DERBYSHIRE COUNTY COUNCIL BUSINESS CONTINUITY POLICY
|
|
|
- Carmella Lindsey
- 9 years ago
- Views:
Transcription
1 DERBYSHIRE COUNTY COUNCIL BUSINESS CONTINUITY POLICY VERSION 1.0 ISSUED JULY 2015
2 CONTENTS Page CONTENTS VERSION CONTROL FOREWORD i ii iii POLICY 1 Scope 1 Aim and Objectives 1 Methods and Standards 1 Responsibilities 2 Governance 2 Training and Exercises 2 July 2015 i
3 VERSION CONTROL Version History Version Date Detail 1.0 July 2015 Approved by Emergency Planning Manager July 2015 ii
4 FOREWORD Derbyshire County Council is one of the top performing Councils in the Country. In order to maintain our high standards it is important to plan how we can deal effectively when faced with any kind of service interruption. Our Business Continuity Plan provides a strategic framework around which staff can work to enable critical functions to be maintained, or quickly restored to minimise any effect on service delivery to the community. The Plan concentrates on services provided at our headquarters and looks at priority functions and minimum staffing levels so we can continue to provide critical services. Further work is being undertaken to look at services provided at other locations, partnership working and external suppliers. We have an annual programme of training and exercises to ensure staff understand what their roles and responsibilities are, test the effectiveness of the plan and assist with future development. IAN STEPHENSON CHIEF EXECUTIVE ANNE WESTERN LEADER OF THE COUNCIL July 2015 iii
5 POLICY SCOPE Derbyshire County Council is committed to ensuring robust and effective business continuity management as a key mechanism to restore and deliver continuity of key services in the event of a disruption or emergency. The Civil Contingencies Act 2004 placed a statutory duty on the Council to ensure that it can: respond to an emergency continue to support emergency response partners continue to provide critical services to the public. The Business Continuity Plan provides the operational structure for responding to serious disruption, and can be summarised as follows: To have an operational document that sets out priorities, management structures and communications mechanisms to ensure an appropriate response to any disruption. The Plan addresses the full range of the Council's functions and service areas. Where appropriate, it considers the interdependencies of different organisations, mutual aid and partnership arrangements. Specific strategies have been produced to mitigate the effects of loss of infrastructure including buildings, communications, IT and staff. Departments will continue to prepare and maintain Business Continuity Service Area Arrangements as appropriate. AIM AND OBJECTIVES The aim of the Plan is: To anticipate risks, mitigate where possible and to have flexible and tested plans in place to minimise disruption when unplanned events significantly interrupt normal business. The objectives are: To ensure the Council can continue to exercise its critical functions in the event of an emergency. To identify the potential areas of vulnerability in Council services. To determine overall priorities for recovery of functions if disruption takes place. July
6 To build on processes already in place for risk management, ensuring that all plans are integrated into the overall framework. To ensure all Council departments are involved in the preparation of the Plan, so that there is an effective and consistent response to service continuity. To undertake training and awareness programmes for staff, suppliers and partners as appropriate and carry out regular tests of the Plan to validate the arrangements. METHODS AND STANDARDS The Council s business continuity management arrangements currently meet the mandatory requirements within the Cabinet Office document Expectations and Indicators of Good Practice Set for Category 1 and 2 Responders. It is also the intention to follow the outline of ISO in the future. RESPONSIBILITIES The business continuity management process is designed to ensure it is a mainstream activity rather than simply an emergency response. The Chief Executive champions business continuity management across the authority, however the responsibility for business continuity does not rest solely with the Chief Executive, but is shared by all staff. Assistant Directors have been identified as lead officers for business continuity, responsible for obtaining information and co-ordinating departmental actions, or identifying another officer to undertake the responsibility on their behalf. Information