BILL OF QUANTITIES FOR CIVIL WORKS FOR 8MW POWER PLANT



Similar documents
BILL OF QUANTITY FOR THE WORK OF "REPAIRING OF CIVIL & PLUMBING WORKS INSIDE AND OUTSIDE OF THE WORKSHOP"

PLUMBING MAINTENANCE WORK FOR TOILETS IN HEAD OFFICE, SUPPLYCO ESTIMATE

After reading this lesson you will be able to: 12.3 IMPORTANCE OF ROOF 12.4 TYPES OF ROOF IN A HOUSE

PRESENTATION ON REPAIR AND REHABILITATION OF BUILDINGS DAMAGED IN EARTHQUAKE. By H P Gupta & D K Gupta

CHAPTER NO. 27 QUANTITIES OF MATERIALS

Chapter. Restoration of Damaged Structures

BOQ for Plumbing, Sanitary Works

LAYING BLOCK AND BRICK

Tender schedule. Rate in

ICRC WORK SPECIFICATIONS IRAQ WATER AND HABITAT

CONTRACT PRICE ADJUSTMENT PROVISIONS (CPAP)

Construction. Pre-Bagged Structural Waterproofing System. Product Description. Product Data. Tests. Form

The minimum reinforcement for the stem wall is the placement of:

Schedule of Quantities

SECTION STORM DRAINAGE SYSTEM

SECTION STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section

SECTION CEMENT-MORTAR LINED AND COATED STEEL PIPE

GENERAL SPECIFICATION FOR CIVIL ENGINEERING WORKS SECTION 13 WORK FOR ELECTRICAL AND MECHANICAL INSTALLATIONS

Project : CONSTRUCTION OF BUILDING(including electrical and plumbing works) FOR NATIONAL CENTRE FOR SUSTAINABLE COASTAL MANAGEMENT,CHENNAI

Sports Buildings: budget costs for the Flood Relief Fund

Issue of the Guidelines on Prevention of Water Seepage in New Buildings

Schlüter -KERDI-BOARD Substrate, structural panel, bonded waterproofing

Revised Specifications & Scale of Amenities for General Pool Residential Accommodation (Type I to VI) Revised Amenities.doc

SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)

A. Contractor shall furnish, to the Engineer, all materials certifications available from the manufacturer for all required materials.

CHAPTER 2 QUANTITY TAKE-OFF

Section 2100-Trenching and Tunneling

If stepping is required, step at 180mm as seen in this picture.

HOUSE BUILDING DIGEST

Seven. Easy Steps. Your Own Walkway, Without Mortar. or Concrete. to Installing. Driveway and Patio

SECTION REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section

Guide to working on Public Sewers

AIR RELEASE, CLEANOUT, AND SEWER MANHOLES

PIPING SYSTEM - ABRASIVE SLURRIES Engineering Standard Specification. 96 B. Riutta

SECTION STORM DRAIN SYSTEM

SECTION 6. Glass Storefront Doors:

SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION

How to build a Pizza Oven in 4 days

STANDARD SPECIFICATIONS SECTION PRECAST REINFORCED CONCRETE MANHOLES AND MANHOLE BASES. 1. Structure Earthwork: 02200

PROJECT TITLE : 2-STOREY RESIDENCE LOCATION : ALONG DAANG HARI,MOLINO.BACOOR,CAVITE OWNER : CUEVASVILLE REALTY

Installation Instructions

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS

STATE BANK OF INDIA.

Attachment G-1: Pit Latrine Diagram. Fig E.1a: Pit Latrine. Fig E.1b: Plan View of Twin Pits

NATIONAL INSTITUTE OF BIOLOGICALS

50AI01oe 02/15. Labko GRP cesspools. Instructions for installation, operation and maintenance

NCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003)

TYPICAL ESTIMATE OF A RAINWATER COLLECTION UNIT (110 mm / 150 mm dia PVC Pipelines)

CLEAR-DIVISIONS CENTERFOLD

DIVISION 2 - SEWERAGE AND DRAINAGE SECTION STORM DRAIN SYSTEMS PART 1 - GENERAL

COMMONLY USED RESIDENTIAL BUILDING CODES

SECTION CAST-IN-PLACE CONCRETE

12.1 Schlüter -KERDI-BOARD

STRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL FRAME SYSTEM

BOQ SPECIFICATIONS. The Blind system consist of a coated aluminium tube of 38 mm diameter with provision of fabric clamping.

