Interchange Scheduling Reference Manual

Size: px
Start display at page:

Download "Interchange Scheduling Reference Manual"

Transcription

1 Interchange Scheduling Reference Manual Effective October 1, 2015 Version 3.0

2 Revision History Revision History Date or Version Number 9/12/2012 Version /09/2012 Version /18/2012 Version 1.0 1/28/2013 Version 1.0 2/1/2013 Version /13/2013 Version 1.0 2/12/2014 Version 1.0 5/28/2014 Version 1.0 9/4/2014 Version 1.1 4/21/2015 Version /1/2015 Version 3.0 Author Shari Brown Shari Brown Shari Brown Shari Brown Shari Brown Shari Brown Shari Brown Shari Brown Shari Brown Shari Brown Shari Brown Change Description Initial Creation of Draft Formal Draft for internal review and comments and edits from staff Completed Internal review and edits from Operations Market staff Added Market Import Service Info added examples for Ramp Reservation System and cleaned up references for publication Official Publication Revised for Protocol and BP changes as well as for EES move to MISO Revised for additional of Marketplace Tagging HUB Revised for helpful hint for OASIS links on Scenario Analyzer and EFFATC reports Revised for changes made since beginning of Marketplace Added (and enhanced) information from the Ramp Reservation User Guide. Added references to Transmission Service Reference Manual. Made clarifications to tags submitted for time changes. Added change due to Implementation of the IS Integration into SWPP footprint Interchange Scheduling Reference Manual 1

3 Table of Contents Table of Contents Revision History...1 Table of Contents Introduction Purpose of the Interchange Scheduling Reference Manual Related/Referenced Documents Scheduling Overview Interchange Scheduling Interchange Authority (IA) Scheduling Systems Balancing Authority (BA) Transmission Service Provider (TP) Purchase and Selling Entity (PSE) Process Overview for Interchange Scheduling SPP Balancing Authority Area and Neighboring Balancing Authorities Registration for SPP Interchange Scheduling NAESB Electric Industry Registry (EIR) SPP Market Registration Commercial Model Changes Settlement Locations Asset Owners/Market Participant Transmission Service for Interchange Scheduling Transmission Losses for Interchange Transactions: Combining Transmission Service on Interchange Transactions Market Import Service (MIS) Ramp Reservation for Interchange Scheduling Ramp Capability Ramp Reservation Business Rules Ramp Reservation Validation Ramp Reservation Deadlines e-tag Ramp Validation...18 Interchange Scheduling Reference Manual 2

4 Table of Contents 5.6 Ramp Reservation System (RRS) Ramp Reservation (Submission) Display Ramp Reservation Status...22 Ramp Availability Tagging Interchange Transactions Electronic Tagging (e-tag) Tag Transaction Types Interchange Schedule Types Import Export Through Market Types Day-Ahead Market Real Time Market (RTBM) Integrated Marketplace Transaction Types Fixed Interchange Transactions Dispatchable Interchange Schedules Up-to-TUC Interchange Schedules Dynamic Interchange Schedules External Dynamic Resources (EDR) HVDC Ties HVDC Tie Inadvertent Scheduling Interchange Transactions Interchange Schedules Electronic Scheduling System (webtrans) Validation of Tags for SPP Tariff Status Energy MW NERC Priority POR/POD Network Service Market Import Service (MIS-NN6) Source/Sink Validation of Tags for SPP Balancing Authority...39 Interchange Scheduling Reference Manual 3

5 Table of Contents Late Start/Late Energy Profile Physical Path SPP Ramp Validation Validation of Tags for Integrated Marketplace SPP Market Bid/Offer SPP Market Timing For Day Ahead SPP Marketplace Settlement Location SPP Market Losses Curtailments and Adjustments NERC Transmission Loading Relief (TLR) Market Adjustments Appendix A: Special Tagging Helpful Information User Options: OATI Users/Non- OATI users OATI Users SPP Market Information Specification for Non-OATI Users Market Information on Tags User Access Admin for OATI Users SPP Integrated Marketplace Tag Template Creating a Tag Template Modifying a Tag Template Daylight Savings Time Options for Spring Forward (Change to CDT) Two-Tag Option for Change to CDT One Tag Option for Change to CDT Options for Fall Back (Change to CST) Two-Tag Option for Change to CST One-Tag Option for Change to CST Recognizing the Right Tag/Schedule Changing Time Zone Settings (OATI Users) Appendix B: Tagging Examples Import Export Through...52 Interchange Scheduling Reference Manual 4

6 Table of Contents 9.4 Dynamic Tags HVDC Ties Import HVDC Ties Export Appendix C: Glossary...56 Interchange Scheduling Reference Manual 5

7 Introduction 1 Introduction 1.1 Purpose of the Interchange Scheduling Reference Manual The purpose of the Interchange Scheduling Reference Manual is to provide Transmission Customers and Market Participants (TC/MP) information on the business rules that are to be followed when scheduling with the SPP Balancing Authority and the Integrated Marketplace. Additionally, this document will allow the TC/MP the information necessary to assist them in determining if there are system changes related to Scheduling that they must make within their own companies. This document is a reference manual only and is not an official SPP Governing Document. 1.2 Related/Referenced Documents SPP Balancing Authority Operations Manual SPP Open Access Transmission Tariff Business Practices SPP Criteria Integrated Marketplace Protocols SPP Open Access Transmission Tariff Transmission Service Reference Manual NOTE: For Real-Time Scheduling Questions contact the Tariff/Interchange Desk at (501) Interchange Scheduling Reference Manual 6

8 Registration for SPP Interchange Scheduling 2.1 Interchange Scheduling 2 Scheduling Overview Interchange is Energy transfers that cross Balancing Authority boundaries. An Interchange Transaction is an agreement to transfer Energy from a seller to a buyer that crosses one or more Balancing Authority Area boundaries. Interchange Scheduling in the Integrated Marketplace includes tagged Energy transactions that cross into, out of and through the SPP Balancing Authority Area. The SPP Integrated Marketplace boundary is the same footprint as the SPP BAA. Interchange Scheduling does not include tagging or scheduling transactions internal to the SPP Balancing Authority. These types of transactions are usually associated with Grandfathered Transmission Service and bilateral agreements between SPP members or internal to SPP members. SPP has included a process within the Market Settlement to manage these types of transactions through the use of Bilateral Settlement Schedules. Market Participants may optionally use Bilateral Settlement Schedules to account for the impact of these internal transactions on Integrated Marketplace settlement. Tags are not allowed for transactions within the Integrated Marketplace. 2.2 Interchange Authority (IA) The Interchange Authority is the responsible entity that authorizes implementation of valid and balanced Interchange Schedules between Balancing Authority Areas and ensures communication of Interchange Information for Reliability assessment purpose. SPP is registered with NERC to perform these IA functions for the SPP Reliability Coordination Region. NERC allows registered IAs to have a third party service provide these services and SPP has contracted with a registered Tagging Authority for use of its systems. These systems perform the duties as described in the Interchange (INT) standards. SPP receives a monthly report from its contracted Tagging Authority for evidence of these requirements, which SPP then evaluates. SPP will investigate any failures to any of the designated requirements listed in the report. Investigations will be documented, and if deemed necessary, reported to NERC. Interchange Scheduling Reference Manual 7

9 Registration for SPP Interchange Scheduling Scheduling Systems Most scheduling tools used by SPP fall within the responsibility of the Interchange Authority function. The following is a list of the electronic tools that SPP uses to accomplish Interchange Scheduling Processing: NAESB Electronic Interchange Registry (EIR) discussed in section 3 - Registration for SPP Interchange Scheduling Open Access Same Time Information System (OASIS) discussed in section 4 - Transmission Service for Interchange Scheduling Ramp Reservation System (RRS) discussed in section 5 - Ramp Reservation for Interchange Scheduling Electronic Tagging (e-tag) discussed in section 6 - Tagging Interchange Transactions Electronic Scheduling System (webtrans) discussed in section 7 Scheduling Interchange Transactions 2.3 Balancing Authority (BA) SPP is the sole registered Balancing Authority (BA) for the SPP Integrated Marketplace footprint. As such, SPP acts as a Balancing Authority for confirmation and verification, approval or denial of all Interchange Schedules entering and/or leaving the SPP Balancing Authority Area (BAA). SWPP is the GCA and/or LCA and Scheduling Entity (SE) for all Interchange Schedules entering and/or leaving the SPP BAA as appropriate. As such, SPP has specific roles and responsibilities for NERC checkout processes that are associated with these entities. NOTE: See Appendix B: Tagging Examples, for examples of properly completed Tag Physical Path section of e-tags. These allow for proper checkout with the appropriate entities. GCA and LCA require active approvals prior to implementation of a tag. See section 7.4 Validation of Tags for SPP Balancing Authority. 2.4 Transmission Service Provider (TP) SPP is the Transmission Service Provider under the SPP OATT. SPP is registered with the acronym SWPP for TP. When SWPP Transmission Service is used, SPP Operators act as a TP for confirmation and verification, approval, or denial of all Interchange Schedules entering and/or leaving the SPP Balancing Authority Area. Beginning for Operating Day October 1, 2015, SWPP will also be the TP/TSP for the WAUW Balancing Authority located in WECC. Since, WAUW will continue to be a Balancing Authority SWPP will not be the Interchange Authority or Scheduling party for WAUW only transactions. SWPP will only act on e-tags as the Transmission Provider. WAUW will continue to perform all Interchange and scheduling responsibilities. TP requires active approval prior to implementation of a tag. See section 7.3 Validation of Tags for SPP Tariff. Interchange Scheduling Reference Manual 8

