KESSEL Oil / Fuel separator KESSEL Coalescence separator
|
|
|
- Raymond Summers
- 10 years ago
- Views:
Transcription
1 INSTALLATION AND OPERATING INSTRUCTIONS KESSEL Oil / Fuel separator KESSEL Coalescence separator PE Separators according to Euro-norm EN 858 NS 3-15 KESSEL Oil / Fuel separator KESSEL Coalescence separator According to EN 858 NG 3-15 for underground installation (.10/.15/.30/.80) (B/D) (.10/.15/.30/.80) (B/D) (.04/.10) (B/D) (B/D Product advantages Easy on-site mobility without the need for heavy machinery Simple and quick installation and hook up Recyclable material Seamless body due to monolith construction 100% watertight Installation Commissioning Instruction The installation and service of this unit should be carried out by a licensed professional servicer Name Date Town Company - Telephone No. Subject to technical amendment Edition 2009/11 ID number
2 1. Safety Instructions Personnel used for installation, assembly, operation, maintenance and repair must have the corresponding qualifications for such work. Areas of responsibility and the supervision of personnel must be clearly specified by the operator. The operating safety of the system supplied is only ensured in the event of proper use. The limit values specified in the technical data must not be exceeded under any circumstances. Accident prevention regulations and the applicable standards and directives must be observed at all times during installation, assembly, operation, maintenance and repair of the system! These include: Accident prevention regulations - Construction work, BGV C22 - Waste water systems, GUV-V C5 Safety regulations for work in enclosed areas of waste water systems, GUV-R 126 Handling of biological materials in waste water systems, GUV-R 145 Directives for work in tanks and restricted areas, BGR 117 Standards - Construction pits and ditches - Embankments, shoring, working area widths, DIN Laying and testing of waste water pipes and channels, DIN EN 1610 Work aids for safety and health protection in waste water systems. ACCESS: NO SMOKING! Smoking is strictly prohibited near or around the separator at all times! All sources of ignition or sparks are prohibited near or around the separator at all times! SLIPPERY WHEN WET! Take caution when standing / walking near the separator. During disposal, cleaning and maintenance the surrounding area can become extremely slippery due to spilled oil / fuel. Dangers from gases and vapours such as the danger of suffocation, poisoning or explosion Danger of falling Danger of drowning Fecal pollution in waste water containing faeces High physical and psychic stresses of work in deep, restricted or dark areas and others Failure to observe these operating instructions may result in substantial material damage, physical injuries or fatal accidents. The system constitutes one component of an overall system. The operating instructions of the overall system and the individual components must therefore also be observed. During all assembly, maintenance, inspection and repair to any of the components, the overall system must be shut down and secured against restarting. Conversion or modifications to the system must only be made after consultation with the manufacturer. Original spare parts and accessories approved by the manufacturer must be used in order to ensure safety. The use of other parts may invalidate liability for the resulting consequences. 2
3 Table of Contents 1. Safety Instructions... Page 2 2. General 2.1 Application... Page Separator description... Page 4 3. Technical Data 3.1 Installation example Oil-/Fuel Separator... Page Dimensioned drawings Oil-/Fuel Separator... Page Installation example Coalescence Separator... Page Dimensioned drawings Coalescence Separator... Page Drawing Coalescence Separator Inspection Chamber LW Page Dimensioned drawings Coalescence Separator Inspection Chamber LW Page 8 4. Transport, Storage 4.1 Transport... Page Storage... Page 9 5. Installation and assembly 5.1 Assembly requirements... Page Filling Material... Page Excavation pit... Page Tryouts before assembly... Page Assembly... Page Alarm unit... Page Oil and Sludge extraction... Page Operation 6.1 Making the plant ready for operation... Page Commissioning / Instruction... Page Important info... Page Disposal... Page Maintenance... Page Accessories / Replacement parts... Page Warranty... Page Separator characteristics... Page Important contacts / info... Page 23 3
4 Dear Customer, Before the KESSEL Oil / Fuel or Coalescence separator is installed and placed in operation please carefully read and follow all of the instructions contained in this Installation, Maintenance and User's Manual. Upon delivery of the KESSEL separator please thoroughly inspect the separator to make sure that it has not been damaged during shipping. In case damage has occurred to the separator, please follow the instructions listed in the, Guarantee section of this user's manual. 2. General 2. General 2.1 Area of application The separators are intended for use under specified conditions, see the Chapter Installation and assembly, for installation underground or below the foundation slab in well-ventilated areas Oil-fuel separators to Separator Class II The separators can be used: a) for the treatment of rainwater contaminated with light fluids from surfaced areas, e.g. filling stations, oil storage and handling areas, parking areas and streets in water protection areas b) as a retaining system for light fluids from systems and areas where light fluids are handled, e.g. filling stations, oil storage and handling areas c) for preliminary separation of light fluids from waste water before further treatment in subsequent internal waste water treatment plants. In cases a) and b), the discharged water from the separators is intended to be fed back into the public drainage system. If the discharged water is to be returned into waters, this is only possible in individual cases following clarification with the local water authority. In the treatment of dirty water contaminated with light fluids (commercial waste water) or waste water from the application areas of Appendix 49 of the waste water regulations, the observation of a limit value for hydrocarbons of 20 mg/l cannot be considered to have been observed Oil-fuel separators to Separator Class I Separators for light fluids with coalescence device can be used: a) for the treatment of rainwater contaminated with light fluids from surfaced areas, e.g. filling stations, oil storage and handling areas, parking areas and streets in water protection areas, b) as a retaining system for light fluids for the safety of systems and areas where light fluids are handled, e.g. filling stations, oil storage and handling areas, c) for the treatment of dirty water contaminated with light fluids (commercial waste water) produced taking into account the operating conditions of industrial processes, the cleaning of parts contaminated with oil and the cleaning of floor areas contaminated with oil (except workshop floors), d) for the treatment of waste water produced taking into account the operating conditions of automatic vehicle cleaning (partial flow: outlet from the closed circuit into the drainage system), manual cleaning (vehicle washing, engine washing, underbody washing, chassis cleaning in washing bays, self-service or commercial washing bays - except for the cleaning of workshop floors contaminated with oil) and for the drainage of areas used for the receipt, storage, drying, dismantling and crushing of old vehicles, e) for preliminary separation of light fluids from waste water before further treatment in subsequent internal waste water treatment plants. 4
5 3. Installation 2.3 Functional description In cases a) to d), the discharged water from the separators is intended to be fed back into the public drainage system. If the discharged water is to be returned into waters, this is only possible in individual cases following clarification with the local water authority. Separators used in case d) are used in systems for the restriction of hydrocarbons in waste water containing mineral oil in the sense of Part E Paragraph 2 of Appendix 49 of the waste water regulations. The level of hydrocarbons required by regulations in cases c) and d) of 20 mg/l is considered to have been observed. 2.2 System description The illustration shows a fuel separator cistern installed in the ground of Class A/B. ➀ Outlet point without stench trap ➁ Light fluid separator ➂ Inlet with stench trap ➃ Outlet with self-actuating closure ➄ Guide tube ➅ Float ➆ Attachment piece ➇ Cover ➈ Sample removal shaft ➉ Backwater valve The separators separate light fluids and sludge out of the waste water by means of gravity. Light fluids refers to fluids of mineral origin with a density of 0.95 g/cm3, which are insoluble or only slightly soluble in water, and which are nonsaponifiable. These do not include stable emulsions, fats and oils of vegetable or animal origin. Light fluids float up in the separation chamber and collect at the surface. Sludges, which are heavier than water, sink to the bottom and form a sludge layer. Coalescence separators, like oil-fuel separators, work on the principle of gravity. To increase the separation performance, the tank also contains a coalescence insert. This cylindrical insert has two functions. Firstly, it affects the flow in the separator, and secondly it filters all the waste water through the coalescence material. When waste water containing oil flows through this filter fabric, very fine oil droplets that can no longer be separated out by gravity collect on the coalescence material, and combine to form large oil droplets. When these reach a sufficient size to create buoyancy, they detach themselves from the filter material and rise to the surface. Light fluid separators are equipped as standard with a selfactuating closure. When the maximum oil storage volume is exceeded, this device closes the outlet into the drainage system. This prevents the escape of light fluids into the drainage system. This safety device consists of a guide tube full of water, which houses a float. The float is carefully designed with regard to its weight, so that it floats in water, and sinks in light fluid (up to a density of 0.95 g/cm3). When the maximum oil storage quantity is reached, oil flows through the lateral openings into the float guide tube. The float then sinks, reliably shutting off the outlet of the separator. The self-actuating closure of a separator is an emergency closure valve. When actuated in an emergency, the separator must be taken out of service and maintained. 5
