700 Analysis and Reporting



Similar documents
Project Control System Manual. Jefferson Science Associates, LLC. 600 Progress Status. Project Control System Manual Revision

An introduction to Earned Value Analysis

Earned Value Management Tutorial Module 6: Metrics, Performance Measurements and Forecasting. Prepared by:

INSE 6230 Total Quality Project Management

300 Scheduling and Budgeting

AACE International Recommended Practice No. 86R 14

Earned Value Management Changes to the Glossary and Chapter 7 of the PMBOK Guide Third Edition.

Earned Value Formulae

Appendix D Glossary Of Terms

EARNED VALUE MANAGEMENT. CASE STUDY USING MICROSOFT PROJECT

Introduction to earn value management in Civil Engineering

COINS EVA Earned Value Analysis

Brainstorm. What is Cost and Project Cost Management?

Project Cost Management

L10: Budgeting and Cost Control. Olivier de Weck

DCMA DCMA-EA PAM October 2012

FERMI RESEARCH ALLIANCE PROCEDURES PROJECT MANAGEMENT. Head, Office of Project Management Oversight

Estimating Cost at Completion - Judgment & EV Information

1200 Project Control System Procedures

Project Management: Tracking Progress and Earned Value with MS Project 2003

DATA ITEM DESCRIPTION Title: Integrated Program Management Report (IPMR) Number: DI-MGMT Approval Date:

Earned Value Exercise. Su-Cheng Wu. MET AD 644: Project Risk, and Cost Management. Paul B. Cook, PhD PMP

A Gentle Introduction to Earned Value Management Systems

Earned Value Management Tutorial Module 8: Reporting. Prepared by:

How To Manage A Project

Using Earned Value Management for Improving Processes. By Cynthia K. West

IST 302 : Project Cost Management

Contract Cash Flow & Performance Analysis. PERCEPTION Helping The Shipyard Stay On Budget

PERCEPTION. Tracking Progress & EAC

Chapter 7: Project Cost Management. Munawar

Simple Earned Value (Using MS Project 2010)

Earned Value Management System (EVMS) and. Project Analysis Standard Operating Procedure (EPASOP)

Earned Value. Valerie Colber, MBA, PMP, SCPM. Not for duplication nor distribution 1

Applied Project Management ( APM )

Earned Value Management Guidelines

Chapter 7. (PMBOK Guide)

Basics of Cost and Schedule Control

Since 1985, the Test Program Set (TPS) development

Earned Value Management (EVM) is a technique that is used to track the progress and status of a project and forecast its likely future performance.

Earned Value Management System Description

Earned Value and Agile Reporting

Unit 5: Cost Management (PMBOK Guide, Chapter 7)

IQPC IT Project Management Conference Sydney Recent Advances in Project Prediction Techniques

MTAT Software Economics. Lecture 6: Software Cost Estimation (part II)

Basic Concepts of Earned Value Management (EVM)

This EVMS Training Snippet sponsored by the Office of Acquisition and Project Management (OAPM) covers Firm Fixed Price (or FFP type) subcontracts.

CPM -100: Principles of Project Management

Appendix A of Project Management. Appendix Table of Contents REFERENCES...761

Tracking Software Development Progress with Earned Value and Use Case Point

Patricia Mast (LCLS Project Controls Manager) Mark Reichanadter (LCLS Deputy Project Director) Signature Date

Tracking Budgets and Schedules

10.1 Communications Planning 10.2 Information Distribution Figure Performance Reporting 10.1 Communications Planning 10.

plans based on actual cost, schedule and technical progress of work [1, 9].

