E&SC Training & Certification

Similar documents
Erosion and Stormwater Management Certification Program

COLORADO DEPARTMENT OF TRANSPORTATION STORMWATER FIELD INSPECTION REPORT - ACTIVE CONSTRUCTION

Activity Yes No N/A Notes

SECTION ELEVEN: ACTIVITIES REQUIRING A CERTIFIED EROSION AND SEDIMENT CONTROL PLAN 1

TCEQ TPDES CGP EPA NPDES GCP Inspection of Controls Report

REFERENCE. All National Grid personnel who plan and perform work involving protected water resources are responsible for:

STORMWATER POLLUTION PREVENTION PLAN TEMPLATE. 1.0 SITE DESCRIPTION 1.1 Project Name and Location Date

City of Shelbyville Site Inspection Checklist

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department

STANDARD INSPECTION FORM GENERAL PERMIT FOR STORMWATER ASSOCIATED WITH CONSTRUCTION ACTIVITY

STATEMENT OF ACKNOWLEDGMENT

APPLICATION PROCESS FOR LAND DISTURBING PERMIT

Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010

1.7.0 Floodplain Modification Criteria

MASSACHUSETTS COASTAL NONPOINT PROGRAM NOAA/EPA DECISIONS ON CONDITIONS OF APPROVAL

LOW INTEREST LOANS FOR AGRICULTURAL CONSERVATION

Carlton Fields Memorandum

Annual Standards and Specifications. Erosion and Sediment Control

CONSTRUCTION PERMIT SUBMITTAL CHECKLIST

Mine Plan of Operations Reclamation Bond Checklist

Restoring Anadromous Fish Habitat in Big Canyon Creek Watershed. Summary Report 2002

MONTANA Water Quality & Storm Water Management Training Programs For Construction Activities

Post Construction Stormwater Management Checklist Program

Outlet stabilization structure

The Basics of Chapter 105 Waterways and Wetlands Permitting in PA

C. Storm Water Pollution Prevention Plan (SWPPP) Yes No Response / Comment. D. Good Site Management Housekeeping Yes No Response / Comment

STATEMENT OF SHARON BUCCINO SENIOR ATTORNEY NATURAL RESOURCES DEFENSE COUNCIL WASHINGTON, DC

Sample DEQ Plan Submitter s Checklist for Stormwater Management Plans

How To Get A Stormwater Discharge Permit In A City Of Scottsdale

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE

Federal Energy Regulatory Commission Speakers Biographies

Index. protection. excavated drop inlet protection (Temporary) Block and gravel inlet Protection (Temporary)

Appendix C. Municipal Planning and Site Restoration Considerations

COMMUNITY CERTIFICATIONS

How To Amend A Stormwater Ordinance

CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN TEMPLATE

Vehicle Tracking Pad

Beseck Switching Station Inspection

Warren County MS4 Stormwater Management Program Plan

2006 Standard Application Processing Time. 10 months. 14 months

City of Paso Robles Community Development Department Construction Site Storm Water Quality Requirements

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (SSBMP) PLAN/STORM WATER POLLUTION PREVENTION PLAN (SWPPP) REVIEW CHECKLIST


Flood Plain Reclamation to Enhance Resiliency Conserving Land in Urban New Jersey

Certification. Septic Tank Contractors

Harris County Flood Control District. Policy, Criteria, and Procedure Manual

Henry Van Offelen Natural Resource Scientist MN Center for Environmental Advocacy

A. Describe the existing drainage patterns on-site as shown on Map I, including any potential flooding and erosion problems.

UNITED STATES OF AMERICA 131 FERC 62,175 FEDERAL ENERGY REGULATORY COMMISSION. United Water Conservation District Project No.

