MIGRATION to IPv6 MTNL PLAN & PERSPECTIVE



Similar documents
IPv6 Migration Challenges for Large Service Providers

Information Services Hosting Arrangements

Restricted Document. Pulsant Technical Specification

The Organizational NOS (Network Operating System)

Zimbra Professional Services Portfolio, Purchasing Guide & Price List

Licensing the Core Client Access License (CAL) Suite and Enterprise CAL Suite

The Importance Advanced Data Collection System Maintenance. Berry Drijsen Global Service Business Manager. knowledge to shape your future

State of Wisconsin Division of Enterprise Technology (DET) Distributed Database Hosting Service Offering Definition (SOD)

2. When logging is used, which severity level indicates that a device is unusable?

IMPLEMENTING CISCO IP SWITCHED NETWORKS (SWITCH)

Gateway Agent - First Amendment to the High Level Design Document

IPTV Service Assurance Challenges For A Comprehensive Solution

State of Wisconsin DET Agency Managed Virtual Services Service Offering Definition

A96 CALA Policy on the use of Computers in Accredited Laboratories Revision 1.5 August 4, 2015

Junos Pulse Instructions for Windows and Mac OS X

AHLA. C. Big Data, Cloud Computing and the New World Order for Health Care Privacy

Systems Support - Extended

System Business Continuity Classification

Licensing Windows Server 2012 for use with virtualization technologies

Cloud Services MDM. Windows 8 User Guide

Cloud Services Frequently Asked Questions FAQ

LINCOLNSHIRE POLICE Policy Document

UC4 AUTOMATED VIRTUALIZATION Intelligent Service Automation for Physical and Virtual Environments

How Does Cloud Computing Work?

Silver Peak NX Appliances and the Brocade 7500 Extension Switch

Mobile Workforce. Improving Productivity, Improving Profitability

Licensing Windows Server 2012 R2 for use with virtualization technologies

preparing the enterprise network for VoIP

HIPAA Compliance 101. Important Terms. Pittsburgh Computer Solutions

1)What hardware is available for installing/configuring MOSS 2010?

Troubleshooting Cisco Unified Communications

CNS-205: Citrix NetScaler 11 Essentials and Networking

service description Colocation of Equipment Infrastructure as a Service

How To Install An Orin Failver Engine On A Network With A Network Card (Orin) On A 2Gigbook (Orion) On An Ipad (Orina) Orin (Ornet) Ornet (Orn

OFFICIAL JOB SPECIFICATION. Network Services Analyst. Network Services Team Manager

G-CLOUD FRAMEWORK SERVICE DEFINITION. Solution Architecture for Cloud Service. Copyright: point6 Ltd

Serv-U Distributed Architecture Guide

VCU Payment Card Policy

This report provides Members with an update on of the financial performance of the Corporation s managed IS service contract with Agilisys Ltd.

IxLoad Storage DATA SHEET

Microsoft Certified Database Administrator (MCDBA)

System Business Continuity Classification

Knowledge Base Article

Improved Data Center Power Consumption and Streamlining Management in Windows Server 2008 R2 with SP1

Factoring the Network into The GRID

Build the cloud OpenStack Installation & Configuration Integration with existing tools and processes Cloud Migration

Ten Steps for an Easy Install of the eg Enterprise Suite

In addition to assisting with the disaster planning process, it is hoped this document will also::

Chapter - 3. Cable Connections

Process Automation With VMware

Readme File. Purpose. What is Translation Manager 9.3.1? Hyperion Translation Manager Release Readme

Document Management Versioning Strategy

G-CLOUD FRAMEWORK SERVICE DEFINITION. Oracle Technology Service for Agile Cloud Projects. Copyright: point6 Ltd

9 ITS Standards Specification Catalog and Testing Framework

Service Level Agreement

Cloud Contact Centre. Getting smart with customer contact

SEEREN. Voice Over IP GRNET Case study.

