H.R. (Herb) Kuehne, MBA, P.Eng. Senior Vice-President Civil Infrastructure

Size: px
Start display at page:

Download "H.R. (Herb) Kuehne, MBA, P.Eng. Senior Vice-President Civil Infrastructure"

Transcription

1 Senior Vice-President Civil Infrastructure Education MBA, University of Alberta B.Sc., Civil Engineering, University of Alberta Employment History Date: Associated Engineering 1976: Texaco Canada : Alberta Transportation Professional Societies Association of Professional Engineers and Geoscientists of Alberta Practice Standards Committee (2001/07) Joint AAA/APEGGA/CEA Committee (2001/03) Member of Elections Committee (1980/81) Students Liaison Committee (1979/80) American Public Works Association Canadian Public Works Association Alberta Board of Directors (1990/00) Consulting Engineers of Alberta President (2000/01) Treasurer (1999/00) Engineering Institute of Canada Edmonton Branch Chairman (1988/89) Water Environment Federation Summary of Experience Herb Kuehne has over 38 years of experience in the consulting engineering industry, as a Senior Project Manager and a Senior Infrastructure Specialist for Associated Engineering. His experience covers a diverse range of Civil Infrastructure multi-discipline projects, including asset management, rehabilitation, trenchless technologies, water treatment plants, reservoirs, pumphouses, lift stations, forcemains, sewage collection, treatment, disposal, land development, roadways, storm water management, and marina and harbour facilities. Herb s depth of experience and insight ensures that the client s requirements are translated into realistic, cost-effective project solutions. Herb has Corporate Responsibilities, in addition to project responsibilities, which include developing corporate strategies to expand the company s Civil Infrastructure sector across Canada, technical development of human resources within the company, develop engineering capabilities through research and development and reviewing partnerships, strategic alliances and acquisitions. 1

2 Water Resources Terwillegar Drive Roadway Extension, City of Edmonton, AB: Preliminary design and design of $6 million of drainage improvements to accommodate the Terwillegar Drive and adjacent arterial roadway connectors. The predesign also addressed drainage of three interchanges proposed as part of the Terwillegar Drive project. 184 th Street and Yellowhead Trail Interchange Drainage, City of Edmonton, AB: including: Wetland development concept including lake stabilization structure for a 100 ha wetland and Ducks Unlimited protected habitat Water quality enhancement using stormwater separators On site SWM ponds, retention and piping.. Mill Creek Roper Pond, City of Edmonton, AB: Concept, preliminary design, design and construction services for a (171,000 m 3 ) stormwater and wetland facility. Work included: Development of a naturalized wetland Water quality improvements Flood reduction of developed lands Contaminated site clean-up Development of a Natural Area Management Plan Walking, jogging paths and interpretative signage. Big Lake Drainage Study, Parkland County, AB: Watershed Management Plan (1,600 km 2 ) to address flooding, predevelopment flows and to develop a regional watershed master plan that addresses: Rural and urban drainage Rural practices Floodway and flood fringe protection Environmental enhancement and protection. Anthony Henday Drive West, Alberta Transportation, Edmonton, AB: Preliminary design, design and construction of the SWM facilities necessary to serve the City of Edmonton Anthony Henday Drive ring road (east section) ($6 million). Work included: 7 SWM wetland ponds 2,000 m of 600 to 1650 mm diameter storm sewers Four creek drop structures varying in depth from 6 to 20 m. Fulton Creek SWM Facility, City of Edmonton, AB: To accommodate WMD extension from 34 th Street to Highway 14, a SWM system was required. Work included Conceptual, Predesign, Design and Construction Services. Components include: Regional Wetland facility, 200,000 m³ - CEA Award of Excellence Naturalization outfall channel including wetlands 1,000 m of 1350, 900 and 750 mm storm sewer. Regional Trunk Wet Weather Flow Analysis, City of Spruce Grove, AB: Analysis of wet weather flows and the regional trunk capacity to determine sizing required accommodating Sanitary Sewer Overflows (SSO). 2

3 Watershed Master Plan, City of Spruce Grove, AB: Master plan for the City of Spruce Grove Drainage System including 1,500 ha of land plus 5,000 ha from outside of the City. Developed SWM facilities, sizes and locations and conveyance. Mill Creek, Fulton Creek and Gold Bar Creek Watershed Master Plan, City of Edmonton, AB: Developed a Watershed Master Plan for a major portion of the City of Edmonton Millwoods development including existing and undeveloped areas. The Master Plan identified capacity restrictions and required upgrading. Watershed Plans included the following basins: Mill Creek Basin: 9,900 ha Fulton Creek Basin: 3,300 ha Gold Bar Creek Basin: 2,600 ha. Water Transmission Systems Avenue Road Trunk Water Main, City of Toronto, ON: Provided design review and constructability reviews for the installation of approximately 3500 m of 900 mm dia. water main on Avenue Road from Cottingham Street to Eglinton Avenue and 2000 m of 750 mm dia. water main on Avenue Road from Eglinton Avenue to the connection point at Caribou Road. Franklin Avenue Water Trunk Main, Regional Municipality of Wood Buffalo, AB: Project director and technical reviewer on the 750 mm Franklin Ave water trunk main. Wok included 1200 m of 750 mm trunk watermain, PRV station, interconnecting piping, and full rehabilitation and restoration of the Franklin Ave. arterial roadway. Saline Creek Water Transmission Main. Regional Municipality of Wood Buffalo, AB: Project Director, Manager and Technical reviewer on this multiyear $55M project consisting of multiple contracts considting of: 1800 m of 750 mm steel pipe including trenchless hammer crossing of a river m of 750 mm steel pipe including a 2500 m directional drill and a 1000 m directional drill 800 m of 750 mm PVC pipe including full street rehabilitation. Saline Creek Water Transmission Main. Regional Municipality of Wood Buffalo, AB: Project Director on the 1700m of 600 mm water trunk main to Saline Creek. Work included full rehabilitation of McLennan Blvd and a 1000 m direction drill of Saline creek. The scope included hydraulic modelling of a community of 20,000 people.. Water for Life Regional Strategy, Alberta Environment, AB: Participated as an expert on the Regional Strategy and Waterworks Facility Assessment study for the Province of Alberta. Water Transmission Main Upgrading, EPCOR Water Services Inc., AB: Design and construction of water transmission main upgrades to accommodate a Highway interchange. Work included: 600 mm hot tap to a 900 mm concrete cylinder pipe 900 mm plug valve on a concrete cylinder pipe 400 m of 750 mm transmission main 700 m of 600 mm transmission main Valve and blow off chambers. Water Master Plan, Strathcona County, AB: Carried out a Water Master Plan for Strathcona County. The scope included: 2,000 ha of industrial land 3

