WASTE MANAGEMENT CONSULTANCY
|
|
|
- Sherman Bond
- 10 years ago
- Views:
Transcription
1 WASTE MANAGEMENT CONSULTANCY MEMBER OF THE WATERLEAU GROUP
2 WASTE MANAGEMENT Waste Management Engineering (WME) covers the conception and realisation of solid waste and biomass management related projects, including recycling and valorization as matter and/or energy, within the scope of sustainable development. Realizing these projects implies a preparatory study on the nature of solid waste and the biomass to be treated, the development of management strategies, the preparation of feasibility studies and the study of contractual modes for the installations construction and exploitation (public assignment, private assignment or public/private partnerships). Through the years, our engineers have gathered significant references in Belgium as well as abroad, with regard to sorting/recycling installations, biological treatment and energetic valorization of household and analogous waste, of medical waste, of water treatment plant sludge, of organic waste and biomass. More specifically, our experts have gathered a profound knowhow in the conception, control of construction and start-up, follow-up of operation and improvement of maintenance of Waste to Energy and Biomass Plants. IBH 30+ YEARS OF EXPERIENCE IN WASTE MANAGEMENT Solid waste and biomass management related projects Recycling and valorization as matter and/or energy Within the scope of sustainable development Significant references Profound knowhow in conception, control of construction and start-up, follow-up of operation and improvement of maintenance SERVICES FEASABILITY, PROJECT MANAGEMENT & OPERATION ASSITANCE Our engineers offer various services, from feasibility studies, the entire project management, contractual and technical advice, general engineering, to the organisation of tendering, tender analysis, the placing of orders, technical and contractual follow-up of construction, follow-up of operation and optimisation of maintenance. 2
3 HOUSEHOLD AND ANALOGOUS WASTE ORGANIC WASTE & BIOMASS MEDICAL WASTE WATER TREATMENT PLANT SLUDGE SORTING & RECYCLING INSTALLATIONS BIOLOGICAL TREATMENT ENERGETIC VALORIZATION PROJECT CYCLE FEASIBILITY STUDY We determine the basics of a project, both with regard to general dimensioning, as regards technical choices, possible locations, required investments and exploitation costs. TECHNICAL AND CONTRACTUAL PROJECT MANAGEMENT Project management, general engineering, contractual advice, technical supervision of construction,... We ensure the entire follow-up of a project, from drawing up the tender documents to the final acceptance of the installations. FOLLOW-UP AND ASSISTANCE OF OPERATION AND MAINTENANCE We verify whether the installations are used in optimum circumstances, reducing the risks of wear and tear. 3
4 REFERENCES WASTE TO ENERGY District Heating Herstal and Liège, Belgium 85 MW th GWh/year Valorical Incineration plant of Charleroi Pont-de-loup, Belgium 110,000 t/year ICDI Municipal waste treatment plant Manama, Bahrain 390,000 t/year HSBC Dubaï Waste management centre San Sebastian, Spain 240,000 t/year GHK Waste to energy plant Huddersfield, United Kingdom 235,000 t/year Lloyds Bank 1999-ongoing Power plant Bilbao, Spain 240,000 t/year Zabalgarbi 1999-ongoing Waste to energy plant Liège, Belgium 320,000 t/year Intradel Waste to energy plant Dudley, United Kingdom 90,000 t/year Dudley Waste Ltd Waste to energy plant Stoke-On-Trent, United Kingdom 180,000 t/year Hanford Waste Ltd Waste to energy plant Wolverhampton, United Kingdom 105,000 t/year Wolverh. Waste Ltd Incineration units of the W.Brabant Virginal, Belgium 50,000 t/year IBW Incineration and composting plant Mataro, Spain 140,000 t/year Crédit Lyonnais (F) Municipal waste treatment St Germain, France 200,000 t/year BCEOM Waste to energy plant Tournai, Belgium 400,000 t/year Ipalle Incineration plant Montreal, Canada 200,000 t/year LBCD Municipal waste treatment London, United Kingdom 400,000 t/year SELCHP Ltd Incineration plant Brussels, Belgium 500,000 t/year Agence Bruxelles Propreté BIOLOGICAL TREATMENT Biological treatment plants Varenne-Jarcy and Calais, France Audit URBASER Biological treatment plant Namur, Belgium 25,000 t/year BEP Equipments for green waste Virginal, Belgium 30,000 t/year IBW Composting plant of Tournai Thumaide, Belgium 12,000 t/year Ipalle SORTING AND RECYCLING Sorting and shredding plant Mont-Saint-Guibert, Belgium 80,000 t/year IBW Sorting and shredding plant of Liège Liège, Belgium 60,000 t/year Intradel Sorting and shredding plant of Tournai Tournai, Belgium 30,000 t/year Ipalle FEASIBILITY STUDIES Solid waste management solutions Charleroi, Belgium - ICDI Waste to energy plants Castellon - Valencia - Alicante, Spain 150,000 to VAERSA CAAZ Materials recycling facility Charleroi, Belgium 300,000 t/year 30,000 t/year ICDI Sorting and shredding plant Walloon Brabant, Belgium 30,000 t/year IBW Herstal Plant refurbishment Liège, Belgium 320,000 t/year Intradel Common collection service Hainaut, Belgium - Ipalle Transfer station for municipal waste Brussels, Belgium 120,000 t/year Bruxelles-Capitale Municipal waste treatment Namur, Belgium - Sonat Treatment of urban solid waste Bangkok, Thailand 50,000 t/year CEC, Ministry of Thailand 4
5 MASTER PLANS, AUDITS AND STUDIES 2011 Nantes incineration plant Nantes, France Huddersfield incineration plant Kirklees, United Kingdom 2009 Solid waste management Charleroi, Belgium River transport of municipal waste Liège, Belgium Polish Waste Management Market Poland Waste to energy plants United Kingdom Incineration plants, feasibilty study Valencia, Spain 2005 Co-incineration in cimentry Valencia, Spain Waste water sludge, Walloon region Walloon Region, Belgium Solid Waste Management Plans Walloon Region, Belgium Solid waste management Samut Sakhon, Thailand Treatment of hospital waste Brussels, Belgium ,000 t/year ,000 t/year USBASER DEXIA Public Finance Bank ICDI Intradel URBASER CIBC World Markets VAERSA VAERSA SPGE/Office Wallon des Déchets Office Wallon des Déchets PWD- Ministry of Interior Région de Bruxelles-Capitale
