Module 3.7. Thermal bridging



Similar documents
Contents. APA Construction Details. Full fill cavity walls Partial fill cavity walls Solid externally insulated walls 26-37

Introduction & Principles Issued in support of Junction Details, Parts 1 to 5

Is Your Envelope Effective? Mark Lawton P.Eng Morrison Hershfield Limited Vancouver

TGD L Limiting Thermal Bridging and Air Infiltration. Acceptable Construction Details. Introduction

BER Assessors Dwellings Technical Bulletin

Post-insulation of cellar ceiling and cellar walls

FACTORS AFFECTING ENERGY CONSUMPTION OF BUILDINGS

Fire 2This Technical Bulletin has been commissioned by the UK SIP Association in

Thermal Performance of Steel Beam Junctions using Different Connection Methods

Section Timber Frame Walls. Single layer between studs. Single layer between studs with service void. Between studs with insulated lining

BuildDesk U 3.4. Manual

SG Series 65mm Frame Windows (Fixed Lite Window Illustrated)

Improving thermal insulation of concrete sandwich panel buildings

SOUND INSULATION FOR EXTERIOR WALLS AND FACADE SYSTEMS

Energy Company Obligation (ECO): Technical Monitoring Questions

Rev Code of Practice. SIP Technology.

Rockwool Flexi Insulation Application Guide

GUIDANCE SHEET FOR CONSERVATORIES, SUNROOMS AND EXTENSIONS TO DWELLINGS.

Multi-layer Insulation Blanket for Roofs

Section 5.0. Basements. Wall insulated externally. Wall insulated internally. Ba02. Product: Polyfoam ECO Floorboard Ba01.

NCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003)

1/9/2013. Terminology Calculating Heat Transfer Code Requirements Design Examples and Sustainability

Part 3 Ancillary technologies. Chapter 3.2. Mechanical ventilation with heat recovery

2012 Ontario Building Code Requirements for New Construction. Bradford West Gwillimbury Building Division March 5, 2012

Standards Committee T echnical Technical Conference

Dienstleistung. Certification as "Quality Approved Passive House" Criteria for Residential-Use Passive Houses

Timber Frame Walls Rethinking Construction

Good Craftsmanship Guide. Carpentry and Joinery- Carcassing

Comment Form on Proposed Gut Rehabilitation Alternatives

Mark Cramer Inspection Services, Inc.

The Real Value of Space

How To Certify The Scottsdale Construction System

GYPSUM AREA SEPARATION FIREWALLS GA

Introduction. 1. Heat Transfer. In Townsville s climate it is essential to choose building materials that perform well in our local conditions.

Envelope INSULATION BATT (2) Avoid Using Batt Insulation With Metal Framing. Pressure or Friction Fit

IEA SHC Task 47 Renovation of Non-Residential Buildings towards Sustainable Standards

Common Problems with Walls

Conventions for U-value calculations

Heating Load Calculation

RULING OF THE MINISTER OF MUNICIPAL AFFAIRS AND HOUSING

2014 British Columbia Building Code Changes

State of Connecticut Department of Public Health RADON PROGRAM

CI/SfB (31.9) BETTER BY DESIGN PRODUCT GUIDE COMPLETE GUIDE TO THE IG PRODUCT RANGE.

We re about to build.

RELEASE NOTES EG USA 3.0.0

Molds and mildew are fungi that grow

Rosslare Case Study Passive House Cost Analysis. Seamus Mullins Quantity Surveyor Michael Bennett Group

October 30, Mr. & Mrs. Daniel Vick 101 Southwind Cove Benton, AR. Report of Findings, Structural Investigation, Benton, Arkansas, Dear Mr.

