Highways & Network Operations Management System Manual
|
|
|
- Deirdre Potter
- 10 years ago
- Views:
Transcription
1 Highways & Network Operations Management System Manual NZ Transport Agency Effective from July 2012 ISBN number (print) ISBN number (online)
2 Copyright information This publication is copyright NZ Transport Agency (NZTA). Material in it may be reproduced for personal or inhouse use without formal permission or charge, provided suitable acknowledgement is made to this publication and the NZTA as the source. Requests and enquiries about the reproduction of material in this publication for any other purpose should be made to: NZ Transport Agency Private Bag 6995 Wellington 6141 The permission to reproduce material in this publication does not extend to any material for which the copyright is identified as being held by a third party. Authorisation to reproduce material belonging to a third party must be obtained from the copyright holder(s) concerned. Disclaimer The NZTA has endeavoured to ensure material in this document is technically accurate and reflects legal requirements. However, the document does not override governing legislation. The NZTA does not accept liability for any consequences arising from the use of this document. If the user of this document is unsure whether the material is correct, they should refer directly to the relevant legislation and contact the NZTA. More information Published July 2012 ISBN number (print) ISBN number (print) If you have further queries, call our contact centre on or write to us: NZ Transport Agency Private Bag 6995 Wellington 6141 This document is available on the NZTA s website at
3 Page i Record of amendments Amendment number Description of change Effective date Updated by Version 01 Initial Release July 2012 Damien Grant
4 Page ii Foreword Document Status This document has the status of a reference document as defined in the NZ Transport Agency s (NZTA) Process manual for network standards & guidelines. The content is based on the Highways Group s current practices and those developed in the past as Transit New Zealand from experience in managing the State highway network.
5 Page iii Contents Management System Introduction Certification Management System Quality Policy Quality Statement Quality Objectives Exclusions Justifications What is excluded Highways & Network Operations Business Group Summary of the NZ Transport Agency s Role Summary of the Highways Business Group Role Strategy Map How Highways Operates State Highway Asset Management Plan (SHAMP) State Highway Plan The Planning Cycle Management of the network Procurement Organisation and Structure NZ Transport Agency Business Groups Highways Organisation charts Delegations and Responsibilities Delegations Responsibilities Management Structure Senior Leadership Team Senior Management Team Operations Committee Decision Making Structure
6 Page iv The NZTA Board Board Committees Value Assurance Committee Business Unit Decision Making Teams Regional Management Teams Highways Decision Making Process Guidance Process Professional Services Business Unit Decision Making Team Value Adding Teams Management Procedures Management Review Purpose Definitions Business Process Management Responsible Procedure Risk Management Records Outputs Audit Outcomes Purpose Definitions Responsible Procedure Records Customer Feedback Purpose Responsible Procedure Process Performance Purpose Responsible Procedure Records Business Improvement Programme
7 Page v Purpose Responsible Procedure Records Control of Documents Purpose Definitions Responsible Procedure Control of Records Purpose Responsible Principles References Control of Non-conforming Product Purpose Definitions Responsible Procedure References
8
9 Page 1 Management System Introduction Certification Quality and customer satisfaction are intrinsic to the success of any business. The Highways & Network Operations (Highways) business group of the NZTA has required its suppliers to be quality assured since July 1997 and itself achieved certification, as Transit New Zealand, to ISO 9001 in December 1999 for project management of the State highway network. Certification to the ISO 9001:2008 version of the standard was achieved in December Our policies and procedures are structured so that there is a high degree of confidence that quality will be delivered to our customers. This manual, (MSM), is a key document in maintaining the Highways ISO 9001 certification.
10 Page 2 Management System The culture of Highways is to regularly monitor and review the way we do our business to ensure that we do the right things right every time, and to help achieve our purpose for being here Creating transport solutions for a thriving New Zealand. Our MSM is a high level manual that provides focus to and links our various procedures and processes into the system to deliver a quality service. The MSM is underpinned by the various technical manuals and procedures that set the quality standards and guidelines. Thus the Highways quality system is described by the standards, guidelines, and reference documents with State Highway status listed in the NZTA s register of network standards and guidelines held on the NZTA s website, and the decision making frameworks detailed in Figure 1: Figure 1 Highways quality system
11 Page 3 Quality Policy Quality Statement Quality is central to the Highways operation as a successful manager of New Zealand s State highways, with the principles of quality management embodied in all aspects of our business process, our goals, our mission, and vision. We regard quality management and ISO 9001 as an essential approach to ensuring there are the right people, doing the right thing, at the right time. Highways provides the commitment, leadership, and support for quality, which enables a strong culture for quality and for innovation to develop. In that regard the Highways quality principles are: Continual improvement Customer focus Process approach Systems approach Factual approach Supplier relationships Involvement with people Leadership Highways interacts with a diverse range of suppliers and customers nationwide. Central to our relationships with them, is applying a consistent approach to how we communicate our requirements to suppliers and manage the expectations of our customers. Through this commitment to ISO 9001, staff are able to engineer best practices to meet the changing needs of our customers, which then become the new benchmarks upon which innovations can be made. Colin Crampton Group Manager Highways & Network Operations
12 Page 4 Quality Objectives Be able to demonstrate high levels of integrity in all our actions; Become trusted partner with key stakeholders; Be able to demonstrate that we have sound decision making and review processes. Be able to demonstrate that our people, processes, and structures consistently deliver on our strategy and demonstrate good value for money to the users of the road network; and Gain investor confidence that Highways runs a high performing business.
13 Page 5 Exclusions Justifications What is excluded This manual provides information on the business operations of the Highways Group. It excludes the NZTA business operational processes that are owned by other parts of the organisation. Control of monitoring and measuring equipment is not applicable to the company s operations.
14 Page 6 Highways & Network Operations Business Group Summary of the NZ Transport Agency s Role The NZ Transport Agency (NZTA) was formed on 1 August 2008 from an amalgamation of two Crown entities, Land Transport New Zealand, and Transit New Zealand. The NZTA s statutory functions and objectives are defined in the: Land Transport Management Act 2003, as amended 2008; Government Roading Powers Act 2989 (formally known as the Transit New Zealand Act 1989); and Crown Entities Act The NZTA s obligations to its primary stakeholders are defined in: The NZTA s Statement of Intent; and The NZTA s Performance Agreement with the Minister of Transport. The NZTA s vision, mission, goals, and objectives are defined in the NZTA s Strategic Plan.
15 Page 7 Summary of the Highways Business Group Role Highways & Network Operations (Highways) is responsible for the State highway network. Its job is to contribute to optimising the wider transport network by planning, operating, protecting, maintaining, and improving the State highway network. State highways perform a vital national, inter-regional, and regional role in the transport network. State highways carry buses, trucks, cars, motorcyclists, walkers, and cyclists and connect cities, towns, ports, and tourist destinations. Our customer base is extensive and we operate adjacent to communities and traverse through sensitive and important parts of New Zealand. Currently approximately $1.5Bn dollars is invested on the State Highway network annually, made up of $1Bn in improvements, $200m in renewals, and $300m in maintenance and operations. Highways plan, managed and monitor our suppliers who develop and deliver services and products to operate, maintain and improve the State Highway network. It is Highways accountability to ensure that the $1.5Bn invested annually is targeted to the right places, effectively and efficiently for the good of all New Zealanders. It therefore makes sense that our strategy is about putting Customers First. For us it is about providing people with a State highway network that ensures efficient, enjoyable, and safe journeys. For further information on our commitment to Customers please refer to Section 2 of the State Highway Asset Management Plan (SHAMP) located on OnRamp. Strategy Map Our Customer First strategy is demonstrated in Figure 2. Figure 2 Strategy Map
16 Page 8 How Highways Operates The NZTA s Planning and Investment Group (P&I) purchases outcomes and outputs from Highways for the State highway network. Operational requirements are set out in the NZTA's Planning, Programme & Funding Manual (PPFM). The PPFM requires Highways, as a road controlling authority, to administer the three year State highway programme, which in turn is managed by professional services consultants. Highways procure the best consultants and contractors to undertake work on our behalf to operate, maintain and improve the State Highway network. Highways retains the client/owner role. Highways has in place well developed and robust procedures for monitoring the performance of our suppliers and for rectifying areas of low performance. These quality assurance processes are supported by significant pre-planning of our client capability, procurement methods, good supplier engagement and relationship meetings at a range of levels, and a firm display of integrity in everything we do. Figure 3 illustrates how the Highways group operates. Figure 3 Highways operations Note that RPP Group has been renamed P&I Group in the NZTA business structure.
17 Page 9 State Highway Asset Management Plan (SHAMP) The State Highway Asset Management Plan (SHAMP): Describes the services offered to customers on the State Highway network Describes the programme of activities Highways will implement to deliver the impact sought by government on these services Provides a business case for the activities required to deliver those services The SHAMP has a 10 year horizon, with a focus on the 2012/15 period. The SHAMP document can be found on NZTA s internet. State Highway Plan The key purpose of the State Highway Plan is to communicate the NZTA's state highway annual work programme. It forms the detailed 1 year deliver plan that compliments the SHAMP. The State Highway Plan can be found on NZTA s internet. The Planning Cycle The State Highway Plan (SHP) defines the activities and projects intended to be delivered in the forth-coming year. Typically, it is a one-year snapshot of the 10-year programme and is accompanied by justification and information to support the financial request for annual funding. The Annual Plan Instruction Manual (SM018) defines the process and procedures for compiling the NZTA s annual SHP. The planning cycle begins in September with the preparation and/or review of a draft 10 year State highway forecast, three year programme, and annual plan. The Highways group presents the State Highway Plan to the Senior Leadership Team (SLT). The SLT then provides direction before the State Highway Plan is considered by the Investment and Operations Committee of the NZTA Board. Once the Committee makes its decisions then these are ratified by the Board. This list of proposed activities is then released to Regional Land Transport Committees for inclusion in their Regional Land Transport Programme (RLTP). They then prioritise activities in their region, consult and develop RLTP s which they need to submit to the NZTA for inclusion in the National Land Transport Programme. This final programme may differ from the Highway s proposed programme since the NZTA Board has the statutory authority to vary or amend the programme. This allows the Board to accommodate other aspects of the NLTP that fit with its need to take a whole of Transport Investment view. The approved programme is published as part of the NLTP and provides the formal basis for all State highway work undertaken during the following three years.
18 Page 10 Management of the network The approved State Highway Plan incorporates all aspects of Highways management of the State highway network including construction, maintenance, safety improvements, planning and design, property purchase and administration. Highways closely monitors all projects included in the approved plan and formally review progress each month. As a road management agency Highways does not directly undertake physical works. Physical works are a professional consultancy services for State highways and are contracted out on a competitive basis. For some State highways some management functions are delegated to local authorities. Highways assesses programme quality, which includes safety, quality, budget, programme and customer interface throughout construction. Our suppliers are required to have quality management systems, through which they deliver work to our required standards; they also provide regular monitoring reports to us. Highways sets national standards for delivery and performance inclusive of scope and management that must be contractually complied with. We have a series of manuals that specify project management best practice, contractual requirements and detailed requirements for asset management, improvement, renewals, operations and maintenance. Highways carry out Post-Implementation and Lessons Learnt Reviews that provide feedback once a project is completed. These allow us to feedback continuous improvement into other projects. We also regularly engage parallel peer reviewers and independent authorities to help us judge risks, issues and claims against contracts. Procurement Tender process Our approach to procurement and contract award includes a number of quality assurance steps at critical points in the process. These have been designed, and refined over the years, to provide confidence that the procurement process followed is robust. These processes ensure the expertise of suitably qualified internal and external personnel is incorporated at key points, and includes documentation requirements to ensure good record keeping is maintained. We require the suppliers to carry Professional Indemnity and Public Liability Insurance, or opt in to the NZTA s Principal Arranged Insurance scheme which covers any defects or rework required to be completed. The standard terms and conditions of the contracts have been developed between the NZTA and the various industry representative organisations which ensures general acceptance and consistency across the types of services we require. Prequalification Prequalification of physical works contractors is a joint NZTA / industry initiative aimed at streamlining the tendering process and reducing tendering costs. The Prequalification process consists of Contractors non-price attributes being evaluated over a range of quality criteria and then being registered to compete for specific types and sizes of work. Contractors are monitored for compliance against their Prequalification level. The Contractor must perform to retain their existing Prequalification level. Any poor performance means they are moved to a lower level. Contractors can apply for a higher level at any stage.
19 Page 11 Organisation and Structure NZ Transport Agency In order to achieve its objectives the NZ Transport Agency (NZTA) operates as a national organisation with a Wellington based National Office, six regional offices, and a number of sub-offices. Business Groups The NZTA s National Office comprises of the following Business Groups: Strategy & Performance Planning & Investment Highway & Network Operations Access & Use Organisational Support People & Culture Highways The Highways business group operates with two business units located in National Office, and four regional business units located in: Auckland (including Whangarei) Hamilton Wellington Christchurch And a further five sub-regional offices located in: Tauranga Napier Palmerston North Blenheim (Marlborough Roads) Dunedin The Network Performance business unit tasked with getting the most out of our existing infrastructure and to ensure Highways operate a national business The Professional Services business unit providing a centralised pool of technical expertise tasked with ensuring Highways deliver products and services to the right quality whilst keeping an eye on the future Four regional business units plus a further five offices tasked with the following in their area: advising & supporting the Regional Director, managing stakeholder relationships delivery on the NLTP. These offices are responsible for the implementation of State highway polices and day-to-day management of the State highway network and projects. In addition Marlborough Roads is also responsible for the day-to-day management of the local roading network and projects in the Marlborough District.
