THE CITY OF EDMONTON SANITARY SERVICING STRATEGY FUND 2015 ANNUAL REPORT
|
|
|
- Claire Bell
- 9 years ago
- Views:
Transcription
1 THE CITY OF EDMONTON SANITARY SERVICING STRATEGY FUND ANITARY ERVICING TRATEGY 2015 ANNUAL REPORT June 2016 Prepared by: City of Edmonton Infrastructure Planning, Drainage Planning & Engineering City Planning Branch, Sustainable Development Department
2
3 MESSAGE FROM THE CHAIR OF THE MANAGEMENT COMMITTEE Since its inception in 1999, the Sanitary Servicing Strategy (SSS) has been remarkably successful in its mandate to encourage growth and facilitate new developments within the City limits through the Sanitary Servicing Strategy Fund (SSSF). The objectives of this strategy are to meet the challenges of providing sanitary servicing to the new development areas through long term planning and constructing sanitary sewer trunks that will bring sewage from the new development into the existing trunk system, and eventually to the wastewater treatment plant. This is the seventeenth annual report of the SSSF. The SSSF activities in 2015 included; construction of Stages SA1a and SW4 tunnels in the South Edmonton Sanitary Sewer (SESS) system; preliminary and detailed design works for segments NC2/NC3 and N1 RTC Gate in the North Edmonton Sanitary Trunk (NEST) system; and remaining post construction works for segments W1, W13 and W14 in the West Edmonton Sanitary Sewer (WESS) system. The SSSF Management and Operational Committees met four times this year as a combined committee to approve design, construction schedules and budgets for various segments to be constructed, approve revenue rates for 2016, monitor construction progress, and review the financial status of the Fund. Since the start of the program, about 37.0 km of offsite tunnels have been constructed to support new developments including single family, multi-family residential, commercial and industrial lots. In 2015, the SSSF recorded revenue of $27.8 million and a total expenditure of about $14.0 million resulting an addition of $13.8 million to the fund. The closing balance at the end of 2015 was $60.9 million as compared to the 2014 year-end balance of $47.1 million. The actual revenue collected this year was higher than anticipated revenue of $24.8 million because of increased development activities which put SSSF in a better financial position to meet the upcoming developments needs within the City, despite the downturn of the economy. In contrast, this year the expenditure was $14.0 million which was less as compared to the forecast of $23.0 million, and this was mainly due to some delays in two major projects SA1a and SW4. In the next ten years, the cash flow model shows that the balance will remain positive. However, after that it starts decreasing and will reach to a negative balance of approximately $40 million by year 2035; after which the revenue starts recovering again and will be back into positive by year The focus in 2016 will be to finish the remaining construction work of SESS Stage SA1a, start construction of SESS Stage SW4, and NEST Stage NC2/NC3, complete the detailed design and construction of N1 RTC Gate at downstream end of existing NEST N1 storage tunnel, and carry out all the proposed planning studies for the current year which includes the SSSF Integrated Planning Study. Mikaela Hanley, M. Eng., P. Eng. Acting Chair, SSSF Management Committee i
4 CONTENTS Message from the Chair of the Management Committee i Table of Contents.. ii 1.0 Planning & Construction Activities In Management and Operational Committees Five Year Construction Plan Fund Balance 4.1 Twenty Five Year History and Projection Five Year Projection Statement of Fund Activities and Balance. 28 TABLES Table 1: Five Year Revenues and Expenditures Projection 27 Table 2: Statement of Fund Activities and Balance.. 29 FIGURES Figure 1a-1g: SSSF Construction Photos in Figure 2: SSSF Major Sanitary Trunks Map 21 Figure 3: SSSF 25-Year Projection.. 24 Figure 4: 2015 SSSF Revenues 30 Figure 5: SSSF Historical Revenue Breakdown. 31 Figure 6: SSSF Historical Expenditures.. 32 Page ii
5 1.0 PLANNING & CONSTRUCTION ACTIVITIES IN 2015 The following is a summary of the planning and construction activities completed under the Sanitary Servicing Strategy (SSS) in 2015 with some construction photos shown: North Edmonton Sanitary Trunk (NEST) - Stage NC2/NC3 This project evolved from the NEST NC1 pump station and force main project as reported in the 2014 SSSF Annual Report. The NEST NC1 pump station and force main project was a temporary solution to defer high capital investment. The SSSF Committees decided that the updated cost estimate for the temporary solution was too high. In order to address the hydraulic capacity issues and mitigate flooding risk in the NC1 tunnel, the NEST NC2/NC3 tunnel project was proposed as a permanent solution. The NEST NC2/NC3 project consists of a 2.7 km long 2,340 mm diameter tunnel to provide sanitary servicing to new neighborhoods north of 153 Avenue between 1
6 Castledowns Road and 88 Street. The NEST NC2/NC3 tunnel will be connecting to the existing NC1 tunnel at Castledowns Road and the NL1 tunnel at 88 Street along 153 Avenue. The project will be constructed in two phases so that a portion of the tunnel can be in-service to address the immediate storage deficit. Phase 1 consists of 0.4 km of tunnel from the existing manhole at NC1 pump station while Phase 2 is the construction of the remaining 2.3 km of tunnel. In 2015, the design for Phase 1 started and a revised budget for the whole project was developed. Construction for Phase 1 will start in 2016 while construction for Phase 2 could start in 2017 as soon as Phase 1 gets commissioned, and upon approval from the SSSF Committees. South Edmonton Sanitary Sewer (SESS) Stage SA1a SESS Stage SA1a will connect the SW1 pump station at Ellerslie Road and Parsons Road to Stage SA1b at 91 Street and 9 Avenue N.W. This segment will allow the SESS flow to bypass the South East Regional Trunk Sewer (SERTS) so that it is no longer limited by SERTS available capacity. Construction of the 2.3 km long SA1a sanitary sewer started in City tunneling crews mobilized in June 2014 to start the 1 km long tunneling portion while the remaining 1.3 km section was awarded to Shanghai Construction Group Canada. In 2015, both in-house City tunneling crews and the external contractor completed the majority of the tunneling works. Some photos of the construction activities for the SA1a tunnel project are shown on pages 5-8. South Edmonton Sanitary Sewer (SESS) Stage SW4 Following the design stage of the SESS SW4/SW5 project (as reported in the 2014 SSSF Annual Report), construction of SESS SW4 was approved to proceed in 2015, (the SW5 portion was deferred). This project involves the construction of 2