4 6,000 ha of residential land 12,000 ha of country residential land (40,000 people) Regional water supply Five pressure zones and multiple reservoirs. Zone 2 Reservoir and Pumphouse, City of Spruce Grove, AB: Design and construction of a 6,800 m³ reservoir and pumphouse. Unique features included: Expansion to 40,000 m³ Twin fire pumps 115 L/s each SCADA control Two tennis courts and a Basketball court Architectural design of exposed edge match a Cardinal designed High School. Transportation Clearwater Drive, Regional Municipality of Wood Buffalo, AB: Preliminary design for a $25 million, 3,000 m arterial roadway complete with a bridge crossing the Hangingstone River. 156 th Street and Yellowhead Trail Interchange Value Engineering, City of Edmonton, AB: Coordinated and participated in the Value Engineering for the Interchange design and provided senior level infrastructure review of the project. 34 th Street Interchange Value Engineering, City of Edmonton, AB: Provided specialist engineering input into the 34 th Street and Whitemud Drive Interchange Value Engineering review. 23 rd Avenue Value Engineering, City of Edmonton, AB: Provided specialist engineering input into the Value Engineering review of the 23 rd Avenue and Calgary Trail Interchange project. 184 th Street and Yellowhead Trail Interchange, City of Edmonton, AB: Project manager for the preliminary design, design and construction services for a $50 million project included 3 bridge structures (CN Widening, 184 th Street Structure, CN Overpass), drainage, electrical and lighting. Confederation Way Twinning, Regional Municipality of Wood Buffalo, Fort McMurray, AB: Preliminary design, design and construction services for 6.5 km of major arterial/ freeway twinning ($8 million). Work included: Curb and gutter and paving Landscaping Sidewalks and trail system Beaming Milling and overlay of 3.5 km Street lighting and traffic lights CB replacement program. Loutit Road Arterial Roadway, Regional Municipality of Wood Buffalo, AB: Design and construction of 300 m of a four-lane arterial roadway. Work included: Functional design and traffic generation for the sizing of Loutit Road Analysis and sizing of water and sanitary sewer trunk services Impact into the legal subdivision of the area Design and construction of water, sewer, storm sewer, curb and gutter, sidewalks, lights for the major arterial roadway. 4

5 Wastewater OAW Trunk Sanitary Sewer Tunnel, Region of Niagara, Technical oversight and constructability reviews for the construction of a 2.8 km 1650 mm dia. concrete CSO diversion sewer tunnel in the City of Welland constructed by tunnel boring machine, four (4) cast-in-place concrete access structures and four (4) drop structures. The trunk serves a population of approximately 41,000 and 1,062 Ha drainage area. East Brampton Trunk Sewer Twinning, Region of Peel, ON: Design and constructability reviews for 5.5 km of new twin trunk sewer in the East Brampton trunk sewer system. Project includes a combination of open cut and trenchless installations across multiple creek crossings, 407ETR highway and CN railway and connection and flow equalization chambers. Waste Water Master Plan, Regional Municipality of Wood Buffalo: AE was commissioned by the RMWB to complete a wastewater master plan. To be consistent with the Alberta Environment and Sustainable Resource Development Operating Approval, AE included all the components that impact the wastewater system for a design population of over 300,000 people. The work included population projections and land use assessments, wastewater treatment facilities, wastewater collection modelling and conceptual design, stormwater management modelling and system design, wastewater green initiatives and asset management. Tertiary Wastewater Reclamation Facility, Regional Municipality of Wood Buffalo, Fort McMurray, AB: Project Manager responsible for 33 MLD WWTP valued at $160 million (Phase 1) and 6 MLD WWTP valued at $25 million - Phase 2 expansion. Responsibilities included: Selecting and managing a design consultant Overall project administration for the Regional Municipality of Wood Buffalo including approvals and financial management. WESS - W12, City of Edmonton, AB: Preliminary, design and construction of a 1200 m by 2.5 m diameter syphon across the North Saskatchewan River. The syphon is part of the City s CSO reduction program and consists of: 1200 m of 2.5 m diameter tunnel Two - 80 m drop shafts Real time control gates and structure Diversion gates and structures Diversion design flow 15 m³/s Total design flow 60 m 3 /s South Nepean Collector Syphon, Ottawa, ON: Conceptual design configuration of a 100 m inverted syphon across the Jock River in Ottawa, Ontario. Proposed syphon serves 67,000 people at a flow of 1.6 m³/s and consisted of a 400, 600 and 900 mm pipe complete with inlet and outlet structures. West Sanitary Trunk Sewer, City of Spruce Grove, AB: Preliminary design, design and construction of a multi-year trunk sewer project. Scope includes: 1,000 m of 900 mm diameter 800 m of 750 mm diameter 400 m of 600 mm diameter Flow measurement vault Creek crossing. 5

6 Millgrove I/I Reduction Program, City of Spruce Grove, AB: Major rainfall event 1:100 resulted in extensive basement flooding. An I/I reduction program consisted of: 800 lot survey Onlot remedial program Lot regarding Roof leader extension Manhole I/I reduction program Overland flow routing program Trunk sewer relief program. Central Sanitary Trunk Sewer, City of Spruce Grove, AB: Preliminary design, design and construction of 1,000 m of 750 mm and 900 mm diameter trunk sewer. Work included: 200 mm trenchless highway crossing Dewatering Flow measurement vault. Clareview Inverted Syphon, City of Edmonton, AB: Design and construction of 400 m of 750 mm diameter inverted syphon. Project relieved system capacity constraints and included: Mag meter vault 1200 mm concrete gravity pipe hot tap Valving and cross over chamber modifications. Southeast Sanitary Trunk Sewer, Town of Slave Lake, AB: Design and construction of 2,000 m of 900 mm, 750 mm, 450 mm, and 300 mm sanitary trunk sewer. The project involved: Four highway auger crossings Two creek crossings Extensive 2 stage well point dewatering. Thickwood Heights Sewer Upgrading, City of Fort McMurray, AB: Preliminary design of a sewer system upgrading to deal with I/I and wet weather flows in the sanitary sewer system. Work included flow monitoring and system modelling. The result was the detailed design and construction of the following: 1,000 m of 450 mm Sanitary Trunk Sewer 400 m of 600 mm Sanitary Trunk Sewer 4,500 m 3 of online sanitary sewer storage upstream of the Thickwood Heights Lift Station. Expert Witness/Arbitration South Expansion Area Annexation, Town of Slave Lake, AB: Technical support and expert witness to a major annexation application for the Town. Included presentation to the Local Authority Board. West Bank Annexation, Town of Peace River, AB: Technical support and expert witness for the annexation application to the Local Authorities Board. Development Review, Emery Jamieson: Expert witness and technical review of a residential development. Drainage Claim, Town of Stony Plain, AB: Carried out a review and investigation into a drainage claim. Work involved foundation inspection and development of a suggested remediation plan. 6