20 Page 12 Organisation charts Detailed organisation charts for Highways are available via the People & Careers section of OnRamp, the NZTA s intranet.
21 Page 13 Delegations and Responsibilities Delegations The NZTA has three levels of delegation: from the Board to the Board committees and the Chief Executive; from the Chief Executive to the Group Managers; and from the Group Managers to staff. The principles of delegation applicable to Highways employees are set out under Policies and guides in the Key Documents section of OnRamp, the NZTA s intranet. Responsibilities These delegations are complemented by individual Job Descriptions which detail the responsibilities applicable to each role.
22 Page 14 Management Structure Senior Leadership Team The New Zealand Transport Agency s Senior Leadership Team (SLT) comprises the Chief Executive, the six Group Managers and the six Regional Directors. SLT s role is to work in the collective interest of the organisation to: shape the vision for NZTA and the desired culture for a successful organisation frame and decide on the organisation s strategy, priorities and resourcing determine the strategy to build the NZTA s capability and organisational development integrate and connect the work of the different Groups within the Agency to strengthen overall performance. Further details are available under Senior Leadership Team in the Key Documents section of OnRamp, the NZTA s intranet. Senior Management Team The Highways Senior Management Team (SMT) comprises the Group Manager Highways & Network Operations, and the six Business Unit Managers. Operations Committee The Operations Committee meets quarterly to discuss performance. It comprises the SMT, and sub-regional State Highway Managers. The meetings are routinely attended by subject matter expertises from within the Highways group.
23 Page 15 Decision Making Structure The NZTA Board Overall business strategy is determined by the Board of the NZTA. The Board is an independent body appointed by the Government. It operates in much the same way as a board of directors of a private company. The NZ Transport Agency Board meets six weekly from February to December. It is responsible for making independent decisions on allocating and investing funds from the National Land Transport Fund. Further details are available under NZTA Board in the Key Documents section of OnRamp, the NZTA s intranet. Decision making for issues of significance only. Policy available on Onramp. Board Committees The main committee responsible for Highways is the Investment and Operations Committee. Further details are available under NZTA Board in the Key Documents section of OnRamp, the NZTA s intranet. Value Assurance Committee The Value Assurance Committee (VAC) provides assurance on efficiency and effectiveness of Highways projects and assets. The VAC represents the highest decision making group within Highways. For decisions above its delegation it acts as Value Assurance review for papers that go to the Board. Business Unit Decision Making Teams Each Business Unit has a Business Unit Decision Making Team (BUDMT) which provides governance and direction to working teams. Regional Management Teams Regional Management Teams are established in each sub region (ie. Tauranga, Napier, Palmerston North, Dunedin). They provide governance and direction to working teams.
24 Page 16 Highways Decision Making Process Figure 4 illustrates how the Highways decision making process operates. Figure 4 Highways decision making process
25 Page 17 Guidance Process Professional Services Business Unit Decision Making Team The Professional Services BUDMT provides assurance on substantial technical decisions and representation from all key technical aspects to provide Big Picture perspective and to resolve outstanding issues. Scope and standards issues to be cleared directly through relevant Professional Services team. Value Adding Teams Value Adding Teams (VAT) are established within Highways to focus on the core aspects of the business, to receive, review, and initiate implementation of improvement suggests, and to regularly overview the effectiveness and efficiency of relevant systems affecting each area. There are seven Value Adding Teams (VAT): Project Management Services, Customer Services, Asset Management, Safety, Transport Outcomes, Health and Safety, and Value for Money. The VATs provide guidance and technical consistency on issues of national importance. Ensure efficiency and effectiveness of State Highway Plan, State Highway Asset Management Plan. Provide a forum for the sharing of best practise.
26 Page 18 Management Procedures Management Review Purpose The management review is the assurance process Highways uses to demonstrate that we are running a high performance business. Definitions Internal Audit A systematic and independent examination undertaken by suitably trained NZTA personnel to determine if the management system is being complied with. External Audit A systematic and independent examination undertaken by an independent organisation, to determine if the management system is being complied with. Risk Management The cultures, processes, and structures that are directed towards the effective management of potential opportunities and threats. Project Life Cycle Reviews These include: Post Approval Review ensure ongoing confidence in, and consistency of, approvals for delegated projects in the National Land Transport Programme. Post Implementation Reviews mechanism to demonstrate whether its investment has been effective in delivering the expected benefits. Contract Management Reviews (CMR) to provide confidence that supplier management systems and practices are appropriate and are delivering on contractual and legislative requirements. Lessons Learnt Reviews (LLR) learning from experience and identifying the successes and the areas for improvement and how these can translate into improved contract delivery in the future. These are normally conducted post completion. Non-Conformance For the purposes of this section we refer to the contracts as specified in the Project Management and Asset Management manuals respectively. Corrective Action We deal with corrective action through the development and management of a business improvement programme. The below diagram illustrates the management review process and how themes are incorporated into an improvement programme.
27 Page 19 Business Process Management Figure 5 Business Process Management Responsible The Network Performance BUDMT and Operations Committee receive reports on the outcomes of the audits/review undertaken within the quarter. Procedure Management reviews are conducted in a distributed manner within the group but with specific focus provided by the Network Performance BUDMT. This broadly includes consideration of: Audit/Review outcomes; Decision making process; Follow up actions from previous Management System review; Changes that could affect the Management System.
28 Page 20 Risk Management The Risk Management Process, described in the NZTA s Risk Management Policy, Strategy, and Framework, and the Risk Management Manual and consistent with AS/NZS4360, is the primary driver for Management Review within the business group. The processes detailed in those documents are concerned with the proactive identification and management of threats and opportunities associated with achieving the Highways group and NZTA s goals and objectives. This is established at strategic, tactical, and operational levels and provides detailed guidance, tools and templates (eg risk treatment plan template) to NZTA staff, line managers, project managers and contractors to assist them to implement effective and efficient risk management consistently across the organisation. Risk profiles are regularly reviewed and significant risks and management thereof reported by the Highways Senior Risk Advisor to the Highways SMT. The status of audit and risk profile action is regularly monitored and followed by the Highways Senior Risk Advisor. Records Highways records all its high level risks in the Impac system. Project specific risks are captured as detailed in the Project Management Manual. Outputs Outputs include decisions and actions on: Improvement of effectiveness of quality management and processes; Improvement regarding customer requirements; and Review of resource needs.
29 Page 21 Audit Outcomes Purpose This process reports the outcomes of the audits/reviews undertaken on the Highways Business, and that the key themes are highlighted, with significant items assessed for Business Improvement opportunities. It also reports the success or otherwise of compliance with accepted Highways Business Processes, and that any noncompliances are identified and corrective or improvement action is taken. This procedure covers all aspects of Highway s management systems. Definitions Internal Audits ISO audits Project Lifecyle Reviews including: Post Implementation Reviews (with P&I) Post Approval Reviews Contract Management Reviews Lessons Learnt Reviews Responsible Internal Auditors/Reviewers Business Services Manager Network Performance BUDMT Procedure The Highways Business Services team is responsible for the development of the Highways Audit/Review programme and ensuring that it is delivered. There are several Audits/Reviews (listed above) that touch on various aspects of the Highways Business during any one year. Each audit/review type has different owners. The Business Services team is responsible for compiling a consolidated view of these. The Audit/Programme owners prepare a programme of audits/reviews each year. The audit teams could comprise of any of the following, not mutually exclusive, expertise areas: Lead Auditor (would normally have expertise in at least one of the following areas) Contract Management and Administration Project and/or Asset Management Other areas as necessary and decided in consultation with the Business Services Manager Aside from the lead auditor, remaining members of the team need not necessarily be trained auditors but this is preferred.
30 Page 22 Auditors/Reviewers may be drawn from other Highways offices (but not the auditee office) including National Office. The audits will be business/risk focused. Records Notification of review Terms of Reference of review Evidence of review Review of report
31 Page 23 Customer Feedback Purpose The NZTA serve two customer groups: Individuals - We help ordinary people make the best use of New Zealand s transport system whether they are drivers, passengers, people getting their WoF, licence or registering their vehicle, or businesses that need permits or commercial operator licences. New Zealand communities - We help plan cities that are easier to get around; build new highways; invest in roads, public transport, walking and cycling in regions and towns; and make the roads safer. We do this by working with our stakeholders. This process ensures we respond to customer queries in an appropriate and timely manner. Responsible Official Correspondence Unit (S&P) Regional Adminstration staff (as co-ordinators) Highways Staff Customer VAT (for improvements) Procedure Customer complaints/queries are managed in a distributed manner within the group. There are a number of different processes in place for responding to customer queries Official correspondence refer to the Official Correspondence Unit page on the intranet for process guidance and the NZTA s legal obligations. Web queries are s to the [email protected] address which are distributed by the Transport Registry Centre to key contacts throughout the business who arrange for an appropriate response to be provided. Queries concerning Network Management are forwarded either to the Asset Manager is each region or directly to the Consultant for auctioning. The Asset Manager will handle queries regarding insurance claims resulting in damage from potholes etc. Customer Relationship Management (CRM) (being developed).
32 Page 24 Process Performance Purpose The procedure is to ensure that appropriate processes and systems are used in providing the Highways business group with performance data. Responsible Business Services Manager Programming Team Procedure Highways is required to report on several levels: External reporting (SOI, Annual Report) KPIs Internal management reporting External reporting Highways provides KPI reporting to S&P for external audiences. These KPI s need to be calculated using approved methodology. The Highways VAC approves the KPIs, prior to being forwarded to S&P. Internal reporting The Network Performance business unit provides monthly performance reports to Highways management. The reports are fit-for purpose and are reviewed by the business based on the business priorities. They are generated using accepted data sources. Records Quarterly and annual reports and methodology Monthly dashboard reports
33 Page 25 Business Improvement Programme Purpose This procedure outlines the process for taking action on deficiencies, preventing potential problems, and improving work practices. It covers: Immediate actions arising from audits/reviews; action to prevent occurrences or recurrence of problems; and action on suggestions for improvement from within the business. Responsible Network Performance BUDMT Procedure Various forums throughout the Highways business will raise ideas which may be included in the business improvement programme. These ideas or audit/review recommendations will be reviewed and moderated by the Network Performance BUDMT and those deemed significant will be assigned to the relevant part of the business for further development and implementation. Records Network Performance BUDMT minutes. Business Improvement Register.
34 Page 26 Control of Documents Purpose Highways conforms with the NZTA process outlined within the Register process manual for standards and guidelines (available on the NZTA internet site). The prime purpose of this process manual is to provide a fit-for-purpose process for managing inclusion of new documents and changes and variations to existing documents in the Register of network standards and guidelines. Definitions State Highway Standard State Highway Guideline Other Reference Document As defined in the Register of network standards and guidelines. Responsible All Highways staff Standards and Guidelines Ratification Committee Procedure All Highways standards and guidelines must follow the procedures outlined in the Register process manual for standards and guidelines and be ratified for inclusion on the register before they can be promulgated for use on the State Highway network.
35 Page 27 Control of Records Purpose Highways adheres to the NZTA s Safeguarding our information policy which is available on the intranet. As a public organisation, it is imperative we safeguard our information for public and national interests. The information we create and collect is widespread and significant, and needs to be preserved and secured, easily retrieved. Responsible All Highways staff Principles At the NZTA, to safeguard our information, we: value information as an asset have information that is safe and secure protect confidential information preserve our electronic tools secure our electronic systems. References New Zealand Public Information Act.
36 Page 28 Control of Non-conforming Product Purpose The NZ Transport Agency (NZTA) addresses the control of non-conforming product through the management, surveillance and quality assurance of physical works (MSQA) process for all work performed on the State Highway network, through the Highways Project/Asset Manager roles, and the process of handover from physical works into operations. Definitions Physical Works Regular sample Contract documents Practical completion Responsible Consultant to contract Highways Project Managers Highways Asset Managers Regional Safety Engineer Procedure Management, surveillance and quality assurance of physical works (MSQA) During the life of the contract the NZTA engages a Consultant, who manages and monitors the performance of the Physical Works by observing, verifying, and checking regular samples of all aspects of the Physical Works for compliance with the contract documents. The Consultant is also responsible for ensuring that the completed works conform to the drawings, specifications, and supplier instructions issues, subject to approved amendments. Highways Project/Asset Managers Highways Project/Asset Managers are responsible for ensuring our suppliers perform and provide quality work. The following are carried out during the life of the Physical Works: Supplier/Consultant/Relationship meetings Onsite inspections Complete interim and final PACE assessments Adhere to the State Highway Construction/Maintenance Manuals Identify Lessons Learnt Organise Road Safety audit Pre opening fit for purpose inspection
37 Page 29 Handover from physical works to operations Before the Physical Works site is opened to traffic, the Project/Asset Manager and Regional Safety Engineer carry out a Pre-opening fit-for-purpose inspection. The purpose of this is to ensure the new construction is not opened or operated prior to addressing any serious or significant road safety hazards. Physical Works generally contain a Defects Liability period which is nominally 12 months following practical completion. This period effectively acts as warranty where the contractors are responsible for rectifying any errors or omissions resulting from the use of the asset, at the contractors cost. As part of most contracts, there are financial incentives for the suppliers to provide quality work. We have the ability to withhold monies (retentions) until works are satisfactorily completed. In some cases we ask the contractors to pay a bond, which is then returned upon satisfactory completion. References State Highway Construction/Maintenance Manuals
ITS specification Handover and commissioning process (ITS-10-01)
ITS specification Handover and commissioning process (ITS-10-01) NZ Transport Agency Effective from September 2011 Copyright information This publication is copyright NZ Transport Agency (NZTA). Material
Alternative fatigue management scheme (AFMS): AFMS 1 standard
Alternative fatigue management scheme (AFMS): AFMS 1 standard NZ Transport Agency www.nzta.govt.nz July 2010 ISBN 978-0-478-36467-5 (online) Copyright information This publication is copyright NZ Transport
Part 1 Checklist. Feasibility 2. Investigation 9. Design 18. Construction 26
Part 1 Checklist Process Page 2 9 Design 18 26 Page 1 FEASIBILITY 1. Establishment 1.1 Establishment Recognise problem, need or opportunity. Formulate goal and objectives. Prepare project charter. Obtain
Wharton Construction Ltd. Quality Manual. Kellaw Road Yarm Road Business Park Darlington DL1 4YA
Quality Manual Kellaw Road Yarm Road Business Park Darlington DL1 4YA MANUAL IDENTIFICATION This document is a controlled/uncontrolled copy. Copy Number:...of... Issued to... Title... Holders of controlled
Guideline for preparing an Environmental and Social Management Plan
Guideline for preparing an Environmental and Social Management Plan NZ Transport Agency www.nzta.govt.nz Version 1: April 2014 ISBN 978-0-478-41934-4 (online) Copyright information This publication is
State Highway Maintenance and Operations Review consultation document
State Highway Maintenance and Operations Review consultation document The State Highway Maintenance and Operations Review was established to investigate options for improving efficiencies and outcomes
Guide to the National Safety and Quality Health Service Standards for health service organisation boards
Guide to the National Safety and Quality Health Service Standards for health service organisation boards April 2015 ISBN Print: 978-1-925224-10-8 Electronic: 978-1-925224-11-5 Suggested citation: Australian
Cost estimation manual (SM014)
Cost estimation manual (SM014) Cost estimation manual manual number: SM014 NZ Transport Agency www.nzta.govt.nz First edition ISBN 978-0-478-37104-8 (print) ISBN 978-0-478-37103-1 (online) Copyright information
PROJECT MANAGEMENT FRAMEWORK
PROJECT MANAGEMENT FRAMEWORK DOCUMENT INFORMATION DOCUMENT TYPE: DOCUMENT STATUS: POLICY OWNER POSITION: INTERNAL COMMITTEE ENDORSEMENT: APPROVED BY: Strategic document Approved Executive Assistant to
Contract and Vendor Management Guide
Contents 1. Guidelines for managing contracts and vendors... 2 1.1. Purpose and scope... 2 1.2. Introduction... 2 2. Contract and Vendor Management 2.1. Levels of management/segmentation... 3 2.2. Supplier
Implementation of a Quality Management System for Aeronautical Information Services -1-
Implementation of a Quality Management System for Aeronautical Information Services -1- Implementation of a Quality Management System for Aeronautical Information Services Chapter IV, Quality Management
A responsible, sign. team up. front. Committing to where we re going and putting our hearts into what we do. We get engaged every day.
4 NZ Transport Agency Statement of intent 214 18 A responsible, collaborative and agile organisation In order to deliver our desired targets and results effectively and efficiently, we continue to invest
Logan City Council. Strategic Planning and Performance Management Framework
Logan City Council Strategic Planning and Performance Management Framework 1 Table of contents 1. Overview 3 a) Purpose 3 b) Key Features 3 2. Context 4 a) National Framework for Sustainability 4 b) Elements
Performance audit report. Ministry of Education: Management of the school property portfolio
Performance audit report Ministry of Education: Management of the school property portfolio Office of the Auditor-General Private Box 3928, Wellington Telephone: (04) 917 1500 Facsimile: (04) 917 1549
Performance audit report. Ministry of Education: Monitoring and supporting school boards of trustees
Performance audit report Ministry of Education: Monitoring and supporting school boards of trustees Office of the Auditor-General Private Box 3928, Wellington 6140 Telephone: (04) 917 1500 Facsimile: (04)
Gateway review guidebook. for project owners and review teams
Gateway review guidebook for project owners and review teams The State of Queensland (Queensland Treasury and Trade) 2013. First published by the Queensland Government, Department of Infrastructure and
Quality Manual Quality Management System Description
Australian Government Security Vetting Agency Quality Manual Quality Management System Description Commonwealth of Australia 2013 This work is copyright. Apart from any use as permitted under the Copyright
Quality Manual. This manual is proprietary and no part thereof shall be copied without written authorisation from the company. Ref: Quality Manual.
This manual is proprietary and no part thereof shall be copied without written authorisation from the company Ref: Quality Manual.ind Issue: June 2009 INDEX 1 Amendment Status 2 Controlled Distribution
Minimum Standard Z/11 - Performance Evaluation
NZ Transport Agency Page 1 of 9 Minimum Standard Z/11 - Performance Evaluation 1 Introduction The following criteria are the requirements for the completion of Performance Evaluations of suppliers using
Guideline. Records Management Strategy. Public Record Office Victoria PROS 10/10 Strategic Management. Version Number: 1.0. Issue Date: 19/07/2010
Public Record Office Victoria PROS 10/10 Strategic Management Guideline 5 Records Management Strategy Version Number: 1.0 Issue Date: 19/07/2010 Expiry Date: 19/07/2015 State of Victoria 2010 Version 1.0
august09 tpp 09-05 Internal Audit and Risk Management Policy for the NSW Public Sector OFFICE OF FINANCIAL MANAGEMENT Policy & Guidelines Paper
august09 09-05 Internal Audit and Risk Management Policy for the NSW Public Sector OFFICE OF FINANCIAL MANAGEMENT Policy & Guidelines Paper Preface Corporate governance - which refers broadly to the processes
a) To achieve an effective Quality Assurance System complying with International Standard ISO9001 (Quality Systems).