6 3. Installation 3.1 Installation example: KESSEL Oil / Fuel Separator Illustration shows KESSEL-oil-/fuel separator class II with cover class B and sampling chamber. 3.2 Dimensioned drawing DN 150: T-TEÜ = 155 mm DN 200: T-TEÜ = 180 mm T-TEÜ = Height above ground Class D: 700 mm TEÜ mm Class A/B: 700 mm TEÜ mm NS Sludge trap (l) Total volume (l) Oil storage (l) Overstand (mm) Weight (Kg) Cover class Art No. 1) Comparable total sludge trap volume according to dimensioning of DIN EN 858 2) Eccentric reduction of inlet/outlet to DN 150 possible on site, fitted through DN 150 sample removal shaft 6
7 3. Installation 3.3 Installation example: KESSEL Coalescence separator Illustration shows KESSEL-coalescence separator class I with cover class B and sampling chamber. 3.4 Dimensioned drawing DN 150: T-TEÜ = 155 mm DN 200: T-TEÜ = 180 mm T-TEÜ = Height above ground Klasse D: 700 mm TEÜ mm Klasse A/B: 700 mm TEÜ mm NS Sludge trap (l) Total volume (l) Oil storage (l) Overstand (mm) Weight (Kg) Cover class Art No. 1) Comparable total sludge trap volume according to dimensioning of DIN EN 858 2) Eccentric reduction of inlet/outlet to DN 150 possible on site, fitted through DN 150 sample removal shaft 7
8 3. Installation 3.5 Illustration: KESSEL coalescence separator shaft LW 1000, NS Dimension drawing of KESSEL coalescence separator shaft LW 1000, NS 3 NS Sludge trap (l) Ø Total volume (l) Oil storage (l) Overstand (mm) Weight (Kg) Ø B B Ø D D Ø B B Ø D D Cover class Art No. 3.7 Dimensioned Drawing KESSEL-coalescence separator LW 1000, NS 6 (with upstream sludge trap) NS Sludge trap (l) Ø Total volume (l) Oil storage (l) Overstand (mm) Weight (Kg) Ø B B Ø D D Cover class Art No. 8
9 4. Transport and Storage Transportation of the KESSEL separator should be handled only by a transporter who has the proper knowledge, equipment and employees to handle such a product. During transport the separator must be firmly fixed into position and must not be allowed to move or shift in place. It also must be protected from other objects coming in contact with the separator during transport. If and when the separator is lifted it is important to follow the following correct procedures: The separator is not to be lifted with the use of steel cables or chains. Proper equipment are heavy duty cloth or hemp straps designed to handle the corresponding loads. The separator should be lifted by placing the proper straps beneath the inlet and outlet of the separator as seen in the illustration. Do not lift the separator by the small holes between the two manholes covers as illustrated on this page. In instances where a forklift is used, secure the separator to the forklift with appropriate cloth / hemp securing straps. Storage In cases where the separator needs to be temporarily stored before installation, it is important that the separator is placed on firm level ground and in an area where it is protected from coming in contact with other objects. Storing the separator outdoors will not cause any problems. 9
10 5. Installation and assembly During interim storage of the separator and up to the end of the installation work, suitable safety measures must be taken on the construction site to avoid accidents and damage to the light fluid separator. The Chapter Safety Instructions must be observed! edge of the lowest connected outlet. The necessary projection depends on the nominal size of the separator (see Chapter on Technical Data). If this excess height cannot be maintained, a warning device for light fluids must be installed. 5.1 Installation requirements The installation must be carried only by companies who have the necessary specialist experience, suitable equipment and adequately trained personnel for the task. The soil characteristics must be investigated for technical construction suitability (soil classification for technical construction purposes, DIN 18196). The maximum ground water level likely to occur must also be established. The ground water level must not exceed the level of the outlet. Adequate drainage of seepage water is also essential in the case of soils impermeable to water. The types of stresses occurring, such as maximum traffic loads and installation depth, must also be clarified. Drainage area Elevated area Surface level covers The separators for ground installation should be installed outside the building, as near as possible to the outlets. If necessary, the connection pipes of the inlets to the separator should be laid with heat insulation, or heated. The required frost-free installation depth is achieved by the use of telescopic attachment pieces, which also allows easy adjustment to feed and outlet pipes (drainage system). The covers for the load classes A / B and D are not bolted and comply with EN 124. Separator systems must be installed close to the point of origin of the light fluids. They must be easily accessible for cleaning and maintenance purposes. The use of locked or ventilated covers is prohibited. Pump or lifting systems must not be installed in the supply line in front of the separator. If these are necessary, they must be installed after the separator. For the reliable operation of the system, KESSEL recommends the installation of a projection, and also a warning system. The necessary fitting requirements must be provided before filling of the construction pit. Illustration 1 Separator system ready for use Light fluid separators must be protected against reverse flow from the drainage system. KESSEL recommend the following protective precautions: Outlet point Separator Reverse flow protection Inside a building Projection Reverse flow closure available Inside a building No projection Reverse flow closure Outside a building Projection Reverse flow closure available Outside a building No projection Lifting system Separator systems must be installed so that the upper edge of the covers is sufficiently high in comparison to the made level of the surfaces to be drained (see Figure 1). The fluid level in the separator is always higher than the water level in the drainage system due to the difference in density between light fluid and water. The definitive level is the highest possible standing rainwater height, when dirty water and rainwater are channelled together. If only dirty water is being fed in, the definitive level is the upper 10
11 5. Installation and assembly 5.2 Filling material The separator must only be installed in non-cohesive or low-cohesive soils (Group G1 to G2 to ATV-DVWU - A127). Substrate: Round-particle gravel (max. particle size 8/16) to DIN Tank bed: Tank jacketing: Sand Round-particle gravel (max. particle size 8/16) to DIN Area outside tank jacketing: Material with suitable properties Covering layer: Humus or similar 5.3 Construction pit The foundation must be horizontal and level in order to be able to set up the system over the full surface, and must also afford adequate load-bearing capability. The substrate consists of compacted round-particle gravel (max. particle size 8/16, minimum depth 30 cm, Dpr=95%), covered by 3-10 cm of compacted sand. The spacing between the construction pit wall and the tank must be at least 70 cm. The embankments must be constructed to DIN The depth of the construction pit should be such that the limits of the earth covering are not exceeded. MIN TEÜ MAX (see dimension drawing in the Chapter on Technical Data). Root penetration In case of installation in the vicinity of trees or shrubbery, penetration by roots must be reliably prevented. Installation on a sloping site In case of installation of the separator on a sloping site, care must be taken to ensure that the laterally-acting soil pressure of unsecured soil is absorbed by a suitably dimensioned supporting wall. Frost-free depth for all-year-round use Always take care to observe the locally established frost-free depth when installing the separator. In order to ensure the smooth operation even in winter, the inlet and outlet pipes must also be laid at a frost-free depth during installation. 5.4 Tests before installation Immediately before installation of the tank in the construction pit, the responsible specialist of the company carrying out the installation must test and certify the following: - the integrity of the tank wall; - the proper condition of the construction pit, in particular with regard to the dimensions and substrate bedding; - the particle size of the filling material. 50cm 50cm b nach yyyyyyyyyy DIN cm 70cm Subbase: round-grain gravel (max. graining 8/16) according to DIN compacted with Dpr=95% Tank bed: compacted sand Tank Tank encasing: round-grain gravel (max. graining 8/16) according to DIN compacted with Dpr=95% Area outside tank encasing: material of suitable consistence 5.5 Installation The float and coalescence insert, if fitted, remain in the tank during installation. Insertion The tanks must be placed carefully in the construction pit with the aid of suitable lifting equipment and positioned on the substrate bedding (see also the Chapter Transport ). Filling of the tank and the backfilling construction pit In order to avoid deformation of the tank, the filling of the tank with water and the construction pit should take place in parallel. The tank jacketing should be applied to a width of at least 50 cm. The backfilling around the tank should take place in 30 cm incremental layers. Each layer should be compacted with light compaction devices (min. Dpr=95%). Damage to the tank wall and displacement of the tank during and after installation must be avoided. The self-actuating closure keeps the system closed during the complete filling process. Connection of the tank Any transport safety devices fitted must be removed. Note: the pipe connection fittings must be protected against damage in order to ensure the permanent integrity of the system. To make connection easier, the pipe connection fittings should be adequately greased. The transition from downpipes to horizontal pipes must be made using two 45 elbows separated by an intermediate pipe at least 250 mm long. A calming section must be installed in front of the separator system, which must be at least 10x as long as the nominal width of the feed pipe. Top layer: topsoil, road surface, concrete or similar 20cm 30cm 30cm 30cm 30cm 30cm 30cm 30cm 30cm 30cm 3-10cm 30cm 11
