Boiler & Pressure Vessel Inspection discrepancies and failures



Similar documents
Boiler and Burner Cleaning and Servicing Specifications

Boiler Preparation, Start-Up and Shutdown

Factory owners must ensure the boiler is:

Preventing Overheated Boiler Incidents

Your Boiler Room: A Time Bomb?

RESIDENTIAL HEATING OIL SERVICE CONTRACT ANNUAL COST $276.00

Routine and Emergency Boiler Operation

LAKE COUNTY ANIMAL SERVICES EXPANSION SECTION 15459

Indirect-Fired Storage Water Heater Models WH-30 through WH-80 INSTALLATION AND OPERATING INSTRUCTIONS

Hot Water Boilers and Controls Why Condensing Boilers are Different. Presented Oct. 14, 2008 Long Island Chapter, ASHRAE

Trouble Shooting. Pump

Tankless Water Heater

BUILDING PERFORMANCE INSTITUTE TECHNICAL STANDARDS

PLBG/GAS SAFETY Information Bulletin

Evaluate, Clean, and Tune Guidance

Air Conditioner Water Heater - A Product of HotSpot Energy LLC

SIOUX HYBRID WATER HEATER

Notes. Material 1. Appropriate Flammable Liquids

PLP - TERMS AND CONDITIONS

SECTION PACKAGED ROOFTOP AIR CONDITIONING UNITS NON-CUSTOM

Sample Written Program. For. Flammable Liquids

CHAPTER 10 BOILERS, WATER HEATERS AND PRESSURE VESSELS

Some Criteria for Choosing a Steam Boiler for a Microbrewery

CARING FOR YOUR WATER HEATER

Backup Fuel Oil System Decommissioning & Restoration Plan

A cure for water damage in real estate

Condensing Boiler Efficiency

Arapahoe County Residential Water Heater Installation and Inspection Guide

The city of Milwaukee s Sample Preventative maintenance manual for Electronically monitored boilers

I. STEAM GENERATION, BOILER TYPES

COMMERCIAL COOKING HOODS, VENTILATION & FIRE SUPPRESSION SYSTEM GUIDELINES AND PROCEDURES

Description of Thermal Oxidizers

INSTALLATION & MAINTENANCE MANUAL TURBOPOWER GAS, OIL & GAS/OIL WATER HEATER

REHABILITATION OF MOBILE HOMES R

Vaillant s plain English guide to. simple, concise and precise

This will also provide you with the knowledge to insure long life for your Investment

FACILITY FIRE PREVENTION AND EMERGENCY PREPAREDNESS INSPECTION CHECKLIST

CDS TROUBLESHOOTING SECTION I. VACUUM Weak vacuum at wand. Gauge reads normal (10hg to 14hg)

INTEC Engineering GmbH Heating Solutions for the Marine Industry

December Newsletter by Vincent Dunn Backdraft and flashover, what is the difference?

Originators of the Flexible Water Tube design

Protect your home s major mechanical systems with Main Street Mechanical s Home Service Agreement.

DEPARTMENT OF CODES AND BUILDING SAFETY FLOOD RECOVERY INFORMATION

ADMINISTRATIVE SERVICES MANUAL

Crawford Inspection Services C.C.B. #

HS-901(A) BASIC STEAM HEATING SYSTEMS

Annual Service Agreement

User's Instructions. Alpha HE CB25/33 and HE SY25

Oil and Coolant Circulating Heating System. Model - OCSM

REGISTRATION EXAMINATION, JUNE 2009 PLUMBING QUESTION AND ANSWER BOOKLET. Time allowed THREE hours

ENGINE COOLING SYSTEM

POLICY BULLETIN Tecumseh Compressor Company Compressor Group

36G22, 36G23, 36G24 & 36G52 36J22, 36J23, 36J24 & 36J52 DSI and HSI Single Stage Combination Gas Valve

UNIVERSITY OF MISSOURI Heating Ventilating and Air-Conditioning (HVAC) March

Rules for construction of heating boilers, Boiler and Pressure Vessel Code, Section IV-2007

Subpart 1. Installation. All plumbing systems must be. installed and tested according to this chapter and chapter 4715,

Service Bulletin SA-008. DATE: June 18, 2008 TO: All Service and Parts Managers SUBJECT: Flood Damaged Appliances

Laddomat Charging unit

BP WIND ENERGY POLICIES AND PROCEDURES

National Competency Based Skill Training Refrigeration and Air-conditioning Mechanic Logbook

This section gives you some helpful information and tips on running your home and the equipment in it.

