Wisconsin Department of Natural Resources, Bureau of Drinking Water and Groundwater PUB-DG-016 2010



Similar documents
A Guide to Plugging Abandoned Wells

CHAPTER 4 WELL COMPLETION AND MAINTENANCE

FARM A SYST Farmstead Assessment System. Drinking Water Well Condition

Fact Sheet #1 Reducing the Risk of Groundwater Contamination by Improving Drinking Water Well Condition

A perforated conduit such as pipe, tubing or tile installed beneath the ground to intercept and convey ground water. or structures.

SECTION ABANDONMENT OF SEWER MAINS

CHAPTER 11 STORM DRAINAGE

Guidelines For Sealing Groundwater Wells

ources of Drinking Water

SECTION STORM DRAIN SYSTEM

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS

SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)

SAMPLE FRACTION MITIGATION CONTINGENCY PLAN FOR DIRECTIONAL DRILLING

SECTION 6 SANITARY SEWER MAIN 6.01 SCOPE

California Department of Transportation Doyle Drive Test Program Contract No. 04A3362

Some people get most of their water from their own

WELL CONSTRUCTION CODE ADMINISTRATIVE RULES Filed with the Secretary of State on April 5, These rules take effect 15 days after filing with the

SUBDRAINS AND FOOTING DRAIN COLLECTORS. A. Construct subdrains, subdrain cleanouts and outlets, and footing drain collectors.

WV Monitoring Well Driller Certification Course Manual

Well Records and Maintenance Guidelines

Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation

SECTION ABANDONMENT OF WATER MAINS. A. Conform to requirements of Section Submittals.

SANITARY SEWER BACKUP. Causes & Prevention

Onsite Wastewater Concepts, Materials, Regulations & The Application Process Part I

BUTE Department of Construction Management and Technology

San Joaquin County. Well Standards. (San Joaquin County Ordinance Code Section )

Properly maintaining your septic system will help reduce the. It s Your Septic System. Homeowner s Guide. Here s How to Take Care of It

SEPTIC SYSTEM CONSTRUCTION REQUIREMENTS ST. MARY S COUNTY HEALTH DEPARTMENT

SPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO)

FY08 SEWER POINT REPAIRS BID TABULATION

AIR RELEASE, CLEANOUT, AND SEWER MANHOLES

10-DEPARTMENT OF HEALTH AND HUMAN SERVICES

SEWER BACKUPS & BASEMENT FLOODING PREVENTATIVE SOLUTIONS FOR THE BUILDING OWNER

SECTION REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section

TECHNICAL NOTE Culvert Sliplining and Lining of Casings with HPPipe

CHAPTER 11 STORM DRAINAGE

50AI01oe 02/15. Labko GRP cesspools. Instructions for installation, operation and maintenance

Understanding and Living With Your Septic System

Section SEWER PIPE INSTALLATION AND TESTING

Causes of Bacteria in Water Samples 1

Septic Tank to Cistern Conversions. Saving Water & Saving Money

ARTICLE II (2) ARTICLE II - REQUIRED USE OF PUBLIC SEWERS. PARAGRAPH Purpose and Application.

Waterproofing System for Wastewater Tanks in Petrochemical Industries and Refineries

Tremie Concrete CM 420 CM 420 CM 420 CM 420. Temporary Structures. Tremie Concrete

Checklist for plans to Construct, Alter or Repair An Individual Subsurface Sewage Disposal System

SIDE SEWER CONDITION ASSESSMENT AND REPAIR RECOMMENDATIONS

Foundation Experts, LLC Specializes in Foundation Repair and Waterproofing

Installation of Large Diameter Buried Pipes

Driven Point (Sand-Point) Wells

Improving the flood resistance of your home. Advice sheet 6: Flood-resilient floors

Proposed Minimum Subterranean Termite Treatment Standards

STANDARD SPECIFICATIONS FOR PRIVATE BUILDING SEWER LINES IN PUBLIC RIGHT-OF-WAY

ITEM # OSTERBERG CELL LOAD TESTING OF DRILLED SHAFT

How To Know If Your Well Water Is Safe

Concrete Washout. Stormwater Best Management Practice. Minimum Measure. Subcategory. Description of Concrete Washout at Construction Sites