SECTION STORM DRAINAGE TABLE OF CONTENTS

CW GRAVITY SEWERS TABLE OF CONTENTS

7. Installation. installation CAST-IN WINDOW SYSTEM 7.1. INSTALLATION OF WINDOW MAIN FRAME

Embedded Parts Introduction - Anchors

SECTION 7: C - STRUCTURAL ENGINEERS SPECIFICATIONS

first look at GigaCrete s revolutionary new New Construction GigaHouse GigaHouse Utilizing GigaPanel

SPECIFICATIONS FOR VASWANI BRENTWOOD PROJECT. RCC Framed Structure confirming with zone II seismic detailing. Reinforced Cement Concrete

How to build raised beds page

Cavity Drain R20 is manufactured from1.0mm thick black high density polyethylene with studs approximately 20mm high.

Chapter 10 - Scaffolding Systems

The Manitoba Water Services Board SECTION Standard Construction Specifications PIPE EXCAVATION, BEDDING AND BACKFILL Page 1 of 11

The better way to build TM. Installation Manual. FOUNDATION SIPs & FROST WALLS SIPs

- From the Makers of India s Finest Designer Homes

International Greenhouse Company

L_All_Vocatinal_Ed_Construction. Sector: Construction. Sr. No Specialisation Page No 1 Construction and Building Technology 02.

TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE

CLEAR-DIVISIONS VARIOFOLD

Installation PowerPoint for Grasscrete Formers

Rooflight INSTALLATION INSTRUCTIONS

RESIDENTIAL MASONRY A BEST PRACTICES GUIDE

STEP-BY-STEP. construction guide. Delivering better priced Conservatories, Sun Lounges and Garden Rooms via the Internet.

No allowance will be made for classification of different types of material encountered.

K. D. FRAME ASSEMBLY FOR CLOSED STEEL STUD WALLS...Ins 10. FRAME INSTALLATION DETAILS FOR CLOSED STEEL STUD WALLS...Ins 11

FORM DESIGN. easy to work with, and generally available.

4. ANCHOR BOLTS AND STRAPS a. ½" anchor bolts shall be embedded 7" into concrete a maximum of 6' on center and 12" from corners and ends of plates.

Superform Products Ltd.

SECTION COILING COUNTER DOORS. Display hidden notes to specifier. (Don't know how? Click Here)

Shower Walls and Tub Surrounds

SUMMARY (PLUMBING WORKS)

CONSTRUCTION OF PERIMETER FENCE - COMMERCIAL AND T&D OFFICE COMPOUND, ONVERWAGT

ALKALI-RESISTANT WATERPROOFING AND DECOUPLING MEMBRANE UNDER CERAMIC TILES AND NATURAL STONE

We urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden window unit.

San Antonio Water System Standard Specifications for Construction ITEM NO SLIP-LINING SANITARY SEWERS

Precast Manhole Sections and Castings. These items shall conform to Section 31, "Storm Drain Installation," of these Standard Provisions.

Section SEWER PIPE INSTALLATION AND TESTING

WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12

City of Tucson and Pima County Arizona Building Code Appendix Chapter 72 Straw-Bale Structures

Chimney systems ICOPAL WULKAN C/CI/C-eko/CI-eko

ROOFING APPLICATION STANDARD (RAS) No. 150 PRESCRIPTIVE BUR REQUIREMENTS

Section 2 Specification 2.18 Concrete and/or Corrugated Steel Storm Sewer TABLE OF CONTENTS

EFFECTIVE FEBRUARY note: drainage permit required to call for a dampproof inspection

How To Run A Test Lab In Rourkela

Wastewater Capital Projects Management Standard Construction Specification

TECHNICAL SPECIFICATIONS CONCRETE SIDEWALKS, DRIVEWAYS AND CURB AND GUTTER

Transcription:

BILL OF QUANTITIES FOR CIVIL WORKS FOR 8MW POWER PLANT ITEM Description Unit Quantity (approx) [A] A-1 EARTH WORK Earthwork in excavation in all types of soil/rock but excluding hard rock requiring blasting at all depths in foundations of structures, pipe trenches, tunnels, sewer lines, drains etc. to required levels, grade and dressing complete as per specifications and directions of the engineer in both dry and wet condition including necessary pumping / bailing out of water, slush removal etc and disposal of the surplus excavated material in spoil dumps / fill areas at all heights and descents including leveling as directed by the Engineer, all material, tools plant and labour complete. Rate (Rs.) (*) Amt. (Rs.) (*) c) A-2 Lead up to 250 m Lead above 250 m but not exceeding 500 m Lead above 500 m but not exceeding 1000 m Backfilling in all positions and heights and descents in foundation, pits, pipe trenches, tunnels sewer lines, around foundations and structures, in plinth etc. with approved excavated material obtained from item A-1 above or 250 m including reclaiming from spoil heaps at all heights, transporting, depositing and dressing, complete as directed. 4336.00 1442.00 1767.00 Ordinary filling in layers of 300 mm in thickness as specified but where no special compaction in required. Plinth filling in layers of 150 mm thickness where special compaction is required including watering and consolidating either manually or by mechanical means to the required density as per the specification. A-3 Supplying and filling of coarse sand in foundations, plinth, underneath flooring and in soaking pits etc as shown in the drawing and as directed the Engineer, complete in all respects. A-4 Supply and filling of moorum in foundations, plinth, including watering & compacting as per the specification and directed by Engineer 2432.60 2546.00 32 Cum 1517.00

[B] B-1 B-2 PLAIN & REINFORCED CEMENT CONCRETES Supplying, laying and compacting plain cement concrete as defined by IS: 456 in all mudmats / leveling courses including filling of loose pockets etc under foundations, pipelines, tunnels, floors etc at all depths below plinth level as per drawings, specification and instruction of the Engineer including curing but excluding the cost of shuttering, all materials tools, plants and labour complete. With 40 mm and down graded aggregates. (1:4:8) 768.00 Supplying and laying reinforced cement concrete in all foundation and super structure in roof slabs, beams, floor slabs, footings, columns etc at all heights and depths above and below plinth level as per the drawings, specifications, directions of the Engineer and as defined in IS:456 including curing but excluding cost of shuttering and steel reinforcement all materials, tools, plants and labour complete: With 20mm down graded aggregate for M15 grade concrete 3 With 20mm down graded aggregate for M20 grade concrete 665 c) With 20mm down graded aggregate for M25 grade concrete B-3 Supplying and placing damp-proof course 40 mm thick with concrete of grade M20 as defined by IS:456 with 6 mm and down graded stone aggregates including curing, with two coats of hot bitumen and sand spread over it as specified, all materials, tools, plant and labour complete. 760.00 100.38 [C] C-1 STEEL REIMFORCEMENT Taking delivery, transporting, placing and fixing in position steel reinforcement including angles / pins provided for the approved welded joints, at all levels for reinforced cement concrete and precast reinforced concrete works including cutting, bending, cranking, binding, tack welding as necessary as per drawings, specifications and direction of the Engineer including binding wire, cover blocks, electrodes etc. and straightening and coiling where necessary, all materials, tools, plant and labour complete. With tor steel of all diameters Ton 43

[D] INSERTS & FOUNDATION BOLTS ETC. D-1 Taking delivery and fixing in position as per drawings, specification and instructions of the Engineer, M.S. inserts, foundation bolts, anchor bolts, nuts, washers, curb angles, channels, pipes, pipe sleeves, rungs etc. for embedding in permanent concrete work at all heights and depths above and below plinth level including all connected works and adjustment in shuttering and reinforcement, all materials, tools, plant and labour complete. [E] E-1 i. ii. Providing and fixing shuttering (formwork) in position with necessary centering, bracings. Propping etc. and removing the same after the specified periods for all types of shuttering for all plain and reinforced cement concrete works including all chamfers, splays, keys, wedges, nails, brackets, cutting holes for embedded steel / pipes and applying waste oil on shuttering surface in contact with concrete, all materials, tools, plant and labour complete. Straight shuttering At and all depths below plinth level At all heights above plinth level E-2 Providing fixing in position and removing shuttering as specified for core holes and pockets as per drawings, specifications and directions of the Engineer including applying waste oil on shuttering surface in contact with concrete and cleaning if core holes and pockets, all materials, tools, plant and labour complete. [F] F-1 Providing and constructing one or more bricks thick brickwork using 50 grade bricks as defined in relevant IS code in cement sand mortar (1:5) in foundations, super structure, manholes, ducts, drains etc at all heights and depths above and below plinth level as per drawings specifications and direction of the engineer, including fair cutting, waste, bonding, plumbing, lining, leveling, flushing, raking joints, scaffolding and curing, all materials, tools plant and labour complete. F-2 Providing and constructing brickwork of halfbrick thickness, using 50 grade bricks as defined in relevant IS code in cement sand mortar (1:4) with reinforcement at every fourth course at all heights and depths above and below plinth level for partition walls as per drawings, specification and directions of the engineer and including fair cutting, waste bounding, plumbing, lining, leveling raking joints, scaffolding and curing, all materials, tools plant and labour complete. Ton 10.00 134 14650.00 4 134 6