gathered is subject to peer review to seek a consistent approach to service prioritisation and a shared understanding of the overall needs. GOVERNANCE The Business Continuity Plan took effect from November 2005 and is reviewed annually against the Community Risk Register to ensure business continuity reflects the current assessment of likelihood of adverse events. It is also reviewed six monthly to ensure that information on service functions and contact details are kept up to date. The Plan will be reviewed when there are significant changes to accommodation, structural reorganisations within the Council or if new duties or responsibilities are taken on, however it is the responsibility of lead officers within each service area to notify the Emergency Planning team of any significant changes that occur between these updates. In line with current legislation the Plan will be comprehensively reviewed every four years in parallel with the Community Risk Register, but this is intended as a maximum period and the Plan will remain a central management activity linked to risk management. July
7 Periodically and in line with the Council s auditing policy, the Business Continuity Plan may be audited by either the internal audit team or external auditors appointed by the Council. TRAINING AND EXERCISES Training takes place regularly for those officers likely to be called on to lead or be part of the Business Continuity Management and Support Teams. Lessons learnt from training and exercises are used to determine any amendments or inclusions required when the Plan is updated. July
Strategic Alliance. Business Continuity Policy
Version 1.1 April 2016 Contents Contents Version control Foreword Policy Scope Aim and objectives Methods and standards Responsibilities Governance Training and exercises Page i ii 1 2 2 2 Version 1.1
Business Continuity Policy. Version 1.0
Business Continuity Policy Version.0 January 206 Contents Contents Version control Foreword Policy. Scope.2 Aim and objectives.3 Methods and standards.4 Responsibilities.5 Governance.6 Training and exercises
BUSINESS CONTINUITY STRATEGY
BUSINESS CONTINUITY STRATEGY January 2009 CONTENTS Page BACKGROUND 1 OVERVIEW 1 AIM AND OBJECTIVES 1 CORE BUSINESS OF THE COUNCIL 2 ORGANISATION STRUCTURE 2 RISK IDENTIFICATION AND MITIGATION STRATEGIES
BUSINESS CONTINUITY MANAGEMENT POLICY
BUSINESS CONTINUITY MANAGEMENT POLICY AUTHORISED BY: DATE: Andy Buck Chief Executive March 2011 Ratifying Committee: NHS Rotherham Board Date Agreed: Issue No: NEXT REVIEW DATE: 2013 1 Lead Director John
TRUST POLICY FOR EMERGENCY PLANNING
TRUST POLICY FOR EMERGENCY PLANNING Reference Number: CL-OP/ 2013/027 Version: 1.4 Status: New Draft Author: Ashley Reed Job Title: Head of Security and EPO Version / Amendment History Version Date Author
NOT PROTECTIVELY MARKED BUSINESS CONTINUITY. Specialist Operations Contingency Planning Business Continuity Manager 17.09.12
POLICY BUSINESS CONTINUITY Policy owners Policy holder Author Head of Services Specialist Operations Contingency Planning Business Continuity Manager Policy No. 132 Approved by Legal Services 17.09.12
Emergency Management and Business Continuity Policy
www.surreycc.gov.uk Making Surrey a better place Emergency Management and Business Continuity Policy 4 TH EDITION June 2011 Title Emergency Management and Business Continuity Policy Version 4.0 Policy
Business Continuity Policy and Business Continuity Management System
Business Continuity Policy and Business Continuity Management System Summary: This policy sets out the structure for ensuring that the PCT has effective Business Continuity Plans in place in order to maintain
Business Continuity Management Framework 2014 2017
Business Continuity Management Framework 2014 2017 Blackpool Council Business Continuity Framework V3.0 Page 1 of 13 CONTENTS 1.0 Forward 03 2.0 Administration 04 3.0 Policy 05 4.0 Business Continuity
BUSINESS CONTINUITY POLICY
BUSINESS CONTINUITY POLICY Document Type Corporate Policy Unique Identifier CO-038 Document Purpose To provide a structure through which: i. A comprehensive business continuity management system (BCMS)
Business Continuity Management Policy
Business Continuity Management Policy Business Continuity Policy Version 1.0 1 Version control Version Date Changes Author 0.1 April 13 1 st draft PH 0.2 June 13 Amendments in line with guidance PH 0.3
SFJCCAD2 Promote business continuity management
Overview This unit is about providing advice and assistance on business continuity management, including general advice for the business and voluntary sectors, and specific advice and assistance to individual
