WV Monitoring Well Driller Certification Course Manual
|
|
|
- Emory Booth
- 9 years ago
- Views:
Transcription
1 WV Monitoring Well Driller Certification Course Manual November 2012
2 Table of Contents Introduction 1 General MWD Certification Information 3 Title 47 Series 59 Monitoring Well Rules 4 Title 47 Series 60 Monitoring Well Design Standards 8 Additional Guidance and Commonly Asked Questions 27 General Driller Knowledge 29 Advantages of Various Drilling Techniques 30 Disadvantages of Various Drilling Techniques 31 Advantages and Disadvantages of Casing and Screen Material 32 Geology & Geologic Settings of West Virginia 33 Hydrologic Cycle 36 Basic Conversion Factors 39 Basic Formulas 40 Filter Pack Volume Calculation 41 Example Volume Calculation 42 Volume of Water in Casing 43 Electronic Submission of Well Completion Reports 44 Example Forms 47 Inspector Check-Off List for Monitoring Wells 49 DW-45 Individually Numbered 47CSR58 Individually Numbered Disclaimer All reasonable precautions have been taken in the preparation of this document, including both technical and non-technical proofing. The West Virginia Department of Health and Human Resources and West Virginia Department of Environmental Protection and all staff assume no responsibility for any errors or omissions. Should the summarized information in this document be inconsistent with a governing rule or statute, the language of the rule or statute shall prevail. Reference herein to any specific commercial products, process, or service by trade name, trademark, manufacturer, or otherwise, does not necessarily constitute or imply its endorsement, recommendation, or favoring by the West Virginia Department of Health and Human Resources and West Virginia Department of Environmental Protection.
3 Monitoring Well Driller Training & Examination WEST VIRGINIA DEPARTMENT OF HEALTH & HUMAN RESOURCES (WV DHHR) BUREAU FOR PUBLIC HEALTH (BPH) OFFICE OF ENVIRONMENTAL HEALTH SERVICES (OEHS) ENVIRONMENTAL ENGINEERING DIVISION (EED) CERTIFICATION & TRAINING PROGRAM 350 CAPITOL STREET, ROOM 313, CHARLESTON, WV PHONE: (304) CONTACTS: RICK SHAVER & DAWN NEWELL Certification & Enforcement WEST VIRGINIA DEPARTMENT OF ENVIRONMENTAL PROTECTION (WV DEP) DIVISION OF WATER & WASTE MANAGEMENT (DWWM) TH STREET CHARLESTON, WV PHONE: (304) , EXT CONTACT: SHARON MULLINS 1
4 West Virginia presently requires all monitoring well drillers that operate within the state to be certified by the state (effective April 9, 2010). A monitoring well is defined as being any cased excavation or opening into the ground made by digging, boring, drilling, driving, jetting or other methods for the purpose of determining the physical, chemical, biological or radiological properties of groundwater. This includes piezometers and observation wells that are installed for purposes other than those listed above, but does not include wells whose primary purpose is to provide a supply of potable water. A monitoring well driller is the individual operating the drilling rig when drilling, constructing, altering or abandoning a monitoring well, pursuant to Chapter 22, Article 12, "Groundwater Protection Act". To be eligible for certification, an individual must meet one of the following criteria: Have a minimum of two (2) years of monitoring well drilling experience under the supervision of a WV certified monitoring well driller; or Have six (6) months monitoring well driller experience that includes properly installing at least fifteen (15) monitoring wells and properly abandoning at least ten (10) monitoring wells under the supervision of a WV certified monitoring well driller. To become a certified monitoring well driller, the applicant must initially take a (1) day training course and pass the associated oral or written certification exam. All training and testing are administered by the West Virginia Bureau for Public Health's (BPH) Office of Environmental Health Services (OEHS) for the West Virginia Department of Environmental Protection (WV DEP) both in Charleston, WV. NOTE: There is currently no certification reciprocity between the State of West Virginia and another state, i.e. regardless of certification in other states; you must attain a West Virginia certification. All individuals interested in attending the training course and exam must complete an application (Form EW-122). An EW-122 must be sent to BPH at least two (2) weeks prior to the preferred session. BPH will send a confirmation letter that the applicant must bring to the training site with a photo ID. 2
5 The required course and exam are free. General MWD Certification Information The exam is open book. This manual, which includes all related content for use during course and exam, will be provided by BPH in hardcopy. 65 Questions Total with 53 Questions from 47CSR59 Monitoring Well Regulations and 47CSR60 Monitoring Well Design Standards (included within this document) and 12 Questions from NDA Driller s Handbook and additional information included within this document. A score of 70% or better on the exam. NOTE: Exam results will be processed as soon as possible and mailed to each participant. This usually is within 2 to 3 weeks from the test date. For confidentiality, results cannot be given out over the phone. Initial certification will be issued by WV DEP when the individual: 1. Fulfills experience, course, and exam requirements with the BPH. 2. Submits a completed address verification form with the initial certification fee of $200 to the WV DEP. Certification expires 1 year from the date of issuance. Renewal notices are sent 30 days prior to the expiration of certificate by the WV DEP. The annual renewal fee is $200. No bonding is required. No per well fee is required. No pre-authorization is required to drill and construct. Drillers may submit their construction and/or abandonment monitoring well and high-risk borehole completion reports via the Internet online at Electronic submission speeds up the process and costs nothing. An electronic receipt is provided upon approval or if problems are encountered. Paper forms are available from the WV DEP upon request while supplies last. 3
6 TITLE 47 LEGISLATIVE RULES DEPARTMENT OF ENVIRONMENTAL PROTECTION WATER RESOURCES SERIES 59 MONITORING WELL RULES General Scope. -- This legislative rule establishes the certification of monitoring well drillers and monitoring well installations and alterations Authority. -- W. Va. Code (d) Filing Date. -- April 9, Effective Date. -- April 9, Definitions Application means the Department of Environmental Protection s standard form(s) for applying for monitoring well driller certification, including any additions, revisions or modifications to the form(s) Borehole means a circular hole, deeper than it is wide, constructed in earth material for the purpose of obtaining geological or groundwater data. Boreholes are also referred to as drill holes Certified monitoring well driller means an individual granted a written certificate by the Secretary to drill, construct, alter or abandon monitoring wells and who meets the requirements of this rule Design standards means those specifications, drawings and other details promulgated by the Secretary to ensure proper location, design, construction, completion and abandonment of monitoring wells Groundwater means the water occurring in the zone of saturation beneath the seasonal high water table, or any perched water zones High risk borehole means a borehole that is on a site that currently contains or contained in the past solid or hazardous waste, hazardous materials or their by-products; or that may be affected by solid or hazardous waste, hazardous materials or their by-products; or at sites known or suspected to be contaminated by hazardous waste, hazardous materials or their by-products, unless the contamination is determined to be innocuous; or in situations where water quality in one water-bearing zone may be detrimental to another water-bearing zone Monitoring well means any cased excavation or opening into the ground made by digging, boring, drilling, driving, jetting or other methods for the purpose of determining the physical, chemical, biological or radiological properties of groundwater. The term monitoring well includes piezometers and observation wells that were installed for purposes other than those listed above, but does not include wells whose primary purpose is to provide a supply of potable water Monitoring well driller means the individual operating the drilling rig when drilling, constructing, altering or abandoning (i.e., properly or improperly closing) a monitoring well or a high-risk borehole. 4
7 2.9. Person means an individual, partnership, association, syndicate, company, firm, trust, corporation, government corporation, institution, department, division, bureau, agency, federal agency or any other entity recognized by law Piezometer means a groundwater monitoring well sealed below the water table that is installed for the specific purpose of determining the potentiometric surface or the physical, chemical, biological or radiological properties of groundwater, or both Secretary means the Secretary of the Department of Environmental Protection or his or her lawful designee Application and Enforcement Application -- This rule applies to all monitoring well drillers Enforcement -- The enforcement of this rule is vested with the Secretary of the West Virginia Department of Environmental Protection, or his or her lawful designee Certification of Monitoring Well Drillers There shall be a certified monitoring well driller on site in direct charge of actively drilling, constructing, altering, testing or abandoning any monitoring well or high-risk borehole To be eligible for certification, an individual must meet one of the following criteria: 4.2.a. Have a minimum of two (2) years of monitoring well drilling experience under the supervision of a West Virginia certified monitoring well driller; or 4.2.b. Have six (6) months of monitoring well drilling experience that includes properly installing at least fifteen (15) monitoring wells and properly abandoning at least ten (10) monitoring wells under the supervision of a West Virginia certified monitoring well driller An application for certification as a monitoring well driller shall be made in writing to the Secretary on a form prescribed by the Secretary. Information required on the form may include, but not be limited to, the applicant s name, address, education, experience, business name and references In addition to filing an application for becoming a certified monitoring well driller, the applicant must pass an oral or written examination to assure the Secretary that the applicant is thoroughly familiar with all requirements of applicable laws, regulations, and design standards pertaining to monitoring well drilling and construction and borehole abandonment. Examinations shall be administered by personnel of the West Virginia Department of Environmental protection or their appointees. An applicant must obtain a passing grade of seventy percent (70%) in order to become certified. An applicant who has failed an examination must wait thirty (30) days before retaking the examination Certification is not transferable or assignable and shall automatically become invalid upon suspension or revocation Certification expires one (1) year after date of issuance and may be renewed thirty days (30) before the expiration date If a certified monitoring well driller allows his or her certification to expire without seeking renewal, 5
8 he or she must be retested in accordance with the provisions of subsection 4.4 above in order to receive recertification under this rule Monitoring Well Driller Identification. All monitoring well drillers shall have proof of certification available for inspection at all times when actively engaged in drilling, constructing, altering, or closing/abandoning monitoring wells or boreholes Advisory Board The Secretary may establish an advisory board and designate the chairman of the board The advisory board membership shall consist of, but not necessarily be limited to, the following members: 6.2.a. Three (3) members shall be certified monitoring well drillers; 6.2.b. One (1) member shall be from the State Bureau for Public Health; 6.2.c. One (1) member shall be from the Department of Environmental Protection; and 6.2.d. One (1) member shall be from the West Virginia Geological & Economic Survey The duties of the advisory board shall be assigned by the Secretary The Secretary may establish other boards, committees or commissions to assist in carrying out the provisions of this rule Denial, Suspension or Revocation of Certification The Secretary may suspend, revoke or deny certification if the information on the application form is incomplete, inaccurate, false or misleading, or if the provisions of this rule or any other rule pertaining to monitoring wells are willfully or negligently violated Suspension or revocation of certification shall be preceded by a written notice from the Secretary at least ten (10) days prior to actual revocation or suspension Denial, suspension or revocation of certification shall be in writing from the Secretary and shall state specific reasons for the denial, suspension or revocation When certification has been denied, suspended or revoked, the individual thereby affected shall immediately discontinue the drilling, altering, constructing and abandonment of monitoring wells and boreholes Any individual whose application for certification has been denied or whose certification has been suspended or revoked may request a hearing in accordance with the provisions of W. Va. Code Administrative Due Process. Those persons adversely affected by the enforcement of this rule who desire a contested case hearing to determine any rights, duties, interests or privileges shall proceed in the manner prescribed in W. Va. Code
9 Severability. If any provisions of this rule or the application thereof to any person or circumstance are held invalid, the invalidity shall not affect the provisions or the application of this rule that can be given effect without the invalid provisions or application and, to this end, the provisions of this rule are declared to be severable. 7
