Power and Water Corporation Report for Bathymetric and Benthic Survey of the Proposed East Point Outfall



Similar documents
Beacon to Beacon Northern & Southern Maps

The Map Grid of Australia 1994 A Simplified Computational Manual

EPSG. Coordinate Reference System Definition - Recommended Practice. Guidance Note Number 5

HYDROGRAPHIC DEPARTMENT MARITIME AND PORT AUTHORITY OF SINGAPORE (MPA) (Version: July 2015)

Geomatics Guidance Note 3

量 說 Explanatory Notes on Geodetic Datums in Hong Kong

Earth Coordinates & Grid Coordinate Systems

Information Not Collected and Retained

Implementation Plan for Local Government Capacity Building Project - Northern Territory

Banana Shire Council Charges Resolution (No.1) 2015

Wire Transfer Agreement

RP Data Housing market update. October 2014

RP Data chart pack. October 2014

House price report. September quarter Dr Andrew Wilson Senior Economist for the Domain Group

WGS AGD GDA: Selecting the correct datum, coordinate system and projection for north Australian applications

Managing the risk of falls while working on roofs in housing construction

Australian Hydrographic Service Charting the Australian waters near and far

Gravir Outer, Isle of Lewis Site and Hydrographic survey report

Application for Digital Radio Multiplex Transmitter apparatus licence(s) Form R058 (In accordance with section 99 of the Radiocommunications Act 1992)

Definitions. Broker means Veda Advantage Information Systems and Solutions Limited;

Flooding in Brisbane

Product 4 (Detailed Flood Risk) for: Sam Murray (Amey) Site: Land at Kingsnorth Reference: KSL KR79 Date: 30 th November 2015.

DECLARATION OF PERFORMANCE NO. HU-DOP_TD-25_001

GEOGRAPHIC INFORMATION SYSTEMS CERTIFICATION

Mr & Mrs Clarke Proposed Development at The River House, Balderstone Flood Risk Assessment

Aquaculture Monitoring Standard

Standard requirements for LEP GIS data. November 2008 Version 1.1

BB CONSTRAINTS MAPPING

Implementing Marine SDI Through Capacity Building

New Technologies and Airborne LiDAR Bathymetry survey Techniques in European Environmental Coastal Mapping Projects

Removal of Wrecks Directive 2015

The OHTO s Booking System, Term & Restrictions

ATCO Gas Australia Commercial Gas Connection Request (CGR) Terms and Conditions Version Jan2015

HotLok Pass Through Blanking Panel

Hydrographic Survey of the Keith Lake-Salt Bayou System

Application to access Chesters Trade

ANNEX 5 RESOLUTION MEPC.127(53) Adopted on 22 July 2005 GUIDELINES FOR BALLAST WATER MANAGEMENT AND DEVELOPMENT OF BALLAST WATER MANAGEMENT PLANS (G4)

Evolving a new Geodetic Positioning Framework: An Australian Perspective

WHAT YOU NEED TO USE THE STATE PLANE COORDINATE SYSTEMS

General Booking Terms & Conditions

COOK STRAIT SUBMARINE CABLE PROTECTION ZONE

COMPLIANCE FRAMEWORK AND REPORTING GUIDELINES

MSDI: Workflows, Software and Related Data Standards

PLOTTING SURVEYING DATA IN GOOGLE EARTH

Application Note Gemalto Access Client for windows smart card and EFS on Microsoft Windows Vista

AN AES encryption and decryption software on LPC microcontrollers. Document information

BEACH NOURISHMENT COMBINED WITH SIC VERTICAL DRAIN IN MALAYSIA.

Our global technology. Your advantage. Telegraphic Transfers. Product Disclosure Statement Issued 2 June 2008

Tidal Correction Using GPS Determination of the Chart Datum. October 9, FIG Congress 2006

Annex IV of MARPOL 73/78. Regulations for the Prevention of Pollution by Sewage from Ships

Planning for sea level rise. Assessing development in areas prone to tidal inundation from sea level rise in the Port Phillip and Westernport Region

MUNICIPAL ENGINEERING RESIDENTIAL SUBDIVISON STANDARDS

Domain House Price Report June Quarter 2015

Level. Two-handed striking

September October 2015 Re-Classification Line. Frames 1-13 (Maps ID: 2015 MSP 09/15) What does this data set describe?

