable Management Systems

Copper Patch Cords. Impact On Network Performance and Reliability

HOSE & CABLE PROTECTION

CABLE & HOSE MANAGEMENT SOLUTIONS FOR MACHINE MOTION INNOVATIVE ECONOMICAL. CoverTrax Tube Style Carriers. Dynamic Cable Management PLASTIC CARRIERS

WORLDWIDE AUSTRIAN CABLE SYSTEMS

spinner Measurement & Calibration equipment for network analyzers

Position Cat5e (EMT) Modular Plug Connectors. Application Specification

Cable management for rack-mounted systems

What ensures easy and fast wiring?

Cat7/Class F New Installation Concept New infrastructure. Handbook

ABB Robotics, June IRB 1200 Overview. ABB Group August 21, 2014 Slide 1

Custom Cable Assemblies for Medical Applications and more.

Energy & Data Transmission Systems for Waste Water Treatment

Cables. Accessories. For Force, Torque and Strain Sensors

New robot improves costefficiency. spot welding. 4 ABB Review 3/1996

Festoon 715 P PUR cable for flexible application in festoon systems

EQUIPMENT SET UP RECURVE BOW

Installation Instructions

CORNING CABLE SYSTEMS GENERIC SPECIFICATION FOR TIGHT BUFFER OPTICAL FIBER CABLES FOR INTER- AND INTRABUILDING APPLICATIONS.

Andersen Electric Window Opener for Andersen Awning and Roof Windows

Tool changer. Rugged and durable. For universal use. Payload up to 800 kg

due to uncertainty. This, in turn, has a direct impact on equipment availability and maintenance costs. Unfortunately, due to misconceptions and

Phil Crowther, Product Management, April 2015 YuMi IRB Overview

white paper Ferrules: Your Best Insurance Against Costly Connection Failure Executive Summary

Medium Voltage Terminations, 5 kv 46 kv

Encoder Wiring Made Simple Fielding a successful product depends on choosing the right wiring scheme and output driver.

EXCELLENCE. LAPP SYSTEMS CAPABILITIES DESIGN AND FABRICATION OF POPULATED CABLE TRACK FULL ENGINEERING DESIGN AND DOCUMENTATION INCLUDING CAD DRAWINGS

WIRE, TERMINAL AND CONNECTOR REPAIR CONDUCTORS

PrODUCt POrtFOLIO cable & hose carrier SYSTeMS

Wind Direction Smart Sensor (S-WDA-M003)

Cat. 6 A EL Incredibly fast Get more

Coaxial Cable Installation Accessories

Hose packages 70 Robot System Products Product catalogue 2014

Cable Preparation and Pulling Procedure Best Practices for Fiber Optic Indoor Tight-Buffered Cable

Video Camera Installation Guide

Waekon Gold. Test Lead Master Kit. Tight Spot Test Lead Kit. Micro Mate Terminal Adapter Set. Magnetic Test Lead Ground Lug

Robots are ready for medical manufacturing

White paper. SACE Tmax XT Circuit-Breaker Terminals and Connection

Instruction Manual. Cable Splicing. Models , HDF1, HDF SS1

Valu Guide Sheaths. Valu Guide Inserts. Optional Valu Guide Inserts. Typical Properties of Valu Guide Rail. and Hardware.

Hydraulic Control Technology for Wind Turbine Generators

Cleveland Tramrail Bridge Components

Massoud Sadeghi: (425) Brett Portwood: (562) Transport Airplane Directorate; ANM-117

I BEAM TRACK INSTALLATION

KSR-SK-DB In-Line Splice Kit KSR Snow Melting Cable INSTALLATION PROCEDURES

db MISER ULTRA LOW LOSS CABLE ASSEMBLIES Are you a design or test engineer fighting a challenging loss budget?