6 WASTE TO ENERGY WASTE TO ENERGY PLANT OF HERSTAL Herstal (Province of Liège), Belgium Intradel is a syndicate of 72 communes (950,000 habitants) of Liège Province. In response to more stringent legislation, Intradel decided to modify an existing sorting and incineration plant by implementing new incineration streams capable to directly mass burn 320,000 tons per year of municipal and non-dangerous industrial waste. Sorting equipment has been dismantled and the reception hall has been extended. Two stoker grates of 21 tons per hour each are installed with a recovery boiler of 67 MWth delivering superheated steam to a 30 MWe turbo generator. Part of the energy could also be used to power a district heating grid. Wastewater sludge is injected in the combustion chamber. The flue gas cleaning system includes electro filter, selective catalytic reactor for DeNOx reduction, semidry lime scrubber, activated carbon injection and bag house filter. For this assignment, a Design, Build and Operate contract was managed. new incineration streams of municipal and non-hazardous industrial waste Intradel project management technical assistance contractual assistance 320,000 tons/year ongoing (construction of the 2 plants, operation follow up) 6
7 WASTE TO ENERGY PLANT OF THUMAIDE Thumaide (Province of Hainaut), Belgium Ipalle has been adapting and expanding its waste disposal plant since the 1990 s. From 1992 to 1996, the addition of equipment to the sorting, composting and incineration plant were managed. The project included a flue gas cleaning equipment and an aerobic composting of green waste. From 1995 to 2004 were managed the extension of the Solid Waste incineration plant with the addition of 2 incineration units and the refurbishment of existing facilities. A flue gas treatment equipment is installed in accordance with DUE/94 regulation (dangerous waste). The bottom ash treatment facility was extended. From 2002 to 2011, a third incineration stream was added, designed to burn 12 tons of waste per hour. A sludge combustion device with pulverization in the combustion chamber was installed, as well as a SCR Denox flue gas treatment for 3 incineration units. From 2006 to 2012 followed the study and installation of a fourth incineration stream (n 7). addition of equipment and new incineration streams Ipalle technical and contractual assistance: project and execution operational monitoring 400,000 tons/year
8 CLINICAL WASTE TRANSFER BUILDING Thumaide (Province of Hainaut), Belgium The progressive strengthening of legislation on air emissions has forced many hospitals to close their incinerators. To respond to the problems faced by clinics and healthcare facilities, Ipalle provides the management and the treatment by incineration of hospital waste type B2 (cutting, piercing, blunt and/ or infectious). The reception area consists of two automatic handling chains responding strictly to legal demands: checking for the absence of radioactivity, prohibition to mix B2 waste with garbage stored in pit, maximum limitation of human contact with this type of waste, limited storage time before treatment (24 hours max), supervising the disinfection of the containers. As the standard containers with waste arrive, they are weighed and identified by a scanning system (barcodes). This ensures a complete traceability of waste (origin, date, time of arrival and treatment). Our engineers provided the general design, preparation of contractual and technical specifications, tendering procedure, evaluation of tenders and construction supervision. construction of a clinical waste transfer building Ipalle project management 2,000 tons/year
9 WASTE TO ENERGY PLANT OF VIRGINAL Virginal (Province of Walloon Brabant), Belgium In 1994, tenders were evaluated for additional equipment and replacement of the existing incineration stream of the plant located in Virginal. The project consisted of the treatment of the exhaust gas in accordance with EC regulations (100,000 Nm³/h) and the installation of a new incineration stoker grate and boiler (65,000 tons/year). From 2001 to 2008, the client was assisted for the design and construction of a second incineration stream for municipal waste (50,000 tons/year) with a water cooled grate (20 MWth), a recovery boiler and a turbo generator set (4 MWe). From 2005 to 2010, we also provided technical assistance services for the provision of SCR denox flue gas treatment of the two incineration units (2 x Nm³/h). A solid waste sorting and transfer station have been studied to improve municipal and industrial bulky waste reception and storage before treatment in the WTE Plant of Virginal. The construction of the facility was completed in addition of new incineration streams, SCR denox and transfer station IBW project management technical assistance contractual assistance 115,000 tons/year
10 INCINERATION PLANT OF CHARLEROI Pont-de-loup (Province of Hainaut), Belgium The project (in joint venture with IGRETEC) consists of a new incineration stream of municipal and nonhazardous waste (55,000 tons/year). Furthermore, civil works and the refuse silo are extended. The existing incineration unit is replaced. provided include basic engineering and architectural improvement, contractual and technical project specification, tender documentation, analysis of tender, preparation of construction contract, construction supervision and operation monitoring. new incineration stream of municipal and non-hazardous waste ICDI project management 110,000 tons/year
11 BRUSSELS INCINERATION PLANT Brussels, Belgium In 1977, on behalf of Brussels Conglomerate, we realized the general design and the tendering for an incineration plant with a capacity of 500,000 tons per year with energy recovery. We then supervised the construction of the plant from 1981 to 1984 and, from 1985 to 1990, monitored the operation.from 1993 to 1996, we assisted the Agency Bruxelles Propreté in the general design, the tender documentation and the evaluation of tenders in relation with the processing of the exhaust gas of the incineration plant, in accordance with the EC regulations. construction of an incineration plant processing of the exhaust gas in accordance with the EC regulations Brussels Conglomerate ( ) Brussels Capital Region ( ) Agency Bruxelles Propreté ( ) project management technical assistance 500,000 tons/year 11