12 5. Installation and assembly When the construction pit has been filled and compacted to the lower edge of the feed and outlet connections, the feed and outlet pipes are laid frost-free and connected. Instructions for the warning system: Lay the connection cable or empty pipe during the earthworks. Insert the lip seal DN 600 in the groove in the dome Telescopic attachment Connection of the sample removal shaft. Sample removal devices must be installed in the direction of flow immediately after the separator. The sample removal device of the separator system must be freely accessible and positioned so that only waste water is removed which has passed through the separator. Connection of the warning system empty pipe, if applicable The connecting section between the separator and control unit must be kept as short as possible. Unnecessary changes of direction, in particular those with angles above 45, should be avoided. The empty pipe for the cable should have a continual slope down to the separator. The formation of condensation within the empty pipe can be minimised by an airtight closure of the empty pipe on the side of the control unit. A cable pull-through wire can also be laid for subsequent cable laying. Lip seal DN 600 Minimum insertion depth 100 mm Tank dome 1 (1) KESSEL light fluid separator (2) Layer thickness sensor (3) Reverse flow sensor (4) Control unit (5) Housing for wall installation 7 3 (6) Watertight cable connection (7) Attachment set (8) Empty pipe closure and apply grease Insert the telescopic KESSEL upper section into the opening of the separator and adjust to the required position. With the aid of the clamping ring, the upper section can now be fixed in the required position (aligned with the upper ground level). The fine adjustment to the final height is then made with the aid of the setscrews. Slopes can easily be compensated for by the fully heightadjustable and inclining upper section. The upper section must be adequately supported from underneath and vibrated in using a flat-bed vibrator and a steel plate laid on the upper section. For greater installation depths, the special KESSEL intermediate piece (Art. no ), height 400 mm, intended for this purpose should be used. remaining filling For installation in areas of heavy vehicle traffic (cover class D), a reinforced concrete slab must be provided as the upper layer. A corresponding formwork and reinforcement plan is available from KESSEL. 12
13 5. Installation and assembly 5.6 Warning system As specified by DIN EN 858, separator systems must be equipped with self-actuating warning devices. The KESSEL warning systems Art. no , and are alarm devices for light fluid separators (fuel, coalescence and oil separators). They are approved for operation in areas subject to the risk of explosion, Zone 0. KESSEL alarm system for oil layer monitoring (detection of the layer thickness in oil and light fluid separators) Oil layer probe suitable for Ex-Zone 0 with 5 m connection cable (extendible up to max. 200 m), attachment set for easy installation and maintenance (the probe is accessible from above), watertight cable connector for extension of the connection cable, through-pipe with screw closure and two screw-type cable connectors, housing for wall mounting IP 65, control unit with visual and acoustic alarm with potential-free contact, with sensor self-monitoring and alarm repetition. KESSEL alarm system for limit value display (detection of backing up in the light fluid separator) Limit value probe suitable for Ex-Zone 0 with 5 m connection cable (extendible up to max. 200 m), attachment set for easy installation and maintenance (the probe is accessible from above), watertight cable connector for extension of the connection cable, through-pipe with screw closure and two screw-type cable connectors, housing for wall mounting IP 65, control unit with visual and acoustic alarm with potential-free contact, with sensor self-monitoring and alarm repetition. The sensors of the warning system must be fitted at different height levels, depending on the size of the separator. The installation dimensions are shown in the table. The specified values must be checked during the course of regular maintenance, and corrected if necessary. The installation and maintenance of the warning system is described in the enclosed original operating instructions. Illustration of the cistern (*)Illustration of the oil layer probe New probe 100 mm Old probe 113 mm 100 mm B (*) A Alarm level Water Oil layer Light fluid separator Art. No. Distance A Distance B Art. No. of the limit value probe of the oil layer probe from the tank bottom from the tank bottom B BEX B BEX D DEX D DEX B BEX B BEX D DEX D DEX B BEX B BEX D DEX D DEX B BEX B BEX D DEX D DEX B BEX B BEX D DEX D DEX B BEX B BEX D DEX D DEX B BEX B BEX D DEX D DEX B D B D 1340 mm 835 mm 1820 mm 1335 mm 1230 mm 1230 mm 1730 mm 1730 mm 764 mm 764 mm 1264 mm 1264 mm 13
14 5. Installation and assembly Note: The holes for the attachment set must be drilled only at the specified positions. The holes must be made using a 3.5 mm diameter drill. The original attachment screws must be used in the attachment, without plugs. The positions of the holes should be adjusted accordingly if the seal might be damaged by the drill. Under no circumstances must the cone of the rotation tank be damaged or drilled through! The extension of the cable to max. 200 m is only possible using original parts (cable and cable connectors). Information can be obtained from the KESSEL Customer Service Department under telephone no The use of any parts other than KESSEL original parts will invalidate the ATEX approval, the construction type approval and any guarantee claims against KESSEL. When drawing in the cable into the empty pipe to the control unit, the cable screw connections on the empty pipe closure must be tightened firmly. The union nut must then be fixed to the end of the pipe. This is beneficial particularly for businesses with a high level of sludge. The complete separator can of course also be emptied by the sludge extraction device. If both devices are used for disposal, it must be ensured that the oil is disposed of first, followed by the sludge. The retaining device is attached at the inlet, using the pipe clamp as shown in the drawing. Fit the oil extraction to the retaining device, set to the required height x (see Table) and fix in position. Sludge extraction Retaining device Stub connection Oil extraction Sludge Inner side (1) Cables to the probes (2) Cable screw-fittings (3) Union nut (4) Through-seal Outer side (5) Empty pipe closure (6) Through-pipe (7) Empty pipe 5.7 Oil and sludge extraction (for shaft LW 1000 on request only) For normal disposal, the hose from the suction vehicle is held in the light fluid separator and the complete contents pumped out. The volume of light fluid is however significantly less than the total volume of the separator. Assistance is provided in this case by the oil extraction device. For disposal of the light fluid, the suction hose is connected to the oil extraction device. The suction vehicle can then remove only the volume corresponding to the maximum light fluid quantity. This means a significant reduction of the disposal quantity, which together saves both time and disposal costs, and causes less wear to the separator components. In the same way as the oil extraction device, the disposal quantity can also be significantly reduced by the sludge extraction device. Fit the sludge extraction to the retaining device, feed to the bottom and then fix in position. Fit the stub connections to the attachment as shown in the drawing using the stainless steel screws provided. 14
15 5. Installation and assembly The holes must be made using a 3.5 mm diameter drill. Use the stub connection as a drilling template. Fit the knuckle coupling to the end of the hose and fix with a hose clamp. Hook the hose with the knuckle coupling upwards in the stub connection, lead to the extraction device and adjust to the required length. Connect the hose and extraction device and fix using a hose clamp. When the cover is closed, it must not be in contact with the knuckle coupling. Light fluid separator Art. No. Distance X of the oil extraction from the tank bottom B BEX B BEX D DEX D DEX B BEX B BEX D DEX D DEX B BEX B BEX D DEX D DEX B BEX B BEX D DEX D DEX B BEX B BEX D DEX D DEX B BEX B BEX D DEX D DEX B BEX B BEX D DEX D DEX B D B D 950 mm 1450 mm On request 15