10 Registration for SPP Interchange Scheduling 2.5 Purchase and Selling Entity (PSE) The Purchasing and Selling Entity (PSE) has various roles in the tagging of schedules for use in the Integrated Marketplace for SPP. The PSE that creates the tag is the Creating Purchase and Selling Entity (CPSE) and may or may not be the same PSE that used as the Transmission Customer that settles with SPP for the Marketplace transaction. The example below shows a PSE that is also the SPP Transmission Customer. Transmission Customers are discussed in section 3 - Registration for SPP Interchange Scheduling. PSE as a Transmission Customer on Tag highlighted in YELLOW Tag Physical Path EXAMPLE: EXPORT Source AECC01 AECC.FULTON GCA/LCA TP PSE POR POD S/E SWPP SWPP AECC01 CSWS EES SWPP EES ENTEMO CSWS EES MISO MISO Sink ENTEMO ENTEMO 2.6 Process Overview for Interchange Scheduling SPP follows NAESB requirements for Interchange Scheduling in the Integrated Marketplace. The general overall process for Scheduling is as follows: 1. Registration with NAESB and SPP for ability to create Transmission Service reservations, create tags, and participate in the SPP Integrated Marketplace discussed in section 3 - Registration for SPP Interchange Scheduling 2. Completed and confirmed Transmission Service must be available for ultimate tagging of the schedule discussed in section 4 - Transmission Service for Interchange Scheduling as well as the Transmission Service Reference Manual 3. Completed and approved Ramp Reservation (Optional) discussed in section 5 - Ramp Reservation for Interchange Scheduling 4. Completed e-tag All Interchange Transactions entering and/or leaving the SPP BAA must be electronically tagged, except in emergencies - discussed in section 6 - Tagging Interchange Transactions 5. Verified and Approved e-tags discussed in section 7.5 Validation of Tags for Integrated Marketplace 6. Communicate implemented Interchange Schedule to Interchange Authority 7. Schedule Data to various SPP systems Interchange Scheduling Reference Manual 9

11 Registration for SPP Interchange Scheduling General Process for Interchange Scheduling in SPP 2.7 SPP Balancing Authority Area and Neighboring Balancing Authorities For Interchange Scheduling, it is helpful to know the SPP BAA boundaries. SPP operates in the Eastern Interconnection. SPP is bounded by the following first tier Eastern Interconnection Balancing Authorities. All Energy scheduled between SPP and other Eastern Interconnection BAs must interface through the first tier BAs listed below. The Eastern Interconnection first tier neighboring BA are: Associated Electric Cooperative, Inc. (AECI) Southwest Power Administration (SPA) Midwest Independent Service Organization (MISO) for (AMRN, CLEC, EES and MEC) SPP is located on the Western edge of the Eastern Interconnection and is the major scheduling connection for Energy scheduled to and from the Western Interconnection (WECC) and the ERCOT Interconnection. All scheduling with the WECC and ERCOT must be accomplished via HVDC tie scheduling. See section 6.7 HVDC Ties. The HVDC ties for between WECC and SPP are: Interchange Scheduling Reference Manual 10

12 Registration for SPP Interchange Scheduling 1. EDDY 2. BLKW 3. LAMAR 4. SYDNEY 5. RAPID CITY EAST 6. STEGALL The HVDC ties between ERCOT and SPP are: 1. ERCOTN 2. ERCOTE The HVDC tie between Canada and SPP is: SASKATCHEWAN Interchange Scheduling Reference Manual 11

13 Registration for SPP Interchange Scheduling 3. 3 Registration for SPP Interchange Scheduling In order for a Transmission Customer to obtain Transmission Service and create Interchange Transactions that enter and/or leave the SPP BAA for use in the Integrated Marketplace, the customer must have completed Market Registration through the SPP Customer Relations process. REFERENCE: Transmission Service Reference Manual These customers must also have completed registry with the NAESB in order to tag transactions using Electronic Tagging systems. Customers must allow time for the registration approval and system integration process prior to commencing Interchange Scheduling transactions. 3.1 NAESB Electric Industry Registry (EIR) The EIR is set up for Balancing Authorities to have approval rights for all transaction entities that plan to schedule with their BA. All PSE, TOP, GOP, Sources, Sinks, etc. must be registered and approved by the SPP BA prior to commencing Interchange Scheduling. Purchasing Selling Entities (SPP Market Participants) must register their OASIS entity code and tagging code with EIR in order to purchase transmission and create tags in the SPP BA and Integrated Marketplace. The OASIS entity code is shown as the Company Name on the Transmission Service reservation. The Tagging code is shown on the tag in various locations. One of the major components on a tag for market settlements is the Transmission Customer associated with SPP Transmission Service. The Creating Purchasing Selling Entity (CPSE) is the entity that created the e-tag and the Transmission Customer is the PSE (not necessarily the same as the CPSE) entity shown as the owner of the SPP transmission under the transmission allocation section of the tag SPP Market Registration SPP Transmission Customers who intend to transact business with the SPP BA and Integrated Marketplace must register through the SPP Customer Relations Market Registration process. Through the SPP Market Portal, Market Participants (MPs) may access the applications that enable submission of Resource Offers, Demand Bids, and Virtual Bids and Offers into the Energy and Operating Reserve Markets. REFERENCE: Market Protocols section 6.1 Registration of Resources 3.2 Commercial Model Changes Whenever a Market Participant registers assets (resources, loads, etc.,) the SPP Commercial Model must be updated. SPP periodically uploads the model data up to one week prior to the effective date. The new data is available for use on the date that the new model is effective. An Interchange Scheduling Reference Manual 12

14 Registration for SPP Interchange Scheduling Asset Owner would not be allowed to tag against the newly updated data (e.g. resources or loads) for a transaction that flows before the effective date. When data is removed from the Commercial Model, it is deactivated the day before the Commercial Model change. This may take up to seven days to take effect. The Commercial Model determines the financial Market relationships for Market Participants and Asset Owners. Transmission Customers (PSE) are mapped to these entities in the Commercial Model. The Commercial Model describes how these financial entities relate to specific nodes. REFERENCE: Market Protocols section Commercial Model Settlement Locations Sources and Sinks on e-tags are mapped to Settlement Locations. These Settlement Locations determine the Transmission Congestion pricing mechanisms. Settlement of all Energy related to schedules into, out of and through the SPP BA is performed as part of the Integrated Marketplace settlement at External Interface Settlement Locations. These External Interface Settlement Locations are pre-determined through off-line analysis and may consist of one or more Pnodes (which are linked to Nodes in the Network Model) In the following example of a Through Transaction, the Interface Settlement Locations for this tagged transaction and the entry of the Energy into the Marketplace through MISO is settled as an injection at the MISO External Interface Settlement Location and by the exit of the Energy out of the Marketplace through ERCO is settled as a withdrawal at the ERCOT N External Interface Settlement Location. The interfaces are shown in yellow. In this situation, since the tag is a Through Transaction, the system uses a combination of the Source PSE/Source data field identification of the interface in and a combination of the Sink PSE/Sink data field for identification of the interface out. REFERENCE: Refer to section for more information about Through Transactions. External Source and Sinks for Mapping Table PHYSICAL PATH SECTION OF E-TAG EXAMPLE: THROUGH/HVDC TAG Source MISO MISO GCA/LCA TP PSE POR POD S/E MISO MISO PSE-ID CIN CSWS MISO SWPP PSE-ID AMRN SPS SWPP SWPP PSE-ID SPS ERCOTN SWPP ERCO PSE-ID ERCOT-N ERCOT ERCO ERCO Sink PSE-ID ERCOT N REFERENCE: Market Protocols section Nodes and Pricing Nodes Interchange Scheduling Reference Manual 13

15 Registration for SPP Interchange Scheduling Asset Owners/Market Participant The SPP Integrated Marketplace uses a Translation Table to map the entities from the tag to the appropriate entities in the SPP Commercial Model. Purchasing and Selling Entity The Purchase and Selling Entity is the NAESB registered (NAESB EIR) name used on the tag to represent company ownership. All PSE s are mapped to a TC, which are mapped to an AO, and are then mapped to an MP in the Marketplace. For example, if a PSE is not registered as an SPP TC, then the tag will be rejected. Also, it is possible that the Creating PSE is different than the PSE used as the TC on the tag. Transmission Customer (TC) The PSE that is shown on the first leg of the SWPP Transmission Service on a tag. The Transmission Customer is mapped to the appropriate Asset Owner. Asset Owner (AO) An owner of any combination of: (1) registered physical assets (2) Transmission Congestion Rights or (3) any combination of financial assets within the SPP Balancing Authority Area. The Asset Owner is mapped to the appropriate Market Participant. Market Participant (MP) the entity in the Commercial Model that is financially obligated to SPP for market settlements. A single MP represents one or more Asset Owners. PSE is mapped to a TC is mapped to a AO is mapped to a MP The Tag Physical Path example below highlights the PSE field in which the Transmission Customer for the TSR should have been identified on this transaction. In this case, SEPCPM (identified from the original Transmission Service Reservation) would be mapped to the appropriate Asset Owner and Market Participant for this Interchange Schedule. It is important to note that if another PSE other than the actual Transmission Customer Owner of the TSR is shown in this field on the e-tag, it will have no effect on the TC mapping or on settlements. Tag Example of PSE for Mapping Table Tag Physical Path EXAMPLE: MARKET IMPORT/HVDC TAG Source WACMM1 WACM GCA/LCA TP PSE POR POD S/E WACM LAPT WACMM1 EIPOR AU WACM PSCO MEANMN AU LAMR345 PSCO SWPP SEPCPM LAM345 SECI SWPP SWPP Sink SEPCPM SECI_SECI REFERENCE: Market Protocols section Asset Owners and Market Protocols section Market Participants Interchange Scheduling Reference Manual 14

16 Registration for SPP Interchange Scheduling Example of Commercial Model Relationships Whereas: AO = Asset Owner MP = Market Participant G = Generator L = Load D = Demand Interchange Scheduling Reference Manual 15

17 Transmission Service for Interchange Scheduling 4 Transmission Service for Interchange Scheduling As outlined in the Transmission Service Reference Manual, Customers use OASIS to request Transmission Service. Transmission Service Requests (TSRs) must be validated, accepted, and confirmed prior to submitting an e-tag to schedule the Service. Helpful information about procuring confirmed Transmission Service is outlined in the Transmission Service Reference Manual. SPP has specific rules for acquisition of TSRs. These business rules are described in the SPP OATT. Clarification and details for these rules are described in the SPP Business Practices. REFERENCES: Transmission Service Reference Manual, SPP OATT, SPP Business Practices This section overviews changes, relating to Interchange Scheduling with the SPP BA and settlement thereof, as a result of the implementation of the Integrated Marketplace. 4.1 Transmission Losses for Interchange Transactions: No physical Transmission Losses are allowed to be self-supplied on Interchange Transaction using SWPP Transmission Service in the SPP Integrated Marketplace. All losses are settled financially in the Integrated Marketplace. 4.2 Combining Transmission Service on Interchange Transactions SPP allows Transmission Customers to combine certain types of Transmission Service reservations when tagging Interchange Transactions. The Business Rules for combing Transmission Service are documented in the SPP Business Practices and the Transmission Service Reference Manual. REFERENCE: Business Practice # 2350 Combining SPP Transmission Service Requests NOTE: Business Practices have been updated for Integrated Marketplace as needed to comply with the newly filed SPP Tariff. 4.3 Market Import Service (MIS) To prevent hoarding, Market Import Service (MIS) will be recalled if not scheduled within 2 hours after queued for Day-Ahead or 30 minutes after queued for Real-Time. The LCA on the tag must be SWPP. REFERENCE: Refer to the Transmission Service Reference Manual for more information about MIS. Interchange Scheduling Reference Manual 16