7 1.6 km of 2,940 mm diameter tunnel which extends from Ellerslie Road S.W. at Whitemud Creek to Windermere Boulevard west of the Anthony Henday/Rabbit Hill Road interchange. Construction of SW4 will be completed through in-house tunneling and the project started in August 2015, scheduled to be completed in In 2015, the construction site was established and construction on the working shaft started. Some of the construction photos are shown on pages Post Construction Work for W1, W13, W14, SE4A All segments have been completed earlier than 2015; however, remaining post construction activities were completed in WESS Planning Update Study The WESS Planning update study was carried out in 2015 to update the West Edmonton Sanitary Sewer (WESS) implementation plan for the remaining WESS system, together with developing a detailed concept for the Terwillegar University Farms Sewer (TUFS) sanitary sewer implementation plan. As of December 2015, major works have been completed. The City has received and reviewed the draft report submitted by the Consultants and currently working with them on some additional details to finalize the report. SSSF Program Review The SSSF program was initially based on a specific development scenario with associated construction and revenue forecasts. However, the rate of development in recent years has been much higher than anticipated, resulting in increased revenue and an increased demand for projects. This has been a major challenge for the SSSF Committee to come up with immediate solution moving forward. Earlier in 2015, two proposed planning solutions were initiated such as the 3
8 following: a) To engage a consultant to review the overall program of the SSSF; b) To update the Financial Model based on new validated information. The City has identified the need to review and update the SSSF Program to evaluate where the program has gone so far; to examine various components forming the strategy in order to assess whether the SSS funds will be sufficient to complete the proposed construction program. The overall program analysis is expected to assess and evaluate revenues and rates projections against available land to be developed. Further, the SSSF program review will assess the applicability of the program (in terms of its original intent), and recommend appropriate amendments to ensure sustainability of the fund. The study was awarded in August 2015 and final report is scheduled to be completed by January 15, SSSF Financial Model Update The SSSF Financial model has been updated over the course of the SSSF Program review with the final version expected to be completed by March The updated model was developed with some additional functional and logical improvements. One of the primary changes from previous version is in the calculation of projected revenue. Previous version of the model used was based on assumptions linked to population growth projections; however, these growth projections do not take into account the developable land inventory remaining in the City. Originally, the program is projected to be completed by 2075; however, with the incorporation of land inventory into the model and with the updated growth rates, full build out of the City is expected to occur by
9 Figure 1a: SESS Stage SA1a- Pipe Jacking station 5
10 Figure 1b: SESS Stage SA1a- Shaft removal 6
11 Figure 1c: SESS Stage SA1a- Shaft & Force main Riser Installation 7
12 Figure 1d: SESS Stage SA1a- TBM removal 8
13 Figure 1e: SESS Stage SW4- Shaft Excavation 9
14 Figure 1f: SESS Stage SW4- Working Shaft Construction 10
15 Figure 1g: SESS Stage SW4- Working Shaft Construction 11
16 2.0 MANAGEMENT AND OPERATIONAL COMMITTEES The role of the SSSF Management Committee is to make decisions regarding revenues and expenditures that best meet the long-range plan of all the stakeholders. The Committee has six members: Chair: Director, Drainage System Planning Todd Wyman Members: Director, Drainage Client Services Clement Yong UDI Representative Dave Kinders UDI Representative Wade Zwicker Senior Planner, Current Planning Tim Ford General Supervisor, Infrastructure Planning- Fernando Sacluti (Secretary & Non-voting Member) The Management Committee met four times in 2015 at joint sessions with the SSSF Operational Committee. Some of the major decisions made are listed below: Approved the five planned consultant works with a total amount of $761K consisting of the following; $240K for WESS Planning Update Study, $36K for NEST Control Philosophy, $275K for SSSF Program Review, $10K for Financial Model Update, and $200K for Integrated NEST/SESS/WESS/TUFS planning studies. Approved construction of the SW4/SW5 trunk in two stages; to construct SW4 in 2017 and delay construction of SW5 until 2021 or Approved construction of the NC2/NC3 tunnel as part of a permanent solution to address storage and wet weather flow issues in the NC1 area instead of the temporary NC1 Pump station and force main which will be of high throwaway cost. 12
17 Approved to proceed with the preliminary and detailed design of the NC2/NC3 project with initial budget of $1.7M; and once detailed design is further advanced, total budget will be presented to the committee for approval. Approved the preliminary and detailed design for the construction of N1 RTC with initial budget of $100,000; and once detailed budget becomes available, the total budget will be presented to the committee for approval. Approved the recommended 2016 SSSF rates for a total of 9.5% increase (i.e. 1.08% increase based on what the model generates and additional 8.42% based on the 2009 program review recommendation of 20% increase over a ten year period on top of inflation). Approved the new recommended timelines for SSSF annual reporting to be by end of first quarter. The SSSF Operational Committee provides recommendations to the Management Committee regarding the timing and capacity requirements for new trunk construction, and flags relevant issues for consideration by the Management Committee. The Committee is composed of seven members: Chair: General Supervisor, Infrastructure Planning Fernando Sacluti Members: Construction Manager James Tan Land Development Engineer, Sustainable Development Jim Wood UDI Representative Leo Levasseur UDI Representative Dylan Hunchak Drainage Financial Coordinator Steve Chung/Ralph Gallace Program Manager, Infrastructure Planning Khalid Aziz (Secretary & Member) 13
18 The Operational Committee met four times in 2015 at joint sessions with the Management Committee and achieved the following major accomplishments: Recommended the WESS planning update study to review implementation plan of the remaining WESS system; and the SSSF Integrated planning study to assess the need of various segments based on the most current growth projections and timelines. Recommended the construction of SW4/SW5 in two stages based on the result of the financial model forecast regarding possible impact to other projects; SW4 to start construction in 2017 and SW5 to be deferred until 2021 or Recommended the total 9.5% increase for the 2016 SSSF rates which is equivalent to1.08 % annual inflationary increase plus 8.42% additional increase based from the recommendation in the 2009 program review of 20% increase to SSSF rates over ten (10) years. Recommended an update of the SSSF Financial model to examine its validity and introduce a new approach/methodology in setting annual revenue rates. Recommended the SSSF Program Review to examine various components of the strategy and evaluate overall health of the Program funding. Recommended construction of the N1 RTC to control storage and release of flow from the interim NEST discharge into the CST trunk. 14
