1 EXPRESSION OF INTEREST DESIGN, DOCUMENTATION AND PROJECT MANAGEMENT UNIT COMPLEX - LOT 8955 PALMERSTON 1

2 Context The City of Palmerston (CoP) is the owner of 5 Birripa Court (allotment 8955) Rosebery, Palmerston. Lot 8955 is zoned multiple dwelling and CoP intends to develop a 15 unit residential complex on the site. CoP has initially worked with a consultant to develop the initial design concepts and has received consent from the Development Consent Authority for the development. CoP has entered into an agreement with the NT Department of Housing (NTDH) to lease the residential unit complex to the Chief Executive Officer (Housing) under the Real Housing for Growth initiative. Scope of services CoP is calling for expressions of interest (EOI) from suitably qualified architects and / or project management consultants to project manage the design, documentation and construction of a 15 unit complex to be developed at lot 8955 Palmerston. Through the EOI process, a lead architect / project manager (the consulting project manager) will be selected and engaged. The consulting project manager will have responsibility to fully design and document the project (including the engagement of sub-consultants as required) and to project manage the construction, including the tendering process and contract administration associated with construction. CoP will consider expressions of interest from suitably qualified lead architects and / or project managers to manage all phases of the project including detailed design which may be sub-contracted. The scope of services is detailed in the Project Brief. Expression of Interest Consultants are requested to consider the attached project brief and submit their EOI to the City of Palmerston. EOIs must include: Return brief outlining how the consulting project manager would intend to carry out the project including administration of the construction contract Contact details for the consulting project manager and the consulting project manager s representative Proposed members of design team including sub-consultants and an outline of members qualifications and experience Proposed form of consultancy/project management contract (for example AS ) Details of applicable insurances including professional indemnity and public liability An indicative project timeline confirming that the design, documentation and construction can be delivered within the specified timeframe Indicative lump sum price for all project management, design, documentation and associated activities including disbursements, up to but not including, issuing a request for tender for construction of the unit complex Percentage rate (or alternative fee proposal) for project management of the tendering process and construction, including contract administration Statement of current commitments 2

3 Assessment of EOI Selection of the successful EOI will be based on but not limited to, assessment against the following criteria: Submission of all required information value for money support for local business and industry open and effective competition Consultant s technical, financial and managerial capacity, including administration of the construction contract Consultant s previous experience Consultant s current commitments Submission of EOI EOI s are to be submitted electronically in pdf format by to: palmerston@palmerston.nt.gov.au Closing time and date EOI s must be received no later than 1400 on the 20 th February 2014 Site inspection A formal site inspection is not required as part of the EOI process, however Lot 8955 is a vacant, unfenced allotment and prospective consultants are encouraged to inspect the site prior to submitting an EOI. Contract to be negotiated Following consideration of the submitted proposals, the City of Palmerston will select a consulting project manager and subsequently negotiate a finalised scope of work, agreed price and conditions of contract. The City of Palmerston is not bound to proceed to contract. Enquiries Any enquiries regarding the EOI should be directed to: Gary Boyle Major Projects Officer City of Palmerston PO Box 1, Palmerston NT 0831 Australia P F M gary.boyle@palmerston.nt.gov.au 3

4 PROJECT BRIEF DEVELOPMENT OF UNIT COMPLEX 5 BIRRIPA COURT ROSEBERY Project Brief: Development of unit complex 5 Birripa Court Rosebery 1

5 Project Name: Project Location: Development of 15 Unit Complex 5 Birripa Court Rosebery Work Order: 405 Client: Client Representative: City of Palmerston Gary Boyle Brief Prepared by: Gary Boyle Major Projects Officer Date: 29 January 2014 Brief Approved by: Signed: Date: February 2014 Project Brief: Development of unit complex 5 Birripa Court Rosebery 2

6 1. Project Context Under the Real Housing for Growth head leasing initiative, the Northern Territory Government will head lease privately owned dwellings, developed on either privately owned land or nominated Territory owned sites, for a 10 year period. The Northern Territory Government will then rent the dwellings to eligible key workers at 30% below market rent. The City of Palmerston (CoP) is the owner of 5 Birripa Court (allotment 8955) Rosebery, Palmerston. CoP has entered into an agreement with the NT Department of Housing (NTDH) to develop a residential unit complex at 5 Birripa Court under the Real Housing for Growth initiative. 2. Project Overview CoP has initially worked with its consultant to develop the initial design concepts and the proposal submitted to NTDH. Under the CoP NTDH agreement, CoP will develop and own the unit complex and will head-lease the entire complex to NTDH for 10 years. The proposed development (Attachment A) includes: 15 units o 7 x 2 bedroom 1 storey villas o 8 x 3 bedroom 2 storey townhouses Carparking o 30 x resident car park bays Facilities o Waste storage area o Community garden o Recreation green zone 3. CoP Intent It is CoP s intent that through an expression of interest process, a lead architect / project manager (the consulting project manager) will be selected and engaged with responsibility to fully design and document the project (including the engagement of sub-consultants as required) and to project manage the construction, including the tendering process and contract administration associated with construction. The detailed design will meet the minimum dwelling specifications and fit out as documented in the Outline Specification for General Construction - low density as required by NTDH (Attachment B). CoP do not intend to strata title the unit complex at this time, however the building/s will be designed, constructed and serviced in a manner that will support the future strata titling of the unit complex. Project Brief: Development of unit complex 5 Birripa Court Rosebery 3

7 4. Project Governance 4.1 Client The client is the City of Palmerston (CoP) who will finance the design and construction of the development and who will own the completed unit complex. 4.2 Project Sponsor The project sponsor is the Chief Executive Officer, City of Palmerston 4.3 Project Director The project director is the Major Projects Officer with responsibility for obtaining key decisions from CoP, communications and liaison with stakeholders. 4.4 Consulting Project Manager lead consultant The project manager is the lead consultant with responsibility for liaison with service authorities, the performance of the design team and construction outcomes. Specifically the consulting project manager role includes: Work in conjunction with the Project Director to ensure the project objectives are achieved Liaison with sub-consultants, suppliers, and contractors as required Prepare, manage and review the project management plan In conjunction with the Project Director manage: o project risk o project scope, constraints and scope creep o project variations and maintain the scope change control process o project costs through cost estimating, budget control and monitoring o quality assurance o project schedule o project administration including document control and records Prepare progress and status reports for the client 4.5 Project Team The project team is lead and managed by the Consulting Project Manager and is responsible for the design and construction of the unit complex. The project team is expected to consist of: Design Phase Project Director Consulting Project Manager Design architect Sub-consultants engaged by the lead consultant including: o Surveyor o Engineer Project Brief: Development of unit complex 5 Birripa Court Rosebery 4