18 Ramp Reservation for Interchange Scheduling 5 Ramp Reservation for Interchange Scheduling The SPP BA is required by NERC to evaluate all Interchange tags to ensure adequate Ramp Capability is available prior to approval. SPP has developed a Ramp Reservation System (RRS) to allow TCs to view the ramp that is available within the SPP BAA at any given time and to reserve the ramp needed for their transactions prior to tagging the transaction. All submissions of tagged Interchange Transactions into or out of the SPP BA will be evaluated against available Ramp Capability prior to approval by SPP. Ramp availability may be verified and pre-arranged by TCs (as mapped to AOs) ahead of submission of an e-tag through the RRS. Subsequent submission of a tag in which scheduled interchange is supported by an approved Ramp Reservation will be automatically approved with respect to Ramp Capability. NOTE: If an approved e-tag is adjusted, the adjusted e-tag will be re-validated for Ramp-Up and Ramp-Down for the adjusted time period, and may fail ramp validation. Use of the RRS is voluntary. Tagged transactions submitted without a Ramp Reservation or those that exceed the ramp reserved by the AO will be checked for remaining Ramp Capability and approved if available. Otherwise, the e-tag will be limited to the reserved ramp or will be denied if ramp was not reserved and there is no available ramp. Ramp validation is only applicable to scheduled Interchange that impacts SPP NSI (i.e. imports or exports of Energy to/from the SPP BA). Ramp validation is not performed on tagged transactions wheeling through the SPP BA. 5.1 Ramp Capability SPP Operations Engineering determines the available Ramp Capability within the SPP BAA based on current operating conditions and generation availability within the Integrated Marketplace. Ramp Capability is the maximum sustainable Ramp-Up and Ramp-Down capability expressed in MWs per minute. 5.2 Ramp Reservation Business Rules Every e-tag that is submitted by the CPSE where the Generating Control Area (GCA) or Load Control Area (LCA) is specified as SWPP will be validated for available Ramp Capability. Tags wheeling through the SPP BA where neither GCA nor LCA are SWPP will not be validated for ramp. The Energy MW profile on a tag physical path segment listing SWPP as the Scheduling Entity (SE) will be used to validate Ramp Capability. In the case of pancaked or stacked transactions, the Energy MW profile at the first (for imports) or last (for exports) tag physical path segment listing SWPP as the Scheduling Entity (SE) will be used to validate Ramp Capability. If no explicit start/stop ramp duration information is supplied in the e-tag, the Eastern Interconnection default ramp duration of 10 minutes will be used for this validation. The only Interchange Scheduling Reference Manual 17

19 Ramp Reservation for Interchange Scheduling acceptable ramp durations are 10 minutes for the Eastern Interconnection, or 20 minutes for tags entering or leaving the Western Interconnection. In the event that the start/stop ramp durations specified in the e-tag overlap such that there is insufficient time to reach the block accounting scheduled Energy MWs specified, the e-tag will be denied by SPP (e.g. a schedule profile segment with start/stop duration of 15 minutes specified with a 20 minute start/stop ramp duration). 5.3 Ramp Reservation Validation The Integrated Marketplace Ramp Validation will first determine the Ramp-Up or Ramp-Down Capability required, in MWs/minute, at each schedule breakpoint based on the change in the proposed scheduled interchange Energy MWs divided by the ramp duration: Import tags: Ramp-Up is validated for import ramp availability; Ramp-Down is validated for export ramp availability. Export tags: Ramp-Up is validated for export ramp availability; Ramp-Down is validated for import ramp availability. Ramp Reservation requests will be approved immediately upon submission subject to the verification of available Ramp-Up or Ramp-Down Capability; after accounting for all other approved Ramp Reservations and approved or pending e-tags. The available Ramp Capability in either direction will be offset by simultaneous reserved or tagged ramp commitments made in the opposite direction in accordance with netting rules established by the SPP Integrated Marketplace. NOTE: Refer to section 5.5 e-tag Ramp Validation for information on how webtrans validates e-tags for ramp availability. 5.4 Ramp Reservation Deadlines Reserved ramp that has not been tagged will be released for the entire Operating Day (OD) immediately after the Day-Ahead (DA) Market closing time. Real-Time (RT) reserved ramp that has not been tagged will be released for the entire duration of the Ramp Reservation at 30 minutes prior to the reserved ramp start time. Tags submitted by the TC subsequent to the release of any reserved ramp will be validated against the remaining available Ramp Capability in the order submitted. If a TC/Market Participant (MP) does not submit a specific Ramp Reservation, the system will evaluate the submitted e-tag against the available capability. 5.5 e-tag Ramp Validation The Integrated Marketplace Ramp Validation will first determine the Ramp-Up or Ramp-Down Capability required, in MWs/minute, at each schedule breakpoint based on the change in the proposed scheduled interchange Energy MWs divided by the ramp duration: Import tags: Ramp-Up is validated for import ramp availability; Ramp-Down is validated for export ramp availability. Export tags: Ramp-Up is validated for export ramp availability; Ramp-Down is validated for import ramp availability. Interchange Scheduling Reference Manual 18

20 Ramp Reservation for Interchange Scheduling The Ramp Validation will then determine if there are any unscheduled ramp commitments held by the CPSE under one or more Ramp Reservations matching the ramp start/stop times specified in the e-tag at each schedule breakpoint. If so, the unscheduled ramp commitments held on those Ramp Reservations will be allocated first to support the proposed e-tag schedule. Any additional Ramp Capability required beyond that supported by one or more Ramp Reservations, or the entire Ramp Capability required by the proposed scheduled interchange in the case where the CPSE does not have any supporting Ramp Reservation(s), will be validated against the remaining Ramp-Up or Ramp-Down Capability available. If there is sufficient Ramp Capability available to support the e-tag transaction, ramp commitments will be allocated to support the proposed scheduled interchange and the e-tag will be approved, subject to passing all other e-tag validations, by SPP. That is, an implied ramp reservation will be committed to support the e-tag from the remaining SPP Ramp Capability for the ramp required in excess of any pre-arranged ramp reservation(s) held by the CPSE on a first-come-first-served basis. If the proposed e-tag schedule would violate SPP Ramp Capability at any point in time, the e-tag will be denied by SPP. The Ramp Validation will respect the netting of simultaneous Ramp-Up and Ramp-Down commitments according to SPP rules for such netting. 5.6 Ramp Reservation System (RRS) The RRS is part of the OATI webtrans. MPs or authorized AOs may gain secured login access to webtrans and the RRS with an authorized Username and Password in addition to an OATI x.509 electronic certificate issued by the OATI webcares system. webtrans is available over the Internet. Market Participants are directed to the OATI Help Desk at (763) to obtain an authorized user account for webtrans. Please see the SMT 33.0 RRS Scenario Document for the URL to be used for SMT. Step Action Comments 1 Open webtrans via the Internet. 2 Click on the Click Here to Enter link/ User Login Screen displays. 3 Enter your credentials in the User Name and Password fields. 4 Click Login. WebTrans dashboard displays with a toolbar at the top. 5 Click Marketplace from the homepage toolbar. 6 Select Ramp from the menu, then Ramp Reservation Summary from the sub-menu. A drop-down menu displays. A screen displays with approved ramp reservations and button that allows you to enter a new reservation. Interchange Scheduling Reference Manual 19

21 Ramp Reservation for Interchange Scheduling 5.7 Ramp Reservation (Submission) Display The TC/MP or authorized AOs may submit ramp reservation requests using the RRS. Ramp reservations are limited to a single designated OD in the SPP Integrated Marketplace. Ramp reservations may be submitted and approved up to seven (7) days prior to a given OD in accordance with the SPP Integrated Marketplace Bid/Offer submission window. The Ramp Reservation Entry Form is accessible from the Ramp Reservation Summary display, which allows entry of a ramp reservation request. Step Action Comments 1 Click Ramp Reservation Entry. The Ramp Reservation Entry screen displays with a blank entry form. 2 Enter the necessary data in the fields, including: Provider (e.g. SWPP) Operating Day Customer (e.g. Your PSE Code) Direction (Direction of Flow; e.g. Import) Start Time and Stop Time (Always CP) Energy MW (MW Amount to be reserved) The information on the right side of the screen populates after you click Check, as shown in the next step. NOTE: The ramp reservation profile should mirror the profile of the e-tag that will be submitted. Interchange Scheduling Reference Manual 20

22 Ramp Reservation for Interchange Scheduling After entering the ramp reservation data, the Customer has several options shown at the bottom of the screen. Option Action Comments 1 Click Check. This option will check the available Ramp-Up and Ramp-Down Capability needed to support the proposed scheduled interchange profile. Any violations of the total SPP Ramp Capability in either direction will be indicated and allow for the user to adjust the Energy profile as needed to avoid the ramp violations. No ramp commitments are held with the Check option, and there is no guarantee that subsequent submission of the Ramp Reservation request will be approved. 2 Click Commit. This option will perform the available Ramp-Up and Ramp-Down Capability verification; and if there is no violation of total SPP Ramp Capability in either direction, the Ramp Reservation will be approved and a corresponding ramp commitment for the proposed scheduled interchange will be held for the MP. If any violations of the total SPP Ramp Capability in either direction are detected, those violations will be indicated and allow for the user to adjust the Energy profile as needed to avoid the ramp violations similar to the Check option. 3 Click Clear. This option clears the data entered and allows the user to start with a clean screen. 4 Click Close. This option closes the screen. If this option is checked prior to clicking Commit, the data will be lost. Interchange Scheduling Reference Manual 21