IRISH BUILDING CONTROL INSTITUTE HOTEL COURT HOTEL BALLYCONNELL CO CAVAN. 26 th MARCH 2009 TIMBER FRAME CONSTRUCTION

201 WATER STREET FORWARDERS MUSEUM AND VISITORS INFORMATION CENTRE

HOOVER TREATED WOOD PRODUCTS, INC. TECHNICAL NOTE FOR ADDITIONAL INFORMATION: TEC-WOOD ( )

Building Control Guidance Note

Fiberglas, Exterior Wall Thermal Insulation

Advice Series. the maintenance and repair of historic buildings

EAST LYME HIGH SCHOOL

Constructions Database User Guide <Virtual Environment> 5.9

CONDENSATION IN REFRIDGERATED BUILDINGS

Basement Moisture Problems

Section 4.3. Separating Floors. Timber frame floor with I-Beams. Upgrading existing timber floor with new ceiling. Timber frame floor with

The Effects of Thermal Bridging at Interface Conditions

ROOFS, SNOW AND ICE DAMS

Excerpts from the Canadian National Building Code (NBC)

CERTIFICATE NAME OF PRODUCT MANUFACTURER PRODUCT DESCRIPTION CERTIFICATION PROCEDURE. No VTT C Date of issue , Updated July 1, 2011

Insulating Basements: Part 3 Basement Wall Systems

STRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL FRAME SYSTEM

Cavity Drain R20 is manufactured from1.0mm thick black high density polyethylene with studs approximately 20mm high.

Building Regulations for the Conservation of Fuel and Power

PB301 July Lightweight Building Solutions. Bushfire Protection.

Chapter 2: Foundations

Glass partitions SFB 3074

Conservatory warm roof conversion system

DEFAULT HEAT LOSS COEFFICIENTS

2.18 INTERIOR & EXTERIOR FINISHES VAPOR & AIR BARRIERS

Building Energy Codes 101 October 23, Matthew Giudice Building Policy Associate Midwest Energy Efficiency Alliance

Signs of insulation problems In the winter. In the summer. conditioning system

The Kingspan Insulation Price List 1 st January 2013

Foundation. Foundation

ANSI/ASHRAE Standard Building Thermal Envelope and Fabric Load Tests

Name of course: Residential Construction Site Management (RCSM) Level 1

Thermal Bridging of Masonry Veneer Claddings and Energy Code Compliance

Section 2.4. Built-up Metal Roofs. Rail and bracket system. Standing seam system. Bu02. Product: Earthwool FactoryClad range Bu01

The Closed Crawl Space: Making the Transition Climate Zones 3A & 4A

Composite Panel Firewall Systems

Loss Prevention Standard

EcoTouch Insulation with PureFiber Technology

Contents. Who is Premier Guarantee? Your Structural Warranty. What to look out for in your New Home. Running in your New Home. DIY and Maintenance

Building Condition Assessment: West Lexington Street Baltimore, Maryland

Poro Lintel System Range Unique to the Porotherm & thin joint masonary systems

Rockwool Cladding Roll

This handout is a guide only and does not contain all of the requirements of the Minnesota State Building Code or city ordinances.

ENVIRONMENTAL INFORMATION APR 1200 products are made from glass mineral wool, one of the most environmentally friendly insulants available.

Adaptive strategies for office spaces in the UK climate

KINGSPAN INSULATION KINGSPAN KOOLTHERM K12 FRAMING BOARD INSULATION

CERTIFICATE OF APPROVAL No CF 5055 ARABIAN VERMICULITE INDUSTRIES

2009 IECC Update. Scope. Content. International Energy Conservation Code

Building Condition Assessment: North Howard Street Baltimore, Maryland

Electrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, Underground branch circuit feeding a detached garage:

Guide to the safe installation of downlighters in dwellings

Innovation - High performance roof, wall and floor insulation board. delivering better performance

Transcription:

Module 3.7 Thermal bridging

Learning Outcomes On successful completion of this module learners will be able to - Describe construction details which influence thermal bridging. 2

Introduction to thermal bridging. Thermal bridging occurs in building envelopes when materials with high thermal conductivity, such as steel timber and concrete, create pathways for heat loss that bypass thermal insulation. When these poor insulating materials provide an uninterrupted short circuit between the interior and exterior of a building, the thermal bridge can result in a) accelerated heat loss through that area, b) localised cold spots on the interior of a wall that may cause a risk of condensation. This effect is most significant in cold climates during the winter when the indoor-outdoor temperature difference is greatest. Reference: http://wiki.aia.org/wikipages/thermalbridging.aspx 3