12 WASTE TO ENERGY PLANT OF HUDDERSFIELD Huddersfield, United Kingdom Kirklees Waste (KWS/SITA) obtained a concession contract to manage the municipal waste disposal of the Kirklees Metropolitan Borough Council in the United Kingdom. A key aspect of the project was the design, finance, construction and operation of a new Waste to Energy Plant. Financing the new facility was assigned to Dexia Bank. The Kirklees Waste Treatment scheme includes 1 Waste To Energy Plant, 1 Material Recycling Facility, 2 Landfill Sites, 2 Transfer Stations... for a total capacity of 235,000 tons per year. The Waste To Energy Plant is designed to handle 136,000 tons per year and includes 1 stream of 17 tons per hour of waste with a NCV (Net Calorific Value) of 9,800 kj/kg. The recovery boiler delivers overheated steam to a 15 MW turbo-generator. The combustion chamber is equipped with a non-catalytic DeNOx system. The flue gas cleaning system comprises the following stages: spray absorber, activated lignite coke injection and bag filter. construction of a waste to energy plant Dexia bank technical assistance during construction reporting on operation 235,000 tons/year (construction) (operation follow-up) 12
13 WASTE TO ENERGY PLANT OF SOUTH-EAST LONDON London, United Kingdom The SELCHP Plant has been commissioned in We have been involved as the s technical advisor during the construction stage of the plant and have been assisting the on technical matters and operation monitoring until The SELCHP plant is designed to handle 400,000 tons per year of municipal waste. Two lines have the capacity to burn 29 tons per hour of waste each with a NCV (Net Calorific Value) of 8,500 kj/kg. The recovery boilers deliver overheated steam to a 32 MW turbo-generator. The combustion chambers are equipped with a non-catalytic DeNOx system. Each stream is fitted with two semi-dry lime scrubbers with lime milk injection and activated carbon injection and followed by bag house filters. construction of a waste to energy plant SELCHP Ltd project management technical assistance contractual advice technical advice 400,000 tons/year
14 MECHANICAL BIOLOGICAL TREATMENT (MBT) AND WASTE TO ENERGY (WTE) PLANT OF GIPUZKOA Gipuzkoa, Spain GHK is a public company with the objective to treat the solid waste of Gipuzkoa. GHK as a public developer leads the construction of a plant for the treatment of Municipal and analogous Solid Waste, including a pretreatment installation for biodrying (200,000 tons/year) and a waste to energy plant (240,000 tons/year). This MBT plant wants to obtain a reduction of waste of 27%, and more energy from waste heat. The WTE plant will process biodried and non-hazardous industrial waste through 2 lines of 16 tons/hour. A royal decree also demands smoke treatment. Supporting facilities contain the treatment and valorisation of ashes and the recycling of metals. construction of a waste to energy plant GHK technical assistance contractual assistance 240,000 tons/year
15 POWER PLANT OF BILBAO Bilbao, Spain Zabalgarbi is a project company whose purpose is the treatment of Municipal Solid Waste generated in Biskaia (Spain). Zabalgarbi is the developer of a power plant that includes a combined cycle and a Municipal Solid Waste incineration stream. The project includes a combustion train of 30 tons per hour, a combined cycle with a gas turbine, a heat recovery steam generator and a steam turbine for a total power of 100 MW (Line 1). The combustion train is designed to handle 240,000 tons per year of municipal solid waste and includes 1 stream of 30 tons per hour of solid waste with a NCV (Net Calorific Value) of 8,500 kj/kg. The recovery boiler following the incineration furnace delivers slightly superheated steam to a heat recovery steam generator following the gas turbine. The combustion chamber is equipped with a non-catalytic DeNOx system. The flue gas cleaning system comprises the following stages: spray absorber, activated carbon injection and bag filter. construction of a power plant Zabalgarbi Ltd project management technical assistance 240,000 tons/year (construction) ongoing (operation) 15
16 WASTE TREATMENT PLANT OF MANAMA Manama, Bahrain IBH is the Lender s Technical Advisor for the construction and exploitation of this waste to energy plant for municipal waste with a capacity of 390,000 tons/year. For this assignment, in association with EC Harris (UK), our engineers are responsible for the analysis and certification of the project (Due Diligence Report), follow up construction, and deliver regular reports on performance teste and operation. new waste treatment plant for municipal waste HSBC Dubaï contractual advice technical advice 390,000 tons/year
17 COMPOSTING PLANT OF THUMAIDE Thumaide (Province of Hainaut), Belgium Each year, approximately 12,000 tons of green waste (grass clippings, leaves, branches) are transported to the composting facility of Thumaide to be transformed into a quality amendment commercialized under the name Composal. The project consisted of adding a facility to an existing composting plant. The facility is composed of preliminary storage and pre-treatment of green waste, magnetic separation, shredding and transfer to an existing composting hall. Green waste is first demetallised and crushed. It is then moistened and stored in a windrow composting hall. Formed windrows are watered and turned periodically. The temperature exceeds 60 C, which allows the elimination of pathogens. The composting process is accelerated thanks to a forced air aspiration system, and takes only 4-8 weeks. After this period, the product is transported to the drying hall where it will continue its maturation phase. It will then be screened and packaged for sale. addition of a facility to an existing composting plant Ipalle technical assistance contractual assistance 12,000 tons/year
18 SORTING & RECYCLING PLANT OF THUMAIDE Thumaide (Province of Hainaut), Belgium The unit consisted of a sorting and shredding plant for Municipal Solid Waste bulky objects ( tons/year). As it arrives on the site, bulky waste is summarily sorted by an handling machine. After this sorting, a loader transports the waste to the loading area equipped with a buried rotary shear. A horizontal hydraulic tappet ensures proper feeding of the cutter with a capacity of 25 tons per hour. This unique shredding line reduces the size of the bulky waste to 400 mm long and 50 mm wide for their introduction into the ovens. For this project, our engineers provided the general design, preparation of contractual and technical specifications, tendering procedure, evaluation of tenders and construction supervision. new sorting and schredding plant Ipalle project management 30,000 tons/year