23 Ramp Reservation for Interchange Scheduling 5.8 Ramp Reservation Status Ramp reservations that have been approved may be viewed from the Ramp Reservation Summary display. Details of the ramp reservation proposed scheduled Interchange profile, and all pending or approved e-tags that have been submitted that are supported by a given ramp reservation may be viewed by clicking on the assigned Ramp Reservation ID from the Ramp Reservation Data display. The ID displays in blue on the left of the screen below. After clicking on the Reservation ID for the PSE bucket, the Ramp Reservation Detail display will provide the details for that particular reservation. If a tag has been created against the ramp reserved, the tag will be indicated in the Ramp Commitment section. Interchange Scheduling Reference Manual 22

24 Ramp Reservation for Interchange Scheduling Ramp Availability SPP s Ramp Availability is the amount of up/down ramp left and ready to be reserved. It will change based on reservations and tags submitted, and it will be deducted from the Ramp Capability of 500. Step Action 1 From the WebTrans dashboard, click Marketplace from the toolbar. 2 Select Ramp from the menu, then Ramp Availability from the sub-menu. Comments A drop-down menu displays. The Ramp Availability Data screen displays. NOTE: To populate the data on the screen, you must either select filtering options or click the View Display button. 3 Click on the Filter icon in the upper right-hand corner of the screen. The Filtering Options window displays. 4 Select SWPP from the Provider field drop-down menu. 5 Select the desired date range from the Range drop-down menu or click on the Calendar icon to select a date. Interchange Scheduling Reference Manual 23

25 Ramp Reservation for Interchange Scheduling Step Action 6 Select the desired block size from the Availability Block Size drop-down menu. 7 Enter the desired Ramp Duration from the drop-down menu. 8 Click Apply to apply the filters selected, or click Reset to reset the filters and start over. Comments NOTE: Block size is the increment displayed in minutes (e.g. a block size of 60 provides the ramp information hourly.) Users can set this field to smaller increments to fine-tune their requests. NOTE: Ramp duration is how long the ramp will spread the desired MWs over to ramp up or down (e.g. 10 minutes for Eastern interconnect; 20 minutes for WECC). NOTE: Results with applied filters are shown in the screenshot below. The Block Size is for 60 minutes (an hour) which users can see from the times in the Start and Stop columns. NOTE: The Available Ramp Up and Available Ramp Down columns display the remaining Ramp- Up (positive numbers) and Ramp-Down (negative numbers) for the selected Block Size. Interchange Scheduling Reference Manual 24

26 Tagging Interchange Transactions 6 Tagging Interchange Transactions 6.1 Electronic Tagging (e-tag) e-tagging is a process of electronically communicating a request for, securing approval of, and recording an Energy transaction. The functionality of the e-tag is used to track proof of Energy delivery as required by one or more regulatory bodies within the Eastern Interconnection. It is the responsibility of the CPSE to fill out and submit the e-tags. e-tags that do not comply with the following criteria are considered to be invalid and will be rejected. e-tags must: comply with the Market Protocols regarding selection of market types and transaction types have an existing confirmed SWPP transmission reservation fit within the parameters of the transmission reservation be compliant with the procedures specified in the SPP OATT and Business Practices have a unique tag ID 6.2 Tag Transaction Types Tag submissions contain several different attributes associated with the request. These attributes provide detailed information associated with each request. The attributes are 1) Tag Transaction type, 2) Interchange Schedule Type, 3) Market Type and 4) Market Transaction Type. Each Interchange Transaction Schedule has type fields that must be filled in indicating the use of the tag. There are several Tag Transaction Types available through the NERC Electronic Tagging Process: Normal Tag for regular (normal) Energy Dynamic Tag with an estimated mw that is updated modified in real-time to comply with NERC requirements and updated to the telemetered reading or mw value After- The-Fact Emergency Tag during an emergency of the BA can be created After-The-Fact. Loss Supply SPP Integrated Marketplace does not allow physical losses on tags/ schedules. Capacity SPP does not support Interchange Capacity Tags/Schedules. Recallable Tag with a recallable feature (The recallable feature is used for supplemental regulation transactions). Pseudo-tie Tag that allows inter-ba transmission visibility for Pseudo-tie facilities NOTE: SPP does not allow the use of all Tag Transaction Types Interchange Scheduling Reference Manual 25

27 Tagging Interchange Transactions 6.3 Interchange Schedule Types The Tag Transaction Types described above result in the following Interchange Schedule types for the SPP BA and Integrated Marketplace: Imports, Exports and Through. NOTE: SPP does not allow the use of all Interchange Schedule Types on tags. Physical paths that are internal to the SPP Integrated Marketplace and SPP BA are not tagged. See Market Protocols for Bilateral Settlement Schedules Import If the Source point is external to the SPP BAA and the Sink point is inside the SPP BA, the Interchange Schedule is an Import Schedule. The GCA and Source for all tags importing into the SPP BAA for settlement in the Integrated Marketplace must be external to the SPP BAA. The following requirements must be met: Confirmed transmission must have been acquired. The Source must match or be electrically equivalent to the Source on the TSR. POR and POD must match the TSR. NOTE: SPP registers members as POR and POD. MIS Transmission Service timing requirements apply. The LCA for all imports into SPP BAA must be SWPP. SWPP is not used in the sink field of an import tag. The sink used must match or be electrically equivalent to the sink on the TSR. REFERENCE: Market Protocols section Import Interchange Transactions Offers NOTE: Refer to Appendix B for an example tag physical path for an Import into SPP BA Export If the Sink point is external to the SPP BAA and the Source point is internal, the Interchange Schedule is an Export Schedule. The LCA and sink for all tags exporting out of the SPP BAA must be an external to the SPP BAA. Confirmed transmission must have been acquired. The GCA for all exports out of the SPP BAA must be SWPP. POR and POD must match the transmission reservation. NOTE: SPP registers members as POR and POD. SWPP is not used in the Source field of an Export tag. REFERENCE: Market Protocols section Export Interchange Transactions Offers NOTE: Refer to Appendix B for an example tag physical path for an Export from SPP BA/Market. Interchange Scheduling Reference Manual 26

28 Tagging Interchange Transactions Through If the Source point and Sink point are external to the SPP BAA; the Interchange Schedule is a Through Schedule (wheels through the SPP BAA). The LCA, GCA, Source and Sink for all Through Schedules must be external to the SPP BAA. Confirmed transmission must have been acquired. Special rules apply for POR and POD when combining Transmission Service. REFERENCE: Business Practice # 2350 Combining SPP Transmission Service Requests NOTE: Refer to Appendix B for example tag physical paths for Through/Wheels into and out of the SPP BA (for HVDC tie and non-hvdc tie transactions). 6.4 Market Types The market types for Interchange Schedules (for Normal and Dynamic tag types) are Day- Ahead Market and Real-Time Market Day-Ahead Market The Day-Ahead Market provides Market Participants with the ability to submit Bids and Offers for exporting and importing Energy out of and into the SPP BAA. NOTE: If Day Ahead is not explicitly defined in the e-tag, the Market Type defaults to Real- Time. The Market Data section of the e-tag must be filled out in order to explicitly define the intention of bidding or offering into the SPP Day-Ahead Market. Inputs to the Day Ahead process through tagged interchange transactions are: Bids and Offers for Exports and Imports Market Type designation Market Transaction Designation MW profile Outputs to Day Ahead process for tagged Interchange Transactions are cleared Import/Export Transactions which reflect adjusted Interchange Schedules that are not completely cleared Interchange Scheduling Reference Manual 27

29 Tagging Interchange Transactions Example of Day-Ahead Schedule Market Information SPP Market Information on an e-tag Market Date Market Type 9/27/2013 Real Time Fixed Day Ahead HE01 HE07 $25 HE07 $20 HE07 HE02 HE08 $20 HE08 $25 HE08 HE03 HE09 $25 HE09 $25 HE09 HE04 HE10 $25 HE10 $30 HE10 HE05 HE11 $20 HE11 HE11 HE06 HE12 $20 HE12 HE12 Transaction Type Dispatchable Up-to-TUC Specific Timing Requirements apply to Day Ahead tagged Interchange Transactions. These timing requirements are shown in the diagram below. It is important to note that Day Ahead tags are only allowed for one Operating Day (CPT) at a time. The Market Date must match the tag start/stop profile. PSEs are not allowed to adjust, correct, or extend Day Ahead tags during the Market Clearing time (11am 4pm). REFERENCE: Market Protocols section 4.3 Day-Ahead Activities The following is a Day-Ahead Activities Timeline taken from the IM Protocols: NOTE: All times are shown CPT. 00:00-11:00 MPs submit Offers and Bids 11:00 DA Market closes 16:00 SPP posts DA Market results 20:00 SPP communicates RUC results to affected MPs 1/30-1/30 Day-Ahead 01:00 02:00 03:00 04:00 05:00 06:00 07:00 08:00 09:00 10:00 11:00 12:00 13:00 14:00 15:00 16:00 17:00 18:00 19:00 20:00 21:00 22:00 23:00 12:00 AM 11:59 PM SPP Posts Operating Reserve Requirements 07:00 SPP performs DA Market process 11:00-16:00 SPP performs Day-Ahead RUC process 17:00-20:00 REFERENCE: Market Protocols section Day-Ahead Market Real Time Market (RTBM) For the RTBM, only Fixed Import and/or Export schedules may be submitted along with Through schedules. Import and/or Export schedules that clear in the Day-Ahead Market automatically roll forward as Fixed schedules for use in the RTBM. Interchange Scheduling Reference Manual 28