- continued. Thermal bridging can also occurs in building envelopes when gaps or breaks in the insulation envelope create pathways for heat loss that bypass thermal insulation. The reduced or missing insulation can allow warm inside air make contact with cold external surfaces. This bypass of the insulation will also cause accelerated heat loss through that area, and localised cold spots on the interior. 4

Examples of construction details which contribute to thermal bridging. Only a small number examples will be shown in this module. Examples shown here may not represent all possible relevant examples in all European countries. Additional examples and information may be found in a free online presentation at www.asiepi.eu/fileadmin/files/ppt-on- DEMAND/PPT_4.1/player.html Also in two documents available at www.asiepi.eu/information-papers.html P188_Thermal_bridge_guidance_principles_ASIEPI-WP4[1].pdf P189_Thermal_bridge_guidance_examples_ASIEPI-WP4[1].pdf 5

Example of construction detail which contributes to thermal bridging. Heat loss through an external wall at a suspended floor. 6

Example of construction detail which reduces thermal bridging. Reduced heat loss with an alternative construction detail. 7

Examples of thermal bridging. All timbers in wall 150mm X 38mm at 400mm centres Full depth noggings Full depth insulation Insulation omitted at high level for clarity Thermal bridge of insulation layer due to a) Full depth timber studs and noggings b) Gap in insulation under nogging 8

- continued. Take any heat loss surface, i.e. floor, wall, roof, etc. Thermal bridging must be considered if there is more than one possible heat flow path through that surface. If the thermal bridge allows for two or more possible heat flow paths, in the main body of the floor, wall, roof. etc. then its effect must be considered. 9

- continued. Typically construction details are broken down into two parts when considering thermal bridging. Part 1. When the thermal bridge is part of the main structure of the floor, wall, roof, etc. In this case the effect of the thermal bridge is included in the calculation of the U-value for that element. Such calculations were outlined in module 3.4 10

- continued. Part 2. When the thermal bridge occurs around doors, windows and other penetrations of the insulation envelope. These are typically grouped together as one major contributor to heat loss from the building. 11

Calculation of heat loss due to thermal bridging. European countries have different ways of calculating heat loss due to thermal bridging. This is highlighted in an free presentation at www.asiepi.eu/fileadmin/files/ppt-on- DEMAND/PPT_4.1/player.html These various methods used are also highlighted by two documents available at www.asiepi.eu/information-papers.html P188_Thermal_bridge_guidance_principles_ASIEPI-WP4[1].pdf P189_Thermal_bridge_guidance_examples_ASIEPI-WP4[1].pdf 12

When the thermal bridge is part of the main structure of the floor, wall, rood, etc. Take heat loss through the timber frame construction show on the next page. One resistance layer is made up of two very different materials, timber and mineral wool insulation. The poor insulator, timber, provides an uninterrupted short circuit through the insulation, between the interior and exterior of a building. The timber create a pathway (or bridge) for heat loss that bypass the insulation. This reduces the effectiveness of the insulation. 13

- continued. Rse - RESISTANCE of Surface External TIMBER FRAMED WALL (Plan view) 102mm BRICK OUTER LEAF 50mm AIR CAVITY ( slightly ventilated ) 19mm PLYWOOD 38x140mm TIMBER STUDS at 400mm CENTRES (CONDUCTIVITY=0.13 W/m K) 140mm MINERAL WOOL INSULATION (THERMAL CONDUCTIVITY=0.038 W/m K) 2 x 12.5mm PLATERBOARD Rsi - RESISTANCE of Surface Internal HEAT FLOW 14

- continued. For this construction detail the timber frame is critical for structural support. However a large area of timber will create a larger thermal bridge and so increase heat loss through this wall. To minimise the area of the thermal bridge the designer must minimise the area of timber exposed to the warm air inside the heated space, however this should not weaken the structure. 15

2400 Possible timber frame detail All timbers in wall 150mm x 38mm at 400mm centres Full depth noggings Full depth insulation Sole plate above floor level Top plate below ceiling level 400-38 = 362mm Floor level 16

Fractional area of timber possible detail. Construction detail repeated every 400mm Overall repeatable area 2.400 x 0.400 = 0.960 m 2 Area of timber Vertical 2.400 x 0.038 = 0.091 m 2 Horizontal 0.362 x 0.038 x 5 = 0.069 m 2 Total 0.160 m 2 Fractional area of timber (0.160 / 0.960) 0.17 Fractional area of insulation ( 1 0.17 ) 0.83 17