19 3.0 FIVE YEAR CONSTRUCTION PLAN The following section outlines the proposed major SSSF construction program for the next five years ( ). This proposed program is developed to support orderly development throughout the City of Edmonton in a cost effective manner, using latest population and employment projections available to the City, as well as input from the development industry. It also strives to meet the important objective of maintaining a positive balance for the Fund. The locations of the construction projects are shown in Figure 2 on page North Edmonton Sanitary Trunk (NEST) Stage N1 RTC This project involves the design and construction of a Real Time Control (RTC) gate at 153 Avenue and Manning Drive. This gate will engage the storage capacity in the NL1/NL2/NL3/N1 tunnel segments. This gate will also control flow into the Clareview Sanitary Trunk (CST) system en route to Capital Region treatment facility. The schedule is to install this gate in 2016/ to 2020 North Edmonton Sanitary Trunk (NEST) Stages NC2 & NC3 This project includes the design and construction of 2.7 km of 2,340 mm tunnel from Castledowns Road to 88 Street along 153 Avenue to connect the existing NC1 tunnel with the existing NL1 tunnel. As a result of the risk assessment, the project will be completed in two phases. Phase 1 is to construct and commission an initial 360 m section of the tunnel to alleviate the immediate flood risk. Phase 2 is to construct the remaining 2.3 km of 15
20 tunnel. The SSSF Management Committee approved the design phase of this project with a budget of $1.7 million. Construction for Phase 1 is expected to start in 2016 and the whole project will be completed in
21 2016 South Edmonton Sanitary Sewer (SESS) Stage SA1a Construction of this 2.3 km long sanitary sewer, comprising both of TBM tunnel and micro-tunneling sections, started in 2014 and will be completed in The City in-house tunneling crews undertake the 1 km long TBM tunnel construction while an external contractor constructs the remaining 1.3 km of work. It is anticipated the project will be completed within its $27.5 million budget to 2018 South Edmonton Sanitary Sewer (SESS) Stage SA10a This section of SESS will be constructed along 34 Street south of 76 Avenue to approximately 68 Ave. It will provide sanitary servicing and wet weather storage to allow continued development in Southeast Industrial areas including Maple Ridge Industrial and Pylypow Industrial. Concept design consists of 750 m long, 2920 mm diameter storage tunnel. Preliminary/detailed design work started in 2012 and is 95% completed. The construction is on hold, subject to the signing of the servicing agreement by the developer. Also, neighborhood design drawings need to be circulated in the City. Once servicing agreement is signed, the project is for approval of the SSSF committee South Edmonton Sanitary Sewer (SESS) Stage SA10a Pump Station & Force main The SESS-Stage SA10a project will include a pump station and a force main at 76 Avenue and 34 Street, with an interim discharge to the existing 74 Avenue sanitary sewer. 17
22 2016 to 2018 South Edmonton Sanitary Sewer (SESS) Stages SW4 This portion of SESS, a westerly extension of the existing SW tunnel, will be constructed south of Anthony Henday Drive along Ellerslie Road S.W. from Whitemud Creek to Windermere Boulevard west of the Anthony Henday/Rabbit Hill Road interchange. This stage will service additional development in the Windermere area. The total length for the 2,950 mm diameter tunnel is 1.6 km. Construction started in 2015 and will be completed in The total budget approved for this project was $29.7 million to 2021 West Edmonton Sanitary Sewer (WESS) Stage W3,4,5 These segments when connected together would ultimately increase the conveyance capacity of the sewer network from West Edmonton, through downtown and to the Gold Bar Waste Water Treatment Plant (GBWWTP). Construction of a 2340 mm, 2.6 km long tunnel along 142 Street to 125 Street is recommended to begin in 2022; however, constructing them sooner will help relieve a bottleneck found in the combined trunk between 142 Street and 125 Street. The combined segments are expected to provide sufficient storage to serve new developments to 2021 West Edmonton Sanitary Sewer (WESS) Stage W3,4,5 Connection Structure to Combined trunk The connection structure is proposed to connect Stages W3,4,5 segment to the combined 1500 to 1650 mm combined trunk between 142 Street and 125 Street to help relieve an existing bottleneck issue. 18
23 2020- South Edmonton Sanitary Sewer (SESS) Stages SW1 PS (1 st Upgrading) This is part of the recommended pump station capacity increases proposed under the recent SESS Planning Update Study. The first stage of SW1 pump station upgrading is expected by The existing SW1 pump station is to be upgraded to 500 L/s capacity to meet the projected increases in dry weather flow and storage drawdown requirements over time South Edmonton Sanitary Sewer (SESS) Stage SA1c RTC Gate/SW1 Pump Station Functional Planning This functional study is required to review and refine storage optimization in SA1 segment by defining control logics at SA1c RTC gate and SW1 pump station. This project is planned to be carried out in 2016 with estimated budget of $75K. The Terms of Reference (TOR) and Request for Proposal (RFP) are underway. This project is targeted for completion in CST Planning Update & Condition Assessment NEST is dependent on CST at the downstream side; however, CST is not in a good shape. The objective of CST Planning and condition Assessment study is to assess the current physical condition of CST, to come up with an upgrading plan and refine the NEST servicing concepts accordingly. The Terms of Reference (TOR) and Request for Proposal (RFP) are underway SESS SW6-SW7 Functional Planning Early than projected developments at Riverview neighborhoods has resulted 19
24 to a need to review and redefine the staging and storage concept for SESS segments (SW6-SW7). Functional planning study will evaluate the timelines and storage requirements based on updated growth projections and rivercrossing options including cost benefit analysis. This project is targeted to be completed in 2016 with estimated budget of $75 K. The Terms of Reference (TOR) and Request for Proposal (RFP) are underway. 20
25 Figure 2 21