30 Tagging Interchange Transactions Real Time Schedule Market Information SPP Market Information on an e-tag Market Date Market Type Transaction Type 9/27/2013 Real Time Fixed Day Ahead Dispatchable Up-to-TUC Bid/Offer MWS are specified in Tag Energy Profile REFERENCE: Market Protocols section Real-Time Balancing Market The following table summarizes the valid combinations and associated Bid information for the SPP Integrated Marketplace: SOURCE Interface A SINK Market Transaction Bid/Offer Combinations WILLINGNESS TO PAY DISPATCHABLE SPP, internal pnode (load) Must be Yes Yes Interface A SPP NA Interface A SPP Yes SPP, internal pnode (generation) Interface A Must be Yes Yes SPP Interface A NA SPP Interface A Yes Interface A Interface B NA Interface A Interface B Must be Yes Yes TAG TRANSACTION TYPE NORMAL OR DYNAMIC INTERCHANGE SCHEDULE TYPES IMPORT OFFER PRICE LMP difference between Interface and Internal MARKET TYPE Up to TUC NORMAL OR DYNAMIC IMPORT Price Taker Fixed NORMAL OR DYNAMIC IMPORT Interface dispatchable LMP difference between NORMAL OR Interface and DYNAMIC EXPORT Internal Up to TUC NORMAL OR DYNAMIC EXPORT Price Taker Fixed NORMAL OR DYNAMIC EXPORT Interface dispatchable NORMAL OR DYNAMIC WHEEL Price Taker Fixed LMP difference between NORMAL OR Interface and DYNAMIC WHEEL Internal Up to TUC NOTE: If no market Bid information is submitted with the e-tag, the associated schedule is assumed to be Real-Time Fixed. Interchange Scheduling Reference Manual 29

31 Tagging Interchange Transactions 6.5 Integrated Marketplace Transaction Types There are 3 Marketplace Transaction Types supported for tagged Interchange Transactions. They are 1) Fixed, 2) Dispatchable and 3) Up-to-TUC. Each is discussed below. NOTE: If the Market Transaction type is not explicitly defined in the e-tag, the transaction defaults to Fixed Fixed Interchange Transactions Fixed Interchange Transactions are physical transactions that bring Energy into and/or out of the SPP BAA. Energy prices are settled at the LMP at the applicable External Interface Settlement Location. Submitters of this type of transaction in the Integrated Marketplace are price takers for that Energy. Fixed Interchange Schedules are supported in both the Day-Ahead Market and in the Real- Time Balancing Market. REFERENCE: Market Protocols section An e-tag for a Real-Time Fixed Interchange Schedule must be submitted no later than 20 minutes prior to the start of the schedule. Fixed Interchange Schedules may not be submitted or modified during the operating hour except for reliability purposes as determined by the Transmission Provider. The MP must ensure the transaction meets the applicable acknowledgement and transfer deadlines. Real Time Fixed Schedule Market Information choices in Yellow SPP Market Information on an e-tag Market Date Market Type Transaction Type 9/27/2013 Real Time Fixed Day Ahead Dispatchable Up-to-TUC Bid/Offer MWS are specified in Tag Energy Profile A Day-Ahead Fixed Interchange Schedule must be submitted via e-tag and approved by the MP and in the implemented state by 1100 hours CPT (OD-1). Day-Ahead Fixed Interchange Schedules automatically roll into the Real-Time Energy and Operating Reserve Market as a Fixed Interchange Schedule. Day-Ahead Fixed Schedule Market Information choices in Yellow SPP Market Information on an e-tag Market Date Market Type Transaction Type 9/27/2013 Real Time Fixed Day Ahead Dispatchable Up-to-TUC Bid/Offer MWS are specified in Tag Energy Profile Interchange Scheduling Reference Manual 30

32 Tagging Interchange Transactions If the submitter does not want the cleared Day-Ahead Fixed Interchange Schedule to roll into the Real-Time Balancing Market, the MP must zero out the e-tag no later than 30 minutes prior to the start of the schedule or the start of the operating hour. The MP is settled at the Day-Ahead Location Marginal Price (LMP) for the cleared MW amount and charged for any deviation in the Real-Time Balancing Market at real-time LMPs. NOTE: All Fixed Interchange Schedules Energy prices are settled at the LMP at the applicable External Interface Settlement Location Dispatchable Interchange Schedules Dispatchable Interchange Schedules are physical transactions that bring Energy into and/or out of the SPP BAA and specify a Bid or Offer (MWh). These schedules are supported in the Day-Ahead Market only and also must meet all market requirements. LMPs are determined in the Day-Ahead Market at the appropriate External Interface Settlement Location representing the interface between the SPP BA and the applicable External BA. A Dispatchable Offer specifies both a MW amount and a minimum price that the customer must pay if the transaction clears the Day-Ahead Market. See the example below for input to the Tag Market info section. REFERENCE: SPP Market Protocols section (3) (b) Import Interchange Transaction Offers The following business rules apply to Dispatchable Interchange Schedules: Dispatchable Interchange Schedules must adhere to the Day-Ahead Market timing deadlines. If the Dispatchable Interchange Schedule is cleared in the Day-Ahead Market, it rolls into the Real-Time Balancing Market and is treated as a Fixed Interchange Schedule at the MW level that was determined in the Day-Ahead Market. All Dispatchable Interchange Schedules, both Import Schedules and Export Schedules, are settled at LMPs determined in the Day-Ahead Market at the appropriate External Interface Settlement Location representing the interface between the SPP BA and the applicable external BA. Dispatchable Interchange Schedules cannot be used for Through Interchange Schedules. MPs may use the Market Import Service (MIS) product for Dispatchable Normal Interchange Schedules that are imports. Dispatchable pricing Offers can be a minimum of $-1000 and a maximum of $1000. Only one price and MW pair per hour is allowed. Partial hour pricing is not permitted. Interchange Scheduling Reference Manual 31

Transmission Service Reference Manual. April 29, 2015

Transmission Service Reference Manual. April 29, 2015 Transmission Service Reference Manual April 29, 2015 Revision History Revision History Date or Version Number April 29, 2015 Version 1.0 Author Shari Brown Change Description Initial creation of draft

More information

Introduction to the Integrated Marketplace

Introduction to the Integrated Marketplace The information, practices, processes and procedures outlined and contained in this publication are the intellectual property of Southwest Power Pool, Inc. and are protected by law. This publication or

More information

Energy Imbalance Market

Energy Imbalance Market Energy Imbalance Market Tariff Framework September 10, 2013 CAIS[Type text] [Type text] [Type text] Table of Contents 1. Introduction... 1 2. Guiding Objectives for the Tariff Framework... 2 3. Tariff

More information

Two Settlement - Virtual Bidding and Transactions

Two Settlement - Virtual Bidding and Transactions Two Settlement - Virtual Bidding and Transactions (Fall 2009) PJM 2009 2009 PJM 1 Agenda Two-Settlement Overview Two-Settlement Features & System Two-Settlement Business Rules Two-Settlement Data Requirements

More information

sink asset load power pool ISO pool participant bids operating constraints ancillary service declarations

sink asset load power pool ISO pool participant bids operating constraints ancillary service declarations G1 DEFINITIONS In the ISO rules: acceptable operational reason means with respect to a source asset, any one or more of the following: i) a circumstance related to the operation of the generating asset

More information

An Overview of the Midwest ISO Market Design. Michael Robinson 31 March 2009

An Overview of the Midwest ISO Market Design. Michael Robinson 31 March 2009 An Overview of the Midwest ISO Market Design Michael Robinson 31 March 2009 The Role of RTOs Monitor flow of power over the grid Schedule transmission service Perform transmission security analysis for

More information

ISO-NE Transmission Markets and Services Tariff Cross Sound Cable Business Practices. Version 10.0 April 17, 2013

ISO-NE Transmission Markets and Services Tariff Cross Sound Cable Business Practices. Version 10.0 April 17, 2013 ISO-NE Transmission Markets and Services Tariff Cross Sound Cable Business Practices Version 10.0 April 17, 2013 ISO-NE Transmission, Markets and Services Tariff Cross Sound Cable Business Practices Version

More information

Resource Monitoring and Deliverability Tool Paper

Resource Monitoring and Deliverability Tool Paper Resource Monitoring and Deliverability Tool Paper NWPP MC Phase 3 Operations Integration Work Group 11/30/2014 Page 1 of 16 Table of Contents Executive Summary... 3 1. Purpose... 5 2. Existent Methods

More information

How To Settle Day Ahead Energy, Loss, And Loss For A Day Ahead Market

How To Settle Day Ahead Energy, Loss, And Loss For A Day Ahead Market Settling the Day-Ahead Market Charge Codes included in this training: 6011, 6800, 6700, 6301. EXTERNAL Customer Services Page 1 of 45 Disclaimer All information contained in this document is provided for

More information

Convergence Bidding Tutorial & Panel Discussion

Convergence Bidding Tutorial & Panel Discussion Convergence Bidding Tutorial & Panel Discussion CAISO June 13, 2006 Joe Bowring PJM Market Monitor www.pjm.com Convergence Basics Day-Ahead Market basics Day-Ahead and Real-Time Market interactions Increment

More information

Energy Use Case - Creative Ideas For Creating a Business Environment

Energy Use Case - Creative Ideas For Creating a Business Environment Use Case 21: Energy Scheduling, Billing, and Settlement Summary: This Use Case presents the activities involved in the creation of an energy trading transaction. It shows the integration of the deregulated

More information

Interjurisdictional Energy Trading. IESO Training

Interjurisdictional Energy Trading. IESO Training Interjurisdictional Energy Trading IESO Training Revised: January, 2014 Introduction to Interjurisdictional Energy Trading AN IESO TRAINING PUBLICATION This document has been prepared to assist in the

More information

Demand Response FAQs

Demand Response FAQs 1 Under the current CAISO tariff, assuming it would otherwise meet the requirements under the CAISO tariff and business practice manuals to do so, can the Load associated with a retail meter participate

More information

Section 4: Scheduling Philosophy & Tools

Section 4: Scheduling Philosophy & Tools Welcome to the Scheduling Philosophy & Tools section of the PJM Manual for Scheduling Operations. In this section you will find the following information: A description of the PJM OI s scheduling philosophy

More information

PJM LMP Market Overview

PJM LMP Market Overview PJM LMP Market Overview Andrew Ott Senior Vice President, Markets June 10, 2010 PJM as Part of the Eastern Interconnection 6,038 substations KEY STATISTICS PJM member companies 600+ millions of people

More information

PAC7 Customer Specific Procedure

PAC7 Customer Specific Procedure PAC7 Customer Specific Procedure Table of contents 1. Procedure... 3 Call Services... 3 Day-Ahead (DA) Scheduling Process Pre DAM... 3 Hour Ahead (HA) Scheduling Process... 5 Real-Time Scheduling... 5

More information

Release User Group Agenda

Release User Group Agenda Release User Group Agenda September 20, 2011 10:00 a.m. 10:55 a.m. (Pacific Time) Web Conference Information URL: https://www.connectmeeting.att.com Meeting Number: 8665282256 Access Code: 4914267 Conference

More information

PJM Overview and Wholesale Power Markets. John Gdowik PJM Member Relations

PJM Overview and Wholesale Power Markets. John Gdowik PJM Member Relations PJM Overview and Wholesale Power Markets John Gdowik PJM Member Relations PJM s Role Ensures the reliability of the high-voltage electric power system Coordinates and directs the operation of the region

More information

PROCEDURE. Part 4.3: Real-Time Scheduling of the Physical Markets PUBLIC. Market Manual 4: Market Operations. Issue 44.