2400 Improved timber frame detail All timbers in wall 150mm x 38mm at 400mm centres HALF DEPTH noggings Full depth insulation Sole plate BELOW floor level Top plate ABOVE ceiling level 400-38 = 362mm Floor level 18

Fractional area of timber improved detail Construction detail repeated every 400mm Overall repeatable area 2.400 x 0.400 = 0.960 m 2 Area of timber Vertical 2.400 x 0.038 = 0.091 m 2 Horizontal 0.362 x 0.038 x 0 = 0.000 m 2 Total 0.091 m 2 Fractional area of timber (0.091 / 0.960) 0.10 Fractional area of insulation ( 1 0.10 ) 0.90 Conclusion smaller fractional area of timber will reduce thermal bridging and so reduce heat loss. No loss in structural strength. 19

One way to reduce thermal bridging in the main structure of the floor, wall, ceiling, etc. a) Reduce the overall area of thermal bridge penetrating the insulation envelope. For previous example move part of the thermal bridge so that it is no longer in contact with the warm air inside the room. Also, if possible, change the construction detail to place the timber struts at 600mm centres rather than 400mm centres. 20

How to reduce thermal bridging in the main structure of the floor, wall, ceiling, etc. b) If possible change the construction detail to eliminate the thermal bridge. For the previous example reduce the depth of the nogging so it does not fully penetrate the insulation layer. c) Ensure full continuity of insulation. For previous example make sure the insulation is fitted tightly against all timber surfaces,.i.e. make sure there are no gaps in the insulation envelope. 21

In some cases the thermal bridge is repeated at given intervals across the construction. Repeated Thermal Bridging due to steel wall ties Repeated Thermal Bridging due to mortar joints between blockwork 22

- continued. In this cases the repeated thermal bridging is caused by a) Steel wall ties in the cavity wall construction. (Effect can be neglected if using plastic wall ties) b) Mortar joints in the internal block work leaf. The effect of this repeated thermal bridging is included when calculating the overall U-value (thermal transmittance) of the block work wall, following procedures described in I.S. EN ISO 6946. 23

When the thermal bridge occurs around doors, windows, etc. In other cases, thermal bridging can occur around openings in the insulation envelope. This thermal bridging does not occur at constant intervals and so cannot easily be calculated as part of the individual wall, roof etc. Treatment of this type of thermal bridging varies between European countries. In some cases all thermal bridging around openings are grouped together as one major contributor to heat loss from the building. In such cases an approximate heat loss factor is used to estimate the relevant heat loss. 24

Examples of construction details which contribute to thermal bridging. Thermal bridge caused by structural beam below a balcony window Image source: www.rensolutions.co.uk/images/thermal%20bridg 25

Incorrect detail allowing thermal bridging. Part fill Cavity Insulation Traditionally, block were used to close the cavity at the jamb, resulting in a solid masonary reveal and so thermal bridging 26

Same detail with a thermal break installed. Part fill Cavity Insulation The cavity should be closed using a proprietary insulated cavity closer, or by inserting a thin strip of insulation between the masony leafs to form a thermal break. 27

Incorrect detail. inside air come in contact with the window frame allows warm Gaps in the insulation layer below cold external surfaces 28

-continued. Image source: www.leedsmet.ac.uk/teaching/ vsite/low_carbon_housing/... All images: Concrete ground floor slab extends across the external cavity wall resulting in a significant thermal bridge. 29

- continued. Thermal bridging at a Juliet balcony when design detail not followed by the builder. Image source: www.leedsmet.ac.uk/teaching/vsite/low_carbon_housing/... 30

- continued. Design detail (1) and actual build(2) for the Juliet Balcony shown on previous page. Image source: www.leedsmet.ac.uk/teaching/vsite/low_carbon_housing/... 31

- continued. Thermal bridging due to structural support steel. Image source: www.leedsmet.ac.uk/teaching/vsite/low_carbon_housing/... 32