19 SORTING & SHREDDER PLANT OF MONT-SAINT-GUIBERT Mont-Saint-Guibert, Belgium For this project on the Sablière site in Mont-Saint- Guibert, our engineers collaborated with the Atelier d Architecture Astragale. The project consists of 3 industrial halls (reception, pit and sorting/shredding unit), a workshop, an administrative building and a weighbridge. The pit has two roller bridges that transfer the bulky waste on conveyor belts for being shredded in the hall before falling back into the pit. The shredding line can also be fed from the shredding hall. Scrap is filtered out for separate recycling. The halls are equipped with a sprinkler installation and deodorizing installation (air scrubbers and biofilters). The preliminary study, tender documents and tender analysis occurred in From June 2010 till 2012, our engineers assisted the client in the administrative and technical supervision of construction. new sorting and schredding plant Intercommunale IBW Architect Atelier d Architecture Astragale project management technical assistance contractual assistance 80,000 tons/year
20 Waste is our food for thought Drève Richelle 161 L 1410 Waterloo - Belgium t. +32 (0) f. +32 (0) [email protected] - MEMBER OF THE WATERLEAU GROUP
of 11,000 households Steam temperature, boiler 400 C Steam pressure, boiler Incineration temperature 1,100 C
refuse collection energy incineration waste REFA Waste-to-Energy Plant from waste to energy REFA Waste-to-Energy Plant - a Facility for waste incineration and energy generation REFA Waste-to-Energy Plant
RECOVERING RESOURCES FOR ALL. Integra South East Energy Recovery Facility
RECOVERING RESOURCES FOR ALL Integra South East Energy Recovery Facility Integra South East Energy Recovery Facility (ERF) is the third of its kind to be built in Hampshire and is a leading example of
Waste to Energy in Düsseldorf. for a clean city.
Waste to Energy in Düsseldorf for a clean city. Waste Management in Düsseldorf. Düsseldorf s public utilities company known as Stadtwerke Düsseldorf operates a waste to energy plant (WtE) that has been
RECOVERING RESOURCES FOR ALL. Integra North Energy Recovery Facility
RECOVERING RESOURCES FOR ALL Integra North Energy Recovery Facility Integra North Energy Recovery Facility (ERF) was the first of its kind to be built in Hampshire and one of the leading examples of best
JASE-world Waste to Energy Sub WG Masanori Tsukahara Hitachi Zosen Corporation 2012.11.14
Presentation of Japanese technology of waste to energy JASE-world Waste to Energy Sub WG Masanori Tsukahara Hitachi Zosen Corporation 2012.11.14 1 JASE-W established in Oct 2008 Introduction of JASE-world
Introduction to Waste Treatment Technologies. Contents. Household waste
Contents Introduction to waste treatment technologies 3 Section 1: The treatment of recyclable waste 4 Bulking facilities 5 Materials Reclamation Facility (MRF) 6 Reuse and recycling centres 8 Composting
Country specific notes on municipal waste data
EUROPEAN COMMISSION EUROSTAT Directorate E: Sectoral and regional statistics Unit E-2: Environmental Statistics and Accounts; Sustainable Development Country specific notes on municipal waste data Last
IWR Integrated Waste Recycling. Integrated System for treatment and recycling of Municipal Solid Waste
IWR Integrated Waste Recycling Integrated System for treatment and recycling of Municipal Solid Waste 1 1. Introduction IWR is an integrated system, realised by different Italian companies, manufacturers
How To Run A Power Plant In Celje
VRANSKO, May 2009 Waste Management Strategy Waste management strategy in accordance with European directive 91/156/EEC: 1. Reduction at source 2. Reuse 3. Recycle 4. Energy recovery 5.Disposal Celje Regional
Gasification as means of Waste-to-Energy - Main Parameters and application -
Gasification as means of Waste-to-Energy - Main Parameters and application - 9 th ISWA Beacon Conference in Malm, Sweden 18 th NOV. 2015 Block 4: Gasification NIPPON STEEL & SUMIKIN ENGINEERING CO., LTD
TBU Stubenvoll GmbH. Experience and Competence in Environmental Technologies. TBU Stubenvoll GmbH
Experience and Competence in Environmental Technologies TBU Services Engineering, consulting, supervision and start-up for waste and biomass incineration plants Basic engineering, detail engineering, delivery
INTEGRATED WASTE MANAGEMENT SERVICES
INTEGRATED WASTE MANAGEMENT SERVICES ENGINEERED SOLUTIONS GRO Golder Associates is a respected, employee-owned, global company providing consulting, design and construction services in our specialist areas
Enhanced power and heat generation from biomass and municipal waste. Torsten Strand. Siemens Power Generation Industrial Applications
Enhanced power and heat generation from biomass and municipal waste Torsten Strand Siemens Power Generation Industrial Applications Enhanced power and heat generation from biomass and municipal waste Torsten
Stora Enso Fors Ltd Sweden
THE ANALYSIS REPORT OF PLANT NO. 3 Cofiring of biomass - evaluation of fuel procurement and handling in selected existing plants and exchange of information (COFIRING) - Part 2 Stora Enso Fors Ltd Sweden
Use of Substitute Fuels in Large Combustion Plants (LCPs)
Use of Substitute Fuels in Large Combustion Plants (LCPs) By Pat Swords Content of the Presentation What are substitute fuels What is the experience to date with these fuels What are the regulatory implications
AffaldVarme Aarhus. AffaldVarme Aarhus. Teknik og Miljø Aarhus Kommune
x The Municipality of Aarhus City Council 7 committees Municipal Authority Mayor s Dept. Dept. for Social Affairs and Employment Dept. for Technology and Environmental Issues Dept. for health and Care
Waste a source of energy. Regional Solid Waste Management Plan Review: Engaging solutions for tomorrow. Incineration. Incineration
Waste a source of energy Regional Solid Waste Management Plan Review: Engaging solutions for tomorrow Garbage School 301: Waste to Energy All organic materials contains energy Plant or animal based Plastics
M.Sc. Matti Kivelä Power Plant Manager R&D Lahti Energia Oy P.O. Box 93 FIN-15141 Lahti Finland Tel. 358 3 823 3240 matti.kivela@lahtienergia.