Project Execution - PM Elements

Project Control with ProTrack

Earned Value User s Guide

Project Cost Management

Earned Value Management Best Practices

Project Management Using Earned Value

Information Technology Project Management, Sixth Edition. Note: See the text itself for full citations. More courses at cie-wc.edu

PROJECT RESOURCES CONTROL

Earned Value Management for Enterprise Resource Planning Implementations

Accounting System. Page 1 of 9

CVR/IT Consulting LLC

technical tips and tricks

Earned Value Management and the Government Program Office. Blair Alan Knapp Jr. MSPM PMP

Essential Views of the Integrated Program Management Reports. Thomas J. Coonce Glen B. Alleman

Profesor: Francisco Javier Sanz Pérez. by fjspsv, PMP Test C07_01

Module 5 Cost Management PMP Exam Questions

Predicting progress on your project

Project Cost Management

BEYOND EARNED VALUE: A Better Practice for Monitoring Project Performance 2012 Dr. Kenneth F. Smith, PMP ; Project Management Consultant

Project Management Glossary

CLARITY PPM TIPS, TRICKS, and TERMINOLOGY

Chapter 3: Project Cost Management

Project Control System Manual. Jefferson Science Associates, LLC. 200 Organization. Project Control System Manual Revision

The To Complete Performance Index

Applied Software Project Management

Lecture Slides for Managing and Leading Software Projects. Chapter 8: Measuring and Controlling Work Processes

Procurement Management S# What? Formula Additional Notes CPPC CPFF CPAF CPIF T&M FPEPA FPAF FPIF FFP

Cost management and Control of Construction Project

Brief Introduction to Earned Value Management (EVM)

Sample Examination Questions

LEADING EDGE FORUM CSC PAPERS 2012 EARNED SCHEDULE: FROM EMERGING PRACTICE TO PRACTICAL APPLICATION

QUALITY AND PERFORMANCE IN PROJECTS. Project Management and Leadership 2015D, PhD, PMP

A Guide to Managing Programs Using Predictive Measures

pm4dev, 2008 management for development series Project Budget Management PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS

RED-AMBER-GREEN STOPLIGHTS IN MICROSOFT PROJECT

THE APPLICATION OF PERFORMANCE MEASUREMENT TECHNIQUE IN PROJECT MANAGEMENT : THE EARNED VALUE MANAGEMENT (EVM) APPROACH

Chapter 7: Project Cost Management. Information Technology Project Management, Fourth Edition

Assignment 2: Microsoft Project Toolset. Eric Palmer & Mahindra Bheodari. Kennesaw State University. IS 8100 Spring 2015

Training Seminars. Description. Core Courses: The core courses consist of the following:

EARNED VALUE MANAGEMENT SYSTEM AS A PROJECT MANAGEMENT TOOL FOR MAJOR MULTI-DISCIPLINARY PROJECTS

EVM.01. Earned Value Analysis Why it Doesn't Work

Agile Project Management Controls

Certification Exam Objectives: PK0-003

Expert Reference Series of White Papers. Importance of Schedule and Cost Control

PROJECT SCHEDULING AND TRACKING

MC9252 SOFTWARE PROJECT MANAGEMENT UNIT I PART A

Is Poor Project Management a Crime?

Transcription:

Jefferson Science Associates, LLC 700 Analysis and Reporting Project Control System Manual Revision 7-50 -

700 Analysis and Reporting This chapter of the JSA Project Control System Manual explains how the performance status is determined, analyzed and documented during the execution of the project plan. The Performance Management Baseline is the basis for performance analysis and reporting. Analysis provides the project team an understanding and assessment of the project and its progress. Reporting is the communication means to provide managers with comprehensive Earned Value Management information. Schedule and cost variances from the Performance Measurement Baseline are derived by analyzing a project s earned value metrics. Variance thresholds are established to enable project management to focus attention and resources on those variances with the most significance to the project. Results from the variance analyses provide the stimulus for management action to resolve project issues before they become substantial problems. 701 Variance Analysis The purpose of variance analysis is to identify problems early so that prompt corrective action can be taken to minimize cost and schedule impacts, cost overruns, and schedule delays to the project. Variance analysis quantifies the deviations from the timed-phased budget based on the work accomplished and cost data collected. Variance within Earned Value Management is described by two metrics: Cost Variance and Schedule Variance. Other project performance measurements are obtained from these two expressions. Variances and other performance measurements (current period and cumulative) are calculated monthly at the project work package level and summarized for each individual control account. Variances can be aggregated at higher WBS and organizational levels to include the total project. 701.1 Variance and Performance Indicators (Exhibit 12) A. Schedule Variance (SV): The difference between the Budgeted Cost of Work Performed (BCWP, Earned Value) and the Budgeted Cost of Work Scheduled (BCWS, Planned Value). SV = BCWP BCWS If the result is a zero (0), it is an indication that the project is on schedule. If the result is a positive (+) value, it is an indication that the project is ahead of schedule. If the result is a negative (-) value, it is an indication that the project is behind schedule. - 51 -

