Work Type Definition and Submittal Requirements



Similar documents
Work Type Definition and Submittal Requirements

Work Type Definition and Submittal Requirements Work Type: Construction Contract Administration & Management

Work Type Definition and Submittal Requirements Work Type: Right-of-Way Surveys / Land Surveys

Work Type Definition and Submittal Requirements Work Type Definition: Archeological

Civil. 2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition.

Work Type Definition

Highway 23 Paynesville Richmond Soils Borings, Soils Tests, and Reporting

STRUCTURES Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL.

SPECIFICATION FOR DYNAMIC CONSOLIDATION / DYNAMIC REPLACEMENT

Appendix A Alternative Contracting General Engineering Consultant RFP. Appendix A

SECTION EARTH MOVING

Chapter 4 SUBSURFACE INVESTIGATION GUIDELINES

COMPENDIUM OF INDIAN STANDARDS ON SOIL ENGINEERING PART 2

Design, Testing and Automated Monitoring of ACIP Piles in Residual Soils

GUIDELINES FOR GEOTECHNICAL INVESTIGATION OF BRIDGE STRUCTURES. Materials Engineering Report No M (Supersedes Report No.

Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering. Geotechnical Bulletin PLAN SUBGRADES

CIVL451. Soil Exploration and Characterization

Exhibit A Scope of Work


State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS

TECHNICAL REPORT ON SCALA DYNAMIC CONE PENETROMETER IRREGULARITY

LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT CONSTRUCTION PLANS QUALITY CONTROL / QUALITY ASSURANCE MANUAL

ANNEX D1 BASIC CONSIDERATIONS FOR REVIEWING STUDIES IN THE DETAILED RISK ASSESSMENT FOR SAFETY

Section 100 Contractor Quality Control Program

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE

SERVICES 2015 ISO 18001

How To Prepare A Geotechnical Study For A Trunk Sewer Project In Lincoln, Nebraska

C. Section TESTING LABORATORY SERVICE.

SECTION SUPPORT OF EXCAVATION

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department

SECTION PUBLIC STORM UTILITY DRAINAGE PIPING

HIGHWAYS DEPARTMENT GUIDANCE NOTES ON SOIL TEST FOR PAVEMENT DESIGN

URBAN DRAINAGE CRITERIA

City of Edgewood REQUEST FOR QUALIFICATIONS 2016 ON-CALL CONSULTANT SERVICES

The Manitoba Water Services Board SECTION Standard Construction Specifications PIPE EXCAVATION, BEDDING AND BACKFILL Page 1 of 11

SECTION LS 2530 SANITARY SEWERS. A. General: Submit the following in accordance with The General Conditions.

c. Borehole Shear Test (BST): BST is performed according to the instructions published by Handy Geotechnical Instruments, Inc.

AN AEM TOOL FOR THE EVALUATION OF UNDESIGNED WASTE STORAGE FACILITIES

COLORADO DEPARTMENT OF TRANSPORTATION STORMWATER FIELD INSPECTION REPORT - ACTIVE CONSTRUCTION

Anirudhan I.V. Geotechnical Solutions, Chennai

SANITARY SEWER SERVICE CONNECTION INSTRUCTIONS

720 Contour Grading. General. References. Resources. Definitions

TECHNICAL NOTE: SI 01 SPECIFIC REQUIREMENTS FOR THE ACCREDITATION OF INSPECTION BODIES FOR SITE INVESTIGATION

TECHNICAL SPECIFICATIONS CEMENT-BENTONITE SLURRY TRENCH CUTOFF WALL

EARTHWORKS COMPLETION REPORT ELLEN STIRLING PARADE, ELLENBROOK. Ellenbrook, W.A. Georgiou Group Pty Ltd

Construction Specifications for Keyhole Pavement Coring and Reinstatement

Polk Commerce Centre CRA Spine Road Alignment Study

Sample DEQ Plan Submitter s Checklist for Stormwater Management Plans

Index. protection. excavated drop inlet protection (Temporary) Block and gravel inlet Protection (Temporary)

INDIANA DEPARTMENT OF TRANSPORTATION QUALIFIED LABORATORY AND TECHNICIAN PROGRAM

Local Road Assessment and Improvement Drainage Manual

DIRECTIONAL DRILLING

Request for Qualifications

MDWASD 8/1999 SECTION TRENCHING AND BACKFILLING FOR PIPING SYSTEMS

Section 2100-Trenching and Tunneling

SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)

Amendment to OPSS 415 (Nov 2008) Construction Specification for Pipeline and Utility Installation by Tunnelling

SEDIMENT/STORMWATER MANAGEMENT BASIN CONSTRUCTION CHECKLIST

Division 2 Section Section 02795

Stormwater/Wetland Pond Construction Inspection Checklist

Section 402. STORM SEWERS

CHAPTER 7: SUBDIVISION CONSTRUCTION, INSPECTION AND BONDING Subdivision Improvement Performance Bond Requirements

PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS

PROCUREMENT SUBSTITUTION PROCEDURES

REQUEST FOR PROPOSALS CENTRAL NEW YORK ECONOMIC DEVELOPMENT REAL ESTATE SITE PROFILE DATA BASE SYRACUSE, NEW YORK MARCH 25, 2013

Development of National Geotechnical Management System Standards for Transportation Applications

NuGeneration Ltd Site Investigations

Work Breakdown Structure Element Dictionary. Final Design

SECTION PERMEABLE INTERLOCKING CONCRETE PAVEMENT (1995 MasterFormat Section 02795)

NJ Interception Drainage

SECTION PERMEABLE INTERLOCKING CONCRETE PAVEMENT (1995 MasterFormat Section 02795)

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 11/5/13)

Effect of grain size, gradation and relative density on shear strength and dynamic cone penetration index of Mahi, Sabarmati and Vatrak Sand

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (SSBMP) PLAN/STORM WATER POLLUTION PREVENTION PLAN (SWPPP) REVIEW CHECKLIST

VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST BID PROPOSAL

Pavements should be well drained both during and upon completion of construction. Water should not be allowed to pond on or near pavement surfaces.

Nebraska Department of Roads Drainage and Erosion Control Manual December 2011 Appendix C: Pipe Material Policy Page C-1 PIPE MATERIAL POLICY

Water Damage During Construction

Caltrans Geotechnical Manual

SECTION PRECAST CONCRETE UTILITY STRUCTURES

Construction Management Program

Managing North Carolina's MSE Wall Assets through Design, Construction and Performance

STORMWATER POLLUTION PREVENTION PLAN TEMPLATE. 1.0 SITE DESCRIPTION 1.1 Project Name and Location Date

Beacon Hill Sewer District Standard Specifications

Appendix D.1. Testing Requirements for Infiltration, Bioretention and Sand Filter Subsoils

CHECKLIST TO DESIGNATE AREAS OF EVALUATION FOR REQUESTS FOR PROPOSAL (RFP)

SECTION STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section

Review of Civil Plant Management, Civil Construction Supervision, Civil Project Management, and Road Construction unit standards

2009 Japan-Russia Energy and Environment Dialogue in Niigata S2-6 TANAKA ERINA

SECTION REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section

OUR SERVICES. Training - Assessment - Events. Driving our industry forward.

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (BMP) PLAN REVIEW CHECKLIST

SECTION POINT REPAIRS TO SANITARY SEWERS. A. Repairs to existing sewer lines by replacing short lengths of failed pipe.

IAC 7/2/08 Utilities[199] Ch 9, p.1 CHAPTER 9 RESTORATION OF AGRICULTURAL LANDS DURING AND AFTER PIPELINE CONSTRUCTION

CHAPTER VII CONSTRUCTION QUALITY CONTROL INSPECTION PROGRAM 1

DRAFT MAINTAINING HOUSTON S STREETS REPAIR, REHABILITATION, RECONSTRUCTION. Using the Full Range of Tools for a Challenging Job

SECTION 1 GENERAL REQUIREMENTS

REAL-TIME SLOPE AND WALL MONITORING AND REPORTING USING 3-D MEMS-BASED, IN-PLACE INCLINOMETER SYSTEM

CULVERT AND STORM SEWER PIPE MATERIAL POLICY ON FEDERALLY FUNDED LOCAL AGENCY PROJECTS UPDATED March 2013

Transcription:

Work Type: Geotechnical Studies Soils Analysis & Recommendations The first section, Work Type Definition, provides a detailed explanation of the work type. The second section, Work Type Submittal Requirements, identifies the requirements a firm must meet to become pre-qualified to perform this work type for Hennepin County. Work Type Definition: Geotechnical Studies I. Description A Geotechnical study includes preparation of final boring logs and an analysis of subsurface conditions and materials, submitted in the form of a report. The report includes, but is not limited to; bearing capacity for deep or shallow foundations, settlement analysis, slope stability analysis, locations of unsuitable soils, subcut depths and type of backfill, muck excavation limits and treatment, culvert treatments, pavement designs, and geologic recommendations. The report should also include definite foundation recommendations for providing a safe and cost effective foundation system. In addition, this work type may include hiring and managing Standard Penetration Test & Rock Coring, and/or Cone Penetration Test subcontractors. Subcontractors must be on the Pre-Qualified list for those work types. II. Standards and Specifications Standards and specifications required for a project under this work type may include the following: A. All tasks will be performed in accordance with current ASTM, AASHTO, and, for highway construction projects, MnDOT standards and specifications. The current Specifications for Subsurface Investigation & Geotechnical Analysis and Design Recommendations can be found at: http://www.mrr.dot.state.mn.us/geotechnical/foundations/tcontract/consultdrillreport.doc III. Provided By Hennepin County Information to be supplied by Hennepin County for a project may include the following: A. Plans showing existing topography, proposed alignments, locations of the existing and proposed structures and locations of borings. B. Completed boring logs in gint format. C. American Society for Testing and Materials (ASTM), American Association of State Highway & Transportation Officials (AASHTO), and MnDOT Standard Specifications. IV. Provided by Consultant Deliverables to be supplied by the consultant for a project may include the following: A. Final Geotechnical Report a. Final boring logs in paper and electronic format. Page 1 of 5 Rev. June 2014 Based on MnDOT 6.1, 6.9