10 TITLE 47 LEGISLATIVE RULE DEPARTMENT OF ENVIRONMENTAL PROTECTION OFFICE OF WATER RESOURCES SERIES 60 MONITORING WELL DESIGN STANDARDS General Scope and Purpose. -- This rule establishes minimum acceptable documentation and standards for the design, installation, construction, and abandonment of monitoring wells and for the abandonment of all boreholes Authority. -- W. Va. Code (d) Filing Date. -- June 21, Effective Date. -- June 21, Applicability. This rule applies to any person who either owns, operates, constructs, installs or abandons monitoring wells and boreholes. All monitoring wells and boreholes shall be abandoned according to section 19 of this rule. This rule does not apply to monitoring wells and boreholes installed prior to the effective date of this rule, except as provided for in section 19 of this rule Definitions Abandonment means the sealing of a monitoring well or borehole in accordance with section 19 of this rule in order to restore original hydrogeologic conditions and/or to prevent contamination Air rotary drilling means a drilling method whereby the borehole is advanced using a circular rotating action applied to a string of drilling rods that have a diffused discharge bit attached to the bottom of the rods. Pressurized air is forced through the drilling rods that cools the drilling tools and removes the cuttings from the borehole Annular space (Annulus) means the space between two well casings or between the casing and the borehole sidewall Annular space seal means the following: 3.4.a. For wells constructed with filter packs, it is the material placed above the top of the filter pack or the filter pack seal up to the surface seal and between the well casing and the adjacent formation; or 3.4.b. For wells constructed into bedrock formations and without well screens, it is the material placed from the bottom of the enlarged borehole up to the surface seal, between the well casing and the adjacent formation. 8
11 3.5. Appropriate groundwater regulatory agency means the groundwater regulatory agency that has primary regulatory oversight of a particular facility or activity. Where primary regulatory oversight is unassigned or shared, the Secretary shall determine which groundwater regulatory agency is to be the appropriate groundwater regulatory agency Aquifer test well means a monitoring well installed to provide information on the hydraulic conductivity, transmissivity, storage coefficient, capture zone, specific capacity, radius of influence or other physical parameters of an aquifer, defined geologic unit, or water bearing formation ASTM means American Society for Testing and Materials Bedrock means the continuous solid rock underlying any loose surface material such as soil, alluvium or boulders. Bedrock includes, but is not limited to, limestone, dolomite, sandstone, shale, coal, igneous, and metamorphic rock Bentonite means a clay consisting of at least eighty-five percent (85%) montmorillonite. Bentonite is available in the following forms: 3.9.a. Bentonite powder means two hundred (200) mesh pure bentonite, without additives. 3.9.b. Bentonite granules means eight (8) mesh pure bentonite, without additives. 3.9.c. Bentonite pellets means commercially manufactured tablets made by compressing pure bentonite, without additives, into forms greater than one-quarter inch (1/4 ) in size. 3.9.d. Bentonite chips means commercially processed angular fragments of pure bentonite, without additives Bentonite-cement grout means a mixture with the ratio not to exceed five (5) pounds of bentonite with ninety-four (94) pounds of Portland cement and approximately eight and six-tenths (8.6) gallons of water from an uncontaminated source Bentonite-fine sand slurry means a mixture with the minimum ratio of fifty (50) pounds of bentonite with one hundred (100) gallons of water from an uncontaminated source and ten to twenty-five percent (10-25%) sand by volume for a mud weight of eleven (11) pounds per gallon Bentonite granular slurry means a thoroughly blended mixture of up to thirty (30) pounds of untreated bentonite powder added to one hundred (100) gallons of water from an uncontaminated source with a minimum of one hundred (100) pounds of untreated bentonite granules mixed together by a Venturi hopper mud mixer or other equivalent high shear mixer Bentonite high-solids grout means a thoroughly blended mixture of water from an uncontaminated source with untreated bentonite, without additives. The mixture by weight shall contain a minimum of twenty percent (20%) bentonite solids Borehole means a circular hole, deeper than it is wide, constructed in earth material for the purpose of obtaining geologic or groundwater related data. Boreholes are also referred to as drill holes Certified monitoring well driller means an individual granted a written certificate by the Secretary to drill, construct, alter or abandon monitoring wells or boreholes, except those defined as low-risk in subdivision 19.2.a below, and who meets the requirements of 47CSR59, Monitoring Well Regulations. 9
12 3.16. Clay means a fine grained inorganic soil with a grain size less than seventy-five micrometers (75 µm) and having a plasticity index equal to or greater than four (4) Clustered monitoring wells means individual monitoring wells situated close together, but not in the same borehole. Clustered wells are most often used for monitoring ground water conditions at various depths in roughly the same area Coarse sand means a well sorted sand with a predominant grain size between four and seventysix hundredths millimeters (4.76 mm) and two millimeters (2.0 mm) as established by the unified soil classification system Concrete means a slurry mixture with a ratio of ninety-four (94) pounds of cement, equal volumes of dry sand and gravel, and five (5) to six (6) gallons of water from an uncontaminated source. The ratio of sand and gravel to cement may not exceed three (3) parts to one (1) Contaminant means any material in a solid, liquid or gaseous state that has the potential to cause contamination Contamination means any manmade or man-induced alteration of the chemical, physical or biological integrity of the groundwater resulting from activities regulated under the West Virginia Groundwater Protection Act in excess of existing groundwater quality, unless that site has been granted a deviation or variance from existing quality as provided for in the West Virginia Groundwater Protection Act, or is subject to an order, permit, or other regulatory action that requires restoration or maintenance of groundwater quality at a different concentration or level Driven-point well means a well constructed by joining a drive point with lengths of pipe and driving the assembly into the ground with percussion equipment or by hand, without first removing material below the ten (10) foot depth Excavated well means any monitoring well that is constructed by backfilling appropriately sized unconsolidated material around the well screen. Excavated wells will be installed in accordance with sections 6, 7, and 8, subdivision 11.4.c, and subsection 11.5 of this rule. Excavated wells include, but are not limited to, any tank pit observation well Filter pack means the sand, gravel or both placed in direct contact with the well screen Filter pack seal means the sealing material placed in the annular space above the filter pack and below the annular space seal to prevent the migration of annular space sealant into the filter pack Fine sand means a well sorted sand with a predominant grain size between 0.42 mm and mm, as established by the Unified Soil Classification System Gravel means an unconsolidated material with the predominant grain size being between 76.2 mm and 4.76 mm, as established by the Unified Soil Classification System Groundwater means the water occurring in the zone of saturation beneath the seasonal high water table, or any perched water zones Groundwater observation well means any monitoring well in which the screened interval intersects the water table Groundwater Regulatory Agency means the Department of Environmental Protection, the 10
13 Bureau for Public Health, the Department of Agriculture, or any other political subdivision that has received approval from the Secretary to regulate facilities or activities for groundwater protection Hollow stem auger drilling means a drilling method where continuous flighting is welded to a hollow stem pipe. The flighting carries drill cuttings to the surface as the flighting is rotated and pushed down into the earth Inside diameter means the horizontal distance between the inner walls of a well casing, hollow stem auger or tremie pipe Medium sand means a well sorted sand with a predominant grain size between 2.0 mm and 0.42 mm, as established by the Unified Soil Classification System Monitoring well means any cased excavation or opening into the ground made by digging, boring, drilling, driving, jetting, or other methods for the purpose of determining the physical, chemical, biological, or radiological properties of groundwater. The term monitoring well includes piezometers and observation wells that are installed for purposes other than those listed above, but does not include wells whose primary purpose is to provide a supply of potable water Montmorillonite means a group of expanding lattice clay minerals of the general formula: R 0.33 Al 2 Si 4 O 10 (OH)2.H 2 O, where R means one or more cations of sodium, potassium, magnesium or calcium and where Al means aluminum, Si means silicon, O means oxygen and H means hydrogen Mud rotary drilling means a drilling method whereby a borehole is advanced by using a circular rotating action applied to a string of drilling rods that have a diffused discharge bit attached to the bottom of the string. A bentonite and water mud slurry is used to provide borehole stability, to cool the bit and to carry cuttings to the ground surface Neat cement grout means a slurry mixture with a ratio of ninety-four (94) pounds of Portland cement mixed with five (5) to six (6) gallons of water from an uncontaminated source Nested monitoring wells means two (2) or more casing strings within the same borehole. The screened interval of each casing string is designed to monitor water from different zones Percussion drilling means a drilling method using a cable tool drilling machine or a drilling method whereby the permanent or temporary well casing is driven, or is set into a borehole and then driven Permanent monitoring well means any monitoring well in place for sixty (60) days or longer Person means any industrial user, public or private corporation, institution, association, firm or company organized or existing under the laws of this or any other state or country; state of West Virginia; governmental agency, including federal facilities; political subdivision; county commission; municipal corporation; industry; sanitary district; public service district; soil conservation district; watershed improvement district; partnership; trust; estate; person or individual; group of persons or individuals acting individually or as a group; or any legal entity whatever Piezometer means a monitoring well sealed below the water table that is installed for the specific purpose of determining the potentiometric surface or the physical, chemical, biological, or radiological properties of groundwater, or both Potentiometric surface or piezometric surface means an imaginary surface representing the total head of groundwater and is the level to which water will rise in a well. 11
14 3.44. PSI means pounds per square inch Purge means an action that removes water from the well, commonly accomplished by using a pump or bailer Recovery well means a well intended and designed to capture and remove contaminants from the subsurface Rotary wash drilling means a drilling method whereby metal temporary casing is advanced into the borehole by driving. At selected intervals, the temporary casing is cleaned out using rotary drilling tools by pumping clean water through the rod to flush out accumulated cuttings. This drilling method is also known as wash bore or wash down drilling Sand-cement grout means a mixture of cement, sand and water in the proportion of ninety-four (94) pounds of Portland cement, one (1) cubic foot of dry sand, and five (5) to (6) gallons of water from an uncontaminated source Secretary means the Secretary of the Department of Environmental Protection or his or her authorized designee Sediment means any unconsolidated material including, but not limited to, clay, silt, sand, gravel, and rock particles Solid stem auger drilling means a drilling method where continuous flighting is welded onto a solid stem pipe. The flighting carries drill cuttings to the surface as the flighting is rotated and pushed down into the earth. The borehole is created by a cutting bit located at the tip of the lead auger Specific gravity means the weight of a particular volume of substance compared to the weight of an equal volume of water at a reference temperature Surge means an action causing water to move rapidly in and out of the well screen, thereby removing fine material from the surrounding aquifer Tank pit observation well means any vapor observation well or groundwater observation well or both installed in an underground storage tank excavation for release detection purposes Temporary monitoring well means any monitoring well in place for less than sixty (60) days Top of bedrock or top of firm rock means at least seventy percent (70%) of the drill cuttings being either: 3.56.a. Angular rock fragments, as in the case of crystalline rock; or 3.56.b. Rock fragments composed of individual grains or rock particles that are cemented together to form an aggregate, as opposed to a single sediment particle Tremie pipe means a pipe or hose used to install well construction materials in an annular space or a borehole Unconsolidated material means that material found above bedrock, composed of single sediment particles, individual grains or rock fragments. Unconsolidated material includes but is not limited to clay, silt, 12
15 sand, gravel, loess, peat and organic soil Unified Soil Classification System means the soil designation system based on the physical properties of the soil developed from the airfield classification system in 1952 and adopted by the American Society for Testing and Materials in standard test method D Note: A copy of this publication is available from the American Society for Testing and Materials, 100 Bar Harbor Drive, West Conshohocken, Pennsylvania Vapor observation well means any excavated well in which the screened interval intersects the backfill or unconsolidated material that is sufficiently porous to readily allow diffusion of vapors into the well Water table means the surface of unconfined groundwater where the water pressure is equal to atmospheric pressure Water table observation well means any monitoring well in which the screen or open borehole intersects a water table that is installed for the specific purpose of determining either the elevation of the water table or the physical, chemical, biological or radiological properties of groundwater, or both Well means any borehole or other excavation or opening in the ground, deeper than it is wide, constructed for the purpose of obtaining or monitoring the surrounding media, including groundwater. This definition does not include water wells whose sole purpose is to provide: a supply of water, for exploration of water, for dewatering, or for functioning as heat pump wells Well depth means the distance from the ground surface to the bottom of the well screen or to the bottom of the open hole when a well screen is not used Well riser means the impervious portion of pipe extending from the top of the well screen or open borehole to the top of the monitoring well. The well riser prevents undesirable fluids and materials from entering the monitoring well and provides access to the zone or the interval being monitored Well screen means the filtering device that allows groundwater to flow freely into a monitoring well from an adjacent formation Well volume means the volume of water contained in the well casing and the filter pack Conflicting Provisions. Where, in certain instances, existing rules impose requirements that are more or less restrictive than the requirements of this rule, and in the event that this rule conflicts with another applicable rule, the Secretary shall determine which rule or section(s) thereof best complies with the intent of the Groundwater Protection Act, W. Va. Code et seq., and require adherence to said rule or section(s) thereof. The Secretary may, at his or her discretion, begin the formal regulatory process to remove the conflict between the rules. 13