16 6. Commissioning The chapter "Safety instructions" must be heeded. 6.1 Setting up for operation Before the separator is put into operation, please make sure that: the separator is clean and the interior is free from any objects which may have been placed inside during shipping or installation. the separator is completely filled with clean cold water. Completely filling the separator is complete when water begins to drain from the outlet. 6.2 Initial Instructions Placing the separator into full operation is normally handled by a licensed tradesman although upon request can be handled by a KESSEL representative. The following personnel should be on hand when the initial instructions for placing the separator into operation are given: Building facilities manager Building maintenance workers Contracted plumber / tradesman Contracted disposal company What to do: Check to make sure the separator is completely watertight. Check to make sure that during transport and installation that no damage to the separator was caused. Check to make sure all connections to the separator (inlet, outlet, refill, rinse pipes etc.) are in perfect working order. Representative should discuss all necessary information regarding the disposal. Representative should take the customer step by step through all stages of a separator disposal. After the separator has been emptied (disposed) all necessary paperwork and documentation should be handed over to the customer. The separator should be returned to service by filling the separator with fresh, cold water. 6.4 Hand-over of installation and userʼs manual. 6.5 Completion of the commissioning report. After commissioning has been completed the separator should be placed into normal operation mode. 6.3 Commissioning report (see attachment) 7. Disposal Disposal intervals: The fuel / oil collected in the separator should be collected / disposed when the level has reached 80% of the maximum storage capacity. Disposal of collected sludge in the base of the separator should be collected / disposed when the level has reached 50% of the maximum sludge storage capacity. Important: Timely disposal of the separator is mandatory to insure proper function and operation of the separator. A licensed disposal company should be contracted to handle disposal of the separator. Disposal should take place when little or no wastewater is entering the separator. Emptying intervals: The light fluid retained in the separator must be removed at the latest when the quantity of separated light fluid reaches 80% of the maximum storage quantity, or the level is below the retained volume. For separators simultaneously or exclusively used for the drainage of systems or areas where light fluids are handled (e.g. fuelling areas), the retained volume required under state regulations must also be provided. The separated light fluid must also be removed at levels below this retained volume if the quantity of separated light fluids has not yet reached 80 % of the maximum storage quantity. The disposal of the sludge contained in the sludge trap must be removed at the latest when the separated sludge quantity reaches half of the sludge trap volume. Note: Light fluids and sludge must be removed as specified above in order to ensure the correct operation of the system. For this reason, a disposal contract should be concluded with a specialist disposal company. The disposal work should be carried out if possible when the system is not in operation. Expected disposal volumes in accordance with the filling level can be estimated by means of the following table. The figures contained in the table are approximate figures only for the purposes of estimating quantities when contracting a specialist disposal company. 16
17 7. Disposal Oil-/fuel Separator Sludge Oil-/Fuel Art.-Nr.: 1) Measured Disposal 2) Measured Disposal Filling level layer thickness volume Filling level layer thickness volume in % in mm in litres in % in mm in litres B BEX B BEX D DEX D DEX B BEX B BEX D DEX D DEX B BEX B BEX D DEX D DEX B BEX B BEX D DEX D DEX B BEX B BEX D DEX D DEX B BEX B BEX D DEX D DEX B BEX B BEX D DEX D DEX B D B D B D ) The sludge retained in the separator must be disposed of at the latest at a filling level of 50%. 2) The light fluid retained in the separator must be disposed of at the latest at a filling level of 80%, or when the retained volume is exceeded. max. sludge thickness max. oil/fuel thickness Water level 80% full, separator should be emptied 100% full, float switch closes 17
18 8. Maintenance and Controls INSTALLATION SELF-CHECK MAINTENANCE DISPOSAL GENERAL INSPECTION REPAIR Who Specialist company Specialist Specialist company or Disposal company Qualified body Specialist company works customer service 1 What Measurement of the Measurement of the Removal of light fluid Complete emptying layer thickness of : layer thickness of : and sludge Cleaning light fluid light fluid of the sludge layer of the sludge layer Check of the self-actuating Check of the self-actuating The waste disposal closure and warning device closure and warning device regulations must be observed! Emptying and cleaning, if necessary Cleaning of the sample removal device Check of the operating logbook Check for proper condition and proper operation, and at least however: - Safety against the escape of light fluids from the separator system or the shaft units (excess height) - Structural condition and integrity of the separator system - Condition of the installed parts and the electrical equipment - Calibration of the self-actuating closure device - Completeness and plausibility of the records in the operating logbook - Disposal confirmations of the materials removed - Availability and completeness of the required approvals and documentation If the separator system is also used for the treatment of commercial waste water or waste water from the cleaning of vehicles, the following points must also be checked: - Actual volume of waste water (origin, quantity, contents, cleaning agents, operating materials, avoidable of stable emulsions) - Dimensioning, suitability and performance of the separator systems. When monthly 6-monthly Light fluid 80% is reached Before commissioning, then every 5 years -As required or the level is below the retained volume Sludge collection chamber is full Docu- Installation certification operating logbook Maintenance report operating logbook Test report operating logbook men- by specialist Maintenance report tation * If the general inspection is carried out at shorter intervals than 5 years, the maintenance must be carried out by a specialist. 18
19 8. Maintenance and Controls The Chapter Safety instructions must be observed! 8.1 Maintenance The separator system must be maintained annually by a specialist 1). In addition to the removal of materials, the following work must also be carried out: - Check of the inner wall surfaces of the sludge trap and the grease separator, - Functional check of the electrical devices and installations, if fitted. - The findings and work carried out must be recorded in the operating logbook and evaluated. If fitted, electro-mechanical assemblies such as pumps, valves, shut-off devices etc. must be maintained twice yearly in accordance with the manufacturers instructions. 8.2 Checking (general inspection) Before commissioning, and then at regular intervals of no more than 5 years, the separator system must be completely emptied and cleaned, and then checked by a specialist 2) for proper condition and operation. The following points at least must be checked and recorded: - Assessment of the separator system - Structural condition and integrity of the separator system - Condition of the inner wall surfaces of the installed parts and the electrical equipment, if fitted - laying of the feed pipe of the separator system as a ventilation pipe over the roof - Completeness and plausibility of the records in the operating logbook - Confirmation of the proper disposal of the materials removed from the separator system - Availability and completeness of the required approvals and documentation (approvals, drainage plans, operating and maintenance instructions A checking report must be compiled on the checks performed, noting any existing faults. If faults are discovered, these must be rectified immediately.) 1) A specialist in this sense refers to personnel of the operator or other company, who by means of their training, skills and experience obtained from practical work, ensure that they carry out assessments or checks in the relevant specialised field to the required standard. A specialist can acquire the specialist knowledge required for the operation and maintenance of separator systems in a training course with the following on-site instruction, which is offered for example by the corresponding manufacturers, professional trade associations, chambers of commerce and expert organisations in the field of separator technology. 2) A specialist in this sense refers to personnel of business other than the operator, experts or other institutions which demonstrably have the specialist skills required for the operation, maintenance and checking of separator systems. In individual cases, such as larger operating units for example, these checks can also be carried out by internally independent specialists of the operator not bound by instructions with regard to their area of responsibility, who have equivalent qualifications and technical equipment. Qualified bodies are specialist businesses independent of the operator or similar institutions, whose employees demonstrably have the specialist skills required for the operation, maintenance and checking of separator systems to the extent specified here, together with the technical equipment for the checking of separator systems. In individual cases, such as larger operating units for example, these checks can also be carried out by internally independent specialists of the operator not bound by instructions with regard to their area of responsibility, who have equivalent qualifications and technical equipment. Article Order No. General inspection of oil/coalescence separator /L Operating logbook of oil/coalescence separator