26 4.0 FUND BALANCE 4.1 TWENTY FIVE YEAR HISTORY & PROJECTION The SSSF Financial Model was updated in 2015 to reflect updated project information associated with the changing economic situation, particularly with the current development growth projections and developable land inventory remaining in the City. As part of the SSSF program review , the segment cost estimates were updated to current dollars and were input into the model. With the incorporation of land inventory into the model and with the updated growth rates, the projected full build out of the City is expected to occur by The latest projection in the financial model shows that the fund balance will remain positive at least throughout the next ten years before it drops to approximately $40 million around 2035, and recovers back into positive within approximately 6 years. Figure 3 on page 24 shows the twenty five year fund balance history and projection ( ). The following list of assumptions have been adopted in the current version of the Model as provided by the City of Edmonton Sustainable Department and Finance Department: a) Population projections were based on the CRB Traffic population and employment forecasting data. b) City of Edmonton Land Supply reports for low density residential and industrial. c) City of Edmonton Employment and Population forecasts by traffic zone. d) City of Edmonton NSP/NASP statistics e) Expenditure Inflation Rate of 3% compounded annually. 22
27 f) Economic inflation rate of 3% g) Interest earning rate of 1% per annum. 23
28 24 Figure 3
29 4.2 FIVE YEAR PROJECTION Table 1 on page 27 shows the five year revenues and expenditures ( ) projections for the Sanitary Servicing Strategy Fund based on the latest information available. REVENUES Opening Balance for 2016 The SSSF cash balance as of December 31, Revenues and Expenditures for 2015 These are based on actual values recorded. Interest ( ) Interest rate assumed at 1% per annum was used. Utility Contribution This amount represents contributions from the Sanitary Utility for diversion of sanitary flows from serviced City lands to the new trunk system constructed under the SSSF. These lands are located in Mill Woods and in Castle Downs. The amount is calculated based on an estimate of the SSTC these lands would have to pay. Based on results of the lot counts conducted in 2000, the Sanitary Utility would make annual contributions of $2.6 million to the SSSF until In March 2006, City Council approved the recommendation to change the Utility Contribution amount to $1.3 million commencing on January 1, Sanitary Sewer Trunk Charge The SSTC is collected when an application is made for a development permit or sanitary service connection. This charge applies to all new and re-developments in the City. Rates for 2016 were increased by 9.5% from The following are the SSTC rates for 2015 and 2016: 25
30 Type of development Single-family/Duplex Residential $1,430/dwelling 1,566/dwelling* Secondary, garage & garden suite $ 633/dwelling $ 693/dwelling Multi-family Residential $1,021/dwelling $1,118/dwelling Commercial, Industrial, Institutional $7,152/ha $7,832/ha Estimated SSTC revenues from 2016 to 2020 were based on the current development growth projections provided by Sustainable Development Department. Expansion Assessment (EA) The EA is an area-based assessment that is collected at the time of subdivision, development permit application or sanitary service connection application. The EA applies to those areas of the City that did not have an approved Neighborhood Structure Plan (NSP) before January 1,1999. The 2015 EA rates were increased by 9.5% from The 2015 and 2016 rates for EA are as follows: Contributing Area North Edmonton Sanitary Trunk (NEST) $20,426/ha $22,367/ha South Edmonton Sanitary Sewer (SESS) $20,426/ha $22,367/ha Terwillegar and University Farms (TUFS) $20,426/ha $22,367/ha West Edmonton Sanitary Sewer (WESS) $25,536/ha $27,962/ha EXPENDITURES Estimated Construction Costs Construction cost estimates for the 2016 to 2020 time frame were based on the updated segment costs provided as a result of the recent program review. 26
31 SANITARY SERVICING STRATEGY FUND-5 YEAR PROJECTION 2015 (Actual) Opening Balance $ 47,114,728 $ 60,928,997 $ 63,535,970 $ 63,046,477 $ 63,790,581 $ 54,122,707 Interest earned 466, , , , , ,581 Sanitary Utility Contribution 1,300,000 1,300,000 1,300,000 1,300,000 1,300,000 1,300,000 Sanitary Sewer Trunk Charge 15,354,874 16,860,031 16,914,943 14,945,913 15,509,308 16,348,705 Expansion Assessment 10,673,208 11,761,280 11,849,639 9,604,506 9,807,590 10,490,492 Total Revenues 27,794,346 30,540,539 30,694,345 26,481,449 27,203,531 28,604,778 Estimated Construction Costs (13,735,781) (27,583,566) (30,683,838) (25,237,345) (36,371,405) (42,768,491) Preliminary Studies (244,296) (350,000) (500,000) (500,000) (500,000) (500,000) Total Expenditures (13,980,077) (27,933,566) (31,183,838) (25,737,345) (36,871,405) (43,268,491) Closing Reserve Balance $ 60,928,997 $ 63,535,970 $ 63,046,477 $ 63,790,581 $ 54,122,707 $ 39,458,994 Construction Costs (Nominal Dollars) Total W13 1,371 1, W1-Rem 17,704 17,704 SA1a 4,879,491 4,879, SW4 28,422,874 10,375,000 9,270,000 8,777, Sa1b/c RTC 1,510,000 1,510,000 SA1d 3,500,000 3,500, SA10a 11,407,376-11,407, SA10a PS & FM 10,092, ,092, SW1 PS (1st Upgrading) 11,386, ,386,773 NC2/NC3 47,483,043 6,000,000 10,006,462 6,367,129 13,424,138 11,685,314 N1 RTC 1,300,000 1,300, W3,4,5 35,988, ,669,086 16,319,878 W3,4,5 Control Structures 6,654, ,278,181 3,376,526 Total $ 162,644,645 $ 27,583,566 $ 30,683,838 $ 25,237,345 $ 36,371,405 $ 42,768,491 Table 1- Five Year Revenues and Expenditures Projection 27
32 4.3 STATEMENT OF FUND ACTIVITIES AND BALANCE The Statement of Fund Activities and Balance for 2015 are shown on Table 2, while Figure 4 shows each revenue component as a percentage of the total 2015 revenues. Figure 5 shows the historical SSSF revenue breakdown, whereas; Figure 6 shows the historical SSSF expenditures. REVENUES: Total revenues for 2015 were $27.8 million which is lower than the amount of $32.7 million collected in Sanitary Sewer Trunk Charge (SSTC) For 2015, SSTC revenues totaled $15.4 million, lower by $2.3 million than the $17.7 million collected in Again for this year, single-family/duplex developments contributed more than the multi-family developments, with the respective revenues being $7.9 million versus $ 6.4 million. The remaining SSTC revenues, $1.03 million came from commercial, industrial, and institutional sector, way below the $3.4 million mark in Expansion Assessment (EA) - For 2015, the total EA collected was $10.7 million, down from the $13.3 million collected in Utility Contribution Total Utility contribution in 2015 was $1.3 million. Interest Earned Total interest earned during 2015 was $0.50 million compared to $0.4 million in This was due to the lower cash balance in EXPENDITURES: The largest expenditure item in 2015 was $11.7 million for the construction of SESS (Stage Sa1a). Another $1.1 million was spent in the construction of SESS (Stage SW4), while the rest were spent on NEST (Stage NC2/NC3), post construction activities for WESS (Stages W1, W13, & W14 SW3) as well as several engineering studies. 28