8 o o o Geotechnical Landscape architect Quantity Surveyor Construction Phase Project Director Consulting Project Manager Design architect Builder engaged by the Consulting Project Manager Cost Control The overall cost control for the project will be the responsibility of CoP supported by the Consulting Project Manager and quantity surveyor (sub-consultant). Primary 4.6 Stakeholders Mayor and elected members Chief Executive Secondary Department of Housing minimum dwelling specification Birripa court Residents Group Project Brief: Development of unit complex 5 Birripa Court Rosebery 5

9 5. Project Location The site of the unit complex to be developed is 5 Birripa Court (allotment 8955) Rosebery, Palmerston as shown on the survey plan (Attachment C) and aerial photograph (Attachment D). 6. Development Consent 5 Birripa Court is currently vacant land and zoned MD - multiple dwelling residential. COP has worked with its consultant to prepare a development application which has received consent from the Development Consent Authority (Attachment E). It should be noted that the DCA consent will require some modification to the original concept shown in Attachment A. The Consulting Project Manager will be responsible for ensuring the development complies with the conditions of the DCA consent while achieving the construction outcome in a cost effective manner. 7. Indicative Budget The indicative total cost for this project including detailed design, all sub-consultancies, construction, fit-out, landscaping and contingency but excluding land is $5M inclusive of GST. 8. Site Details The owner of Lot 8955 Town of Palmerston is the City of Palmerston as shown on the title search (Attachment F). While the title shows registered easements for: Electricity supply Easement to Power and Water Corporation Sewerage Easement to Power and Water Corporation Water supply Easement to Power and Water Corporation Electricity supply Easement to Power and Water Corporation The title does not record the details for the two storm water easements located on lot Lot 8955 is located within the Darwin building control area. 9. Plan of Survey The Survey Plan S2004/218B is shown at Attachment C. The Survey Plan does not show the storm water easements located on lot The approximate position of the storm water easements is shown on the as constructed drawing (Attachment G). An aerial photograph of the site and immediate surrounding area is included at Attachment D). 10. Environment and Heritage Lot 8955 was subdivided as part of the Rosebery subdivision. There are no known registered, or sites of interest relating to environment, heritage or aboriginal significance. Project Brief: Development of unit complex 5 Birripa Court Rosebery 6

10 11. Scope of Commission This commission is for a Consulting Project Manager to design, document and project manage all works to construct the unit complex to be located at 5 Birripa Court, Rosebery. The scope includes but is not limited to: Development of the Client Consultant Agreement for this commission Confirmation of the concept design with CoP Prepare the detailed design including: o Survey o Geotechnical o Building o Engineering o Landscaping o Cost estimate o All drawings, plans and specifications o Service authority approvals as required Engage and manage sub-consultants as required to prepare the detailed design Prepare construction documentation Undertake a project risk analysis and provide report Confirmation of the detailed design with CoP including a design report and cost estimation Engage building certifier and ensure all required permits and approvals are in place Procurement of building contractor including: o Preparation of tender documents o Assessment of tenders in conjunction with COP o Award of construction contract/s on behalf of COP Project management of construction including: o the delivery timeframe o contract administration o cost management o quality assurance Oversight of defects liability period Liaison with service authorities and consent authority as required The scope excludes: Consultation, communication and media interest in relation to the project Project Brief: Development of unit complex 5 Birripa Court Rosebery 7

11 12. Design Review and Approval Detailed design reviews will be held at 30%, 60% and 90% design hold points before submission of the final design and supporting documentation by the Consulting Project Manager to CoP for approval. A detailed cost estimate is to be provided at 30% and 90% design to allow COP to confirm budget and availability of funds. 13. Tendering of Construction Works As a Local Government entity, CoP is required to publicly tender works valued at greater than $100,000. As part of the commission the Consulting Project Manager will: prepare all documentation to support the public tendering of the construction works including tender schedules, the construction contract/s and tender evaluation plan call and receive tenders on behalf of CoP participate in tender assessment with CoP 14. Timing / Key Dates Date Milestone Comment 6 Feb 14 CoP call EOI Design and project manage CoP 20 Feb 14 EOI close CoP 27 Feb 14 Design and project manage consultancy awarded CoP 14 Apr 14 30% design review Includes QS estimates 30 Apr 14 60% design review 14 May 14 90% design review hold point Includes QS estimates 20 May 14 Client Approval to proceed to construction Council meeting 20 May May 14 Submit final design and documentation 7 Jun 14 Call tenders - construction 28 Jun 14 Tenders close hold point 15 July 14 Client Approval to award contract Council meeting 15 July July 14 Construction contract awarded 31 Nov 14 Final defect inspection 24 Dec 14 Practical completion Critical date 24 Dec 15 Completion of defect liability period Milestones (except Council meeting dates and practical completion) are indicative and subject to negotiation with the Consulting Project Manager Practical completion must be achieved by 24 December 2014 Project Brief: Development of unit complex 5 Birripa Court Rosebery 8

12 15. Project Value and Cost Basis of Fees The preliminary estimate of cost, indicates a total project value of around $4.92M, inclusive of GST, all fees, charges and levies but excluding land costs. COP envisage that the cost basis / fee structure for the commission will be: Design phase o Lump sum plus disbursements o Progress payments may be requested following acceptance by COP of design documentation at 30%, 60%, 90% and 100%. Construction phase o Percentage of the cost of works o Consulting Project Manager progress payments aligned to construction progress payments COP will consider proposals for payment of opportunity bonuses arising from delivery of the construction program under the approved cost of works. 16. List of Attachments Attachment A Proposed development 5 Birripa Court, Rosebery Attachment B Department of Housing minimum dwelling specifications Attachment C Survey plan - S2004/218B Attachment D Aerial photograph Attachment E Development Consent Authority - consent Attachment F Title search Attachment G As-constructed drawing - stormwater Project Brief: Development of unit complex 5 Birripa Court Rosebery 9

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36 Survey Plan S2004/218B Viewed at 14:09:36 on 17/09/2013 Page 1 of 1.

37 City of Palmerston Contact Details PO Box 1 Palmerston, NT, 0831 Tel: (08) Fax: (08) palmerston@palmerston.nt.gov.au Disclaimer This map is a representation of the information currently held by the City of Palmerston. While every effort has been made to ensure the accuracy of the product, Council accepts no responsibility for any errors or omissions. Any feedback on omissions or errors would be appreciated.