Parking Management Services Phase 1 - Invitation to Express Interest

AGM Presentation. 24 June 2013

Northern Territory International Women s Day Vocational Education and Training Study Grants 2014

California Solar Initiative (CSI) Program 2007 Reservation Request Form and Program Contract [follows the second page Reservation Request form]

SafeNet Cisco AnyConnect Client. Configuration Guide

Sample Customer Reports

DODO WEB HOSTING TERMS OF SERVICE

Rail Contractors Liability Insurance

TEXTURA AUSTRALASIA PTY LTD ACN ( Textura ) CONSTRUCTION PAYMENT MANAGEMENT SYSTEM TERMS AND CONDITIONS OF USE

HV Submarine Cable Systems Design, Testing and Installation

GCCC - Copy Only. Root Structure of a tree in normal growing conditions. Arbor Master Tree Services 2012 Page 12 of 16

The changing role of gas transmission organisations

CROSS BORDER HOUSING: TERMS AND CONDITIONS. Last Updated Date: May 31st

GCalc 2.1. GDA94 Datum Transformation DLL Technical Specification

Information Security Policy

REGULATORY ACCOUNTS FOR THE YEAR ENDED 30 JUNE 2004

DailyGrain Online Grain Trading Platform User Agreement

BlackBerry Enterprise Server Express for IBM Domino. October 7, 2014 Version: 5.0 Service Pack: 4. Compatibility Matrix

MarketPlace Leichhardt VIP Cashback Card and Loyalty Program Terms and Conditions Issued 5 December 2013

American Express. Credit Card Conditions, Financial Services Guide and Credit Guide. December 2010 AU027108E

DEPARTMENT OF TRANSPORT AND MAIN ROADS BRIEF FOR DECISION

Practical Aspects of Applying the Mandatory Compensation for Payment Recovery Costs Legal newsletter

SPECIAL CONDITIONS PART A SPECIFIC CONDITIONS OF CONTRACT

Invitation to Express Interest CABLE BRIDGES STADIUMS

Stock Pond (Highgate No. 6) FINAL ANNUAL STATEMENT BY SUPERVISING ENGINEER RESERVOIR NOT SUBJECT TO THE RESERVOIRS ACT 1975.

BULLETIN. The Senior Statutory Auditor under the United Kingdom Companies Act April /6

Red Sky Desktop Software. Freeware License Agreement

1.1 The primary function of the ECDIS is to contribute to safe navigation.

Using the RS232 serial evaluation boards on a USB port

NAB CONNECT MERCHANT TRANSACTION REPORTING SERVICE

EOPTION ELECTRONIC ACCESS AND TRADING AGREEMENT

Home Owners (Owner Builder) Warranty Inspection Agreement

Flood Risk Assessment. For Application at: Brick House Farm Brick House Lane Hambleton Lancashire FY6 9BG

Installing Your MS Access Database (Manual Installation Instructions)

PARTICIPATION AGREEMENT. GlobalDairyTrade operates the Trading Platform known as GlobalDairyTrade to facilitate sales of certain dairy Products.

MAP READING AND NAVIGATION

Appendix B4. London City Airport CADP Addendum to the Energy and Low Carbon Strategy. Architect drawings showing PV panels [ 27 Drawings]

SafeNet Authentication Service

Asbestos Disposal in the Northern Territory

Environmental guidelines for preparation of an Environment Management Plan

The New South Wales Prize System

EXPRESSION OF INTEREST DESIGN, DOCUMENTATION AND PROJECT MANAGEMENT UNIT COMPLEX - LOT 8955 PALMERSTON

Housing Market Overview Prepared for CitiBank. January 2014

3M Serial Attached SCSI (SAS) Connector Boardmount Compliant Pin and Surface Mount, Vertical Receptacle

INTERNATIONAL BANK OF CHICAGO

Transcription:

Power and Water Corporation Report for Bathymetric and Benthic Survey of the Proposed East Point Outfall Part Two Bathymetric Report January 2009 Photo: East Point at high tide

Contents 1. Hydrosurvey Australia Bathymetric Report 1 Appendices A Maps 43/21461/27908 Bathymetric and Benthic Survey of the Proposed East Point Outfall Part Two Bathymetric Report

1. Hydrosurvey Australia Bathymetric Report 43/21461/27908 Bathymetric and Benthic Survey of the Proposed East Point Outfall Part Two Bathymetric Report 1