16 Borehole Protection. Protective measures shall be taken to prevent a borehole from acting as a conduit for contamination or becoming a safety hazard until abandonment in accordance with section 19 of this rule Monitoring Well Location And Reporting Requirements Where prior groundwater regulatory agency approval is required, monitoring wells shall be installed at the locations indicated on the approved plans and specifications Following installation of a monitoring well, each certified monitoring well driller shall report to the Secretary, on forms provided by the Secretary, the following information within sixty (60) days after completion of the well installation. 6.2.a. The name and address of the person for whom the wells were installed; 6.2.b. The date the wells were installed; and 6.2.c. The latitude and longitude coordinates in degrees, minutes, and seconds to the nearest second, and the method used to determine such coordinates for each well installed The certified monitoring well driller shall assign each monitoring well a registration number using the following system: 6.3.a. The first group of numbers will be the certified monitoring well driller s certification number followed by a dash (-). 6.3.b. The second group of numbers will represent the number of the monitoring well(s) installed by the driller for the calendar year followed by a dash (-). 6.3.c. The third group of numbers will represent the calendar year in which the well was installed. Example: The first well drilled by a certified monitoring well driller with certification number 0123 in calendar year 1996 would be: The certified monitoring well driller shall permanently affix the registration number onto each well installed Failure to comply with any part of section 6 of this rule may result in enforcement action taken pursuant to 47CSR Well Riser The well riser for wells constructed in a floodplain or floodway shall terminate a minimum of two (2) feet above ground level and be provided with a watertight cap, unless it can be demonstrated that inundation will not occur, except as provided for in subsection 11.6 of this rule Specifications. -- The riser must consist of materials that will not alter the quality of water samples for the constituents of concern and that are appropriate for the monitoring environment. The riser should have adequate wall thickness and coupling strength to withstand installation and development stresses. Each section of riser should be uncontaminated prior to installation. The minimum nominal internal diameter of the riser should be chosen based on the particular application. However, in most instances, a minimum of 14
17 two (2) inches (50.8 mm) is needed to accommodate sampling devices. Note: Risers are generally constructed of PVC, stainless steel, fiberglass, or fluoropolymer materials Assembly and Installation. -- Where the well is to be used for organic water quality monitoring, all riser couplings shall use a coupling method that is watertight and that does not introduce organic compounds to the well. Wells that will not be monitored for organic compounds may use any industry accepted watertight coupling method Inspection. -- Prior to use, the casings, couplings and other components shall be inspected for cuts, deformities, gouges, deep scratches, damaged ends, and other imperfections that could compromise the integrity of the well. Any casing, coupling or component having such a defect may not be used Risers shall be centered in the borehole, using centralizers if necessary, except in the case of nested monitoring wells A protective cap on the well riser may be necessary during the installation of the annular space seal, the filter pack, the filter pack seal and the ground surface seal to prevent any of these materials from entering the monitoring well Well Screen Specifications. -- The well screen must consist of materials that will not alter the quality of water samples for the constituents of concern and that are appropriate for the monitoring environment. The well screen should have adequate wall thickness and coupling strength to withstand installation and development stresses. Each section of well screen should be uncontaminated prior to installation. The minimum nominal internal diameter of the well screen should be chosen based on the particular application All monitoring well screens shall be constructed of material that is nonreactive with the constituents in soils and groundwater at the monitoring location. The well screen slot size shall be sized to retain at least ninety percent (90%) of the grain size of the collapsed formation where such is used as filter pack material, or at least ninety percent (90%) of the grain size of the filter pack if material other than collapsed formation is used. In lieu of a sieve analysis, or where other well design considerations require a different slot size, a number ten (10) slot screen size may be used, as a maximum, to retain at least ninety percent (90%) of the filter pack material. Well screen interval lengths should be chosen to adequately monitor the water-bearing zone of interest and to comply with section 13 of this rule. Well screens on piezometers installed for the purpose of determining the elevation of the potentiometric surface may not exceed five (5) feet in length, except where potentiometric surfaces may fluctuate over greater intervals. Note: Well screens for wells other than the water table observation wells and piezometers identified above may vary in length Assembly and Installation. All well screens shall be joined to the well riser by methods described in subsection 7.3 of this rule. All joints shall be watertight. Monitoring wells installed in bedrock using an open borehole may be constructed without a well screen Well screens shall be centered in the borehole, using centralizers if necessary, except in the case of nested monitoring wells The bottom portion of each well screen or well must be plugged or capped to prevent oversized material from entering the well. 15
18 Tremie Pipes and Sealing Procedures Materials. -- The tremie pipe used for the placement of sealant materials shall be one of the following materials and shall exhibit pressure ratings adequate for the pumping pressures to be used: 9.1.a. Metal pipe, 9.1.b. Rubber-covered hose reinforced with braided fiber or steel, 9.1.c. Thermoplastic pipe including but not limited to: 9.1.c.1. Polyvinyl chloride (PVC), 9.1.c.2. Chlorinated polyvinyl chloride (CPVC), 9.1.c.3. Polyethylene (PE), 9.1.c.4. Polybutylene (PB), or 9.1.c.5. Acrylonitrite butadiene styrene (ABS) Procedures. -- This subsection describes groundwater regulatory agency approved sealant placement methods when a tremie pipe is used. Note: These procedures apply to the use of grout or slurry sealant. 9.2.a. The sealant material shall be placed in such a manner as to not disturb the integrity of the filter pack and seal, and to not threaten the integrity of the riser. 9.2.b. When a tremie pipe is used for placement of fluid sealants, the bottom end shall be kept submerged in the sealant material throughout the sealing process. 9.2.c. The sealant material shall be brought up to the ground surface seal. Any settling of the sealant material shall be topped off. 9.2.d. Tremie pipe - gravity. Sealing material may flow by gravity through a funnel or hopper connected to a tremie pipe. The tremie pipe shall be lowered to the bottom of the annular space or borehole to be sealed and the sealing material placed from the bottom up. 9.2.e. Tremie pipe - pumped. Sealing material shall be placed by a pump through a tremie pipe into the annular space or borehole. Tremie pipes used for the placing of pumped slurry or grout should be fitted with a J-hook end or a closed end with side discharge. Note: The J-hook end or closed end with side discharge of the tremie pipe will direct the flow of the materials to the side or upward. 16
19 Filter Packs All permanent monitoring wells installed in unconsolidated material and used for the collection of water quality samples shall be constructed with filter packs, except as provided in subsection 10.4 of this rule. Permanent monitoring wells installed in bedrock may be constructed with filter packs. When used, the filter pack shall be the only material in contact with the well screen. All commercially prepared filter packs installed in permanent monitoring wells shall meet the requirements in subsection 10.2 of this rule. All other filter packs shall meet the requirements in subsection 10.4 of this rule Specifications. -- The filter pack shall be a silica based sand or gravel. The sand or gravel used for filter packs shall be hard and durable and shall have an average specific gravity of not less than The sand and gravel shall be visibly free of clay, dust and micaceous and organic matter. Not more than five percent (5%) of the sand or gravel shall be soluble in a ten percent (10%) hydrochloric acid solution. Uniformity coefficients for filter pack material shall range from one (1) to three (3). All filter pack material should be purchased from a reputable supplier who has properly cleaned and bagged the material. In lieu of a sieve analysis, for unconsolidated material that is predominately silt and clay, the filter pack shall be a fine sand. In bedrock, the filter pack shall be a medium or coarse sand or gravel, except in karst or highly fractured bedrock formations where fine sand filter packs may be used. Crushed limestone, dolomite or any material containing clay or any other material that will adversely impact on the performance of the monitoring well may not be used as filter pack. Note: When installing a monitoring well in karst or highly fractured bedrock, a pre-packed or double sleeved screen may be necessary to hold the filter pack material in place Installation. -- The filter pack shall generally extend from six (6) inches beneath the bottom of the well to between two (2) and five (5) feet above the top of the well screen. For water table observation wells constructed in areas where the depth to water table is less than seven (7) feet or where discrete monitoring is desired, the required filter pack height above the top of the well screen may be reduced to six (6) inches to allow for the required amount of annular space sealant to be placed. To ensure that the filter pack is installed evenly surrounding the well screen and casing over the proper depth interval, a tape measure, measuring rod or similar device shall be used to measure the height of the filter pack. The tape measure, measuring rod or similar device shall be carefully raised and lowered while the filter pack is being installed to identify bridging. If bridging occurs, the filter pack material shall be tamped into place surrounding the well screen and riser, using a measuring rod or similar device. Pre-packed screens may be used if necessary Collapsed Formation. -- Collapsed formation may be used as filter pack material, if the collapsed formation will limit the passage of formation fines into the well screen and either an artificial filter pack cannot be installed or the formation grain size is greater than or equal to fine sand sized grains. The grain size distribution of the collapsed formation shall be such that at least ninety percent (90%) of the formation will be retained by the well screen Sealing Requirements All materials and procedures used in the installation of seals for permanent monitoring wells shall meet the requirements of this section Installation of the Filter Pack Seal. -- A bentonite chip, pellet or a slurry seal shall be placed in the annulus between the borehole and the riser pipe on top of the secondary or primary filter pack. This seal will retard the movement of cement-based grout backfill into the primary or secondary filter packs. To be effective, the filter pack seal should extend above the filter packs approximately three (3) feet or more, but may be less depending on site-specific conditions, where discrete sampling is desired or where physical conditions prohibit a longer seal depending on local conditions. The filter pack seal should be installed using 17