7 Rifle Range, Defence Construction Canada, AB: Carried out an independent review of a contractor s claim and assessment. East Prairie, Alberta Municipal Affairs, AB: Provided expert witness on a construction claim regarding contractual payment and measurement discrepancies. Drainage Channel, Town of Vegreville, AB: Provided arbitration services on a construction claim regarding contractual payment and measurement discrepancies. Urlacher, Esso Resources, AB: Provided expert witness on contractor claim regarding measurement discrepancies and payment shortfalls. Indian Lakes Golf Course, Enoch Cree Nation, AB: Certification of construction of an 18 hole golf course for purposes of a Bank Draw. Intervention Application, Regional Municipality of Wood Buffalo, AB: Expert witness of Infrastructure issues at the RMWB s intervention application to the Suncor Voyageur Upgrader and Steepbank Mine expansion at the Environmental Utility Board (EUB) hearings. Intervention Application, Regional Municipality of Wood Buffalo, AB: Expert witness of Infrastructure issues at the RMWB s intervention application to the Shell Muskeg River Mine expansion at the Environmental Utility Board (EUB) hearings. Intervention Application, Regional Municipality of Wood Buffalo, AB: Expert witness of Infrastructure issues at the RMWB s intervention application to the Imperial Oil Resources Kearl Oil Sands Project expansion at the Environmental Utility Board (EUB) hearings. International Experience Recreation Development. Prepared a Recreational Master Plan for Tian Muh, China: The pristine area needed water, sewer, roadway and conceptual development plan for up to 12,000 rooms of hotel development. Included recreational concepts. Environmental Screening, Chungzu, China: Carried out an environmental screening according to CEAA for a proposed Manufacturing facility for medial garments to be exported to North America. Environmental Screening, Jin Tan, China: Carried out an environmental screening according to CEAA for a proposed gauze manufacturing facility. The screening dealt with a cotton bleaching process and waste water treatment process. Awards Institute of Planners - Sturgeon Valley, Area Structure Plan Institute of Architects - City of Spruce Grove, Downtown Redevelopment Plan CEA Award of Excellence for Environmental: City of Edmonton, Fulton Creek Regional Wetlands CEA Award of Excellence for Environmental: Big Lake Basin Drainage Study CEA Award of Merit for Project Management: Big Lake Basin Drainage Study CEA Award of Excellence for Sustainable Design: Mill Creek Roper Pond CEA Award of Merit for Community Development: Mill Creek Roper Road Canadian Consulting Engineering Awards 2013 Schreyer (highest award for Canadian consulting engineers in Canada): Edmonton West Sanitary Sewer W12 7

Kansas City s Overflow Control Program

Kansas City s Overflow Control Program Kansas City s Overflow Control Program Kansas City Water Services Water Wastewater Stormwater 2 Water Services Department 1000 Positions 835 Employees 3 Utilities FY 13/14 Budget = $307 million Water Wastewater

More information

UPDATED FUNCTIONAL SERVICING and STORMWATER MANAGEMENT REPORT

UPDATED FUNCTIONAL SERVICING and STORMWATER MANAGEMENT REPORT TRAFALGAR ENGINEERING LTD. #1-481 Morden Road Oakville Ontario L6K 3W6 UPDATED FUNCTIONAL SERVICING and STORMWATER MANAGEMENT REPORT Fernbrook Homes (Bronte 15) Limited 3059/3047 Lakeshore Road West TOWN

More information

TOWN OF SURFSIDE UTILITY UPGRADE PROJECT Project Completion

TOWN OF SURFSIDE UTILITY UPGRADE PROJECT Project Completion TOWN OF SURFSIDE UTILITY UPGRADE PROJECT Project Completion Project Overview Sanitary Sewer System 2 Town of Surfside Project Overview Potable Water System 3 Town of Surfside Project Overview Storm Water

More information

PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE

PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE REGION OF PEEL PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE Storm Sewer Design Criteria REVISED July 2009 PUBLIC WORKS STORM SEWER DESIGN CRITERIA TABLE OF CONTENTS 1.0

More information

HERE COMES THE RAIN AGAIN Stormwater Management in a Changing Climate at the City of Toronto

HERE COMES THE RAIN AGAIN Stormwater Management in a Changing Climate at the City of Toronto HERE COMES THE RAIN AGAIN Stormwater Management in a Changing Climate at the City of Toronto Evergreen s Urban Watershed Forum 20 March 2015 Presented by Kurtis Elton Policy & Program Advisor, Toronto

More information

Aquatera 2015/16 Business Plan Highlights

Aquatera 2015/16 Business Plan Highlights Who We Are Aquatera 2015/16 Business Plan Highlights Aquatera is a full-service utility corporation the provider of choice for governments, businesses, and communities. Our business is to provide high-quality

More information

COMBINED SEWER OVERFLOW LONG-TERM CONTROL PLAN Executive Summary

COMBINED SEWER OVERFLOW LONG-TERM CONTROL PLAN Executive Summary CITY OF LAKEWOOD COMBINED SEWER OVERFLOW LONG-TERM CONTROL PLAN Executive Summary MAY 2006 storage conveyance treatment performance Prepared for: City of Lakewood, Ohio Prepared by: Metcalf & Eddy of Ohio,

More information

Engineering. 2006 2007 2007 2008 2008 2008 Major Service Actual Budget Projected Request Executive Adopted

Engineering. 2006 2007 2007 2008 2008 2008 Major Service Actual Budget Projected Request Executive Adopted Engineering Agency Number: 53 Budget Function: Public Works and Transportation The Engineering Division is responsible for the design, supervision and inspection of all street, highway, sidewalk and bike