Installation & Weatherproofing Guide for ENCOM Broadband Radios

EMC Test Chamber Solutions RF Cable Assemblies and Connectors

800 Communications Circuits

Selecting Microwave/RF Cable Assemblies for Reliable Performance Over Time. White Paper

UNDERSTANDING. C&M Corporation 51 South Walnut Street, Wauregan, CT Phone: Fax:

igus solutions for textile machines achines plastics for longer life

Xtra-Guard Performance Cable

Application Data Important Safety Information

LOW LOSS CABLE PAG. 1

1) Cut-in Place Thermoforming Process

WHITE PAPER. A Comparison of Conventional and Robotic Palletizers

Coaxial Cables for Medium-Frequency Applications

ETHERLINE Ethernet Cable, Connectors & Tools

PDI-P10LCD Pre-Tensioned Swivel Cartridge

Navico-Northstar 2kW JRC Radar Package, Scanner Cable Removal and Replacement

TRUCK MOUNTED KNUCKLE BOOM HYDRAULIC CRANE PROPOSAL

Cable Installation Notes

I-Line. Accessories. Essential cable installation products for corrugated, smooth wall, and braided cables

UNIT 1 INTRODUCTION TO NC MACHINE TOOLS

Unified requirements for systems with voltages above 1 kv up to 15 kv

Cable Products HONEYWELL SECURITY & CUSTOM ELECTRONICS. Honeywell's Genesis Series provides a full range

SECTION SIGNAL WIRE AND CABLE

Transcription:

Robotic cable management made easy Managing the six-axis platform in robotics requires special consideration when designing cabling systems. Ellen Rathburn Technical Copywriter igus Inc.

In the field of multi-axis robots, industrial integrators are faced with the unique challenge of selecting and managing cables to be run on the outside of a moving six-axis platform. The complex movements made by six-axis robots require special consideration when deciding how to manage their cable systems. There are many unsuitable ways to accomplish this, from corrugated tubing used in static wiring, to on the fly fixes such as duct tape and bungee cords, Don Nester, Product Manager for Chainflex Continuous flex cable at igus explained. Traditional cable management systems attempt to keep cables static, while operations surrounding them are dynamic. Restricting the movement of the cables can create points of stress, accelerating cable failure. Today, new intricate movements carried out by robots, especially the sixth-axis rotation, have created a need for a more modern way of thinking about cable selection and management. One of the major problems with robotic cable management, according to Nester, is that it is often the last thing to be thought of in the design process. These are complicated movements with multiple profiles, he said. You re not just dealing with an X-Y axis, you re dealing with twisting, turning, and a lot of points on a robot that you cannot mount to but need to keep controlled. The length of cable needed for each movement profile is different; this requires a cable management system that allows the cable length to change without rerouting. These articulated machines can be used in a wider variety of applications due to their increased range of motion, but the aspect that renders the machines more flexible in function is the very thing that most affects the cabling system. While current systems use a more restrictive cable package that will run cables from the robot case to the end effector, igus engineers are urging designers to consider a new, dynamic approach: treat a six-axis robot as three separate segments: the sixth to third axis, the third to second axis, and the second to first axis. Segmenting the dress pack

into three shorter sections prevents it from wrapping, catching, or snagging on machines, and minimizes stress on cables and hoses. This breakdown of segments is imperative to having maximum cable control while allowing cables to function properly for their manufacturerdetermined service life. Ideally, each segment should feature a minimal dress-pack, strain relief with service loops, and a junction box that contains and protects electrical connectors joining the cables. Strain relief cables specially designed to handle torsional movement are crucial to avoid cable failure and keep machines up and running for as long as possible. The insulated conductors should be twisted in a way that allows for torsional movement of the internal parts of the cable. To do this, special buffering materials are used to keep the components moving freely within the cable. Special shield designs are also required to prolong the shield s effectiveness and mechanical life of the shield material, whether it is braided or single serve. Use special jacket materials that have been proven to be abrasion resistant and pliable enough for the twisting movements required. Cable management Though robotic cables have been designed to withstand the unique strains a six-axis robot can put on them, a cable management system is crucial to ensuring these cables work at their potential for as long as possible. When improperly housed, cables will wear prematurely or fail in other ways, causing downtime and a delay in production. Unhoused, cables can sag and fall into the work area, or Moving robots call for moving cables Conventional cables are not designed to take on the repeated torsional movement these types of robots execute. A cable designed for linear movement will not be the best option for torsional movements. Robotic applications requiring torsion of more than ±180º will demand a cable designed specifically for torsion, Nester explained. In order to make a cable that can stand up to this type of torsional strain, certain things must be incorporated into the cable s design: Special conductor stranding and pitch length should be used. Consider a new approach to sixaxis robotic cable management by separating the dress pack into three separate segments.