LAHTI ENERGIA OY M.Sc. Matti Kivelä Power Plant Manager R&D Lahti Energia Oy P.O. Box 93 FIN-15141 Lahti Finland Tel. 358 3 823 3240 [email protected] Contact LAHTI ENERGIA OY Founded. 1907
ESBI Carbon Solutions. Partnering with Countries to Achieve their Full Carbon Credit Potential
ESBI Carbon Solutions Partnering with Countries to Achieve their Full Carbon Credit Potential ESB International ESB International (ESBI) is a growing international energy company and one of Europe s leading
Green paper on the management of biowaste in the European Union
COUNCIL OF EUROPEAN MUNICIPALITIES AND REGIONS CONSEIL DES COMMUNES ET REGIONS D EUROPE Green paper on the management of biowaste in the European Union COM (2008) 811 final CEMR RESPONSE Brussels, March
February 9, 2011 Peter Kling, ÅF Consult Ltd Vice President, Bio and WtE Consulting
International WtE projects Project development and implementation February 9, 2011 Peter Kling, ÅF Consult Ltd Vice President, Bio and WtE Consulting 1 ÅF in Energy and Environment World class renown expertise
DEVELOPMENT AND CURRENT STATE OF WASTE SECTOR
WASTE MANAGEMENT DEVELOPMENT AND CURRENT STATE OF WASTE SECTOR Municipal Waste In accordance with Law on Environment, Solid Waste Management Regulation, Metropolitan Municipalities Law and Municipal Law;
Nordic Baltic Bioenergy Conference, Riga April 2015
Nordic Baltic Bioenergy Conference, Riga April 205 Modern Flue Gas Cleaning how to use waste for heat and electricity with very low environmental impact Per Lindgren, Manager Sales [email protected]
Waste Incineration Plants
Waste Incineration Plants Modern Technology for a better Environmental Welcome at Hafner! We Manufacture Systems for Energy Recovery from Wastes and Biomass as well as for Treatment of Hazardous Wastes.
SEATTLE STEAM COMPANY FREQUENTLY ASKED QUESTIONS
SEATTLE STEAM COMPANY FREQUENTLY ASKED QUESTIONS What products/services does Seattle Steam provide? The company provides thermal energy (heat) produced at two central heating plants in downtown Seattle.
an overview of trends and approaches
Open Workshop Global Issues pertaining to BioWaste March 15th 212 - Turin, Italy Composting and Anaerobic Digestion, an overview of trends and approaches D. Mainero Working Group "Biological Treatment",
University of Iowa Power Plant
University of Iowa Power Plant Contents Purpose... 2 History... 3 Cogeneration... 6 Boilers... 7 Environmental Impact... 10 Steam Turbine Generators... 12 Modernization... 14 Biomass Fuel Initiative...
Well Positioned for the Future
Dominion Generation Virginia City Hybrid Energy Center Well Positioned for the Future The Coal Institute July 13, 2015 Rick Boyd Manager of Fuel Origination & Operations 1 Dominion Profile Operating Segments
Drying of Woody Biomass. Process Engineering / GEA Barr-Rosin
Drying of Woody Biomass BioPro Expo & Marketplace / Atlanta, GA / March 14-16, 2011 Drying of Woody Biomass Conventional Direct Fired Dryer Technology Proprietary work of the Copyright Owner Issues with
1.3 Properties of Coal
1.3 Properties of Classification is classified into three major types namely anthracite, bituminous, and lignite. However there is no clear demarcation between them and coal is also further classified
ASME QRO Certification Program
ASME QRO Certification Program ASME QRO Certification For Operators of Resource Recovery Facilities Applicant Information Table of Contents Table of Contents Page QRO Certification Overview...1 Types of
48 No Change to Content of Form Permitted
13. FORM 2A BREAKDOWN OF FIXED CONSTRUCTION PRICE All prices are in Canadian dollars as at the Closing Time. 1. Design, Permits, and Construction Management including project development expenses, mobilization,
English version. Manual for Determination of Combined Heat and Power (CHP)
CEN/CENELEC WORKSHOP CWA 45547 September 2004 AGREEMENT ICS 27.100 English version Manual for Determination of Combined Heat and Power (CHP) This CEN/CENELEC Workshop Agreement has been drafted and approved
Sewage sludge treatment with oxygen enrichement and oxyfuel combustion in CFBC - new pilot plant results
Sewage sludge treatment with oxygen enrichement and oxyfuel combustion in CFBC - new pilot plant results 64 TH IEA FLUIDIZED BED CONVERSION MEETING Naples 3 rd of June, 2012 Authors: David Wöß, Gregor
6 CONSIDERATION OF ALTERNATIVES
6 CONSIDERATION OF ALTERNATIVES 6.1.1 Schedule 4 of the Town and Country Planning (Environmental Impact Assessment) (Scotland) Regulations 2011 sets out the information for inclusion in Environmental Statements
Arecibo Resource Recovery Project
Arecibo Resource Recovery Project Energy Answers International, Inc., through its subsidiary, Energy Answers Arecibo, LLC, is developing a 77 MW Resource Recovery Project to generate renewable energy and
T@W Good Practice Form
T@W Good Practice Form Setting Title: Public-private Partnership Leading to a New CHP Plant Utilising Fibre Sludge and Biomass Country: Location: Sweden Mariestad in West Sweden Region Start date: 1999