20 9. Accessories / Replacement parts KESSEL alarm system set Oil/fuel level monitoring device (see Art. no ) and back up / over flow monitoring device (see Art. no ). Art.No KESSEL Oil / fuel level monitoring device. 5 meter connection cable (extendable up to 200 meter), installation set, watertight cable connection, conduit access insert, IP 54 control unit housing, plug in ready, with LED and audible alarm and potential free contact. Art.No KESSEL back up / overflow monitoring device. 5 meter connection cable (extendable up to 200 meters) installation set, watertight cable connection, conduit access insert, IP 54 control unit housing, plug in ready, with LED and audible alarm and potential free contact.. Art.No KESSEL alarm system cable for extension of the KESSEL oil layer probe and KESSEL limit value probe. Art.No KESSEL Oil Suction System Suction pipe B 50 with Bi 50 suction hose for on-site connection to interior of upper section, with Storz 52 C connection coupling. Inlet Art.No. DN DN KESSEL Sludge Extraction System Suction pipe B 50 with sludge suction funnel, 0.5m re-enforced suction hose Bi 50 for on-site connection to interior of upper section, with Storz 52 C connection coupling.. Inlet Art.No. DN DN
21 9. Accessories / Replacement parts KESSEL-Coalescence filter insert Art.No KESSEL-Coalescence filter replacement part for KESSEL-Coalescence separator LW 1000 Art.No Warranty 1. In the case that a KESSEL product is defective, KESSEL has the option of repairing or replacing the product. If the product remains defective after the second attempt to repair or replace the product or it is economically unfeasible to repair or replace the product, the customer has the right to cancel the order / contract or reduce payment accordingly. KESSEL must be notified immediately in writing of defects in a product. In the case that the defect is not visible or difficult to detect, KESSEL must be notified immediately in writing of the defect as soon as it is discovered. If the product is repaired or replaced, the newly repaired or replaced product shall receive a new warranty identical to that which the original (defective) product was granted. The term defective product refers only to the product or part needing repair or replacement and not necessarily to the entire product or unit. KESSEL products are warranted for a period of 24 month. This warranty period begins on the day the product is shipped form KESSEL to its customer. The warranty only applies to newly manufactured products. Additional information can be found in section 377 and 378 of the HGB. In addition to the standard warranty, KESSEL AG offers an additional 20 year warranty on the polymer bodies of class I / II fuel separators, grease separators, inspection chambers, wastewater treatment systems and rainwater storage tanks. This additional warranty applies to the watertightness, usability and structural soundness of the product. A requirement of this additional warranty is that the product is properly installed and operated in accordance with the valid installation and user's manual as well as the corresponding norms / regulations. 2. Wear and tear on a product will not be considered a defect. Problems with products resulting from improper installation, handling or maintenance will also be considered a defect. 21
22 Separator Characteristics Bahnhofstr. 31 D Lenting Type Production number / production year Weight/kg length x width X height EN Approval Sludge trap volume / l Oil/fuel storage volume / l Control stamp Material (Accessories) This unit has been checked for watertightness to be sure that it is fully operational before leaving the factory. Date Name of examiner 22
23 Important contacts / Info Separator Type: Day / Hour Project description /Building services supervisor Address Telephone / Fax Builder Address Telephone / Fax Planner Address Telephone / Fax Contracted plumbing company Address Telephone / Fax KESSEL-Commissions no.: System operator /owner Address Telephone / Fax User Address Telephone / Fax Person of delivery Other remarks The system operator, and those responsible, were present during the commissioning of this system. Place and date Signature owner Signature user 23
24 Everything for drainage Backwater valves and cleanouts Polymer and Ecocast drains Volatile liquid traps Lifting stations, pumps, warning and control units Rainwater management systems Grease separators Oil/fuel and coalescence separators Inspection chambers Custom projects for industrial applications
KESSEL KTP 500 Submersible Pump with lateral and vertical outlet connection Order Numbers 28710, 28810, 28850
INSTALLATION AND OPERATING INSTRUCTIONS KESSEL KTP 500 Submersible Pump with lateral and vertical outlet connection Order Numbers 28710, 28810, 28850 Product advantages Automatic float switch as water
50AI01oe 02/15. Labko GRP cesspools. Instructions for installation, operation and maintenance
02/15 Labko GRP cesspools Instructions for installation, operation and maintenance Reliable solutions Wastewater treatment systems Contents 1 LABKO CESSPOOLS... 3 1.1 GENERAL... 3 1.2 IMPORTANT TO KNOW
16. Storm water drainage
16. Storm water drainage There are three principal ways to dispose of rainwater from roofs, courtyards and paved areas: storm water sewers, soakaways and collection in storage tanks. Storm water sewers,
PRODUCT SELECTOR Pollution Control, Pumping and Rainwater Harvesting Systems
PRODUCT SELECTOR Pollution Control, Pumping and Rainwater Harvesting Systems PACKAGE SEWAGE TREATMENT SYSTEM Clearwater treatment plants are ideal for single houses and employ the well proven aerobic biological
Hydraulic control unit series 0086-372-01
Technical Product Information No. 1290 EN Hydraulic control unit series 0086-372-01 Contents Page About this Technical Product Information (TPI) 2 The ORTLINGHAUS numbering system 2 About the product 3
Drainage and Grease Management for the Commercial Kitchen
Drainage and Grease Management for the Commercial Kitchen ACO. The future of drainage. The ACO system chain provides drainage solutions to meet the needs of tomorrow s food service facilities. Hostile
SunMaxx Solar Filling Station Operating Instructions
SunMaxx Solar Filling Operating Instructions Content 1. Declaration of conformity... 2 2. Introduction... 2 3. Transportation and unpacking... 4 4. Mounting and commissioning... 5 5. End of operation...
Oil and Coolant Circulating Heating System. Model - OCSM
Oil and Coolant Circulating Heating System Model - OCSM Installation & Operation Manual 216280-000 REV 2 Identifying Your System The HOTSTART heating system is designed to heat fluids for use in marine
31. ECO-INFO -- SEPTIC SAFE PROTECT YOUR HEALTH AND ENVIRONMENT YOUR SEPTIC PUMP-OUT SYSTEM with SELF ASSESSMENT TROUBLE SHOOTING GUIDE
31. ECO-INFO -- SEPTIC SAFE PROTECT YOUR HEALTH AND ENVIRONMENT YOUR SEPTIC PUMP-OUT SYSTEM with SELF ASSESSMENT TROUBLE SHOOTING GUIDE Edited 21/12/01 Wyong Shire Council has many non sewered areas that
ENGLISH FORK GUIDE 2013
FORK GUIDE 2013 ENGLISH 1 With a brand which is synonymous with specialists in forest products handling attachments, BOLZONI AURAMO offers its expertise and market leading attachments for all requirements,
Affordable and Reliable. Wastewater. &Rainwater Solutions for Domestic & Commercial Applications FREE. Delivery. On-site advice.
Affordable and Reliable Wastewater &Rainwater Solutions for Domestic & Commercial Applications On-site advice available FREE Delivery Wastewater &Rainwater When budget matters - Count on Clearwater Solutions
GUERNSEY OIL INSTALLATION GUIDELINES
GUERNSEY OIL INSTALLATION GUIDELINES This guidance relates only to liquid oil. For information on the requirements for associated equipment such as the positioning of boilers and flues please refer to
PROCESS AUTOMATION. ALARM SYSTEMS FOR SEPARATORs PRODUCT OVERVIEW
PROCESS AUTOMATION Protection for the environment ALARM SYSTEMS FOR SEPARATORs PRODUCT OVERVIEW warning devices for separator systems Detects dangers to protect the environment Water is the basis of all
Grease Trap Maintenance, Procedures and Cleaning Logs
SAWS Grease Reduction Program Grease Trap Maintenance, Procedures and Cleaning Logs Don t Feed the Grease Monster Best Management Practices for Commercial Food and Restaurant Facilities Train kitchen staff
40 ltr Domestic Grease Trap GTO1. 200 ltr Commercial Grease Trap GTO2. Rotational Moulders providing State of the Art Product Design and Developement.
Rotational Moulders providing State of the Art Product Design and Developement. The JFC Grease Trap system is designed: GREASE TRAPS A major problem in the drainage systems of dwelling houses, restaurants,
Saferand easierinstallation
EN 85-07 Saferand easierinstallation IföSigninstallationsystem andifösignbuilt-incistern www.ifosanitar.com/sign Aneffectivesolution withmanyadvantages. Ifö Sign installation system makes life a little
AIR RELEASE, CLEANOUT, AND SEWER MANHOLES
AIR RELEASE, CLEANOUT, AND SEWER MANHOLES **From Hartford IM BLDG(10) DESCRIPTION. This work shall consist of the construction of air release, cleanout, and sanitary sewer manholes; and the furnishing
Operating Instructions
Operating Instructions Cable Glands Ex d and Ex e with Compound > Contents 1 Contents 1 Contents...2 2 General Information...2 3 General Safety Information...3 4 Designated Use...4 5 Technical Data...4
SEPTIC SYSTEM CONSTRUCTION REQUIREMENTS ST. MARY S COUNTY HEALTH DEPARTMENT
SEPTIC SYSTEM CONSTRUCTION REQUIREMENTS ST. MARY S COUNTY HEALTH DEPARTMENT The following are minimum requirements for installation of conventional trench sewage disposal systems in St. Mary s County,
Please also see 10 golden rules for correct Saniflo installation on www.saniflo.co.uk
1. Description Sanicom is a lifting pump for wastewater used in commercial applications (restaurants, hairdressing salons, the catering industry etc.). The unit operates automatically, has a high performance
Installation and Commissioning Manual Solar Stations FlowCon Max Evolution II
Installation and Commissioning Manual Solar Stations FlowCon Max Evolution II 1 For your safety Table of Contents 1 For your safety... 3 1.1 About this manual... 3 1.2 Designated use... 3 1.3 Qualification
Cavity Drain R20 is manufactured from1.0mm thick black high density polyethylene with studs approximately 20mm high.