38

39

40

41

42

43

44 NORTHERN TERRITORY OF AUSTRALIA Record of Administrative Interests and Information Record of Administrative Interests and Information The information contained in this record of Administrative Interests only relates to the below parcel reference. Parcel Reference: Lot Town of Palmerston plan(s) S2004/218B (See section 38 of the Land Title Act) Note: The Record of Administrative Interests and Information is not part of the Land Register and is not guaranteed by the Northern Territory of Australia, and the NT Government accepts no Liability for any omission, misstatement or inaccuracy contained in this statement. Registrar General Government Land Register (none found) Custodian - Registrar General ( ) Current Title CUFT (order 1) Tenure Type ESTATE IN FEE SIMPLE Tenure Status Current Area Under Title 4650 square metres Owners City of Palmerston PO Box 1, Palmerston NT 0831 Easements Electricity supply Easement to Power and Water Corporation Water supply Easement to Power and Water Corporation Sewerage Easement to Power and Water Corporation Scheme Name (none found) Scheme Body Corporate Name (none found) Reserved Name(s) (none found) Printed by 56PAT 17/01/ :11:22 Page 1 of 5

45 Unit Entitlements (none found) Transfers (none found) Tenure Comments (none found) Historic Titles CUFT (order 1) Visit the website Custodian - Surveyor General ( ) Address 5 BIRRIPA CT, ROSEBERY Survey Plan S2004/218B Survey Status Approved Parcel Status CURRENT Parcel Area 4650 square metres Map Reference Code 503 Scale 2500 Sheet Parent Parcels (none found) Parcel Comments (none found) Survey Comments SUBDIVISION OF LOT 7865 Proposed Easements (none found) Municipality PALMERSTON MUNICIPALITY Region DARWIN Custodian - Valuer General ( ) Owner's Last Known Address City of Palmerston, PO Box 1 Palmerston NT 0831 Parcels in Valuation Lot Town of Palmerston Printed by 56PAT 17/01/ :11:22 Page 2 of 5

46 Unimproved Capital Value $900,000 on 01/07/2011 $322,000 on 01/07/2008 $166,000 on 01/07/2005 $102,000 on 01/07/2002 Valuation Improvements (none found) Custodian - Property Purchasing ( ) Acquisitions (none found) Custodian - Building Advisory Service ( ) Building Control Areas BBDAR001 - Building Control Area DARWIN BUILDING AREA Building Permits (none found) Visit the website Custodian - Town Planning and Development Assessment Services ( ) Planning Scheme Zone MD (Multiple Dwelling) Interim Development Control Orders (none found) Planning Notes (none found) Planning Applications File Number PA2013/0761 Type Development Date Received 03/10/2013 Application Purpose 7x2 and 8x3 bedroom multiple dwellings in 1x1 storey building and 2x2 storey buildings. Application Status Current Other Affected Parcels (none found) Printed by 56PAT 17/01/ :11:22 Page 3 of 5

47 Instrument Signed Instrument Number Instrument Issued Not Complete Instrument Status Custodian - Power and Water Corporation ( ) Meters on Parcel Power Water - Electricity Power Water - Water (none found) (none found) For Account balances, contact the Power and Water Corporation. Custodian - Pool Fencing Unit ( ) Swimming Pool/Spa Status (none found) For more information, contact the Pool Fencing Unit ( ). Custodian - Mines and Energy ( ) For information on possible Exploration Licences, contact Mines & Energy or visit the website For information on possible Petroleum Titles, contact Mines & Energy for further details. Custodian - Environment and Heritage ( ) Results of site contamination assessment (none found) For further information contact Environment and Heritage or visit the website Other Interests For Account balances, contact Palmerston City Council Printed by 56PAT 17/01/ :11:22 Page 4 of 5

48 Date Registered: 06/03/2013 Duplicate Certificate as to Title issued? No SEARCH CERTIFICATE Lot 8955 Town of Palmerston from plan(s) S2004/218B Area under title is 4650 square metres Volume 774 Folio 720 Owner: City of Palmerston of PO Box 1, Palmerston NT 0831 Easements: Electricity supply Easement to Power and Water Corporation Sewerage Easement to Power and Water Corporation Water supply Easement to Power and Water Corporation Electricity supply Easement to Power and Water Corporation Registered Date End of Dealings Dealing Number Description Previous title is Volume 681 Folio 743 Page 5 of 5 Searched on 17/01/2014 at 2:11:22 PM by 56PAT

49

Guide to lodging a certified building permit application (form BA1)

Guide to lodging a certified building permit application (form BA1) Guide to lodging a certified building permit application (form BA1) If you lodge an incomplete application to the permit authority, it can be refused and you may lose your fees. These notes are to assist

More information

How To Apply For Land Division In Australia

How To Apply For Land Division In Australia Development Act 1993 GUIDE FOR APPLICANTS Land Division Guide GUIDE FOR APPLICANTS Land Division Guide Planning SA Primary Industries and Resources SA 136 North Terrace Adelaide GPO Box 1815 South Australia

More information

Investa Listed Funds Management Limited ACN 149 175 655 AFSL 401414

Investa Listed Funds Management Limited ACN 149 175 655 AFSL 401414 Investa Listed Funds Management Limited ACN 149 175 655 AFSL 401414 Valuation policy Approved by the Board of Investa Listed Funds Management Limited on 29 June 2011, to be effective from 7 July 2011.

More information

NZIA Agreement for Architects Services AAS 2013 1st Edition Standard Form

NZIA Agreement for Architects Services AAS 2013 1st Edition Standard Form NZIA Agreement for s Services AAS 2013 1st Edition Standard Form Between The Client And The For Project At Location NZIA Agreement for s Services AAS 2013 Contents Part A Contract 3-5 A1 Contract Agreement

More information

DIRECTORATE OF ESTATES & FACILITIES

DIRECTORATE OF ESTATES & FACILITIES DIRECTORATE OF ESTATES & FACILITIES PROCEDURE AND INFORMATION MANUAL EPM PM4 Client Representative (University Project Manager) for Capital Projects Scope of Services Document Originated: April 2006 By:

More information

Home Warranty Insurance Claim Form

Home Warranty Insurance Claim Form Home Warranty Insurance Claim Form General WFI Insurance Limited (ABN 24 000 036 279) trading as Lumley Insurance offers Builders Home Warranty Insurance to owner Builders and Licensed Builders in the

More information

Guide to Subdivision and Land Development

Guide to Subdivision and Land Development Guide to Subdivision and Land Development Fraser Thomas Ltd...... is a consulting company located in Manukau City which has provided Surveying, Engineering, Planning and Resource Management services in

More information

Building in the ACT. A consumer guide to the building process OCTOBER 2014

Building in the ACT. A consumer guide to the building process OCTOBER 2014 Building in the ACT A consumer guide to the building process OCTOBER 2014 Australian Capital Territory, Canberra 2014 This work is copyright. Apart from any use as permitted under the Copyright Act 1968,

More information

Local Government (Finance, Plans and Reporting) Regulation 2010

Local Government (Finance, Plans and Reporting) Regulation 2010 Queensland Local Government (Finance, Plans and Reporting) Regulation 2010 Subordinate Legislation 2010 No. 124 made under the Local Government Act 2009 Contents Page Chapter 1 Preliminary 1 Short title...........................................