Status and Quo of MSM. Policy Frameworks and Plans. Examples of MSM Projects in Thailand
1 2 3 4 5 6 Status and Quo of MSM Problems Policy Frameworks and Plans Schemes of MSM Examples of MSM Projects in Thailand Q&A *SAOs = Sub District Administrative Organizations (Oboto) Collected 84% 12.69
HYBRID WAY EAF OFF GAS HEAT RECOVERY -ECORECS- MASANARI YAMAZAKI*1, YASUHIRO SATO*2, RYUTARO SEKI*3
HYBRID WAY EAF OFF GAS HEAT RECOVERY -ECORECS- BY MASANARI YAMAZAKI*1, YASUHIRO SATO*2, RYUTARO SEKI*3 SYNOPSIS JP Steel Plantech Co. has developed Hybrid system for EAF off-gas heat recovery, with EAF
Layout Planning of Waste-to-Energy Plants
Layout Planning of Waste-to-Energy Plants Layout Planning of Waste-to-Energy Plants Falko Weber The layout planning of waste incineration and solid recovered fuel power plants is subject to certain local
Thank you for being here today
Thank you for being here today Presenter: Rob Smoot, a senior engineer for the Solid Waste division of Parks and Environmental Services here at Metro, a licensed Chemical Engineer with over 27 years working
Top Technology for Industry, Agriculture, Business and Communities
Top Technology for Industry, Agriculture, Business and Communities CHP The Technology with a Potential for Saving Energy Combined Heat and Power (CHP) is a highly efficient technology for the conversion
Data and Trends. Environmental protection and Safety
Data and Trends Environmental protection and Safety 2006 EMS-GRIVORY Performance Polymers EMS-GRIVORY Extrusion Polymers EMS-GRILTECH EMS-PRIMID EMS-PATVAG EMS-SERVICES Data and Trends 2006 Protection
Case-studies: TURIN (Italy)
FP6 - HOLIWAST Case-studies: TURIN (Italy) Enzo Favoino Scuola Agraria del Parco di Monza Krakow 11,12 June 2007 Content & context 3 case-studies studies Fairly good geographical coverage Size: small to
BIOMASS LOOKING FOR EFFICIENT UTILIZATION THE REHEAT CONCEPT. Jaroslav Lahoda Olaf Arndt Walter Hanstein. Siemens Power Generation (PG)
BIOMASS LOOKING FOR EFFICIENT UTILIZATION THE REHEAT CONCEPT Jaroslav Lahoda Olaf Arndt Walter Hanstein Siemens Power Generation (PG) Brno, Czech Republic & Görlitz, Germany BIOMASS LOOKING FOR EFFICIENT
BMEI BMEI CO., LTD. Environmental Total Solution Vender. www.bmeiglobal.com
CO., LTD Environmental Total Solution Vender www.bmeiglobal.com COMPANY PROFILE More than 30 years of professional experience in environmental protection technology, the turnover is 150 Million USD in
Policy measures for the prevention and minimization of hazardous wastes
WASTE AND WASTE MANAGEMENT PROGRESS AND ACHEIVEMENTS Policy measures for the prevention and minimization of hazardous wastes 1. At the international level, Mongolia joined The Basel Convention on the Control
NAWTEC18-3541 CONCEPTS AND EXPERIENCES FOR HIGHER PLANT EFFICIENCY WITH MODERN ADVANCED BOILER AND INCINERATION TECHNOLOGY
Proceedings of the 18th Annual North American Waste-to-Energy Conference NAWTEC18 May 11-13, 2010, Orlando, Florida, USA NAWTEC18-3541 CONCEPTS AND EXPERIENCES FOR HIGHER PLANT EFFICIENCY WITH MODERN ADVANCED
Tutkimuksen merkitys menestyvässä liiketoiminnassa- Innovaatiosta tuotteeksi
Tutkimuksen merkitys menestyvässä liiketoiminnassa- Innovaatiosta tuotteeksi Matti Rautanen Manager, External Networks, Power-wide R&D Tutkimuksella tulevaisuuteen- seminaari Kaukolämpöpäivät, Kuopio 29.8.2013
PRE-QUALIFICATION ANNOUNCEMENT
Warsaw March 9, 2011 PRE-QUALIFICATION ANNOUNCEMENT The contracting authority 00-526 Warsaw, ul. Krucza 24/26, Poland Website: www.elektrowniapolnoc.pl Contact person: Mr. Marek Obuchowicz E-mail: [email protected]
Finanzierung von Erneuerbaren Energie und Energieeffizienz Projekten in Asien. INTEC Engineering GmbH Berlin, 08.03.2016
Finanzierung von Erneuerbaren Energie und Energieeffizienz Projekten in Asien INTEC Engineering GmbH Berlin, 08.03.2016 Energy efficiency projects in Asia, The 8 th March INTEC 2016, GROUP Berlin INTEC
Waste to Energy. Anders Damgaard. Thanks to Jiri Hyks and Thomas H Christensen DTU for some slides
Denmark (Thomas Astrup) Denmark (COWI) Waste to Energy Anders Damgaard Austria (CEWEP) Thanks to Jiri Hyks and Thomas H Christensen DTU for some slides Copyright Anders Damgaard & Morton A. Barlaz, NC
Official Journal of the European Communities
L 332/91 DIRECTIVE 2000/76/EC OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 4 December 2000 on the incineration of waste THE EUROPEAN PARLIAMENT AND THE COUNCIL OF THE EUROPEAN UNION, waste, and 0,2
Improving Energy Efficiency through Biomass Drying
Improving Energy Efficiency through Biomass Drying Gilbert McCoy, Senior Energy Systems Engineer Northwest CHP Technical Assistance Partnership International District Energy Association Woody Biomass CHP
Renewable Energy from Biomass. Opportunities in London and Area? Eric Rosen
Renewable Energy from Biomass Opportunities in London and Area? Eric Rosen KMW ENERGY INC. LONDON, ONTARIO Tel: (519) 686-1771 www.kmwenergy.com Company Background Long History in designing bioenergy systems.
