Air Conditioning Equipment



Similar documents
Phone: (201) Phone: (212) Fax: (973)

SECTION HVAC AIR-DISTRIBUTION SYSTEM CLEANING

10 tips for getting more reliability from your air-conditioning system [reliability]

REPLACEMENT AIR CONDITIONING UNITS FOR BRITISH EMBASSY RESIDENCE

GLYCOL CHILLER SYSTEM TROUBLESHOOTING 101

HVAC Checklist - Long Form

Statement of Work. 3.0 Details of Service Pre Start-up Cooling Start-up Service. Installation Service. Table of Contents. 1.0 Executive Summary

REFRIGERATION & AIR-CONDITIONING UNIT IIT KHARAGPUR

AIR CONDITIONING EFFICIENCY F8 Energy eco-efficiency opportunities in Queensland Foundries

Consortiwm Awdurdodau Lleol Cymru Consortium Local Authorities Wales

Why is my air conditioner dripping on my customers?

Radford University. Indoor Air Quality Management Plan

DUFFERIN-PEEL CATHOLIC DISTRICT SCHOOL BOARD

SECTION TESTING, ADJUSTING, AND BALANCING FOR HVAC INTRODUCTORY INFORMATION

COMPETENCY ANALYSIS PROFILE Refrigeration and Air Conditioning Systems Mechanic - Branch 1 313A

Maintenance for Energy Efficiency

The Embassy of the United States of America invites you to submit an offer for supply and install the following A/Cs:

Heat Pump Water Heater IOM Manual

123 street Salt Lake City, Utah 84092

RFI Response RFP: HSCG88-16-R-PQQ015 Replace HVAC Bldg A & C San Diego, CA.

COMMISSIONING OF HVAC SYSTEMS


Ceiling Mount Air Handler Manual

PANASONIC TROUBLE SHOOTING GUIDE

QUESTIONS TO ASK WHEN REPLACING YOUR HVAC TOGETHERWESAVE.COM

Evaluate, Clean, and Tune Guidance

Portable Air Conditioner

To suit Daikin FDY "F" Series and FD "F" Series. (and other models incorporating BRC1B62/52 Remote Controller)

DESERT RESEARCH INSTITUTE MOLD ASSESSMENT AND REMEDIATEION PROCEDURE

Chris Clement 701 Bayou Lane Thibodaux, LA

National Competency Based Skill Training Refrigeration and Air-conditioning Mechanic Logbook

Air Conditioning. The opportunity for energy efficiency. Low cost actions to reduce energy usage now

Preventive Maintenance. State Energy Assessment Workshop By: DTE Energy Partnership & Services

SECTION HEAT PUMPS

EXTENDED 10 YEAR LIMITED LIFETIME WARRANTY LIMITED LIFETIME WARRANTY

WARRANTY CERTIFICATE Please complete the following details and retain with the original purchase docket

Bradlee Boilers Ltd. Instruction Manual for starting up Bradlee Hire Boiler from Cold

PLP - TERMS AND CONDITIONS

HP switch LP switch Discharge thermo Comp. Surface thermo

USER S MANUAL HSC-24A

HEATING, VENTILATION & AIR CONDITIONING

NADCA GENERAL SPECIFICATIONS FOR THE CLEANING OF COMMERCIAL HEATING, VENTILATING AND AIR CONDITIONING SYSTEMS

SPECIFICATION TECHNICAL AIR-CONDITIONING UNITS SINGLE AND SPLIT (DUCTED) (AIR COOLED PACKAGED UNIT)

Preventive Maintenance. Learning Objectives: Howdy! Learning Objectives Cont:

Air Conditioner Water Heater - A Product of HotSpot Energy LLC

Certified Installer Partnership Code of Practice

610-6-MURPHY PRIORITY SERVICE AGREEMENTS PLUMBING HEATING COOLING DUCT CLEANING BATHS TILE Thank You. Richard G.

