Proposal for Data Center Migration & Logistic Support.



Similar documents
CASE STUDY. Case Study #2 Hi-Tech Transportation, Inc Page 1

Ahmedabad. Bangalore. Chandigarh. Charles Sturt University Curtin University CQUniversity Deakin University James Cook University - Brisbane

DCMP Exam Preparation Syllabus

Datacenter Migration Think, Plan, Execute

Data Center Relocation Take One! Joseph E. Ford, RCDD Craig A. Lowe, RCDD/OSP,LEED AP Robert G. Hall, MCSD Bala Consulting Engineers, Inc.

Contact us for a free consultation today! officemove@aie195.com

Pulling up the Roots: a Guide to Corporate Relocation

Statement of Work Server Migration & Cable Management. Installation Services. Table of Contents. 1.0 Executive Summary. 2.0 Features & Benefits

Storage System. Planning Checklist. EC E1, First Edition

City Wise Client Participation List

SMART PREPARATION FOR DATA CENTER MIGRATION

Smile.

Regulated Recordkeeping: An Accurate Solution From SpreadBoss and DocuVista

Determine dates with you telecom suppliers so that the new office is online before your move for both Phones and Data connections.

Exhibit to Data Center Services Service Component Provider Master Services Agreement

Product Comparison List

Appendix A: Installation and upgrade checklists

Your EyE in the Sky. Fleet Management System

About Transitional Data Services

DHL INTERNATIONAL SUPPLY CHAIN DISCOVER THE ADVANTAGE OF A SMARTER SUPPLY CHAIN

Storage Trends Choice-Solutions Ltd.

To get started, you will need the following items Product Key Router with firewall capability Network cables

EDI Modernization Case Studies and Best Practices

NATIONAL AND INTERNATIONAL REMOVALS

3.7 Logistics Execution

SAN Conceptual and Design Basics

DSV India Corporate July 2014

PERFECT ELECTRONIC TECHNOLOGY FOR MEASURING AND CONTROL.

KWE Basic Philosophy. As of March 2010, KWE is ISO14001 certified at 6 locations in Japan and 8 locations overseas

FLEXIBLE DEPENDABLE TRUSTWORTHY FASTER SERVICE SMARTER PEOPLE LATEST TECHNOLOGY

Avnet Integration Services.

15 Organisation/ICT/02/01/15 Back- up

Best Practices for VMware ESX Server 2

Office Relocation Planning Guide. The Department of Administrative Services (DAS) offers these guidelines to help plan office relocations.

STORAGE & DISTRIBUTION SERVICE PROPOSAL. Prepared for Jade Lambert

Managing Availability and Failure Avoidance

AN APPLICATION-CENTRIC APPROACH TO DATA CENTER MIGRATION

ADC KRONE s Data Centre Optical Distribution Frame: The Data Centre s Main Cross-Connect WHITE PAPER

PADOVA (PD) - R.E.A.

Keys to a Successful Data Center Relocation

HP Storage Data Migration Service

IT Relocation Checklist

RECORDS MANAGEMENT RECORDS MANAGEMENT SERVICES. Cost-Effective, Legally Defensible Records Management

InfraStruxure TM Management Software

Preparing for Your First DCIM System Deployment: Auto-Discovery and Data Collection

P13 Route Plan. E216 Distribution &Transportation

DISASTER RECOVERY PLAN

PACKAGING AND SHIPPING INSTRUCTIONS FOR SEAGATE PRODUCTS CONTENTS:

In Place. In Sight. Always.

Contents. Before you begin. Introduction: Organise dispatch operations 1. Element 1: Planning and organising dispatch operations 3

Logistics Warehouse. Janco Logistics (HK) Ltd. DSC Services

HP StorageWorks Modular Smart Array 1000 Small Business SAN Kit Hardware and Software Demonstration

About New Zealand Movers

ConVox. Call Center Solution Effective Complete and Comprehensive Solution for your Call Center

User Manual. RK-2d / RK-2t. dedicated KVM switch and rackmount screen technology. Designed and manufactured by Austin Hughes

Move Management. Enter

Exam: QUESTION 1 QUESTION 2 QUESTION 3 QUESTION 4

Smart Choice Business Consulting Data Centre Migration Story Board

Raritan LCD KVM Console (T1700/T1900)

The Trellis Dynamic Infrastructure Optimization Platform for Data Center Infrastructure Management (DCIM)

YOUR BUSINESS MOVING GUIDE

Product Comparison List

The safest passage for your relocation

Smart Integrated Multiple Tracking System Development for IOT based Target-oriented Logistics Location and Resource Service

ACME Enterprises IT Infrastructure Assessment

Documenting and Managing Infrastructure Connectivity

GAC International Moving Moving solutions for the Middle East, Indian Subcontinent and beyond

2014 AT&T Intellectual Property. All rights reserved. AT&T, Globe logo and other marks are trademarks of AT&T Intellectual Property.

