1 The Priority Environmental Investment Programme for SEE (PEIP) Analytical Report on progress on developing and implementing environmental investment projects in the SEE. BACKGROUND DOCUMENT NR: 6 Country name: CROATIA Timescale: progress between November 2008 and June 2009 Aim of the document: To present major developments in the countries on creating conditions for implementation of environmental investment projects and progress on financing these projects. This document accompanies the updated list of projects (background document nr 7) and it is prepared for the final Regional Meeting of the PEIP on 18 th of June Progress on financing priority projects from PEIP list As of November 2008, there were 29 projects on the PEIP List. Until June 2008 there were no additions, while two projects are proposed to be removed from the list: HR 31 because the financial construction is closed, and HR 19 because the project is in liquidation, please see more details below about these two projects. Therefore, the list closes in June 2009 with 27 projects. Between November 2008 and June 2009, 5 projects have seen improvements, three from the waste sector and one from the water sector, while 1 project (HR 19) has to be unsuccessfully terminated. Waste Sector: HR 15 Remediation of the Asbestos Polluted Mravinacka Kava Site. Progress: Additional co-financing is foreseen from the Fund for Environemntal Protection and Energy Efficiency. The Fund secured Kn (around 257k ) for the preparation of project documentation. The consulting company for preparation of project documentation and permits is tendered out and all permits should be issued by September The Fund also became the owner of two objects on site needed for the project implementation. Project cost: MEUR. HR 19 Regional Waste Management Centre for East Slavonia. The negotiations between the MoEPPPC and 2 involved counties (Vukovar-Syrmia and Osijek-Baranja) related to adaptation of the BOT - based landfill and the concept of RWMC that should be financed according to the model suggested by the Ministry lasted for 1,5 years. The negotiations until mid 2008 assumed promises for the fast solution to further development of RWMC. Setback: based on the impossibility to adapt the previously 1
2 planned model of technology and financing to the National WMP, by the beginning of 2009 both counties decided to take their own approach to integral waste management, by establishment on their own County WMCs. The decision was accompanied by abatement of Public Institution for Eastern Slavonia. Until the resolvement of situation that also involves the dispute between the founders of ZOIS and the consortium for BOT, a temporary Director is appointed. Therefore, the project is to be removed from the PEIP List as of June HR 39 Remediation of Botovo - hazardous waste disposal site. The project is on the EPOP list, and is now in the IPA project pipeline. Estimated date of finalising IPA application with supporting documents is Progress: The project is co-financed by EPEEF (1,1 MEuro). Project for remedation of site is made. Project Cost: 8.5 MEUR. HR 40 Remediation of Kaštelanski zaljev - hazardous waste disposal site. The project is on the EPOP list, and in the IPA project pipeline. Estimated date of finalising IPA application with supporting documents is Progress: Project documentation of site remedation is completed. Project cost: 10 MEUR. Water Sector: HR 31 Upgrade of the wastewater treatment plant in the town of Garesnica. First phase of the project is finished and operationa, second phase will be finished next year. Progress: Funds are now completely secured, all documentataion exists. Project was financed 60% by Hrvatske Vode and 40% by Town of Garesnica. Therefore, the project is to be removed from the PEIP List. Project Cost: 0.82 MEUR. All funds secured HR 48 Waste Water Disposal System and Treatment Plant of town Nova Gradiska. The project is on the EPOP list and in te IPA project pipeline. Estimated date of finalising IPA application with supporting documents is IPA application and feasibility study will be developed through IPA tehnical assistance pipe-line. IPA technical assistance is still in process of assesing the project. Therefore there is no funding for the project available yet, but technical assistance from IPA is expected. Progress: The project size is expanded to cover 31,000 person equivalent (from 14,000). 2
3 2. Strategic and Planning Documents No changes since November Legislative framework Several legislative documents have been update in 2009, as follows: Croatian legislation Regulation on categories, types and classification of waste with a Waste catalogue and list of hazardous waste, OG 50/05 Regulation on supervision of transboundary movement of waste, OG 69/06 Ordinance on packaging and packaging waste, OG 97/05, 115/05 Corresponding EU legislation 91/689/EEC Regulation 1013/2006 Amended (OG) 39/09 Regulation 1013/ /07, 39/09 94/62/EC 81/08, 31/09 Ordinance on the management of waste tyres, OG 40/06-31/09 Ordinance on waste oils management, OG 124/06 75/439/EEC 121/08, 31/09 Ordinance on management of waste batteries and accumulators, OG 133/06 Ordinance on the management of end-of-life vehicles, OG 136/06 Ordinance on the management of waste electrical and electronic appliances and equipment, OG 74/ /66/EC 31/ /53/EC 31/ /96/EC 133/08, 31/09 4. Institutional structures No changes since November In the Water sector the Ministry of Regional Development, Forestry and Water Managemet (Directorate for Water Management and Directorate for Water Policy and International Projects) is still sharing water sector responsibilities with the Croatian Waters (CW) which is assisting water sector in project preparation and IPA application. The Ministry for Environmental Protection, Physical Planning and Construction (MoEPPC) is responsible for the Air and Waste sector, as well as the Environmental Protection and Energy Efficiency Fund (EPEEF) which is assisting the waste sector in project preparation and IPA application. Beteween 2007 and 2009 the key actions of the EPEEF were the following: contracts with SGU for remediation of 299 registered landfills ( works completed on 63 landfills), Total value 387 MEUR, disbursed for remediation of official landfills in years MEUR. EPEEF co-finance projects with 55%. for remediation of illegal dumpsites EPEEF allocated another 14.3 MEUR, and for remediation of hot spots 53.4 MEUR. 3
