Thames Water: Decision Support Tools, Whole Life Costing and Asset Data Improvements Marie Linscott



Similar documents
2014 Price Review Business Plan Supporting Appendices Network Management. Published 2 December 2013

Contents BUSINESS PLAN Part A Business Plan Summary

Risk-based Modelling for Wastewater Infrastructure Asset Management

PATTERN MATCHING OF LIVE DATA TO IMPLEMENT PROACTIVE NETWORK MANAGEMENT

Staff Paper 6. Allowed for operating costs. 6.1 Introduction

Capital Maintenance Planning From a historical and future perspective

OUR ASSURANCE PLAN 2016/17 MARCH Our Assurance Plan 2016/17

Inputs, outputs and outcomes what should price limits deliver? A discussion paper

2007 Operating Budget Capital Budget 2007 Proposed Water and Wastewater Service Rate

Highway Asset Management Strategy

Creating the environment for business

LIFECYCLE MANAGEMENT OF UTILITY ASSETS A PRACTICAL APPROACH

Dynamic and Real Time Modelling. Consultants Perspective

MAP KEYS GLOSSARY FOR THE DRAINAGE AND WATER REPORT

A NEW METHOD FOR DEVELOPING THE MOST COST- EFFECTIVE REHABILITATION PROGRAMS FOR OUR AGEING SEWER NETWORKS

Operations, Maintenance and Monitoring Branch Status Update

Thames Water key Messages for London Borough of Ealing 25 th October 2005

monitoring water networks Identifying and Quantifying the Value of Water Network Monitoring

Guide to Conservatory Installation and Sewers

Delivering for our customers Our 2015 to 2020 business plan

Asset Management Strategy ( ) Doing things Differently A New Approach for a sustainable future

Cash for Growth Working Capital in the Nordics

GOLDSMITHS University of London

Sewer Flooding Alleviation in the Counters Creek Catchment

Water Mains Rehabilitation Framework (NI) Northern Ireland Water

SP Energy Networks Business Plan

Thames Water s Thames Tunnel Consultation

about your water and sewerage services

IBM Emptoris Procurement SaaS Service

PREDICTIVE AND OPERATIONAL ANALYTICS, WHAT IS IT REALLY ALL ABOUT?

DRAFT. Wastewater Asset Management Plan. Southland District Council

Aspects of Energy Efficiency in Water Supply systems

KIRKLEES. Visions and Strategies related to Energy and Climate Issues

Smarter Buildings & Management of Buildings

NETWORK MONITORING. Network Monitoring. Product brief. NETWORK MONITORING Logger Only

Energy and Carbon Management

5 Year Strategic Asset Management Plan

IBM Enterprise Asset Management

Essential Water. Customer Charter

NuRON Water Network Monitoring. Detect problems in real time before they turn into headaches

Specialists in the Refurbishment, Replacement and Renewal of Water Mains throughout the UK

A 360 Approach To Optimise Network Efficiency

Technical Journal. Paper 142

Transit Asset Management MBTA Initiatives

Real-time Monitoring Platform to Improve the Drinking Water Network Efficiency

Bevan Faulkner Director, Asset Management

Water Clean Up and Transparency: Corporate and Regulatory Accountability in the Water Industry. Jean Shaoul

Moving water around the UK is part of the solution

@DanSSenter. Business Intelligence Centre of Excellence Manager. +44 (0) dansenter.co.