Impact of thermal bridging on overall heat loss. As stated previously European countries have different ways of calculating heat loss due to thermal bridging. Take an example for Ireland. Even when applying best practice details described by Irelands building regulations Limiting Thermal Bridging and Air Infiltration ---- Acceptable Construction Details (www.environ.ie ) heat loss due to thermal bridging may account for more than 10% of the space heating load. 33

- continued. When applying typical construction details heat loss due to thermal bridging in Irelands dwellings may account for more than 20% of the space heating load. source: Authors calculations performed on worked examples of Irelands Dwelling Energy Assessment Procedure DEAP using varying default values for non-repeating thermal bridge. This heat loss due to thermal bridging may be much larger if design details are not accurately followed, as in the case of the Juliet balcony described earlier. 34

How to reduce heat loss due to thermal bridging. Some European countries have developed Accredited construction details to show designers and builders examples of good practice to minimize thermal bridging of insulation layers and to achieve air tightness of buildings. Some examples are described in Chapter 12. 35

Source of accredited construction details. Source Denmark Source France Source Spain Source Germany. - Not found. - Not found. - Not found. Passivhaus Institut - Protokollband #16 Source Ireland. reference ASEIPI P189 Section 4. http://www.environ.ie/en/publications/developm entandhousing/buildingstandards/ 36

- continued. Source United Kingdom. http://www.planningportal.gov.uk/england/profes sionals/buildingregs/technicalguidance/bcconsfp partl/bcassociateddocuments9/bcptlaccdet/ Source Scotland. http://www.scotland.gov.uk/resource/doc/21773 6/0088295.pdf 37

- continued. Buildings using these details will reduce heat loss by achieving a) Less thermal bridging. b) Increased air tightness. Details and guidelines developed in Ireland appear to have been adapted from UK guidelines. Both also adopt a checklist approach where tick boxes can be completed to verify checking and correct installation. 38

Responsibility for reducing thermal bridging. Every person involved in construction can help reduce thermal bridging. In all cases everyone must try to keep a continuous insulation envelope around the building. Designers must specify construction details that minimise thermal bridging. Those details should be as straight forward as possible so that craftsmen do not make mistakes and are not tempted to take short cuts. 39

- continued. Builders must complete the building works as specified. Craftsmen taking services through the finished insulation envelope must repair and replace any damaged insulation. Owners must inspect and approve all construction details, as the work progresses, and before it gets hidden from view by internal or external finished. 40

Module Summary. Thermal bridging can increase heat loss from buildings. Task. Explain how thermal bridging can occur. 41

Module Summary. Traditionally, blocks were used to close the cavity at the jamb around doors and windows, resulting in a solid masonry reveal and thermal bridging. Task. How can this thermal bridging be reduced / eliminated. 42

Module Summary. On inspecting a concrete floor slab at a door opening, you find that concrete floor extends across the external cavity wall. Task. a) Is this an acceptable construction detail to reduce thermal bridging. b) Who might be responsible for allowing this occur. c) What would you suggest to correct the fault. 43

Module Summary. Some European countries have developed Accredited construction details to show designers and builders examples of good practice to minimize thermal bridging of insulation layers and to achieve air tightness of buildings. Task. Can you list the source of some of those details. 44

References: http://wiki.aia.org/wikipages/thermalbridging.aspx www.asiepi.eu/fileadmin/files/ppt-on- DEMAND/PPT_4.1/player.html www.asiepi.eu/information-papers.html - P188_Thermal_bridge_guidance_principles_ASIEPI-WP4[1].pdf - P189_Thermal_bridge_guidance_examples_ASIEPI-WP4[1].pdf www.leedsmet.ac.uk/teaching/vsite/low_carbon_housing/... I.S. EN ISO 6946 : 2007 Building components and building elements - Thermal resistance and thermal transmittance - Calculation method www.rensolutions.co.uk/images/thermal%20bridg 45

References continued. http://www.environ.ie/en/publications/developm entandhousing/buildingstandards/ http://www.planningportal.gov.uk/england/profes sionals/buildingregs/technicalguidance/bcconsfp partl/bcassociateddocuments9/bcptlaccdet/ http://www.scotland.gov.uk/resource/doc/21773 6/0088295.pdf 46