More information

HOME INSURANCE ASSESSMENT

HOME INSURANCE ASSESSMENT m pl e HOME INSURANCE ASSESSMENT Sa Street Address, Suburb File. 0000 Date. December 2014 Street Address, Suburb Page 1 of 8 File. 0000 Date. December 2014 Client Name Street Address Suburb HOME INSURANCE

More information

ARCHITECTS, ENGINEERS, SURVEYORS & CONSTRUCTION INDUSTRIES PROFESSIONAL INDEMNITY INSURANCE PROPOSAL FORM

ARCHITECTS, ENGINEERS, SURVEYORS & CONSTRUCTION INDUSTRIES PROFESSIONAL INDEMNITY INSURANCE PROPOSAL FORM Australian Indemnity ARCHITECTS, ENGINEERS, SURVEYORS & CONSTRUCTION INDUSTRIES PROFESSIONAL INDEMNITY INSURANCE PROPOSAL FORM IMPORTANT FACTS RELATING TO THIS PROPOSAL FORM The Purpose of this Proposal

More information

Valuation Report. Property Address: Bristol. Date Inspected: 14 August 2013 CHARTERED SURVEYORS AUCTIONEERS VALUERS ESTATE AGENTS

Valuation Report. Property Address: Bristol. Date Inspected: 14 August 2013 CHARTERED SURVEYORS AUCTIONEERS VALUERS ESTATE AGENTS Valuation Report Property Address: Bristol Prepared for: Mr & Mrs Date Inspected: 14 August 2013 CHARTERED SURVEYORS AUCTIONEERS VALUERS ESTATE AGENTS CONTENTS Part 1 Part 2 Part 3 Part 4 Instructions

More information

Board of Surveying and Spatial Information

Board of Surveying and Spatial Information Board of Surveying and Spatial Information Determinations 1. Surveyor s Assistant 2. Recognised Qualifications 3. General or Immediate Supervision 4. Board Examinations a) Part A Land Surveying Projects

More information

CHANGES TO HOME INSURANCE

CHANGES TO HOME INSURANCE CHANGES TO HOME INSURANCE ESTIMATING REBUILDING COSTS FOR SUM INSURED POLICIES 25 JULY 2013 - PROPERTY INSTITUTE OF NEW ZEALAND WHAT S CHANGING? Home insurance in New Zealand is moving back from unlimited

More information

Land and Business (Sale and Conveyancing) Act 1994

Land and Business (Sale and Conveyancing) Act 1994 Version: 1.1.2014 South Australia Land and Business (Sale and Conveyancing) Act 1994 An Act to regulate the sale of land and businesses and the preparation of conveyancing instruments; and for other purposes.

More information

REAL ESTATE SELLING YOUR HOME

REAL ESTATE SELLING YOUR HOME Introduction Congratulations on the sale of your home. Selling a home is a major decision and we would like to assist you with the legal requirements. In the event that you choose RDM Lawyers, you can

More information

Plan, Build, Enjoy! Everything you need to know about funding a new build or renovation

Plan, Build, Enjoy! Everything you need to know about funding a new build or renovation Plan, Build, Enjoy! Everything you need to know about funding a new build or renovation From foundations to fit out a construction loan can help you get there... Building a brand new home or completing

More information

Your guide to the residential architectural process. A step-by-step guide from Context Architects

Your guide to the residential architectural process. A step-by-step guide from Context Architects Your guide to the residential architectural process A step-by-step guide from Context Architects We know that building a new house or renovating your home can seem daunting and complicated. So we ve produced

More information

Land development manual Section 73 Compliance Certificate application process

Land development manual Section 73 Compliance Certificate application process Land development manual Section 73 Compliance Certificate application process Published by Sydney Water PO Box 399 Parramatta NSW 2124 sydneywater.com.au Copyright 2013 Sydney Water Corporation Sydney

More information

e-news Professional Indemnity Insurance survey Course endorsement South Australian conference South East Queensland conference VALE CONTENTS

e-news Professional Indemnity Insurance survey Course endorsement South Australian conference South East Queensland conference VALE CONTENTS THE LATEST PROPERTY NEWS ISSUE 08-6 August 2008 CONTENTS Professional Indemnity Insurance survey... 1 Course endorsement... 1 South Australian conference... 1 South East Queensland conference... 1 Provisional

More information

LGAGOVA616A Provide property asset management services

LGAGOVA616A Provide property asset management services LGAGOVA616A Provide property asset management services Release 2 LGAGOVA616A Provide property asset management services Modification History LGAGOVA616A Release 2: Layout adjusted. LGAGOVA616A Release

More information

FREQUENTLY ASKED QUESTIONS ABOUT PROPERTY INVESTMENT IN VANUATU (updated January 2012)

FREQUENTLY ASKED QUESTIONS ABOUT PROPERTY INVESTMENT IN VANUATU (updated January 2012) FREQUENTLY ASKED QUESTIONS ABOUT PROPERTY INVESTMENT IN VANUATU (updated January 2012) 1. Q. Can foreigners buy property in Vanuatu? A. Yes. There are no restrictions on foreigners buying property. A non-citizen

More information

CONSTRUCTION PROJECT MANAGER TERMS OF REFERENCE CENTRAL BANK OF LESOTHO PROPOSED EXTENSION BUILDING AND DISASTER RECOVERY SITE CONSTRUCTION PROJECTS

CONSTRUCTION PROJECT MANAGER TERMS OF REFERENCE CENTRAL BANK OF LESOTHO PROPOSED EXTENSION BUILDING AND DISASTER RECOVERY SITE CONSTRUCTION PROJECTS CONSTRUCTION PROJECT MANAGER TERMS OF REFERENCE CENTRAL BANK OF LESOTHO PROPOSED EXTENSION BUILDING AND DISASTER RECOVERY SITE CONSTRUCTION PROJECTS 1. GENERAL PROVISIONS. 1.2 DEFINITIONS Where the words

More information

Professional Indemnity Insurance Proposal Form for Architects

Professional Indemnity Insurance Proposal Form for Architects QPI Professional Specialists in Protecting Professions Professional Indemnity Insurance Proposal Form for Architects IMPORTANT INFORMATION Duty of Disclosure When completing any insurance proposal form

More information

INTERNSHIP TRAINING SCHEME

INTERNSHIP TRAINING SCHEME EAST AFRICA INSTITUTE OF ARCHITECTS INTERNSHIP TRAINING SCHEME (Rules & Guidelines) As Adopted by Council January 26 th 2013 Arusha Tanzania Fee: UGX.2500 KES.85 TZS.1,600 RWF. 650 Table of Contents. Section

More information

in this issue A newsletter from the Consumer Protection Division of the Department of Commerce CPD activities for 2012

in this issue A newsletter from the Consumer Protection Division of the Department of Commerce CPD activities for 2012 No.03 Autumn 2012 settlement news A newsletter from the Consumer Protection Division of the Department of Commerce Are you on track Office for Distribution your CPD? List in this issue New policy to counter

More information

ANNEXURE TO Australian Standard Minor Works Contract Conditions (Superintendent Administered) AS 4905 2002. Part A

ANNEXURE TO Australian Standard Minor Works Contract Conditions (Superintendent Administered) AS 4905 2002. Part A ANNEXURE TO Australian Standard Minor Works Contract Conditions (Superintendent Administered) AS 4905 2002 Part A This Annexure shall be completed and issued as part of tender documents and subject to

More information

1.1 The vendor has no obligation to disclose to you whether there are any physical defects or the state and condition of any of the improvements.