33 Sanitary Servicing Strategy Fund Statement of Fund Activities and Balance For the Period Ending December 31, , Actual Actual Budget Variance REVENUES Sanitary sewer trunk charge - single/duplex revenue 8,447,473 7,934,122 6,349,021 1,585,101 Sanitary sewer trunk charge - multi family revenue 5,949,671 6,386,353 3,808,134 2,578,219 Sanitary sewer trunk charge - commercial/industrial/institutional revenue 3,363,639 1,034,399 1,797,576 (763,177) Rebate (18,853) - 0 Expansion assessment 13,250,883 10,673,208 9,047,514 1,625,694 30,992,813 26,028,082 21,002,245 5,025,837 Sanitary Utility Contribution 1,300,000 1,300,000 1,300,000 0 Interest earned 412, , , ,218 Total Revenues 32,705,748 27,794,346 22,598,291 5,196,055 A EXPENDITURES NEST Stage NL2 & NL3 8, NEST NC2/NC , ,000 (120,901) NL1 PS Concept Study 0 219, ,829 NL1 PS Piping Repairs 0 137, ,565 SESS SA1a 9,574,462 11,693,491 16,170,423 (4,476,932) SESS SA1d 0 0 3,500,000 (3,500,000) SESS SA10a 462, ,000 (39,906) SESS SW4 0 1,133,012 5,349,577 (4,216,565) WESS W1-Rem 12, WESS W13 814,057 69,740 65,000 4,740 WESS W14 765,861 34,857 23,000 11,857 Preliminary Studies 376, , ,000 (547,704) Total Expenditures $ 12,014, $ 13,980, ,508,000 $ (12,527,924.00) B Opening Balance $ 26,423, $ 47,114, ,114,726 $ - Excess of Revenues over Expenditures $ 20,690, $ 13,814, (3,909,709) $ 17,723, Ending Balance $ 47,114, $ 60,928, ,205,017 $ 17,723, C Table 2-Statement of Fund Activities and Balance 29
34 2015 SSSF Revenues (27.8 M) 30 Figure 4
35 Figure 5 31
36 32 Figure 6
37 For more information, please: Visit our website: Inquiries may also be directed to: The City of Edmonton Drainage Services Fifth & Sixth Floors, Century Place A Avenue NW Edmonton, Alberta T5J 3A3 Phone:
BEFORE THE PHILADELPHIA WATER, SEWER AND STORMWATER RATE BOARD DIRECT TESTIMONY OF STEPHEN J. FURTEK
BEFORE THE PHILADELPHIA WATER, SEWER AND STORMWATER RATE BOARD Re Application of the Philadelphia Water Department for Increased Rates and Related Charges Fiscal Years 2017-2018 DIRECT TESTIMONY OF STEPHEN
Asset Management Plan
Asset Management Plan Final Report May 2014 EXECUTIVE SUMMARY Adequate municipal infrastructure such as roads, bridges, and underground water and sewage pipes are essential to economic development, citizen
Kansas City s Overflow Control Program
Kansas City s Overflow Control Program Kansas City Water Services Water Wastewater Stormwater 2 Water Services Department 1000 Positions 835 Employees 3 Utilities FY 13/14 Budget = $307 million Water Wastewater
Sanitary Sewer Master Plan
, Illinois Sanitary Sewer Master Plan EXECUTIVE SUMMARY Prepared by September 9, 2010 1670 South Taylorville Road Decatur, Illinois 62521 www.bgmengineering.com Sanitary Sewer Master Plan A. SCOPE OF STUDY
Executive Director, Engineering & Construction Services Director, Purchasing & Materials Management Division
PW8.5 STAFF REPORT ACTION REQUIRED Contract Award Request for Proposal No. 9117-15-7122 Engineering Services for the Detailed Design, Services During Construction, and Post-Construction Services for an
REQUEST FOR PROPOSALS SANITARY SEWER MAINTENANCE SERVICES FOR THE TOWN CENTER SEWER ASSESSMENT DISTRICT WITHIN THE TOWN OF WOODSIDE
REQUEST FOR PROPOSALS SANITARY SEWER MAINTENANCE SERVICES FOR THE TOWN CENTER SEWER ASSESSMENT DISTRICT WITHIN THE TOWN OF WOODSIDE Submit Proposals to: Town of Woodside Public Works Department 2955 Woodside
Based on the above, it is recommended that Lift Stations #1 and #3 be abandoned and their flows be diverted to the regional Lift Station #8.
Lakeside; Clairmont Heights; Portion of Clairmont currently serviced to Pump Station #2; Crossroads North and Crossroads South portion of flows that are diverted to Lakeside Trunk. It is understood that
Parkhill Road Sewage Pumping Station Class EA Study
Parkhill Road Sewage Pumping Station Class EA Study Public Information Centre October 4, 2011 6:30 pm 8:30 pm Westmount Public School DRAWING ON EXPERIENCE BUILDING ON STRENGTH Sewage Pumping Station (SPS)
SANITARY SEWER MASTER PLAN
SANITARY SEWER MASTER PLAN PREPARED FOR: VILLAGE OF GALENA, OHIO PREPARED BY: POGGEMEYER DESIGN GROUP, INC. 1168 NORTH MAIN STREET BOWLING GREEN, OHIO 43402 JOB NO. 3550-030 MARCH, 2006 TABLE OF CONTENTS
Policies & Procedures
Budget and Business Plan 2015 Policies & Procedures POLICIES & PROCEDURES Policies & Procedures Presentation of Halton Region s Financial Information General Guidelines Halton Region prepares and presents
Capital Facilities Financial Plan (2007-2012) Supporting document to the 20-year Comprehensive Management Plan
Capital Facilities Financial Plan (2007-2012) Supporting document to the 20-year Comprehensive Management Plan Revised May 2007 CAPITAL FACILITIES FINANCIAL PLAN 2007-2012 CLARK COUNTY 20-YEAR GROWTH MANAGEMENT
COMBINED SEWER OVERFLOW LONG-TERM CONTROL PLAN Executive Summary
CITY OF LAKEWOOD COMBINED SEWER OVERFLOW LONG-TERM CONTROL PLAN Executive Summary MAY 2006 storage conveyance treatment performance Prepared for: City of Lakewood, Ohio Prepared by: Metcalf & Eddy of Ohio,
APPENDIX 9 INFRASTRUCTURE SERVICING REPORT
APPENDIX 9 INFRASTRUCTURE SERVICING REPORT Lot 50 Cockram Street, Mundijong Infrastructure Servicing Report Peet Ltd August 2012 LOT 50 COCKRAM STREET, MUNDIJONG-INFRASTRUCTURE SERVICING REPORT Project
WATER AND WASTEWATER UTILITY RATE STUDY CITY OF
WATER AND WASTEWATER UTILITY RATE STUDY CITY OF MAY 2013 WATER AND WASTEWATER UTILITY RATE STUDY FOR CITY OF YREKA 701 4 TH STREET YREKA, CA 96097 JOB NO. 69.39 MAY 2013 PREPARED BY: TABLE OF CONTENTS
Bridges & Culverts Condition by Quantity
3.4.3 What condition is it in? Approximately 93% of the municipality s bridge structures are in good to excellent condition, with the remaining 7% in fair condition. As a result, the municipality received
TOWN OF SAUGEEN SHORES WATER AND SANITARY SEWER SERVICING MASTER PLAN 2014 REPORT
TOWN OF SAUGEEN SHORES WATER AND SANITARY SEWER SERVICING MASTER PLAN 2014 REPORT TOWN OF SAUGEEN SHORES WATER AND SANITARY SEWER SERVICING MASTER PLAN 2014 REPORT April 1, 2015 B. M. ROSS AND ASSOCIATES
Class Environmental Assessment Schedule B Project File Report
R.J. Burnside & Associates Limited 16775 Yonge Street Suite 200 Newmarket ON L3Y 8J4 Canada telephone (905) 953-8967 fax (905) 953-8945 web www.rjburnside.com Class Environmental Assessment Schedule B
Township of Terrace Bay Drinking Water System Financial Plan
Township of Terrace Bay Drinking Water System Financial Plan August 2014 Introduction Municipalities in Ontario recently adopted a full accrual accounting approach to tangible municipal assets in accordance
UPDATED FUNCTIONAL SERVICING and STORMWATER MANAGEMENT REPORT
TRAFALGAR ENGINEERING LTD. #1-481 Morden Road Oakville Ontario L6K 3W6 UPDATED FUNCTIONAL SERVICING and STORMWATER MANAGEMENT REPORT Fernbrook Homes (Bronte 15) Limited 3059/3047 Lakeshore Road West TOWN
Components of a Basement Flooding Protection Plan: Sewer System Improvements. November 2000
Components of a Basement Flooding Protection Plan: Sewer System Improvements November 2000 Components of a Basement Flooding Protection Plan: Sewer System Improvements November 2000 SEMCOG 2000 Prepared
REGION OF PEEL PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL
REGION OF PEEL PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE Functional Servicing and Storm Water Management Report PUBLIC WORKS TABLE OF CONTENTS 1. INTRODUCTION...1 2.