4 EPEEF will support investments for establishment and construction of RWMC with 51.5 MEUR from EPEEF co-finance project investigation works, give allocations for land purchasing, finance preparation of technical documentation in nine counties (5.5 MEUR) in EPEEF invests 8.8 MEUR in management of special waste categories 5. Status of water and waste infrastructure and public utilities No changes since November There has been no significant progress in regionalisation efforts. The intention is to reorganize municipalities and to achieve regional cooperation among municipalities. In the meantime, one new regional waste management center company has been officially established, the one in the Sisačkomoslavačka County. 6. Financing mechanisms There have been no changes in the structure of the financing mechanisms since November The Environmental Protection and Energy Efficiency Fund (EPEEF) is assisting the waste sector in project preparation and IPA application, while the Croatian Waters (CW) is assisting water sector in project preparation and IPA application. The indicative financial table for IPA is as follows: Total public Expenditure Community Contribution (IPA) National Public Contribution Priority Axis 1: Developing waste management infrastructure for establishing an integrated waste management system in Croatia Measure 1.1: Establishment of new waste management centres at county/ regional levels mil Eur mil Eur 8.78 mil Eur mil Eur mil Eur 8.72 mil Eur Measure 1.2 : Remediation of sites highly polluted by waste (hot spots) 0.24 mil Eur 0.18 mil Eur 0.06 mil Eur 7. Relevant projects/programmes RWMC Primorje Gorski Kotar (HR 10) RWMC Split-Dalmatia County (HR 24) RWMC Istria (HR 26) 4
5 8. Key challenges for the next 6 months Further approximation of Water Management legislation with the EU Acquis Implementation of projects under IPA component III b Slavonski Brod, Knin, Drniš, Sisak Preparation for Structural Funds (NSRF, OP for Environment and Energy and project preparation) Investment strategy in water management sector (PHARE 2006) Updating of OP Environment
Environmental Protection and Energy Efficiency Fund in financing EE and RES programs and projects
Republic of Croatia Environmental Protection and Energy Efficiency Fund Environmental Protection and Energy Efficiency Fund in financing EE and RES programs and projects Marija Šćulac Domac Assistant Director
More informationCROATIA - TURKEY Preparation Screening Bi-lateral meetings List of questions related to key acquis requirements
CROATIA - TURKEY Preparation Screening Bi-lateral meetings List of questions related to key acquis requirements Please describe the provisions in place, and envisaged. Please underline any problem or difficulty
More informationScreening report Croatia
8 March 2007 Screening report Croatia Chapter 22 Regional policy and coordination of structural instruments Date of screening meetings: Explanatory meeting: 11 12 September 2006 Bilateral meeting: 5 6
More informationWASTE QUESTIONNAIRE. Legal basis Council Directive 75/442/EEC of 15 July 1975 on waste (OJ L 194 25.07.1975 p. 39) EUR-Lex hyperlink html
WASTE QUESTIONNAIRE Waste Framework Directive Legal basis Council Directive 75/442/EEC of 15 July 1975 on waste (OJ L 194 25.07.1975 p. 39) EUR-Lex hyperlink html A. Which parts of the provisions of the
More informationWaste and Water Management in Croatia
Waste and Water Management in Croatia Zagreb, 2012 Embassy of Belgium, Commercial Section Luka Matković 1 Table of Contents Glossary of Abbreviations 3 1. Croatia s Overview...4 2. Economic Indicators...5
More informationHow To Improve The Environment In Serbia
ENVIRONMENTAL INFRASTRUCTURE SUPPORT PROGRAMME (EISP) SIDA MEMSP IMG Programme Proposal July 2011 July 2013 (estimated, depending on approval date) Contents 1. Summary... 2 2. Background... 3 3. Strategic
More informationSANITATION COUNTRY PROFILE NORWAY
SANITATION COUNTRY PROFILE NORWAY Decision-Making Programmes and Projects Status Capacity-Building, Education, Training and Awareness-Raising Information Research and Technologies Financing Cooperation
More informationCore description: The successful candidate will be responsible for the following functions:
The Mangaung Metropolitan Municipality is an employer of choice committed to the principles of Employment Equity Act N0. 55/98 as amended and in this vain Suitably qualified persons are invited to apply
More informationOECD WORKSHOP: THE ENVIRONMENTALLY SOUND MANAGEMENT OF RECOVERABLE WASTES (ESM) SESSION 1
OECD WORKSHOP: THE ENVIRONMENTALLY SOUND MANAGEMENT OF RECOVERABLE WASTES (ESM) SESSION 1 ESM in the Country Undergoing Transition of Economy: Case Study: Czech Republic RNDr. V. Mikulová Ministry of Environment
More informationDEVELOPMENT STRATEGY FOR INLAND WATERWAY TRANSPORT IN THE REPUBLIC OF CROATIA (2008-2018)
REPUBLIC OF CROATIA MINISTRY OF THE SEA, TRANSPORT AND INFRASTRUCTURE DEVELOPMENT STRATEGY FOR INLAND WATERWAY TRANSPORT IN THE REPUBLIC OF CROATIA (2008-2018) April, 2008 Contents page 1 Introduction.
