A SURVEY OF PROJECT MANAGEMENT TOOLS, TECHNIQUES AND METHODOLOGIES USED IN MAURITIUS: THE CURRENT STATUS
|
|
|
- Poppy Carr
- 10 years ago
- Views:
Transcription
1 A SURVEY OF PROJECT MANAGEMENT TOOLS, TECHNIQUES AND METHODOLOGIES USED IN MAURITIUS: THE CURRENT STATUS Sukhoo, A. 1, Barnard, A. 2, Eloff, M.M. 2 and Van der Poll, J.A. 2 1 Central Informatics Bureau Royal Road, Paillotte, Quatre Bornes, Mauritius. Tel: (23) [email protected] 2 UNISA School of Computing, UNISA, South Africa. Tel: (27) [email protected], [email protected] or [email protected] ABSTRACT Developing countries are very often faced with a shortage of skilled staff, difficult economic and social conditions, weak political institutions, deeply rooted cultural and religious beliefs that all have an impact on development in various disciplines (Nessan, 1993). This paper critically analyses the situation of software project management in Mauritius with a view for further research in the field. Data sets for statistical analysis were collected using two questionnaires, one aimed at gathering information from software development companies and/or staff and another one targeting users of computer software. The use of project management methodologies, tools and techniques, considered as important for assessment by Ralph and Ludin (1996), faced by software developers in Mauritius in particular, were analysed. User satisfaction was one of the criteria analysed by the client questionnaire. Based on the analysis of the surveys conducted, it was found that there is room for improvement regarding software project management in Mauritius and we speculate that this will also be the case for other regional developing countries. Methodologies developed for use in western countries may not be totally suitable for developing countries. Furthermore, given the assumption of economic rationality and cultural differences and the need to cope with political and community demands on the project s resources, a new project management methodology to be developed to ensure that developing countries, in particular Mauritius, are not left apart, is indicated (Murithi and Crawford, 3). Keywords: Software; Project management; Software project management methodologies, tools and techniques; Surveys; Developing countries INTRODUCTION Economic rationality is often assumed and cultural differences, political situation and social conditions are usually ignored when dealing with project management. Hofstede (1983) points out that project management can be related to differences in national cultures and Adler (1983) raises concerns regarding cross-cultural management. Murithi and Crawford (3) found that in Africa, theorists and practitioners in many disciplines are increasingly wary of adopting concepts of (a) western origin. Even Turner (1993) as cited by Murithi and Crawford (3) observed that contrary to the common belief that western-oriented techniques of project management are just straight forward procedures that anyone can learn and implement, there are considerable cross-cultural problems in using the approach in non-western countries. The purpose of this survey is to analyse the situation of software project management in developing countries, and Mauritius in particular. A statistical approach is followed regarding data gathered from software development companies and/or staff and users of such software. Mauritius, as is the case in other developing countries are either using methodologies of western origin, or are not using any methodology at all. The information gathered from the questionnaires, after analysis, reveals that project managers in Mauritius are not at present entirely comfortable with the methodologies in use, given that the latter does not appear to yield expected success rates. To achieve this goal, we briefly consider the research methods adopted in this study in section 2 of this paper while we focus on the analysis of the survey results in section 3. We conclude the paper by observing in section 4 that project management concepts, especially of western origins, may not be universally applicable. Proceedings of the 4 PMSA International Conference 1 12 th May 4 Global Knowledge for Project Management Professionals Johannesburg, South Africa Conference Organised by PMSA ISBN:
2 RESEARCH METHODOLOGY Two questionnaires were designed for the data collection activity. The survey was carried out between July 3 and November 3. The target group for one questionnaire focused on software development companies and/or staff. The questionnaire aims at gathering information about the respondents awareness regarding prevailing project management methodologies in the Information Technology arena. It furthermore surveyed tools and techniques in use as well as the level of success of projects within their organisations with respect to the project parameters such as time, cost and quality. Out of a total of questionnaires sent to software companies in Mauritius and other regional developing countries, 16 completed questionnaires were received. 1 completed survey forms were received from Mauritian companies while 6 forms came from other regional developing countries like South Africa, India, Kenya and Zimbabwe. As the majority of responses were received from Mauritius, we focus in this paper on the status quo of the use of software project management methodologies in Mauritius. It is, therefore, important to note that 1 responses were received from the 21 questionnaires sent to software development companies in Mauritius in particular. Many project managers in Mauritius were contacted by phone to fill in the questionnaires, and it was particularly noteworthy that top managers were reluctant to provide substantial information. Subsequently in section 3 below we present an analysis of the data gathered from this survey with reference to the Mauritian environment. We intend to conduct the survey in the other developing regional countries, with more rigour in the future. Another questionnaire was dispatched to the users of software that were developed in Mauritius. The objective of this questionnaire was to investigate user satisfaction with respect to software developed and supplied by software companies in Mauritius. A total of users and/or clients were contacted and all of them responded positively to the request for information. Another objective of the questionnaire was to confirm whether or not software companies were making the necessary efforts to ensure user satisfaction with respect to timely delivery, optimum cost and an acceptable quality standard for the product concerned. ANALYSIS OF SURVEY RESULTS The data from these questionnaires were used to determine:! the awareness of existing project management methodologies in use by software developers and/or project managers;! tasks addressed by the methodologies in use;! project management tools in use;! software development approach(es) in use;! quality management standards in use;! information reports received from companies regarding projects suffering from failure to meet deadline, budget overrun and user dissatisfaction;! reasons supplied by the respondents regarding their perception of the deviation in project achievement;! quality of software from the users point of view;! causes of failure of projects to meet expected objectives according to users; and! factors to improve user satisfaction supplied by the respondents. ANALYSIS OF SOFTWARE DEVELOPERS AND/OR COMPANIES SURVEY RESULTS The data collected was analysed and is represented graphically in this paper by considering the percentages as well as mean scores. For some questions, a number from 1 to 5 was requested (1 strongly agree; 2 Agree; 3 Neutral; 4 Disagree; 5 Strongly Disagree). The mean score was the average value calculated for a particular question received from all Mauritian respondents. This result shows the tendency of the response for a particular question. In the following subsections we focus only on the data evaluation of the 1 respondents received out of a possible 21 questionnaires distributed in Mauritius in particular. Awareness of the Existence of Project Management Methodologies The chart in figure 1 shows that the majority of the methodologies have scored less than 5% regarding their awareness among software developers. This chart indicates that the most popular methodology used in Mauritius is Prince 2 (OGC, 2; CCTA, 2), while Euromethod (Helmerich, 2; Hughes and Cotterrel, 2) and BS79 (Hughes and Cotterrel, 2) are the least known among software development personnel in Mauritius. It is, therefore, reasonable to assume that a significant number of software development personnel in Mauritius are familiar with methodologies such as Euromethod, ISO 127 (Hughes and Cotterrel, 1; Moore, 2), PMBOK (Hughes and Cotterrel, 1) and BS79.