Storm Sewer Trenchless Upgrade Alternatives and Recommendations
Storm Sewer Trenchless Upgrade Alternatives and Recommendations Background Approximately 1,930 feet of the 40-inch and 42-inch CMP storm sewer pipe from manhole M22 to manhole M12 will be evaluated for
Aquatera 2015/16 Business Plan Highlights
Who We Are Aquatera 2015/16 Business Plan Highlights Aquatera is a full-service utility corporation the provider of choice for governments, businesses, and communities. Our business is to provide high-quality
ZIONSVILLE WASTEWATER DEPARTMENT 10-YEAR SEWER REHABILITATION REPORT 2013-2022
ZIONSVILLE WASTEWATER DEPARTMENT 10-YEAR SEWER REHABILITATION REPORT 2013-2022 Town of Zionsville, Indiana December 19, 2012 PREPARED BY BEAM, LONGEST & NEFF, LLC. 8126 Castleton Road Indianapolis, Indiana
DECISION/DIRECTION NOTE
DECISION/DIRECTION NOTE Title: Proposed rezoning new residential zone PDE file MPA1500006 150 Stavanger Drive Date Prepared: April 12, 2016 Report To: Chair and Members, Planning and Development Committee
APPROVED CONSOLIDATION AGREEMENT BETWEEN THE TOWN OF AMHERST SANITARY SEWER DISTRICTS 1 and 16 REGARDING THEIR CONSOLIDATION INTO A SINGLE DISTRICT
REGARDING THEIR CONSOLIDATION INTO A SINGLE DISTRICT This Agreement ("the Agreement ) is entered into this day of, 2011, between the Town of Amherst Sanitary Sewer District 1 (hereinafter SSD 1 ) and Town
Altoona Water Authority. Infrastructure Overview
Altoona Water Authority Infrastructure Overview Mission Statement As stewards of the community s water system, our mission is to provide a clean, safe, reliable water supply and to collect and treat wastewater
Glen Hills Area: Septic System and Public Sewer Q & A Information Sheet Page 1
Glen Hills Area: Septic System and Public Sewer Q & A Information Sheet Page 1 The Montgomery County Dept. of Environmental Protection, in cooperation with the Dept. of Permitting Services and the Washington
Dewatering - Time and Cost Relief by way of Trenchless Construction
North American Society for Trenchless Technology (NASTT) NASTT s 2015 No-Dig Show Denver, Colorado March 15-19, 2015 TA-T3-04 Dewatering - Time and Cost Relief by way of Trenchless Construction Jenn Stillman,
STAFF REPORT TO COMMITTEE OF THE WHOLE
STAFF REPORT TO COMMITTEE OF THE WHOLE DATE: November 7 2012 TO: FROM: SUBJECT: ATTACHMENT(S): COMMITTEE OF THE WHOLE GINA LAYTE-LISTON, SUPERVISOR, WASTEWATER Stormwater Management Funding Strategy None
ESCAMBIA COUNTY FLOOD RECOVERY: 1- YEAR ANNIVERSARY REPORT
Joy D. Blackmon, P.E. Director, County Engineer Public Works Department ESCAMBIA COUNTY FLOOD RECOVERY: 1- YEAR ANNIVERSARY REPORT EXECUTIVE SUMMARY One year after the devastating April 2014 floods hit
Draft Goals and Objectives Wadena Comprehensive Plan City of Wadena, Minnesota. Land Use Goals:
Draft Goals and Objectives Wadena Comprehensive Plan City of Wadena, Minnesota Land Use Goals: 1. Growth in Wadena will be undertaken in such a manner as to create a full range of living, working, shopping,
H.R. (Herb) Kuehne, MBA, P.Eng. Senior Vice-President Civil Infrastructure
Senior Vice-President Civil Infrastructure Education MBA, University of Alberta - 1988 B.Sc., Civil Engineering, University of Alberta - 1976 Employment History 1977 - Date: Associated Engineering 1976:
The Business Plan and You
The Business Plan and You BUSINESS START-UP For more information, contact: The Business Link Edmonton: 100 10237 104 Street NW Edmonton, Alberta T5J 1B1 Calgary: 250 639 5 Avenue SW Calgary, Alberta T2P
RESPONSIBLE DEPARTMENT: ADDITIONAL DIRECTOR (S): ASSISTANT CITY MANAGER: JIM CALLAWAY
CITY COUNCIL AGENDA REQUEST AGENDA OF: 07-01-14 AGENDA REQUEST NO: IV-D INITIATED BY: GREG NICHOLS PROJECT MANAGER RESPONSIBLE DEPARTMENT: ENGINEERING PRESENTED BY: TIMOTHY JAHN, P.E. SENIOR ENGINEER DIRECTOR:
3.6.1 Existing Conditions - Police, Fire, Ambulance, Water, Sewer, & Solid Waste
3.6 3.6.1 Existing Conditions - Police, Fire, Ambulance, Water, Sewer, & Solid Waste Police Protection The Clarkstown Police Department provides police protection services to properties within the 40 square
Chapter 7 COMMUNITY FACILITIES and SERVICES PLAN
Chapter 7 COMMUNITY FACILITIES and SERVICES PLAN Introduction Community facilities play an important role in ensuring a quality standard of living for Township residents, as well as impacting the location
Action plans for hotspot locations - Ash Study
Appendix 9 Action plans for hotspot locations - Ash Study Ash Vale North 1. Local evidence indicates the culvert could not discharge during December 2013 because the outlet was blocked on the western side
Essential Water. Customer Charter
Essential Water Customer Charter Who is Essential Water? Essential Water is a division of Essential Energy and provides water supply services to over 20,000 people in Broken Hill, Menindee, Sunset Strip
The Clean Water Project What Is The Stormwater Impact?
The Clean Water Project What Is The Stormwater Impact? Presentation To: Seminar On Water Issues Bob Weimar, PE, BCEE Chief of Program Management The Metropolitan District Sewage Overflows Have Become More
TOWN OF GRIMSBY ASSET MANAGEMENT PLAN
TOWN OF GRIMSBY ASSET MANAGEMENT PLAN August 20, 2014 DFA Infrastructure International Inc. Executive Summary ES1 Background The Town of Grimsby (Town) with a population of approximately 25,325 is located
Proposed General Plan Update Goals, Policies, and Implementation Actions
Proposed General Plan Update Goals, Policies, and Implementation Actions The construction and maintenance of infrastructure is necessary to support existing and planned land uses and to achieve Environmental
Where available we have reviewed preliminary documents completed as part of these studies.