CI/SfB Tn6 L6813 September 2013 RIW CAVITY DRAIN R20 R20 is manufactured from1.0mm thick black high density polyethylene with studs approximately 20mm high. Other systems are available for specific uses,
Portable Air Conditioner
Portable Air Conditioner Owner's Manual Model:3 in 1 12,000 Btu/h Series 3 Please read this owner s manual carefully before operation and retain it for future reference. CONTENTS 1. SUMMARY...1 2. PORTABLE
Operating Instructions Drill rig DRU160
Operating Instructions Drill rig DRU160 Index 000 / 001 Original operating instructions 10988825 en / 20.10.2009 Congratulations! With a Hydrostress unit from TYROLIT you have chosen a tried and tested
10 TON HYDRAULIC PRESS
10 TON HYDRAULIC PRESS Model Nos. CSA10F and CSA10B OPERATING & MAINTENANCE INSTRUCTIONS 0200 SPARE PARTS and SERVICING Please contact your nearest dealer, or CLARKE International, on one of the following
Jay R. Smith Mfg. Co.
Jay R. Smith Mfg. Co. Automatic Backwater Valve SMITH CUSTOMER DRIVEN FLOOD-GATE FEATURES Index Page Flood-Gate Features and Applications 2 How Flood-Gate Works 3 Flood-Gate Operation & Approvals 4 Valve
! WARNING. McDonnell & Miller Installation & Maintenance Instructions MM-217(I) Series 150S and 157S (Snap Switch, All Models except 157S-RB-P)
Series 150S and 157S (Snap Switch, All Models except 157S-RB-P) Low Water Cut-Off/Pump Controllers For Steam Boilers and Other Level Control Applications McDonnell & Miller Installation & Maintenance Instructions
Stormwater/Wetland Pond Construction Inspection Checklist
: Construction Inspection ChecklistsTools Stormwater/Wetland Pond Construction Inspection Checklist Project: Location: Site Status: Date: Time: Inspector: SATISFACTORY/ UNSATISFACTORY COMMENTS Pre-Construction/Materials
IH 17025 E Sigma Island 90
INSTRUCTIONS FOR USE Kitchen extractor hood Type: IH 17025 E Sigma Island 90 Dear Customer!! You are now a user of the newest generation kitchen extractor hood type IH 17025 E Sigma Island 90. This hood
Packaged Terminal Air Conditioner Wall Sleeve Installation
Installation & Maintenance Data IM 1196 Group: PTAC Part Number: 910141799 Date: October 2013 Packaged Terminal Air Conditioner Installation x 42" PGAN with Top-Mounted Hydronic Heat Note: Installation
PBX Series Quick Fit Connector Bimetallic Steam Traps
6262100/6 IM-P626-01 ST Issue 6 PBX Series Quick Fit Connector Bimetallic Steam Traps Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation 4. Commissioning
Section 2100-Trenching and Tunneling
SECTION 5200 - STORM SEWER PART 1 - GENERAL 1.01 SCOPE: This Section covers installation of storm sewer mains and culverts. Topics include permits and fees, trench widths, pipe laying, bedding, initial
Bench Autoclave. Standard Operating Procedure. For Installation, Use and Maintenance
Bench Autoclave Standard Operating Procedure For Installation, Use and Maintenance 1. Introduction This SOP is intended for use with the following model, in a laboratory context: Type: Nuve Bench Top Steam
Specifications for Residential Property Owners Connection to New Public Sewer
Specifications for Residential Property Owners Connection to New Public Sewer Spalding Tract property owners are required to connect to the community sewer system when construction is complete and the
OPL BASIC. Dosing System for Professional Laundry machines. Contents
OPL BASIC Dosing System for Professional Laundry machines Contents 1 Getting Started. Page 2 2 Installation. Page 4 3 Set Up & Operation. Page 8 4 Maintenance & Accessories. Page 10 5 Troubleshooting Page
Installation and Service Instructions. Neutralization System Part no. 7441823 Grünbeck part no. 410480
Installation and Service Instructions for use by heating contractors Neutralization System Part no. 7441823 Grünbeck part no. 410480 Safety and Installation Requirements Please ensure that these instructions
SEDIMENT/STORMWATER MANAGEMENT BASIN CONSTRUCTION CHECKLIST
SEDIMENT/STORMWATER MANAGEMENT BASIN CONSTRUCTION CHECKLIST For permanent structures per Delaware SCS Pond Code 378 and Delaware Sediment and Stormwater Regulations KEY PROJECT INFORMATION Item meets standard
Art.S001-S002 SOLAR MODULE WITH DELIVERY AND RETURN CONNECTIONS
Art.S001-S002 SOLAR MODULE WITH DELIVERY AND RETURN CONNECTIONS Technical Information sheet 0001/07/Rev01 ENG FUNCTION Series S001 and S002 circulation units are applied to the primary circuit of solar
SUFFOLK COUNTY DEPARTMENT OF HEALTH SERVICES TOXIC/HAZARDOUS MATERIAL TRANSFER FACILITY DESIGN GUIDELINES
SUFFOLK COUNTY DEPARTMENT OF HEALTH SERVICES TOXIC/HAZARDOUS MATERIAL TRANSFER FACILITY DESIGN GUIDELINES 1.0 GENERAL 1.1 Article 12 of the Suffolk County Sanitary Code requires that toxic/hazardous material
Hand chain 6,0m 1000kg
Manual Hand chain 6,0m 1000kg Table of contents 1. Safety instructions... 3 1.1. For safe and efficient operation... 3 2. Designated use of the chain hoist... 4 3. Start-up... 5 4. Maintenance and cleaning...
foundation designed to keep water out of the basement.