20 a tremie pipe lowered to the top of the filter pack and slowly raised as the bentonite pellets or the slurry fill the annular space. Bentonite pellets may bridge and block the tremie pipe in deep wells. In these cases, pellets may be allowed to free fall into the borehole. As a bentonite pellet seal is poured into the tremie pipe or allowed to free fall into the borehole, a tamper or weighted line may be necessary to tamp pellets into place. If the seal is installed above the water level, water from an uncontaminated source shall be added to allow proper hydration of the annular seal. The tremie pipe or a weighted line inserted through the tremie pipe shall be used to measure the top of the filter pack seal as the work progresses. Sufficient time should be allowed for the bentonite pellet seal to hydrate or the slurry annular seal to expand prior to grouting the remaining annulus. The volume and elevation of the filter pack seal material should be measured and recorded on the well construction diagram Annular Space Seal Specifications. -- All permanent monitoring wells shall be installed with an annular space seal designed to achieve a permeability of 10-5 centimeters per second or less. For permanent monitoring wells constructed with filter packs, the annular space seal shall extend from the filter pack seal to the ground surface seal and should be at least two (2) feet in length. For monitoring wells constructed into bedrock formations and without well screens, the annular space seal shall extend from the bottom of the outer casing to the ground surface seal Annular Space Seal Installation. -- Bentonite chips, pellets or granules with a diameter of threeeighths inches (3/8 ) or less shall either be poured freely down the borehole or added through a tremie pipe to seal the annular space. When a tremie pipe is used to place the annular space sealant, the procedures in subsections 9.2.a and 9.2.b of this rule shall be followed a. When grouts or slurries are used to seal the annular space, the material shall be poured freely down a tremie pipe or pumped down a borehole with the use of a tremie pipe. When a tremie pipe is used to place the annular space sealant, the procedures of subsection 9.2 of this rule shall be followed b. When any slurry or grout is used, there shall be a twelve (12) hour period between the time the annular space seal is installed and the time the protective ground surface seal is installed. Any settling in the annular space seal shall be topped off before the ground surface seal is installed c. The top of the well casing shall be covered with a protective cap Excavated Wells. -- For excavated wells, the seal between the protective cover and the riser pipe acts as both the filter pack seal and the annular space seal Ground Surface Seal and Protective Cover Pipe a. Ground surface seal. -- All permanent monitoring wells shall be constructed with a bentonite cement grout, neat cement grout, or concrete ground surface seal. The ground surface seal shall extend to a minimum of thirty (30) inches below the land surface, and the top shall be sloped away from the well casing. If the monitoring well depth is such that both a minimum two (2) foot annular space seal and a minimum two and one-half (2.5) foot ground surface seal cannot both be placed, the ground surface seal may be shortened b. Protective cover pipe. -- The protective cover pipe shall consist of a casing at least two (2) inches larger in diameter than the well riser and have a locking cap. The protective cover pipe shall extend from the bottom of the ground surface seal to a minimum of twenty-four (24) inches above the ground surface, except as provided in subsection 11.5 of this rule. The protective cover pipe shall always extend above the top of the well riser. For water table observation wells constructed in areas where the depth to the water table is less than seven (7) feet, the required length (depth) of protective cover shall be reduced and may not extend into the filter pack. 18
21 11.7. Ground Surface Seal and Flush Mounted Protective Cover a. Ground surface seal. -- All permanent monitoring wells with a flush mounted protective cover shall be constructed with a concrete ground surface seal. The ground surface seal shall extend to, but not beyond, the total depth of the flush mounted protective cover. The ground surface seal shall be installed around the flush mounted protective cover and may not be placed between the flush mounted protective cover and the well casing b. Flush mounted protective cover. -- The flush mounted protective cover shall not be installed in areas subject to ponding or flooding. The flush mounted protective cover lid(s) shall indicate on its outer surface that it is a type of monitoring well as defined in section 3.35 of this rule. A black equilateral triangle inset in a white background is also an acceptable label. If an impervious surface does not exist, an apron shall be created that will support the weight of the traffic in the area. The flush mounted protective cover shall consist of a watertight metal casing with an inside diameter at least two (2) inches greater than the inside diameter of the monitoring well riser. The flush mounted protective cover shall be one continuous metal piece or two metal pieces that are joined with a continuous weld. The flush mount protective cover shall be a minimum of twelve (12) inches in length. There may be no more than eight (8) inches between the top of the monitoring well riser and the top of the flush mounted protective cover after installation. The flush mounted protective cover shall have an exterior flange or lugs. The flush mounted protective cover or the monitoring well shall have a locking mechanism. The monitoring well installed within any flush mounted protective cover shall have a watertight cap. Note: After removing the watertight cap and prior to taking a head level measurement, a waiting period is recommended to enable the water level to stabilize Drilling Methods and Fluids. Drilling shall be conducted in a manner so as to minimize the introduction of foreign material into the borehole, produce the least possible disturbance to the formation, and permit the proper construction and development of the required diameter well. Only air, water free of bacterial and chemical contamination, or bentonite drilling mud mixed with water from an uncontaminated source may be used as drilling fluids. The water used for drilling shall be stored in such a manner as to prevent contamination of the clean water. If air is used as a drilling fluid, the air shall be filtered by an oil-air filter or oil trap to reduce or remove the oil content discharged from the compressor. If water is used, the source of the water shall be reported Cross Contamination. In areas where contamination is suspected to exist, precautions shall be taken to prevent cross contamination of groundwater bearing zones or uncontaminated zones Disposal and Decontamination In areas where contamination is known to occur, all drill cuttings and fluids and surge and wash waters from borehole and monitoring well construction and development shall be disposed of in a manner that is protective of the waters of the State. 19
22 14.2. All borehole and monitoring well construction and development equipment shall be decontaminated as needed to prevent contamination or cross-contamination of boreholes or monitoring wells Borehole Diameter Boreholes in unconsolidated geologic formations. -- For all permanent monitoring wells in unconsolidated geologic formations, the borehole diameter shall meet the following requirements: 15.1.a. If hollow stem augers are used, their inside working diameter shall be at least two (2) inches greater than the inside diameter of the permanent well casing b. If solid stem augers are used, their outside diameter shall be at least four (4) inches greater than the inside diameter of the permanent well casing c. If an air or mud rotary method is used, the borehole diameter shall be at least four (4) inches greater than the inside diameter of the permanent well casing. If a temporary outer casing is used, the inside diameter of the temporary outer well casing shall be at least four (4) inches greater than the inside diameter of the permanent well casing. The temporary outer casing shall be pulled immediately before or as the annular space is sealed, depending on site specific geology. Note: The dual-tube or triple-tube reverse rotary systems are rotary methods d. If percussion methods, including the rotary wash, wash down, and wash bore methods are used with a temporary outer casing in unconsolidated geologic formations, the inside diameter of the temporary outer casing shall be at least four (4) inches greater than the inside diameter of the permanent well casing. The temporary outer casing shall be removed during the sealing of the annular space Boreholes in bedrock geologic formations. -- For all permanent monitoring wells installed deeper than two (2) feet past the top of the bedrock, the borehole diameter shall meet the following requirements: 15.2.a. If an air or mud rotary method is used to construct the monitoring well, the requirements of subdivision 15.1.c of this rule shall be followed b. If percussion methods are used to construct the monitoring well, the requirements of subdivision 15.1.d of this rule shall be followed Recovery Wells. Groundwater quality data from recovery wells may not be acceptable, as some recovery wells may not meet the minimum design standards required for monitoring wells. Recovery wells shall be subject to the reporting requirements in section 6 of this rule, documentation requirements in section 18 of this rule, and the abandonment requirements in section 19 of this rule Well Development, Redevelopment and Reconditioning. All permanent monitoring wells shall be developed according to the requirements of this section, except for excavated wells and wells that are installed for the sole purpose of determining the level of groundwater or the potentiometric surface. Wells sealed with grout or slurry shall be developed after a minimum waiting period of twelve (12) hours after installation is completed. Development, redevelopment and/or reconditioning operations shall be performed with care, so as to prevent damage to the well and any strata surrounding the well. Care is necessary to prevent the spread of contaminants, particularly when the well is 20
23 situated in known or suspected areas of contamination. The goal of well development is to produce water free of sediment and all drill cuttings and drilling fluids. Appropriate methods of well development vary with the type and use of a monitoring well. Development methods that may be acceptable under certain circumstances include: Methods for wells that cannot be purged dry. -- All permanent monitoring wells that cannot be purged dry shall be developed until a minimum of ten (10) well volumes of water are removed or until the well produces sediment free water. Well volumes shall be calculated in the manner prescribed in Table 1 of this rule. One or more of the following methods shall be used to develop a well under this section: 17.1.a. Surge and Purge Method. -- The surge and purge cycle shall consist of several minutes of surging followed by several minutes of purging to remove the material collecting in the bottom of the well. The surging shall move formation water in and out of the well screen. The surging shall be accomplished by using a bailer, surge block or by pumping the well sufficiently to cause a drawdown and then allowing the well to recover and repeating the process. Plungers, bailers, surge blocks, and other surging devices must incorporate safety valves or vents to prevent excessive pressure differentials that could damage casing, screen, or the formation. The positive and negative pressures exerted shall not force contaminants from or into the well bore, cause mechanical damage to the well components, draw annular space or filter pack sealant into the filter pack, bridge the filter pack with excessive sediments, or collapse the formation b. Over Pumping (Pump Surging Method). -- The monitoring well shall be pumped at a rate considerably higher than it would be during normal operation to dislodge fine-grain materials from the filter pack and surrounding strata. This method also requires mechanical surging in order to delete the negative influences associated with one directional movement of water. This method may not be suitable for wells producing large amounts of sediment that could jam or clog a pump. Over pumping can also create a cone of depression in the water table that can draw contaminants to the well c. Air Lift Pumping Method. -- An air lift pump shall be operated by cycling the air pressure on and off for short periods of time to provide a surging action that will dislodge fine-grained materials from the filter pack and surrounding strata. A steady, low pressure shall be applied to remove the fines that have been drawn into the well by the surging action. Efforts should be made (through the use of a foot valve) to avoid pumping air into the filter pack and adjacent hydrologic unit because the air may lodge there and inhibit future sampling efforts and may also alter ambient water chemistry. Furthermore, application of high air pressures should be avoided to prevent damage to PVC risers, screens, and filter packs. The use of an eductor pipe is recommended. Operational air must be free of oil or other contaminants through use of a coalescing filter d. Well Jetting Method. -- The well screen area shall be jetted with water using sufficient pressure to achieve the desired effect but limiting force to prevent damage to the well components and surrounding formation. Water added during this development procedure will alter the natural, ambient water quality and may be difficult to remove. Therefore, the water added should be obtained from an uncontaminated source. Water from the monitoring well being developed may also be used if the suspended sediments are first removed Methods for Wells that Can Be Purged Dry. All permanent monitoring wells that can be purged dry shall be developed in a manner that limits agitation by slowly purging the well dry. Any water added for development shall be from an uncontaminated source, and an equal volume of water shall be purged upon completion of development. 21
24 Monitoring Well Construction Documentation All permanent monitoring well construction details shall be reported to the person for whom the wells were installed using forms and instructions provided by the Secretary within sixty (60) days after the well has been installed. These forms are to be retained by the person for whom the well was installed for five (5) years beyond the abandonment of the well. These forms are transferable with notification to the proper groundwater regulatory agency. At a minimum, the completed report shall include the following information: 18.1.a. Well location, as determined by subdivision 6.2.c of this rule; 18.1.b. Well casing material and installation procedures; 18.1.c. Well screen materials and installation procedures; 18.1.d. Filter pack materials, installation procedures, and depth to bottom and top of filter pack; 18.1.e. Sealing materials, installation procedures, and depth to bottom and top of seal (i.e. filter pack, annular space, etc,); 18.1.f. Drilling methods and fluids used for installation; 18.1.g. Borehole diameter; 18.1.h. Well development procedures; 18.1.i. Length of screen; 18.1.j. Screen slot size; 18.1.k. Depth of bottom of screen; 18.1.l. Well depth; 18.1.m. Total drilled depth of the borehole; 18.1.n. Well registration number; 18.1.o. Certified driller s name and company name(s), address(es), and telephone number(s); and 18.1.p. Driller s certification number, The certified monitoring well driller shall report any and all decontamination procedures for each borehole to the person for whom the wells were installed Abandonment Requirements. The following requirements apply to the abandonment of all monitoring wells and all boreholes. The appropriate groundwater regulatory agency may require, by order or other appropriate means, that any borehole or monitoring well be abandoned. The appropriate groundwater regulatory agency shall consider the following factors in determining whether a borehole or monitoring well should be abandoned: purpose, location, groundwater quality, age and condition of the well or borehole, potential for groundwater contamination, and well or borehole construction. 22