Achieving high performance with Accenture Utilities Business Process Outsourcing Services

DISTRIBUTION, OPERATION and MAINTENANCE STRATEGY ASSET MANAGEMENT WORK INSTRUCTION ISOLATION OF A TREATED WATER STORAGE POINT ON THE WATER NETWORK

Project, Programme and Portfolio Management Delivery Plan 6

Draft Water Services Strategic Plan

Implementing an Enterprise Asset Performance Management System: Northumbrian Water Limited Case Example

Asset Management Overview. Water & Wastewater Utility Operation and Management for Tribes

Automating FP&A Analytics Using SAP Visual Intelligence and Predictive Analysis

Operations. Transport Officer OP199. Operations Manager. Administration Officer

Managing sewer flood risk

Expense Reduction in the Insurance Industry

Type of Sewer Systems. Solomon Seyoum

United Utilities Water Limited Page 2 of 223

Executive summary 2. 1 Introduction 4

Sopra Steria - A Leader in the Insurance Industry

Asset Management Excellence Utilising the AMCL Asset Management Excellence Model (AMEM) to achieve world class Asset Management.

FM & SECURITY SOLUTIONS. SSS Managed Services. Impartial, innovative, involved

Appendix D Programme Stream 6 CRM Procurement. Programme Stream 6 Remodelling of Customer Services Programme CRM Procurement

IT Services. Capita Private Cloud. Cloud potential unleashed

December Watercare Services Limited Asset Management Plan. For the period: 1 July 2012 to 30 June 2022

MORUWASA S STRATEGIC PLAN MATRIX FOR 2007/ /2022. Strategy Activity Responsibility Time Frame Performance

Project Management: Improving performance, reducing risk When will you think differently about project management?

Appendix 10: Improving the customer experience

DISTRIBUTION, OPERATION and MAINTENANCE STRATEGY ASSET MANAGEMENT WORK PROCEDURE SCOTTISH WATER ACCESS TO LIVE NETWORK

Guidance for Flood Risk Analysis and Mapping. Quality Management

ESKISP Conduct security testing, under supervision

Homes and Environment Scrutiny Committee. (Environment & Transport)

Climate Change Adaptation in London. Alex Nickson, Policy & Programmes Manager Climate Change Adaptation & Water, Greater London Authority

Housing Association Regulatory Assessment

Water Efficiency Self-Assessment Guide from

Transcription:

Thames Water: Decision Support Tools, Whole Life Costing and Asset Data Improvements Marie Linscott October 2012

Agenda UK water industry and Thames Water Challenges at their last price review Strategic responses from Thames Water Overview of the programme Decision Support Tools Whole Life Costing Data Improvement How it all comes together Embedding the change

WASTE WATER The water sector in the UK is highly regulated and vertically integrated Abstraction Treatment Storage Distribution Retail Distribution Treatment Regulators Source: Ofwat Ofwat Drinking Water Inspectorate Environment Agency Consumer Council for Water

Thames Water Largest UK water company with 14 million customers 1.6bn revenue 1.1bn operating costs & 1bn p.a. capital programme 2.6 billion litres of water a day 1.6bn of cash collected per year 715 reservoirs and treatment sites 80,000 kms of water main and sewer

Data related categories Challenges were laid out by the regulator at the last Price Review in 2009 PR09 Asset Management Assessment (AMA) criteria Stakeholder Engagement Leadership, policy and Strategy Management Processes WI WNI WWI WWNI Ofwat challenged Thames Water s reliance on expert judgement Asset data issues Lack of integration and use of asset planning tools Systems Data Analysis Reporting Balance % of total loss in PR09

We responded to PR09 with a number of strategic change programmes Data Improvement and Decision Support Tools Programme (DI and DST) - improve data quality in key areas and implement tools that improve investment cases to the regulator in time for the next price review SCADA WAMI Field Ops Transformation Field Ops Transformation Lean plan optimisation, terms and conditions review... WAMI Programme to enable work management and planning using SAP-PM SCADA Programme of improvement of Systems, Control and Automation DI & DST Programme Targeting service & operational improvements and more robust investment plans and improved outcome at PR14