A GROUNDWATER PROTECTION PLAN FOR HOME HEATING OIL TANKS

Protect Your Home From Flooding. A guide for Lethbridge Residents

PRIVATE WELL SEPARATION

Specifications for Residential Property Owners Connection to New Public Sewer

CW 3110 SUB-GRADE, SUB-BASE AND BASE COURSE CONSTRUCTION TABLE OF CONTENTS

SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DEEP FOUNDATIONS

a guide to PREVENTING HOME FLOODING DURING STORMS

Exhibit A. Rules and Regulations for House Connections and Sewer Extensions

SE-10 STORM DRAIN INLET PROTECTION. Objectives

SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS

A Consumer Guide For Well Construction

First in Service First in Safety

Foundation Drainage. Gable Roof Runoff. Hip roof Runoff. By: Brent Anderson, P.E. Moisture Control Engineering Leader STRUCTURAL TECHNOLOGIES

Guidelines for Control of Water Runoff on Small Lots. Revised 6/09

9.00 THE USE OF HUNTER LAND DRAINAGE PERFORATED PIPES. Hunter Underground Systems

Repair and Disinfection of Water Mains Water Protection Program fact sheet

STEPS TO CONSTRUCTING A MOISTURE-RESISTANT FOUNDATION SOURCES OF MOISTURE IN NEW CONSTRUCTION. Natural ground slope

Section 2100-Trenching and Tunneling

The Manitoba Water Services Board SECTION Standard Construction Specifications PIPE EXCAVATION, BEDDING AND BACKFILL Page 1 of 11

Does Part of My Basement Floor Have to Be Removed to Install. Where Does the Water from the Sump Pump Go?...Page 5

City of Shelbyville Site Inspection Checklist

CGA Standard Practices Series. Article 600 Standard for Pozzolan Enhanced Grouts Used in Annular Seals & Well Destruction

Basement Moisture Problems

MARICOPA COUNTY ENVIRONMENTAL HEALTH CODE CHAPTER II SEWAGE AND WASTES SECTION 8

SANITARY SEWER SPECIFICATIONS

STANDARD SPECIFICATIONS SECTION CLEANING AND LINING WATER MAINS

Annular Space Grouting of Slipline Products

STRUCTURES Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL.

APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT

Chapter 7 Plumbing Connections

Louisiana Administrative Code Title 51 Part XIII. Sewage Disposal

Protect your. home from. basement. have you done everything you can?

DIVISION 2 - SEWERAGE AND DRAINAGE SECTION STORM DRAIN SYSTEMS PART 1 - GENERAL

C. Section TESTING LABORATORY SERVICE.

Foundation Code compliance and Best Practices By Michael Coello

BASEMENT FLOODING. Prevention Guide for. Homeowners

BMP #: Dry Wells / French Drains

Storm Sewer Trenchless Upgrade Alternatives and Recommendations

CHAPTER 6 - SANITARY SEWER

Preventing water damage in the basement

Wastewater Capital Projects Management Standard Construction Specification

Septic Records and Maintenance Guidelines

TECHNICAL REVIEW OF SECONDARY CONTAINMENT SYSTEM TECHNOLOGY FOR ALASKA

Introduction. Do You Need A Water Right? Exempt Groundwater. Plan Ahead

What s a Private Well Owner to do? Eight Tips for Maintaining Your Well

Transcription:

Wisconsin Department of Natural Resources, Bureau of Drinking Water and Groundwater PUB-DG-016 2010 Answers to Your Questions on Well Filling and Sealing Why are unused and improperly fi lled and sealed wells threats to groundwater? Unused and improperly filled and sealed wells are a significant threat to groundwater quality. If not properly filled with impermeable material, unused wells can directly channel contaminated surface or soil water into groundwater. Water that gets into unused wells bypasses the purifying action that normally takes place in the upper layers of the soil. Because groundwater fl ows in soil and bedrock formations (aquifers), contamination that enters old wells can move to nearby drinking water wells. Many thousands of improperly filled and sealed wells are threatening groundwater in Wisconsin. Whenever you see an old deteriorating windmill in the countryside, there is likely an improperly filled and sealed well underneath. How can unused and improperly filled and sealed wells threaten groundwater and personal safety? Contaminated surface water can enter a well if the casing pipe does not extend high enough above the ground surface and the well cap has been broken or removed; or if there are cracks or holes in the casing due to damage or deterioration with age. Contaminated surface water can seep down along the casing pipe of an improperly constructed well. Wells in low areas are sometimes illegally left open to drain surface water from heavy rainfall or snowmelt. Open wells offer tempting disposal receptacles for liquid and solid wastes. The disposal of any pollutant or wastewater in a well is prohibited by State codes. Large-diameter open wells, especially old dug wells, pose safety hazards for small children and animals. In recent years, there have been instances in Italy, Missouri and Kansas where children have fallen into wells. Although such occurrences are infrequent, they should never be allowed to happen. Improperly filled and sealed fl owing wells can be a nuisance and may lower artesian pressure in neighboring wells.

2 When should wells be properly filled and sealed? Wells must be properly filled when they are removed from service. Wells are removed from service for a number of reasons, including construction of a replacement well, destruction of the building being served, failure of the well to produce safe water, failure of the well to meet the State Well Code (NR812) standards, or when a community water system is extended into an area formerly served by individual private wells. After wells are removed from service they are seldom used. They often get forgotten after a property transfer and, in time, may get covered by a parking lot or a building. Sometimes in this way all traces of old wells disappear. Such wells can cause groundwater contamination. In one recent case in Wisconsin, a house burned down over an improperly filled and sealed well located in the basement. The well provided a point of entrance into the aquifer and allowed ashladen water to contaminate the neighbor s well. In another case, a buried well having only a stone set on the top of the open casing caused severe contamination of the drinking water pumped from another well on the same property. The unused well was near both an animal yard and a sewage absorption field and thus provided direct access for the entrance of contamination into the groundwater. After a well gets covered, it is very difficult, if not impossible, to find it and determine if it s causing contamination. When new wells are constructed in an area with improperly filled and sealed wells, they may have to be cased much deeper or to alternate aquifers to provide safe water. These problems can be avoided by the proper filling and sealing of unused wells. Chapters NR811 and NR812, Wis. Adm. Codes, require proper permanent filling and sealing of unused wells. Who can perform proper well filling and sealing work? As of June 1, 2008, only licensed well drillers and pump installers may be hired to fill and seal wells. These contractors are familiar with correct filling and sealing materials and procedures, are knowledgeable about wells, and have access to the necessary equipment. It s usually more economical to fill and seal an old unused well at the same time the well driller is at the site constructing a new well. Improperly filled and sealed well Surface water leaking into improperly filled & sealed well. Washed-out concrete aggregate How should a well be properly filled and sealed? First determine the construction and condition of the well Well in service Unconsolidated overburden Fractured bedrock The first step in proper well filling and sealing is to obtain information on the construction and condition of the well. Construction information is best obtained from the Well Construction Report on file with the Wisconsin Geological and Natural History Survey (WGNHS) or on DNR s website at dnr.wi.gov. Search for Well Construction Reports. The records date back to 1936. IMPORTANT INFORMATION TO KNOW WHEN REQUESTING A WELL CONSTRUCTION REPORT: To request a report, you must furnish a legal description in terms of ¼ - ¼ Section, ¼ - Section, Section, Township and Range designations of the property where the well is located. It s also helpful if you can obtain the name of the well driller, the property owner or agent at the time of drilling, the approximate date of construction and the street address or lot #. The chances of finding the report are greater with more information. Order forms and other information about well construction reports are available on the WGNHS (Wisconsin Geological & Natural History Survey) uwex.edu/wgnhs/well.htm. Specific forms include: To request a Well Construction Report for a specific well uwex.edu/wgnhs/pdfs/wcrpdf/wellord.pdf. To request a Well Construction Report for an area uwex.edu/wgnhs/pdfs/wcrpdf/wellord2.pdf.