25 19.1. Timelines for Abandonment a. A borehole shall be abandoned within three (3) working days after its use has been discontinued b. Any permanent monitoring well no longer being used to gather information on geologic or groundwater properties shall be abandoned within sixty (60) days after its use has been discontinued c. Any monitoring well or borehole found by the appropriate groundwater regulatory agency to be acting as a conduit for groundwater contamination shall be abandoned within fifteen (15) working days after written notification by the appropriate groundwater regulatory agency d. Any monitoring well constructed after the effective date of this rule not meeting the requirements of this rule shall be abated, abandoned or replaced with a monitoring well meeting the requirements of this rule within sixty (60) days after written notification by the appropriate groundwater regulatory agency that the well is noncompliant, unless approved by the appropriate groundwater regulatory agency in accordance with section 22 of this rule Abandonment Procedures a. Boreholes are determined to be low risk or high risk. High risk boreholes are those boreholes on sites containing or formerly containing solid or hazardous waste, hazardous materials or their by-products, or that may be affected by solid or hazardous waste, hazardous materials or their by-products in the future; or at sites of known or suspected contamination unless otherwise determined to be innocuous; or in situations where water quality in one water bearing zone may be detrimental to another water bearing zone. All other boreholes are low risk. Low risk boreholes may be abandoned by complete filling from bottom to top with drill cuttings, tailings or native materials to restore the borehole to its original geologic setting, such that the natural migration of groundwater is not significantly influenced and the borehole has no adverse influence on the environment. High risk boreholes shall be abandoned in accordance with subsection 19.3 of this rule b. Monitoring wells with impermeable annular space seals. -- Monitoring wells known to be constructed with an impermeable annular space seal shall be abandoned according to the requirements of subsection 19.3 of this rule after the protective cover pipe or the flush mounted protective cover and the ground surface seal have been removed and the well riser cut off at least thirty (30) inches below the ground surface. The well riser may be completely removed during abandonment by pulling the well riser, overdrilling around the riser and then pulling the well riser out of the ground, or by drilling out the well riser completely. If the well riser is to be removed, the well should be sealed as the riser is removed pursuant to subsection 19.3 of this rule c. Monitoring wells with permeable annular space seals and wells in waste areas. -- A monitoring well not known to be constructed with an impermeable annular space seal or located in an existing or planned future waste disposal or treatment area shall be abandoned by removing the protective cover pipe or the flush mounted protective cover and the ground surface seal and then completely removing the well riser. The well riser may be completely removed during abandonment by pulling the well riser, overdrilling around the riser and then pulling the well riser out of the ground, or by drilling out the well riser completely. The well riser shall be removed from the well and should be sealed as the riser is removed, pursuant to subsection 19.3 of this rule Sealing requirements. -- Boreholes and monitoring wells shall be abandoned by complete filling with neat cement grout, bentonite-cement grout, bentonite high-solids grout, concrete, bentonite-sand slurry 23
26 or sand-cement grout. When a tremie pipe is used to place the sealing material, the procedures of subsection 9.2 of this rule shall be followed. A tremie pipe shall be used to abandon monitoring wells and boreholes greater than thirty (30) feet in depth or with standing water. Monitoring wells and boreholes greater than one hundred (100) feet in depth shall be sealed with a tremie pipe-pumped method. A J-hook end or closed end with side discharge is recommended, but not required, when placing sealant materials for the abandonment of a borehole. Bentonite may be used as a sealing material without the use of a tremie pipe under the following conditions: 19.3.a. Bentonite or bentonite mixed sand consisting of eighty percent (80%) silica sand and twenty percent (20%) bentonite by volume may be used for abandonment of boreholes and monitoring wells less than thirty (30) feet deep where there is no standing water b. Bentonite chips or bentonite pellets may be used for abandonment of boreholes and monitoring wells less than fifty (50) feet deep and where the depth of standing water is less than thirty (30) feet, provided that the pellets or chips are smaller than one-fifth (1/5) the diameter of the hole or the annular space c. Bentonite chips or bentonite pellets may be used for abandonment of boreholes and monitoring wells that are greater than four (4) inches in diameter and less than two hundred fifty (250) feet deep and where the depth of standing water is less than one hundred fifty (150) feet, provided that the pellets or chips are smaller than one-fifth (1/5) the diameter of the hole or the annular space Sealant Settlement. -- Any settling of the sealant material shall be topped off. Sealing material may be terminated thirty (30) inches below the ground surface in agricultural areas to avoid interference with agricultural activities. A native soil plug shall be placed on top of the settled sealing material in such cases Abandonment Documentation. -- High risk borehole and permanent monitoring well abandonments shall be reported to the appropriate groundwater regulatory agency within sixty (60) days of the abandonment on forms supplied by the appropriate groundwater regulatory agency. In addition to the information required on the form, the person performing the abandonment shall report any decontamination procedures used between borehole and well abandonments Driven-Point Wells. Driven-point wells with contaminant compatible drive pipes and well screens may be used as permanent monitoring wells if prior groundwater regulatory agency approval is obtained. Prior approval is not necessary for driven-point wells installed in the backfill surrounding underground storage tanks used solely to determine the water table elevation in the tank pit for tank tightness testing purposes. Written documentation shall be supplied to the appropriate groundwater regulatory agency prior to installation indicating: That the well is to be used only for water table elevation measurements or to monitor for parameters for which the well casing and screen material will not interfere with the analytical results; That the well will not provide a conduit for contaminants to enter the groundwater; and That information on subsurface stratigraphy is not needed. In situations where subsurface geologic information is needed, a separate borehole shall be constructed to collect the required data Temporary Monitoring Wells. Temporary monitoring wells may be installed according to alternate standards than specified for permanent monitoring wells. Any temporary monitoring well construction shall be approved by the 24
27 appropriate groundwater regulatory agency prior to its installation. All temporary monitoring wells shall be abandoned in accordance with section 19 of this rule within one hundred twenty (120) days after their installation unless an exception is allowed under section 22 of this rule Special Circumstances and Exceptions The appropriate groundwater regulatory agency may require or approve more restrictive or alternative well material, assembly, installation, development or abandonment procedures if the contaminant concentrations or geologic setting require alternative construction. Prior written approval is required before any alternative materials are used in monitoring well installation Exceptions to the requirements of this rule may be approved by the appropriate groundwater regulatory agency prior to installation or abandonment. An exception request shall state the reasons why compliance with the rule requirements is infeasible or unnecessary. The appropriate groundwater regulatory agency may conditionally approve an exception by requiring materials or procedures that safeguard against contamination and result in monitoring well construction that is substantially equivalent to the requirements of this rule. Failure to comply with the conditions of an exception voids the appropriate groundwater regulatory agency s approval of the exception Enforcement Any person who violates this rule shall be subject to civil administrative penalties, civil or criminal penalties, enforcement orders, and procedures as set forth in W. Va. Code and 47CSR59 Monitoring Well Regulations The appeal and review procedures set forth in W. Va. Code shall be applicable to actions arising under this rule. 25
28 TABLE 1 WELL VOLUME CALCULATIONS V 1 + V 2 = well volume Where: V 1 = volume of water in well casing = x (D 1 /2) 2 H 1 V 2 = volume of water in filter pack = N x x H 2 [(D 3 /2) 2 - (D 2 /2) 2 ] N = porosity of filter pack D 1 = inside diameter of well casing D 2 = outside diameter of well casing D 3 = diameter of borehole H 1 = height of water column -- (Use appropriate H 2 ) -- H 2 = length of sand used in filter pack and fine sand filter pack seal or the height of the water column in water table observation wells. -- or -- H 2 = length of filter pack or the height of the water column in water table observation wells. Note: There are 7.48 gallons per cubic foot. 26
29 Additional Guidance and Commonly Asked Questions MANAGEMENT AND DISPOSAL OF DRILL CUTTINGS OF HIGH RISK BOREHOLES Drill cuttings from borings that are drilled on a property or at a facility which is known to be contaminated or suspected to be contaminated shall be placed in a 55 gallon drum(s), marked with the words drill cuttings and the drilling date. A representative sample should be collected from the drum and sent for laboratory analysis for any suspected contaminants. The drum is to be stored in a central storage location where access to the drums is controlled pending receipt of the laboratory analysis. Based on analysis, the material could then be managed and disposed of as either a hazardous or solid waste. If the drum(s) will be stored for longer than 90 days, or if the drum(s) storage is on a clean site, then the drum(s) will be stored according to Groundwater Protection Rule 47CSR58 Section 4.7.d. which specifies storage so that spills and leaks are contained and drum deterioration and/or damage due to handling is minimized. On those sites where there is no suspected contamination, the drill cuttings from the borehole can be placed back into the original borehole, provided that the cuttings are field screened and proven to the satisfaction of the Director of the Division of Water and Waste Management to be innocuous. When groundwater is encountered the borehole shall be abandoned in accordance with 47CSR60 Section 19. REVIEW OF MONITORING WELL DRILLER CERTIFICATION EXAM OEHS will maintain monitoring well driller certification examination for applicants who did not obtain a passing score of 70% or better. If an individual wants to review their failed exam prior to retaking, they may do so by submitting a written request to BPH. Review will have to take place during normal business work hours between Monday through Friday in Charleston, WV. PROPER ABANDONMENT DOCUMENTATION ON REMEDIATION SITE BEFORE ISSUANCE OF NO FURTHER ACTION All monitoring wells on remediation sites must have appropriate abandonment documentation submitted to the WVDEP Division of Water and Waste Management Monitoring Well Driller Program and the documentation approved before a company can get a No Further Action letter from the remediation program involved. For well(s) the company intends not to abandon, the company must submit a written request as to why the well(s) need to stay in place. The No Further Action letter should state clearly that this does not alleviate the need for proper abandonment and that the proper abandonment documentation is to 27
30 be filed with the Division of Water and Waste Management Monitoring Well Driller Program at such time the well(s) are abandoned. DRILLER COMPLAINTS The WV DEP Division of Water and Waste Management Monitoring Well Driller Program maintains information on complaints that are filed with and/or resolved by the program and subsequent enforcement actions. Contact the WV DEP to voice or investigate any monitoring well driller concerns. CORE DRILLING OPERATIONS IN WATERWAYS When core borings that are less than 10 feet to rock and are within the limits of a waterway, backfilling of the boreholes are not required due to the difficulty involved in the drilling of the boreholes and that the boreholes tend to backfill themselves, except where WV 401 Water Quality Certification Special Condition A applies. All others have to be abandoned in accordance with 47CSR60 Section 19. This exception does not preclude the driller/consultant from following the Best Management Practices in all other cases and backfill core holes in upland area. REPLACEMENT AND ALTERNATION OF MONITORING WELLS Any change to a monitoring well other than replacing the well s cap constitutes a new well and the well is treated as such. If redrilling/replacing or altering a well makes a new one, the Monitoring Well Construction Documentation Form and/or Abandonment of Monitoring Wells/Boreholes Form must be completed appropriately and submitted to the WV DEP Monitoring Well Driller Program. On the construction form, note it as replacement or alteration. Excluding the replacement of the locking cap, any alteration or replacement of monitoring well is considered new and requires a state monitoring well registration number. REGISTRATION OF MONITORING WELLS ON SOLID WASTE SITES In order to comply with the monitoring well numbering requirement of the Solid Waste and the Monitoring Well Design Standards rules, both sets of registration numbers are to be located on the monitoring well. INSTALLATION OF BOREHOLES WITH HAND-HELD AUGER A driller does not have to be a certified monitoring well driller to advance or abandon boreholes drilled by a hand-held auger, if the boring is not to be used as a monitoring well. Boreholes made with hand-held auger require abandonment documentation to be submitted to the WV DEP Monitoring Well Driller Program on the Abandonment of Monitoring Wells/Boreholes Form. 28
31 General Driller Knowledge Monitoring wells used to sample groundwater should always be: Installed with great care to avoid contamination from the drilling process; Installed to protect the well from surface pollution; and, Installed with secure well protective covers. Always use a source of known water quality for any stage of the monitoring well operation. All equipment introduced into borehole must be decontaminated. Any solvents, improperly stored or handled casing, drilling fluids, poorly cleaned drilling equipment can alter groundwater quality. The importance of developing a monitoring well is to: Increase water production rate; Lower the turbidity; and, Assure samples are representative of the groundwater. Well development method is determined by well construction and geologic formation. During well installation with a hollow stem auger rig, one must withdraw augers slowly to allow backfill material to fill in voids. The most efficient method for removing sand that has entered the hollow stem auger below the water table is to wash the sand out with approved water. Air rotary with downhole hammer is the most efficient method of drilling a monitoring well in bedrock. 29