FAT MEDIA QUALITY ASSURANCE STATEMENT NOTE 1: This is a CONTROLLED Document as are all quality system files on this server. Any documents appearing in paper form are not controlled and should be checked
Quick Guide: Meeting ISO 55001 Requirements for Asset Management
Supplement to the IIMM 2011 Quick Guide: Meeting ISO 55001 Requirements for Asset Management Using the International Infrastructure Management Manual (IIMM) ISO 55001: What is required IIMM: How to get
4 Adoption of Asset Management Policy and Strategy
4 Adoption of Asset Management Policy and Strategy Abstract The report recommends the adoption of an updated Asset Management Policy 2014 and an Asset Management Strategy 2014-2019. Both documents are
HEALTH SAFETY & ENVIRONMENT MANAGEMENT SYSTEM
HEALTH SAFETY & ENVIRONMENT MANAGEMENT SYSTEM September 2011 OUR HEALTH, SAFETY AND ENVIRONMENT POLICY OUR PRINCIPLE OF DUE CARE We care about the wellbeing of our people and our impact on the environment.
Training Management Guidelines
Training Management Guidelines February 2009 Training Management Guidelines - February 2009 These guidelines provide a strategic approach to training and skills development in the construction industry
Operations. Group Standard. Business Operations process forms the core of all our business activities
Standard Operations Business Operations process forms the core of all our business activities SMS-GS-O1 Operations December 2014 v1.1 Serco Public Document Details Document Details erence SMS GS-O1: Operations
Part E: Contract management
Overview Part A: Strategic assessment Part B1: Business case developing the business case Part B2: Business case procurement options Part B3: Business case funding and financing options Part C: Project
CHECKLIST ISO/IEC 17021:2011 Conformity Assessment Requirements for Bodies Providing Audit and Certification of Management Systems
Date(s) of Evaluation: CHECKLIST ISO/IEC 17021:2011 Conformity Assessment Requirements for Bodies Providing Audit and Certification of Management Systems Assessor(s) & Observer(s): Organization: Area/Field
Scrim And Texture Data Collection Contract Management S Chamberlain
Scrim And Texture Data Collection Contract Management S Chamberlain Introduction Transit New Zealand (Transit) has been successfully managing SCRIM and texture data collection through external suppliers
SAFETY and HEALTH MANAGEMENT STANDARDS
SAFETY and HEALTH STANDARDS The Verve Energy Occupational Safety and Health Management Standards have been designed to: Meet the Recognised Industry Practices & Standards and AS/NZS 4801 Table of Contents
University of Brighton Sustainable Procurement Strategy 2011-2015
University of Brighton Sustainable Procurement Strategy 2011-2015 Sustainable procurement in a challenging environment Introduction There is widespread recognition that climate change and the use of dwindling
ISO 9001 Quality Systems Manual
ISO 9001 Quality Systems Manual Revision: D Issue Date: March 10, 2004 Introduction Micro Memory Bank, Inc. developed and implemented a Quality Management System in order to document the company s best
SMS0045 Construction Health and Safety Policy and Procedures
SMS0045 Construction Health and Safety Policy and Procedures March 2015 Version 8 Please note that for projects utilising a CDM Co-ordinator under the transitional arrangements of CDM 2015 (between 6 April
BEST PRACTICE GUIDE 6: ESTABLISHING CONTRACTS. RDTL MINISTRY OF FINANCE Procurement Service
RDTL MINISTRY OF FINANCE Procurement Service BEST PRACTICE GUIDE 6: ESTABLISHING CONTRACTS 1 RDTL Procurement Guidelines The Procurement Legal Regime Decree Law sets out new procurement processes which
Measuring your capabilities in Fleet Safety Management ACC Fleet Saver
Measuring your capabilities in Fleet Safety Management ACC Fleet Saver Audit Standard 29 May 2014 Table of Contents Page 2 1. Getting Started...3 2. Critical element 1: Registered Owner Commitment to Safety
International Workshop Agreement 2 Quality Management Systems Guidelines for the application of ISO 9001:2000 on education.
ISO 2002 All rights reserved ISO / IWA 2 / WD1 N5 Date: 2002-10-25 Secretariat: SEP-MÉXICO International Workshop Agreement 2 Quality Management Systems Guidelines for the application of ISO 9001:2000
ED FAGAN INC. QUALITY SYSTEM MANUAL
ED FAGAN INC. QUALITY SYSTEM MANUAL APPROVED BY: Ed Fagan President ED FAGAN INC. January 13, 2010 TABLE OF CONTENTS 1. PURPOSE AND SCOPE 2 2. PRODUCTS, SERVICES AND CAPABILITIES 2 3. REVISION HISTORY
1.1 An initial request to enter into a contractual arrangement may be initiated by either Massey University or another party (Other Party).
CONTRACT MANAGEMENT PROCEDURE Section Risk Management Contact Risk Manager Last Review February 2013 Next Review February 2016 Approval Not required Procedures Contract Initiation Request Mandatory Guidance
Contract Management. Brief 22. Public Procurement. September 2011
Brief 22 September 2011 Public Procurement Contract Management C O N T E N T S The process of contract management Contract management in practice Post contract performance review www.sigmaweb.org This
TRANSPORT FOR LONDON (TfL) LOW EMISSIONS CERTIFICATE (LEC) GUIDANCE NOTES FOR THE COMPANY AUDIT PROCESS. LEC (Company Audit) Guidance Notes
TRANSPORT FOR LONDON (TfL) LOW EMISSIONS CERTIFICATE (LEC) GUIDANCE NOTES FOR THE COMPANY AUDIT PROCESS LEC (Company Audit) Guidance Notes Glossary of Terms Transport for London (TfL) London Low Emission
Management of Business Support Service Contracts
The Auditor-General Audit Report No.37 2004 05 Business Support Process Audit Management of Business Support Service Contracts Australian National Audit Office Commonwealth of Australia 2005 ISSN 1036
Performance Detailed Report. May 2008. Review of Performance Management. Norwich City Council. Audit 2007/08
Performance Detailed Report May 2008 Review of Performance Management Audit 2007/08 External audit is an essential element in the process of accountability for public money and makes an important contribution
1.1 Terms of Reference Y P N Comments/Areas for Improvement
1 Scope of Internal Audit 1.1 Terms of Reference Y P N Comments/Areas for Improvement 1.1.1 Do Terms of Reference: a) Establish the responsibilities and objectives of IA? b) Establish the organisational
Benchmark OHS Consulting Pty Ltd Self Assessment WHS Audit Tool
Benchmark OHS Consulting Pty Ltd Self Assessment WHS Audit Tool This WHS Auditing System Tool is to be used as a self-assessment of YOUR COMPANY compliance with AS 4801 and the Work Health and Safety Act
6.0 Procurement procedure 1 Infrastructure
Page 6-1 6.0 Procurement procedure 1 Infrastructure 6.1 Overview Introduction Procurement procedure 1 Infrastructure consists of four parts: guidelines for understanding the strategic context for the procurement
ISO 9001:2000 Gap Analysis Checklist
ISO 9001:2000 Gap Analysis Checklist Type: Assessor: ISO 9001 REQUIREMENTS STATUS ACTION/COMMENTS 4 Quality Management System 4.1 General Requirements Processes needed for the quality management system
ENTERPRISE RISK MANAGEMENT FRAMEWORK
ROCKHAMPTON REGIONAL COUNCIL ENTERPRISE RISK MANAGEMENT FRAMEWORK 2013 Adopted 25 June 2013 Reviewed: October 2015 TABLE OF CONTENTS 1. Introduction... 3 1.1 Council s Mission... 3 1.2 Council s Values...
Standard 1. Governance for Safety and Quality in Health Service Organisations. Safety and Quality Improvement Guide
Standard 1 Governance for Safety and Quality in Health Service Organisations Safety and Quality Improvement Guide 1 1 1October 1 2012 ISBN: Print: 978-1-921983-27-6 Electronic: 978-1-921983-28-3 Suggested
Association for Project Management Business Management System
Association for Project Management Business Management System December 2012 2 Association for Project Management About APM Formed in 1972, the Association for Project Management (APM) is committed to developing
Position Description. Te Aho o Te Kura Pounamu. Purpose Statement
Position Description Te Aho o Te Kura Pounamu Position: Team: Finance Wahanga: Operations and Performance Location: Wellington Reporting to: Manager, Finance Salary range: Hay Level 17 Purpose Statement
Continuous. Improvement. Review Kit. for planning and responsible authorities February 2006. A Victorian Government Initiative
Continuous Improvement Review Kit for planning and responsible authorities February 2006 A Victorian Government Initiative Published by the Victorian Government Department of Sustainability and Environment
CONTRACT MANAGEMENT POLICY
CONTRACT MANAGEMENT POLICY Section Finance Approval Date 25/08/2014 Approved by Directorate Next Review Aug 2016 Responsibility Chief Operating Officer Key Evaluation Question 6 PURPOSE The purpose of
Health and Safety Management Standards
Health and Safety Management Standards Health and Safety Curtin University APR 2012 PAGE LEFT INTENTIONALLY BLANK Page 2 of 15 CONTENTS 1. Introduction... 4 1.1 Hierarchy of Health and Safety Documents...
Information Governance Strategy :
Item 11 Strategy Strategy : Date Issued: Date To Be Reviewed: VOY xx Annually 1 Policy Title: Strategy Supersedes: All previous Strategies 18/12/13: Initial draft Description of Amendments 19/12/13: Update
Ministry Of Health Registration of Interest
Ministry Of Health Registration of Interest Intermediaries Social Bond Pilot(s) Part 1 Instructions and Supporting Information What s inside? Introduction to Social Bonds Purpose of the ROI Instructions
ISO 9001:2000 AUDIT CHECKLIST
ISO 9001:2000 AUDIT CHECKLIST No. Question Proc. Ref. Comments 4 Quality Management System 4.1 General Requirements 1 Has the organization established, documented, implemented and maintained a quality
FINAL DOCUMENT. Guidelines for Regulatory Auditing of Quality Management Systems of Medical Device Manufacturers Part 1: General Requirements
GHTF/SG4/N28R4:2008 FINAL DOCUMENT Title: Guidelines for Regulatory Auditing of Quality Management Systems of Medical Device Manufacturers Authoring Group: GHTF Study Group 4 Endorsed by: The Global Harmonization
Policy: D9 Data Quality Policy
Policy: D9 Data Quality Policy Version: D9/02 Ratified by: Trust Management Team Date ratified: 16 th October 2013 Title of Author: Head of Knowledge Management Title of responsible Director Director of
CP14 ISSUE 5 DATED 1 st OCTOBER 2015 BINDT Audit Procedure Conformity Assessment and Certification/Verification of Management Systems
Certification Services Division Newton Building, St George s Avenue Northampton, NN2 6JB United Kingdom Tel: +44(0)1604-893-811. Fax: +44(0)1604-893-868. E-mail: [email protected] CP14 ISSUE 5 DATED 1 st OCTOBER
D. MCLAUGHLIN & SONS LTD QUALITY MANUAL
D. MCLAUGHLIN & SONS LTD QUALITY MANUAL Originated By: Anne Wall (Quality Consultant) Date: Approved By: Date: Issue AMENDMENT DATE Draft 1 Quality Manual QM1 CONTENTS 1 QUALITY ASSURANCE POLICY 1.1 Quality
Schedule of Prices. Project Name Contract No. Contract Number
Schedule of Prices Project Name Contract No. Contract Number C3-LS-BP-Issue 2 SP Page 1 Printed 1 March 2011 >: 1. When preparing the schedule
Safety Management System (SMS) Guidelines
Safety Management System (SMS) Guidelines Pursuant to section 9D (2) (c) of the Passenger Transport Act 1990 For Bus and Coach Operators in NSW Roads and Maritime Services Level 5, 27-31 Argyle Street
Asset Management Policy March 2014
Asset Management Policy March 2014 In February 2011, we published our current Asset Management Policy. This is the first update incorporating further developments in our thinking on capacity planning and
Title: Rio Tinto management system
Standard Rio Tinto management system December 2014 Group Title: Rio Tinto management system Document No: HSEC-B-01 Standard Function: Health, Safety, Environment and Communities (HSEC) No. of pages: 23
Preparation of a Rail Safety Management System Guideline
Preparation of a Rail Safety Management System Guideline Page 1 of 99 Version History Version No. Approved by Date approved Review date 1 By 20 January 2014 Guideline for Preparation of a Safety Management
Procurement, Contracting and Contract Management Policy
Procurement, Contracting and Contract Management Policy Corporate policy 8.4 Responsible Officer: Group Manager Accounting and Taxation Policy Custodian: Chief Finance Officer Division: Finance and Resources
Quality Management Subcontractor QM Guide-Section Two
SECTION TWO QUALITY MANAGEMENT SYSTEMS Version No 1. PREFACE This document has been developed to assist subcontractors to meet Monaco Hickeys (MHPL) Quality Management (QM) requirements whilst working
ISO 9001: 2008 Boosting quality to differentiate yourself from the competition. xxxx November 2008
ISO 9001: 2008 Boosting quality to differentiate yourself from the competition xxxx November 2008 ISO 9001 - Periodic Review ISO 9001:2008 Periodic Review ISO 9001, like all standards is subject to periodic
Strategic Alliance. Business Continuity Policy
Version 1.1 April 2016 Contents Contents Version control Foreword Policy Scope Aim and objectives Methods and standards Responsibilities Governance Training and exercises Page i ii 1 2 2 2 Version 1.1
Table of Contents. 1 P a g e
Table of Contents Financial Regulations 2 General... 2 Accounting Procedures... 2 Internal Audit... 3 Budget Planning And Preparation... 3 Power To Incur Expenditure Within Approved Estimates... 4 Budget
This Business Management System Manual is based on ISO 9001:2008 requirements
Page 1 of 19 (Formerly: Quality Management System Manual) When the ISO 9001:2008 standard is identifying the Quality Manual or Quality Management System, Turbonetics is representing this requirement with
2015 EDUCATION PAYROLL LIMITED STATEMENT OF INTENT
2015 EDUCATION PAYROLL LIMITED STATEMENT OF INTENT Published in August 2015 Education Payroll Limited 2015 EDUCATION PAYROLL LIMITED STATEMENT OF INTENT CONTENTS Foreword 3 Who We Are 4 What We Do 5 How
Mossfiel Electrical & Safety Management Pty Ltd
ISO 9001:2008 QUALITY MANAGEMENT PLAN Be warned. Any reproduction of this quality management system or associated documents without the express permission of the company and
Health, Safety and Environment Management System
Health, Safety and Environment Management System For Bridgeport Energy Ltd Level 7, 111 Pacific Highway North Sydney 2011 June, 2010 DOCUMENT CONTROL Title: Document Number: Health, Safety and Environmental
Aberdeen City Council. Performance Management Process. External Audit Report o: 2008/19
Aberdeen City Council Performance Management Process External Audit Report o: 2008/19 Draft Issued: 11 February 2009 Final Issued: 6 April 2009 Contents Pages Pages Management Summary Introduction 1 Background
CORPORATE PERFORMANCE MANAGEMENT GUIDELINE
-001 CORPORATE PERFORMANCE MANAGEMENT GUIDELINE -001 TABLE OF CONTENTS 1 Introduction... 3 1.1 Scope... 3 1.2 Purpose... 3 2 Performance Management Framework Overview... 4 3 Performance Management Framework...