1.1 The vendor has no obligation to disclose to you whether there are any physical defects or the state and condition of any of the improvements. 1. PHYSICAL STATE AND CONDITION OF THE PROPERTY 1.1 The vendor has no obligation to disclose to you whether there are any physical defects or the state and condition of any of the improvements. 1.2 The

More information

Owner Builder permit. Owner builder application. Company application. Lease agreements. Owner builder course. Build better.

Owner Builder permit. Owner builder application. Company application. Lease agreements. Owner builder course. Build better. Build better. Owner Builder permit Under the Queensland Building and Construction Commission Act 1991 you must obtain an Owner Builder permit before carrying out building work with a value of $11,000 or

More information

OWNER BUILDER AS AN WHAT ARE MY RESPONSIBILITIES UNDER THE DEVELOPMENT ACT 1993

OWNER BUILDER AS AN WHAT ARE MY RESPONSIBILITIES UNDER THE DEVELOPMENT ACT 1993 AS AN OWNER BUILDER building work? What records should I keep? Is insurance required? W I need approval for? What do I need approval for? How do I obtain building work? How do I obtain approval? What records

More information

PROPERTY MANAGEMENT AGREEMENT

PROPERTY MANAGEMENT AGREEMENT Harris Real Estate (Rentals) Pty Ltd T/A Level 1 134 Fullarton Road ROSE PARK SA SA 5067 Tel: 08 8334 2700 Fax: 08 8334 2727 email: reception@harrispm.com.au 1/7/2013 / Lawsoft Pty Ltd PROPERTY MANAGEMENT

More information

Code of Practice. for Inspecting and Certifying Buildings and Works. Building Control Regulations 2014

Code of Practice. for Inspecting and Certifying Buildings and Works. Building Control Regulations 2014 for Inspecting and Certifying Buildings and Works Building Control Regulations 2014 February, 2014 Table of Contents 1. Introduction 1 1.1 Status and Purpose of Code 1 1.2 Overview of Code 1 1.3 Application

More information

Stockland "North Lakes Hot Lot" promotion Terms and Conditions

Stockland North Lakes Hot Lot promotion Terms and Conditions Stockland "North Lakes Hot Lot" promotion Terms and Conditions PART A THE PROMOTION 1. In these Terms and Conditions and all advertisements relating to the Stockland North Lakes Hot Lot promotion (Promotion),

More information

The changing environment for multiple dwellings Strata Titles Act Reform: proposed new tenure forms Presentation to Local Government Planners

The changing environment for multiple dwellings Strata Titles Act Reform: proposed new tenure forms Presentation to Local Government Planners The changing environment for multiple dwellings Strata Titles Act Reform: proposed new tenure forms Presentation to Local Government Planners Association 20 November 2014 Steve McFadzean Importance of

More information

PROFESSIONAL INDEMNITY INSURANCE PROPOSAL FORM

PROFESSIONAL INDEMNITY INSURANCE PROPOSAL FORM PROFESSIONAL INDEMNITY INSURANCE PROPOSAL FORM IMPORTANT NOTICES Claims Made Insurance Your professional indemnity policy is issued on a claims made basis. This means that the policy responds to: - 1.

More information

Building Report & Consent

Building Report & Consent 1 Building Report & Consent The material contained in this brochure has been prepared as a guide. No reader should rely on it without seeking their own independent professional advice. June 2011 The Report

More information

Home indemnity insurance

Home indemnity insurance Home indemnity insurance October 2007 What is the law? If residential building work worth over $20,000 is to be undertaken, the law requires that a builder must take out indemnity insurance in the name

More information

Law Society and Council of Mortgage Lenders Approved Certificate of Title

Law Society and Council of Mortgage Lenders Approved Certificate of Title Law Society and Council of Mortgage Lenders Approved Certificate of Title Details box TO: (Lender) Lender's Reference or Account No: The Borrower: Property: Title Number: Mortgage Advance: Price stated

More information

Certificate IV in Property Services (Real Estate) CPP40307. Unit Descriptions & Evidence Required to Demonstrate Competency

Certificate IV in Property Services (Real Estate) CPP40307. Unit Descriptions & Evidence Required to Demonstrate Competency Certificate IV in Property Services (Real Estate) CPP40307 Unit Descriptions & Evidence Required to Demonstrate Competency Agenda Course Description... 3 Pathways Information... 3 Entry Requirements...

More information

THE CORPORATION OF THE CITY OF MISSISSAUGA PLANNING ACT PROCESSING FEES AND CHARGES BY-LAW 288-14 (amended by 20-15)

THE CORPORATION OF THE CITY OF MISSISSAUGA PLANNING ACT PROCESSING FEES AND CHARGES BY-LAW 288-14 (amended by 20-15) THE CORPORATION OF THE CITY OF MISSISSAUGA PLANNING ACT PROCESSING FEES AND CHARGES BY-LAW 288-14 (amended by 20-15) WHEREAS by-laws establishing a tariff of s for the processing of s made in respect of

More information

HOSPITALITY DEVELOPMENT AT WEMBLEY GOLF COURSE BUSINESS PLAN FOR MAJOR LAND TRANSACTION

HOSPITALITY DEVELOPMENT AT WEMBLEY GOLF COURSE BUSINESS PLAN FOR MAJOR LAND TRANSACTION HOSPITALITY DEVELOPMENT AT WEMBLEY GOLF COURSE BUSINESS PLAN FOR MAJOR LAND TRANSACTION 1. Background The Town of Cambridge proposes to undertake further development of Wembley Golf Course with improved

More information

Discussion Paper Strata Titles Act Reform. Tenure

Discussion Paper Strata Titles Act Reform. Tenure Discussion Paper Strata Titles Act Reform DISCLAIMER: this discussion paper has been prepared for the purposes of stakeholder consultation concerning review and reform of legislation relating to strata

More information

A Guide To Your Real Estate Purchase

A Guide To Your Real Estate Purchase A Guide To Your Real Estate Purchase Buying real estate is always an exciting experience but sometimes, it can also be daunting. This information is provided to help your purchase proceed quickly and efficiently.