While Schedule Variance indicates the dollar value difference between accomplished and planned work activities, it does not specify the amount of time the project is ahead or behind schedule. Analysis of the project schedule in the Schedule Management System will reveal the status of specific activities, milestones, and critical events. It is important that both schedule and performance measurement analysis be performed to accurately monitor schedule performance. B. Cost Variance (CV): The difference between the Budgeted Cost of Work Performed (BCWP, Earned Value) and the Actual Cost of Work Performed (ACWP, Actual Cost). CV = BCWP ACWP If the result is zero (0), it is an indication that the project is on budget. If the result is a positive (+) value, it is an indication that the project is underrunning its budget. If the result is a negative (-) value, it is an indication that the project is overrunning its budget. C. Schedule Performance Index (SPI): The ratio of the Budgeted Cost of Work Performed to the Budgeted Cost of Work Scheduled and represents the schedule efficiency of the project. SPI = BCWP / BCWS If the result is equal to 1.0, it is an indication that the project is on schedule. If the result is greater than 1.0, it is an indication that the project is ahead of schedule, accomplishing more work than planned for the considered time period. If the result is less than 1.0, it is an indication that the project is behind schedule, accomplishing less work than planned for the considered time period. Note: SPI will trend toward 1.0 as the project nears completion. Earned Value equals Planned Value at the end of the project, i.e., the work you planned to do is finally accomplished. - 52 -

D. Cost Performance Index (CPI): The ratio of the Budgeted Cost of Work Performed to the Actual Cost of Work Performed and represents the cost efficiency of the project. CPI = BCWP / ACWP If the result is equal to 1.0, it is an indication that the project is on budget. If the result is greater than 1.0, it is an indication that the project is running under budget, spending less for the accomplished work than planned for that work. If the result is less than 1.0, it is an indication that the project is running over budget, spending more for the accomplished work than planned for that work. E. Calculated Earned Value Management performance indicators will provide an early warning that the project is not executing to plan. To get to the root causes of the variances, the affected control account schedule and cost reports must be thoroughly examined. Once the causal analysis has been completed, then a corrective action plan can be formulated and implemented. 701.2 Estimate at Completion A. The next step in the analysis is to evaluate the earned value data and develop a projection for the future of the project based on the progress made to date. An estimate of when the project will be completed and the cost to complete can be established. B. For schedule projections, there are approximation methods to arrive at an estimate of the completion date. The most common method is to divide the Schedule Variance (SV) by the average monthly budgeted cost of work scheduled (BCWS). This method provides an approximate duration in months of how far a project is ahead or behind schedule, but assumes current and future work will be accomplished at the same average monthly rate. A more accurate forecast can be made by analyzing the schedule data (e.g., critical path) in the Schedule Management System. C. For cost projections, an Estimate at Completion (EAC) can be derived using a number of methods. The EAC is the actual cost to date on the project plus an estimate of costs for the remaining authorized work (referred to as Estimate to Complete, ETC). EAC = ACWP + ETC - 53 -