Electronic and Information Resources Accessibility Compliance Plan

SaaS Listing CA Cloud Service Management

Using McAllister Payment Solutions and Updating to AVImark version

POLICY 1390 Information Technology Continuity of Business Planning Issued: June 4, 2009 Revised: June 12, 2014

Datasheet. PV4E Management Software Features

Software and Hardware Change Management Policy for CDes Computer Labs

Help Desk Level Competencies

Level 1 Technical. RealPresence Web Suite and Web Suite Pro. Contents

Transcription:

MIGRATION t IPv6 MTNL PLAN & PERSPECTIVE 1

MTNL RESPONSE TO TRAI RECOMMENDATIONS ON IPv6 (JUNE, 2006) (a) (b) (c) (d) (e) IPv6 migratin is a cmplex issue and need jint effrt. Deptt. f Telecm/Deptt. f IT/Gvt. shuld initiate t set up IPv6 test bed. Set up Natinal Internet Registry. Cnduct training and awareness prgramme. Upgrade cst d nt allw ne time up gradatin and life cycle upgrade is the feasible ptin. 2

IP BASED NETWORK/SERVICES INFRASTRUCTURE IN MTNL ISP PPs, Internet access. MPLS, L2/L3 VPNs, Multicast, QS. Bradband access XDSL, Metr Ethernet, 3G. Wireless Netwrk, 3G services, GPRS. NGN (C4) CPEs DSL CPEs, STBs, IP phnes, Sft Clients. OSS/BSS : DNS, DHCP, AAA (RADIUS), NMS, PMS, WSC, Billing & CRM. Services : IPTV, VOIP, VASs. 3

IPv6 MIGRATION CHALLENGES Hw t define IPv6 migratin Timeframe/Radmap. - IPv4 based equipment still being manufactured /supplied. Hw t test / assess the equipment / services fr * Cnfrmance - t IPv6 features & prtcls. * Perfrmance - thrughput, latency, packet lss / resurces required fr IPv6. * Security * Mbility * Interperability Hw t evaluate IPv6 effect in terms f csts invlved / ROI and disruptin etc. 4

IPv6 MIGRATION PLAN IPv6 Prcurement Plan. IPv6 Deplyment strategy. Netwrks/Services cmpnent testing. Netwrk & Service Integratin. - Exceptinal strategy. - Integratin Plan - Security Plan finalizatin. - Actual Implementatin. IPv4 and IPv6 t c exist fr sme time and migratin t happen nly as life cycle upgrade f the prducts 5

IPv6 PROCUREMENT PLAN MTNL had decided (>3 years back) that all hardware, sftware, and Applicatin being prcured, shall be IPv6 cmpliant and accrdingly adhering t it fr all prcurements: Hw t ensure? Requires mandate fr the vendrs. Requires incentive such as tax relief t vendrs t manufacturer IPv6 cmpliant hardware/sftware/ applicatin. 6

IPv6 DEPLOYMENT STRATEGY Architectural Slutins: Native IPv6. Dual Stack. Tunnelling. Prtcl translatin 6PE, 6VPE. MTNL t finalize after assessment/testing f the assessment f available features n Edge & Cre ruters and access NW cmpnents 7

TESTING Testing fr - Cnfrmity t IPv6 technlgy and prtcls. Perfrmance i.e. thrughput, latency, packet lss /prcessing and memry requirement etc. Security, Mbility, QS requirements. Inter-perability. Cmpnents t be tested - Edge ruters and cre ruters Cmpnents f access netwrk and ther NW islands. Applicatin sftware and services. *Test Bed Required. 8

IP ADDRESSING Obtain IPv6 Address Blck/IPv6 suffix frm the centralized (natinal/reginal) Internet Registry. Set up Natinal Internet registry? Develp Addressing Plan and frmulate Address Distributin mechanism t custmers. 9

NETWORK & SERVICES INTEGRATION Analyse varius Netwrk/Systems and services fr IPv6 cmpliance and migratin radmap. IPv6 exceptin strategy identificatin f cmpnents (HW/SW/Services) that will remain IPv4. Integrate prgressively the existing/new IPv6 cmpliant netwrk Island(s) with IPv6 cmpliant, Transprt N/W High level analysis f NWs/services fr IPv6 cmpliance and identificatin f cmpnents that will remain IPv4 is underway - migratin t IPv6 nly as the life cycle upgrade 10