b. Final logs using MnDOT s gint templates. c. Plotted boring plan and soils profile in electronic format (hard copy may be required). d. Materials Design Recommendation (if required). e. Weekly progress reports. f. Final report summarizing the results of the testing along with recommendations and conclusions. Work Type Definition: Soils Analysis & Recommendations V. Description The purpose of this work type is to analyze field boring measurements and laboratory soils tests to develop recommendations that include but are not limited to muck excavation, subgrade excavation, embankment construction, subsurface drainage, infiltration tests, dewatering, ponding, berms, shrinkage factors, use of onsite materials and grading, base and surfacing design. The required outline for the Materials Design Recommendations Report can be found in Chapter 6 of the MnDOT Geotechnical and Pavement Design Manual. VI. Standards and Specifications Standards and specifications required for a project under this work type may include the following: A. All tasks will be performed in accordance with current ASTM, AASHTO, and, for highway construction projects, MnDOT Standards, Specifications, and Manuals. The current MnDOT Specifications for Soils Surveys, Engineering Analysis, Laboratory, and Field Soils Tests can be found at: http://www.mrr.dot.state.mn.us/pavement/pvmtdesign/documentation/soilsinv.pdf. VII. Provided By Hennepin County Information to be supplied by Hennepin County for a project may include the following: A. Plans showing existing topography, proposed alignments, locations of the existing and proposed structures and locations of borings. B. Completed soils investigation including boring logs in electronic format (MnDOT s Soils Data Dictionary format). C. Approved traffic forecast. Page 2 of 5 Rev. June 2014 Based on MnDOT 6.1, 6.9

D. American Society for Testing and Materials (ASTM), American Association of State Highway & Transportation Officials (AASHTO), MnDOT Geotechnical and Pavement Manual, MnDOT Standard Specifications and Technical Memoranda. VIII. Provided by Consultant Deliverables to be supplied by the consultant for a project may include the following: A. Final Materials Design Recommendation Report. a. Laboratory testing reports. b. Plotted boring plan and soils profile in electronic format (hard copy may be required). c. A Final Materials Design Recommendation Report (if required) summarizing the results of the investigation, testing, analyses, and recommendations. The remainder of this page is intentionally left blank. Page 3 of 5 Rev. June 2014 Based on MnDOT 6.1, 6.9

Work Type: Work Type: Geotechnical Studies Soils Analysis & Recommendations Submittal Requirements NOTE: A consultant firm becomes pre-qualified based on the qualifications of the personnel that are employed by the firm. Key Personnel Requirements Minimum number of Key Personnel: At least one professional engineer. Proof of Professional Certification/Licensure (Submit in PDF format) Qualified professional engineer must be a licensed Civil Engineer with the Minnesota State Board of Professional Engineers. Documentation Requirements I. Project Experience Submit PDF of Form PQ1 A. Complete Parts 1 and 2 of Form PQ1 Part 1: Fill out general information and names of personnel Qualifying experience of staff must be documented by personal experience histories of key personnel. Qualified professional engineer must have a minimum of 5 years experience in the activities required. Satisfactory experience must be demonstrated on at least two projects (maximum of five) within the last ten years. Project identifications should include the name of client for which work was performed. Part 2: Must correlate to Example Project Requirements section. II. Example Projects Requirements Submit PDF of Form PQ2 A. Provide a description or submit a project cut-sheet as examples of at least two project examples completed within the last five years. Example should be a final report or summary of final report. B. One project example is required. The example must include a complete design recommendations report and supporting data from a project as outlined in Chapter 6 of the MnDOT Geotechnical and Pavement Manual. III. Supplemental Information Submit PDF Responders that do not perform their own subsurface investigations must have a demonstrated ability to hire and manage qualified drillers. This may include Standard Penetration Test & Rock Coring and/or Cone Penetration Test sub contractors. Provide documentation in this section of ability to comply with this requirement. Page 4 of 5 Rev. June 2014 Based on MnDOT 6.1, 6.9

Submittal Instructions Each Work Type Submittal must include the following individual items submitted in the following order as a single PDF: File name: FIRMNAME_WORKTYPENAME 1. Cover Letter 2. Form PQ1- Project Experience 3. Form PQ2 Project Description (or allowable equivalent) 4. Form PQ3 Supplemental Information (if required) Email the completed package to pwbiz@hennepin.us NOTE: A separate Submittal is required for EACH Work Type. Page 5 of 5 Rev. June 2014 Based on MnDOT 6.1, 6.9