Appendix A Maps Map 1, East Point Outfall Study Area (B08-1731) Map 2, East Point Bathymetric Study Area Map 3, Larrakeyah Outfall Study Area Map 4, East Point (FP1679) Map 5, East Point (FP1678) Map 6, Larrakeyah (FP1681) Map 7, Larrakeyah (FP1680) Map 8, East Point Study Area and Proposed Pipeline Alignment 43/21461/27908 Bathymetric and Benthic Survey of the Proposed East Point Outfall Part Two Bathymetric Report

X=695533 Y=8630896 X=695700 Y=8630771 500 0m 500 1,000 1,500 2,000m LEGEND SCALE 1:20,000 (A3 SHEET) 5 X=695184 Y=8629410 0 1-6 WATER DEPTHS AT LOWEST ASTRONOMICAL TIDE HEIGHTS IN METRES AND DECIMETRES (MEAN SEA LEVEL IS 4.1m ABOVE THIS DATUM) UNDERLINED HEIGHTS ARE DRYING HEIGHTS ABOVE LOWEST TIDE EXISTING OUTFALL DISCHARGE LOCATION PREVIOUSLY MODELLED OUTFALL LOCATIONS EAST POINT AQUATIC LIFE RESERVE EXISTING OUTFALL MAIN BATHYMETRIC SURVEY AREA 6 3 2 1 0 X=698631 Y=8628579 BENTHIC HABITAT SURVEY AREA X=694506 Y=8628185 X=698482 Y=8628231 X=698371 Y=8627869 4 DES DRN CKD T.DURLING R.INNES - EAST POINT SEWAGE OUTFALL AUGMENTATION INVESTIGATIONS 2 AREA OF INVESTIGATION AMENDED. RGI SEP 08...... 1 AREA of INVESTIGATION AMENDED AJC March 08 JF TD NO DESCRIPTION DRN DATE CKD APPD AMENDMENTS NORTHERN TERRITORY APPD SCALE ISSUED T.DURLING 1:20,000 FEB 08 ALL DIM. IN mm A3 DRAFTING STANDARD TO A.S.1100 PLAN OF OPTIONS (PORT MAP) DRAWING NUMBER B08-1731 CAD PRODUCT - DO NOT AMEND MANUALLY 2 AMDT

8,631,000 692,000 693,000 694,000 695,000 696,000 697,000 698,000 699,000 700,000 701,000 8,631,000 Additional Bathymetric Survey Area 8,630,000! Darwin 8,630,000 5 Bathymetric Survey Area 8,629,000 6 3 Proposed Pipeline Alignment 2 1 0 4 8,626,000 8,626,000 8,627,000 8,629,000 8,627,000 8,628,000 8,628,000 East Point Reserve East Point Marine Reserve 692,000 693,000 694,000 695,000 696,000 697,000 698,000 699,000 700,000 701,000 1:35,000 (at A4) 0 150 300 600 900 1,200 Metres Map Projection: Transverse Mercator Horizontal Datum: Geocentric Datum of Australia (GDA) Grid: Map Grid of Australia 1994, Zone 52 o LEGEND Potential Outfall Locations Proposed Pipeline Alignment Bathymetric Survey Area East Point Marine Reserve Power and Water Corporation Job Number 43 21461 Proposed East Point Outfall, Bathymetic and Benthic Survey Revision A Date 02 FEB 2009 The East Point Bathymetric Study Area Map 2 Appendix A G:\43\21461\CADD\GIS\PROJECTS\FINAL\PART_2\Map2_Appendix_A_Bathymetric_Study_Area.mxd Level 5, 66 Smith Street Darwin NT 0800 T 61 8 8982 0100 F 61 8 8981 1075 E W www.ghd.com.au 2009. While GHD has taken care to ensure the accuracy of this product, GHD, Power and Water Corporation, Northern Territory Government and Google Earth Pro make no representations or warranties about its accuracy, completeness or suitability for any particular purpose. GHD, Power and Water Corporation, Northern Territory Government and Google Earth Pro cannot accept liability of any kind (whether in contract, tort or otherwise) for any expenses, losses, damages and/or costs (including indirect or consequential damage) which are or may be incurred as a result of the product being inaccurate, incomplete or unsuitable in any way and for any reason. Data source: Bathymetric Survey Area Data from Power and Water Corporation, Northern Territory Coastline data, Cadastre and Roads Data from Northern Territory Government, Reserve Data from GHD, Imagery Obtained from Google Earth Pro, WARNING Google Earth Imagery is not Orthorectified Created by: sdwoodger