PROCEDURE. Part 4.3: Real-Time Scheduling of the Physical Markets PUBLIC. Market Manual 4: Market Operations. Issue 44. PUBLIC IMP_PRO_0034 PROCEDURE Market Manual 4: Market Operations Part 4.3: Real-Time Scheduling of the Physical Markets Issue 44.0 This procedure provides guidance to Market Participants on the Real-time

More information

New Brunswick Electricity Business Rules

New Brunswick Electricity Business Rules New Brunswick Electricity Business Rules Table of Contents Chapter 1 Chapter 2 Chapter 3 Chapter 4 Administration and Participation Transmission Planning and Connections Reliable Operations Billing and

More information

Table of Contents. Purpose. Eldorado Intertie and System (Eldorado- Four Corners) Scheduling. Operating Procedure

Table of Contents. Purpose. Eldorado Intertie and System (Eldorado- Four Corners) Scheduling. Operating Procedure Table of Contents Purpose... 1 1. Limits, Ratings, & Effectiveness Factors... 2 2. Contingency Operations... 2 2.1 Transmission Lines Outages... 2 2.2 APS Terminal Equipment Outages... 2 2.3 SCE Terminal

More information

First Deliverer Approach to Regulating gelectricity Imports in Cap and Trade Programs. RGGI Learning Session October 11, 2011 New York, NY

First Deliverer Approach to Regulating gelectricity Imports in Cap and Trade Programs. RGGI Learning Session October 11, 2011 New York, NY First Deliverer Approach to Regulating gelectricity Imports in Cap and Trade Programs RGGI Learning Session October 11, 2011 New York, NY Scott Murtishaw, California i PUC 2 Background: AB 32 Requirements

More information

Department of the Treasury Division of Purchase and Property QUICK REFERENCE GUIDE: SUBMIT A QUOTE SELLERS

Department of the Treasury Division of Purchase and Property QUICK REFERENCE GUIDE: SUBMIT A QUOTE SELLERS Department of the Treasury Division of Purchase and Property QUICK REFERENCE GUIDE: SUBMIT A QUOTE SELLERS Rev. Dec 24, 2015 12:42 PM Table of Contents 1. Purpose... 3 2. Summary Instructions... 3 2.1

More information

Ms. Rae McQuade President & COO, North American Energy Standards Board

Ms. Rae McQuade President & COO, North American Energy Standards Board NORTH AMERICAN ENERGY STANDARDS BOARD 801 Travis, Suite 1675 Houston, Texas 77002 Phone: (713) 356-0060 Fax: (713) 356-0067 email: naesb@naesb.org Web Site Address: www.naesb.org The Honorable Kimberly

More information

User Manual. CitiDirect \ CitiDirect EB - Citi Trade Portal. InfoTrade Phone No. 0 801 258 369 infotrade@citi.com

User Manual. CitiDirect \ CitiDirect EB - Citi Trade Portal. InfoTrade Phone No. 0 801 258 369 infotrade@citi.com CitiDirect \ CitiDirect EB - Citi Trade Portal User Manual InfoTrade Phone No. 0 801 258 369 infotrade@citi.com CitiDirect HelpDesk Phone No. 0 801 343 978, +48 (22) 690 15 21 Monday Friday 8.00 17.00

More information

NEW USER REGISTRATION AND EMAIL VERIFICATION

NEW USER REGISTRATION AND EMAIL VERIFICATION NEW USER REGISTRATION AND EMAIL VERIFICATION The Children s Treatment (CT) or Residential Treatment (RT) organization must have an assigned Departmental Vendor Number (DVN), a PIN number issued to the

More information

Document Services Online Customer Guide

Document Services Online Customer Guide Document Services Online Customer Guide Logging in... 3 Registering an Account... 3 Navigating DSO... 4 Basic Orders... 5 Getting Started... 5 Attaching Files & Print Options... 7 Advanced Print Options

More information

New York State of the Market System - NYISO Success Project

New York State of the Market System - NYISO Success Project Auxiliary Market Products Additional Capacity Zones The NYISO and stakeholders are developing the rationale in 2010 for creating additional capacity zones, identified as a recommendation in the 2009 State

More information

The Power Market: E-Commerce for All Electricity Products By Edward G. Cazalet, Ph.D., and Ralph D. Samuelson, Ph.D.

The Power Market: E-Commerce for All Electricity Products By Edward G. Cazalet, Ph.D., and Ralph D. Samuelson, Ph.D. The Power Market: E-Commerce for All Electricity Products By Edward G. Cazalet, Ph.D., and Ralph D. Samuelson, Ph.D. Why not use the Web to buy and sell transmission rights at prices derived from bids

More information

Mobility Tool Guide for Beneficiaries of Leonardo da Vinci programme

Mobility Tool Guide for Beneficiaries of Leonardo da Vinci programme EUROPEAN COMMISSION Directorate-General for Education and Culture Lifelong Learning: policies and programme Coordination of the "Lifelong learning" programme Mobility Tool Guide for Beneficiaries of Leonardo

More information

Rules on Southern Companies Energy Auction Participation

Rules on Southern Companies Energy Auction Participation Southern Company Services, Inc. First Revised Sheet No. 20B Superseding Original Sheet No. 20B Rules on Southern Companies Energy Auction Participation 1.0 Participation; Definitions 1.1 Southern Companies

More information

Credit Management and the ERCOT Nodal Market

Credit Management and the ERCOT Nodal Market Credit Management and the ERCOT Nodal Market Legal Disclaimers and Admonitions PROTOCOL DISCLAIMER This presentation provides a general overview of the Texas Nodal Market Implementation and is not intended

More information

user guide This user guide can be used as a whole manual, or sections, depending on the user s access permissions to AgendaOnline.

user guide This user guide can be used as a whole manual, or sections, depending on the user s access permissions to AgendaOnline. user guide This user guide can be used as a whole manual, or sections, depending on the user s access permissions to AgendaOnline. home page...3 General Features... 3 Other Features... 4 navigating agendas...5

More information

Wisconsin Medicaid Electronic Health Record Incentive Program for Eligible Professionals

Wisconsin Medicaid Electronic Health Record Incentive Program for Eligible Professionals P- Wisconsin Medicaid Electronic Health Record Incentive Program for Eligible Professionals June 15,2015 User Guide i Table of Contents 1 Introduction... 1 2 Before You Begin... 2 2.1 Register

More information

Table of Contents. Real-Time Reliability Must Run Unit Commitment and Dispatch (Formerly G-203) Operating Procedure

Table of Contents. Real-Time Reliability Must Run Unit Commitment and Dispatch (Formerly G-203) Operating Procedure No. 2310 Table of Contents Purpose... 2 1. Responsibilities... 2 2. Scope/Applicability... 2 2.1 Background... 2 2.2 Scope / Applicability... 2 3. Detail... 3 3.1 Energy Dispatching... 3 3.1.2 Real-Time

More information

Business Requirements Specification

Business Requirements Specification Business s Specification Version.16 October 19, 211 Revision History Date Version Description Author 6/8/211.8 Created the external business

More information

Quick Reference Guide. Vendor FAQ

Quick Reference Guide. Vendor FAQ This Frequently Asked Questions guide is meant to assist vendor users of the new emaryland Marketplace. If you require additional support, the emaryland Marketplace Support Team can be reached at emaryland@dgs.state.md.us.

More information

User's Guide. Product Version: 2.5.0 Publication Date: 7/25/2011

User's Guide. Product Version: 2.5.0 Publication Date: 7/25/2011 User's Guide Product Version: 2.5.0 Publication Date: 7/25/2011 Copyright 2009-2011, LINOMA SOFTWARE LINOMA SOFTWARE is a division of LINOMA GROUP, Inc. Contents GoAnywhere Services Welcome 6 Getting Started

More information

Administrator Instructions for Link2CDMS Contractor Document Management System

Administrator Instructions for Link2CDMS Contractor Document Management System Table of Contents Administrator Instructions for Link2CDMS Contractor Document Management System Getting Started... 2 Viewing Your Approvals Dashboard... 2 Specifying Contractor Approval Status... 7 Adding

More information

Council of Ontario Universities. COFO Online Reporting System. User Manual

Council of Ontario Universities. COFO Online Reporting System. User Manual Council of Ontario Universities COFO Online Reporting System User Manual Updated September 2014 Page 1 Updated September 2014 Page 2 Table of Contents 1. Security... 5 Security Roles Defined in the Application...

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) ) ) ) ) )

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) ) ) ) ) ) UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION Independent Market Monitor for PJM v. PJM Interconnection, L.L.C. ) ) ) ) ) ) Docket No. EL14- -000 COMPLAINT AND MOTION TO CONSOLIDATE

More information

Optimizing Wind Generation in ERCOT Nodal Market Resmi Surendran ERCOT Chien-Ning Yu ABB/Ventyx Hailong Hui ERCOT

Optimizing Wind Generation in ERCOT Nodal Market Resmi Surendran ERCOT Chien-Ning Yu ABB/Ventyx Hailong Hui ERCOT Optimizing Wind Generation in ERCOT Nodal Market Resmi Surendran ERCOT Chien-Ning Yu ABB/Ventyx Hailong Hui ERCOT FERC Conference on Increasing Real-Time and Day-Ahead Market Efficiency through Improved

More information

CRM Login ADMIN PANEL. URL - www.fulloncrm.com. Login page Details: 1. Login Page :

CRM Login ADMIN PANEL. URL - www.fulloncrm.com. Login page Details: 1. Login Page : CRM Login ADMIN PANEL URL - www.fulloncrm.com Login page Details: 1. Login Page : Enter your Login Credential and click on login then it will open your panel. 2. Admin Dashboard : Your Admin dashboard

More information

CONTRACT MANAGEMENT SYSTEM USER S GUIDE VERSION 2.7 (REVISED JULY 2012)

CONTRACT MANAGEMENT SYSTEM USER S GUIDE VERSION 2.7 (REVISED JULY 2012) CONTRACT MANAGEMENT SYSTEM USER S GUIDE VERSION 2.7 (REVISED JULY 2012) VERSION 2.6 (REVISED APRIL 2012)... I INTRODUCTION... 5 Helpful Hints... 5 Pop-Up Blockers... 5 Users... 6 CPUC Staff Administrator...

More information

Portal Interactions Reports. Settlements dddaniels@spp.org

Portal Interactions Reports. Settlements dddaniels@spp.org Portal Interactions Reports Settlements dddaniels@spp.org Content Settlements Financial Reports Determinant Reports Settlement Statements Settlement Invoices EQR Data Download Reports Settlements Timeline

More information

Compliance Document Manager User Guide

Compliance Document Manager User Guide Compliance Document Manager User Guide CONTENTS Overview...2 System Requirements...2 Log In...3 Navigation...4 Navigating Compliance Manager...4 Screen Vendors...5 Manage Oversight...6 My Calendar...6

More information

Demand Response Frequently Asked Questions (Last Updated 02/23/16)

Demand Response Frequently Asked Questions (Last Updated 02/23/16) # Questions Answers 1 Under the current CAISO tariff, assuming it would otherwise meet the requirements under the CAISO tariff and business practice manuals to do so, can the Load associated with a retail

More information

VENDOR ENROLMENT HELP MANUAL MATERIALS, COMPONENTS & SERVICES

VENDOR ENROLMENT HELP MANUAL MATERIALS, COMPONENTS & SERVICES VENDOR ENROLMENT HELP MANUAL For MATERIALS, COMPONENTS & SERVICES Page 0 OFB eprocurement System Vendor Enrolment Module This module affects all users who wish to enroll as a Vendor. Through this enrolment,

More information

Florida Department of Environmental Protection Office of Technology and Information Services

Florida Department of Environmental Protection Office of Technology and Information Services Florida Department of Environmental Protection Office of Technology and Information Services Industrial and Domestic Wastewater EzDMR (Discharge Monitoring Reporting) External User s Guide Prepared by:

More information

1. Cloud Computer... 1. 2. Login to ICT Marketplace Portal... 1. 3. Dashboard... 2. 4. Management... 5. 4.1. New Cloud computer...

1. Cloud Computer... 1. 2. Login to ICT Marketplace Portal... 1. 3. Dashboard... 2. 4. Management... 5. 4.1. New Cloud computer... Contents 1. Cloud Computer... 1 2. Login to ICT Marketplace Portal... 1 3. Dashboard... 2 4. Management... 5 4.1. New Cloud computer... 5 4.2. SMS authentication... 6 4.3. Remove Cloud computers... 7 4.4.

More information

STEPS TO REGISTER YOUR PROFILE AND BOOK THE COUPON

STEPS TO REGISTER YOUR PROFILE AND BOOK THE COUPON STEPS TO REGISTER YOUR PROFILE AND BOOK THE COUPON 1. Registering with Sabarimala Virtual Q Portal A user can register into the site after a few easy steps. A user needs to register with the site to be

More information

CAQH ProView. Practice Manager and Provider Frequently Asked Questions

CAQH ProView. Practice Manager and Provider Frequently Asked Questions CAQH ProView Practice Manager and Provider Frequently Asked s *s related to the CAQH ProView Practice Manager Module begin on page 2. *s on the CAQH ProView system for providers begin on page 6. 1 P age

More information

MERCHANT SERVICES ONLINE. TD Retail Card Services

MERCHANT SERVICES ONLINE. TD Retail Card Services MERCHANT SERVICES ONLINE TD Retail Card Services FAST, FREE & SECURE Web Manual Version 11.30 Table of Contents The TDRCS Online Merchant Services Website What is it? How to Use It Log In Main Menu Consumer

More information

Nodal Exchange Contract Specifications

Nodal Exchange Contract Specifications Nodal Exchange Contract Specifications Monthly Day Ahead On-Peak Power Contract Specification Cash Settled Financial On-Peak Power. Financial On-Peak, [PJM/NYISO/MISO/MISO-RTO/ISO- NE/CAISO/ERCOT] [Nodal

More information

www.etenders.gov.ie Electronic Tender Management System Quick User Guide Supplier

www.etenders.gov.ie Electronic Tender Management System Quick User Guide Supplier Electronic Tender Management System Quick User Guide Supplier Page 1 Contents 1. Using the system 1.1 1.2 Supplier registration Finding published tenders 2. Responding to a public advertisement / notice

More information

153 FERC 61,306 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER ON REHEARING AND CLARIFICATION. (Issued December 17, 2015)

153 FERC 61,306 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER ON REHEARING AND CLARIFICATION. (Issued December 17, 2015) 153 FERC 61,306 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Norman C. Bay, Chairman; Cheryl A. LaFleur, Tony Clark, and Colette D. Honorable. Nevada Power Company

More information

MICHIGAN RENEWABLE ENERGY CERTIFICATION SYSTEM OPERATING PROCEDURES

MICHIGAN RENEWABLE ENERGY CERTIFICATION SYSTEM OPERATING PROCEDURES MICHIGAN RENEWABLE ENERGY CERTIFICATION SYSTEM OPERATING PROCEDURES November, 2012 Table of Contents Glossary... iiiv 1 Introduction... 1 2 MIRECS User Registration... 2 2.1 Participation in MIRECS...

More information

Oracle Eloqua HIPAA Advanced Data Security Add-on Cloud Service

Oracle Eloqua HIPAA Advanced Data Security Add-on Cloud Service http://docs.oracle.com Oracle Eloqua HIPAA Advanced Data Security Add-on Cloud Service Configuration Guide 2015 Oracle Corporation. All rights reserved 05/11/2015 Contents 1 HIPAA 3 1.0.1 What is HIPAA?

More information

Transactive Energy Framework for Bilateral Energy Imbalance Management

Transactive Energy Framework for Bilateral Energy Imbalance Management Transactive Energy Framework for Bilateral Energy Imbalance Management Farrokh Rahimi, Ph.D. Vice President Market Design and Consulting GridWise Architectural Council Meeting Westminster, CA December

More information

Alfresco Online Collaboration Tool

Alfresco Online Collaboration Tool Alfresco Online Collaboration Tool USER MANUAL BECOMING FAMILIAR WITH THE USER INTERFACE... 4 MY DASHBOARD... 4 MY PROFILE... 6 VIEWING YOUR FULL PROFILE... 6 EDITING YOUR PROFILE... 7 CHANGING YOUR PASSWORD...

More information

Automatic Exchange of Information (AEOI)

Automatic Exchange of Information (AEOI) Automatic Exchange of Information (AEOI) Web Portal Help v1.7 Index General Registration process IRS registration AEOI registration FI online user management Report submission / file upload Submission

More information

Learning Management System (LMS) Guide for Administrators

Learning Management System (LMS) Guide for Administrators Learning Management System (LMS) Guide for Administrators www.corelearningonline.com Contents Core Learning Online LMS Guide for Administrators Overview...2 Section 1: Administrator Permissions...3 Assigning

More information

Overview of Reliability Demand Response Resource

Overview of Reliability Demand Response Resource Overview of Reliability Demand Response Resource Radha Madrigal Customer Service Department May 8, 2014 Agenda Product overview and purpose Define Reliability Demand Response Resource Agreements & registration

More information

Key Take Away : There are 4 types of MISO transmission transactions : 1) Drive- In, 2) Drive-Within, 3) Drive-through, and 4) Drive-Out

Key Take Away : There are 4 types of MISO transmission transactions : 1) Drive- In, 2) Drive-Within, 3) Drive-through, and 4) Drive-Out 1 2 3 Key Take Away : There are 4 types of MISO transmission transactions : 1) Drive- In, 2) Drive-Within, 3) Drive-through, and 4) Drive-Out Speaker Notes: Drive-In refers to transactions that originate

More information

July 2009 Request for Proposals (RFP) for Baseload Supply-Side Resources Bidders Q&A List Updated as of August 13, 2009

July 2009 Request for Proposals (RFP) for Baseload Supply-Side Resources Bidders Q&A List Updated as of August 13, 2009 July 2009 Request for Proposals (RFP) for Baseload Supply-Side Resources Bidders Q&A List Updated as of August 13, 2009 1) Will questions related to the July 2009 Baseload RFP be addressed at the LPSC

More information

Ministry of Education User Guide for the School Facilities Inventory System Application

Ministry of Education User Guide for the School Facilities Inventory System Application Ministry of Education User Guide for the School Facilities Inventory System Application Version 3.0 November 2009 Table of Contents Purpose of this Guide... 1 Overview... 2 Connecting to the SFIS Application...

More information

Chapter 7 System Operations and Physical Markets

Chapter 7 System Operations and Physical Markets MDP_RUL_0002_07 Market Rules Chapter 7 System Operations and Physical Markets Public Issue Date: June 3, 2015 Library Record No. MDP_RUL_0002_07 Document Name Market Rules for the Ontario Electricity Market

More information

An Associate of the UOB Group A UTRADE FX ELITE QUICK START GUIDE

An Associate of the UOB Group A UTRADE FX ELITE QUICK START GUIDE An Associate of the UOB Group A UTRADE FX ELITE QUICK START GUIDE Contents UTRADE FX QUICK START GUIDE About The Application... 1 Starting With the Application...1 Getting Started... 2 Logging In...2 Changing

More information

Wind Power and Electricity Markets

Wind Power and Electricity Markets PO Box 2787 Reston, VA 20195 Phone: 703-860-5160 Fax: 703-860-3089 E-mail: info@uwig.org Web: www.uwig.org Wind Power and Electricity Markets A living summary of markets and market rules for wind energy

More information

Coordinated Transaction Scheduling (CTS) between NYISO & PJM - Fourth Joint Meeting. Joint NYISO-PJM Meeting June 25, 2013 Hosted by PJM

Coordinated Transaction Scheduling (CTS) between NYISO & PJM - Fourth Joint Meeting. Joint NYISO-PJM Meeting June 25, 2013 Hosted by PJM Coordinated Transaction Scheduling (CTS) between NYISO & PJM - Fourth Joint Meeting Joint NYISO-PJM Meeting June 25, 2013 Hosted by PJM Agenda Final Proposal Benefits Assessment Look Ahead Prices Fees

More information

Getting Started. Getting Started with Time Warner Cable Business Class. Voice Manager. A Guide for Administrators and Users

Getting Started. Getting Started with Time Warner Cable Business Class. Voice Manager. A Guide for Administrators and Users Getting Started Getting Started with Time Warner Cable Business Class Voice Manager A Guide for Administrators and Users Table of Contents Table of Contents... 2 How to Use This Guide... 3 Administrators...