Mechanical, Plumbing, and Fire Protection Conditions

Chicago Stationary Engineer Licensure Examination Information

CHAPTER 9: WATER HEATING

GUIDELINES - Gas Inspection Regulations 1. Recommendations for camping site owners

OTF Oil Fired Pool Heater

Attachment J-C18.1. HVAC Work Instructions

Element D Services Plumbing

GUIDELINES FOR LOGBOOKS COMPLIANCE TO BOILER REGULATIONS N.J.A.C. 12:90

Energy Saving Fact Sheet Boilers

?52. Questions. and their. Answers, Relating To Hot Water Safety

Failure to comply with the following cautions and warnings could cause equipment damage and personal injury.

healthy homes assessment

Air Conditioner Water Heater Model ACWH18

OWNER S MANUAL FORCE 10 MARINE COMPANY HAMILTON ROAD RICHMOND, BC CANADA V6V 1C9 TEL: (604) FAX: (604)

Service Manual Models: 502, 752, 1002, 1302,

Water Damage Prevention Risk Management Guidebook

2010 Residential Water Heater Replacement Check List

UNDERSTANDING CENTRAL HEATING SYSTEMS

SAMPLE TEST QUESTIONS STEAMFITTER/PIPEFITTER - ITA WEBSITE

INSTRUCTION MANUAL. Boil-Out TABLE OF CONTENTS SAFETY WARNINGS 2-3 RESPONSIBILITY 3 INTRODUCTION 3 PRE-BOIL OUT PROCEDURES 3-5 BOIL OUT PROCESS 5-9

! WARNING. McDonnell & Miller Installation & Maintenance Instructions MM-217(I) Series 150S and 157S (Snap Switch, All Models except 157S-RB-P)

This material is confidential and may not be copied, used or distributed without the written permission of Safeguard Properties LLC.

Flammable and Combustible Liquids. Slide 1 (of 23)

Exhibit IV Approved Measures List. Page 1 of 5

STATE OF FLORIDA HOME INSPECTION STANDARDS OF PRACTICE:

Commercial Gas Water Heaters

Department of Veterans Affairs VHA DIRECTIVE Veterans Health Administration Washington, DC October 15, 2008 BOILER PLANT OPERATIONS

How to Prevent Liquid Damage Property Losses

Guidelines for energy efficient heating, ventilation and air conditioning (HVAC) systems

5.2. Vaporizers - Types and Usage

Gas-Fired, Residential Storage Type Water Heaters

Float and Thermostatic Traps Series H, C and X

COMPRESSED GASES. 1.2 The contents of each cylinder and container must be clearly identified (by tag or stamp) on the cylinder.


ALVERNIA UNIVERSITY OSHA REGULATION: 29 CFR WELDING, CUTTING, AND BRAZING ( HOT WORK ) SECTION: 3600

Transcription:

Boiler & Pressure Vessel Inspection discrepancies and failures

Water Heaters / Pressure Vessels Pressure Vessels are inspected once every three years. This requires a test of A: safety relief devices B: Temperature and Pressure controls C: External exam to check for leaks D: Testing to verify thickness of the vessel body

Basic Thermo Dynamics of water. Water boils at atmospheric pressure (14.7psi) at 100 deg. C or 212 deg. F.. When placed under pressure water can be heated to extremes without flashing to steam. The typical expansion rate for 1 cu. ft of water is 1700 cu ft. of steam.

Relief valve installed backward on a 119 gal. electric water heater. With inlet and outlet stamped into the valve.

Failure of Normal Operation If the relief valve does not properly function and the temperature control fails to properly control temp. The water heater will heat unchecked until catastrophic failure occurs. The routinely inspected water heater holds 119 gallons, there is considerable explosive force behind such a release of energy.

This is the result of a relief valve failing to lift on a 119 gal. water heater in a split level home.

Multiple family dwelling in Mifflinburg PA. Relief valve failed to function, Water Heater was in the basement

Routine Maintenance and inspections on Low Pressure Boilers Low Pressure Boilers are inspected annually while in operation and internally every 3 years, if construction permits. During this inspection all safety device function is evaluated, relief valves, Low water fuel cut outs, high temperature and high pressure switches.

The following photos are of a Maine boiler that failed due to mechanical issues stemming from lack of proper maintenance This boiler was added to the inspection route days before this incident. This was the initial inspection to place it in the system What follows is the list of items noted during the inspection.

Items noted on the inspection prior to failure A: Low water cutout both left and right sides failed to initially function. Units required multiple flushing to function. B: Relief tested and leaking steam from spindle C: Gage glass scaled, can not read water level within boiler D: Bottom connection on right side low water cutout corroded and leaking water E: Steam and water connections on water column leaking F: Left side mud drum water supply piping heavily corroded and steadily leaking water G: Left side mud drum, 3 mud drum to boiler connections heavily corroded and leaking H: Check burner operation and combustion system tuning, heavy puff of smoke on ignition of burner.

It is suspected that in the night the left side mud drum water supply connection that was corroded and leaking failed along with the low water cutout switch.