3 A site inspection will help you locate the well and see what condition it is in. You should determine if the well is easily accessible in the yard; or if it is in a pit or a basement. It s possible the top of the well is buried in the yard, in which case you may be able to find it using a metal detector. During your inspection you can also check to see if the pump has been removed. Clearing, filling and sealing the well Before the well is filled and sealed, the pump and its associated piping, any ungrouted liner pipe, or other obstacles must be removed from the well. If debris has been thrown in the well, a well driller may have to first drill it out. After the well is cleared, it must be filled from the bottom up with neat cement grout, sand-cement grout, concrete or approved bentonite chips. Well drillers and pump installers are familiar with these materials and know how to calculate and place the proper volume of material. The filling material must be placed through a conductor (tremie) pipe extending to the bottom of the well except when approved bentonite chips are used according to DNR instructions (see pages 4 and 5). Use of a conductor pipe will assure that the filling material won t be diluted by the water in the well and will not plug in the well part-way down. The bottom of the conductor pipe must be kept submerged in the material during filling, but may be pulled as the well is being filled. Except when using bentonite chips, a well driller or pump installer may not just pour or dump the filling material into the well without the use of a conductor pipe because this could cause the filling material to become diluted or bridge in the well part-way down. If dilution occurs, the fill material will not be impermeable. If bridging occurs, the well will only get partially filled. An improperly filled and sealed well can be as much a threat to groundwater quality as an open well. After properly filling and sealing the well from the bottom up, the filling material may terminate a few feet below the ground surface to allow the top of the casing to be cut off, if preferred. The casing may also be left in place. If the well discharged through a non-pressure conduit, the end of this conduit (in the basement) must be sealed watertight with a steel plate. Flowing wells Flowing artesian wells that fl ow at high rates may require special techniques to reduce the fl ow before the well is filled and sealed. Gravity method for well filling and sealing Works best in shallow wells. Cement hopper Grout pump Water flows out first Conductor pipe Larger diameter works better Cement displaces water and fills well from the bottom up. Grout Cement from truck or hand mixed Barrel or funnel set on well Unconsolidated overburden Conductor pipe may be withdrawn as well fills, as long as bottom of pipe remains submerged in cement. Fractured bedrock Pumped method for well filling and sealing Driven-point (sand-point) wells Unconsolidated overburden Conductor pipe may be withdrawn as well fills, as long as bottom of pipe remains submerged in cement. Fractured bedrock Driven-point or jetted wells 2 inches or less in diameter must be filled with neat cement grout. Only licensed well drillers and pump installers are allowed to fill and seal driven point wells. Grout may be poured down the casing or pumped down through a conducter pipe. The drive pipe and screen may be pulled before the grout is poured if the well is 25-feet deep or less. Bentonite chips may not be used for these wells because the chips can too easily bridge in the casing pipe. Many driven-point wells terminate in pits or in the basements of buildings. Since April 10, 1953 such well locations have been prohibited by the State Well Code.

4 If your well was constructed after this date, the well does not comply and must be properly filled and sealed except when the DNR approves its continued use. Dug wells To properly fill and seal a dug well, a well driller or pump installer must first remove the well cover and remove any piping or debris before filling the well. (If a drilled well extends below the dug well it must be filled first.) The dug well must be filled and sealed with clean clay, silt, clean native clay or silt-type soil free of organic material (if compacted), concrete, sand-cement grout or bentonite chips. If the dug well penetrates partially or completely into bedrock, the well must be filled with concrete or sand-cement grout to a point at least two feet above the top of the bedrock. The top 5 feet of curbing of the dug well must be removed to allow for a good contact between the filling material and the soil. The curbing may be caved into the dug well while the well is being filled if it s done in a manner to prevent plugging of the filling material part-way down; or this step may also be done near the end of the filling and sealing procedure. If the dug well is less than 18 inches in diameter, a conductor (tremie) pipe must be used to place the filling material, except when bentonite chips are used. For very deep or large diameter dug wells, alternate materials may be allowed. Dug well filling and sealing Unconsolidated portion backfill with: clay slurry clay-type clean soil Well pits Remove upper 5 feet of curbing Unconsolidated overburden Bedrock portion filled with cement Fractured bedrock If a drilled well extends below the dug well it must be filled first according to drilled well requirements. When a pit well is unused, the pit structure must also be filled and sealed. To properly fill and seal a well pit, perforate or knock in at least one wall, break up or perforate the fl oor, and then fill the pit with clean native clay, silt, or clean native soil. If the pit is a subsurface pump room (alcove) connected to the building foundation, the pit does not have to be filled. Well filling and sealing using bentonite chips In Wisconsin approved bentonite chips may be used to fill wells and drillholes. The chips may be used for both sand and gravel formation wells and bedrock wells. They may only be used for wells & drillholes meeting the following specifications. 4 inches or larger in diameter. Not more than 500 feet deep. Not more than 350 feet of water standing in the well or drillhole. (Note: Bentonite chips may not be used to fill wells or drillholes filled with drilling mud or clay slurry and may not be used for small diameter driven point wells.) Bentonite chips may also be used for the following: To fill dug wells. As an alternative to concrete in the top 5 feet when clay slurry is used to fill a well or drillhole from the bottom up to the 5-foot depth. (Note: Bentonite chips come in two basic size ranges (¼" - 3 / 8 " and ½"- ¾" chips). The ¼" - 3 / 8 " chips should be used for 4-inch diameter wells. Bentonite chips are irregularly shaped pieces of sodium bentonite clay that look very much like crushed limestone. They should not be confused with pellets or tablets which are not allowed). Well drillers and pump installers must follow these procedures when using bentonite chips: 1. Determine the construction details of the well or drillhole including at least the: a. Well or drillhole diameter, by simply measuring the inside diameter of the well casing pipe or drillhole; and b. Well or drillhole depth, by lowering a weighted line down to the bottom. (Make sure the weight is securely attached). 2. Remove the pump, pump piping and any other material obstructions or debris in the well or drillhole that could prevent complete filling and sealing. 3. Calculate the volume of the well or drillhole to determine the number of bags of chips that will be required by using: a. The attached Table I page 5; OR b. The formula: π = pi = 3.14 π r 2 h r = well radius (in feet) 0.69 ft 3 /bag h = well depth (in feet) 0.69 = number of ft 3 filled by one 50 lb. bag (Remember: Divide the well radius (in inches) by 12 to get the radius in feet.)

5 4. Fine particles and dust contained in the bags of bentonite chips must not be allowed to enter the well. This is prevented by pouring the bentonite chips out of the bag such that they tumble under their own weight down across a coarse-mesh screen 2 to 3 feet in length. This allows the dust to fall through the screen onto the ground. The screen should be formed into a U-shape like a rain gutter. One end of the screen should be placed on the top of the well casing while the other end is supported at a steep angle. Removal of the dust prevents bridging of the chips at the water table. Do not push or pull the chips down across the screen as this will only create more dust. 5. Pour the bentonite chips across the screen into the top of the well at a rate not faster than about 3 minutes per bag. Pour at this rate so bridging of the chips does not 350' Max. Coarse mesh screen Min. 4" diameter well Water table 500' Max. well depth occur the chips must fall all the way to the bottom of the well. (Do not use a conductortremie pipe). Check well periodically with weighted line for possible bridging of chips. 6. Make sure the well accepts the entire number of bags calculated to fill it. If it doesn t, bridging may have occurred. The point of bridging must be broken so the bentonite chips will fall to the bottom. If the bridge cannot be broken, the well may have to be drilled out and re-filled with neat cement grout. 7. If the standing water in the well does not rise to the surface during the filling procedure, clean, uncontaminated water must be poured down into the well (through the chips) until water rises up to the top of the well and stays there. The chips will then swell and create an impermeable plug in the well. Table I - Method for determining the number of 50 lb. bags of bentonite chips to fill a well Hole size and volume table Hole diameter Hole volume Pounds bentonite Feet filled by one bag Bags bentonite chips inches (ft3/foot) chips to fill 1 ft bentonite chips to fill 100 Ft 4 0.087 6.3 7.9 12.6 4-½ 0.110 7.9 6.3 15.8 5 0.136 9.8 5.1 19.6 5-½ 0.165 11.9 4.2 23.8 6 0.196 14.1 3.5 28.2 6-½ 0.230 16.6 3.0 33.2 7 0.267 19.2 2.6 38.4 7-½ 0.307 22.1 2.3 44.2 8 0.349 25.1 2.0 50.2 8-½ 0.394 28.4 1.8 56.8 9 0.442 31.8 1.6 63.6 9-½ 0.492 35.4 1.4 70.8 10 0.545 39.2 1.3 78.4 11 0.660 47.5 1.1 95.0 12 0.785 56.5 0.89 113.0 15 1.227 88.3 0.57 176.6 18 1.767 127.2 0.39 254.4 20 2.182 157.1 0.32 314.2 25 3.409 245.4 0.20 490.8 30 4.909 353.4 0.14 706.8