More information

Choosing your perfect builder

Choosing your perfect builder Choosing your perfect builder Sentinel Homes are experts in their field and understand the pitfalls of buying a section and building a home. Sentinel Homes will assist you in identifying and eliminating

More information

Request for Proposals April 10, 2008 Freshwater Brook Sewer & Water Project Contract Administration & Inspection Page No. 1 TABLE OF CONTENTS

Request for Proposals April 10, 2008 Freshwater Brook Sewer & Water Project Contract Administration & Inspection Page No. 1 TABLE OF CONTENTS REQUEST FOR PROPOSAL Freshwater Brook Sewer and Water Project April 2008 Closing Date: Wednesday, April 23, 2008 Closing Time: 3:00 p.m. (Local Time) Halifax Water 200 Bluewater Road, Suite 201 P.O. Box

More information

Regional Council of Goyder

Regional Council of Goyder Regional Council of Goyder Request for Quotation for the design/supply and installation of a Solar Photovoltaic System to the Eudunda Swimming Pool. RFQ Number 07.2015.15 Tender Closing Time: 3:00pm on

More information

PROGRESS UPDATE. January 2015

PROGRESS UPDATE. January 2015 PROGRESS UPDATE January 2015 DISCLAIMER This presentation document (hereinafter "this document") has been prepared by Green REIT plc (the Company ) and Green Property REIT Ventures Limited ( Green ), the

More information

What you need to know about. Being an owner-builder

What you need to know about. Being an owner-builder What you need to know about Being an owner-builder 2 Many owner-builders gain great satisfaction from undertaking their own building work. What is an owner-builder? An owner-builder is defined as a person

More information

CONTRACT FOR THE APPOINTMENT OF AN APPROVED INSPECTOR

CONTRACT FOR THE APPOINTMENT OF AN APPROVED INSPECTOR CONTRACT FOR THE APPOINTMENT OF AN APPROVED INSPECTOR CIC/AppInsp The Construction Industry Council - Association of Consultant Approved Inspectors contract for the appointment of an approved inspector

More information

REAL ESTATE AGENT / PROPERTY MANAGERS/ VALUER PROFESSIONAL INDEMNITY INSURANCE PROPOSAL FORM

REAL ESTATE AGENT / PROPERTY MANAGERS/ VALUER PROFESSIONAL INDEMNITY INSURANCE PROPOSAL FORM REAL ESTATE AGENT / PROPERTY MANAGERS/ VALUER PROFESSIONAL INDEMNITY INSURANCE PROPOSAL FORM IMPORTANT FACTS RELATING TO THIS PROPOSAL FORM The Purpose of this Proposal Form is to set out all relevant

More information

Appendix 18 NEC3 Options

Appendix 18 NEC3 Options Appendix 18 NEC3 Options December 2007 Page 449 Appendix 18 NEC3 Options NEC3 Main Options There are six main options as set out below. The Contractor carries the greatest risk under options A and B, and

More information

BOARD NOTICE COUNCIL FOR THE BUILT ENVIRONMENT. Notice No... 2011

BOARD NOTICE COUNCIL FOR THE BUILT ENVIRONMENT. Notice No... 2011 BOARD NOTICE COUNCIL FOR THE BUILT ENVIRONMENT Notice No.... 2011 NOTICE IN TERMS OF THE COUNCIL FOR THE BUILT ENVIRONMENT ACT, 2000 (ACT NO. 43 OF 2000) The Council for the Built Environment has under

More information

Invitation to Quote for General Fund Assets Revaluation for Resource Accounting 2015/16-2019/20.

Invitation to Quote for General Fund Assets Revaluation for Resource Accounting 2015/16-2019/20. Invitation to Quote for General Fund Assets Revaluation for Resource Accounting 2015/16-2019/20. Deadline for submission 12 Noon, Friday 18 th December 2015 Kettering Borough Council Municipal Offices

More information

SITING VARIATIONS PART 4 of Building Regulations COVER SHEET SECTION A

SITING VARIATIONS PART 4 of Building Regulations COVER SHEET SECTION A Office use only: (Date Received) Date Paid: Receipt Number: Fee: / / Form current as at 1 July 2015 File Number: APPLICATION FOR REPORT & CONSENT SITING VARIATIONS PART 4 of Building Regulations COVER

More information

UNITED STATES VIRGIN ISLANDS TAX INCREMENT FINANCING PROGRAM

UNITED STATES VIRGIN ISLANDS TAX INCREMENT FINANCING PROGRAM UNITED STATES VIRGIN ISLANDS TAX INCREMENT FINANCING PROGRAM The Virgin Islands Economic Development Authority Application Tax Increment Financing Overview Government Mandate: It is the policy of the Government

More information

A guide to appointing an architect

A guide to appointing an architect A guide to appointing an architect and to being a good client Hurditch Architecture, 24 Botallack, St Just, Penzance, Cornwall, TR19 7EP Page 1 of 7 RIBA Chartered Architects Architects act 1997 In the

More information

GUIDANCE NOTE 1.1.1 Building Control (Amendment) Regulations 2014 Procurement Implications for Contracting Authorities

GUIDANCE NOTE 1.1.1 Building Control (Amendment) Regulations 2014 Procurement Implications for Contracting Authorities GUIDANCE NOTE 1.1.1 Building Control (Amendment) Regulations 2014 Procurement Implications for Contracting Authorities Office of Government Procurement Building Control (Amendment) Regulations 2014 Procurement

More information

Becoming an owner-builder

Becoming an owner-builder Becoming an owner-builder An owner builder is an individual who does owner builder work and holds a permit for that work under the authority of a permit issued by NSW Fair Trading. What is owner-builder

More information

ROYALTIES FOR REGIONS COUNTRY LOCAL GOVERNMENT FUND INDIVIDUAL COUNTRY LOCAL GOVERNMENTS. 2012-13 Guidelines

ROYALTIES FOR REGIONS COUNTRY LOCAL GOVERNMENT FUND INDIVIDUAL COUNTRY LOCAL GOVERNMENTS. 2012-13 Guidelines Background ROYALTIES FOR REGIONS COUNTRY LOCAL GOVERNMENT FUND INDIVIDUAL COUNTRY LOCAL GOVERNMENTS 2012-13 Guidelines The Western Australian Liberal National Government s Royalties for Regions is a commitment

More information

FIRE SAFETY INFORMATION FACT SHEET

FIRE SAFETY INFORMATION FACT SHEET Disclaimers: This information was believed to be correct at the date of its publication. This information is for general information purposes only and should not be relied upon for legal advice. FIRE SAFETY

More information

The Loose Fill Asbestos Insulation Eradication Scheme

The Loose Fill Asbestos Insulation Eradication Scheme Introduction The Loose Fill Asbestos Insulation Eradication Scheme The Eradication Scheme A Guide to the Voluntary Buyback Program The ACT Government s Loose Fill Asbestos Insulation Eradication Scheme

More information

Common Definitions and Glossary of Queensland Government Grants

Common Definitions and Glossary of Queensland Government Grants RPS V6-2013 Part 11 - Planning Scheme Policy 3 - Contributions and Security Bonding - Chapter 4 - Page 17 Chapter 4 - Security Bonding 3.4.1 Purpose (1) To outline the minimum requirements for security

More information

PALMERSTON REGIONAL HOSPITAL PROJECT Status Report to the Commonwealth for the period: June November 2015