3 Prince 2 Euromethod ISO 127 PMBOK BS79 Figure 1. PM Methodologies awareness. When software developers were polled regarding the methodology they were using, a significant number, %, of the respondents mentioned that they were not using any methodology for their software development process. However, it is our perception that some internal guidelines exist so that new entrants to the organisation can at least follow the relevant procedures, note that this perception was not explicitly measured by our survey. We speculate that some reasons for the absence of a formal methodology include, among others:! limited time allocated for completion of a project;! software professionals are not provided with appropriate training regarding software project management;! scarce staff resources. All respondents, where a project management methodology is in use, claim to support multi-project management and the average number of projects handled concurrently amounts to 3.6. This appears to be a reasonable average, especially where large projects are concerned. Tasks Addressed by Methodology in Use in The Organisation Planning Cost Man. Quality Man. HRM Comm. Man. Risk Man. Proc. Man Figure 2. Tasks addressed by Methodology. From the survey data it seems that the use of a project management methodology emphasises quality management (percentage = %), while cost management scores 25%. From the gathered data, planning and procurement management are also well represented at around 75%. Human resource management, communications management and risk management scored 5%. It is, however, possible that human resource management, communications management and risk management are addressed separately
4 rather than by the methodology employed, although grouping all these tasks under the same umbrella would be helpful. Project Management Tools Used WBS Gantt chart PERT/CPM Gantt with links RAM M. Carlo Sim. Earned value RM RE PR Other Legend: WBS - Work Breakdown Structure PERT/CPM Project Evaluation and Review Technique/Critical Path Method RAM Risk Assessment Matrix M. Carlo Sim. Monte Carlo simulation RM Responsibility Matrix RE Resource Estimate PR Progress Report Figure 3. PM Tools used. The data gathered indicates that Gantt charts (around 7%), resource estimates (around %) and progress reports (around 5%) are popular tools in the management of software development in Mauritius. Monte Carlo simulation seems not to be frequently used by software developers. It appears that in Mauritius, software developers choose Software Project Management tools that do not take much time to implement in practice. This is possibly due to shortages of staff and the difficulty to allocate sufficient time for the use of software project management tools. Software Development Approach (1) (2) (3) (4) (5) Legend: (1) - Classical System Development Life Cycle (e.g. based on the Waterfall model) (2) - System Development Life Cycle (SDLC) (3) - 4GL (4th Generation Language) techniques (4) - Prototyping (5) Other (e.g. formal methods) Figure 4. Software development approach in use.
5 From the data it is found that most software companies prefer relatively short development cycles, where 4GL techniques are best preferred, 7%, followed by prototyping, %. The Classical System Development Life Cycle is used less, about 5%. Software with shorter development cycles, such as prototyping, have the added advantage that users can be given a sense of the final product. It was noted that companies in Mauritius did reportedly not use SDLC. Software developers and/or companies are generally concerned with the development of software within the minimum period of time. Quality Management Standards (1) (2) (3) (4) Legend: (1) - International Standards Organisation (ISO) (2) - Total Quality Management (TQM) (3) - A standard developed in-house (4) - No standard is used Figure 5. Standards used. The chart in figure 5, based on respondent information, reveals that 5% of software companies in Mauritius prefer to develop and use their own standards. This is possibly due to a lack of expertise with regards to international standards and difficulty to allocate sufficient time to investigate these standards given the scarcity of qualified staff. However, to extend their trade to other countries, an international standardised approach would certainly present Mauritian companies with a competitive advantage. Software professionals must take note that software project management has also been used for ISO 9 certification (Ralph, 1999). Projects Suffering from Failure to Meet Deadlines, Budget Overrun and User Satisfaction (1) (2) (3) (4) (5) Series1 Series2 Series3 Series 1 represents projects suffering from failure to meet the deadline. Series 2 represents projects suffering from a budget overrun. Series 3 represents projects suffering from failure to satisfy user requirements Figure 6. Projects affected by deadlines, budget and failure to meet user satisfaction.