More informationFLOW CHART OF PROCESSES FOR OBTAINING PERMITS IN SISAK MOSLAVINA COUNTY
FLOW CHART OF PROCESSES FOR OBTAINING PERMITS IN SISAK MOSLAVINA COUNTY SI-MO-RA d.o.o. S. i A. Radića 8b, Sisak simora@simora.hr www.simora.hr Sisak projekti d.o.o. Rimska 26, Sisak www.sisak-projekti.hr
More informationEuropean waste policy:
Waste: the problem European waste policy: prevention a dream? EU Waste policy: general principles and summary of legislation Waste Framework Directive - 2008 Waste Electr(on)ical Equipment 2002 and review
More informationTender Procedures for EU-funded Projects
Tender Procedures for EU-funded Projects Membership in the European Union opens up an opportunity for Bulgaria to utilize up to 7 billion EUR during the period 2007-2013. The economic and social areas
More informationEuropass Curriculum Vitae
Europass Curriculum Vitae Personal information First name(s) / Surname(s) Address Helga Bubanović Devčić 7 / Supilova ulica, 10000 Zagreb (Croatia) Telephone(s) +385.(0)1.4572.769 Mobile +385.(0)91.44.555.21
More informationPolicy measures for the prevention and minimization of hazardous wastes
WASTE AND WASTE MANAGEMENT PROGRESS AND ACHEIVEMENTS Policy measures for the prevention and minimization of hazardous wastes 1. At the international level, Mongolia joined The Basel Convention on the Control
More informationWaste management of hazardous waste in Poland
Waste management of hazardous waste in Poland Administrative structure of Poland. There are three levels of administrative structure in Poland: regions (called województwo) sub-regions (called powiat)
More information07 Ekim 2006/06:41-FINAL. Table of Contents
Table of Contents Table of Contents... 1 1 Legal Framework... 2 1.1 Budget planning and implementation mechanisms at national, regional and local level... 2 1.2 Co-financing mechanisms at national, regional
More informationREPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL
EUROPEAN COMMISSION Brussels, 3.3.2015 COM(2015) 78 final REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL on the implementation of the work under the nuclear decommissioning assistance
More informationJOB DESCRIPTION. Team Leader Fleet Engineering. Environment & Sustainable Communities / Highways. Transport Operations / Vehicle Fleet & Depot
JOB DESCRIPTION JOB TITLE: DIRECTORATE: SECTION: GRADE: Team Leader Fleet Engineering Environment & Sustainable Communities / Highways Transport Operations / Vehicle Fleet & Depot BBCU11 DATE PREPARED:
More informationAnnex to the Resolution No. 39/2010 of the Council of Ministers of 15 March 2010 MINISTRY OF ECONOMY
Annex to the Resolution No. 39/2010 of the Council of Ministers of 15 March 2010 MINISTRY OF ECONOMY Programme for Asbestos Abatement in Poland 2009-2032 Warsaw, 2010 2 TABLE OF CONTENTS 1. SUMMARY...5
More informationOfficial Journal of the European Union
L 132/32 COMMISSION IMPLEMTING REGULATION (EU) No 447/2014 of 2 May 2014 on the specific rules for implementing Regulation (EU) No 231/2014 of the European Parliament and of the Council establishing an
More informationEDM Referenzen - Electronic IT data management
Foto zum Thema... EDM Referenzen - Electronic IT data management December 2011 1 Overview Basic principles and objectives of EDM Short introduction of EDM Applications e.g. Central database for company
More informationWaste Management. Background
Waste Management Background Overview of current waste management In 1970, the main method of waste disposal in Iceland was open-pit burning. Over 50 burning pits were in operation, close to one pit per
More informationEconomic and Social Council
UNITED NATIONS E Economic and Social Council Distr. GENERAL CEP/AC.10/2005/5 12 April 2005 ORIGINAL: ENGLISH ECONOMIC COMMISSION FOR EUROPE COMMITTEE ON ENVIRONMENTAL POLICY Working Group on Environmental
More informationFINAL PLAN OF REMEDIAL ACTION
FINAL PLAN OF REMEDIAL ACTION 1000 FRENCH STREET SITE Wilmington, Delaware DE 1115 June 1999 Department of Natural Resources and Environmental Control Division of Air and Waste Management Site Investigation
More informationEnsuring Preparedness of the Slovak Public Health Insurance System to Apply the Acquis on Co-ordination of Social Security Schemes TERMS OF REFERENCE