A cable designed for linear movement will not be the best option for torsional movements. Robotic applications requiring torsion of more than ±180º demand a cable specifically designed for torsion, such as igus own Chainflex CF-Robot line of robotic cables. become tangled within the moving parts of the machinery. Leading system integrators cited cable issues as the number one reason for downtime in robotic cells at a conference held by the Robotic Industries Association. Often overlooked, housing the cable bundle properly around a robot is critical in maintaining proper performance and avoiding machinery downtime. In these robotic systems, cables run along the robot from the base to the end effector, with the robot divided into six axes. As reported by Nester and his colleagues at igus, the most challenging movement robotic cables and management systems have to endure is at the sixth axis, at the end of the robotic wrist. These sometimes move significantly, more than 180, creating problems in managing the cables. Corrugated, flexible tubing is one of the options for cable management used in these robots, but it has its limitations, mainly limited torsion resistance and ability to stretch along with the robot s movements. These failings cause strain on the cables, leading to downtime. A second option is enclosed dress packs, mounted directly on the robot. This method is comprised of corrugated tubing housed in reinforced plastic. This adds strength, but its non-modular design makes cable maintenance difficult and requires the replacement of the entire system if one component were to break. A third option for cable management is a robotic cable carrier, which is mounted directly to the robot and can be tailored to the customer s exact specifications. Similar to an enclosed dress pack, the spring-loaded design is equipped with strain relief options, extending the service life of the cables, as well as the ability to quickly add or remove cables without dismantling the entire system, allowing for minimal downtime. Most importantly, the defined bend radius of these systems ensures that cables are protected from exceeding their maximum bend radii. Tested systems that integrate seamlessly One option for robotic cable carriers is igus Triflex R, a modular, multi-axis cable

carrier system designed to guide and protect cables and hoses in robotic applications. Triflex R ships and installs as one piece and features an integrated fiber rod that returns cables to a home position after the robot completes a cycle. The system includes mounting plates and brackets, protection links, and a pre-engineered fiber-rod assembly. It is a modular, compact system, but with only one piece to install for complete end-ofarm tooling guidance. The lightweight plastic 3D robotic cable management system is made up of one-piece links that require no additional items such as steel cables or spring mechanisms for support. Triflex R is highly flexible due to its ball-and-socket design, enabling movements in all axes. Its small bending radii and short pitch make it an ideal space saving installation. The modular design also simplifies maintenance; individual links can be replaced as needed, reducing costs; and cables are easily accessed, saving time. Made up of injection-molded components, Triflex R requires minimal assembly effort; the links simply snap together. Specially designed mounting brackets allow the system to attach to the machine easily, whether needed at the ends of the cable system, or in between. According to Don Nester, robotic cable carriers like Triflex R offer one distinct advantage over other methods: their movement. [It s] twisting the assembly, [It s] twisting the whole cable bundle when the sixth axis rotates, allowing the cables to be twisted without kinking, he clarified. Other solutions in the market, such as the tube-style solutions, aren t capable of that type of rotation. Making the change from corrugated tubing or unprotected cables to a 3-dimensional robotic cable carrier may seem like an unnecessary and complicated task, but experts in the field agree that proper cables and cable management can make or break a robotic system. While the initial savings may sway a potential customer away from purchasing robotic cables and a suitable carrier, costly repairs and loss of productivity from unplanned machine downtime could convince even the most tentative of engineers and designers. These new, specifically designed systems can make maintaining six-axis robots a much simpler task. It s a system that reduces maintenance, Nester finalized. It s easy to install, simple to maintain, and it works. Tested in the igus labs in Cologne, Germany, Chainflex CF-Robot cables and TriflexR cable carriers have been proven to reliably work in six-axis robotic applications. The test is conducted with a fixed point of 3.2 ft (1 m) and torsion of ±180º for a minimum of 3 million cycles. A second test is conducted at 8.2 ft (2.5 m) with a ±270º torsion field. These tests duplicate the force imparted in cables installed in the field. Combined, the CF-Robot cables and TriflexR cable carriers create a system that will perform throughout the life of the robot. Igus Inc. www.igus.com