Training Centre is at the back of KFC in Three Rivers. Next to Telkom

FOXAIR 60/50 ALL MODELS

SECTION PACKAGED ROOFTOP AIR CONDITIONING UNITS NON-CUSTOM

Ener.co & Viridian Energy & Env. Using Data Loggers to Improve Chilled Water Plant Efficiency. Randy Mead, C.E.M, CMVP

Comfort you can count on.

Plan Number A Cross Beam Dr. Charlotte, NC Simplified Service Plan. Air Conditioning.

Central Air Conditioner

forair optimal air environments Service Partner Plan

AABC Specifications for Testing and Balancing HVAC Systems

1. Certification: Employ an ASCS certified by NADCA on a full-time basis. 2. Supervisor Qualifications: Certified as an ASCS by NADCA.

Automotive & Commercial. Air Conditioning & Refrigeration Courses 2015

MINNESOTA WEST COMMUNITY & TECHNICAL COLLEGE COURSE OUTLINE

Code of Practice EST 01 Decommissioning arrangements prior to site hand over Oct 2004

HomeServices Terms and Conditions

SECTION PACKAGED ROOFTOP AIR CONDITIONING UNITS

ADDENDUM NO. 1 TO THE BIDDING DOCUMENTS. HVAC SERVICE AND MAINTENANCE Saint Clair County MidAmerica Saint Louis Airport.

Mechanical Engineering Technician- Plant Technician

ASTACEA4 Inspect complex/central air conditioning systems

Table Z. Troubleshooting Chart for Air Conditioners. Cause

STATEMENT OF WORK FOR MAINTENANCE OF AIR CONDITIONERS

HVAC Claims: Repair vs. Replacement

How Ground/Water Source Heat Pumps Work

Failure code manual. content

Residential Duct Systems for New and Retrofit Homes

Asbestos

service breakdown emergency 3in1 Plan What the SGS Service Plan provides What happens if you have a breakdown Cover provided by the Plan Dear

Annual Service Agreement

WEST VIRGINIA CODE CHAPTER 21. LABOR ARTICLE 16. REGULATION OF HEATING, VENTILATING AND COOLING WORK.

Elements Elements describe the essential outcomes.

Elements Elements describe the essential outcomes. 1. Prepare to diagnose and repair air conditioning and HVAC system

Table V. Troubleshooting Checklist for Refrigeration Systems. Air or non-condensable gas in system. Inlet water warm.

HVAC Design Requirements

Mold Response and Remediation Plan

Building Agreement For Minor Building work

MOLD RESPONSE AND REMEDIATION PLAN

Electrostatic or Electronic: Know the Facts By Robert P. Scaringe, P.E., Ph.D., ---President of Mainstream Engineering

Refrigeration & Air-conditioning Technician

FPS4 APPENDIX A (INTERIM) SPECIFICATION FOR THE INSPECTION AND TESTING OF AUTOMATIC FIRE SPRINKLER SYSTEMS

Heating, Ventilation, Air Conditioning and Refrigeration (HVACR)

Permit Number: 7.0/048904/JT

SECTION HEATING, VENTILATION AND AIR CONDITIONING EQUIPMENT

COMMERCIAL REPORT / STOCK CONDITION SURVEY. Sydenham Hill Estate Sydenham Hill London SE 23

Please read this owner s Manual carefully before operating the unit. - Cooling - Heating - Dehumidifying - Fan

PIPES AND TUBES FOR HVAC PIPING AND EQUIPMENT

Best Practice Guide BPGCS007

Customized Assessment Blueprint

Terms of Reference Air Handling Unit (HVAC System) Cleaning

Operating instructions

Transcription:

1. PURPOSE OF THIS DOCUMENT This document has been written to assist DCC Premises Managers in obtaining quotations for the ongoing servicing and maintenance of where fitted to their premises. Specialist contractors will usually offer a service agreement for each site setting out the cost of the annual service, replacement parts and filters etc being charged in addition. This document has been designed to set out the standards of service that is required and to enable a detailed and comprehensive quotation to be provided to the Premises Manager. A list of specialist contractors is provided but is not endorsed by. There are many other companies who undertake such work and it is the Premises Managers responsibility to assess the suitability and competence of such contractors. 2. GENERALLY: Servicing is required to be undertaken in accordance with BS EN 378-4:2008, as applicable. Servicing is to be generally undertaken at 6 monthly intervals, unless agreed otherwise. All servicing and repairs will conform strictly to the specific manufacturer s instructions and procedures contained in the relevant Service Manuals for each air conditioning system. Any contractor undertaking the servicing work is to be suitably qualified and is to be a current member of the Heating and Ventilation Contractors Association (HVAC) The contractor is expected to visit site to satisfy himself of the details of the installations and that he is aware of all the associated components. Ensure power supplies are isolated and secured before any work commences. EXTENT OF WORK TO BE INCLUDED 1) Check operation of the system in both heating and cooling modes 2) Check operation of all functions on the remote controller 3) Interrogate remote controller for any fault codes take action accordingly and clear fault codes upon completion 4) Examine and clean external surfaces of all motors, compressors, fans, finned heat exchangers, grilles and louvers. 5) Check and adjust all driving belts and couplings and, replace if necessary. 6) Oil and grease all moving parts and bearings. 7) Check and clean or renew air filters as necessary

8) Spray indoor heat exchanger with Biocide cleaner 9) Clean and flush all condensate and drain lines. 10) Check operation of the condensate pump, if fitted. 11) Check refrigerant charge and leak test all flared joints on pipework.. 12) Check interconnecting pipework. 13) Check pipework insulation replace damaged sections as required. 14) Check electrical connections on indoor unit 15) Check fixings of indoor unit 16) Check airflow across the coil on indoor unit 17) Check air temperature differentials across the coil on indoor unit in both heating and cooling modes and record information 18) Check temperature differentials across the coil on the outdoor unit in both heating and cooling modes, and record information. 19) Record the ambient temperature in the vicinity of the condensing unit. 20) Check the electrical connections on the outdoor unit. 21) Check supply voltages. 22) Check earth loop impedance and record information. 23) Check condensing unit current in both heating and cooling modes and record information. 24) Check both high and low running pressures in both heating and cooling modes and record information. 25) Check all covers are secure. WORKMANSHIP GENERALLY: Protect all products from all detrimental elements as appropriate. Ensure products are clean, undamaged and otherwise in good condition. Inspect components and products carefully before incorporating, fixing or using and reject any which are defective. Keep clean and free from contamination. Prevent straining, chipping, scratching or other disfigurement, particularly products exposed to view in the finished work.

The whole of the work shall be carried out in a competent manner, in strict accordance with the manufactures instructions and procedures and all relevant best practice guides. Service and install replacement components within the practical limits of the original design and specification to ensure the design performance is maintained. 3. ROUTINE SERVICING 3.1 SERVICING GENERALLY: All servicing will be carried out strictly in accordance with the specific manufacturer s current servicing manuals and in accordance with all of the above criteria. Servicing will be carried out during normal working hours; this will be between the hours of 8.00am and 4.30pm Monday to Friday inclusive and will be paid for at the rate submitted by the contractor in his quotation. The rate will include the following:- 1) All necessary labour to carry out the service. 2) All associated travelling time and costs from the contractors base to the site and return. The rate will exclude the following:- 1)The cost of any materials supplied by the contractor, including refrigerant oil, driving belts and air filters will be charged additionally to any servicing costs at the supply cost, less any discounts and plus any reasonable mark up from the contractor. Before materials are purchased, agreement to order is required from the Premises Manager. 3.2 SERVICING RESPONSIBILITIES: To make all the appropriate arrangements with the Premises Manager prior to the service visit. To carry out the service at the agreed time in a clean workmanlike manner to all the above criteria. Provide all necessary barriers, signs, notices and any other equipment required to ensure the safety of the occupier and all visitors to the property. Clear away all materials, plant and arising from the site on completion. Leaving the site safe, clean and tidy. All arisings must be removed from site and disposed of by the contractor. Do not use the occupiers litter or refuse bins. Test the system and associated components on completion to ensure it is left in full working order and complies with the original design criteria. 3.3 SERVICE ROUTINE: Carry out the following routine for each service visit:-