More information

KAWERAU DISTRICT COUNCIL BUSINESS DISASTER RECOVERY PLAN 2011

KAWERAU DISTRICT COUNCIL BUSINESS DISASTER RECOVERY PLAN 2011 KAWERAU DISTRICT COUNCIL BUSINESS DISASTER RECOVERY PLAN 2011 Kawerau District Council Private Bag 1004 Ranfurly Court KAWERAU 3169 Tel (07) 306 9009 Fax (07) 323 8072 Email [email protected]

More information

Micromanagement of Stormwater in a Combined Sewer Community for Wet Weather Control The Skokie Experience

Micromanagement of Stormwater in a Combined Sewer Community for Wet Weather Control The Skokie Experience Micromanagement of Stormwater in a Combined Sewer Community for Wet Weather Control The Skokie Experience Robert W. Carr 1 * and Stuart G. Walesh 2 1 Water Resources Modeling, LLC, 4144 S. Lipton Ave,

More information

Pioneer Park Stormwater Management Rehabilitation Project Town of Richmond Hill Engineering and Public Works Department Design, Construction and

Pioneer Park Stormwater Management Rehabilitation Project Town of Richmond Hill Engineering and Public Works Department Design, Construction and Pioneer Park Stormwater Management Rehabilitation Project Town of Richmond Hill Engineering and Public Works Department Design, Construction and Water Resources Division Presentation Outline Background

More information

The Clean Water Project What Is The Stormwater Impact?

The Clean Water Project What Is The Stormwater Impact? The Clean Water Project What Is The Stormwater Impact? Presentation To: Seminar On Water Issues Bob Weimar, PE, BCEE Chief of Program Management The Metropolitan District Sewage Overflows Have Become More

More information

COMBINED SEWER OVERFLOW OPERATIONAL AND MAINTENANCE PLAN SUMMARY

COMBINED SEWER OVERFLOW OPERATIONAL AND MAINTENANCE PLAN SUMMARY COMBINED SEWER OVERFLOW OPERATIONAL AND MAINTENANCE PLAN SUMMARY Revised: April 2014 Village of Wilmette, Illinois NPDES CSO Permit No. ILM580012 Chapter 1 Introduction This Operational and Maintenance

More information

STAFF REPORT TO COMMITTEE OF THE WHOLE

STAFF REPORT TO COMMITTEE OF THE WHOLE STAFF REPORT TO COMMITTEE OF THE WHOLE DATE: November 7 2012 TO: FROM: SUBJECT: ATTACHMENT(S): COMMITTEE OF THE WHOLE GINA LAYTE-LISTON, SUPERVISOR, WASTEWATER Stormwater Management Funding Strategy None

More information

Toronto s Wet Weather Flow Master Plan

Toronto s Wet Weather Flow Master Plan Toronto s Wet Weather Flow Master Plan 1. The Master Plan 2. The Don And Waterfront Study 3. What the Individual Can Do Wet Weather Flow Management Master Plan 2000 Storm Presentation to Don Mouth Naturalization...

More information

2007 Operating Budget 2007-2016 Capital Budget 2007 Proposed Water and Wastewater Service Rate

2007 Operating Budget 2007-2016 Capital Budget 2007 Proposed Water and Wastewater Service Rate 2007 Operating Budget 2007-2016 Capital Budget 2007 Proposed Water and Wastewater Service Rate Toronto City Council February 1 5, 2007 Multi-Year Toronto Water Business Plan was approved by Council February

More information

Based on the above, it is recommended that Lift Stations #1 and #3 be abandoned and their flows be diverted to the regional Lift Station #8.

Based on the above, it is recommended that Lift Stations #1 and #3 be abandoned and their flows be diverted to the regional Lift Station #8. Lakeside; Clairmont Heights; Portion of Clairmont currently serviced to Pump Station #2; Crossroads North and Crossroads South portion of flows that are diverted to Lakeside Trunk. It is understood that

More information

Flood Mitigation Strategy for the Milwaukee 30 th Street Corridor Redevelopment Program

Flood Mitigation Strategy for the Milwaukee 30 th Street Corridor Redevelopment Program Flood Mitigation Strategy for the Milwaukee 30 th Street Corridor Redevelopment Program Eric Loucks, P.E., D.WRE Kumar Gali, P.E. June 4, 2015 Outline MMSD Service Area Problem and Challenges Solution

More information

CITY OF HIGHLAND PARK, ILLINOIS Stormwater Management Fact Sheet

CITY OF HIGHLAND PARK, ILLINOIS Stormwater Management Fact Sheet CITY OF HIGHLAND PARK, ILLINOIS Stormwater Management Fact Sheet WHAT IS STORMWATER MANAGEMENT? Stormwater management is the method for channeling rainfall through pipes and sewers away from property to

More information

Lansdowne Stormwater UPDATE

Lansdowne Stormwater UPDATE Lansdowne Stormwater UPDATE August 22, 2012 Ann Arbor Footing Drain Disconnection Stormwater Review Presentation Agenda Welcome and introductions Background on stormwater and sanitary sewer issues Footing

More information

2015-18 Department Business Plan. Utilities

2015-18 Department Business Plan. Utilities 2015-18 Department Business Plan Utilities Updated June 2016 I am pleased to introduce Utilities 2015-18 Department Business Plan. The goals capture four main areas where Utilities will contribute to making

More information

Town of Essex NE Lagoon. Service Area. Essex Plant. Service Area. Pumping Station No. 4. Wastewater Pumped To NE Lagoons (Treatment Plant No.

Town of Essex NE Lagoon. Service Area. Essex Plant. Service Area. Pumping Station No. 4. Wastewater Pumped To NE Lagoons (Treatment Plant No. Town of Essex Basement Flooding Study Town of Essex NE Lagoon Service Area Pumping Station No. 4 Essex Plant Service Area Wastewater Pumped To NE Lagoons (Treatment Plant No. 2) Essex Treatment Plant (Treatment

More information

JULY 24, 2009 WEST-END FLOODING INVESTIGATION ACTION PLAN. Presentation to Insurance Companies 19 January 2012

JULY 24, 2009 WEST-END FLOODING INVESTIGATION ACTION PLAN. Presentation to Insurance Companies 19 January 2012 JULY 24, 2009 WEST-END FLOODING INVESTIGATION ACTION PLAN Presentation to Insurance Companies 19 January 2012 Topics of Discussion Investigation Levels of Service Cause of Flooding Analysis Undertaken

More information

Home Drainage & Causes of Basement Flooding. Water

Home Drainage & Causes of Basement Flooding. Water Home Drainage & Causes of Basement Flooding Understanding Drainage There are two separate sewer systems Eavestroughs & Downspout Road Property Line Floor Drain Catch basin Access Cover Weeping Tile House