An objective ETC can be generated by a detailed bottoms up approach where the Control Account Managers provide a description of the remaining activities in their accounts and an update to the estimated resources or cost for completing these activities. This comprehensive EAC method represents the best estimate of the total cost at the completion of the project and is required to be formulated at least once a year. Another approach is to declare the current Planned Value for the remaining work represents the ETC. This method for estimating the EAC assumes that all remaining work is independent of the dollar burn-rate established for the project to date. D. For calculating an Independent Estimate at Completion (IEAC) based solely on performance factors, there are multiple methods that can be used. The first IEAC formula uses the Budget at Completion (BAC) and the Cost Performance Index (CPI) to calculate IEAC: IEAC = BAC / CPI, where BAC is the sum of all project control accounts (and equal to a project s total BCWS, Planned Value). This formula assumes that the project dollar burn-rate remains constant for the remainder of the project. Another IEAC formula uses the Actual Cost, Budget at Completion, Earned Value and the Cost Performance Index to calculate IEAC: IEAC = AC + [(BAC BCWP )/ CPI] This formula is the same as formula 1 as long as a rebaselining that sets cost and/or schedule variances to zero has not occurred. If such an occurrence has happened, this equation should be used with the CPI being based on performance subsequent to the rebaselining. Finally, the following formula considers the potential cost impact of a schedule variance: IEAC = BAC/[0.8 (CPI) + 0.2 (SPI)] In this formula, the EAC is weighted by 80% of the CPI and 20% of the SPI. E. As no single technique consistently provides the best answer, the Project Manager will decide which EAC method or group of methods represents the - 54 -

best approach for the project. An EAC will be generated each month for each control account and for the total project, and for other WBS levels as required for reporting to the Project Customer. The EAC for each control account will be reviewed at the monthly progress meeting. 701.3 Variance at Completion EAC (or IEAC) is used to determine the Variance at Completion (VAC) for the project. The VAC is calculated as follows: VAC = BAC (I)EAC If VAC is positive, the project is projecting an underrun; negative, an overrun. 702 Project Reports Formal project reports are an integral part of the Earned Value Management System. Summarized project data from the control account to the senior management reporting level provide the project management team with the insight into how the project is performing compared to the baseline project plan. Reports are generated by the Financial, Schedule and Cost Management Systems. The Financial Management System provides various cost reports and these can be found on the Jefferson Lab MIS web portal (Web Applications/Finance Related Applications). Project performance reports with Earned Value Management data will be produced by the Project Management & Integrated Planning Department from the Schedule and Cost Management Systems. The following list of reports is the nominal set appropriate for all levels of projects at Jefferson Lab. Other management and Project Customer-specified reports can be generated by the Schedule and Cost Management Systems and tailored to the particular needs of the project. 702.1 Financial Management System Reports A. Open Commitments Report (Exhibit 13) The Open Commitments Report lists those procurement items for a project that have been ordered but have not been delivered or completed. B. Project Status Report (Exhibit 14) The Project Status Report details the incurred costs and open Purchase Order commitments on the project including labor, expenses, and overhead (indirect cost). - 55 -

C. 12 Month Report (Exhibit 15) The 12 Month Report breaks the project costs down to a monthly level. Previous fiscal year totals are provided for labor and expenses and then for each month of the current fiscal year. D. Spending by Month Report (Exhibit 16) The Spending by Month Report is similar to the 12 Month Report but also provides a breakout of indirect costs (fringe benefits and G&A). 702.2 Schedule and Cost Management Systems Reports A. Project Analysis Report (Exhibit 17) The Project Analysis Report is the primary earned value report for the project. These reports are normally provided at WBS Level 2, but can be produced down to WBS Level 4. The report displays the BCWS (Planned Value), BCWP (Earned Value), and ACWP (Actual Costs) for the current period and as a cumulative to date. The Schedule and Cost Variances, along with the associated performance index, are provided as well as the Budget at Completion, Estimate at Completion and Variance at Completion data. B. Red Flag Report (Exhibit 18) The Red Flag Report is the core of the variance reporting system. This monthly report summarizes cumulative performance data as of the end of the accounting period and identifies those control accounts with cost or schedule variances exceeding thresholds established by the Project Manager. Variance thresholds are established for the value of the variance as well as the associated performance index (see Exhibit 19). Unless specified otherwise in a project s Project Execution Plan, the thresholds listed in Exhibit 19 will be the standard for all Jefferson Lab projects. Based on these thresholds, control accounts with a significant variance are identified by a color-coded flag on the Red Flag Report. Depending on the variance level, a yellow or red flag highlights the control account. A yellow flag is a warning and indicates a slightly unfavorable variance. A red flag indicates an unfavorable variance and initiates a Variance Analysis Report. C. Variance Analysis Report (Exhibit 20) Those control accounts identified with a red flag require the initiation of a Variance Analysis Report. (Note: While Variance Analysis Reports are normally generated at the control account level, these reports can be produced for other WBS levels at the discretion of the Project Manager.) The purpose of this report is to provide project management with an understanding of the - 56 -