32 Advantages of Various Drilling Techniques 30
33 Disadvantages of Various Drilling Techniques 31
34 Advantages and Disadvantages of Casing and Screen Material 32
35 Geology & Geologic Settings of West Virginia APPALACHIAN PLATEAU The Appalachian Plateau Province in West Virginia consists geologically of nearly horizontal shale, sandstone and coal. The aquifers may be porous or slightly fractured. Fractures are commonly the main groundwater flow paths on the Appalachian Plateau. Stress-relief fractures are a fracture network unrelated in age and orientation to tectonic stresses and are often the most transmissive part of an aquifer. They include vertical fractures parallel to valley walls and bottoms caused by the removal of rock mass during erosional downcutting. The valley walls and bottom are subjected to inward and upward stresses and as a result, stress-relief fractures occur. The network of fractures tend to mimic the local topography. FOLDED PLATEAU AREAS Folded Plateau areas in West Virginia consist geologically of faulted strata that contains either localized confined or localized unconfined aquifers, or complete lack of aquifers. The aquifers may be porous or fractured rock. KARST The type of flow in karst areas is described as being conduit flow and is delivered via cave passages or along fault planes and fault passages. There are some shallow sinkholes in these areas and the surface streams will generally lose their water to the subsurface. Surface waters can enter the groundwater regime very quickly via direct 33
36 injection through sinkholes or other fracture or solution openings which can allow contamination to be carried very quickly and unaltered to the groundwater discharge point such as a spring. VALLEY AND RIDGE The Valley and Ridge areas consist of faulted blocks of fractured sandstone, shale, and some limestone. The aquifers may be porous or fractured rock. ALLUVIAL VALLEY The Alluvial Valley areas consist of river flood plains. These flood plains are very heterogenic and contain unconfined and confined clay, silt, and sand aquifers. COAL MINES Coal mine areas consist of areas of deep mining of coal and will function as a ground water drain for all permeable rocks above it. Therefore mines may store a large quantity of water or may deplete surrounding ground water for an entire area if the mine is draining freely. 34
37 35
38 The Hydrologic Cycle is the movement of water as it evaporates from rivers, lakes or oceans, returns to the earth as precipitation, flows into rivers and evaporates again. PRECIPITATION Precipitation occurs when water from the atmosphere falls to the ground in the form of rain, sleet, snow or hail. INFILTRATION The entry of water into the soil surface is infiltration. It constitutes the sole source of water to sustain the growth of vegetation and it helps to sustain the groundwater supply to wells, springs and streams. The rate of infiltration is influenced by the physical characteristics of the soil, soil cover (i.e. plants), water content of the soil, seasonal soil temperature and rainfall intensity. PERCOLATION The downward movement of water through soil and rock that occurs beneath the root zone is percolation. Groundwater percolates through the soil much as water fills a sponge, and moves from space to space along fractures in rock, through sand and gravel, or through channels in formations such as cavernous limestone. The terms infiltration and percolation are often used interchangeably. 36
39 RUNOFF Runoff is the movement of water, usually from precipitation, across the earth's surface towards stream channels, lakes, oceans, or depressions or low points in the earth's surface. The characteristics that affect the rate of runoff include rainfall duration and intensity, as well as the ground's slope, soil type and ground cover. TRANSPIRATION The process of transpiration is when water is absorbed by the root systems of a plant, moves up through the plant, passes through pores (stomata) in leaves, and then evaporates into the atmosphere as water vapor. EVAPORATION The process in which liquid water is transferred into the atmosphere is called evaporation. CONDENSATION Condensation is the cooling of water vapor until it becomes a liquid. The Hydrologic Cycles Influence on Groundwater UNSATURATED ZONE The Unsaturated Zone (sometimes called the Vadose Zone) is the unsaturated region between the soil surface and the water table, in which pores within the geologic matrix are partially filled with air and partially filled with water. Groundwater in this zone moves mostly downward toward the water table. SOIL WATER ZONE In the Soil Water Zone, water is held in the pore spaces between particles of soil. It is the water that is immediately available to plants. CAPILLARY FRINGE The Capillary Fringe is the zone above the water table in which water is held by surface tension. SATURATED ZONE The Saturated Zone is the portion of soil or an aquifer, below the water table, in which all of the pore space is filled with water. Water flow in this zone is toward the groundwater s ultimate recharge point. 37
40 38
41 Basic Conversion Factors LENGTH AREA VOLUME TIME 1 ft. = 12 in. 1 yd. = 3 ft. 1 in. = 25.4 mm. 1 ft. 3 = lb. 1 m. = ft. 1 gal. = lb. 1 m. = 1000 mm. WEIGHT 1 gm. = 1000 mg 1 km. = 1000 m. 1 kg. = 1000 gm 1 mile = 5280 ft. 1 kg. = 2.2 lbs 1 mile = km. 1 lb. = 454 gm 1 acre = 43,560 ft. 2 POWER 1 HP = kw 1 ft. 2 = 144 in. 2 1 ppm = 1 mg/l. 1 yd. 2 = 9 ft. 2 DOSAGE 1 grain/gal 17.1 mg/l. 1 ft. 3 = 7.48 gal 1 mg = 64.7 grains 1 ft. 3 = L. 1 psi = 2.31 ft water 1 ft. 3 = 1728 in. 3 PRESSURE 1 ft water = psi 1 gal. = L. 1 in Mercury = ft water 1 gal. = 231 in. 3 1 gpm = 1440 GPD 1 L. = 1000 ml. FLOW 1 MGD = 1,000,000 GPD 1 min = 60 sec 1 MGD = 694 gpm 1 hr = 60 min 1 MGD = 1.55 cfs 1 day = 24 hr 1 day = 1440 min 39
42 Basic Formulas AREA or A = ½ bh A = area Triangle: b = base h = height Circle: A = πr 2 π = 3.14 r = radius A = 3 πd 2 d = diameter Pipe: A = 2πrh r = radius or h = length A = πdh d = diameter VOLUME V = volume Rectangular Tank: V = A h A = area or l = length V = l w h w = width h = height Circular Tank: V = A h A = area or h = height V = 0.785d 2 h FLOW Q = v A Q = V t d = diameter Q = flow v = velocity A = area V = volume t = time 40
43 Filter Pack Volume Calculation Monitoring Well (Side View) ground surface D d D = Diameter of the well d = Diameter of the well casing H = Height of filter pack V D = Volume of well (at filter pack) V d = Volume of well casing (at filter pack) V F = Volume of filter pack V D = D 2 H V d = d 2 H H Filter Pack V F = V D - V d V F = ( D 2 H) ( d 2 H) 41
44 Example Volume Calculation GIVEN THE FOLLOWING, CALCULATE FILTER PACK VOLUME: D = 6 in. d = 2 in. H = 30 ft. 1. Convert H from feet to inches. H = 30 ft. X 12 in. 1 ft. H = 360 in. 2. Calculate V D. V D = D 2 H V D = (0.7854) (6 in.) 2 (360in.) V D = 10, in 3 3. Calculate V d. V d = D 2 H V d = (0.7854) (2 in.) 2 (360in.) V d = 1, in 3 4. Calculate V F. V F = V D - V d V D = 10, in 3-1, in 3 V D = 9, in 3 5. Convert V F from in 3 to gallons. V F = 9, in 3 X 1 gallon 231 in 3 V F = 39 gallons 42
45 Volume of Water in Casing Diameter of Casing or Hole (Inches) Gallons per Foot of Depth ½ ½ ½ ½ ½ Cubic Feet per Foot of Depth 43
46 Electronic Submission of Well Completion Reports 1. Access the Internet and go to 2. On the WV DEP web page on Water and Waste Home (below the waterfall picture) The Waste and Waste Management page appears 3. In the column called Hot Topics locate Programs and click on it 4. Then click on Monitoring Well Construction. The Monitoring Well Construction Program page appears If you do not have a user Log In, click on the bold Request user login and follow instructions to obtain one. Since you will be ed the Log In, make sure the address is the one you can be reached. If you already have a Log In, then click on the bold Here to take you to the Log In screen for monitoring well documentation submission. NOTE: You can exit the program at any time by clicking on Log Out or Exit System wherever they appear on the program s windows. Prior entries will be saved so you can access the same document when logged back onto the site. 5. The Well Program window appears. Whether creating a new document, or completing a previously started document or reviewing a completed not yet submitted document, click on either Monitoring Well Construction Document or Abandonment Documentation to choose the relevant report that you want to complete. 6. When Monitoring Well Construction Document selected: Type the State Well Registration Number into the box labeled Well Registration No in order to create, to retrieve a completed or incomplete submission or to review previous submissions. 7. When Abandonment Documentation selected: Type the State Well Registration Number or the company/project number for a monitoring well or borehole in the box labeled Select Well in order to create, retrieve a completed or incomplete submission or to review previous submissions. 8. To exit the system, click on Exit System in the window. Clicking on the well or borehole number chosen, pulls up the well or borehole into the document program window. 44
47 NOTE: A previous document can also be accessed by clicking the arrow at the end of either of the text boxes Well Registration Number or Select Well, and then selecting from the drop-down menu. Clicking on the component you want to work on will pull that component up. Each time a component is completed a check appears in the box by it on the check-off list page. The components are completed by the use of drop-down menus and text boxes. Instructions to aid in completing a component can be accessed by clicking on Instruction For Use, located in the white title bar area on the page you are working on. If the address you are about to enter is the same address you entered for another well, you can click on Locate Address (found in the white title bar area on Site Address, Owner Address, and Well Installer Address pages) and find that same address instead of typing it again. From the drop-down menu Under Special Circumstances and Exceptions select Yes or No. If a written variance has been granted, select Yes and type the WV DEP issued variance number in the text box that appears. This is the number that appears on the WV DEP written response to the applicant s written variance request. NOTE: The WV DEP does not grant variances verbally. A written variance request from the driller must be submitted prior to construction or abandonment actions. Click on Save Changes button located at the bottom of every component page to save information as you progress through the document. Click on Return button to return you to the check-off list page. This button is located at the bottom of every component page. This program automatically saves information you are working on every few minutes. You can return to the Main Page of the program at anytime by clicking Home. You can log out at any time by clicking on Log Out. When the document is completed, click Submit Document on the check-off list. A window appears in which you can type a message or explanation to accompany your document. This comment will appear in the Document Status window. The system will not allow you to submit incomplete documentation. If you try to submit one that is incomplete a message will appear informing you that the document is not complete. 45
48 Once you click on Submit Document, it is automatically sent to the Division of Water and Waste Management Program staff for review. You will be notified electronically of the document s approval or of problems with the document upon review. You can see the status of your document by clicking on Review Document Status which is located on the check-off list page window of the particular document type you are interested in. A Document Status window appears to track the status. The document can be printed out at anytime. It is the driller s responsibility to give a completed copy of the document to the well owner/borehole owner. 46
49 WV DEP, Division of Water and Waste Management, Groundwater Program, th Street SE Charleston, WV
50 48
51 Inspector Check-off List for Monitoring Wells 1. Is a currently certified WV monitoring well driller who is responsible for the site, on the site at all times during installation and abandonment procedures? 47CSR59 Section Does the driller who is actively engaged in drilling abandoning and altering monitoring wells and high-risk boreholes have a current WV monitoring well driller certification card on their person? 47CSR59 Section Is the driller s certification card signed by the card holder on the card s back? 47CSR59 Section 5 4. Do all wells installed show (where applicable) the well s state registration number? 47CSR60 Section 6 5. Have protective measures been taken to prevent borehole from acting as a conduit for contamination and becoming a safety hazard? 47CSR60 Section 5 6. If the well riser is in a floodplain or floodway does it terminate a minimum of 2 feet above the ground with a water tight cap? 47CSR60 Section Does the riser consist of materials that will not alter the quality of water samples for the constituents of concern? 47CSR60 Section Is the riser diameter appropriate for the sampling devices? 47CSR60 Section Is there a locked protective cap on the well riser during installation until protective cover is in place? 47CSR60 Section Is the annular space seal of approved material (i.e. bentonite chips, pellets or granules and have a diameter of 3/8th inch or less? 47CSR60 Section Is the ground surface seal for the monitoring well constructed with bentonitecement grout or neat cement grout? 47CSR60Section 11.6.a. 12. Is the ground surface seal sloped away from the well casing and of an approved depth? 47CSR60 Section 11.6.a. 13. Is the protective cover pipe at least 2 inches larger in diameter than the well riser and have a locked cap? 47CSR60 Section 11.6.b. 14. Does the protective cover pipe extend to a minimum of 24 inches above the ground surface except in an excavated well? 47CSR60 Section 11.6.b. 49