Solar Energy Engineering, Consulting & Permitting Services

Chagrin River Watershed Partners, Inc. Cost Analysis of Low Impact Development Best Management Practices

STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY STORMWATER MANAGEMENT PLAN PREPARATION GUIDANCE. Revised 4/2011. Contact information

COMMONWEALTH OF KENTUCKY CITY OF LONDON ORDINANCE NO AN ORDINANCE ESTABLISHING EROSION AND STORM WATER CONTROL

Appendix A. Lists of Accomplishments and Project Costs. UMRWD 10 Year Plan Update. Appendix A UPPER MINNESOTA RIVER WATERSHED DISTRICT

WETLAND RESTORATION PROGRAM WATER ACT APPROVAL ADMINISTRATIVE GUIDE

Town of Elkton & Cecil Soil Conservation District Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control

Construction Site Inspection. Inspecting to Keep You in Compliance

As stewards of the land, farmers must protect the quality of our environment and conserve the natural resources that sustain it by implementing

Chesapeake Bay Preservation Area (CBPA) in Virginia Beach, Virginia. The Resource Protection Area (RPA) and Buffers The First 100 Feet

APPENDIX A: STORMWATER MANAGEMENT CHECKLIST

HOUSE BILL 987. Read and Examined by Proofreaders: Sealed with the Great Seal and presented to the Governor, for his approval this

Agua Hedionda Creek Flood Plain Information; Department of Army, Los Angeles District,

Supplier Environmental Health and Safety Certification

Miquon Creek STREAM RESTORATION PROJECT WHO WE ARE

How to Select an Environmental Consultant

Multi-purpose Drainage Management (MDM) Plans

SECTION 104 PREVENTION, CONTROL, AND ABATEMENT OF EROSION AND WATER POLLUTION

1 INTRODUCTION. Kayenta Complex Page 9 December 2011 Cumulative Hydrologic Impact Assessment

IMPROVING SOUTH FORK PEACHTREE CREEK WATERSHED USING THE TRIPLE BOTTOM LINE DEKALB COUNTY, GEORGIA

The answers to some of the following questions are separated into two major categories:

NPDES Industrial Stormwater Inspection Worksheet

CONSTRUCTION GENERAL PERMIT RISK ASSESSMENT R-FACTOR CALCULATION NOTIFICATION

EFB / Online Wetland Restoration Techniques Class Syllabus

Minimizes sediment and debris from entering storm drains that lead to waterways and watercourses.

Statement of Qualifications for Natural Resource Management Services October 2014

Accounting for Uncertainty in Offset and Trading Programs

Block and Gravel Inlet Protection (BIP)

Board of Certified Site Safety and Health Officers

CITY UTILITIES DESIGN STANDARDS MANUAL

Appendix C3: Response Plan for Investigations of Illegal Discharges, 2016

North Branch Chicago River Watershed-Based Plan

SeCTion TemPoRARy Soil erosion and WaTer pollution ConTrol sewpcp requirements

Construction Site Inspection Checklist for OHC By making use of some simple Best Management Practices (BMPs) a construction site operator can

Transcription:

E&SC Training & Certification 5 Chapter E&SC training involves educating, training and certifying individuals involved with managing stormwater, erosion and sediment on NCDOT construction projects. The training and certification program required by NCDOT is the E&SC / Stormwater Certification Program (E&SC/SW) which is a partnership program between NC State University and NCDOT and is the primary program. The Certified Professional in Erosion and Sediment Control (CPESC) program administered by EnviroCert International, Inc. is also an NCDOT-recognized certification program for managing stormwater, erosion and sediment for construction and maintenance activities. E&SC / Stormwater Certification Program (E&SC/SW) NCDOT, in conjunction with NC State University, developed the NCDOT E&SC / Stormwater (E&SC/SW) Certification Program to raise the level of environmental awareness for managing stormwater on construction and maintenance sites. Levels I, II and III certifications are offered as part of this program to assist those individuals involved in the development, design, site management, installation and inspection of E&SC plans. Levels I, II and III Certification Levels I, II and III certification courses are offered through NC State University to meet NCDOT requirements for trained and qualified individuals to develop, design, implement or inspect the E&SC plan for all projects disturbing one or more acres of land. The program provides comprehensive training to inspectors, project managers, contractors and designers. Course topics focus on maintaining compliance with E&SC/stormwater regulations on NCDOT construction projects. These certifications are valid for three years; recertification is required. 5-1