More information

Day to Day Operations Guide

Day to Day Operations Guide Day to Day Operations Guide Contents The Fulfillment Process... 2 Fulfilling Orders... 3 Sales Tax Documentation... 6 Cancelling an Order or Changing Order Quantity... 6 Processing Refunds and Partial

More information

NYC Common Online Charter School Application

NYC Common Online Charter School Application NYC Common Online Charter School Application Admin Guide In this guide, you will find information about the following features: How to log in How to view or export basic data 1. Application index How to

More information

SAP BusinessObjects Financial Consolidation Web User Guide

SAP BusinessObjects Financial Consolidation Web User Guide SAP BusinessObjects Financial Consolidation Document Version: 10.0 Support Package 18 2016-02-19 SAP BusinessObjects Financial Consolidation Web User Guide Content 1 General user functions....12 1.1 To

More information

End User Training Guide

End User Training Guide End User Training Guide October 2013 2005-2013 ExpenseWire LLC. All rights reserved. 1 expensewire.com Use of this user documentation is subject to the terms and conditions of the applicable End- User

More information

Wisconsin Medicaid Electronic Health Record Incentive Program for Eligible Hospitals

Wisconsin Medicaid Electronic Health Record Incentive Program for Eligible Hospitals P-00358D Wisconsin Medicaid Electronic Health Record Incentive Program for Eligible Hospitals User Guide i Table of Contents 1 Introduction... 1 2 Before You Begin... 2 2.1 Register with Centers for Medicare

More information

State Of California's Energy Bill

State Of California's Energy Bill 2750 Monroe Boulevard Valley Forge Corporate Center Audubon, PA 19403 James M. Burlew Counsel Telephone: (610) 666-4345 Fax (610) 666-8211 Email Address: james.burlew@pjm.com December 15, 2015 The Honorable

More information

Call Recorder User Guide

Call Recorder User Guide Call Recorder User Guide User Types The Call Recorder application includes a web based user interface. You must have the proper credentials to access the interface. There are two types of users of the

More information

Appendix A. Glossary. For. 2016 Request For Proposals For Long-Term Renewable Generation Resources for Entergy Louisiana, LLC

Appendix A. Glossary. For. 2016 Request For Proposals For Long-Term Renewable Generation Resources for Entergy Louisiana, LLC Appendix A Glossary For 2016 Request For Proposals For Long-Term Renewable Generation Resources for Entergy Louisiana, LLC Entergy Services, Inc. June 8, 2016 Website means the internet website https://spofossil.entergy.com/entrfp/send/2016ellrenewablerfp/index.htm.

More information

CFD-FX Trading platform Software User Guide. May 2006

CFD-FX Trading platform Software User Guide. May 2006 CFD-FX Trading platform Software User Guide May 2006 CONTENTS Introduction........................................................1 Installing the trading platform........................................1

More information

Health Insurance Oversight System Portal User Manual

Health Insurance Oversight System Portal User Manual Last updated: July 22, 2014 Table of Contents 1 Introduction... 7 2 HIOS System Access... 8 2.1 New Users Registration... 8 2.2 Existing HIOS Users... 20 3 Portal Home Page... 24 3.1 Manage an Organization...

More information

Kentico CMS 7.0 Intranet Administrator's Guide

Kentico CMS 7.0 Intranet Administrator's Guide Kentico CMS 7.0 Intranet Administrator's Guide 2 Kentico CMS 7.0 Intranet Administrator's Guide Table of Contents Introduction 5... 5 About this guide Getting started 7... 7 Installation... 11 Accessing

More information

North American Energy Standards Board

North American Energy Standards Board February 22, 2010 TO: NAESB Members, Related Energy Associations and Organizations and Posting CC: Lynn Costantini, NERC RE: Request for Proposals on Electric Industry Registry Administrator DATE: February

More information

AAPG 2011 Annual Convention & Exhibition April 10, 2011

AAPG 2011 Annual Convention & Exhibition April 10, 2011 Generator Transmission Grid Interconnection Guidelines AAPG 2011 Annual Convention & Exhibition April 10, 2011 Hala Ballouz, B.Sc., M.Sc. TAMU, P.E. President, Electric Power Engineers, Inc. Partner &

More information

Using the jmrdesign Service Desk

Using the jmrdesign Service Desk The jmrdesign Service Desk provides supported client users with a more comprehensive resource and easier to use interface. The jmrdesign Service Desk is designed to increase the efficiency and reduce the

More information

User Guide Quote Request for Quotation (RFQ)

User Guide Quote Request for Quotation (RFQ) OVERVIEW This User Guide describes how Suppliers participates in Request for Quotation (RFQ) events. HOW TO USE THIS USER GUIDE If familiar with the isupplier Portal Functionalities and the Oxy processes,

More information

HDA Integration Guide. Help Desk Authority 9.0

HDA Integration Guide. Help Desk Authority 9.0 HDA Integration Guide Help Desk Authority 9.0 2011ScriptLogic Corporation ALL RIGHTS RESERVED. ScriptLogic, the ScriptLogic logo and Point,Click,Done! are trademarks and registered trademarks of ScriptLogic

More information

Job Descriptions. Job Title Reports To Job Description TRANSMISSION SERVICES Manager, Transmission Services. VP Compliance & Standards

Job Descriptions. Job Title Reports To Job Description TRANSMISSION SERVICES Manager, Transmission Services. VP Compliance & Standards Updated July 11, 2013 Job Descriptions Job Title Reports To Job Description TRANSMISSION SERVICES VP Compliance & Standards Develops strategy and business plans for efficient, safe, reliable, regulatorycompliant

More information

Virtual Transactions in the PJM Energy Markets

Virtual Transactions in the PJM Energy Markets PJM Interconnection October 12, 2015 This page is intentionally left blank. PJM 2015 www.pjm.com i P age Table of Contents Executive Summary... 1 Background... 3 Synopsis of the Virtual Transactions...

More information

Florida Trip Ticket. Quick Start

Florida Trip Ticket. Quick Start Florida Trip Ticket Quick Start Support Number: 225-744-0807 1. Insert setup CD and the Trip Ticket setup will start automatically, then start program with icon named Trip Ticket on Desktop 2. Fill out

More information

ERCOT Monthly Operational Overview (March 2014) ERCOT Public April 15, 2014

ERCOT Monthly Operational Overview (March 2014) ERCOT Public April 15, 2014 ERCOT Monthly Operational Overview (March 2014) ERCOT Public April 15, 2014 Grid Operations & Planning Summary March 2014 Operations The peak demand of 54,549 MW on March 3 rd was greater than the mid-term

More information

ClinicAid Ontario - Getting Started Guide

ClinicAid Ontario - Getting Started Guide ClinicAid Ontario - Getting Started Guide Welcome to ClinicAid Setting up your provider record Connecting your account to the MC EDT system Adding your first patients Doing a demographic import of patient

More information

Bidder FAQ's and Tips LIWA eprocurement Portal

Bidder FAQ's and Tips LIWA eprocurement Portal Bidder FAQ's and Tips LIWA eprocurement Portal 1 FREQUENTLY ASKED QUESTIONS Welcome to Frequently Asked Questions (FAQ) The FAQ S published here are intended to help answer common concerns of our Supplier

More information

Technical Bulletin 2011-04-01. Bid Cost Recovery and Accounting for Delivered Minimum Load Energy Market Revenues. Market Issue

Technical Bulletin 2011-04-01. Bid Cost Recovery and Accounting for Delivered Minimum Load Energy Market Revenues. Market Issue Technical Bulletin 2011-04-01 Bid Cost Recovery and Accounting for Delivered Minimum Load Energy Market Revenues Market Issue April 5, 2011 Technical Bulletin 2011-04-01 Bid Cost Recovery and Accounting

More information

Rules on Southern Companies Energy Auction Participation. 1.2.1 Available Capacity: See Section 1.3 of Appendix DA-1 and Section 1.3 of Appendix HA-1.

Rules on Southern Companies Energy Auction Participation. 1.2.1 Available Capacity: See Section 1.3 of Appendix DA-1 and Section 1.3 of Appendix HA-1. Rules on Southern Companies Energy Auction Participation 1.0 Participation; Definitions 1.1 Southern Companies shall participate in the Energy Auction in accordance with these Rules on Southern Companies

More information

ECO Brokerage eauction Programme Bidder Guidance

ECO Brokerage eauction Programme Bidder Guidance ECO Brokerage eauction Programme Bidder Guidance Revised 05.02.2014 1 About the ECO Brokerage eauction Programme The Crown Commercial Service eauction team has been commissioned by the Department for Energy

More information

Process Owner: Change Manager Version: 1.0

Process Owner: Change Manager Version: 1.0 BMC REMEDY 8.1 CHANGE MANAGEMENT USER GUIDE Process Owner: Change Manager Version: 1.0 DOCUMENT REVISION HISTORY Revision Description Date Approved by Number V1.0 Initial Release 6/25/2015 6/25/2015 Page

More information

Last Updated on 11/06/2008. www.jobprotech.com

Last Updated on 11/06/2008. www.jobprotech.com Last Updated on 11/06/2008 www.jobprotech.com Copyright JobPro Technology, 2008 How to Use this Guide This manual is designed as a reference for JobPro customers. It is not intended to be a replacement

More information

Patient Portal. Accessing the Patient Portal. How to Begin: Enter first and last name, date of birth and create a user name and password.

Patient Portal. Accessing the Patient Portal. How to Begin: Enter first and last name, date of birth and create a user name and password. Patient Portal How to Begin: If you provided an email address when you registered as a patient, you can expect an email after your discharge that will be sent directly from CPSI, our Electronic Health

More information

Resolve Disputes User Guide

Resolve Disputes User Guide Resolve Disputes User Guide Online Merchant Services Copyright Statement Copyright 2012 by American Express Travel Related Services Company, Inc. All rights reserved. No part of this document may be reproduced

More information