52 15. Is the ground surface seal for a well with a flush mounted protective cover constructed with a concrete ground surface seal that extends to but not beyond the total depth of the flush mounted protective cover? 47CSR60 Section 11.7.a 16. Is the ground surface seal not installed between the flush mounted protective cover and the well casing? 47CSR60 Section 11.7.a. 17. Is the flush mounted protective cover not installed in area subject to ponding or flooding? 47CSR b. 18. Is the type of monitoring well indicated on the outside surface of the flush mounted protective cover? 47CSR60 Section 11.7.b. 19. If an impervious surface does not exist for flush mounted protective cover, is an apron created to support the weight of the traffic? 47CSR60 Section 11.7.b. 20. Does the flush mounted protective cover consist of watertight metal casing with an inside diameter at least 2 inches greater than the inside diameter of the monitoring well riser? 47CSR60 Section 11.7.b. 21. Is the flush mounted protective cover one continuous metal piece or 2 metal pieces joined with a continuous weld? 47CSR60 Section 11.7.b. 22. Is there no more than 8 inches between the top of the monitoring well riser and the top of the flush mounted cover after installation? 47CSR60 Section 11.7.b. 23. Does the flush mounted protective cover have an exterior flange or lugs? 47CSR60 Section 11.7.b. 24. Does the flush mounted protective cover or protective cover pipe have a cap with a locking mechanism? 47CSR60 Section 11.7.b. 25. Have all contaminated materials, fluids, drill cuttings, surge and wash waters from monitoring wells and boreholes construction and development been properly collected and disposed according to the State law? 47CSR60 Section Has equipment been decontaminated before drilling and before leaving the site? 47CSR60 Section Does the driller log indicate the storage and disposal of contaminated material and water? 47CSR60 Section 12.0 and Section If a borehole has been abandoned, has the borehole been abandoned within 3 working days after its use has been discontinued? 47CSR60 Section 19.1.a. 50
53 WEST VIRGINIA Monitoring Well Driller Certification and Renewal Information Sharon Mullins WV Department of Environmental Protection Division of Water and Waste Management th Street, SE Charleston WV Ext Monitoring Well Driller Application and Examination Information Richard K. Shaver WV Department of Health and Human Resources Bureau for Public Health, Office of Environmental Health Services Environmental Engineering Division, Source Water Assessment Program 350 Capitol Street, Room 313 Charleston, WV Phone 304/ FAX 304/ Monitoring Well Construction and Abandonment Documentation, Variances George R. Dasher Th St., SE Charleston WV Work Schedule: MON-FRI 8 AM TO 4 PM Division/Office: Division of Water and Waste Management Phone: Ext.: 1074 Fax: /12 51
CHAPTER 4 WELL COMPLETION AND MAINTENANCE
CHAPTER 4 WELL COMPLETION AND MAINTENANCE Section 1: Disinfection. (a) Each person who repairs, modifies, works on, or otherwise affects the physical components of a well shall clean and disinfect the
Oil and Gas Exploration and Production Oil and gas exploration and production... 22a-472-1
Department of Environmental Protection Sec. 22a-472 page 1 (4-97) TABLE OF CONTENTS Oil and Gas Exploration and Production Oil and gas exploration and production... 22a-472-1 Department of Environmental
Guidelines For Sealing Groundwater Wells
Guidelines For Sealing Groundwater Wells Government of Newfoundland and Labrador Department of Environment and Conservation Water Resources Management Division Government of Newfoundland and Labrador Department
Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation
Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation Jeff R. Hill, P.E. Hayward Baker Inc. 111 W. Port Plaza Drive Suite 600 St. Louis, MO 63146 314-542-3040 [email protected]
STANDARD SPECIFICATIONS SECTION 02512 CLEANING AND LINING WATER MAINS
STANDARD SPECIFICATIONS SECTION 02512 CLEANING AND LINING WATER MAINS PART 1 GENERAL 1.1 DESCRIPTION A. Section includes requirements for cleaning and lining existing cast iron and ductile iron water mains
TECHNICAL SPECIFICATIONS CEMENT-BENTONITE SLURRY TRENCH CUTOFF WALL
TECHNICAL SPECIFICATIONS CEMENT-BENTONITE SLURRY TRENCH CUTOFF WALL SCOPE This section of the specifications includes requirements for the Slurry Trench Cutoff Wall and related work as indicated on the
State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS
State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS While its use is not required, this checklist has been prepared to provide the field inspector a summary
RULES OF TENNESSEE DEPARTMENT OF ENVIRONMENT AND CONSERVATION DIVISION OF WATER SUPPLY
RULES OF TENNESSEE DEPARTMENT OF ENVIRONMENT AND CONSERVATION DIVISION OF WATER SUPPLY CHAPTER 1200-4-9 WATER WELL LICENSING REGULATIONS AND WELL TABLE OF CONTENTS 1200-4-9-.01 Definition of Terms 1200-4-9-.11
WELL CONSTRUCTION CODE ADMINISTRATIVE RULES Filed with the Secretary of State on April 5, 1994. These rules take effect 15 days after filing with the
WELL CONSTRUCTION CODE ADMINISTRATIVE RULES Filed with the Secretary of State on April 5, 1994. These rules take effect 15 days after filing with the Secretary of State (By authority conferred on the department
ources of Drinking Water
The drop on water Sources of Drinking Water Did you know that 40 per cent of Nova Scotians get their water privately from a drilled well, a dug well, or a surface water source? The other 60 per cent rely
Section 2100-Trenching and Tunneling
SECTION 5200 - STORM SEWER PART 1 - GENERAL 1.01 SCOPE: This Section covers installation of storm sewer mains and culverts. Topics include permits and fees, trench widths, pipe laying, bedding, initial
Fiberstars Lighted Laminar Flow Fountain Installation Manual
Fiberstars Lighted Laminar Flow Fountain Installation Manual 79-15037-00 REV Xx http://www.fiberstars.com Page 1 of 8 SAVE THESE DIRECTIONS! These directions are provided to ensure the proper installation
Specifications for Residential Property Owners Connection to New Public Sewer
Specifications for Residential Property Owners Connection to New Public Sewer Spalding Tract property owners are required to connect to the community sewer system when construction is complete and the
TECHNICAL NOTE Culvert Sliplining and Lining of Casings with HPPipe
TECHNICAL NOTE Culvert Sliplining and Lining of Casings with HPPipe TN 5.14 February 2010 Introduction It may be at times necessary, in an aging infrastructure, to rehabilitate drainage and sanitary lines
SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)
SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701) 55-1 GENERAL The Contractor shall perform all work required by the plans for construction of pipe for storm drains, precast polymer trench drains
SECTION 10 WATER WELL SUPPLY 10.01 SCOPE OF WORK
10.01 SCOPE OF WORK The work covered by this section of the specifications consists in furnishing all labor, equipment and material necessary to perform the installation of a Type I water supply well per
CGA Standard Practices Series. Article 600 Standard for Pozzolan Enhanced Grouts Used in Annular Seals & Well Destruction
California Groundwater Association An NGWA Affiliate State PO Box 14369 Santa Rosa CA 95402 707-578-4408 fax: 707-546-4906 email: [email protected] website: www.groundh2o.org CGA Standard Practices Series
San Joaquin County. Well Standards. (San Joaquin County Ordinance Code Section 9-1115.6)
San Joaquin County Well Standards (San Joaquin County Ordinance Code Section 9-1115.6) Amended by Board of Supervisors May 8, 1993, R-93-307 County Ordinance History December 21, 1971 Ordinance 1862 July
Checklist for plans to Construct, Alter or Repair An Individual Subsurface Sewage Disposal System
Checklist for plans to Construct, Alter or Repair An Individual Subsurface Sewage Disposal System An application for the construction or alteration of an individual subsurface sewage disposal system shall
SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS
SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS Section Page 36-1 GENERAL... 36.1 36-2 PIPEMAKING EQUIPMENT... 36.1 36-3 TRENCH EXCAVATION... 36.1 36-4 SPECIAL FOUNDATION TREATMENT...
Well Records and Maintenance Guidelines
1 Well Records and Maintenance Guidelines If you have a home well, you alone are responsible for maintaining the safety of our drinking water supply. When your well system is suitably located, correctly
SECTION 6 SANITARY SEWER MAIN 6.01 SCOPE
6.01 SCOPE The work covered by this section of the specifications consists of the furnishing of all plant, labor, materials, equipment and supervision and performing all operations involved in the construction
The Manitoba Water Services Board SECTION 022180 Standard Construction Specifications PIPE EXCAVATION, BEDDING AND BACKFILL Page 1 of 11
Page 1 of 11 Part 1 General 1.1 DESCRIPTION OF WORK.1 The work described herein shall consist of the excavation of trenches (or excavation of tunnels); the supply and placing of bedding and backfill materials;
DIRECT PUSH DRILLING.
DIRECT PUSH DRILLING. CONCEPT. Direct Push Drilling is a method of drilling and sampling where the tools are pushed or driven into the ground. No rotation is involved so all the samples are uncontaminated
Exhibit A. Rules and Regulations for House Connections and Sewer Extensions
The purpose of this application example is to provide assistance to small and medium sized rural communities in the drafting of documents necessary for the efficient operation of water, wastewater, and
SECTION 02400 - STORM DRAIN SYSTEM
SECTION 02400 - STORM DRAIN SYSTEM CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement And
ON-SITE WASTEWATER TREATMENT SYSTEMS ACT
ON-SITE WASTEWATER TREATMENT SYSTEMS ACT Revised and reproduced by the Colorado Department of Public Health and Environment June, 2012 (PLEASE NOTE: This is an unofficial copy of this statute. The official
MARICOPA COUNTY ENVIRONMENTAL HEALTH CODE CHAPTER II SEWAGE AND WASTES SECTION 8
MARICOPA COUNTY ENVIRONMENTAL HEALTH CODE CHAPTER II SEWAGE AND WASTES SECTION 8 ONSITE WASTEWATER TREATMENT FACILITIES REGULATION 1. Definitions a. Aggregate means a clean graded hard rock, volcanic rock,
10-DEPARTMENT OF HEALTH AND HUMAN SERVICES
10-DEPARTMENT OF HEALTH AND HUMAN SERVICES 144A BUREAU OF HEALTH ************************************************* ************************************************* ********** CMR CHAPTER 232 - Well Drillers
SHAFT CONSTRUCTION IN TORONTO USING SLURRY WALLS
SHAFT CONSTRUCTION IN TORONTO USING SLURRY WALLS Vince Luongo Petrifond Foundation Co., Ltd. PROJECT DESCRIPTION The York Durham Sanitary System (YDSS) Interceptor in the Town of Richmond Hill located
SPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO)
SPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO) 1 Intent: The intent of trenchless sewer pipe Insertion is to rehabilitate the existing sewer
SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DEEP FOUNDATIONS
Page 1 of 9 SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DEEP FOUNDATIONS 1. GENERAL REQUIREMENTS 1. Description of Work: This work consists of furnishing all materials, equipment and
SUBDRAINS AND FOOTING DRAIN COLLECTORS. A. Construct subdrains, subdrain cleanouts and outlets, and footing drain collectors.
SUBDRAINS AND FOOTING DRAIN COLLECTORS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Subdrains B. Subdrain Cleanouts and Outlets C. Footing Drain Collectors D. Storm Sewer Service and Connections 1.02 DESCRIPTION
WELL DEVELOPMENT COMPARING SEVERAL METHODS OF WELL
WELL DEVELOPMENT This continuing education course is primarily written for an audience of groundwater professionals who live in a water rich state, Florida. Because Florida is blessed with one of the most
Dr. Jesús Gómez, P.E. 36th Annual Conference on Deep Foundations, Boston, MA
FHWA Hollow Bar Soil Nail (HBSN) Test Program Dr. Jesús Gómez, P.E. 36th Annual Conference on Deep Foundations, Boston, MA Outline Introduction and motivation Installation methods for testing Testing and
FARM A SYST Farmstead Assessment System. Drinking Water Well Condition
G3536 1W FARM A SYST Farmstead Assessment System Worksheet #1 Assessing the Risk of Groundwater Contamination from Why should I be concerned? Drinking Water Well Condition About 95 percent of this country
Fox Township On-lot Sewage Program
Fox Township On-lot Sewage Program Many Pennsylvanians, particularly those living in rural areas, depend on septic systems (also called on-lot systems) to treat the sewage from their home. Properly functioning
Bethel Township Municipal Authority (BTMA) RESIDENTIAL SEWER CONNECTION MANUAL
155 E. Front Street (rear) Lititz, PA 17543 Phone (717) 625-1930 Fax (717) 625-1931 Bethel Township Municipal Authority (BTMA) RESIDENTIAL SEWER CONNECTION MANUAL CONSTRUCTION SPECIFICATIONS AND DETAILS
CONSTANT HEAD AND FALLING HEAD PERMEABILITY TEST
CONSTANT HEAD AND FALLING HEAD PERMEABILITY TEST 1 Permeability is a measure of the ease in which water can flow through a soil volume. It is one of the most important geotechnical parameters. However,
ARLINGTON HEIGHTS MUNICIPAL CODE CHAPTER 22 SEWERS
ARLINGTON HEIGHTS MUNICIPAL CODE CHAPTER 22 SEWERS Article I General Provisions Section 22-101 Definitions Section 22-102 Supervision of Sewer System Section 22-103 Inspections Section 22-104 Use of Public
The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.
Section 33 0200- Page 1 of 4 PART 1 - GENERAL 1.1 DESCRIPTION OF WORK The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.
INSITU TESTS! Shear Vanes! Shear Vanes! Shear Vane Test! Sensitive Soils! Insitu testing is used for two reasons:!
In-situ Testing! Insitu Testing! Insitu testing is used for two reasons:! To allow the determination of shear strength or penetration resistance or permeability of soils that would be difficult or impossible
SECTION 1 GENERAL REQUIREMENTS
Page 1 of 6 SECTION 1 GENERAL REQUIREMENTS 1. SCOPE OF WORK: The work to be performed under the provisions of these documents and the contract based thereon includes furnishing all labor, equipment, materials,
SECTION 7 UNDERDRAIN SERVICE
SECTION 7 UNDERDRAIN SERVICE ARTICLE I USE OF THE PUBLIC UNDERDRAIN SYSTEM 7.100 The purpose of the District s underdrain system is to provide a method for conveying ground water from around building foundations
SECTION 02630 STORM DRAINAGE SYSTEM
SECTION 02630 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes specifications for storm drainage systems including modifications and connections to existing storm drainage systems. 1.02 REFERENCE
Specification for Pipe Bursting Gravity Sewer Mains with HDPE Pipe
Specification for Pipe Bursting Gravity Sewer Mains with HDPE Pipe 1. GENERAL The following supplemental sewer main specifications are intended to address the installation of high-density polyethylene
SIERRA LAKES COUNTY WATER DISTRICT P.O. Box 1039, Soda Springs, CA 95728-1039 (7300 Short Road, Serene Lakes)
SIERRA LAKES COUNTY WATER DISTRICT P.O. Box 1039, Soda Springs, CA 95728-1039 (7300 Short Road, Serene Lakes) Maintenance Office Administrative Office Billing Office 530-426-7802 530-426-7800 916-332-4872
APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT
APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT City of Swartz Creek 8083 Civic Drive Swartz Creek, MI 48473 810-635-4464 Fee Received: $ Date: / / Receipt No: Demolition Permit (including Right of
ARTICLE II (2) ARTICLE II - REQUIRED USE OF PUBLIC SEWERS. PARAGRAPH 020001 Purpose and Application.