[G] PLASTER & FINISHING ITEMS G-1 Providing and laying plaster with (1:5) cement sand mortar at and at all heights and depths above and below plinth level to faces of walls, pillars, columns, lintel sides, drains, jambs, column projections, narrow bands and widths etc including chipping and curing as per specifications, drawings and direction of the Engineer, all materials, tools, plant and labour completes. 15 mm thick c) 20 mm thick Extra for neat cement finish G-2 Providing drip course 30 mm wide and 15 mm deep at chajjas, sills and other outside projections at all heights above plinth level with cement sand mortar (1:4) all materials, tools, plant and labour complete. G-3 Providing two coats of cement paint of SUPER SNOWCEM or approved equivalent of different approved shades and as specified by the manufacturer to external plastered surfaces at all heights and depths above and below plinth level as per drawings and direction of the Engineer including scaffolding, cleaning and curing all materials, tools plant and labour complete. G-4 Providing three coats of white wash with lime over the plastered surfaces / concrete surface as per drawings and as specified at all heights and depths above and below plinth level including scaffolding, all materials, tools, plant and labour complete. [H] FLOORING H-1 Supplying and fixing glazed vitreous ceramic tiles of 1 st quality JOHNSON or 1 st quality BPT or approved equivalent in floor dado, skirting etc at all heights above plinth level, including providing 19 mm thick bedding of (1:3) cement sand mortar and each tile plastered on the beck side with neat cement slurry before fixing to the bedding mortar including filling and finishing of all joints with white cement grout and cleaning with saw dust and dilute sulphuric acid, curing etc as per drawings specifications and as directed by the Engineer, all materials, tools plant and labour complete. H-2 Providing and laying 15 mm thick heavy duty floor hardener topping course with IRONITE @2.2 Kg/m 2 or approved equivalent including the bedding layer of 25 mm thick screed concrete (1:1:2) with 10 mm and down graded stone aggregate topping course laid over 25 thick granolithic floor finish whilst the screed concrete is still green, all according to the manufacturer s specification including trowel 384 35 440.00 Rmt. 180.00 1790.00 192 23 980.00

finishing and curing, all materials, tools, plant and labour complete. H-3 Supplying & fixing 25 mm thick kota stone on min. 20 mm thick bedding mortar as specified including, curing machine/wax polish in three operations with satisfaction of the Engineer, all materials, tools & labour complete. H-4 Cement concrete flooring with 1:2:4 concrete (1 cement : 2 sand : 4 graded stone aggregate 20 mm Normal size) finished with a floating coat of neat cement i/c cost of glass strip of size of 40 x 4 mm for panels in flooring not exceeding 2.0 m 2 area. 40 mm thick [J] DOORS, WINDOWS & ROLLING SHUTTERS J-1 J-2 J-3 Supplying, fitting and fixing in position Indian standard steel windows and ventilators with frames and shutters of different types according to IS:1038 with all joints flush butt welded including coupling bars for composite windows and ventilators, steel handles and peg stays with black chrome finish and all other steel fitting and fixtures like hinges, lugs, stoppers etc. and including cutting / drilling necessary holes in walls etc. and grouting lugs in the same with (1:2) cement sand mortar and finishing neatly, all materials, tools, plant and labour complete. Openable type Fixed type Providing glazing to doors, windows and ventilators as specified including supplying and fixing of approved quality clear sheet glass, including glazing putty, glazing clips etc. all materials, tools and labour complete (glazing will be measured on the basis of individual glass pane size as specified in IS:1038) 5 mm thick float glass weighing approx 14 Kg/m 2 to openable steel / aluminum windows, doors. Supplying, fitting and fixing in position approved 18 gauge M.S. rolling shutters as specified with all accessories, ball bearings, side guides, 20 gauge hood cover of hexagonal shape, locking arrangement, handles to operate the rolling shutters and including cutting necessary holes in walls and grouting with (1 : 1½ : 3) cement concrete and finishing neatly to the satisfaction of the Engineer, all materials, tools, plant and labour complete (measurement of rolling shutters shall be the same as that of clear wall opening). Mechanical operated Manually operated 200.00 56 20 3 135 36.00