1. Introduction urbanmetrics inc. has been retained by the City of Vaughan to conduct a Commercial Land Use Review (CLR). The purpose of this study is to examine the current commercial structure in the
APPENDICES G) DETAILED BACKBONE INFRASTRUCTURE CONSTRUCTION COST ESTIMATE SUMMARY
ALAMEDA POINT MASTER INFRASTRUCTURE PLAN March 31, 2014 APPENDICES G) DETAILED BACKBONE INFRASTRUCTURE CONSTRUCTION COST ESTIMATE SUMMARY Carlson, Barbee & Gibson, Inc. Backbone Infrastructure Engineer
UDG Spring Conference Birmingham 2016
Use of Monitoring Equipment to Proactively Manage the Waste Water Network Presenters James Mason (RPS), Joanna Kelsey (Severn Trent Water) Contributors Andrew Bailey (RPS), John Hateley (RPS) Ruth Clarke
A Quick Guide to Municipal Financial Statements MUNICIPAL AFFAIRS
A Quick Guide to Municipal Financial Statements MUNICIPAL AFFAIRS June 2010 Alberta Municipal Affairs (2010) A Quick Guide to Municipal Financial Statements Edmonton: Alberta Municipal Affairs For more
City of Mt. Angel. Comprehensive Financial Management Policies
City of Mt. Angel Comprehensive Financial Management Policies May 2014 Table of Contents Section Description Page I. Purpose... 3 II. Objectives... 3 III. Management of Fiscal Policy... 4 IV. Accounting,
Emergency Flood Damage Reduction Program April 2013 (revised) Program Profile
Emergency Flood Damage Reduction Program April 2013 (revised) Program Profile Purpose The Emergency Flood Damage Reduction program (EFDRP) provides assistance with the implementation of emergency flood
REPORT TITLE: TERM OF COUNCIL PRIORITY NO. 6 - ENHANCE INTEGRITY OF WASTEWATER COLLECTION SYSTEM INCLUDING FLOOD REMEDIATION PROGRAM
J Wokking foh y or REPORT Meeting Date: November 28,2013 Regional Council DATE: October 22,201 3 REPORT TITLE: TERM OF COUNCIL PRIORITY NO. 6 - ENHANCE INTEGRITY OF WASTEWATER COLLECTION SYSTEM INCLUDING
A Facility Planning Guide
The opinions and recommendations expressed in this report are those of the author/s and may not be in agreement with Association officers but are offered as being worthy of consideration by decision makers.
District of Columbia Water and Sewer Authority George S. Hawkins, General Manager
District of Columbia Water and Sewer Authority George S. Hawkins, General Manager FLOODING ISSUES IN BLOOMINGDALE AND LeDROIT PARK A DC Water Presentation Given to the Mayor s Task Force on the Prevention
SANITARY SEWER BACKUP. Causes & Prevention
SANITARY SEWER BACKUP Causes & Prevention A. PURPOSE The purpose of this publication is twofold: 1. It provides homeowners with basic information on the causes of sanitary sewer backups. 2. It provides
CR_3467 Attachment 1. Utility Services. Branch Manager: Chris Ward. Amended June 2016
CR_3467 Attachment 1 Utility Services Amended June 2016 Branch Manager: Chris Ward UTILITY SERVICES 2016 2018 BUSINESS PLAN AMENDED JUNE 2016 Table of Contents INTRODUCTION Our Branch 4 Vision Mission
Greater Dublin Strategic Drainage Study Regional Drainage Policies - Volume 2 New Development
7 SPECIFICATIONS There is currently no Irish specification for construction of drainage works, or water supply works. There are several publications that give guidance on drainage works, such as the Building
RE: 2014 Asset Management Plan. OBJECTIVE: To present Council with an Asset Management Plan and recommended implementation strategy moving forward.
HALDIMAND COUNTY Report PW-GM-01-2014 of the General Manager of Public Works For Consideration by RE: 2014 Asset Management Plan OBJECTIVE: To present Council with an Asset Management Plan and recommended
CHAPTER 372-68 WAC WATER POLLUTION CONTROL AND ABATEMENT PLANS FOR SEWAGE DRAINAGE BASINS
CHAPTER 372-68 WAC WATER POLLUTION CONTROL AND ABATEMENT PLANS FOR SEWAGE DRAINAGE BASINS Last Update: 6/8/88 WAC 372-68-010 Authority. 372-68-020 Purpose. 372-68-030 Definitions. 372-68-040 Planning guide.
Fiscal Impact Analysis of the Annexation Proposed by the Town of Beaumont. Leduc County FINAL REPORT
Fiscal Impact Analysis of the Annexation Proposed by the Town of Beaumont Leduc County FINAL REPORT Suite 2220 Sun Life Place 10123 99 Street Edmonton, Alberta T5J 3H1 T 780.425.6741 F 780.426.3737 www.think-applications.com
SHAFT CONSTRUCTION IN TORONTO USING SLURRY WALLS
SHAFT CONSTRUCTION IN TORONTO USING SLURRY WALLS Vince Luongo Petrifond Foundation Co., Ltd. PROJECT DESCRIPTION The York Durham Sanitary System (YDSS) Interceptor in the Town of Richmond Hill located
PRESENTATION. Improving the performance of Public Water Utilities A case study of Bangalore N.C. MUNIYAPPA, Chairman, BWSSB LOCATION MAP OF BANGALORE
Arabian Sea Mumbai KARNATAKA Delhi Chennai Nepal Calcutta Bay of Bengal PRESENTATION Improving the performance of Public Water Utilities A case study of Bangalore By N.C. MUNIYAPPA, Chairman, BWSSB LOCATION
Review of Footing Drain Disconnection Projects
Wastewater Master Plan DWSD Project No. CS-1314 Review of Footing Drain Disconnection Projects Technical Memorandum Original Date: August 8 2002 Revision Date: September 2003 Author: CDM Table of Contents
DRAFT Public Outreach Document for What s an SSMP?
DRAFT Public Outreach Document for What s an SSMP? This easy to read document is developed and provided to interested parties to assist in educating cities, agencies, their management, elected officials
KEYPORT COMMUNITY PLAN
PLANNING COMMISSION TASKS Collect Public Comments on Draft Plan. Provide Clear Direction for: Preferred LAMIRD Boundary Lot Clustering Provision View Protection Recommendation to Board of County Commissioners.
Report Relating to Incidents of Flooding within the Dollar Catchment
Joint Position Statement Report Relating to Incidents of Flooding within the Dollar Catchment October 2012 Eric McQuarrie, Scottish Water Stuart Cullen, Clackmannanshire Council TABLE OF CONTENTS 1. INTRODUCTION...