ARTICLE II - REQUIRED USE OF PUBLIC SEWERS. PARAGRAPH 020001 Purpose and Application. Article II provides rules governing the allowable connection to the City POTW and the construction and inspection of
California Department of Transportation Doyle Drive Test Program Contract No. 04A3362
California Department of Transportation Doyle Drive Test Program Deep Soil Mixing (DSM) /Cutter Soil Mixing (CSM) Testing Report By Malcolm Drilling Company, Inc. 3524 Breakwater Ave., Suite 108 Hayward,
GROUNDWATER MONITORING WELL DRILLING, CONSTRUCTION, AND DECOMMISSIONING
GROUNDWATER MONITORING WELL DRILLING, CONSTRUCTION, AND DECOMMISSIONING DEQ GUIDANCE DOCUMENT D 1 D 2 Filter-Pack Seal WATER LEVEL IN WELL H 1 H 2 August 24, 1992 D 3 PRINTED ON RECYCLED PAPER This page
A Consumer Guide For Well Construction
A Consumer Guide For Well Construction Introduction If you are planning to have a water well constructed, there are some facts concerning the well construction permit, the well installation, and the pump
TECHNICAL REVIEW OF SECONDARY CONTAINMENT SYSTEM TECHNOLOGY FOR ALASKA
Final Report to STATE OF ALASKA DEPARTMENT OF ENVIRONMENTAL CONSERVATION DIVISION OF SPILL PREVENTION AND RESPONSE TECHNICAL REVIEW OF SECONDARY CONTAINMENT SYSTEM TECHNOLOGY FOR ALASKA May 1, 1998 Steven
PREVENTION. City of Orem FLOOD DAMAGE PREVENTION 10-1-1
City of Orem FLOOD DAMAGE PREVENTION 10-1-1 CHAPTER 10. Article 10-1. Article 10-2. Article 10-3. Article 10-4. Article 10-5. FLOOD DAMAGE PREVENTION Purposes Definitions General Provisions Administration
Frequently-Asked Questions about Floodplains and Flood Insurance FLOOD INSURANCE
Frequently-Asked Questions about Floodplains and Flood Insurance What is a floodplain? The floodplain is any area covered by water during normal water flows, and which could be inundated as a result of
1.3.2 Method of construction and restoration of existing water service connections. This shall include:
1.0 GENERAL 1.1 DESCRIPTION: This specification shall cover the rehabilitation of existing water lines using the GRUNDOCRACK PIPE BURSTING SYSTEM. Pipe bursting is a system by which the pneumatic bursting
ITEM #0702770 OSTERBERG CELL LOAD TESTING OF DRILLED SHAFT
ITEM #0702770 OSTERBERG CELL LOAD TESTING OF DRILLED SHAFT Description: This work shall consist of furnishing all materials, equipment and labor necessary for conducting an Osterberg Cell (O-Cell) Load
New York Laws. Title 11, ARTICLE 48-B REGISTRATION OF ALL TERRAIN VEHICLES
New York Laws 2281. Definitions. For the purposes of this article: 1. (a) "All terrain vehicle" or "ATV" means any self-propelled vehicle which is manufactured for sale for operation primarily on off-highway
SANITARY SEWER SPECIFICATIONS
SANITARY SEWER SPECIFICATIONS OCTOBER 2003 HARVEST-MONROVIA WATER, SEWER, AND FIRE PROTECTION AUTHORITY SECTION 1.00 1.10 Purpose The purpose of this document is to assemble the sewer specifications, policies,
Geotechnical Investigation using Standard Penetration Test (SPT) in Rangamati, Bandarban and Khagrachari Towns
1. Introduction 1.1 Scope of Work The Asian Disaster Preparedness Centre (ADPC) is implementing the project Seismic Hazard and Vulnerability Mapping for Rangamati, Bandarban and Khagrachari Municipality.
ARCHIVE. Table of Contents. 07.02.05 - Rules Governing Plumbing Safety Licensing
Table of Contents 07.02.05-000. Legal Authority.... 2 001. Title And Scope.... 2 002. Written Interpretations.... 2 003. Administrative Appeals.... 2 004. -- 010. (Reserved).... 2 011. Apprentice Registration....
Table of Contents. 07.02.05 - Rules Governing Plumbing Safety Licensing
Table of Contents 07.02.05-000. Legal Authority.... 2 001. Title And Scope.... 2 002. Written Interpretations.... 2 003. Administrative Appeals.... 2 004. -- 009. (Reserved)... 2 010. Licensure History....
ETL listed for installations within 5 ft. (1.5M) of outer edge of water www.srsmith.com 79-15152-00 Rev E2 9.14 Page 1 of 10
Color Light Streams Large Laminar Installation Manual (CLSLL) Input Power: Total Power: 12V AC 5W 4008814 ETL listed for installations within 5 ft. (1.5M) of outer edge of water 79-15152-00 Rev E2 9.14
City of Paso Robles Community Development Department Construction Site Storm Water Quality Requirements
City of Paso Robles Community Development Department Construction Site Storm Water Quality Requirements Overview of the City s Construction Storm Water Program The City of Paso Robles is committed to protecting
Maryland Containment System Testing Protocol. The individual performing the inspection and testing as outlined in this protocol must be either:
MARYLAND DEPARTMENT OF THE ENVIRONMENT Oil Control Program, Suite 620, 1800 Washington Blvd., Baltimore MD 21230-1719 4 410-537-3442 410-537-3092 (fax) 1-800-633-6101 http://www.mde.state.md.us Maryland
1 RCNY 101-07 CHAPTER 100
1 RCNY 101-07 CHAPTER 100 Subchapter A Administration 101-07 Approved Agencies. (a) Definitions. For the purposes of this section, all terms used herein shall have the same meanings as set forth in the
For the purposes of this Part, the following words shall have the following meanings:
LOUISIANA REVISED STATUTES TITLE 51. TRADE AND COMMERCE CHAPTER 2. PARTICULAR GOODS PART XIV-B. MINIMUM STANDARDS FOR INSTALLATION OF MANUFACTURED HOMES Current through all 2010 Regular Session Acts 912.21.
SAMPLE FRACTION MITIGATION CONTINGENCY PLAN FOR DIRECTIONAL DRILLING
SAMPLE FRACTION MITIGATION CONTINGENCY PLAN FOR DIRECTIONAL DRILLING 1 TABLE OF CONTENTS 1.0 Introduction and Purpose 3 2.0 Description of Work 3 3.0 Site Supervisor/Foremen Responsibilities 4 4.0 Equipment
CHAPTER 11 STORM DRAINAGE
CHAPTER STORM DRAINAGE SECTION PC 0 GENERAL 0. Scope. The provisions of this chapter shall govern the materials, design, construction and installation of storm drainage. Storm water discharge shall be
STANDARD SPECIFICATIONS FOR PRIVATE BUILDING SEWER LINES IN PUBLIC RIGHT-OF-WAY
STANDARD SPECIFICATIONS FOR PRIVATE BUILDING SEWER LINES IN PUBLIC RIGHT-OF-WAY Approved and adopted as Official Document Number 800576 this 10th day of December, 1980 Donald R. Boyd, P.E., Director Water
CHAPTER 7 BUILDING ARTICLE 7-1 UNIFORM CODES 1. 7-1-1 Adoption. Board of Appeals. Annual Review
CHAPTER 7 BUILDING ARTICLE 7-1 UNIFORM CODES 1 7-1-1 Adoption 7-1-2 Board of Appeals 7-1-3 Annual Review Section 7-1-1 Adoption A. Those certain documents known as the 1997 Uniform Building Code, Volumes
INDEX. Sec. No. Items Page Nos.
INDEX Sec. No. Items Page Nos. 1. Types of Pipe............... MSSP- 2 2. Concrete Pipe............... MSSP- 2 thru MSSP-3 3. ABS and PVC Truss Pipe............... MSSP- 3 4. ABS and PVC Solid Wall Pipe...............
A Guide to Plugging Abandoned Wells
AE-966 (Revised) A Guide to Plugging Abandoned Wells Tom Scherer Extension Agricultural Engineer Irrigation/Water Quality Roxanne Johnson Water Quality Associate Although an actual survey has not been
Certification. Septic Tank Contractors
Certification I. Certification Required Chapter 290-5-26-.17 provides for certification and de-certification of septic tank contractors, inspection personnel, pumpers, soil scientists and maintenance personnel.
C. Section 014510 TESTING LABORATORY SERVICE.
SECTION 014500 QUALITY CONTROL PART 1 GENERAL 1.01 RELATED REQUIREMENTS A. Drawings and General Provisions of Contract, including General and Special Conditions and other Division 1 Specification Sections,
DIRECTIONAL DRILLING
DIRECTIONAL DRILLING 1. General. Installation of pipelines through the levee embankment using directional drilling technology is prohibited. Installation of pipelines through a flood control project foundation
SUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS
July 14, 2015 1.0 GENERAL BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS This work shall consist of furnishing all materials, equipment, labor, and incidentals necessary for conducting bi-directional
Revised April (May) 2015
Section 19.0 Cross Connection Control Policy 19.1 Responsibility 19.1.1 The Elkhart Water Utility has the responsibility to supply safe, potable water from the source to the point of delivery defined as
Amendment to OPSS 415 (Nov 2008) Construction Specification for Pipeline and Utility Installation by Tunnelling
Engineering and Construction Services Division Standard Specifications for Sewers and Watermains TS 415 April 2013 Amendment to OPSS 415 (Nov 2008) Construction Specification for Pipeline and Utility Installation
CHAPTER 11 STORM DRAINAGE
CHAPTER 11 STORM DRAINAGE SECTION 11 GENERAL 11.1 Scope. The provisions of this chapter shall govern the materials, design, construction and installation of storm drainage. 11.2 Where required. All roofs,
Information to Applicants for WV Pump Installer Certification
Information to Applicants for WV Pump Installer Certification Each applicant for PI certification must: 1) Be at least 18 years of age. A written waiver may be granted if requested in writing for applicants
3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees.
The following shall serve as the minimum requirements for contractors performing work in relation to the Authority s potable water and sanitary sewer system(s), appurtenances and service connections. General:
STANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION
STANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION Design Criteria Drainage Area The drainage area for storm drain inlets shall not exceed one acre. The crest elevations of these practices shall
SECTION 33 41 13 PUBLIC STORM UTILITY DRAINAGE PIPING
SECTION 33 41 13 PUBLIC STORM PART 1 - GENERAL 1.01 SECTION INCLUDES A. Storm drainage piping, fittings, and accessories at proposed station areas and locations other than under and immediately adjacent
STRUCTURES. 1.1. Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL.
STRUCTURES 1. General. Critical structures may impact the integrity of a flood control project in several manners such as the excavation for construction of the structure, the type of foundation, backfill
SECTION 33 05 16.13 PRECAST CONCRETE UTILITY STRUCTURES
SECTION 33 05 16.13 PRECAST CONCRETE PART 1 - GENERAL 1.01 SECTION INCLUDES A. This item shall consist of the construction of both sanitary and storm sewer precast concrete manholes in accordance with
SECTION 1.0 STATUTORY AUTHORIZATION AND PURPOSE
A local law for Flood Damage Prevention as authorized by the New York State Constitution, Article IX, Section 2, and Environmental Conservation Law, Article 36 1.1 FINDINGS SECTION 1.0 STATUTORY AUTHORIZATION
Effective July 1, 2010 WYOMING STATE LAW Title 37 Public Utilities Chapter 12 Article 3. DAMAGE TO UNDERGROUND PUBLIC UTILITY FACILITIES
Effective July 1, 2010 WYOMING STATE LAW Title 37 Public Utilities Chapter 12 Article 3. DAMAGE TO UNDERGROUND PUBLIC UTILITY FACILITIES 37-12-301. Short title; definitions. (a) This act may be known and
Private Well Regulations
Commonwealth of Virginia State Board of Health Private Well Regulations April 1, 1992 Virginia Department of Health 1500 E. Main Street Richmond, Virginia 23219 0 CHAPTER 630. PRIVATE WELL REGULATIONS.
DIVISION 4300 STORM DRAINAGE
DIVISION 4300 STORM DRAINAGE SECTION 4305 STORM SEWER PART 1 - GENERAL 1.01 SCOPE This section covers the construction of storm sewers for the collection and transport of stormwater runoff. 1.02 REFERENCES
DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS
DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS Phase I MS4 permits require continuous updating of the stormwater system inventory owned and operated by the MS4. They also include inspection
IAC 7/2/08 Agriculture and Land Stewardship[21] Ch 44, p.1
IAC 7/2/08 Agriculture and Land Stewardship[21] Ch 44, p.1 CHAPTER 44 ON-SITE CONTAINMENT OF PESTICIDES, FERTILIZERS AND SOIL CONDITIONERS [Prior to 7/27/88, see 21 Ch 9] PESTICIDES 21 44.1(206) Definitions.
Guide for SOLID CONCRETE BLOCK SEALS
Guide for SOLID CONCRETE BLOCK SEALS July, 2006 Mine Safety and Health Administration SOLID CONCRETE BLOCK SEAL Formersection 30 CFR 75.335(a)(1) specifies requirements for seals constructed using solid
SEPTIC SYSTEM CONSTRUCTION REQUIREMENTS ST. MARY S COUNTY HEALTH DEPARTMENT
SEPTIC SYSTEM CONSTRUCTION REQUIREMENTS ST. MARY S COUNTY HEALTH DEPARTMENT The following are minimum requirements for installation of conventional trench sewage disposal systems in St. Mary s County,
MOBILE HOME LAW. Revised November 2001
MOBILE HOME LAW Revised November 2001 TABLE OF CONTENTS: SECTION 1: SECTION 2: SECTION 3: SECTION 4: SECTION 5: SECTION 6: SECTION 7: SECTION 8: SECTION 9: SECTION 10: SECTION 11: SECTION 12: INTENT DEFINITIONS