BOILER OPERATORS HANDBOOK
BOILER OPERATORS HANDBOOK prepared by National Industrial Fuel Efficiency Service Ltd. Graham & Trotman First published in 1959 as the New Stoker's Manual and in 1969 as The Boiler Operators Handbook This
A New CHP Concept for 60 000 tons of SRF
A New CHP Concept for 60 000 tons of SRF PowerGen 2015, Amsterdam 11th June 2015 Markus Bolhàr-Nordenkampf [email protected] Valmet GesmbH Anders Victoren [email protected] Valmet AB 2015-05-18
Biomethane production and its use in captive fleets. Lille Metropole Experience
Biomethane production and its use in captive fleets Lille Metropole Experience 1 Lille Urban Community : Local authority reuniting 85 communes and 1.1 million inhabitants. 4th urban area of France after
Bill Maxwell, U.S. Environmental Protection Agency, OAQPS (C439-01)
TO: Bill Maxwell, U.S. Environmental Protection Agency, OAQPS (C439-01) FROM: Jeffrey Cole, RTI International DATE: December 2003 SUBJECT: Methodology for Estimating Cost and Emissions Impact for Coal-
Environment Impact Assessment of Thermal Power Plant for Sustainable Development
International Journal of Environmental Engineering and Management. ISSN 2231-1319, Volume 4, Number 6 (2013), pp. 567-572 Research India Publications http://www.ripublication.com/ ijeem.htm Environment
Medical Waste Management Issues in Asia
Medical Waste Management Issues in Asia C. Visvanathan Environmental Engineering & Management Program Asian Institute of Technology Thailand 1 [email protected] Web: http://www.faculty.ait.ac.th/visu/ Asia
SLMA Meeting. Boiler MACT and Related Rules. Atlanta, GA March 2, 2011. Martin Rollins, P. E. H. M. Rollins Company, Inc. Gulfport, Mississippi
SLMA Meeting Atlanta, GA March 2, 2011 Boiler MACT and Related Rules Martin Rollins, P. E. H. M. Rollins Company, Inc. Gulfport, Mississippi Boiler MACT and Related Rules EPA Had Requested 15 Month Delay
Energise your waste! EU legislation pushes for a reliable alternative to landfilling for residual waste. 13 th September 2011, Birmingham
Energise your waste! EU legislation pushes for a reliable alternative to landfilling for residual waste 13 th September 2011, Birmingham Recycling & Waste Management (RWM) Exhibition Dr.ir. Johan De Greef
SHAIYO TRIPLE A GROUP. Hochiminh City, 16 September 2013
Integrated Biomass Power Generation in Thailand: Lesson Learnt and Transfer to Vietnam SHAIYO TRIPLE A GROUP Hochiminh City, 16 September 2013 Shaiyo Triple A is a world class agricultural based organization
Energy From Waste or Waste-to-Energy. Pyromex. The Solution to Multiple Energy & Environmental Issues James Pfeiffer, CEM
Energy From Waste or Waste-to-Energy Pyromex The Solution to Multiple Energy & Environmental Issues James Pfeiffer, CEM 1 Agenda Who is PowerHouse Energy What is Pyromex How Does Pyromex Work History of
ANNUAL PERFORMANCE REPORT 2012. This report fulfils the requirements of Article 12(2) of the Waste Incineration Directive regarding the:
ANNUAL PERFORMANCE REPORT 2012 Sheffield Energy Recovery Facility PPC Permit: BM4082 1. Introduction. This report fulfils the requirements of Article 12(2) of the Waste Incineration Directive regarding
Nu G Medical Waste System Technology (Pyrolysis / Thermal Decomposition)
Product Description: Nu G Medical Waste System Technology (Pyrolysis / Thermal Decomposition) The NU G System uses pyrolysis thermal decomposition to treat infectious wastes typically generated in hospitals.
Innovation in Greece. the area of Waste Management in Greece. Chief Executive Officer
WASTE MANAGEMENT Innovation in Greece Challenges of the newly created companies in the area of Waste Management in Greece W a s t e S y c l o S.A. Rodianos S. Antonakopoulos Chief Executive Officer The
POLLUTED EMISSION TREATMENTS FROM INCINERATOR GASES
POLLUTED EMISSION TREATMENTS FROM INCINERATOR GASES Ecole Nationale Supérieure de Chimie Avenue du Général Leclerc, Campus de Beaulieu 35700 Rennes, France Tel 33 (0)2 23 23 80 02 Fax 33 (0)2 23 23 81
Steam and hot water boiler systems for industrial and municipal power generation Dr.-Ing. Wolfgang Sobbe VKK Standardkessel Köthen GmbH
Steam and hot water boiler systems for industrial and municipal power generation Dr.-Ing. Wolfgang Sobbe VKK Standardkessel Köthen GmbH German-Vietnamese Bio Energy Day Ho Chi Minh City, 16. September
Feasibility Study of a Municipal Solid Waste Incinerator
Feasibility Study of a Municipal Solid Waste Incinerator Kame Khouzam Queensland University of Technology Research Concentration in Electrical Energy School of Electrical and Electronic Systems Engineering
Developments and trends shaping the future for Waste-to- Energy technology suppliers
Developments and trends shaping the future for Waste-to- Energy technology suppliers 21 st October 2015 Copenhagen, Denmark Edmund Fleck ESWET President 2 Contents 1. About ESWET 2. Introduction 3. Modern
Energy from digester gas. Optimised biogas utilisation
Energy from digester gas Optimised biogas utilisation The complete solution The complete solution Our company ENER-G designs, installs and operates biogas combined heat and power (CHP) systems for a variety
Municipal waste management in Austria
Municipal waste management in Austria Prepared by Márton Herczeg ETC/SCP February 2013 EEA project manager Almut Reichel Author affiliation Márton Herczeg, Copenhagen Resource Institute, http://www.cri.dk/
This fact sheet provides an overview of options for managing solid
What Is Integrated Solid Waste Management? This fact sheet provides an overview of options for managing solid waste, identifies the important issues you should consider when planning for solid waste management,