Ensuring Preparedness of the Slovak Public Health Insurance System to Apply the Acquis on Co-ordination of Social Security Schemes TERMS OF REFERENCE 1. BACKGROUND The main objective of this project is
More informationScreening report Turkey
ORIGIN: COMMISSION SERVICES WP ENLARGEMENT + COUNTRIES NEGOTIATING ACCESSION TO EU MD 154/07 14.05.07 Screening report Turkey Chapter 22 Regional policy and coordination of structural instruments Date
More informationSTANDARD TWINNING LIGHT PROJECT FICHE
STANDARD TWINNING LIGHT PROJECT FICHE 1. Basic Information 1.1 Programme: IPA 2011 1.2 Twinning Number: HR/2011/IB/OT/01 TWL 1.3 Title: Capacity Building of the National School for Public Administration
More informationFINANCING REGIONAL DEVELOPMENT THROUGH DEVELOPMENT BANKS *
FINANCING REGIONAL DEVELOPMENT THROUGH DEVELOPMENT BANKS * Branko Matić 1, Hrvoje Serdarušić 2 1 Full Professor, Faculty of Economics in Osijek, Croatia, matic@efos.hr 2 Teaching Assistant, Faculty of
More informationA. WASTE MANAGEMENT A.1. INTRODUCTION AND GENERAL ISSUES ON HAZARDOUS WASTES AND SOLID WASTES
A. WASTE MANAGEMENT A.1. INTRODUCTION AND GENERAL ISSUES ON HAZARDOUS WASTES AND SOLID WASTES The objective of the German government s policy on waste is to achieve a recyclingbased economy that conserves
More informationThe Public Participation Process in Cyprus
The Public Participation Process in Cyprus Priority Actions Programme Regional Activity Centre Split, February 2007 Table of Contents 1. Introduction... 1 2. Benefits of Public Participation in Decision
More informationDevelopments in Turkey in the Context of Participatory Approach Based on River Basin Management. Nermin ÇİÇEK, Özge Hande SAHTİYANCI
Developments in Turkey in the Context of Participatory Approach Based on River Basin Management Nermin ÇİÇEK, Özge Hande SAHTİYANCI The Ministry of Forestry and Water Affairs, General Directorate of Water
More informationDEVELOPMENT AND CURRENT STATE OF WASTE SECTOR
WASTE MANAGEMENT DEVELOPMENT AND CURRENT STATE OF WASTE SECTOR Municipal Waste In accordance with Law on Environment, Solid Waste Management Regulation, Metropolitan Municipalities Law and Municipal Law;
More informationDemand for Natural Gas*
Taking Control Over Natural Gas Gathering and Transmission Pipelines and Compressor Stations* 2009 Texas City Attorneys Association Summer Conference South Padre Island, Texas June 11, 2009 Presented by:
More informationI. Latest developments in environmental monitoring at the national and subnational levels
WORKING GROUP ON ENVIRONMENTAL MONITORING AND ASSESSMENT Thirteenth session Geneva, 1-2 November 2012 Items 6 (b), (d), (e) and (f) of the provisional agenda Submitted by the Republic of Serbia 1 Members
More informationSINGAPORE INSTITUTE OF PUBLIC ADMINISTRATION. TRAINING calendar. Regional Training Centre For Public Administration
SINGAPORE C O O P E R AT I O N P RO G R A M M E INSTITUTE OF PUBLIC ADMINISTRATION TRAINING calendar Regional Training Centre For Public Administration 2015-2016 3 METHOD OF NOMINATION: All nominations
More informationIPA 2009 Croatia Project Fiche HR2009-03-28-11
IPA 2009 Croatia Project Fiche HR2009-03-28-11 1. Basic information 1.1 CRIS Number:IPA/2009/21661 1.2 Title: Strengthening the Institutional Capacity for Blood, Tissues and Cells 1.3 ELARG Statistical
More informationJOB DESCRIPTION. Position Title and Number: Senior Procurement Officer (100618) Health, Wellbeing & Commissioning
JOB DESCRIPTION Position Title and Number: Senior Procurement Officer (100618) Grade: Department: Section: Responsible to: Responsible for: SO2 People Directorate Health, Wellbeing & Commissioning Team
More informationThe new Polish Act on Waste of 2012
Karolina Karpus * The new Polish Act on Waste of 2012 http://dx.doi.org/10.12775/pyel.2013.003 Summary The aim of this paper is the description of changes in the Polish law on waste connected with the
More informationWaste management in the Netherlands. Herman Huisman RWS Environment
Waste management in the Netherlands Herman Huisman RWS Environment Whistler, May 29th 2014 Content Waste policy EU Netherlands performance in waste management Instruments we used Integrate waste management
More informationLanguage skills: Proven fluency in written and spoken English.