Out-of-box comparison between Dell, HP, and IBM blade servers

Your reliable source for barcode scanning solutions

Determining The Right Lift Truck Navigation System. For Your Very Narrow Aisle (VNA) Warehouse

Large mining company implements RFID-based IRON ORE VEHICLE TRACKING SYSTEM

HHSL Barcode Guidelines Version September 2, 2014 HHSL Barcode Guidelines Version September 2, 2014 Page #1 of 14

The Trellis Dynamic Infrastructure Optimization Platform for Data Center Infrastructure Management (DCIM)

Transcription:

Proposal for Data Center Migration & Logistic Support. 1

Introductions: -----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------Opus Worldwide Data Center Migrations we are committed to provide excellent quality services in Data center Migration. Now Opus Data Center Migration is providing consistent quality service throughout its worldwide network, the group will continues to keep the Opus moving ahead. Now Opus worldwide is providing fully insured Data Center Migration Solutions with Full technical Support. Through these many migration and consolidation co projects Opus worldwide has recognized that there are 3 key elements to every successful Data Center Migration: a. An accurate inventory of all Racks, servers, storage and other assets involved b. A thorough understanding of asset interdependencies c. A perfect Planning -- the minute-by-minute move-day day plan for all migration activities Technical Support for DC Migrations: Migrations --------------------------------------------------------------------------------------------------------------------------------Comparing to other in industries one of our main specialty is we have well trained and qualified engineers in our team to give support for mounting/ unmounting/ unmounting/ cabling/ connectivity testing/ Migration Inventory Management/ documentation etc. Here we are offering our clients to complete Migration Projects management support for their migration related requirements. Royal s Migration Team always Executing DC DC Migration in their well maintained procedures and tools like Project Management Plan. Scope Management Plan Risk Assessment & Migrations Plan Risk Management Plan Schedule Management Plan Cost management Plan Progress Tracking Tools/ Repositories *Documented Procedures * Pre-Move Move / Post Move Validation Check List 2

Opus worldwide Services in Data Center Migration:----------------------- Technical Support for DC Migration: Origin data center: {labeling, cabling, unmounting, Migration Inventory Management} Destination Data Center: {Mounting, Cabling, labeling, Connective testing, Reinstalling Migration Inventory Management, signoff} Packing & Logistic Support for Servers & other IT assets: Origin data Center: {Packing, Documentation, Loading, transportation) Destination data Center: {re-collecting documentation, un-loading, un-packing} Transportation Vehicles: Close body container, GPS enable, Air-suspense. Packing Method: Servers, Switches & storages (1U-10U): Virgin Server Cartoon box (7ply), 5mm & 25mm Poly Urethane Form Sheet, Anti-static Bubble sheet, Corrugated Sheets, Silica gel, brown Masking tape & Fragile tape. Servers & storages (10U-18U): Virgin Server Wooden box, 25mm Poly Urethane Form Sheet, Anti-static Bubble Sheet, Corrugated sheet, Silica gel, brown Masking tape & fragile tape Data center Migration Checklist Plan: Define the Scope & size of the Project. Plan, agree and allocate resources & Budget. Agree key determining factors & limitation. Understand the risk analysis (transit Insurance). Create project plan identifying the critical path & key resource. Consider your company s operational requirements and planning the move to cause minimal disruption. Check that transportation and buildings can cope with equipments size & weight. Review development teams tasks & timelines. 3

Packing and Logistic Support for server and other IT Assets: ---------------------------------------- Opus Team is well experienced to handle your high valued equipments like (Live / Demo Servers, storage Racks, disk arrays or router & switches). Our trained Logistics team using effective methods to pack the same in high secure way using state of the art packing materials. And Opus Worldwide having various types of Containerized Vehicles to move the same with advanced / unloading equipments Packing Method: ------------------------------------------------------------------------------------------------------ For Packing Royal Uses Different types of materials like (1U/2U/4U/6U/8U/10U) Server Carton Boxes or Ply Wood Boxes (7 Ply 25 MM and 5 MM Poly Urethane Form, Air Bubble Sheets, Corrugated sheets, Silica Gels(for Moisture Prevention inside package) and Brown Masking tapes and Fragile Tapes. This type of effective packing methods and standard packing materials ensure that the materials can move easily without any type of damages. Physical Migration of Servers & Data Center Migration: ------------------------------------------------ The foundation of any relocation event is a thorough inventory of your data center s assets. Working with your team, our engineers inventory all of the servers, storage, network and other hardware. Dependencies between assets are discovered, and a dependency map of your specific environment is developed to be used as the basis for planning the relocation events, As part of the planning process, all assets are tagged with barcode labels generated by Transition Manager, which also maintains complete source and destination room layouts and rack elevation diagrams. During move events every task is controlled and logged by Project Manager, providing the entire project team with real-time status for all assets. A project manager or lead move engineer performs audits on rail installation, server locations and cabling throughout the move and a final audit is performed upon competition of the project to ensure move accuracy. Why Opus Worldwide? ---------------------------------------------------------------------------------------------- Well Trained Employees Systematic Relocation Planning High Quality services with Reasonable Cost Best Quality Packing Material Containerized trucks and other Advanced Moving equipments Well maintained Warehouses 24hrs emergency DC Migration Services 24hrs Customer Support 4

www.opusww.com Info@opusww.com 022-60464646 HO: Mumbai Branch: Bangalore Chennai Kolkata Delhi Pune Hyderabad 5