PALMERSTON REGIONAL HOSPITAL PROJECT Status Report to the Commonwealth for the period: June November 2015 PALMERSTON REGIONAL HOSPITAL PROJECT Status Report to the Commonwealth for the period: June November 2015 KEY DATES Achievements in the next three months for this project include the completion of excavation

More information

Code of Practice for Agents Undertaking Renovation Grants

Code of Practice for Agents Undertaking Renovation Grants Code of Practice for Agents Undertaking Renovation Grants July 1998 Contents Introduction Page 1 Approved List of Agents Page 1 Procurement Page 2 Approval Page 5 Works in Progress Page 6 Completion Page

More information

PROJECT AGREEMENT FOR THE PLANNING AND DESIGN OF THE COMMON REGISTRY SOLUTIONS

PROJECT AGREEMENT FOR THE PLANNING AND DESIGN OF THE COMMON REGISTRY SOLUTIONS PROJECT AGREEMENT FOR THE PLANNING AND DESIGN OF THE COMMON REGISTRY SOLUTIONS Council of Australian Governments An agreement between the Commonwealth of Australia and the States and Territories, being

More information

qbcc Insurance Policy Conditions Edition 8 1 queensland building and construction commission

qbcc Insurance Policy Conditions Edition 8 1 queensland building and construction commission qbcc queensland building and construction commission Insurance Policy Conditions Edition 8 1 Effective 1 July 2009 Dear Homeowner, These documents are your Home Warranty Insurance Policy and Insurance

More information

ACQUISITION & COMPENSATION

ACQUISITION & COMPENSATION 6 Contents 6.1 Public land acquisition... 3 6.1.1 Who may compulsorily acquire land?... 3 6.1.2 Can the Minister for Planning or a responsible authority compulsorily acquire land?... 3 6.1.3 Government

More information

Block Management Brochure

Block Management Brochure BLOCK MANAGEMENT BROCHURE Block Management Brochure 4 Englands Lane London NW3 4TG T 020 7586 8550 F 020 7586 8582 info@kernahans.net www.kernahans.net YOUR PROPERTY IN SAFE HANDS 4 Englands Lane, London

More information

RE: Benchmark Costs Per Square Metre for School Function Areas

RE: Benchmark Costs Per Square Metre for School Function Areas Ms Penny Freestone ACT Block Grant Authority Inc. National Surveyors House 27-29 Napier Close Deakin ACT 2600 Dear Penny, RE: Benchmark Costs Per Square Metre for School Function Areas As requested, we

More information

ROYAL MALAYSIAN CUSTOMS GOODS AND SERVICES TAX GUIDE ON VALUERS, APPRAISERS AND ESTATE AGENTS

ROYAL MALAYSIAN CUSTOMS GOODS AND SERVICES TAX GUIDE ON VALUERS, APPRAISERS AND ESTATE AGENTS ROYAL MALAYSIAN CUSTOMS GOODS AND SERVICES TAX GUIDE ON VALUERS, APPRAISERS AND ESTATE AGENTS CONTENTS INTRODUCTION... 1 Overview of Goods and Services Tax (GST)... 1 GST AND VALUERS, APPRAISERS AND ESTATE

More information

ARTS PROJECT MANAGEMENT SERVICES REQUEST FOR QUOTATION (RFQ)

ARTS PROJECT MANAGEMENT SERVICES REQUEST FOR QUOTATION (RFQ) ARTS PROJECT MANAGEMENT SERVICES REQUEST FOR QUOTATION (RFQ) The City of Vincent is a Western Australian local authority with a population of approximately 31,000. The City has played a significant role

More information

Practice Note 2014-62

Practice Note 2014-62 Practice Note 2014-62 Documentation Required for Applications for Building Permits Reference to the Building Code of Australia (BCA) in this Practice Note means Volume One and Volume Two of the National

More information

Consulting Services for CORPORATE SPONSORSHIP ASSET INVENTORY & VALUATION

Consulting Services for CORPORATE SPONSORSHIP ASSET INVENTORY & VALUATION REQUEST FOR PROPOSALS RFP No. 14-01-11 Consulting Services for CORPORATE SPONSORSHIP ASSET INVENTORY & VALUATION Proposals will be received on or before 2:00 pm local time Wednesday, February 19, 2014

More information

4 FOREIGN LEASE OWNERS RESIDING OUTSIDE OF

4 FOREIGN LEASE OWNERS RESIDING OUTSIDE OF The Lease Owner s Advisory is a resource provided by the Arizona Association of REALTORS Residential Rentals are required to comply with the Arizona Residential Landlord/Tenant Act: http://www.azhousing.gov/azcms/uploads/publications/landlord%20tenant%20act%20-12-31-12.pdf

More information

Lending guidelines and submission requirements

Lending guidelines and submission requirements Lending guidelines and submission requirements 1 February 2013 Buy-to-let for serious players Submission requirements The following items are required to be submitted on application: For all applications:

More information

ENGAGING A LANDSCAPE CONSULTANT GUIDANCE FOR CLIENTS ON FEES SEPTEMBER 2002

ENGAGING A LANDSCAPE CONSULTANT GUIDANCE FOR CLIENTS ON FEES SEPTEMBER 2002 ENGAGING A LANDSCAPE CONSULTANT GUIDANCE FOR CLIENTS ON FEES SEPTEMBER 2002 The Landscape Institute 33 Great Portland Street London W1W 8QG Tel: +44 (0)20 7299 4500 Fax: +44 (0)20 7299 4501 Email: mail@llandscapeinstitute.org

More information

Info Note BS08 Home Indemnity Insurance (Owners) Updated 07/10

Info Note BS08 Home Indemnity Insurance (Owners) Updated 07/10 info note Info Note BS08 Home Indemnity Insurance (Owners) Updated 07/10 What is Home Indemnity Insurance? Home indemnity insurance protects property owners against financial loss if the builder is unable

More information

[Project Name] NZTA Contract No. [Contract Number] Schedule of Prices

[Project Name] NZTA Contract No. [Contract Number] Schedule of Prices [Project Name] NZTA Contract No. [Contract Number] Schedule of Prices Schedule of Prices SP1

More information

Records Disposal Schedule. NT Fleet Management. Department of Corporate and Information Services. Disposal Schedule No. 2004/2

Records Disposal Schedule. NT Fleet Management. Department of Corporate and Information Services. Disposal Schedule No. 2004/2 DISPOSAL SCHEDULE FOR RECORDS OF THE NT FLEET SEPTEMBER 2003 Records Disposal Schedule NT Fleet Management Department of Corporate and Information Services Disposal Schedule No. 2004/2 June 2004 For information

More information

Home Warranty Insurance eligibility application

Home Warranty Insurance eligibility application Home Warranty Insurance eligibility application Please ensure all questions are completed and the declaration at the end of this form is signed prior to lodgement with your insurance broker. For any assistance

More information

Department of the Environment and Local Government. Project Management. Public Private Partnership Guidance Note 7. 14 April 2000