J-4 c) Providing and fixing aluminum anodized doors/windows ventilators made out of extruded aluminum section conforming to IS:733, IS:1285 & IS:1868 with outer frame size 101.6 x 44.45 x 1.90 mm weighing 1.54 Kg/m and shutter frame made from aluminum section 47.62 x 44.45 x 1.90 mm weighing 0.97 Kg/m for vertical style and top rail bottom and lock rail are made from aluminum section 101.6 x 44.45 x 1.90 mm weighing 1.64 Kg/m including jointing with extruded aluminum cleats neoprene weather stripping gasket beveled edge beading, screws and mm thick float glass sheets of good quality & make including all fitting of superior quality (decorative type) such as door handles, tower bolts, hinges etc. complete including applying a coat of lacquer, as per direction of Engineer in- charge duly fixed in walls with 16 x 3.15 mm lugs 10 cm long embedded in c.c. block 15 x 10 x 10 cm. size in C.C. 1:3:6 or with wooden plug and screws or with rawl plugs and screws or with fixing clips or with bolts and nuts as required. Openable Sliding Fixed WATERPROOFING [K] K-1 Supplying, laying and fixing at all heights above plinth level bitumen felt water proofing 7 course treatment (i.e. two layers of flats) including prime and topping course of pea-sized gravel for roof with all necessary laps, as specification and according to IS:1346 with minimum 7 layers guarantee for water proof-ness including cutting chases in brickwork / concrete for anchoring tar felt in parapet and making good the chases with (1:4) cement sand mortar and curing, all materials, tools (1:4) cement and mortar and curing, all materials, tools, plant and labour complete (Measurement will be made for the finished net area only) 40.00 1 40

BILL OF QUANTITIES FOR CIVIL WORK FOR 350 TPD SPONGE IRON KILN (EXPANSION) Sl No Item Description Unit Quantity (aaprox) 1 GR. HOPPER 1 FOR COAL 12 10.00 172.00 30.00 e) Back filling 30.00 f) Brick Work 7.20 g) Pocket Shuttering M 2 0.00 h) Water proof plastering 84.00 Unit Rate (Rs) Amount (Rs) 2 GR-HOPPER -2 FOR IRON ORE f) Brick Work g) Pocket Shuttering h) Waterproof Plastering 3 CRUSHER HOUSE 4 STOCK HOUSE 5 ABC BUILDING 6 ID FAN FOUNDATION M 2 12 10.00 172.00 30.00 30.00 7,20. 0,00 84.00 216.00 1 96.00 80.00 161.00 380.00 2 17 290.00 162.00 10.00 670.00 200.00 12 12.00 50.00

7 E.S.P. FOUNDATION 8 CONCRET CHIMNEY 48.00 4.00 40.00 170.00 9 550.00 50.00 9 KI.M. PLANT d) Back filling 10 KILN FOUNDATION f) Pocket shuttering M 2 36.00 34.00 24.00 1450.00 70.00 1400.00 1400.00 810.00 70.00 11 K.C.T.B 12 COOLER FOUNDATION e) Back filling f) Pocket Shuttering M 2 172.00 10.00 90.00 50.00 132.00 328.00 422.00 200.00 140.00 66.00 13 C.D. BUILDIN f) Brick Work 60.00 40.00 9.00

14 TR-1 f) Pocket Shuttering 15 TR-2 f) Pocket Shuttering 16 INTERMEDIATE BIN e) Back filling f) Pocket shuttering 17 PS BUILDING 182.00 2 280.00 15 60.00 182.00 2 280.00 15 60.00 300.00 50.00 450.00 200.00 300.00 190.00 1 96.00 145 18 PRODUCT STORAGE SILO (FOR DRI LUMPS 2 nos 37 2168.00 750.00 160.00 19 PRODUCT STORAGE SILO FOR DRI FINES ) 1 NO 20 COAL SHED 12 650.00 290.00 64.00 182.00 86.00 150.00 162.00

21 CHAR STORAGE Shuttering RCC c) 22 CONVEYOR GANTRY WITH TRUSSEL 184.00 50.00 150.00 170.00 12 60.00 23 COMPRESSOR ROOM d) RC C f) Brick Work 51.00 30.00 78.00 50.00 48.00 36.00 24 Land development filling & leveling 5000.00