More information

Components of a Basement Flooding Protection Plan: Sewer System Improvements. November 2000

Components of a Basement Flooding Protection Plan: Sewer System Improvements. November 2000 Components of a Basement Flooding Protection Plan: Sewer System Improvements November 2000 Components of a Basement Flooding Protection Plan: Sewer System Improvements November 2000 SEMCOG 2000 Prepared

More information

SECTION 6A STORM DRAIN DESIGN Mar. 2002 S E C T I O N 6A STORM DRAIN - DESIGN

SECTION 6A STORM DRAIN DESIGN Mar. 2002 S E C T I O N 6A STORM DRAIN - DESIGN S E C T I O N 6A STORM DRAIN - DESIGN 6A.l Scope 6A.2 Storm Water Quantity 6A.3 Storm Drain Hydraulics 6A.4 Depths 6A.5 Locations 6A.6 Curved Storm Drains 6A.7 Manholes 6A.8 Catch basins 6A.9 Storm Drain

More information

Interim Technical Guidelines for the Development of Environmental Management Plans for Underground Infrastructure Revised - July 2013.

Interim Technical Guidelines for the Development of Environmental Management Plans for Underground Infrastructure Revised - July 2013. Interim Technical Guidelines for the Development of Environmental Management Plans for Underground Infrastructure Revised - July 2013 Rationale Underground infrastructure may be at risk from valley, streambank

More information

Engineering Servicing Standards and Development Procedures

Engineering Servicing Standards and Development Procedures Table of Contents 2013 2013 Engineering Servicing Standards and Development Procedures Engineering Department Regional Municipality of Wood Buffalo FINAL: August 2013 Engineering Department Regional Municipality

More information

Planning and Zoning Commission Johnston, Iowa June 29, 2015

Planning and Zoning Commission Johnston, Iowa June 29, 2015 ITEM NO. 15-19 Planning and Zoning Commission Johnston, Iowa June 29, 2015 SUBJECT: Consider recommending approval of the Final Plat for Crosshaven Plat 6 subdividing 28.28 acres into 47 single family

More information

REGION OF PEEL PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL

REGION OF PEEL PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL REGION OF PEEL PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE Functional Servicing and Storm Water Management Report PUBLIC WORKS TABLE OF CONTENTS 1. INTRODUCTION...1 2.

More information

Source Water Protection Practices Bulletin Managing Sanitary Sewer Overflows and Combined Sewer Overflows to Prevent Contamination of Drinking Water

Source Water Protection Practices Bulletin Managing Sanitary Sewer Overflows and Combined Sewer Overflows to Prevent Contamination of Drinking Water United States Office of Water EPA 916-F-01-032 Environmental Protection (4606) July 2001 Agency Source Water Protection Practices Bulletin Managing Sanitary Sewer Overflows and Combined Sewer Overflows

More information

2015-18 Department Business Plan. Utilities

2015-18 Department Business Plan. Utilities 2015-18 Department Business Plan Utilities I am pleased to introduce Utilities 2015-18 Department Business Plan. The goals capture four main areas where Utilities will contribute to making Strathcona County

More information

ASSET MANAGEMENT PLAN

ASSET MANAGEMENT PLAN ASSET MANAGEMENT PLAN REPORT Prepared for: Township of South Frontenac December 2013 RVA 132914 This report is protected by copyright and was prepared by R.V. Anderson Associates Limited for the account

More information

Repairs Made With Under Pressure Installations Can Offer Reduced Risks And Expenses

Repairs Made With Under Pressure Installations Can Offer Reduced Risks And Expenses Repairs Made With Under Pressure Installations Can Offer Reduced Risks And Expenses They also give the community a built-in re-entry system for future monitoring and repair. BY BRETT HANES According to

More information

INFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION. Infrastructure Flood Protection Remediation Policies

INFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION. Infrastructure Flood Protection Remediation Policies INFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION Infrastructure Flood Protection Remediation Policies DRAFT POOLBEG PLANNING SCHEME 196 FIGURE 9.1: UTILITIES WAYLEAVES Electricity Cables 8m Wayleave for

More information

Proposed General Plan Update Goals, Policies, and Implementation Actions

Proposed General Plan Update Goals, Policies, and Implementation Actions Proposed General Plan Update Goals, Policies, and Implementation Actions The construction and maintenance of infrastructure is necessary to support existing and planned land uses and to achieve Environmental

More information

Flood Reduction Strategies in the City of Ottawa. Presented by : Eric Tousignant, P.Eng Senior Water Resources Engineer, City of Ottawa

Flood Reduction Strategies in the City of Ottawa. Presented by : Eric Tousignant, P.Eng Senior Water Resources Engineer, City of Ottawa Flood Reduction Strategies in the City of Ottawa Presented by : Eric Tousignant, P.Eng Senior Water Resources Engineer, City of Ottawa Flooding in Ottawa Since amalgamation in 2000, there has been 4 significant

More information

CD i -STREETS- Detail #

CD i -STREETS- Detail # -STREETS- Detail # 3000 Vertical Curb, Gutter and Sidewalk 3010 Low-Profile Curb, Gutter and Sidewalk 3020 Rolled Curb, Gutter and Sidewalk 3030 Separated Sidewalk, Curb & Gutter 3040 Sidewalk Staged Construction

More information

5.14 Floodplains and Drainage/Hydrology

5.14 Floodplains and Drainage/Hydrology I-70 East Final EIS 5.14 Floodplains and Drainage/Hydrology 5.14 Floodplains and Drainage/Hydrology This section discusses floodplain and drainage/hydrology resources and explains why they are important

More information

4. Environmental Impacts Assessment and Remediation Targets

4. Environmental Impacts Assessment and Remediation Targets 4. Environmental Impacts Assessment and Remediation Targets 4.1 Environmental Impacts Significant additional development in the Alder Creek watershed is not anticipated at this time; however, there are

More information

Drainage Analysis for the McKownville Area

Drainage Analysis for the McKownville Area Drainage Analysis for the McKownville Area Town of Guilderland Albany County, New York Prepared by: DELAWARE ENGINEERING, P.C. 28 Madison Avenue Extension Albany, New York 12203 June 2010 Town of Guilderland

More information

89 Avenue Road GP Ltd. Functional Servicing and Stormwater Management Report for 89 Avenue Road Re-Development City of Toronto

89 Avenue Road GP Ltd. Functional Servicing and Stormwater Management Report for 89 Avenue Road Re-Development City of Toronto 89 Avenue Road GP Ltd. Functional Servicing and Stormwater Management Report for 89 Avenue Road Re-Development City of Toronto Prepared By: R.J. Burnside & Associates Limited 6990 Creditview Road, Unit

More information

Chapter 7 COMMUNITY FACILITIES and SERVICES PLAN

Chapter 7 COMMUNITY FACILITIES and SERVICES PLAN Chapter 7 COMMUNITY FACILITIES and SERVICES PLAN Introduction Community facilities play an important role in ensuring a quality standard of living for Township residents, as well as impacting the location

More information

Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010

Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010 Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010 Background What are permeable interlocking concrete pavements (PICP)?