Executive Summary Consent Decree
OVERFLOW ABATEMENT PROGRAM Executive Summary Consent Decree The sewer system in Nashville dates back to the late 1800s and originally consisted of a combined sewer system, later transitioning to separate
SANITARY SEWER SYSTEM ASSESSMENT
SANITARY SEWER SYSTEM ASSESSMENT What is this tool? The Sanitary Sewer System Assessment is a form that helps your utility identify and document all of the components in your utility s sanitary sewer system.
Flood Reduction Strategies in the City of Ottawa. Presented by : Eric Tousignant, P.Eng Senior Water Resources Engineer, City of Ottawa
Flood Reduction Strategies in the City of Ottawa Presented by : Eric Tousignant, P.Eng Senior Water Resources Engineer, City of Ottawa Flooding in Ottawa Since amalgamation in 2000, there has been 4 significant
Wastewater Collection System Supplemental Design Standards for Capital Improvement Program Projects
Wastewater Collection System Supplemental Design Standards for Capital Improvement Program Projects March 2013 i Metropolitan Sewer District of Greater Cincinnati Wastewater Collection System Supplemental
Application of InfoWorks CS Software for the Hydraulic Design of HATS Stage 2 Sewage Conveyance System in Hong Kong, China
Proceedings of 2013 IAHR World Congress Application of InfoWorks CS Software for the Hydraulic Design of HATS Stage 2 Sewage Conveyance System in Hong Kong, China Anil Kumar Senior Engineer, ARUP, Level
Water Mains Rehabilitation Framework (NI) Northern Ireland Water
PROJECT: CLIENT: MAIN CONTRACTOR: Water Mains Rehabilitation Framework (NI) Northern Ireland Water Farrans Background Northern Ireland Water manages a water mains infrastructure that supplies 625 million
INTERNAL AUDIT REPORT ON THE FINANCIAL MANAGEMENT CONTROL FRAMEWORK FOR INITIATIVES RELATED TO CANADA S ECONOMIC ACTION PLAN (EAP) REPORT.
INTERNAL AUDIT REPORT ON THE FINANCIAL MANAGEMENT CONTROL FRAMEWORK FOR INITIATIVES RELATED TO CANADA S ECONOMIC ACTION PLAN (EAP) REPORT July 2010 PREPARED BY THE INTERNAL AUDIT BRANCH (IAB) Project No:
Caring for. our. harbour
Caring for our harbour What s HATS? Stonecutters Island Sewage Treatment Works Harbour Area Treatment Scheme (HATS) is a major Government infrastructure project in Hong Kong. It is being implemented in
EXECUTIVE SUMMARY. Asset Management Relationships and Dependencies. Introduction
EXECUTIVE SUMMARY Introduction The Asset Management Plan demonstrates sound stewardship of the Region s existing assets to support services at desired levels and to ensure the support of the Region s infrastructure
The City of Owen Sound Asset Management Plan
The City of Owen Sound Asset Management Plan December 013 Adopted by Council March 4, 014 TABLE OF CONTENTS 1 EXECUTIVE SUMMARY... 1 INTRODUCTION....1 Vision.... What is Asset Management?....3 Link to
REGULATORY ACCOUNTING GUIDELINES FOR TRINIDAD AND TOBAGO ELECTRICITY COMMISSION DRAFT FOR CONSULTATION
REGULATORY ACCOUNTING GUIDELINES FOR TRINIDAD AND TOBAGO ELECTRICITY COMMISSION DRAFT FOR CONSULTATION January 2008 C O N T E N T S Page No. 1. Overview 1 2. Introduction 3 3. RIC s Regulatory Framework
Water Rate Study & O.Reg.453/07 Water Financial Plan No.103-301A
March 2, 2012 dfa DFA Infrastructure International Inc. dfa DFA Infrastructure International Inc. 33 Raymond Street St. Catharines Ontario Canada L2R 2T3 Telephone: (905) 938-0965 Fax: (905) 937-6568 March
The Town of Fort Frances
The Town of Fort Frances Long-Term Capital Financial Plan POLICY Resolution Number: 391 (Consent) 12/09 SECTION ADMINISTRATION AND FINANCE NEW: December 2009 REVISED: Supercedes Resolution No. Policy Number:
Chapter 3 Province of New Brunswick Audit: Accounting for Pensions and NB Power
PNB Audit: Accounting for Pensions and NB Power Chapter 3 Province of New Brunswick Audit: Accounting for Pensions and NB Power Contents Introduction... 41 Provincial Pension Plans... 41 Accounting for
Click to edit Master title style
Click to edit Master title style Sewer System Improvement Program (SSIP) Karen Kubick, PE Wastewater Enterprise Capital Program Director San Francisco Public Utilities Commission Construction Managers
How To Install An Overhead Sewer
Village of Broadview Flood Control Assistance Program Village of Broadview 2350 S. 25 th Avenue, Broadview, IL 60155 INTRODUCTION The Village of Broadview is served by combined sewers which carry sewage
Iowa Smart Planning. Legislative Guide March 2011
Iowa Smart Planning Legislative Guide March 2011 Rebuild Iowa Office Wallace State Office Building 529 East 9 th St Des Moines, IA 50319 515-242-5004 www.rio.iowa.gov Iowa Smart Planning Legislation The
FISCAL YEAR 2014-2018 CAPITAL IMPROVEMENT PLAN WASTEWATER TREATMENT FACILITIES
FISCAL YEAR 2014-2018 CAPITAL IMPROVEMENT PLAN WASTEWATER TREATMENT FACILITIES 1 FISCAL YEAR 2014-2018 CAPITAL IMPROVEMENT PLAN Wastewater Treatment Facilities The Wastewater Treatment System (System)
Toscana Resource Corporation Condensed Consolidated Interim Financial Statements
TOSCANA RESOURCE CORPORATION Toscana Resource Corporation Condensed Consolidated Interim Financial Statements March 31, 2012 and 2011 Condensed Consolidated Interim Statements of Financial Position As
Asset Management: A Best Practice
Asset Management: A Best Practice Purpose Introduction This guide will help you understand: The definition of Asset Management. Why asset management is important to your utility. The best practices in
CHAPTER 2 HYDRAULICS OF SEWERS
CHAPTER 2 HYDRAULICS OF SEWERS SANITARY SEWERS The hydraulic design procedure for sewers requires: 1. Determination of Sewer System Type 2. Determination of Design Flow 3. Selection of Pipe Size 4. Determination
London Borough of Bromley LEAD LOCAL FLOOD AUTHORITY UPDATE AND GRANT DRAW-DOWN
Report No. ES15041 London Borough of Bromley PART ONE - PUBLIC Decision Maker: Executive Date: 9 th September 2015 Decision Type: Non-Urgent Executive Non-Key Title: Contact Officer: Chief Officer: Ward: