REQUEST FOR PURCHASE IN EXCESS OF $20,000/CHANGE ORDER
|
|
|
- Erin Peters
- 10 years ago
- Views:
Transcription
1 REQUEST FOR PURCHASE IN EXCESS OF $20,000/CHANGE ORDER To: Mayor and City Council Agenda Item #: IV.F. From: Patty McGrath General Manager Edinborough Park/Aquatic Center Date: October 21, 2014 The Recommended Bid is El Within Budget 0 NotWithin Budget Subject: Request for Purchase Bathhouse Roof Replacement Aquatic Center Date Bid Opened or Quote Received: August 20, 2014 Bid or Expiration Date: Company: Les Jones Roofing, Inc. $27,791 Bulldog Contractors, LLC $29,925 TopSide, Inc. $29,994 Recommended Quote or Bid: Les Jones Roofing $27,791 Amount of Quote or Bid: General Information: The roof on the bathhouse was installed in The roof is not currently leaking, but it is showing its age and starting to wear thin. There is only one layer of shingles on the roof at this time. The roof replacement is an approved 2014 CIP. This project includes a tear off and new shingles on the entire bathhouse, and also the main entrance, admissions office, the concession stand, manager's office and several storage areas. Replacing the roof will update and modernize the look of the facility. The scope of work includes a complete tear off, underlayments, metal work, venting, and shingles. Les Jones Roofing, Inc. also includes their own 10 year watertight warranty, as well as the GAF lifetime warranty that holds a 50 year non-prorated 100% material and labor replacement if the product should fail. The work will be completed in fall Staff recommends the project be awarded to Les Jones Roofing, Inc. Attachments: Proposals City of Edina 4801 W. 50th St. Edina, MN 55424
2 LESJONES ROOFING ItiCORPORA TED October 2, 2014 MN License #6560 City of Edina 4801 W. 50th St. Edina, MN Re: Edina Aquatic Center Bath House 4300 W, 66th Street Edina, MN We have inspected the existing roofing on the above referenced location. The existing roofing consists of one layer of deteriorated asphalt shingles. Les Jones Roofing will be bidding on the tear off and reroofing.of the referenced building. We propose to do the following work. Note: We have not included any other buildings on the property in our scope of work. SHINGLE SPECIFICATIONS Tear Off 1. We will tear off the existing roofing on the referenced building. All debris will be cleaned up and hauled away. Underlayments 1. Snow and ice barrier will be installed up the first six feet at the eaves. 2. Snow and ice barrier will be installed 51/2 feet wide in valleys. 3. One layer of Shingle Mate will be installed over the remaining exposed roof area. 941 W. 80th Street Bloomington, MN / Fax: 962/
3 City of Edina Re; Edina Aquatic Center Bath House 10/2/14 Metal 1. New aluminum drip edge will be fastened to the roof decking at the eaves. 2. Preflnished metal 24" W-style valley will be installed. Vents 1. Seven new plumbing vents will be installed to replace the existing. 2. We will remove and install a new heat base, cap collar and flange to replace the existing. Note: The actual heat stack itself will not be removed or replaced. 3. New ridge vents will be installed at the main ridges. Shingles 1. We will install GAF Timberline HD shingles In the color of your choice. 2. New ridge cap and hip cap will be installed. Les Jones Roofing, Inc. Warranty Les Jones Roofing will issue a 10 year watertight warranty. Manufacture Warranty We have included the GAF Lifetimewarranty that holds a 50 year non prorated 100% material and labor replacement if the product should fail. MATERIALS AND LABOR FOR THIS WORK: $27, GAF Timberline HD Architectural Shingles Shingle Color: Accepted 8: Approved Initial THERE WILL BE ADDED CHARGES TO REPLACE ANY ROTTED WOOD. PLEASE NOTE: THIS PROPOSAL IS VALID FOR THIRTY DAYS FROM THE PROPOSAL DATE. ONCE THE PROPOSAL EXPIRES, PLEASE CONTACT THE OFFICE FOR A PRICE UPDATE. CONTRACTS POSTMARKED ON OR BEFORE THE CONTRACT EXPIRATION DATE WILL BE HONORED. 2
4 City of Edina Re: Edina Aquatic Center Bath House 10/2/14 Note: Due to the time of year, winter conditions are in effect. There will be an additional charge for snow and ice removal in order to perform your project. This work performed for an hourly rate of $55/Hr. per employee. If you do not wish to pay for snow and ice removal, you may choose to delay the project until spring when weather conditions are more favorable. I HAVE READ AND UNDERSTAND THE ABOVE Initial Notes: Les Jones Roofing is licensed, bonded and insured. Customer will need to provide a source of electricity for our use at the customer's expense. Miscellaneous items included in our bid: Building Permit Dumpsters Clean up and removal of roofing debris We will go over the premises with a magnet upon completion of job Tarps and plywood will be laid down to protect the landscaping Dumpster While your job is in progress, we will need to place a dumpster on site / in your driveway. If the dumpster cannot be placed in your driveway, there may be an additional charge to place it in the street, if this is allowed in your area. This dumpster is for Les Jones Roofing's construction debris only. The landfill will not accept any type of household debris. Trucks While your job is in progress, we may need to utilize your driveway for delivery of equipment and materials. Our crew will plan to park in your driveway for access to their tools and equipment. Please notify us to request a different parking arrangement. PAYMENT TERMS We will require a 30% down payment for this work at the time you sign this proposal. Please enclose your 30% down payment along with your signed copy of this contract, If your down payment Is not received at least five working days prior to your scheduled start date, your project may need to be rescheduled until the down payment is received. We will send monthly progress invoices at the end of each month. Payment of the amount reflected in the monthly progress Invoice is due upon receipt. You agree that we may cease work on the project, which is the subject matter of this proposal, if we do 3
5 City of Edina Re: Edina Aquatic Center Bath House 10/2/14 not receive payment of the amount due on a monthly progress invoice within 15 days of the invoice date. We will send you a final invoice of the balance due upon completion of the project described in this proposal. Payment in full of the amount reflected in the final invoice is due upon receipt of the final invoice. Interest of 1.5% per month will be charged on any balance for which we do not receive full payment within 15 days of the invoice date. STANDARD TERMS AND CONDITIONS Customer acknowledges reading and understanding the attached Standard Terms and Conditions, and any and all exhibits attached hereto, which are incorporated herein and made a part of this contract by reference. PERFORMANCE GUIDELINES Les Jones Roofing follows best industry practices concerning the specifications, materials and installation of quality roof systems as set forth by the National Roofing Contractors Association (NRCA). FORMALDEHYDE NOTICE Minnesota Statutes 325F.18 requires that contractor give the following notice to customer: IMPORTANT HEALTH NOTICE. SOME OF THE BUILDING MATERIALS USED IN THIS HOME (OR THESE BUILDING MATERIALS) EMIT FORMALDEHYDE. EYE, NOSE, AND THROAT IRRITATION, HEADACHE, NAUSEA AND A VARIETY OF ASTHMA-LIKE SYMPTOMS, INCLUDING SHORTNESS OF BREATH, HAVE BEEN REPORTED AS A RESULT OF FORMALDEHYDE EXPOSURE. ELDERLY PERSONS AND YOUNG CHILDREN, AS WELL AS ANYONE WITH A HISTORY OF ASTHMA, ALLERGIES, OR LUNG PROBLEMS, MAY BE AT GREATER RISK. RESEARCH IS CONTINUING ON THE POSSIBLE LONG-TERM EFFECTS OF EXPOSURE TO FORMALDEHYDE. REDUCED VENTILATION MAY ALLOW FORMALDEHYDE AND OTHER CONTAMINANTS TO ACCUMULATE IN THE INDOOR AIR. HIGH INDOOR TEMPERATURES AND HUMIDITY RAISE FORMALDEHYDE LEVELS. WHEN A HOME IS TO BE LOCATED IN AREAS SUBJECT TO EXTREME SUMMER TEMPERATURES, AN AIR-CONDITIONING SYSTEM CAN BE USED TO CONTROL INDOOR TEMPERATURE LEVELS, OTHER MEANS OF CONTROLLED MECHANICAL VENTILATION CAN BE USED TO REDUCE LEVELS OF FORMALDEHYDE AND OTHER INDOOR AIR CONTAMINANTS. IF YOU HAVE ANY QUESTIONS REGARDING THE HEALTH EFFECTS OF FORMALDEHYDE, CONSULT YOUR DOCTOR OR LOCAL HEALTH DEPARTMENT, 4
6 City of Edina Re: Edina Aquatic Center Bath House 10/2/14 ACCEPTANCE Thank you for the opportunity to bid on your roofing needs. If you find the above proposal acceptable, please sign below, initial next to the option selected above and return the original signed document to our office. If you need further information or clarifications, please contact me at LES JONES ROOFING, INC. By )L41 $:f2ecare/ Steve Spaid Sales 81, Estimating AZY-- I have read and understand this contract, including the Standard Terms and Conditions attached hereto, and agree to all of the terms and conditions contained herein. Accepted: Date: 5
7 CONTRACTORS, LLC Lic. ID 11BC August 28th, 2014 Patty McGrath General Manager Edinborough Park and Edina Aquatic Center 7700 York Avenue South Edina, MN Dear Patty, Thank you for the opportunity to bid on the Edina Aquatic Center roof. Bulldog Contractors provide outstanding service and quality. We seperate ourselves from other roofing companies by doing the following: We don't use dumpsters, all material is immediately removed from the site. We tear off the old ice and water membrane (other companies go over it, which voids the warranty) and if we can't tear it off we replace the decking. We use Tiger Paw under laminate which is superior to 15# felt. We have a list of referals and testimonials on our website, please visit Please let me know if you require additional information for your meeting with the city council. Thank you, Kirby Herman Cedar Avenue Lakeville, MN * Phone: * Fax: www,bulldogcontractorsllc.com
8 BULLDOG CONTRACTORS, LLC Cedar Ave Lakeville, MN Avww.bullclogcontractorsilc.com MN State License* 8C Phone: Name: Edina Aquatic Center 7700 York Ave S Edina, MN Scope of Work : Date: 8/20/14 > Remove and replace 95 sq asphalt shingle D Install synthetic underlayment(tiger paw) > Remove and replace all vents D Remove and replace all valleys D Remove and replace Ice and Water shield(to code) > Remove debris and haul away D Subject to change order for necessary permit Note: Proposal does not include any unforeseen conditions that may be uncovered, such as rotting wood and/or mold. These issues will be addressed via Change Order and will be corrected only upon approval of Patty Mcgrath and Bulldog Contractors, LLC. We hereby propose to furnish material and labor, complete in accordance with the above specifications for the sum of $29, plus applicable tax. Term: Payment to be made with a 50% deposit at contract signing and balance due upon completion and fmal inspection. All material is guaranteed to be as specified All work to be completed in a workmanlike manner according to the standard practices and Minnesota building code. Any alteration or deviation from the above specifications invoking extra cost will be executed only upon written change orders and will become an extra charge over and above the estimate. Our workers are fully covered by workers' compensation and general liability insurance. A lien waiver and warranty will be provided when contract is paid in Acceptance of Agreement: Date: Bulldog Contractors, LLC: Date:
9 Topside, Inc, 6140 Morgan CT OP IDE Minneapolis, MN Phone/Fax: (612) PROPOSAL Date Job # 10/2/ Name / Address Edina Aquatic Center Patty McGrath 4300 West 66th Street Edina, MN A+ RATING WITH THE BETTER BUSINESS BUREAU Specifications Tear-off shingles on entire roof of Edina Aquatic Center Install 12 feet of ice and watershield on lower edge of aquatic center roofline - Middle one slope of roof 22 X 64: Install ice & watershield on entire slope Line valley with ice & watershield; Lay #15 tar paper Install GAF Royal Sovereign 3-tab shingles Install new metal valleys (60 LF) Install 14 plumbing stack covers 'Install 152 LE anew ridge vent Clean up and removal of all roof debris; Dumpster Topside, Inc. will pick-up and pay for building permits Labor and Materials: 29, Optional - Additional: - Upgrade to GAF Timberline HD or Atlas Pinnacle shingles + $1, Downpayment of $14, due on or before start of job. Balance of $15, due within 7 days of completion of work. Total MN LICENSE #5276 LICENSED - BONDED - INSURED Total $29, (A) ANY PERSON OR COMPANY SUPPLYING LABOR OR MATERIALS FOR THIS IMPROVEMENT TO YOUR PROP irty MAY FILE A LIEN AGA1PS ['YOUR PROPER] Y tel LIM' PERSON OR COMPANY ISNOI PAIL) FOR 1HE CONTRIBOHON. (B) I INDER MINNESOTA LAW, YOU HAVE THE RIGHT TO PAY PERSONS WHO SUPPLIED LABOR OR MATERIALS FOR THIS IMPROVEMENT DIRECTLY AND DEDUCT THIS AMOUNT FROM OUR CONTRACT PRICE, OR WITHHOLD THE AMOUNTS DUE THEM FROM US UNTIL 120 DAYS AFTER COMPLETION OF THE IMPROVEMENT UNLESS WE GIVE YOU A LIEN WAIVER SIGNFA) BY PERSONS WHO SUPPLIED ANY LABOR OR MATERIALS FOR THIS IMPROVF,MENTAND WHO GAVE YOU TIMELY NO l'ice. CONDITIONS: All material. is guaranteed to meet speicifications. All work to be completed in a professional. workmanlike manner according to standard practices. Any alteration to or deviation from the above specifications involving extra costs will be executed only upon written orders and will be billed as an extra charge over and above this estimate. All agreements contingent upon strikes, accidents or delays beyond our control. Owner to carry fire, tornado and other necessary insurance, Workers are fully covered by Workman's Compensation insurance. NOTE: This proposal may be withdrawn by us if not accepted within 30 days. ACCEPTANCE: the above proposed prices. specifications and conditions are satisfactm and hereby accepted. You are authorized to complete this work as specified. Payment will be made as indicated above. Signature Date Robert Olson, President
Larry Haight's Residential Roofing Co, Inc 15203 NE 95th Street Redmond, Washington Phone: (425) 881-9771 Fax: (425) 869-1010
Larry Haight's Residential Roofing Co, Inc 15203 NE 95th Street Redmond, Washington Phone: (425) 881-9771 Fax: (425) 869-1010 Custom bid generated for: Job site address: Lake Villas Condominium Attention:
ROOFING AGREEMENT. Claims Managers Name: Property Address: Telephone (h) (w) (c) Insurance Company Policy No.
ROOFING AGREEMENT Date:_ Claims Managers Name: _ Homeowner(s) Property Address: 1 Story 2 Story Email Address: Telephone (h) _ (w) (c) Insurance Company Policy No. Deductible: Claim Other: Company will
1. Date 2. Page 1 of 7. GIVEN TO THE SELLER (BUILDER) AS A CONSTRUCTION DEPOSIT FOR PART PAYMENT OF MATERIALS 8. AND LABOR; OR
3. RECEIVED OF 4. This form approved by the Minnesota Association of REALTORS, which disclaims any liability arising out of use or misuse of this form. 2010 Minnesota Association of REALTORS, Edina, MN
CITY OF WHITE BEAR LAKE BUILDING INSPECTION DEPARTMENT 4701 Highway 61 White Bear Lake, MN 55110 Fax: 651-429-8503. Re-Roofing: Asphalt Shingles
CITY OF WHITE BEAR LAKE BUILDING INSPECTION DEPARTMENT 4701 Highway 61 White Bear Lake, MN 55110 Fax: 651-429-8503 Re-Roofing: Asphalt Shingles This is a summary of the standard requirements based on the
Watertown City Council
City of Watertown Watertown City Council October 13 th, 2015 Agenda Item: Highland Park Roof and Dugout Repairs Request for Action: Approve Resolution #2015-103, Approving Bid from JLF Homes, Inc. Department:
C. Remove all existing asphalt shingles, underlayment and any loose debris into contractor provided dumpsters.
SCOPE OF WORK Project Title: Replace Deteriorated Roof Singles at Cape Lookout National Seashore Maintenance Shop PMIS # 159350 Prepared By: Mike Baker Cape Lookout National Seashore 131Charles St Harkers
HomeGuard. Roof Inspection Report
510 Madera Ave. San Jose, CA 95112 (408) 993-1900 Fax (408) 993-1944 Contractors License No. 729266 Ordered by: Al Pippert Remax Santa Clara Valley 1530 Parkmoor Avenue #B San Jose, CA 95128 Inspected
ROOF INSPECTION REPORT
ROOF INSPECTION REPORT Date: October 9, 2012 Requesting Firm: FIRST CHOICE INSPECTIONS Santiago Salazar Address: 447 Chilberg Court, San Jose, CA 95133 Phone #: 408-771-7563 Roof Inspected At: 1465 Gerlach
Final inspections are completed by site visit only. Access to fenced yards shall be planned.
ROOFING RESIDENTIAL BUILDING INSPECTIONS DEPARTMENT www.ci.blaine.mn.us This handout is intended only as a guide and is based in part on the 2015 Minnesota State Building Code, Blaine City ordinances,
Roofing 101 - Signs that Your Roof Needs Repair/Replacement
By: Cherie Martel Roofing 101 - Signs that Your Roof Needs Repair/Replacement 1. Tell us a little bit about your company and its foundation. In 1963, Samuel T. Martel began a small family run roofing company,
Roofing Replacement Guide
Roofing Replacement Guide Prepared by Kearns Brothers Incorporated 2008, Kearns Brothers Incorporated, Dearborn, MI Roofing Replacement Guide 1- Finding a Roofing Contractor 2- The Interview 3- Roofing
Roof Inspection Report
Fax (408) 993-1944 Roof Inspection Report 1260 Fremont Street San Jose, 95126 Ordered by: Olivia Sahagun Custom Line Realty 3431 Hickerson Drive San Jose CA 95127 Inspected by: Kenneth Carlin March 17,
Residential Roofing Guide
Residential Roofing Guide TABLE OF CONTENTS Building Detail and Accessories...... 1 Panel Introduction and Handling...... 2 Cutting and Trimming.... 3 Roof Preparation..... 3 Roof Slope..... 3 Re-roofing...
NEW CONSTRUCTION PURCHASE AGREEMENT
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 NEW CONSTRUCTION PURCHASE AGREEMENT This form approved by the Fargo-Moorhead Area Association
Chapter 9: INSTALLING ROOFING
9.1 LEAK BARRIER (ICE AND WATER SHIELD) 9.2 SHINGLE UNDERLAYMENT 9.3 INSTALLING GUTTER APRON AND GABLE D-EDGE 9.4 INSTALLING SHINGLES 9.5 RIDGE VENT AND CAP Tools needed by each volunteer: Hammer (16 oz.
How To Replace A Roofing System In Florida
Florida Consumer Considerations in Replacing their Roofing System The Florida Roofing, Sheet Metal and Air Conditioning Contractors Association provides the following general information to help Florida
RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000
RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000 SECTION R905 REQUIREMENTS FOR ROOF COVERINGS R905.1 Roof covering application. Roof coverings
If You Own Property With GAF Timberline Roofing Shingles Made Between 1998 and 2009,
U.S. DISTRICT COURT FOR THE DISTRICT OF SOUTH CAROLINA If You Own Property With GAF Timberline Roofing Shingles Made Between 1998 and 2009, You Could Get Benefits from Class Action Settlements. A Federal
Detached accessory structures that contain no conditioned floor area are exempt.
RESIDENTIAL ROOFING PERMITS: A roofing permit is required for roofing of residential dwellings and garages in accordance with Section R105 of the International Residential Code. Updated 11/2013 City of
Roof Inspection Report
Fax (408) 993-1944 Contractors License No. 729266 Ordered by: Chad Hester Intero Real Estate 1900 Camden Avenue San Jose CA 95124 Inspected by: Kenneth Carlin Report No. 146190 SCOPE OF THE INSPECTION:
Asphalt Shingle Application Requirements
Alberta Allied Roofing Association Asphalt Shingle Application Requirements Section 1 Roof Decks 1.1 General Asphalt Shingles are not permitted to be installed directly over rigid insulation. When Asphalt
Oakridge Shingles Artisan Colors
Oakridge Shingles Artisan Colors featuring Oakridge Artisan Color Flagstone Oakridge Driftwood Oakridge Shingles Make it your own. When does a house become a home? When the place you live in begins to
DURATION STORM. TruDefinition. TruDefinition Duration STORM Shingles are a component of the Owens Corning Total Protection Roofing System.
TruDefinition DURATION STORM Impact-Resistant Shingles with WeatherGuard and SureNail Technologies Onyx Black TruDefinition Duration STORM Shingles are a component of the Owens Corning Total Protection
The Wo rd. Shingle Warranties - Getting Real
The Wo rd A look at terms used in home inspection reports Photo I ONCE AGAIN THE WORD INVITES YOU TO TRAVEL into the dark realm of subjects that are sometimes misunderstood by home inspectors. The Word
+1.877.497.3528 [email protected] www.grscanadainc.com
WORK ORDER AGREEMENT I. Work Site Documentation Quotation / Bid # Core Samples / Infrared Purchase Order # Consultant Report Start Date: II. Work Site Address Building Name Street City Province Postal
Shingle Installation Guide
Shingle Installation Guide Getting Started Dedicated to improving the environment, NewTech manufactures roofing tiles that are composed of up to 90% recycled post-industrial plastic. The manufacture of
What Every Homeowner Should Know About Replacing a Roof
What Every Homeowner Should Know About Replacing a Roof The Pacific Northwest lifestyle is the reason many of us live here. The proximity of the outdoors combined with all that a metropolitan area has
PREMIUM LAMINATED ASPHALT SHINGLES Dallas, TX Tuscaloosa, AL Phillipsburg, KS
Application Instructions for THESE ARE THE MANUFACTURER S APPLICATION INSTRUCTIONS FOR THE ROOFING CONDITIONS DESCRIBED. TAMKO BUILDING PRODUCTS, INC. ASSUMES NO RESPONSIBILITY FOR LEAKS OR OTHER ROOFING
ABOUT MACBETH THE MACBETH ADVANTAGE
www.macbethroof.com THE MACBETH ADVANTAGE Our goal is to ensure that every roofing project is performed with the highest attention to detail and to our customers complete satisfaction. Every MacBeth client
Georgia State University. Urban Life Building Roof Replacement
ENGINEERING AND ENVIRONMENTAL 140 DECATUR STREET SE, ATLANTA, GA 30303 GEORGIA STATE UNIVERSITY - FACILITIES DESIGN & CONSTRUCTION 34 BROAD STREET, SUITE 100 ATLANTA, GA 30303 DRAWING INDEX A-0 PROJECT
FLAT ROOF REPAIR CUT COST WITHOUT CUTTING CORNERS
FLAT ROOF REPAIR CUT COST WITHOUT CUTTING CORNERS Table of Contents Chapter 1: FLAT ROOF REPAIR - CUT COST WITHOUT CUTTING CORNERS Chapter 2: PVC RECOVER SYSTEM HOW IT WORKS Chapter 3: 8 STRATEGIES TO
ROOF INVESTIGATION SURVEY
ROOF INVESTIGATION SURVEY Prepared For: Susan Sametz Property Manager AAS Community Management P.O. Box 4382 St. Louis, MO 63123 Location: Rush Creek Homeowners Association Building #8 (8 units) 2025-2039
REPLACE YOUR ROOF TO VISUALLY INSPECT YOUR ROOF REGULARLY SO YOU CAN DISCOVER PROBLEMS WHILE THEY ARE STILL MINOR AND CAN BE REPAIRED.
???????????????????? REPLACE YOUR ROOF ???????????????????? REPLACE YOUR ROOF YOUR ROOF PROTECTS YOUR HOME FROM THE SUN, WIND AND RAIN. AGE, WEATHER AND THE SUBTROPICAL FLORIDA CLIMATE CAN TAKE THEIR TOLL
Berkshire. Collection. Berkshire Sherwood Beige
Berkshire Collection Berkshire Sherwood Beige ABOVE ALL ELSE Home sweet home. It s the place where you want to feel the most comfortable. Safe. Protected. But no matter how much you love your house, it
Building Owners Guide to a Duro-Last System!
Building Owners Guide to a Duro-Last System Table of Contents Section 1: Introduction to Duro-Last Roofing Systems Section 2: Benefits of a Duro-Last Roofing System Section 3: Comparing a Duro-Last Roof
TABLE OF CONTENTS" SECTION 3: Comparing Standing Seam Metal to Other Metal Roofs PAGE 7"
2 TABLE OF CONTENTS SECTION 1: What is a Standing Seam Metal Roof PAGE 3 SECTION 2: Common Types of Standing Seam Metal Roofs..PAGE 5 SECTION 3: Comparing Standing Seam Metal to Other Metal Roofs PAGE
HERITAGE WOODGATE LAMINATED ASPHALT SHINGLES Dallas, TX
Application Instructions for THESE ARE THE MANUFACTURER S APPLICATION INSTRUCTIONS FOR THE ROOFING CONDITIONS DESCRIBED. TAMKO BUILDING PRODUCTS, INC. ASSUMES NO RESPONSIBILITY FOR LEAKS OR OTHER ROOFING
ROOF CONSTRUCTION Roof Styles Gable Roof Hip Roof Gambrel Roof
ROOF CONSTRUCTION The overall appearance of a building is greatly affected by the roof lines and the roofing materials. The designer has many standard designs to choose from and should be able to find
How To Choose A Roofing Shingle
CertainTeed Homeowner s Guide to Reroofing So You Need to Reroof Your Home? Maybe you re not quite sure where to start? Or maybe you have reroofed your home before, but you need to brush up on some of
ROOFING CONTRACTORS QUESTIONNAIRE
ROOFING CONTRACTORS QUESTIONNAIRE ALL QUESTIONS MUST BE ANSWERED 1. Applicant Name: Website Address: Address: Years in business under the applicant name: Are you an NRCA (National Roofing Contractors Association)
Shingle Roofing: What s below the surface is important
What s below the surface is important The roof is leaking, the shingles look old, and the downspouts are dripping. It must be time to replace the roof or is it? Shingle roofs may seem simple, but a roof
Insurance claims EFFECTS OF HAIL
New Section 1 Page 1 Insurance claims As an insurance loss specialist, Sarasota Architectural Solutions is fully qualified to work with insurance companies to satisfy storm claims for damages. We are a
UNIVERSITY OF MINNESOTA
UNIVERSITY OF MINNESOTA Bond Number CONTRACTOR: «Vendor_Name» «Address_1» «Address_2» 00620PAY PAYMENT BOND SURETY (Name and Address as listed in the current Federal Register): OWNER: Regents of the University
NRCA s steep-slope manual is thoroughly revised for 2013
Photo courtesy of Boone Brothers Roofing, Omaha, Neb. NRCA s steep-slope manual is thoroughly revised for 2013 by Maciek Rupar 38 www.professionalroofing.net MARCH 2013 P ublished in January, The NRCA
REQUEST FOR QUOTES (RFQ)
REQUEST FOR QUOTES (RFQ) Lincoln County Public Works is requesting quotes (RFQ) through its Small Works Roster Process. Quotes are being requested for a project to replace the roof on the Crew Headquarters/Truck
TruDefinition DURATION STORM. Impact-Resistant Shingles with WeatherGuard Technology. Onyx Black
TruDefinition DURATION STORM Impact-Resistant Shingles with WeatherGuard Technology Onyx Black TWO TECHNOLOGICAL BREAKTHROUGHS IN ONE HIGH-PERFORMANCE SHINGLE. The innovative features of TruDefinition
Superior Cleaning and Restoration 950-5 Old Medford Avenue Medford, New York 631-451-8840. Proposal
Superior Cleaning and Restoration 950-5 Old Medford Avenue Medford, New York 631-451-8840 Proposal Submitted to: From: Date: March 12th, 2008 THIS REMEDIATION AGREEMENT is made this Day between AND (*Customer)
Preventing Ice Dams on Roofs
Preventing Ice Dams on Roofs Facility Manager November/December 2005 When a roof leaks, facility managers inevitably receive complaints from building occupants. If it is winter, ice dams are often the
16 2 10.3 Materials and Colors
16 2 10.3 Materials and Colors To create a harmonious and coherent image for each development, building designs shall pay close attention to choice of materials and colors. Building construction shall
SECTION 07320 ROOFING TILE
SECTION 07320 ROOFING TILE PART 1 - GENERAL 1.1 SUMMARY: A. Section Includes: 1. Vitrified clay roofing tiles. 2. Tile accessories. 3. Felt underlayment. 4. Self-adhering sheet underlayment. 5. Snow guards.
REQUEST FOR QUOTATION RFQ-FH-08-09-10118 ROOF REPAIR
DEPARTMENT OF CENTRAL SERVICES REQUEST FOR QUOTATION RFQ-FH-08-09-10118 ROOF REPAIR 1. GENERAL CONDITIONS A. The City of Farmington Hills DPW is requesting quotes to repair the existing flat roof on the
TruDefinition. Duration Storm. Impact-Resistant Shingles with WeatherGuard Technology. Onyx Black
TruDefinition Duration Storm Impact-Resistant Shingles with WeatherGuard Technology Onyx Black Teak Beauty that s designed to weather the storm. TruDefinition Duration STORM Impact- Resistant Shingles
APPLICATION / PERMIT# (office use only); DETAILED DESCRIPTION OF WORK:
DATE: 2016 PERMIT APPLICATION FOR RESIDENTIAL ROOFING, SIDING, WINDOW / DOOR REPLACEMENT City of Robbinsdale 4100 Lakeview Avenue North Robbinsdale MN 55422 Phone (763) 531-1268 Fax (763) 531-1200 Applications
SchoolRoof Repair - Cost For Replacement of a Student Roof, Part 2
ROOF REPAIR UPDATE For the November school newsletter, I wrote an article in which I explained the condition of the school roof, the estimated cost of replacing the three flat sections from the 1996 building
Inspecting to a higher standard.
Inspecting to a higher standard. Rob Hopkin Silver Spring, MD 20902 Monday, June 2, 2014 ProTec Inspection Services Inc. 19736 Selby Ave Poolesville, MD 20837 301-972-8531 www.protec-inspections.com [email protected]
Standard Product Limited Warranty
Standard Product Limited Warranty on Roofing Shingles OWENS CORNING ROOFING AND ASPHALT, LLC ONE OWENS CORNING PARKWAY TOLEDO, OHIO, USA 43659 1-800-GET-PINK www.owenscorning.com/roofing Pub. No. 10013920-G.
!!! !!!! !!! !!! !!! !!! !!!!!!!!! Table of Contents! Section 1: Most Common Types of Flat Roofing! Section 2: Better Understand Your Flat Roof!
Table of Contents Section 1: Most Common Types of Flat Roofing Section 2: Better Understand Your Flat Roof Section 3: Flat Roofing Cost in 2015: Four Factors that Dictate Section 4: Planning A Flat Roofing
ATLAS Roofing Products
ATLAS Roll Roofing Products World s Largest producer of roofing s Preferred by roofing professionals. Atlas has you covered on every part of the job, even what goes under your roofing. We are proud to
CHAPTER 67.2 RESIDENTIAL BUILDING CODE
CHAPTER 67.2 RESIDENTIAL BUILDING CODE 1. APPLICABILITY. This Chapter shall have, along with the Code adopted hereby, the scope and applicability set out in said code except as modified by the provisions
Table of Contents. Western States Standing Seam SS675 Panel Installation, Flashings & Shop Drawing Detail Guide. Notes to Designer /Installers..
Western States Standing Seam SS675 Panel Installation, Flashings & Shop Drawing Detail Guide Table of Contents Section Page Section Page Notes to Designer /Installers.. 1 Fastener Placement and Selection.2-3
NORTH CAROLINA WEATHERIZATION ASSISTANCE PROGRAM SUBCONTRACTOR AGREEMENT - PLUMBING
NORTH CAROLINA WEATHERIZATION ASSISTANCE PROGRAM SUBCONTRACTOR AGREEMENT - PLUMBING This Agreement is hereby entered into by and between Piedmont Triad Regional Council (herein Contractor ) and (Subcontractor)
Installation Manual for STANDING SEAM ROOFING
Installation Manual for STANDING SEAM ROOFING Absolute Steel Toll Free 877-833-3237 / Phone 480-768-1618 / Fax 480-768-1514 www.metalroofingsource.com Standing Seam features approximately one-inch high
INVITATION TO BID CITY OF HOPKINSVILLE
INVITATION TO BID CITY OF HOPKINSVILLE Office of the Procurement Specialist 715 South Virginia Street P. O. Box 707 Hopkinsville, Kentucky 42241-0707 TITLE: DESIGN BUILD MASONRY RESTROOM FACILITIES FOR
Assessment Report for Windmill Rehabilitation Project. Anne Curren, Town Clerk Town of North Castle 15 Bedford Road Armonk, New York 10504
Assessment Report for Windmill Rehabilitation Project Anne Curren, Town Clerk Town of North Castle 15 Bedford Road Armonk, New York 10504 Investigation and Documentation MAP employees measured all three
SINGLE FAMILY RESIDENCE HURRICANE MITIGATION APPLICATION
SINGLE FAMILY RESIDENCE HURRICANE MITIGATION APPLICATION As of October 1, 2007, this mitigation form must be submitted as part of the roofing permit application package. Secondary water barrier (if applicable)
Woodcrest. Shingles. Woodcrest Autumn Maple
Woodcrest Shingles Woodcrest Autumn Maple ABOVE ALL ELSE Home sweet home. It s the place where you want to feel the most comfortable. Safe. Protected. But no matter how much you love your house, it seems
Roof Maintenance Scope of Work
Roof Maintenance Scope of Work Reviewed By: Approved By: Version 3.0 Date 08-09-07 Author K. Vandenbussche 1 BACKGROUND The Integrated Service Provider s program will provide superior on-site equipment,
Retrofitting an Insulated Cold Roof
Retrofitting an Insulated Cold Roof As a metal-roofing contractor in the Upper Peninsula of Michigan, I am frequently asked to fix roof leaks that have less to do with roofing than with the way poorly
REMODELING CONTRACT., remodeling contractor, whose address is, to on the property located at.
REMODELING CONTRACT I. Parties This contract is made and entered into on and specifies the terms the agreement between, homeowners, and, remodeling contractor, whose address is, to on the property located
ARTICLE 11. INSURANCE AND BONDS
Provide submittals to Architect / Engineer that are required by any governing body or other authorities. Upon receipt of the Contractor s list, the Architect will make an inspection to determine whether
Springdale Public Works Department Specifications and Bid Document Roof Repair on Sign Shop Building at Public Works November 2015 1.