SECURITY PLAN Access IPv6 security requirements & finalize Security Plan. Security requirements. Des the NW supprt IPv6 based slated reference extended ACL. Server cnnectivity e.g - Supprt IP Sec. - Prtcl authenticatin fr OSPF V.3 - IPv6 IP Sec terminal, ruter-t-ruter. - IPv4/IPv6 Encryptin Hardware adapter. - Mbile IP authenticatin. IPv6 Firewall - Des the FW supprt IPv4/ IPv6. - Des NIDS/NIPS supprt IPv4/ IPv6. - Security Applicatin. TEST BED REQUIRED 11

HIGH LEVEL NW/SERVICES ANALYSIS MPLS TRANSPORT (CORE & AGGREGATION PE & P ruters : IPv6 cmpliant (t be verified). Aggregatin/CE : IPv6 cmpliant (t be ruters verified) ems/nms : T be tested fr IPv6 cmpliance & interperability / t be upgraded required 12

ISP NETWORK Gateway Ruter : IPv6 cmpliant (t be verified) Web Server/Caching Server : T be verified/ upgraded. Messaging/ Security/ Firewall/ : Under replacement by IPv6 DNS : cmpliant Hardware/ Sftware as : part f planned upgrade. ISP/LL ruters/ switches : Narrw band RAS : Shall remain IPv4 island ISP NW t evlve t supprt bth IPv4 and IPv6 versins at the same time ( dual stack apprach )

BROADBAND ACCESS (xdsl & Metr Ethernet) BRAS, Tier 1 & Tier 2 switches, MES, ME- CPEs : IPv6 cmpliant (t be verified) DSLAM & DSLAM CPEs : ems & NMS system : Plicy Cntrl (SSSC) : T be verified fr IPv6 cmpliance else shall remain IPv4 island and tunnelling used in access. IPv6 cmpliant (t be verified) T be upgraded t IPv6. 14

WIRELESS BROADBAND (a) Sft Switch (3G) : T be tested fr IPv6 cmpliance else upgraded t IPv6 / retained as IPv4 islands and replaced as life cycle upgrade f their netwrks/systems. TMG/SGW GGSN (GPRS) : T remain as IPv4 islands. GGSN t be replaced as life cycle upgrade (b) CDMA (PDSN) : T remain as IPv4 islands 15

NGN (C.4) Sft-switch and ther cmpnents. : T be tested fr IPv6 cmpliance & upgraded t IPv6 if required. 16

VOICE OVER IP (VOIP) IPv6 Readiness fr SIP Server T be ensured frm Service Partner. OSS DHCP, DNS, NMS : T be ensured frm Service Partner. BSS : Cnvergent Billing t be used after due testing. IP Phne / PC Sft client :? 17

IPTV IPv6 readiness fr Head End. Equipment : Service Partner t ensure. Metr Ethernet, XDSL, access and CPE / STB : T be verified fr IPv6 cmpliance else shall remain IPv4 island and tunnelling used in access. OSS / BSS Cnvergent Billing & CRM t be used after due testing and integratin. 18

AAA fr dial-up & Bradband n IPv6. Mediatin/ Billing/ Prvisining/ CRM/Web Selfcare,. DNS (which understands IPv4 A recrd and IPv6 AAAA recrd) OSS/BSS MIGRATION PLAN : Upgrade t IPv6 cmpliant system. : Migratin t/use f Cnvergent Billing & CRM system test upgrade. : T be Upgraded Legal Interceptin. : T be assessed and upgraded. Plicy Cntrl (SSSC) : T be upgraded. NMS t be tested and evlutin planned t cater fr fllwing : - Netwrk Management evlutin needs t be dne befre IPv6 deplyment strategy. - System / Applicatin / Prtcl t be cnsidered. - In a Dual Stack Netwrk, bth IPv4 & IPv6 envirnment must be managed with best ptimizatin t decrease cst f peratin. 19

SUMMARY Defining Migratin Radmap is a challenge - availability f IPv6 cmpliant equipment is still issue. Supply f IPv6 cmpliant equipment (frm a given date) shuld be mandated. IPv6 Test bed - Deptt. f IT / DOT (TEC) / Gvt. t take up challenges. Setting up f Natinal Internet Registry Gvt / DIT t decide IPv6 address allcatin Gvt. / DOIT t take challenge. IPv6 Awareness & Training Prgrammes need t be cnducted. MTNL shall upgrade Netwrk/system cmpnents nly as life cycle upgrade. 20

THANK YOU 21