On arrival, report to the reception; participate in all relevant health and safety requirements for each establishment. Become acquainted with all evacuation procedures and advise of your procedure should an evacuation become necessary during the servicing period. Discuss with the Premises Manager any problems experienced since the last service visit. Carry out the service in accordance with the above criteria. On completion of the service visit, report to the Premises Manager. Comment on the service, and advise if further work is required, indicating a possible time scale. A full and comprehensive report shall be sent to the Premises Manager together with any recommendations 4. CALL OUTS 4.1 CALL OUTS GENERALLY: The contractor will provide two telephone numbers which can be used during normal working hours and out of hours to instigate the call out procedure. Attendance to call outs during normal working hours that is between the hours of 8am to 4.30pm Monday to Friday inclusive will be paid for at the rate submitted by the contractor in the schedule. Attendance to call outs outside normal working hours will be paid for at the rate submitted by the contractor in the schedule for call outs during out of hours working The rate will include the following in both cases:- All necessary labour for up to one hour on site. This must include all travel time to and from site. The rate will exclude the following:- 1)The cost of any materials supplied by the contractor, including refrigerant oil, driving belts and air filters will be charged additionally to any servicing costs at the supply cost, less any discounts and plus any reasonable mark up from the contractor. Before materials are purchased, agreement to order is required from the Premises Manager. 4.2 CALL OUTS RESPONSIBILITIES To make all the appropriate arrangements with the Premises Manager prior to the call out visit. To carry out the work in a clean workman like manner. Provide all necessary barriers, signs, notices and any other equipment required to ensure the safety of the Premises Manager and all visitors to the property. Clear away all materials, plant and arising from the site on completion. Leaving the site safe, clean and tidy. All arisings must be removed from site and disposed of by the contractor.

Test the system and associated components on completion to ensure it is left in full working order and complies with the original design criteria. 4.3 CALL OUT ROUTINE: Carry out the following routine for each call out:- Contact the Premises Manager of the property to notify your time of arrival. On arrival, report to the reception; participate in all relevant health and safety requirements for each establishment. Become acquainted with all evacuation procedures and advise of your procedure should an evacuation become necessary during the working period. Ascertain the problem and carry out remedial work in accordance with the above criteria. On completion of the work, report to the Premises Manager. Comment on the remedial work, and advise if further work is required, indicating a possible time scale. A full and comprehensive report shall be sent to the Premises Manager. 5 NEED FURTHER INFORMATION: NPS Contact: Chris Jay Director of Maintenance and Minor Works Chris.jay@nps.co.uk 01392 351 005 6 SUGGESTED LIST OF CONTRACTORS Macwhirter Western Ltd, Unit 2, Chatto Road Industrial Estate, Chatto Road, Torquay, Devon, TQ1 4UE. Tel: 01803-314566. Email: cool@mac-western.co.uk I J Cannings & Son Ltd, Stratford House, Waterbridge Court, Matford Park Road, Exeter, EX2 8EX Tel: 01392-279354. Email: david@ijcannings.co.uk A M S, Unit 3 Henley Business Park, Manor Road, Abbotskerswell, Newton Abbot, TQ12 5NF Tel: 01626 353844. Email: admin@airms.co.uk A & A Refrigeration Ltd, Quay Road, Teignmouth, TQ14 8EL Tel: 01626 778747, Email: enquiries@aandarefrigeration.co.uk Other Heating and ventilation Contractors Association (HVAC) Members can be found at http://www.hvca.org.uk Please be advised that the contractors identified in the Suggested List of Contractors have not been drawn from DCC s Standing List of Approved Contractors and as such have only been

subject to limited scrutiny. The ongoing checking and monitoring that takes place on Standing List Contractors such as maintaining acceptable health & safety accreditation, financial standing, adequacy of insurance or verification of workforce competency has not been undertaken on the Suggested contractors therefore prior to using them you must ensure compliance with Devon Health & Safety Service s Guidance, Policies and Managers Key Action Notes for Contractors - Selection and Control. CJ Rev 0