Internal Audit Standards
Internal Audit Standards Department of Public Expenditure & Reform November 2012 Copyright in material supplied by third parties remains with the authors. This includes: - the Definition of Internal Auditing
INTEGRATED MANAGEMENT SYSTEM MANUAL IMS. Based on ISO 9001:2008 and ISO 14001:2004 Standards
INTEGRATED MANAGEMENT SYSTEM MANUAL IMS Based on ISO 9001:2008 and ISO 14001:2004 Standards Approved by Robert Melani Issue Date 30 December 2009 Issued To Management Representative Controlled Y N Copy
Job Description Strategic Projects Team Leader
Strategic Projects Team Leader Department: Group: Direct Line Manager: Responsible For: Planning & Community Relations Manager - & Community Relationships Three (3) Strategic Project Drivers Delegations:
Australian Transport Council. National Standard for the Administration of Marine Safety SECTION 5
Australian Transport Council National Standard for the Administration of Marine Safety SECTION 5 APPROVAL AND AUDITING OF REGISTERED TRAINING ORGANISATIONS August 2008 First Published: August 2008 Endorsed
CENTRIS CONSULTING. Quality Control Manual
CENTRIS CONSULTING Quality Control Manual ISO 9001:2008 Introduction Centris Consulting developed and implemented a Quality Management System in order to document the company s best business practices,
DERBYSHIRE COUNTY COUNCIL BUSINESS CONTINUITY POLICY
DERBYSHIRE COUNTY COUNCIL BUSINESS CONTINUITY POLICY VERSION 1.0 ISSUED JULY 2015 CONTENTS Page CONTENTS VERSION CONTROL FOREWORD i ii iii POLICY 1 Scope 1 Aim and Objectives 1 Methods and Standards 1
Capital Works Management Framework
POLICY DOCUMENT Capital Works Management Framework Policy for managing risks in the planning and delivery of Queensland Government building projects Department of Public Works The concept of the asset
Procurement and Contract Management Strategy 2013-2017
Procurement and Contract Management Strategy 2013-2017 Title Owner Version 1 Distribution Procurement and Contract Management Strategy 2013 2017 Procurement and Performance Manager Corporate Issue date
QUALITY MANAGEMENT SYSTEM (QMS) MANUAL
Printed QMS Documentation is Uncontrolled Page 1 of 19 QUALITY MANAGEMENT SYSTEM (QMS) MANUAL ISSUE/ REVISION DATE DESCRIPTION ISSUE HISTORY PREPARED/ APPROVED BY 09/04/2014 Initial issue G.Rees 11/04/2014
Quality Manual. UK Wide Security Solutions Ltd. 1 QM-001 Quality Manual Issue 1. January 1, 2011
Quality Manual 1 QM-001 Quality Manual Issue 1 January 1, 2011 This document is uncontrolled when printed. Please verify with Quality Management Representative 16 Dukes Close, West Way, Walworth Industrial
ISO 9001:2008 Quality Management System Requirements (Third Revision)
ISO 9001:2008 Quality Management System Requirements (Third Revision) Contents Page 1 Scope 1 1.1 General. 1 1.2 Application.. 1 2 Normative references.. 1 3 Terms and definitions. 1 4 Quality management
QUALITY MANAGEMENT SYSTEM Corporate
Page 1 of 12 4 Quality Management System 4.1 General Requirements The Peerless Pump Quality Management System shall include: Documented statements of a quality policy and of quality objectives; A quality
DATA QUALITY POLICY April 2010 Updated January 2015 1
DATA QUALITY POLICY April 2010 Updated January 2015 1 Contents page 1. Introduction 3 2. Context and Purpose 3 3. Why is data quality important? 4 4. Characteristics of good quality data 5 5. Policy Objectives
BOARD NOTICE COUNCIL FOR THE BUILT ENVIRONMENT. Notice No... 2011
BOARD NOTICE COUNCIL FOR THE BUILT ENVIRONMENT Notice No.... 2011 NOTICE IN TERMS OF THE COUNCIL FOR THE BUILT ENVIRONMENT ACT, 2000 (ACT NO. 43 OF 2000) The Council for the Built Environment has under
Annual Governance Statement
Annual Governance Statement 2014/15 1 Fareham Borough Council Civic Offices, Civic Way, Fareham PO16 7AZ Scope of Responsibility Fareham Borough Council is responsible for ensuring that its business is
Asset and Development Coordinator
Department: Section: Location: Works and Services Technical Services City Offices Position Overview The is a critical role within Council s Technical Services section of the Works and Services Department
Job Description Asset Planning Engineer Senior
Asset Planning Engineer Senior Department: Business Unit Group: Direct Line Manager: Water Services Service Delivery Leader Direct Reports: Delegations: Primary Location: Job Summary and Purpose: House