6 Table C - Acceptable materials and methods for well filling and sealing Materials Well type Clean clay or Approved Neat Concrete Sand- Bentonite-sand Chlorinated, Methods silt or clean bentonite chips cement cement slurry w/min. sand-free native soil grout grout mud wt. 11 lbs/gal pea gravel Driven-Point No No Yes No No No No Cement grout may (sand-point) wells be poured & drillholes without using a < 2 ½ diameter conductor pipe Wells & drillholes No Yes, provided Yes Yes Yes Yes, provided Yes, but Conductor pipe > 2 ½ diameter well is 4 minimum top 5 filled in depths required except diameter & 500 with neat below 250 when bentonite chips maximum depth cement grout, or pea gravel is used sand-cement grout or concrete Dug wells Yes (top 5' of Yes Yes Yes Yes No No Conductor pipe not curbing must required unless well be removed is <+18 diameter following filling) Bedrock wells not No Yes, provided Yes Yes Yes No Yes, but Conductor pipe extending through 4" minimum in depths required except when Maquoketa Shale diameter & 500' below 250' bentonite chips or pea maximum depth gravel is used Bedrock wells No Yes in top 500' & Yes Yes Yes No Yes, in depths Conductor pipe extending through for 40' plugs at top below 250', required except Maquoketa Shale & bottom of but not at when bentonite chips Maquoketa Shale Maquoketa Shale or pea gravel is used contact surfaces contact surfaces Dug wells Yes, but only in Yes Yes Yes Yes No No Conductor pipe Bedrock wells Unconsoli dated formation wells unconsolidated portion of well required only for placement of grout or concrete; or if well is <+18 diameter Well pits Yes Yes Yes Yes Yes No No Must perforate floor & 1 wall of pit Bentonite chips may only be used for wells not deeper than 500 feet and having not more than 350 feet of standing water in them. The chips must be poured across a coarse mesh screen such that excess dust does not enter the well. Pour rate should not be faster than 3 min. per 50 lb. bag to prevent bridging. Neat cement grout and sand-cement grout must have a density of at least 15.2 lbs per gallon When concrete is used, the gravel size may not exceed 1/ 3 the inside diameter of the conductor pipe used. Driven-Point (Sand-Point) Wells may be pulled prior to filling the hole if the well is 25' deep or less. The terms conductor pipe and tremie pipe are synonymous. The bottom of the pipe must remain submerged in the grout throughout the filling procedure. Conductor pipe must be metal pipe, thermoplastic pipe rated for at least 100 psi or rubbercovered hose reinforced with braided fiber or steel and rated for at least 300 psi. 40' Impermeable plugs shall be provided at each bedrock formation change. [See s. NR 812.26(7)(a)] The top 5 feet of dug well curbing must be knocked out to provide a soil contact with the filling material.