Preventing Sewer Backups To safeguard your home against flooding from sewer backups, you should understand your home's basic plumbing and the preventative techniques discussed in this brochure. Basement
SEPTIC TANKS FOR THE COLLECTION & SETTLEMENT OF DOMESTIC SEWAGE
SEPTIC TANKS FOR THE COLLECTION & SETTLEMENT OF DOMESTIC SEWAGE Let us help! Free professional site visit with friendly support and advice. [email protected] to make the right decision or call
National Precast Concrete Association
National Precast Concrete Association NOTES 1. This manual does not claim or imply that it addresses any safety-related issues associated with its use. Operation and maintenance of precast concrete grease
CHAPTER 2 QUANTITY TAKE-OFF
CHAPTER 2 QUANTITY TAKEOFF The quantity takeoff is an important part of the cost estimate. It must be as accurate as possible and should be based on all available engineering and design data. Use of appropriate
UB1 AIR CONDITIONING UNIT INSTALLATION INSTRUCTIONS
UB1 AIR CONDITIONING UNIT INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS: Carefully read these instructions before installing your new air-conditioner. AUSTRALIAN AUTOMOTIVE AIR AL00500054E 1 Table
REPAIR INSTRUCTIONS UNDER BODY CYLINDER (UM, UL)
Table of contents 1. Introduction... 3 1.1. Scope of use... 3 1.2. General remarks... 3 1.3. Contact Hyva... 3 1.4. Precautions... 4 1.5. Spare parts... 4 1.5.1. Prior to use... 4 1.6. Recycling and Reuse
Instructions Manual. Electromagnetic sensor Series FLOMID FX. instrumentation for fluids. R-MI-FlomidFX Rev.: 0 English version
instrumentation for fluids Electromagnetic sensor Series FLOMID FX Instructions Manual! Conforms with the Pressure Equipment Directive 97/23/EC. 0830 This equipment is considered as being a pressure accessory
Indiana State Department of Health Construction Guidelines for Gravity and Flood-Dose Trench Onsite Systems
Indiana State Department of Health Construction Guidelines for Gravity and Flood-Dose Trench Onsite Systems The septic tank-absorption field sewage treatment system is composed of two major elements; the
Instruction manual of pumps WQ, WQF, SN, Furiatka, Furia, KRAKEN, BIG, IP, IPE, SWQ, CTR
CAUTION! Instruction manual of pumps WQ, WQF, SN, Furiatka, Furia, KRAKEN, BIG, IP, IPE, SWQ, CTR NOTE: read the manual prior to commencement of use. For safety reasons, the pump can only be operated by
SERIES ASM NEOPRENE/EPMD FLANGED SINGLE SPHERE CONNECTOR CONNECTORS. Pressures to 225 PSIG (15.51 barg) Temperatures to 230ºF (110ºC)
APPLICATIONS Process Industry Weak Acids Alkalies Compressed Air Pulp & Paper MODELS ASM - Flanged Connection OPTIONS Control Rods Oil & Gas Water & Waste Pump suction & discharge Sea water Chemical lines
Plumbing Installations. A homeowner guide to the City of Winnipeg plumbing requirements for a single-family dwelling
Plumbing Installations A homeowner guide to the City of Winnipeg plumbing requirements for a single-family dwelling February 2001 contents General Information 3 Inspection 4 New Drain and Vent Installations
DIRECTIVE 055: STORAGE REQUIREMENTS FOR THE UPSTREAM PETROLEUM INDUSTRY. August 2012
DIRECTIVE 055: STORAGE REQUIREMENTS FOR THE UPSTREAM PETROLEUM INDUSTRY August 2012 SECTION 2 The storage requirements in Directive 055 apply to upstream petroleum facilities, well sites, and pipelines
HEAVY-DUTY HAND CUTTING TORCHES AND ACCESSORIES. Page 1 Version no.: V0-090902
Page 1 HEAVY-DUTY HAND CUTTING TORCHES AND ACCESSORIES Page 2 Heavy-Duty Hand Cutting Torch HCT 663: With lever-operated valve for cutting oxygen, for cutting duties involving high thermal loads on slabs,
MOBILE FIRE - RESCUE DEPARTMENT FIRE CODE ADMINISTRATION
MOBILE FIRE - RESCUE DEPARTMENT FIRE CODE ADMINISTRATION Fire Pump Plan Review 2009 International Fire Code and NFPA 20 Date of Review / / BLD201 - Project Address: Project Name: Contractor s Business
ECOCIAT. Domestic hot water heat recovery unit
Heat recovery unit Domestic hot water High energy efficiency with R410A Compact and quiet Scroll compressors Brazed-plate heat exchangers Heating Heat recovery ENVIRONMENTALLY HFC R410A PROTECTION DE FRIENDLY
SECTION 33 31 00.11 GRAVITY SANITARY SEWERS
SECTION 33 31 00.11 GRAVITY SANITARY SEWERS PART 1: GENERAL 1.01 SCOPE A. Gravity sanitary sewers and appurtenances. 1.02 SUBMITTALS A. Conform to requirements of Section 01 33 00 Submittals. B. Submit
15GAL STEEL OIL DRAIN WITH 110V PUMP
15GAL STEEL OIL DRAIN WITH 110V PUMP OWNER S MANUAL WARNING: Read carefully and understand all ASSEMBLY AND OPERATION INSTRUCTIONS before operating. Failure to follow the safety rules and other basic safety
SECTION 31 20 00 EARTH MOVING
SECTION 31 20 00 PART 1 - GENERAL 1.01 DESCRIPTION A. This Section describes the requirements for excavating, filling, and grading for earthwork at Parking Structure, new exit stair and as required to
Fats, Oil and Grease. Best Management Practices Manual. Information, Pollution Prevention, and Compliance Information For Food Service Facilities
Fats, Oil and Grease Best Management Practices Manual Information, Pollution Prevention, and Compliance Information For Food Service Facilities Pinellas County Utilities Water Quality Management Division
Cardok Sàrl CP37 CH-1295 Tannay Switzerland Phone: 0041 22 77 66 051 [email protected]
CARDOK CARLIFT Fast access to underground garages Fast, Silent, Discreet, Design, High-Tech Installation to replace an access ramp on private property Dimensions: (Built to measure, all dimensions can
SRA-125/SRAX-125 Double-Rail Lift-Out Rail System Installation & Service Manual with Parts List
SRA-125/SRAX-125 Double-Rail Lift-Out Rail System Installation & Service Manual with Parts List For MG, WG, WGL, and Grinder Pumps for Effluent & Sewage CAUTION! Read these safety warnings first before
OWNER S MANUAL DRAINVAC ATOMIK PRINTED APRIL 4-2011
OWNER S MANUAL th DRAINVAC ATOMIK PRINTED APRIL 4-2011 INTRODUCTION We take this opportunity to express our gratitude and extend our congratulations for your decision to purchase a Drainvac product. A
Elektromotoren und Gerätebau Barleben GmbH
Elektromotoren und Gerätebau Barleben GmbH OPERATING INSTRUCTIONS Transformer Protection Relay (Buchholz principle) Elektromotoren und Gerätebau Barleben GmbH Table of contents Page 1 Safety instructions
CONFINED SPACE ENTRY WORK STANDARD
CONFINED SPACE ENTRY WORK STANDARD CONFINED SPACE ENTRY WORK STANDARD Copyright 2007 All rights reserved. Reproduction of this document in whole or in part by any means is prohibited, unless authorized
ACO Water Management: Civils + Infrastructure
ACO Water Management: Civils + Infrastructure Uniclass JR12/JR23 L731 CI/SfB (52.7) ACO Q-Ceptor Bypass and full retention oil separators ACO Q-Ceptor Introduction to the ACO Group Throughout the world
Rexroth Hydraulic Pump A10VO Series User Manual
Rexroth Hydraulic Pump A10VO Series User Manual Rexroth Hydraulic pump A10VO Series User Manual Revised 5/1/2009 Page 1 of 12 Functional Purpose This pump is preferred over a fixed displacement (gear)
ATS Overhead Table Shelf System INSTRUCTION MANUAL
ATS Overhead Table Shelf System INSTRUCTION MANUAL ATS Overhead Table Shelf System Instruction Manual Warranty Newport Corporation warrants this product to be free of defects in material and workmanship
UST RULES CHANGES. Heather Peters, Environmental Specialist
UST RULES CHANGES Heather Peters, Environmental Specialist Today s Topic 2011 Rule package- what s left? Upcoming rule changes Federal Regulation Changes & Testing Protocols How are you doing? 2011 Rule
English AUTOMATION SYSTEMS FOR SLIDING GATES. Operating and installation instructions SLIDE SERIES
English AUTOMATION SYSTEMS FOR SLIDING GATES Operating and installation instructions SLIDE SERIES v.0 Rev /202 INDEX ) General Safety Regulations... pág. 0 2) Description... pág. 02 3) Technical Specifications...
Installation information. METTLER TOLEDO MultiRange Floor scales / Pit scales
Installation information METTLER TOLEDO MultiRange Floor scales / Pit scales KC300/KCS300 KC600/KCS600 KD600/KD1500 KE1500/KE3000 KES1500/KES3000 KG3000/KG6000 KN1500 Floor scales / Pit scales Contents
Maintenance and Operating Instructions SIS 120P/SISF
Maintenance and Operating Instructions IRRITROL Pop-up sprinkler with integrated valve SIS 120P/SISF Contents 1. General 2. Safety 3. Description 4. Assembly 5. Commissioning 6. Maintenance 7. Break-down
3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees.
The following shall serve as the minimum requirements for contractors performing work in relation to the Authority s potable water and sanitary sewer system(s), appurtenances and service connections. General:
The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.
Section 33 0200- Page 1 of 4 PART 1 - GENERAL 1.1 DESCRIPTION OF WORK The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.
ACO Building Drainage
ACO Building Drainage Backflow systems Backflow systems 33 Stop that backflow ACO backflow stops and lifting plant Contents Background What causes backflow?... 3 Liability aspects... 3 The backflow level...