New Request for Services Project Title Internal number Country Approx. Dates Eligible Nationalities Deadline for submissions of CV for internal consortium voting Development of legislation for waste management
More informationExamples for financing of biogas projects in Italy
IEE Project BiogasIN Examples for financing of biogas projects in Italy D.3.2., WP3 - Henning Hahn, Dominik Rutz, Erik Ferber, Franz Kirchmayer - November 2010 Contents 1. Introduction... 3 2. Basics of
More informationSTANDARD TWINNING PROJECT FICHE
STANDARD TWINNING PROJECT FICHE 1. Basic Information 1.1 Publication notice reference: EuropeAid/ 137-675/IH/ACT/HR 1.2 Programme: Transition Facility IPA/2013/24986 (Annex of C(2013) 8057 final) 1.3 Twinning
More informationILLINOIS DEPARTMENT OF CENTRAL MANAGEMENT SERVICES CLASS SPECIFICATION ENERGY AND NATURAL RESOURCES SPECIALIST SERIES
ILLINOIS DEPARTMENT OF CENTRAL MANAGEMENT SERVICES CLASS SPECIFICATION ENERGY AND NATURAL RESOURCES SPECIALIST SERIES CLASS TITLE POSITION CODE ENERGY AND NATURAL RESOURCES SPECIALIST TRAINEE 13715 ENERGY
More informationFinancing energy efficiency through grants lessons learned in Austria
Financing energy efficiency through grants lessons learned in Austria FINANCING ENERGY EFFICIENCY FUNDING OPORTUNITIES, INSTITUTIONAL MODELS AND SUCCESFUL PRACTICES Wolfgang Diernhofer 1 Contents Introduction
More informationPOSITION DESCRIPTION Number: PD:
POSITION DESCRIPTION Number: PD: The VALUES of The City of South Perth Customer Focus - To work together with our customers to achieve positive outcomes. Excellence - To develop a culture of flexibility,
More informationThe Control of Major Accident Hazards Regulations (Northern Ireland) 2015
STATUTORY RULES OF NORTHERN IRELAND 2015 No. 325 HEALTH AND SAFETY The Control of Major Accident Hazards Regulations (Northern Ireland) 2015 Made - - - - 26th August 2015 Coming into operation - 28th September
More informationREPORT On the work of the Croatian Energy Regulatory Agency For the year 2005
Republic of Croatia Croatian Energy Regulatory Agency REPORT On the work of the Croatian Energy Regulatory Agency For the year 2005 Zagreb, July 2006 Croatian Energy Regulatory Agency CONTENT A. REPORT
More informationSTANDARD TWINNING LIGHT PROJECT FICHE
STANDARD TWINNING LIGHT PROJECT FICHE 1. Basic Information 1.1 Programme: IPA 2011 FF RAC 1.2 Twinning Number: HR/2011/IB/SO/02 TWL 1.3 Title: Contribution to institutional capacity for blood, tissue and
More informationRiver Basin Management in Croatia
River Basin Management in Croatia 2. INTERNATIONAL RIVER BASIN MANAGEMENT HIGH LEVEL SYMPOSIUM Cappadocia/NEVŞEHİR, Turkey 16-18 April 2013 2 Water sector responsibilities are shared among: Croatian Parliament
More informationANNEX IV Procurement by grant Beneficiaries in the context of European Union external actions 1
ANNEX IV Procurement by grant Beneficiaries in the context of European Union external actions 1 1. GENERAL PRINCIPLES If the implementation of an Action requires procurement by the Beneficiary, the contract
More informationRecords Retention and Disposal Schedule. Property Management
Records Retention and Disposal Schedule Property Management Version control Version Author Policy Approved By Approval Date Publication Date Review Due V 1.0 Information Governance Unit Philip Jones, Head
More informationINSURANCE AND POLLUTION PREVENTION
INSURANCE AND POLLUTION PREVENTION Publication #99-439 Environmental Insurance What is environmental insurance and what does it insure against? Environmental insurance insures against potential damages
More informationDenmark Country Report
IEA Bioenergy Task 37 Energy from Biogas Denmark Country Report Berlin (Germany), October 2015 Teodorita AL SEADI BIOSANTECH Lerhøjs Allé 14 DK 6715 Esbjerg N Denmark teodorita.alseadi@biosantech.com +45
More informationPrepared by: Environmental Protection Services Alberta Environment August, 1989. Guidelines for the Disposal of Asbestos Waste
Prepared by: Environmental Protection Services Alberta Environment August, 1989 Guidelines for the Disposal of Asbestos Waste TABLE OF CONTENTS Item Page 1. Introduction 1 2. Definitions 2 3. Legislation
More informationCurrent situation with asbestos in Bosnia and Herzegovina
CAPACITY BUILDING FOR BANNING AND PHASING OUT ASBESTOS IN WEST BALKAN COUNTRIES Current situation with asbestos in Bosnia and Herzegovina CA EKOPOT Project is funded by European Union Thematic areas Legislation
More informationINDUSTRIAL POLLUTION CONTROL AND RISK MANAGEMENT QUESTIONNAIRE IPPC Directive
INDUSTRIAL POLLUTION CONTROL AND RISK MANAGEMENT QUESTIONNAIRE IPPC Directive Legal reference Council Directive 96/61/EC of 24 September 1996 concerning integrated pollution prevention and control (Official
More informationEnvironmental Management Plan
Environmental Management Plan This environmental management plan outlines Red Bus Services objectives and strategies for protecting the environment. This plan sets out how Red Bus Services intends to comply
More informationPUBLIC ACCESS TO LAND ADMINISTRATION DATA IN CROATIA
Republic of Croatia State Geodetic Administration PUBLIC ACCESS TO LAND ADMINISTRATION DATA IN CROATIA Maja Pupačić, dipl.ing.geod. Workshop on Efficient and Transparent Land Management in ECE Countries
More informationCity of Bakersfield Public Works Department Sewer System Management Plan December 2014
City of Bakersfield Public Works Department Sewer System Management Plan December 2014 C:\Users\hmayberry\Desktop\SEWER SYSTEM MANAGEMENT PLAN 2014.doc 1 Sewer System Management Plan Index: Section 1 Goals
More informationOman Environmental Services Holding Company
Oman Environmental Services Holding Company Population 654,000 3 Schools with a total of 909 students 1970 Less waste generated 10 km of paved roads and 1,700km of unpaved roads 1 small Hospital with unreliable
More informationStandard Summary Project Fiche IPA centralised national programme Project number 8: Technical assistance for Hazardous Waste Treatment Facility
Standard Summary Project Fiche IPA centralised national programme Project number 8: Technical assistance for Hazardous Waste Treatment Facility 1. Basic information 1.1 CRIS Number: 2009/021-638 1.2 Title:
More informationK. P. Catlett D. G. Adler U.S. Department of Energy, Oak Ridge, TN. P. D. Moss Science Applications International Corporation, Oak Ridge, TN
PREVENTING WASTE - SUPPORTING CLEANUP: POLLUTION PREVENTION USED IN CONJUNCTION WITH CERCLA ACTIVITIES AT BEAR CREEK VALLEY, OAK RIDGE RESERVATION, OAK RIDGE, TN K. P. Catlett D. G. Adler U.S. Department
More informationThird Call for Participation in the
Third Call for Participation in the CzechAccelerator 2011-2014 Project (Close of registration acceptance prolongs to 8 May 2012) The CzechAccelerator 2011-2014 project is being implemented within the Consulting
More informationConstruction of facility for waste water purification in Grubišno Polje
http://narodne-novine.nn.hr/clanci/oglasi/2324325.html (675) Town of Grubišno Polje intends to award a works contract for the construction of facility for waste water purification in Grubišno Polje which
More informationElectronic Data Management - An Integrated EGovernment-Application in the Environmental Field in Austria
Electronic Data Management - An Integrated EGovernment-Application in the Environmental Field in Austria Franz Mochty Federal Ministry of Agriculture, Forestry, Environment and Water Management Austria
More informationANNEX. to the REPORT FROM THE COMMISSION. Annual Report 2014 on subsidiarity and proportionality
EUROPEAN COMMISSION Brussels, 2.7.2015 COM(2015) 315 final ANNEX 1 ANNEX to the REPORT FROM THE COMMISSION Annual Report 2014 on subsidiarity and proportionality EN EN Annex List of Commission documents
More informationInvestment incentives in Bulgaria
Investment incentives in Bulgaria Types of incentives under the current Bulgarian legislation Tax incentives Incentives under the Investment Promotion Act (IPA) Employment incentives (training and job
More informationSafe management of healthcare waste
Safe management of healthcare waste Introduction A wide variety of waste is generated from healthcare activities and employers have a statutory duty of care in relation to the management of that waste.