7 Clean clay or silt or clean native soil means low permeability soil material, free of organic humus or any other contamination. Clay or Bentonite-sand slurry means a mixture having the minimum ratio of 50 pounds of native clay or approved bentonite mixed with 100 gallons of water (from a known safe and uncontaminated source) and 10-25% sand by volume of the slurry such that a mud weight of at least 11 lbs./gal. is achieved. Neat Cement Grout means a mixture of cement and water in the proportion of one bag of Portland cement (94 lbs.) meeting ASTM C 150, Type I or API-10A, Class A standard; and 5 to 5.5 gallons of water from a known safe and uncontaminated source. Powdered bentonite may be added up to ratio of 5 pounds per 94-pound bag of cement provided 1.3 gallons of water are added for each 2 pounds of bentonite added. Concrete (sand-cement) grout means a mixture of cement, sand and water in the proportion of one bag of Portland cement (as described above), a cubic foot of dry sand and 5 to 5.5 gallons of clean water from a known safe and uncontaminated source. Concrete means a mixture of cement, water, sand and gravel in the proportion of one bag of Portland cement (as described above), an equal measure of gravel (by weight or by volume) and not more than 5.5 gallons of water from a known safe and uncontaminated source. A commerciallyprepared mix may be used provided the mix has at least 6 bags of cement per cubic yard. Approved chipped bentonite products are as follows: ABI Plug... ABI, Inc. Bentonite Plug... Loresco (medium: ¼ - 3 / 8 and coarse ½ - ¾ ) Black Hills Bentonite Plug Black Hills Bentonite, LLC CETCO Chip... CETCO (medium: ¼ - 3 / 8 & coarse: 3 / 8 - ¾ ) Cowboy Brand... Cowboy Mining Co. (Fine, Medium & Coarse) Econoplug... Economy Mud Products Co. (both medium chips: ¼ to 3 / 8 and coarse chips: ½ to ¾ )(mfg. by Wyo-Ben, Inc.) Enviroplug... Wyo-Ben, Inc. (both medium chips: ¼ to 3 / 8 and coarse chips: ½ to ¾ ) Federal Plug... M-1 Drilling Fluids (Federal) 100% of chipped sodium bentonite (both medium chips: ¼ to 3 / 8 and coarse chips: ½ to ¾ ) Holeplug... Baroid Industrial Drilling Products ( 3 / 8 and ¾ chips) Kwik Plug... Federal Summit ( 3 / 8 and ¾ chips) Naturapel... Wyo-Ben, Inc. (chips) Opti Seal... Bentonite Corp. ( 3 / 8 and ¾ chips) PdsCo Plug... PdsCo. (Polymer Drilling Systems)(medium and coarse chips) Permaplug... Cathodic Engineering Equipment Co. (both coarse chips: ¾ and medium chips: 3 / 8 ) Pure Gold Chips... CETCO (both medium ¼ to 3 / 8 and coarse 3 / 8 to ¾ chips) Tower Plug... Black Hills Bentonite, LLC ( 3 / 8 and ¾ chips) Well-Plug... Fluidril Mud Systems (from Black Hills Bentonite) 100% chipped bentonite ( 3 / 8 and ¾ chips)

Conductor (tremie) pipe used for well filling and sealing shall be any of the following: 1. Metal pipe, 2. Rubber-covered hose reinforced with braided fiber or steel and rated for at least 300 psi, or 3. Thermoplastic pipe rated for at least 100 psi including: a. polyvinyl chloride (PVC), b. chlorinated polyvinyl chloride (CPVC), c. polyethylene (PE), d. polybutylene (PB), and e. acrylonitrile butadiene styrene (ABS) Must I report the well filling and sealing to the DNR? Yes. When groundwater contamination investigations are undertaken, it s important to know the location of active, unused and former wells. Further, this information is important documentation for property transfers. Well Filling and Sealing Reports (Form #3300-005) are available to licensed well drillers and pump installers from DNR central office. Well Filling and Sealing Reports must be used to report how the well was filled and sealed and document that the well no longer exists. The form must be completed, signed, and sent to DNR central office by the licensed person performing the well filling and sealing work. The second copy is the owner s copy. What administrative rules cover well filling and sealing? NR 812.26 governs proper abandonment of private water supply wells. The filling requirements are also printed on the back of the well abandonment form. NR141, Wis. Adm. Code, governs the proper abandonment of monitoring wells. NR 811.17, has rules for abandonment of community wells. Where can I obtain additional information? For further information on drinking water supplies and groundwater quality check the DNR website at dnr.wi.gov/org/water/dwg/index.htm. Also check the UW Extension website at: learningstore.uwex.edu/drinking-water-c120.aspx This brochure was revised by the Wisconsin Department of Natural Resources with assistance from the Education Subcommittee of the Groundwater Coordinating Council. The Wisconsin Department of Natural Resources provides equal opportunity in its employment, programs, services and functions under an Affirmative Action Plan. If you have any questions, please write to: Equal Opportunity Office, Department of the Interior, Washington, D.C. 20240. This publication is available in alternative format (large print, Braille, audiotape, etc) upon request. Please call (608) 266-0821 for more information. PRINTED ON RECYCLED PAPER