1.0 Policy Statement / Intentions (FOIA - Open)
Force Policy & Procedure Reference Number Business Continuity Management D269 Policy Version Date 23 July 2015 Review Date 23 July 2016 Policy Ownership Portfolio Holder Links or overlaps with other policies
Business Continuity Management
Business Continuity Management Policy Statement & Strategy July 2009 Basildon District Council Business Continuity Management Policy Statement The Council is committed to ensuring robust and effective
NHS ISLE OF WIGHT CLINICAL COMMISSIONING GROUP BUSINESS CONTINUITY POLICY
NHS ISLE OF WIGHT CLINICAL COMMISSIONING GROUP BUSINESS CONTINUITY POLICY AUTHOR/ APPROVAL DETAILS Document Author Written By: Human Resources Authorised Signature Authorised By: Helen Shields Date: 20
EMERGENCY PREPAREDNESS POLICY
EMERGENCY PREPAREDNESS POLICY CONTROLLED DOCUMENT CATEGORY: CLASSIFICATION: Policy Emergency Planning PURPOSE This document sets out the strategic framework for the management of emergency preparedness
Business Continuity Policy
Business Continuity Policy Summary: This policy sets out the structure for ensuring that the PCT has effective Business Continuity Plans in place in order to maintain its essential business functions during
BSO Board Director of Human Resources & Corporate Services Business Continuity Policy. 28 February 2012
To: From: Subject: Status: Date of Meeting: BSO Board Director of Human Resources & Corporate Services Business Continuity Policy For Approval 28 February 2012 The Board is asked to agree the attached
CHAPTER 1: BUSINESS CONTINUITY MANAGEMENT STRATEGY AND POLICY
Zurich Management Services Limited Registered in England: No 2741053 Registered Office The Zurich Centre, 3000 Parkway Whiteley, Fareham Hampshire, PO15 7JZ CHAPTER 1: BUSINESS CONTINUITY MANAGEMENT STRATEGY
Business Continuity (Policy & Procedure)
Business Continuity (Policy & Procedure) Publication Scheme Y/N Can be published on Force Website Department of Origin Force Operations Policy Holder Ch Supt Head of Force Ops Author Business Continuity
Corporate Risk Management Policy
Corporate Risk Management Policy Managing the Risk and Realising the Opportunity www.reading.gov.uk Risk Management is Good Management Page 1 of 19 Contents 1. Our Risk Management Vision 3 2. Introduction
TRANSPORT FOR LONDON SAFETY, HEALTH AND ENVIRONMENT ASSURANCE COMMITTEE
AGENDA ITEM 9 TRANSPORT FOR LONDON SAFETY, HEALTH AND ENVIRONMENT ASSURANCE COMMITTEE SUBJECT: REVIEW OF TFL RESILIENCE MANAGEMENT POLICY FRAMEWORK DATE: 20 JULY 2010 1 PURPOSE AND DECISION REQUIRED 1.1
Business Continuity Management Policy and Plan
Business Continuity Management Policy and Plan 1 Page No: Contents 1.0 Introduction 3 2.0 Purpose 3 3.0 Definitions 4 4.0 Roles, Duties & Responsibilities 4 4.1 Legal And Statutory Duties, Responsibilities
Information Security Policy. Chapter 11. Business Continuity
Information Security Policy Chapter 11 Business Continuity Author: Policy & Strategy Team Version: 0.5 Date: July 2008 Version 0.5 Page 1 of 6 Document Control Information Document ID Document title Sefton
South West Lincolnshire NHS Clinical Commissioning Group Business Continuity Policy
South West Lincolnshire NHS Clinical Commissioning Group Business Continuity Policy Reference No: CG 01 Version: Version 1 Approval date 18 December 2013 Date ratified: 18 December 2013 Name of Author
Solihull Clinical Commissioning Group
Solihull Clinical Commissioning Group Business Continuity Policy Version v1 Ratified by SMT Date ratified 24 February 2014 Name of originator / author CSU Corporate Services Review date Annual Target audience
WEST YORKSHIRE FIRE & RESCUE SERVICE. Business Continuity Management Strategy
WEST YORKSHIRE FIRE & RESCUE SERVICE Business Continuity Management Strategy Date Issued: 12 November 2012 Review Date: 12 November 2015 Version Control Version Number Date Author Comment 0.1 June 2011
Essex Clinical Commissioning Groups. Business Continuity Management System. Scope and Policy
Essex Clinical Commissioning Groups Essex Clinical Commissioning Groups Business Continuity Management System Scope and Policy Policy Author: Daniel Hale - Head of Emergency Planning Version: 1.0 Date
Risk Management & Business Continuity Manual 2011-2014
ANNEX C Risk Management & Business Continuity Manual 2011-2014 Produced by the Risk Produced and by the Business Risk and Business Continuity Continuity Team Team February 2011 April 2011 Draft V.10 Page
NHS Hardwick Clinical Commissioning Group. Business Continuity Policy
NHS Hardwick Clinical Commissioning Group Business Continuity Policy Version Date: 26 January 2016 Version Number: 2.0 Status: Approved Next Revision Due: January 2017 Gordon Stevens MBCI Corporate Assurance
Business Continuity Policy & Plans
Agenda Item 8.3a SNCCG Governing Body 11.03.2014 Business Continuity Policy & Plans Ref Number: Version: 1 Status: Pending Approval Author: A Brown Approval body Governing Body Date Approved Date Issued
Appendix 1 - Leicester City Council s Business Continuity Management Strategy and Policy Statement - 2016
Appendix 1 - Leicester City Council s Business Continuity Management Strategy and Policy Statement - 2016 Policy Statement - 2016 This Policy sets the direction for Business Continuity Management at Leicester
Risk Management Strategy and Policy. The policy provides the framework for the management and control of risk within the GOC
Annex 1 TITLE VERSION Version 2 Risk Management Strategy and Policy SUMMARY The policy provides the framework for the management and control of risk within the GOC DATE CREATED January 2013 REVIEW DATE
Business Continuity Management
Business Continuity Management Standard Operating Procedure Notice: This document has been made available through the Police Service of Scotland Freedom of Information Publication Scheme. It should not
NHS Lancashire North CCG Business Continuity Management Policy and Plan
Agenda Item 12.0. NHS Lancashire North CCG Business Continuity Management Policy and Plan Version 2 Page 1 of 25 Version Control Version Reason for update 1.0 Draft for consideration by Executive Committee
NHS Commissioning Board: Information governance policy
NHS Commissioning Board: Information governance policy DOCUMENT STATUS: To be approved / Approved DOCUMENT RATIFIED BY: DATE ISSUED: October 2012 DATE TO BE REVIEWED: April 2013 2 AMENDMENT HISTORY: VERSION
Business Continuity Management. Policy Statement and Strategy
Business Continuity Management Policy Statement and Strategy November 2011 Title Business Continuity Management Policy & Strategy Date of Publication: Cabinet Council Published by Borough Council of King
Business Continuity Management Policy and Plan
Business Continuity Management Policy and Plan Version No Author Date of Update 0.3 Allan Jude and Charmaine Grundy 05/06/2015 1 P a g e Contents Contents... 2 1. Introduction... 3 2. Purpose... 4 3. Definitions...
Appendix 2 - Leicester City Council s Business Continuity Management Policy Statement and Strategy 2015. Business Continuity Policy Statement 2015
Appendix 2 - Leicester City Council s Business Continuity Management Policy Statement and Strategy 2015 Business Continuity Policy Statement 2015 This Policy sets the direction for Business Continuity
Cumbria Constabulary. Business Continuity Planning
Cumbria Constabulary Business Continuity Planning 0 Cumbria Shared Internal Audit Service Images courtesy of Carlisle City Council except: Parks (Chinese Gardens), www.sjstudios.co.uk, Monument (Market
Business Continuity Policy
Business Continuity Policy Ref. No. TP/028 Title: Business Continuity Policy Page 1 of 15 DOCUMENT PROFILE and CONTROL. Purpose of the document: Provides an overview of the London Ambulance Service NHS
Introduction UNDERSTANDING BUSINESS CONTINUITY MANAGEMENT
INFORMATION SECURITY: UNDERSTANDING BUSINESS CONTINUITY MANAGEMENT FACTSHEET This factsheet will introduce you to Business Continuity Management (BCM), which is a process developed to counteract systems
39 GB Guidance for the Development of Business Continuity Plans
39 GB Guidance for the Development of Business Continuity Plans Policy number: Version 2.2 Approved by Name of author/originator Owner (director) 39 GB Executive Committee Date of approval August 2014
Internal Audit Division
Internal Audit Division at the Financial Conduct Authority Information Pack April 2013 Contents of Information Pack A. Introduction B. Internal Audit Terms of Reference C. Organisation D. Skills and Competencies
NORTH HAMPSHIRE CLINICAL COMMISSIONING GROUP BUSINESS CONTINUITY MANAGEMENT POLICY AND PLAN (COR/017/V1.00)
NORTH HAMPSHIRE CLINICAL COMMISSIONING GROUP BUSINESS CONTINUITY MANAGEMENT POLICY AND PLAN (COR/017/V1.00) Subject and version number of document: Serial Number: Business Continuity Management Policy
Derbyshire Trading Standards Service Quality Manual
Derbyshire Trading Standards Service Quality Manual This Quality Manual has been developed to give a broad outline of how the Trading Standards Division s range of services comply with the requirements
The Risk Management strategy sets out the framework that the Council has established.
Derbyshire County Council Management Policy Statement The Authority adopts a proactive approach to Management to achieve Best Value and continuous improvement and is committed to the effective management
BUSINESS CONTINUITY MANAGEMENT POLICY
This document is uncontrolled once printed. Please check on the CCG s Intranet site for the most up to date version BUSINESS CONTINUITY MANAGEMENT POLICY DOCUMENT CONTROL Type of Document Document Title
DORSET & WILTSHIRE FIRE AND RESCUE AUTHORITY Performance, Risk and Business Continuity Management Policy
Part Two Part One Not Protectively Marked DORSET & WILTSHIRE FIRE AND RESCUE AUTHORITY Performance, Risk and Business Continuity Management Policy. The Dorset & Wiltshire Fire and Rescue Authority (DWFRA)
Business Continuity Management (BCM) Policy
Business Continuity Management (BCM) Policy Reference number: Corporate 042 Title: Business Continuity Management (BCM) Policy Version number: Version 2 Policy Approved by: LLR PCT Cluster Board Date of
Business Continuity Management Policy
Governance: Business Committee Policy Owner: Chief Superintendent, Corporate Services Department: Corporate Services Policy Number: 002 Version: 3.0 Policy Writer: Business Continuity Co-ordinator Effective
Confident in our Future, Risk Management Policy Statement and Strategy
Confident in our Future, Risk Management Policy Statement and Strategy Risk Management Policy Statement Introduction Risk management aims to maximise opportunities and minimise exposure to ensure the residents
Business Continuity Plan
Business Continuity Plan March 2014 Version: 1.0 Ratified by: Quality Group Date ratified: Name of originator/author: Name of responsible committee/ individual: Julie Killingbeck NHS North Lincolnshire
Business Continuity Policy
Business Continuity Policy 1 NHS England INFORMATION READER BOX Directorate Medical Commissioning Operations Patients and Information Nursing Trans. & Corp. Ops. Commissioning Strategy Finance Publications
NHS COUNTER-FRAUD AND SECURITY MANAGEMENT
Restricted Appendix 17 Adult and Community Services County Hall, Colliton Park Dorchester Dorset DT1 1XJ Direct Line: 01305 22 Fax: 01305 224325 Minicom: 01305 267933 We welcome calls via text Relay NHS
NHS Central Manchester Clinical Commissioning Group (CCG) Business Continuity Management (BCM) Policy. Version 1.0
NHS Central Manchester Clinical Commissioning Group (CCG) Business Continuity Management (BCM) Policy Version 1.0 Document Control Title: Status: Version: 1.0 Issue date: May 2014 Document owner: (Name,
The ISO 14001 standard
The ISO 14001 standard ISO14001 is designed for any organisation wishing to demonstrate to customers, insurers, regulators, the public and financial institutions, that the organisation is committed to
Risk Management Strategy
Risk Management Strategy Version: 8 Approved by: Quality and Governance Committee Date approved: 31 July 2014 Ratified by: Trust Board of Directors Date ratified: Name of originator/author: Head of Patient
Business Continuity Policy
Business Continuity Policy St Mary Magdalene Academy V1.0 / September 2014 Document Control Document Details Document Title Document Type Business Continuity Policy Policy Version 2.0 Effective From 1st
Risk Management Within an Organisation
COUNTY DURHAM AND DARLINGTON FIRE AND RESCUE SERVICE Administration and General Order No. AD/1/TBC CORPORATE RISK MANGEMENT POLICY 1. INTRODUCTION 1.1 County Durham and Darlington Combined Fire Authority
DORSET & WILTSHIRE FIRE AND RESCUE AUTHORITY Performance, Risk and Business Continuity Management Policy
Not Protectively Marked Item 6 Appendix B DORSET & WILTSHIRE FIRE AND RESCUE AUTHORITY Management Policy The Dorset & Wiltshire Fire and Rescue Authority () is the combined fire and rescue authority for
BUSINESS CONTINUITY & STRATEGY POLICY
BUSINESS CONTINUITY & STRATEGY POLICY Authorship: Chris Wallace, Information Governance Manager Committee Approved: Quality and Clinical Governance Committee Approved date: 1 Feb 2014 Review Date: Jan
COMPANY NAME. Environmental Management System Manual
Revision No. : 1 Date : DD MM YYYY Prepared by : Approved by : (EMR) (Top Management) Revision History Revision Date Description Sections Affected Revised By Approved By Table of Content 0.0 Terms and
London Borough of Bromley. Executive & Resources PDS Committee. Disaster Recovery Plans for London Borough of Bromley
Report No. DRR12/041 London Borough of Bromley PART 1 - PUBLIC Decision Maker: Executive & Resources PDS Committee Date: 4 th April 2012 Decision Type: Non-Urgent Non-Executive Non-Key Title: Disaster
Birmingham CrossCity Clinical Commissioning Group. Business Continuity Management Policy
Birmingham CrossCity Clinical Commissioning Group Business Continuity Management Policy Version V1.0 Ratified by Operational Development Group Date ratified 6 th November 2014 Name of originator / author
APES 325 Risk Management for Firms
APES 325 Risk Management for Firms Prepared and issued by Accounting Professional & Ethical Standards Board Limited ISSUED: December 2011 Copyright 2011 Accounting Professional & Ethical Standards Board
VISION FOR LEARNING AND DEVELOPMENT
VISION FOR LEARNING AND DEVELOPMENT As a Council we will strive for excellence in our approach to developing our employees. We will: Value our employees and their impact on Cardiff Council s ability to
BUSINESS CONTINUITY POLICY
BUSINESS CONTINUITY POLICY Last Review Date Approving Body n/a Audit Committee Date of Approval 9 th January 2014 Date of Implementation 1 st February 2014 Next Review Date February 2017 Review Responsibility
RISK MANAGEMENT POLICY (Revised October 2015)
UNIVERSITY OF LEICESTER RISK MANAGEMENT POLICY (Revised October 2015) 1. This risk management policy ( the policy ) forms part of the University s internal control and corporate governance arrangements.
How To Manage A Disruption Event
BUSINESS CONTINUITY FRAMEWORK DOCUMENT INFORMATION DOCUMENT TYPE: DOCUMENT STATUS: POLICY OWNER POSITION: INTERNAL COMMITTEE ENDORSEMENT: APPROVED BY: Strategic document Approved Manager Organisational
Shared service centres
Report by the Comptroller and Auditor General Cabinet Office Shared service centres HC 16 SESSION 2016-17 20 MAY 2016 4 Key facts Shared service centres Key facts 90m estimated savings made to date by
Version: 3.0. Effective From: 19/06/2014
Policy No: RM66 Version: 3.0 Name of Policy: Business Continuity Planning Policy Effective From: 19/06/2014 Date Ratified 05/06/2014 Ratified Business Service Development Committee Review Date 01/06/2016
Business Continuity Management Policy
Governance 1 Purpose The purpose of this policy is to communicate Business Continuity Management (BCM) framework, responsibilities and guiding principles for Victoria to effectively prepare for and achieve
Police use of Firearms
CODE OF PRACTICE ON Police use of Firearms and Less Lethal Weapons Contents 1. Introduction 1.1 Purpose of the code 1 1.2 Statutory basis of the code 1 1.3 Weapons covered by this code 2 1.4 Armed support
UNIVERSITY OF LONDON GUIDE TO RISK MANAGEMENT. Purpose of the guide... 2
UNIVERSITY OF LONDON GUIDE TO RISK MANAGEMENT Purpose of the guide... 2 Risk Management The Basics... 2 What is Risk Management?... 2 Applying Risk Management... 2 The Use of Risk Registers in Risk Management...
APPENDIX 50. Enterprise risk management - Risk management overview
APPENDIX 50 Enterprise risk management - Risk management overview Energex regulatory proposal October 2014 ENTERPRISE RISK MANAGEMENT Risk Management Overview (RMO) 06 11 2013 Table of Contents 1. INTRODUCTION...