Page 1 of 8 1. INTRODUCTION 1.1 INTRODUCTION This is a Request for Bid (RFB). The format of this document must be followed throughout. 1.2 GENERAL INFORMATION Where the term City is used in the Request
APPLICATION INFORMATION FOR RESIDENTIAL ROOFING AND RESIDENTIAL ROOFING PACKET
Environmental Protection and Growth Management Department PERMITTING, LICENSING AND CONSUMER PROTECTION DIVISION 1 N. University Drive, Box #302 Plantation, Florida 33324 954-765-4400 www.broward.org/permittingandlicensing
CITY OF BELL PROFESSIONAL CONSULTING SERVICES FOR ROOF REPAIRS TO CITY OWNED FACILITIES
CITY OF BELL 6330 PINE AVENUE BELL, CA 90201 PH: (323) 588-6211 FAX: (323) 771-9473 CITY OF BELL PROFESSIONAL CONSULTING SERVICES FOR ROOF REPAIRS TO CITY OWNED FACILITIES I. INTRODUCTION City of Bell
For a period of one (1) year beginning on the Closing ( Warranty Period ), Builder warrants to Purchaser, and only Purchaser, that:
Limited Home Warranty Agreement The Limited Warranty specifies limits for responsibility and conditions under which it is valid or applicable. Our Employees, Sales Associates, Trade Contractors, Vendors,
CertainTeed. Protecting Your Home From Ice Dams Homeowner s Guide
CertainTeed Protecting Your Home From Ice Dams Homeowner s Guide What Are Ice Dams? Ice dams are formed when heat from the inside of a home escapes into the attic and warms the roof decking during the
CITY OF FLORIDA CITY Building and Zoning Department 404 West Palm Drive Florida City, FL 33034 305-247-8222 ROOFING PERMIT APPLICATION
IF SUBSIDIARY, PROVIDE MASTER PERMIT NUMBER HERE: CITY OF FLORIDA CITY Building and Zoning Department 404 West Palm Drive Florida City, FL 33034 305-247-8222 ROOFING PERMIT APPLICATION Location of Improvements
RESIDENTIAL/COMMERICIAL ROOFING APPLICATION Date / / BUILDING PERMIT APPLICATION
Community Development 1050 W Romeo Rd, Romeoville, IL 60446-1530 (815) 886-7200 Fax: 815/886-2724 Email: [email protected] RESIDENTIAL/COMMERICIAL ROOFING APPLICATION Date / / BUILDING
HERNDON/MUNCEY, INC. Office: (281) 579-0515 INVESTIGATIVE PLUMBING
HERNDON/MUNCEY, INC. Office: (281) 579-0515 INVESTIGATIVE PLUMBING Fax: (281) 579-1960 February 21, 2014 INVOICE NO.: HR18831 TIN: 76-0462307 1 STATIC TEST $350.00 1 HYDROSTATIC $125.00 PAID MASTER CARD
Crescent Valley High School Roof Investigation
Crescent Valley High School Roof Investigation Project: Corvallis School District Crescent Valley High School Roof Date: July 26, 2011 Report By: Rowell Brokaw Architects: Mark Young, AIA, Chris Andrejko
A0 SHEET 1 OF 5 400 LOCUST STREET FRANKFORT, KANSAS 66427 FRANKFORT, KANSAS 66427 ROOF REPAIR OF THE 400 LOCUST STREET
POYNTZ AVENUE, STE 9 MANHATTAN, KS 0..0..9 FAX WEST th STREET JUNCTION CITY, KS.... FAX 0, Bruce McMillan AIA, Architects, P.A. HERITAGE TRUST FUND GRANT PROJECT NO. 0-0 ROOF REPAIR OF THE 00 LOCUST STREET
TITLE: MASONRY PARAPET WALLS AND FLAT ROOF REQUIREMENTS 11/1/09
TITLE: MASONRY PARAPET WALLS AND FLAT ROOF REQUIREMENTS 11/1/09 PMT GUIDE # 10 Book of Order Section G-10.0102o: "The session is responsible for the mission and government of the particular church. It
Sales Playbook ROOFING & SIDING
Sales Playbook ROOFING & SIDING Contents: SECTION 1 1.1 The What 1.2 The Why 1.3 Display Advertising 1.4 The Lingo 1.5 The Economy 1.6 The Seasons SECTION 3 3.1 The Conversation 3.2 The Questions 3.3 The
Mold. Guidelines for New Jersey Residents. Understanding Mold Investigations & Remediation
Mold Guidelines for New Jersey Residents Understanding Mold Investigations & Remediation What Services Should I Ask For? What Are Important Inspection Procedures? Is Mold Sampling Helpful? What Information
Commercial Roof Management
Disclaimer: This material is designed and intended for general informational purposes only, and is not intended, nor shall it be construed or relied upon, as specific legal advice. Roof damage is a leading
The Peak of Protection
FUTURE ROOF The Peak of Protection Our Future is Your Satisfaction E l e g a n t Imagine the look of heavy wood shake without all the problems associated with wood. Future Shake by Future Roof Systems
HHS J.W. Peavy Center Exterior Walls Waterproofing and Roof Replacement Project WBS # H-000018-0006-4 SECTION 07610 STANDING SEAM METAL ROOFING
PART 1 - GENERAL 1.01 DESCRIPTION SECTION 07610 A. Furnish and install a weather and watertight prefabricated standing seam roof system complete, in place, as shown on the drawings and as specified herein.
UNIVERSITY AREA JOINT AUTHORITY STATE COLLEGE CENTRE COUNTY, PENNSYLVANIA CONTRACT #2015-04 BID, CONTRACT & SPECIFICATIONS FOR PAVING CONTRACT
UNIVERSITY AREA JOINT AUTHORITY STATE COLLEGE CENTRE COUNTY, PENNSYLVANIA CONTRACT #2015-04 BID, CONTRACT & SPECIFICATIONS FOR PAVING CONTRACT JANUARY 2015 1 INVITATION TO BID Sealed Bids will be received