Level I Certification The NC State University Soil Science Department administers and manages the Level I and II Certifications. The NC State Biological and Agricultural Engineering Department manages the Level III Certification. For specific agenda, fees and schedules regarding these courses, refer to the following websites for each level of certification. For Level I and II Certification http://www.cvent.com/events/level-i-and-ii-erosion-sediment-control- stormwater-certification-for-ncdot-projects/event-summary- 2a3ac3872e974d739c05122a282673ef.aspx For Level III Certification http://www.bae.ncsu.edu/workshops/dot/level_iii.html Designed for those who inspect and install BMPs Level II Certification Designed for project engineers, superintendants, supervisors, crew foremen and chief inspectors that manage site E&SC/SW operations Level III Certification Designed for engineers and technicians who develop E&SC plans, including reclamation plans Level I Certification Figure 5.1 Descriptions of Level I, II and III Certifications The Level I Certification course is designed for NCDOT, contractors and Construction, Engineering and Inspection (CEI) personnel who install or inspect E&SC on construction sites. The course outlines the BMPs used by NCDOT to minimize and control erosion and sedimentation. The function and installation of the BMPs are emphasized in this course, as well as the basics of soil erosion, vegetation establishment, stream restoration and borrow pit dewatering. Additional topics include E&SC plan implementation, regulatory agency requirements and consequences of permit violations. 5-2

Level II Certification The Level II Certification course is designed for NCDOT, contractors and CEI personnel, who supervise, install or direct grading work, culvert replacement work and bridge construction work over rivers and streams. The course emphasizes permit requirements, roles and responsibilities, applicable specifications and BMPs to control erosion and prevent sedimentation. The course also includes soil erodibility, vegetative establishment techniques, grading techniques to minimize erosion, timing of installations, reclamation plans and proper installation of BMPs. Implementation of the E&SC plan, regulatory agency requirements and consequences of permit violations are also covered in the Level II course. Level III Certification The Level III Certification course is designed for engineers and technicians who develop the E&SC plans on NCDOT projects, including reclamation plans. The course focuses on selection of BMPs to meet regulatory requirements for NCDOT. The course addresses hydrology, erosion, regulations, channels, sediment and turbidity control and lateral effects of borrow pits on adjacent wetlands. NCDOT E&SC plans must contain the name of the plan designer and the Level III certificate number on the title sheet of the plans. Reference Chapter 3. As indicated in Chapter 3, NCDOT E&SC plans must contain the name of the plan designer and the Level III certificate number on the title sheet of the plans. EnviroCert International, Inc. Certification Programs EnviroCert International, Inc. is a nonprofit corporation that offers a certification that relates to managing erosion and sediment control for construction and maintenance activities: the CPESC. Although reciprocity for the CPESC certification applies only to Levels I and II, this certifications provides excellent advanced level training for erosion and sediment control practitioners. 5-3

CPESC certification can be substituted for Levels I and II certifications. Reciprocity does NOT apply for the Level III certification. If an individual with CPESC certification is in good standing, their credentials reside on the EnviroCert International, Inc. website directory. This certification requires annual renewal fees and completion of professional development units per year. CPESC The CPESC program is an international certification program administered by EnviroCert International, Inc. and is designed to provide professional credentials to individuals working with construction site E&SC issues. Registrants in the program are trained to understand the minimum requirements of the NPDES permit program as well as demonstrate proficiencies in planning and management, erosion prediction, runoff management, soil stabilization, erosion control and sediment control. For schedules, procedures and fees associated with CPESC, refer to the CPESC website: http://www.cpesc.org/ NCDOT Erosion and Sediment Control / Stormwater Certification Provision The NCDOT Erosion and Sediment Control / Stormwater Certification Provision (SP01 G180) can be found at the NCDOT link: https://connect.ncdot.gov/resources/specifications/pages/specifications-and- Special-Provisions.aspx For contract projects, a chain of responsibility should be established, implemented and maintained throughout the life of the contract as part of the NCDOT Erosion Control and Stormwater Certification Provision. 5-4

Recertification Level I, II and III certifications are valid for three years. A recertification class and examination are required every three years for renewal of certification. Refer to the NC State University website for specific schedules and fees associated with the recertification process. A recertification class and examination are required every three years for renewal of certification. Other Training Opportunities for additional training in the erosion, sediment and stormwater disciplines are available for practitioners to pursue as well. Local, state and national training entities provide workshops and courses for those involved at various levels in the planning, design, installation, inspection and maintenance of E&SC practices and stormwater quality. Opportunities for such courses are often advertised through email list servers, university extension notifications and professional association publications. 5-5