PHARMACEUTICAL AND CHEMICAL WASTE MANAGEMENT
Medicines and Medical Devices Agency of Serbia PHARMACEUTICAL AND CHEMICAL WASTE MANAGEMENT Ivana Bozic, MSc Health, Safety and Environment ISWA Beacon Conference, Novi Sad, 08 10 December 2010 458, Vojvode
10 Nuclear Power Reactors Figure 10.1
10 Nuclear Power Reactors Figure 10.1 89 10.1 What is a Nuclear Power Station? The purpose of a power station is to generate electricity safely reliably and economically. Figure 10.1 is the schematic of
State of the Nation Report
State of the Nation Report Landfilling Practices and Regulation in Denmark Contents 1. Summary of Solid Waste Management Sector... 2 2. Overview of Landfill Practices... 5 3. Key Stakeholders in the solid
Inventory of LCPs in Turkey LCP Database introductory presentation
Inventory of LCPs in Turkey LCP Database introductory presentation Zoran Stanković 13-14 November 2014 LCP DIRECTIVE 2001/80/EC( Overall Objective Emissions reduction of acidifying pollutants, ozone precursors,
Energy from waste. Introduction. Legal status of this guideline. What is energy from waste? Draft guideline
Draft guideline Energy from waste Publication 1549 September 2013 Authorised and published by EPA Victoria, 200 Victoria Street, Carlton Introduction As outlined in Getting full value: the Victorian Waste
Costs related to health-care waste management
11 Costs related to health-care waste management 11.1 Principles According to the polluter pays principle, each health-care establishment should be financially liable for the safe management of any waste
Swallow Street recycling facts and figures in partnership with Bywaters
Regent Street Direct Swallow Street recycling facts and figures in partnership with Bywaters 2013 Swallow Street produced 76 tonnes of cardboard Mission Recycling Ltd: Paper and Cardboard Paper of all
The new waste burning investment in the Helsinki Metropolitan Area
The new waste burning investment in the Helsinki Metropolitan Area Vantaa Energy, Project Director Pekka Karjalainen 15.1.2010 / PK The Vantaa Energy Group Vantaa Energy Ltd Vantaa Energy Electricity Networks
Landfill Gas In Ireland - The Facts
Landfill Gas In Ireland - The Facts Almost two million tonnes of municipal solid waste (MSW) were generated in Ireland in 1998, over 90% of which was consigned to landfill. At landfill, bacteria cause
Iron and Steel Manufacturing
Pollution Prevention and Abatement Handbook WORLD BANK GROUP Effective July 1998 Iron and Steel Manufacturing Industry Description and Practices Steel is manufactured by the chemical reduction of iron
Power Plant Operations and Maintenance. Maximize Your Plant s Bottom-Line Results
Power Plant Operations and Maintenance Maximize Your Plant s Bottom-Line Results Since 1867, The Babcock & Wilcox Company (B&W) has engineered, supplied and constructed advanced steam generation and emissions
Quanzhou city Licheng Huangshi Machinery Co., Ltd VANCOUVER ENVIRONMENTAL MACHINERY INVESTMENT LTD TEL:0086-595-22493855 0086-595-22413855
Quanzhou City Licheng Huangshi Machinery Co., Ltd - Garbage incineration Quanzhou city Licheng Huangshi Machinery Co., Ltd VANCOUVER ENVIRONMENTAL MACHINERY INVESTMENT LTD TEL:0086-595-22493855 0086-595-22413855
It s time for H.E.R.O. Energy Saving Strategy for. Tunnel & Shuttle Kilns
Energy Saving Strategy for Tunnel & Shuttle Kilns SANITARY WARE 1 Introduction The application of the Kyoto protocol and the effects of the recent energy crisis, have highlighted just how important it
GreEnergy. Power Plants. ELECTRICAL POWER from CEMENT PLANT WASTE HEAT. for the Cement Industry
ELECTRICAL POWER from CEMENT PLANT WASTE HEAT for the Cement Industry GreEnergy Power Plants Power Solutions from ORMAT to Increase the Eco-Efficiency of the Cement Industry Courtesy of Heidelberger Zement
European standardization of Solid Recovered Fuels
European standardization of Solid Recovered Fuels Chairman CEN/TC 343 Workshop: Processing routes for Solid Recovered Fuels 20 October, 2011 Dublin Outline Objectives and Challenges Background Mandate
La caldaia a letto fluido circolante per la riduzione delle emissioni di CO2
La caldaia a letto fluido circolante per la riduzione delle emissioni di CO2 Paolo Cotone Principal Process Engineer Silvio Arienti Process Director Power Division Foster Wheeler Italiana Tecnologie e
Rauhalahti Biomass CHP Plant
Rauhalahti Biomass CHP Plant Jyväskylän Energiantuotanto Oy, a heat production company owned by Fortum Heat and Power (%) and the City of Jyväskylä (40%), owns in all 29 boilers. Two of these are power
ISIC Rev.4 draft, Section E. Water supply; sewerage; waste management and remediation activities
ISIC Rev.4 draft, Section E Water supply; sewerage; waste management and remediation activities United Nations Statistics Division Workshop on Classifications, Montevideo, Uruguay, 14-18 March 2005 Why
Assessing the Changes Required by the Industrial Boiler MACT Regulations
Technical Paper MS-17 Assessing the Changes Required by the Industrial Boiler MACT Regulations Authors: A.L. LeClair L.M. McDermitt Babcock & Wilcox Power Generation Group, Inc. Barberton, Ohio, U.S.A
12:10 Lysotherm : 5 jaar ervaring met innovatieve slibhydrolyse. Bert Geraats (Eliquo)
LYSOTHERM A novel approach to thermal sludge hydrolysis 01.07.2015 ELIQUO WATER GROUP FACTS AND FIGURES STAFF HISTORY FIGURES >200 employees Engineers Technicians Sales, commercial staff 1986 ELIQUO WATER
Small Scale Coal Power Plant in Indonesia
Small Scale Coal Power Plant in Indonesia Taufik Sastrawinata Director Technology and Business Development of PT. Advance Technology Indonesia and Secretary General of Indonesian Coal Society Indonesia