More informationIowa Smart Planning. Legislative Guide March 2011
Iowa Smart Planning Legislative Guide March 2011 Rebuild Iowa Office Wallace State Office Building 529 East 9 th St Des Moines, IA 50319 515-242-5004 www.rio.iowa.gov Iowa Smart Planning Legislation The
More informationIllegally Dumped Asbestos Clean Up Program Guidelines
Illegally Dumped Asbestos Clean Up Program Guidelines October 2013 Contents Introduction... 1 Assessment criteria... 2 Eligibility... 3 Application process... 5 Further information... 8 Glossary... 10
More informationDate: 26/01/2004. MEETING NAME Executive Delegation of award of energy supply contracts
Item No. Classification: Open Report title: Ward(s) or groups affected: From: Date: 26/01/2004 MEETING NAME Executive Delegation of award of energy supply contracts ALL Assistant Chief Executive Strategy
More informationNAPCS Product List for NAICS 54162: Environmental Consulting Services
NAPCS List for NAICS : Environmental Consulting Services National 1 Environmental consulting Providing objective information, advice, and guidance to clients concerning the preservation of air, water,
More informationThe Clean Up of Clandestine Drug Lab Sites in Minnesota
CLEANUP OF CLANDESTINE DRUG LAB SITES ORDINANCE for Renville County ARTICLE I. GENERAL PROVISIONS SECTION 1.10 SECTION 1.20 SECTION 1.30 SECTION 1.40 SECTION 1.50 SECTION 1.60 SECTION 1.70 TITLE AND STATUTORY
More informationState of Georgia Department of Natural Resources Environmental Protection Division Watershed Protection Branch
State of Georgia Department of Natural Resources Environmental Protection Division Watershed Protection Branch National Pollutant Discharge Elimination System (NPDES) Industrial Antidegradation Analysis
More informationA comparative analysis of Turkish and European Union environmental legislation regarding cleaner (sustainable) production concept
246 Int. J. Environment and Sustainable Development, Vol. 10, No. 3, 2011 A comparative analysis of Turkish and European Union environmental legislation regarding cleaner (sustainable) production concept
More informationThe economic basis of municipal waste management A comparison between Poland, Sweden and Lithuania
The economic basis of municipal waste management A comparison between Poland, Sweden and Lithuania Team: Małgorzata Zakręcka (CUT), (gosiazakr@poczta.onet.pl), Neringa Kedavičiūtė (KTU), (neringa.kedaviciute@gmail.com),
More informationCapital Project Development - definitions, Values and Funding
Definitions and Descriptions Capital Expenditure - A capital expenditure is any significant expenditure incurred to acquire or improve land, buildings, engineering structures, machinery and equipment.
More informationStandard Summary Project Fiche IPA decentralised National programmes (maximum 12/15 pages without the annexes) 1.
Standard Summary Project Fiche IPA decentralised National programmes (maximum 12/15 pages without the annexes) 1. Basic information 1.1 CRIS Number: TR2009/0327.03 1.2 Title: Implementation Capacity for
More informationLIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT
LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT Introduction The purpose of this Public Environmental Report (PER) is to provide the Government
More informationaccommodation services on board of foreign vessels have the following obligations, depending on the vessel's flag:
INSTRUCTIONS FOR CHARTER COMPANIES INTENDING TO CARRY OUT CHARTERING OF FOREIGN YACHTS AND BOATS - PROVISION OF ACCOMODATION SERVICES ON YACHTS AND BOATS - Zagreb, March 2014 Charter companies which, according
More informationDocument Management Policy
Document Management Policy Introduction 1.1. The Snowdonia National Park Authority considers effective record management to be a key administrative function. It maintains records of its own internal functions
More information2 SUMMARY AND MORE SIGNIFICANT EVENTS IN
Table of contents 1 INTRODUCTION 5 2 SUMMARY AND MORE SIGNIFICANT EVENTS IN 2009 6 2.1 An overview of the basic organizational scheme and authorities in the Agency 7 2.2 More significant events on the
More informationVILLAGE OF LUDLOW, VERMONT ORDINANCE REGULATING OUTDOOR STORAGE OF JUNK AND JUNK VEHICLES
VILLAGE OF LUDLOW, VERMONT ORDINANCE REGULATING OUTDOOR STORAGE OF JUNK AND JUNK VEHICLES 1. Enabling Authority 2. Definitions 3. Requirements 4. Enforcement & Penalties 5. Severability 6. Publication
More informationDIVISION D ELECTRICITY, GAS, WATER AND WASTE SERVICES
The Electricity, Gas, Water and Waste Services Division comprises units engaged in the provision of electricity; gas through mains systems; water; drainage; and sewage services. This division also includes
More informationHow To Implement The European Constitution On Public Procurement
5 April 2006 Screening report Turkey Chapter 5 Public procurement Date of screening meetings: Explanatory meeting: 7 November 2005 Bilateral meeting: 28 November 2005 Turkey: chapter 5 Public procurement
More information7. LAW ON LOCAL SELF-GOVERNMENT FINANCING. Pursuant to Article 88 item 2 of the Constitution of the Republic of Montenegro, I hereby issue the
Pursuant to Article 88 item 2 of the Constitution of the Republic of Montenegro, I hereby issue the Decree Promulgating the Law on Local Self-Government Financing (Official Gazette of the Republic of Montenegro
More informationLiquid Effluent Treatment Plant (LETP) Land Clean-Up
Liquid Effluent Treatment Plant (LETP) Land Clean-Up Frequently Asked Questions What is proposed? Magnox Ltd is proposing to remove the redundant Liquid Effluent Treatment Plant (LETP) at Harwell and to
More informationAlkaline Manganese Dioxide Battery Product Safety, Transportation and Disposal
PRODUCT SAFETY PRECAUTIONS FOR HANDLING AND USE DURACELL alkaline manganese cells and batteries will provide long, reliable and safe service when used correctly. To achieve optimum performance and trouble-free
More informationCOMMISSION OF THE EUROPEAN COMMUNITIES. COMMISSION REGULATION (EC) No /..