Meaco 30L and Meaco 40L dehumidifier instruction manual
Meaco 30L and Meaco 40L dehumidifier instruction manual Please read this instruction manual before using the dehumidifier and keep safe for future reference SAFETY INSTRUCTIONS PLEASE READ ALL INSTRUCTIONS
Preventing water damage in the basement
Preventing water damage in the basement Thousands of home insurance claims are filed every year. Some losses are major, others aren t, but they re always an inconvenience and usually avoidable! As prevention
6720616592.00-1.SD. Flat roof. Rack Mounting. Installation instructions 6 720 647 036 (2010/11) AU
6720616592.00-1.SD Flat roof Rack Mounting AU Installation instructions 2 Contents AU Contents 1 Key to symbols and safety instructions....... 3 1.1 Explanation of symbols................ 3 1.2 Safety
SIR 900-1100. INTERMEDIATE LIFTING STATIONS Communal waste water 50 Hz OPERATING LIMITS APPLICATIONS. AdVANTAGES
OPERATING LIMITS Useful volume up to : L 9 L Ambient temperature : to + C Max.fluid temperature : + C* passing blade at : mm Ø Inlet dia. : mm DN Ø Outlet dia. : / Ø Vent dia.: mm Ø Cable passage : mm
INSTRUCTIONS FOR USE SAFETY PRINCIPLES, OPERATION AND MAINTENANCE FOR. HYDRAULIC PUMP type HP 03L, 05L, 07L volume 3 l, 5 l, 7 l
BRANO a.s, 747 41 Hradec nad Moravicí Czech Republic tel.:+420/ 553 632 316, 553 632 303 fax:+420/ 553 632 407, 553 632 151 http://www.brano.eu [email protected] INSTRUCTIONS FOR USE SAFETY PRINCIPLES, OPERATION
MODEL G300 BRAKE BLEEDER
MODEL G300 BRAKE BLEEDER Installation, Operation & Repair Parts Information Branick Industries, Inc. 4245 Main Avenue P.O. Box 1937 Fargo, North Dakota 58103 REV060616 P/N: 81-0035G 1 THIS PAGE INTENTIONALLY
Conlift1, Conlift2, Conlift2 ph+
GRUNDFOS DATA BOOKLET Conlift1, Conlift2, Conlift2 ph+ Small lifting stations 50 Hz CONLIFT1, CONLIFT2, CONLIFT2 ph+ Table of contents 1. Product overview 3 Conlift for condensate applications 3 Applications
STANDARD PLUMBING AND DRAINAGE REGULATION 2003
Queensland Subordinate Legislation 2003 No. 265 Plumbing and Drainage Act 2002 STANDARD PLUMBING AND DRAINAGE REGULATION 2003 TABLE OF PROVISIONS Section Page PART 1 PRELIMINARY Division 1 Introduction
Accessory Manual Ventilation Section Model Comfort Circle
Accessory Manual Ventilation Section Model Comfort Circle Manual version:. R a Copyright and trademarks All the information and drawings in this manual are the property of Biddle and may not be used (other
1. Description. 2. List of Accessories included A B C F G H
1. Description This unit is a pump that will clear the waste from a domestic shower and washbasin. The unit will start automatically. Please pay particular attention to the following: Possible danger to
Air Conditioner Water Heater Model ACWH18
Air Conditioner Water Heater Model ACWH18 Installation Guide IMPORTANT! READ THIS FIRST! Commissioning of this unit must be done by a licensed HVAC technician. Commissioning includes making the electrical
Explosion of a gasoline vapour cloud formed in a hydrocarbon loaded effluents storage tank 10 December 1999 Arquata Scrivia Italy
Explosion of a gasoline vapour cloud formed in a hydrocarbon loaded effluents storage tank 10 December 1999 Arquata Scrivia Italy UVCE Storage tank Hydrocarbons Steam coil Corrosion Steam Instrumentation
POSEIDON 2-29, 2-25 & 2-22 POSEIDON 2-29, 2-25 & 2-22 XT
POSEION 2-29, 2-25 & 2-22 POSEION 2-29, 2-25 & 2-22 XT Repair Manual Index A. Safety precautions 3 B. Technical data 4 C. Structure 5-6. Service / Repair 7-23 E. Tools 24 F. Function 25-26 G. Electric
Fluid Level Gauge Fluid Level Sensor Temperature Switch FSA / FSK / TS
Fluid Level Gauge Fluid Level Sensor Temperature Switch FSA / FSK / TS up to size 381; to PN 0.5; to T = 80 C 1. Description 1.1. General FSA fluid level gauges, FSK fluid level sensors and TS temperature
SECTION 807 PUMP STATION REHABILITATION
SECTION 807 PUMP STATION REHABILITATION 807-1 DESCRIPTION: Rehabilitation of pump stations shall be defined as the cleaning, removal, repair and/or replacement of any and/or all components including but
Elo Touch Solutions Wall-mounting Kit for the 5501L IDS Touchmonitors
Installation Manual Elo Touch Solutions Wall-mounting Kit for the 5501L IDS Touchmonitors SW602206 Rev B Table of Contents Chapter 1: Safety Warning... 3 Chapter 2: Kit Contents... 4 Included in Kit...
MAINTENANCE OF SMALL WATER SUPPLY, SANITATION AND IRRIGATION SCHEMES
MAINTENANCE OF SMALL WATER SUPPLY, SANITATION AND IRRIGATION SCHEMES John van Rijn INDEVELOPMENT MAINTENANCE OF SMALL WATER SUPPLY, SANITATION AND IRRIGATION SCHEMES Any part of this publication may be
Volkswagen Jetta, Golf, GTI 1999, 2000 2.8 Liter VR6 2V Engine Mechanical, Engine Code(s): AFP 17 Engine-Lubrication (Page GR-17)
17 Engine-Lubrication (Page GR-17) Lubrication system components, removing and installing Oil filter housing, disassembling and assembling Oil pan, removing and installing Oil pressure and oil pressure
ALMATEC Series CX CX 10 CX 130
ALMATEC Series CX CX 10 CX 130 Operating and Installation Instructions ought to be studied before installing the pump The ALMATEC Maschinenbau GmbH is certified as a modern, quality-orientated enterprise
Installation and Operation Instructions Domestic hot water modules: FriwaMidi DN 20 FriwaMaxi DN 25
PAW GmbH & Co. KG Böcklerstr. 11, D-31789 Hameln, Germany Phone: +49-5151-9856-0, Fax: +49-5151-9856-98 E-mail: [email protected], Web: www.paw.eu Installation and Operation Instructions Domestic hot water modules:
EFFECTIVE FEBRUARY 2014. note: drainage permit required to call for a dampproof inspection
EFFECTIVE FEBRUARY 2014 note: drainage permit required to call for a dampproof inspection 1. ROOF DRAINS/DECK DRAINS (INTERIOR ) All roof and deck drains within the perimeter of the building shall be APPROVED
ELECTRIC/DIESEL FIRE PUMP CHECK LIST
BUILDING NAME: DESIGNER: SCO REPRESENTATIVE: PUMP MANUF.: LOCATION: INSTALLER: DATE: OWNER NAME: INSTALLATION Certificate for flushing and hydrostatic test furnished Piping been hydrostatically tested
OWNER S MANUAL FORCE 10 MARINE COMPANY 23080 HAMILTON ROAD RICHMOND, BC CANADA V6V 1C9 TEL: (604) 522-0233 FAX: (604) 522-9608
Electric Water Heater OWNER S MANUAL FORCE 10 MARINE COMPANY 23080 HAMILTON ROAD RICHMOND, BC CANADA V6V 1C9 TEL: (604) 522-0233 FAX: (604) 522-9608 If your water Heater is Damaged or you have questions
A HOMEOWNERS GUIDE ON-SITE SEWAGE MANAGEMENT SYSTEMS
GEORGIA DEPARTMENT OF HUMAN RESOURCES ENVIRONMENTAL HEALTH SECTION A HOMEOWNERS GUIDE TO ON-SITE SEWAGE MANAGEMENT SYSTEMS March 12, 2002 WHAT IS AN ON-SITE SEWAGE MANAGEMENT SYSTEM An on-site sewage management
Guidelines for Precast Concrete Grease Interceptors
Guidelines for Precast Concrete Grease Interceptors Purpose Provide an overview of the basic design principals that govern why gravity grease interceptors work Provide a forum for discussion of common