Department of the Environment and Local Government. Project Management. Public Private Partnership Guidance Note 7. 14 April 2000 Project Management Project Management Public Private Partnership Guidance Note 7 14 April 2000 Guidance Note 7 14 April 2000 Project Management Contents Section Page I INTRODUCTION...1 SCOPE AND PURPOSE

More information

QBE BUILDERS WARRANTY. Residential Builders Warranty INSURANCE CLAIM FORM CLAIM FORM

QBE BUILDERS WARRANTY. Residential Builders Warranty INSURANCE CLAIM FORM CLAIM FORM QBE BUILDERS WARRANTY Residential Builders Warranty INSURANCE CLAIM FORM CLAIM FORM Residential Builders Warranty Insurance Claim Form PRIVACY STATEMENT We are committed to safeguarding your privacy and

More information

Schedule of Prices. Project Name Contract No. Contract Number

Schedule of Prices. Project Name Contract No. Contract Number Schedule of Prices Project Name Contract No. Contract Number C3-LS-BP-Issue 2 SP Page 1 Printed 1 March 2011 >: 1. When preparing the schedule

More information

Architects and Engineers Professional Liability Proposal Form

Architects and Engineers Professional Liability Proposal Form Notice:Statement pursuant to Section 25(5) of the Insurance Act (Cap 142) or any amendments thereof; You are to disclose in this application, fully and faithfully, all the facts which you know or ought

More information

The Role of Building Construction Project Team Members In Building Projects Delivery

The Role of Building Construction Project Team Members In Building Projects Delivery IOSR Journal of Business and Management (IOSR-JBM) e-issn: 2278-487X, p-issn: 2319-7668. Volume 14, Issue 1 (Sep. - Oct. 2013), PP 30-34 The Role of Building Construction Project Team Members In Building

More information

Sample: Request for Proposals District Official Community Plan. Request for Proposal. Elm Planning District

Sample: Request for Proposals District Official Community Plan. Request for Proposal. Elm Planning District Sample: Request for Proposals District Official Community Plan Request for Proposal For professional community planning services to the Elm Planning District, including, but not limited to, the preparation

More information

QBE BUILDERS WARRANTY. Residential Builders Warranty INSURANCE PROPOSAL. Eligibility Application PROPOSAL

QBE BUILDERS WARRANTY. Residential Builders Warranty INSURANCE PROPOSAL. Eligibility Application PROPOSAL QBE BUILDERS WARRANTY Residential Builders Warranty INSURANCE PROPOSAL Eligibility Application PROPOSAL Residential Builders Warranty Insurance Eligibility Application Insurance Coverage Residential Builders

More information

Professional Indemnity Insurance Proposal Form for Engineers and Construction Professionals

Professional Indemnity Insurance Proposal Form for Engineers and Construction Professionals Professional Indemnity Insurance Proposal Form for Engineers and Construction Professionals Answer all questions. Blanks &/or dashes, or answers known to underwriters or brokers or N/A are not acceptable

More information

Section 5 Home Purchase. Section 5: Home purchase. Assistance for Homebuyers

Section 5 Home Purchase. Section 5: Home purchase. Assistance for Homebuyers Section 5 Home Purchase Section 5: Home purchase Buying a home is one of the biggest expenditure items a person can make in their entire lifetime. Before making such an important decision, there are several

More information

Words to Know When Buying a Home

Words to Know When Buying a Home Words to Know When Buying a Home Adjustable mortgage interest rate: With an adjustable rate, both the interest rate and the mortgage payment vary, based on market conditions. Amortization: Length of time

More information

Term Sheet for Lease in Cambridge, Massachusetts

Term Sheet for Lease in Cambridge, Massachusetts 1/22/15 Term Sheet for Lease in Cambridge, Massachusetts D A T E D A S O F : J A N U A R Y X X, 2015 PREAMBLE: Landlord and Tenant (each as defined below) hereby enter this Term Sheet (this Term Sheet

More information

Government of Western Australia Department of Commerce Consumer Protection. Buying land or property off-the-plan

Government of Western Australia Department of Commerce Consumer Protection. Buying land or property off-the-plan Government of Western Australia Department of Commerce Consumer Protection Buying land or property off-the-plan April 2014 BUYING LAND OR PROPERTY OFF-THE-PLAN April 2014 This brochure contains general

More information

Royalties for the Regions Floodplain Security Scheme Business Case

Royalties for the Regions Floodplain Security Scheme Business Case Royalties for the Regions Floodplain Security Scheme Business Case Version 3 October 2012 The Royalties for the Regions program is delivered through the Department of State Development, Infrastructure

More information

Section 6356, Hundred of Bagot Development Application

Section 6356, Hundred of Bagot Development Application . INTRODUCTION Section 6356, Hundred of Bagot Development Application Section 6356 is located in Mighall Place, Holtze. The property is owned by a local company, Mighall Investments Pty Ltd. The property

More information

PROFESSIONAL SERVICES

PROFESSIONAL SERVICES ROYAL MALAYSIAN CUSTOMS GOODS AND SERVICES TAX GUIDE ON PROFESSIONAL SERVICES CONTENTS INTRODUCTION... 1 Overview of Goods and Services Tax... 1 PROFESSIONAL SERVICES... 1 FREQUENTLY ASKED QUESTIONS...

More information

SITING VARIATIONS PART 4 of Building Regulations COVER SHEET SECTION A

SITING VARIATIONS PART 4 of Building Regulations COVER SHEET SECTION A Office use only: (Date Received) Date Paid: Receipt Number: Fee: / / Form current as at 1 July 2015 File Number: APPLICATION FOR REPORT & CONSENT SITING VARIATIONS PART 4 of Building Regulations COVER

More information

Preparing a Green Wedge Management Plan

Preparing a Green Wedge Management Plan Preparing a Green Wedge Management Plan Planning Practice Note 31 JUNE 2015 This practice note provides a guide for the preparation of Green Wedge Management Plans and sets out the general requirements

More information

BUILDING PERMIT APPLICATION FOR NON-COMPLEX BUILDINGS

BUILDING PERMIT APPLICATION FOR NON-COMPLEX BUILDINGS BUILDING PERMIT APPLICATION FOR NON-COMPLEX BUILDINGS NON-REFUNDABLE APPLICATION FEE $ NON-COMPLEX BUILDING AS DEFINED BY BYLAW NO. 4900 A building of three storeys or less in building height, having a

More information

Common Documents Filed in Land Transactions

Common Documents Filed in Land Transactions Common Documents Filed in Land Transactions The statutory conveyancing FORMS A to E came into effect on April 1st, 1990. October 2009 The - General Instrument replaced the - General Document on May 1st

More information

APPLICATION FOR MULTIPLE DWELLING PROJECTS

APPLICATION FOR MULTIPLE DWELLING PROJECTS APPLICATION FOR MULTIPLE DWELLING PROJECTS Please ensure all questions are completed and the declaration at the end of this form is signed prior to lodgement with your insurance broker. For any assistance

More information