More information

Construction Specification for Sewer Bypass Flow Pumping

Construction Specification for Sewer Bypass Flow Pumping Engineering and Construction Services Division Standard Specifications for Sewers and Watermains TS 4.01 April 2013 Pumping Table of Contents TS 4.01.01 SCOPE... 2 TS 4.01.02 REFERENCES... 2 TS 4.01.03

More information

Executive Director, Engineering & Construction Services Director, Purchasing & Materials Management Division

Executive Director, Engineering & Construction Services Director, Purchasing & Materials Management Division PW8.5 STAFF REPORT ACTION REQUIRED Contract Award Request for Proposal No. 9117-15-7122 Engineering Services for the Detailed Design, Services During Construction, and Post-Construction Services for an

More information

NATIONAL INSTITUTE OF GOVERNMENT PURCHASING (NIGP) DESIGN AND CONSTRUCTION CODES

NATIONAL INSTITUTE OF GOVERNMENT PURCHASING (NIGP) DESIGN AND CONSTRUCTION CODES NATIONAL INSTITUTE OF GOVERNMENT PURCHASING (NIGP) DESIGN AND CONSTRUCTION CODES All searches and notifications on Bid4Michigan are based on National Institute of Government Purchasing (NIGP) codes. It

More information

Basement Flood Risk Reduction City of Winnipeg. Charles Boulet

Basement Flood Risk Reduction City of Winnipeg. Charles Boulet Basement Flood Risk Reduction City of Winnipeg Charles Boulet Outline Background Winnipeg Floodway Rain Events Winnipeg Sewer System Basement Flooding Flood Reduction Measures ICLR - BFRR Strategy 2 Where

More information

Altoona Water Authority. Infrastructure Overview

Altoona Water Authority. Infrastructure Overview Altoona Water Authority Infrastructure Overview Mission Statement As stewards of the community s water system, our mission is to provide a clean, safe, reliable water supply and to collect and treat wastewater

More information

Asset Management Plan

Asset Management Plan Corporation of the Town of Innisfil Asset Management Plan Prepared by: AECOM 55 Cedar Pointe Drive, Suite 620 705 721 9222 tel Barrie, ON, Canada L4N 5R7 705 734 0764 fax www.aecom.com Project Number:

More information

Class Environmental Assessment Schedule B Project File Report

Class Environmental Assessment Schedule B Project File Report R.J. Burnside & Associates Limited 16775 Yonge Street Suite 200 Newmarket ON L3Y 8J4 Canada telephone (905) 953-8967 fax (905) 953-8945 web www.rjburnside.com Class Environmental Assessment Schedule B

More information

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE 1008 STORM DRAINAGE (3/24/05) 1008.01 PURPOSE To minimize the amount of stormwater runoff resulting from development utilizing nonstructural controls where possible, maintain and improve water quality,

More information

Water and Sewer Utilities

Water and Sewer Utilities Water and Sewer Utilities Capital Improvement Program Utilities Water and Sewer Requested - $98,295,000 - $97,792,600 Funded - $32,951,600 Sewer 53.3% Sewer 54% Water 27% Water Water 46% 46.7% Sewer 73%

More information

REPORT TITLE: TERM OF COUNCIL PRIORITY NO. 6 - ENHANCE INTEGRITY OF WASTEWATER COLLECTION SYSTEM INCLUDING FLOOD REMEDIATION PROGRAM

REPORT TITLE: TERM OF COUNCIL PRIORITY NO. 6 - ENHANCE INTEGRITY OF WASTEWATER COLLECTION SYSTEM INCLUDING FLOOD REMEDIATION PROGRAM J Wokking foh y or REPORT Meeting Date: November 28,2013 Regional Council DATE: October 22,201 3 REPORT TITLE: TERM OF COUNCIL PRIORITY NO. 6 - ENHANCE INTEGRITY OF WASTEWATER COLLECTION SYSTEM INCLUDING

More information

Review of Footing Drain Disconnection Projects

Review of Footing Drain Disconnection Projects Wastewater Master Plan DWSD Project No. CS-1314 Review of Footing Drain Disconnection Projects Technical Memorandum Original Date: August 8 2002 Revision Date: September 2003 Author: CDM Table of Contents

More information

MARYLAND AVENUE BACKUPS DURING AUGUST 31, 2014 STORM EVENT COMMUNITY OUTREACH

MARYLAND AVENUE BACKUPS DURING AUGUST 31, 2014 STORM EVENT COMMUNITY OUTREACH MARYLAND AVENUE BACKUPS DURING AUGUST 31, 2014 STORM EVENT COMMUNITY OUTREACH MARYLAND AVENUE BACKUPS COMMUNITY OUTREACH MEETING AGENDA Introductions History of PWSA Actions August 31 Storm Impacts Short

More information

SANITARY SEWER BACKUP. Causes & Prevention

SANITARY SEWER BACKUP. Causes & Prevention SANITARY SEWER BACKUP Causes & Prevention A. PURPOSE The purpose of this publication is twofold: 1. It provides homeowners with basic information on the causes of sanitary sewer backups. 2. It provides

More information

New Road 11.0m Asphalt 23m ROW

New Road 11.0m Asphalt 23m ROW New Road 11.0m Asphalt 23m ROW Granular A - 150 mm sq. m. $5.35 $69.53 Granular B - 300 mm sq. m. $7.35 $95.54 Concrete Curb and Gutter m. $44.67 $89.34 HL3 Asphalt - 40 mm sq. m. $7.66 $84.23 HL 4 or

More information

in Marina Del Rey Prepared by: County of Los Angeles Department of Public Works

in Marina Del Rey Prepared by: County of Los Angeles Department of Public Works Planned Public Works Projects in Marina Del Rey Prepared by: County of Los Angeles Department of Public Works Planned Projects in Marina Del Rey Waterline Projects Phase II Phase III Roadway Projects Admiralty