Overview of the Data Improvement and Decision Support Tool Programme DI and DST Programme Providing data of greater accuracy/completeness through: Improving and cleansing data already in systems Data Cleanse Asset data cleansing for SAP- PM/EAM implementation Strategic Data Data requirements defined for PR14 - Field and desktop data improvements Decision Support Tools >15 asset class investment planning tools for Asset Planners prioritised against AMA and PR14 spend Whole Life and Unit Costing Improved cost data availability WLC process implementation Purchase of new or better quality data Tools to support decision making around risk, replacement, repair and forecasting Models to be able to effectively support whole life costing decisions and efficiency within operational sites Data focussed Model and tool focussed

A portfolio of Decision Support Tools have been delivered to improve decision making around investment vs risk vs service List of Decision Support Tools Clean water Distribution: bursts risks model Distribution: mains modelling phase 2 Leakage model natural rate of rise and deterioration Benefits of pressure management (PRVs) Trunk mains risk model Operations meters and PRV DST development WaterNet implementation River asset condition ARCs Waivers Zonal network solutions (ZNS) System resilience & generic mass balance tool WaRMs Waste water Rising mains models Large diameter sewer model Urban creep DAP Integration with risk models Floodworks model Small diameter blockages model Small diameter collapse model Small works headroom model System reliability modelling Sewage Pumping Systems (and availability) Integrated sludge planning model Integrated development forecasting tool (SOLAR) Investment planning processes Asset planning Risk modelling and serviceability assessments Operational efficiency management Assessing historic performance Intervention planning Others Benefits database Carbon models AIM Risk Wrapper AIM (the Risk Wrapper), is an intuitive risk-based solution tool targeting investment under multiple serviceability and budgetary constraints. It is a bottom-up investment planning tool allowing the user to aggregate proactive investment needs, reactive costs, risks and investment benefits.

WaterNet example Waternet DST benefits Improve cost benefit analysis by prioritisation of capital maintenance on Pressure Reducing Valves & Operational Meters The tool provides a user friendly interface and improved reporting thereby reducing the time required to undertake this activity

The Strategic Asset Data workstream supported the tools and investment planning process in delivering targeted asset data improvements Examples: Purchasing Datasets LiDAR Data elevation levels for the entire Thames Water landscape Combining Datasets Improved data inputs to models Demand Forecasting Model to provide more granular forecasting of demand Trunk Mains Age Data replacing inferred age data for trunk mains in North London with actual ages Other PR14 data sets Odour Complaints mapping of complaints to assets on corporate system PR09 data needs Early PR14 view Identification thru SME Workshops Prioritisation & Delivery Process Prioritisation Procurement and Delivery Completion and Load

Whole Life Costing is another related workstream improved asset cost data... Whole Life Costing will deliver a consistent integrated view of capex and opex costs for different asset classes and activities across the business throughout the lifecycle. 2. Asset cost models 1. Leverage existing reports Improving Thames Water s Whole Life Costing capability 4. WLC process & methodology 3. Unit Cost reporting

Examples of deliverables that span asset classes Sewerage network Large diameter sewer model Helps us to assess the safety and stability of our large sewers SDAC cost model Helps us understand where to invest and what the Opex impact will be Data feed: Gravity sewer construction date Customer impact: Better service due to reduced business cost and effort Benefits: Reduced risk of flooding Fewer sewer collapses Reduced number of tankers at sites

Examples of deliverables that span asset classes Water Network Systems resilience model Helps us to assess the resilience of our water supply systems Cost and performance data for DMAs Unit cost reports for treatment sites Guildford Water Supply Network Supporting data improvements: Service reservoir condition District meter calibration

Embedding the change Business & programme working closely together network of business users Programme, workstream and product communications Robust approach to training 30 training events Network of 76 super users (across different products) Building controls into the key business processes (e.g. investment gateway processes) Planned future business audits Measuring usage

Questions

Contacts Marie Linscott (Thames Water) Head of Asset Information Email: marie.linscott@thameswater.co.uk Barry Middleton (PwC) Mobile: +44 (0) 7969 554717 Email: barry.p.middleton@uk.pwc.com