EN EN EN COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, XX/XX/2007 COM(2006) XXX COMMISSION REGULATION (EC) No /.. of [ ] implementing Council Regulation (EC) No 1085/2006 establishing an instrument
More informationCzechInvest issues, on August 6 th 2013, Supplemental Call to the 5 th Call for Participation in the CzechAccelerator 2011-2014 Project
CzechInvest issues, on August 6 th 2013, Supplemental Call to the 5 th Call for Participation in the CzechAccelerator 2011-2014 Project The CzechAccelerator 2011-2014 project is being implemented within
More informationLaw of Mongolia on Concessions
Economic Policy Reform and Competitiveness Project April 2005 Ulaanbaatar, Mongolia This publication was produced for review by the United States Agency for International Development The views expressed
More informationStandard Summary Project Fiche IPA centralised programmes
Standard Summary Project Fiche IPA centralised programmes Project number 30: Chemicals Management 1 BASIC INFORMATION 1.1 CRIS Number: 2008/020-406 1.2 Title: Chemicals Management 1.3 ELARG statistical
More informationBOARD NOTICE COUNCIL FOR THE BUILT ENVIRONMENT. Notice No... 2011
BOARD NOTICE COUNCIL FOR THE BUILT ENVIRONMENT Notice No.... 2011 NOTICE IN TERMS OF THE COUNCIL FOR THE BUILT ENVIRONMENT ACT, 2000 (ACT NO. 43 OF 2000) The Council for the Built Environment has under
More informationKANABEC COUNTY ORDINANCE NO. 30
KANABEC COUNTY ORDINANCE NO. 30 CLEANUP OF CLANDESTINE DRUG LAB SITES ORDINANCE Kanabec County ARTICLE I. GENERAL PROVISIONS SECTION 1.10 SECTION 1.20 SECTION 1.30 SECTION 1.40 SECTION 1.50 SECTION 1.60
More informationList of Contents Section 10, Nuclear Safety and Radiation Protection Legislation Page
List of Contents Section 10, Nuclear Safety and Radiation Protection Legislation Page Overview 1 The Radiation Protection (Medical Exposures) Directive 11 The Public Information (Radiological Emergency)
More informationAppendix 8 Providing Pre-construction information and check list (Regulations 10)
Appendix 8 Providing Pre-construction information and check list (Regulations 10) Project specific health and safety information STFC will have procedures in place to ensure that there is timely release
More information1 INTRODUCTION AND SUMMARY OF ACHIEVEMENTS... 2 2 PROJECT MANAGEMENT... 3 3 GENERAL PROGRESS IN THE PROJECT... 3
TABLE OF CONTENTS 1 INTRODUCTION AND SUMMARY OF ACHIEVEMENTS... 2 2 PROJECT MANAGEMENT... 3 3 GENERAL PROGRESS IN THE PROJECT... 3 4 DETAILED OVERVIEW OF THE PROGRESS... 4 4.1 Progress on Component 1 -
More informationSERVICE PROCUREMENT NOTICE Integration of Financial Management Informatics System of the State Treasury and Budget Users Republic of Croatia
SERVICE PROCUREMENT NOTICE Integration of Financial Management Informatics System of the State Treasury and Budget Users Republic of Croatia 1. Publication reference EuropeAid/125799/D/SER/HR 2. Procedure
More informationEnd-of-life vehicles. Information for authorised treatment facilities
End-of-life vehicles Information for authorised treatment facilities 1. What is this guide about? This booklet is a simple guide to SEPA s requirements under the end-of-life vehicle (ELV) legislation.
More information