More information

LISGAR DISTRICT BASEMENT WATER INFILTRATION INVESTIGATION SUMMARY REPORT. Submitted to: City of Mississauga Mississauga, Ontario

LISGAR DISTRICT BASEMENT WATER INFILTRATION INVESTIGATION SUMMARY REPORT. Submitted to: City of Mississauga Mississauga, Ontario LISGAR DISTRICT BASEMENT WATER INFILTRATION INVESTIGATION SUMMARY REPORT Submitted to: Mississauga, Ontario Submitted by: A division of Americas Limited 3215 North Service Road Burlington, ON L7N 3G2 Tel:

More information

THE CITY OF EDMONTON SANITARY SERVICING STRATEGY FUND 2015 ANNUAL REPORT

THE CITY OF EDMONTON SANITARY SERVICING STRATEGY FUND 2015 ANNUAL REPORT THE CITY OF EDMONTON SANITARY SERVICING STRATEGY FUND ANITARY ERVICING TRATEGY 2015 ANNUAL REPORT June 2016 Prepared by: City of Edmonton Infrastructure Planning, Drainage Planning & Engineering City Planning

More information

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department Land Disturbance, Erosion Control and Stormwater Management Checklist Walworth County Land Conservation Department The following checklist is designed to assist the applicant in complying with the Walworth

More information

Harris County Flood Control District. Policy, Criteria, and Procedure Manual

Harris County Flood Control District. Policy, Criteria, and Procedure Manual Harris County Flood Control District Policy, Criteria, and Procedure Manual For Approval and Acceptance of Infrastructure General Review October 10, 2003 Draft Please Provide Written Comments to the HCFCD

More information

5901 Milwaukee Street Planned Unit Development (GDP) (Second Addition to Grandview Commons)

5901 Milwaukee Street Planned Unit Development (GDP) (Second Addition to Grandview Commons) DATE: March 8, 2006 TO: FROM: SUBJECT: Plan Commission Larry D. Nelson, P.E., City Engineer 5901 Milwaukee Street Planned Unit Development (GDP) (Second Addition to Grandview Commons) The City Engineering

More information

ZIONSVILLE WASTEWATER DEPARTMENT 10-YEAR SEWER REHABILITATION REPORT 2013-2022

ZIONSVILLE WASTEWATER DEPARTMENT 10-YEAR SEWER REHABILITATION REPORT 2013-2022 ZIONSVILLE WASTEWATER DEPARTMENT 10-YEAR SEWER REHABILITATION REPORT 2013-2022 Town of Zionsville, Indiana December 19, 2012 PREPARED BY BEAM, LONGEST & NEFF, LLC. 8126 Castleton Road Indianapolis, Indiana

More information

BEFORE THE PHILADELPHIA WATER, SEWER AND STORMWATER RATE BOARD DIRECT TESTIMONY OF STEPHEN J. FURTEK

BEFORE THE PHILADELPHIA WATER, SEWER AND STORMWATER RATE BOARD DIRECT TESTIMONY OF STEPHEN J. FURTEK BEFORE THE PHILADELPHIA WATER, SEWER AND STORMWATER RATE BOARD Re Application of the Philadelphia Water Department for Increased Rates and Related Charges Fiscal Years 2017-2018 DIRECT TESTIMONY OF STEPHEN

More information

Roadway Cost Per Centerline Mile Revised June 2014

Roadway Cost Per Centerline Mile Revised June 2014 Rural Arterial From LRE MOT * Mobilization * Subtotal Total PE Design (15%) CEI (15%) Total Project ** New (2-Lane Roadway) with 5' Paved Shoulders $3,351,896 $335,190 $368,709 $4,055,794 $1,013,949 $5,069,743

More information

Affordable Asset Management Making Use of the Data You Have: An Owner s Perspective

Affordable Asset Management Making Use of the Data You Have: An Owner s Perspective Affordable Asset Management Making Use of the Data You Have: An Owner s Perspective An Owner Operator s Approach for Asset Management on a Budget Lane Longley, City of St. Petersburg Presented by the April

More information

Engineering Specifications February, 2004 Schedule H to Bylaw 7452, Subdivision Bylaw Page 18

Engineering Specifications February, 2004 Schedule H to Bylaw 7452, Subdivision Bylaw Page 18 Schedule H to Bylaw 7452, Subdivision Bylaw Page 18 3.4 Sanitary Sewers 3.4.1 Materials 3.4.1.1 The class and type of pipe and fittings, together with required class of bedding and trench widths, shall

More information

Understanding Your An Introduction to the Chicago Area s Combined Sewer Systems

Understanding Your An Introduction to the Chicago Area s Combined Sewer Systems Understanding Your An Introduction to the Chicago Area s Combined Sewer Systems Metropolitan Water Reclamation District of Greater Chicago What is a combined sewer? In a combined sewer system, sanitary

More information

Type of Sewer Systems. Solomon Seyoum

Type of Sewer Systems. Solomon Seyoum Type of Sewer Systems Solomon Seyoum 0 Learning objectives Upon completion of this lecture, the participants will be able to differentiate between types of sewer systems and discuss different aspects of

More information

Chapter 6 INFRASTRUCTURE ELEMENT 6.1 INTRODUCTION 6.2 AUTHORITY FOR THE ELEMENT 6.3 KEY THEMES AND VISION FOR GENERAL PLAN

Chapter 6 INFRASTRUCTURE ELEMENT 6.1 INTRODUCTION 6.2 AUTHORITY FOR THE ELEMENT 6.3 KEY THEMES AND VISION FOR GENERAL PLAN Chapter 6 INFRASTRUCTURE ELEMENT 6.1 INTRODUCTION Public infrastructure is an important support network for the City. Well-designed and maintained infrastructure systems are critical to the community s

More information

Regional Water Works. Sharing Urban Water Services. Susan McFarlane Senior Policy Analyst. Western Cities Project Report #28

Regional Water Works. Sharing Urban Water Services. Susan McFarlane Senior Policy Analyst. Western Cities Project Report #28 Regional Water Works Sharing Urban Water Services Susan McFarlane Senior Policy Analyst Western Cities Project Report #28 November 2003 WESTERN CITIES PROJECT This report is part of the Canada West Foundation

More information

Action plans for hotspot locations - Ash Study

Action plans for hotspot locations - Ash Study Appendix 9 Action plans for hotspot locations - Ash Study Ash Vale North 1. Local evidence indicates the culvert could not discharge during December 2013 because the outlet was blocked on the western side