Left Mud Drum Water Inlet connection

These failures allowed the boiler to continue to operate without a cooling medium. Allowing the unit to overheat to the point of rupturing the left mud drum and burning off the electrical wires from the safety shutoff connections at the front of the boiler

Top right in photo is the point where the safety switches wiring connected to the burner controls

Photo of the over heated firebox. No one was injured in this event. Even though the boiler was found running in this condition in the morning.

Hot Water Heating Boiler failure due to non functioning low water cutout This was a domestic or residential size hot water heating boiler used for building heat. This was a Federal Facility located in Maine in which the State of Maine has no jurisdiction. This boiler does not require inspection per Maine law Failure of the Low water fuel cutout safety switch was root cause Incident occurred after normal working hours, no individuals were injured.

Boiler lying on its side where it landed after the explosion. Significant damage is evident throughout the room

Ceiling of the room where the boiler hit when it lifted from the floor

Exterior of the building damaged by the blast. The boiler was located in the basement.

Low Pressure Steam heating boiler installed in Maine. Inspection noted, leaking sections, a rusted out condensate return line and improperly operated boiler

Securing and opening the steam heating boiler found the boiler full of calcium hardness and scale. As the unit heated, the calcium hardness expanded and pushed the sections apart causing leakage

Condensate return line that should have been returning reclaimed water to the boiler was pouring on the floor due to rusted out piping.

With lack of blow down, nearly 100% make up, and lack of proper operation and service this unit pushed itself apart. These units are serviced on an annual basis by properly licensed technicians

The following photos are of boilers and items found during routine annual inspections of low pressure boilers in Maine.

Corroded water inlet line. Incident waiting to happen

Mud Drum to Boiler connection, corroded and leaking.

Corroded mud drum and boiler connections. Hazard is boiler explosion.

Leaking and corroded safety valve.

Discolored lagging top left and bottom background is soaked with fuel oil from a leaking fuel oil supply fitting.

Hot Water system circulating pumps corroded and leaking inlet and outlet connections

Bad refractory causing hot spots and fire hazard along with bad door seals allowing CO into the building

Missing insulation causing fire hazard, and allowing exhaust gasses into the building

Bad door gaskets creating fire hazard, heat damaged pipe insulation, exhaust gasses allowed into building.

Domestic hot-water heating boiler in NJ. Came up through the floor, out the side of the house and.

Into the neighbors house 60 feet away.

One individuals solution to a leaking relief valve. Last resort? Place an isolation valve in the system. Refer back to the 119 gal water heater.

Boiler explosion caught on video in Maine. Note the items on the desk bottom right. These 3 photos watched in series will show the first few seconds of a boiler event

The operator had just exited the scene heading to the left. Note fireball top of the screen, burner on front of boiler twisting to the right, ladder twisting and items lifting of the desk bottom right

These 3 photos were taken from a continuous feed video. Elapsed time is split seconds.

A situation where an air tank had been welded in place of a Steam Jenny Boiler and used for thawing culverts by a Public Works dept in Maine. This is not built to code.

The vessel is clearly ASME stamped U, non fired pressure vessel, max temp 650 deg. F.

It had been fitted with a hot water boiler relief valve not a steam safety valve, was manually filled with 5 gallons of water

Then a gas rosebud torch was placed underneath the vessel to boil the water and bring the pressure to 15 psi. At that point they would open the isolation valve and force steam into frozen culverts. The perfect IED

The gas bottle and rosebud torch used to bring the vessel to a boil.

In Closing There are many, many more pictures to show, we are limited only by time. We have situations where no one is monitoring the boiler in schools and minucipalities on a regular basis. Sometimes the inspector is the only individual looking at the boiler. There have been instances where a school has needed to be closed early due to conditions found during the inspection. In this case relief valves on two water heaters and the heating boiler were found to be non-functioning.

Frequently noted items Low water fuel cutouts, stuck safety and relief valves in day care buildings on college campuses. Due to these units not requiring annual inspection by State of Maine Law, controls and safety devices such as low water fuel cutouts, high temperature and high pressure switches are often found not installed to current requirements. These items were found during consult inspections as requested by Risk Management

Routine annual heating boiler maintenance. Most owners are under the assumption that the technician servicing their boiler on an annual basis is somehow taking care of the testing of devices and inspection. This is not always the case. This service normally entails servicing the combustion and burner fuel systems, change of fuel filters, clean the fuel pump housing, nozzles, check the igniter, vacuum the gas passes of the boiler and perform an efficiency test of the unit, etc. An evaluation of the pressure containing capability of the boiler is not made. That is the primary purpose of the annual boiler inspection.

Inspections Routine inspections are considered critical to ensure proper safety of the boiler. The inspector may be the only one to look at these boilers. If conditions go un-noted it may lead to catastrophic results. This is why we do inspections.