nature of the problem causing the variance and its impact to the overall project. The Project Management & Integrated Planning Department will issue the Variance Analysis Report form to the appropriate Control Account Manager. After being completed by the Control Account Manager, the Associate Project Manager and the Project Manager will review the form to confirm accurate variance causes are identified and adequate corrective plans are established. Variance Analysis Reports will be evaluated monthly to monitor the implementation of current action plans. D. Earned Value Management Performance Chart (Exhibit 21) Earned Value Management Performance Charts are prepared each month summarizing cost performance and obligation status for the project as a whole and for each Control Account. The cost performance graphs show BCWS (Planned Value), BCWP (Earned Value), and ACWP (Actual Cost) as a function of time. The obligation status graph shows commitments and pending obligations for the same period. E. Performance Indicator Charts (Exhibit 22) Performance Indicator Charts are prepared each month for the project as a whole and for each Control Account. These graphs show the schedule and cost performance data and are useful for tracking variance trends. 703 Meetings and Reviews Project management initiates regularly scheduled meetings and reviews to determine project status. Early detection of technical, schedule, and cost difficulties is imperative to maintaining good project performance. Depending on a project s size and complexity, the Project Manager and his staff will decide on the appropriate meeting types, frequency, and required attendees. Types of meetings include executive management meetings, project staff meetings, technical and design reviews, project performance reviews, and of course, customer meetings. Open discussion at these forums will reveal specific project technical, schedule, and cost issues requiring management attention and/or decision. Addressing programmatic issues in a timely manner will help prevent greater problems in the future. - 57 -

704 Exhibits 12. Earned Value Chart 13. Open Commitments Report Example 14. Project Status Report Example 15. 12 Month Report Example 16. Spending by Month Report Example 17. Project Analysis Report Example 18. Red Flag Report Example 19. Variance Threshold Flags Example 20. Variance Analysis Report Example 21. Earned Value Management Performance Chart Example 22. Performance Indicator Chart Examples - 58 -

Exhibit 12. Earned Value Chart Project Control System Manual $ EAC VAC ACWP BAC CV PMB BCWS SV BCWP Now Time PMB Performance Measurement Baseline BCWS Budgeted Cost of Work Scheduled (or Planned Value) BCWP Budgeted Cost of Work Performed (or Earned Value) ACWP Actual Cost of Work Performed (or Actual Cost) SV Schedule Variance CV Cost Variance BAC Budget at Completion EAC Estimate at Completion VAC Variance at Completion - 59 -

Exhibit 13. Open Commitments Report Example Project Control System Manual - 60 -

Exhibit 14. Project Status Report Example Project Control System Manual - 61 -

Exhibit 15. 12 Month Report Example Project Control System Manual - 62 -

Exhibit 16. Spending by Month Report Example Project Control System Manual - 63 -

Exhibit 17. Project Analysis Report Example Project Control System Manual - 64 -

Exhibit 18. Red Flag Report Example Project Control System Manual - 65 -

Exhibit 19. Standard Variance Threshold Flags Project Control System Manual - 66 -

Exhibit 20. Variance Analysis Report Example Project Control System Manual Exhibit 2. Earned Value Management Performance Chart Example - 67 -

Exhibit 21. Earned Value Management Performancee Chart Example - 68 -

Exhibit 22. Performance Indicator Chart Examples - 69 -