More information

DEPARTMENT OF ENVIRONMENTAL QUALITY

DEPARTMENT OF ENVIRONMENTAL QUALITY PROJECT IDENTIFICATION DEPARTMENT OF ENVIRONMENTAL QUALITY City of Burton Sanitary Sewer Collection System Improvements State Revolving Fund (SRF) Environmental Assessment April 2015 Applicant: Authorized

More information

SERVICING REPORT SITE PLAN AND PLAN OF CONDOMINIUM BLOCK 53 FERRIS DRIVE PLAN 58M-379 & PART OF LOT 4, REGISTERED PLAN 622 WELLESLEY, ONTARIO

SERVICING REPORT SITE PLAN AND PLAN OF CONDOMINIUM BLOCK 53 FERRIS DRIVE PLAN 58M-379 & PART OF LOT 4, REGISTERED PLAN 622 WELLESLEY, ONTARIO BLOCK 53 FERRIS DRIVE PLAN 58M-379 & PART OF LOT 4, REGISTERED PLAN 622 WELLESLEY, ONTARIO MARCH 2014 BLOCK 53 Ferris Drive Plan 58M-379 & Part of Lot 4, Registered Plan 622 WELLESLEY, ONTARIO DOCUMENT

More information

CHAPTER 11 STORM DRAINAGE

CHAPTER 11 STORM DRAINAGE CHAPTER STORM DRAINAGE SECTION PC 0 GENERAL 0. Scope. The provisions of this chapter shall govern the materials, design, construction and installation of storm drainage. Storm water discharge shall be

More information

The Next Generation in Storm Sewer Inlet Controls

The Next Generation in Storm Sewer Inlet Controls The Next Generation in Storm Sewer Inlet Controls S T O R M W A T E R F L O W C O N T R O L THE COST-EFFECTIVE SOLUTION TO YOUR STORM WATER SURCHARGE PROBLEMS Conserves sewer system capacity System accommodates

More information

Bridges & Culverts Condition by Quantity

Bridges & Culverts Condition by Quantity 3.4.3 What condition is it in? Approximately 93% of the municipality s bridge structures are in good to excellent condition, with the remaining 7% in fair condition. As a result, the municipality received

More information

Volume Reduction in the Regional District of Nanaimo s Sanitary Sewers

Volume Reduction in the Regional District of Nanaimo s Sanitary Sewers Volume Reduction in the Regional District of Nanaimo s Sanitary Sewers Andy Bell Infrastructure Engineer AECOM Canada Inc Vancouver, CANADA [email protected] Introduction The Ministry of Environment

More information

WEST-END FLOODING INVESTIGATION 24 JULY 2009 RAINSTORM EVENT CONSOLIDATED REPORT AND ACTION PLAN

WEST-END FLOODING INVESTIGATION 24 JULY 2009 RAINSTORM EVENT CONSOLIDATED REPORT AND ACTION PLAN Background WEST-END FLOODING INVESTIGATION 24 JULY 2009 RAINSTORM EVENT MARCH 2011 TABLE OF CONTENT Summary Report 1. Background 2. Flood Investigation Process 3. Public Input 4. Level of Service Objective

More information

Breslau Settlement Plan. Preliminary Servicing and Stormwater Management Report. December 2015. Prepared by:

Breslau Settlement Plan. Preliminary Servicing and Stormwater Management Report. December 2015. Prepared by: Breslau Settlement Plan Preliminary Servicing and Stormwater Management Report December 2015 Prepared by: SCS Consulting Group Ltd 30 Centurian Drive, Suite 100 Markham, ON, L3R 8B8 Phone 905 475 1900

More information

2011 HYDRAULICS MANUAL

2011 HYDRAULICS MANUAL STATE OF LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT P.O. Box 94245 Baton Rouge, Louisiana 70804-9245 http://www.dotd.la.gov/ HYDRAULICS MANUAL Hydraulics (225) 379-1306 PREFACE The following

More information

Impact of July 8, 2013 storm on the City's Sewer and Stormwater Systems

Impact of July 8, 2013 storm on the City's Sewer and Stormwater Systems STAFF REPORT ACTION REQUIRED Impact of July 8, 2013 storm on the City's Sewer and Stormwater Systems Date: September 6, 2013 To: From: Wards: Reference Number: Public Works and Infrastructure Committee

More information

Emerging Technologies in Wastewater Collection Systems

Emerging Technologies in Wastewater Collection Systems Keville Enterprises Emerging Technologies in Wastewater Collection Systems Douglas McCutchen, CCM Brian Karmasin, P.E., BCEE CMAA Annual Conference Oct 2008 San Francisco, California Today s s Presentation

More information

Exceptional... Everytime!

Exceptional... Everytime! Oil & Gas Exceptional... Everytime! Oil & Gas Industry With each Team Leader possessing 10 20 Years experience, BAR Engineering not only contributes high level engineering expertise, but also the practical

More information

Developer s/consultants Field Services Guidelines

Developer s/consultants Field Services Guidelines Developer s/consultants Field Services Guidelines 2007 Engineering and Works Department DEVELOPER S/CONSULTANT S FIELD SERVICES GUIDELINES Fourth Electronic Edition February 2007 STATEMENT OF COMPLETION

More information

Executive Summary Consent Decree

Executive Summary Consent Decree OVERFLOW ABATEMENT PROGRAM Executive Summary Consent Decree The sewer system in Nashville dates back to the late 1800s and originally consisted of a combined sewer system, later transitioning to separate

More information

CHAPTER 17: STORM SEWER STANDARDS. 17.00 Introduction. 17.01 Administration. 17.02 Standards 17.1

CHAPTER 17: STORM SEWER STANDARDS. 17.00 Introduction. 17.01 Administration. 17.02 Standards 17.1 CHAPTER 17: STORM SEWER STANDARDS 17.00 Introduction 17.01 Administration 17.02 Standards 17.1 17.00 INTRODUCTION The purpose of this chapter is to provide guidance for the design and construction of storm

More information

EFFECTIVE FEBRUARY 2014. note: drainage permit required to call for a dampproof inspection

EFFECTIVE FEBRUARY 2014. note: drainage permit required to call for a dampproof inspection EFFECTIVE FEBRUARY 2014 note: drainage permit required to call for a dampproof inspection 1. ROOF DRAINS/DECK DRAINS (INTERIOR ) All roof and deck drains within the perimeter of the building shall be APPROVED

More information

DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS

DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS Phase I MS4 permits require continuous updating of the stormwater system inventory owned and operated by the MS4. They also include inspection

More information