250 0m 250 500 750 1,000m LEGEND SCALE 1:10,000 (A3 SHEET) WATER DEPTHS AT LOWEST ASTRONOMICAL TIDE HEIGHTS IN METRES AND DECIMETRES (MEAN SEA LEVEL IS 4.1m ABOVE THIS DATUM) UNDERLINED HEIGHTS ARE DRYING HEIGHTS ABOVE LOWEST TIDE EXISTING OUTFALL MAIN LARRAKEYAH MACERATOR BATHYMETRIC SURVEY AREA DARWIN CITY X=698725 Y=8621150 X=698925 Y=8621150 X=698725 Y=8620950 X=698825 Y=8621050 X=698925 Y=8620950 LARRAKEYAH OUTFALL DES DRN CKD APPD SCALE T.DURLING R.INNES...... 1:10,000 LARRAKEYAH SEWAGE OUTFALL PLAN WITH PORT MAP FOR BATHYMETRIC SURVEY.................. NO DESCRIPTION DRN DATE CKD APPD NORTHERN TERRITORY ISSUED OCT 08 ALL DIM. IN mm A3 DRAWING NUMBER B08-6946 B AMENDMENTS DRAFTING STANDARD TO A.S.1100 CAD PRODUCT - DO NOT AMEND MANUALLY AMDT

8,631,000 692,000 693,000 694,000 695,000 696,000 697,000 698,000 699,000 700,000 701,000 8,631,000 Additional Bathymetric Survey Area 8,630,000! Darwin 8,630,000 5 Bathymetric Survey Area 8,629,000 6 3 Proposed Pipeline Alignment 2 1 0 4 8,626,000 8,626,000 8,627,000 8,629,000 8,627,000 8,628,000 8,628,000 East Point Reserve East Point Marine Reserve 692,000 693,000 694,000 695,000 696,000 697,000 698,000 699,000 700,000 701,000 1:35,000 (at A4) 0 150 300 600 900 1,200 Metres Map Projection: Transverse Mercator Horizontal Datum: Geocentric Datum of Australia (GDA) Grid: Map Grid of Australia 1994, Zone 52 o LEGEND Potential Outfall Locations Proposed Pipeline Alignment Bathymetric Survey Area East Point Marine Reserve Power and Water Corporation Job Number 43 21461 Proposed East Point Outfall, Bathymetic and Benthic Survey Revision A Date 02 FEB 2009 East Point Study Area and Proposed Pipeline Alignment Map 8 Appendix A G:\43\21461\CADD\GIS\PROJECTS\FINAL\PART_2\Map2_Appendix_A_Bathymetric_Study_Area.mxd Level 5, 66 Smith Street Darwin NT 0800 T 61 8 8982 0100 F 61 8 8981 1075 E W www.ghd.com.au 2009. While GHD has taken care to ensure the accuracy of this product, GHD, Power and Water Corporation, Northern Territory Government and Google Earth Pro make no representations or warranties about its accuracy, completeness or suitability for any particular purpose. GHD, Power and Water Corporation, Northern Territory Government and Google Earth Pro cannot accept liability of any kind (whether in contract, tort or otherwise) for any expenses, losses, damages and/or costs (including indirect or consequential damage) which are or may be incurred as a result of the product being inaccurate, incomplete or unsuitable in any way and for any reason. Data source: Bathymetric Survey Area Data from PowerWater Corporation, Northern Territory Coastline data, Cadastre and Roads Data from Northern Territory Government, Reserve Data and Proposed pipeline from GHD, Imagery Obtained from Google Earth Pro, WARNING Google Earth Imagery is not Orthorectified Created by: sdwoodger

GHD Level 5, 66 Smith Street Darwin NT 0800 GPO Box 351 Darwin NT 0801 T: (08) 8982 0100 F: (08) 8981 1075 E: drwmail@ghd.com.au GHD 2009 This document is and shall remain the property of GHD. The document may only be used for the purpose for which it was commissioned and in accordance with the Terms of Engagement for the commission. Unauthorised use of this document in any form whatsoever is prohibited. Document Status Rev No. Author 1 HyrdoSurvey Australia Reviewer Approved for Issue Name Signature Name Signature Date K Rope W Freeland 03.02.2009 43/21461/27908 Bathymetric and Benthic Survey of the Proposed East Point Outfall Part Two Bathymetric Report