6 The approximate annual percentage of projects that fail to meet deadlines, suffer from budget overrun, or fail to satisfy user requirements, were categorised as follows:! above 75%! between 5% and 75% (both inclusive)! above % but less that 5%! %! no response Figure 6 indicates that:! % of companies sampled claimed that more than 75% of their projects annually failed to meet the set deadlines! 3% of companies sampled claimed that between 5% and 75% of their projects annually failed to meet the set deadline! % of companies sampled claimed that less than 5% of their projects annually failed to meet the set deadline! none of the sampled companies claimed that none of their projects annually failed to meet the set deadline! 3% of companies sampled did not respond to this question. These figures are quite alarming and we contend that this implies that improvement must be brought about in this area. We, therefore, suggest that better planning needs to be effected and that closer monitoring has to be carried out. It also appears that some companies are reluctant to disseminate the above kind of information. Regarding budget overrun:! 1% of companies sampled claimed that more than 75% of their projects annually suffered from budget overrun! % of companies sampled claimed that between 5% and 75% of their projects annually suffered from budget overrun! 3% of companies sampled claimed that less than 5% of their projects annually suffered from budget overrun! none of the sampled companies claimed that none of their projects annually suffered from budget overrun! % of companies sampled did not respond to the question. Again, we deduce that much improvement is required in this area. Regarding projects suffering from failure to satisfy user requirements, we note the following:! 1% of companies sampled claimed that more than 75% of their projects failed to satisfy user expectations! none of the sampled companies claimed that between 5% and 75% of their projects failed to satisfy user expectations! 5% of companies sampled claimed that less than 5% of their projects failed to satisfy user expectations! 1% of companies sampled claimed that none of their projects failed to satisfy user expectations! 3% of companies sampled did not respond to this question. These figures are equally alarming and we speculate that this area particular to software project management methodologies currently in use in Mauritius requires further research. Factors for Deviation in Project Achievement Responses for the factors for deviation in project achievement as supplied by the respondents, were assigned values on a scale from 1 to 5 as shown below: Strongly Agree (SA) Agree (A) Neutral (N) Disagree (D) Strongly Disagree (SD) The mean score was the average value calculated for a particular question. This result then depicts a tendency of the response for a particular question. In figure 7 below, the mean score varied between approximately 2 and 2.5 for all the factors under study, which implies that respondents are of the perceived opinion that all of these factors have to be overcome for software projects to be successful in Mauritius.
7 Mean Score (1) (2) (3) (4) (5) (6) (7) (8) (9) Figure 7. Reasons for deviation. (1) (11) (12) (13) The legends used in figure 7 above is as follows:! No formal methodology is used! Poor planning! User resistance! Inadequate or improper communication infrastructure (between project team and customer)! Inappropriate project team! No executive support! Failure of project team to understand user needs! Inadequate or absence of user involvement! Risk Management! Difficulty to cope with concurrent projects! Lack of expertise in innovative/new technology! Lack of skilled professionals! Mobility of labour ANALYSIS OF CLIENT SURVEY RESULTS The data collected was analysed and represented graphically by considering the percentages as well as mean scores. In the following subsections we will focus only on the data evaluation of the respondents who provided feedback regarding the use of software developed in Mauritius. Note that a % response rate was achieved in this part of the survey. Quality of Software: A User Perspective Series1 Series2 Series3 Very Good Good Satisfactory Poor Series 1 represents user friendliness of software. Series 2 represents performance of software. Series 3 represents security features of software. Figure 8. Rating of quality.
8 The majority of users of software are satisfied with the user friendliness features of such software (5% of respondents view this feature as Good and % as Satisfactory ). This is probably attributed to the generally short development cycles used in Mauritius, whereby users are exposed early on in the development phase to a prototype version of the software under development. 5% of the respondents are satisfied with the performance of the said software. Respectively 35% and 1% of users view software as good and very good. Again, this may be attributed to short development cycles, whereby users are exposed early to the software under development. % of users rate security features as Good, 3% as Satisfactory and 1% as Very Good. Around % of users are of the opinion that security features are poorly addressed. The high degree of user satisfaction in this respect may also be attributed to short development cycles, whereby users are exposed early to the software under development. Causes of Project Failure to Meet Expected Objectives: A User Perspective (1) (2) (3) (4) (5) Figure 9. Causes of failure. The following legend is used in figure 9 above to indicate the causes of project failure to meet expected user objectives:! lack of communication between supplier and customer! lack of experience on the part of software developer! unprofessional mind-set of supplier! possible lack of best practices for software development and IT management! none of the above reasons are applicable (i.e. other reasons exist). Most users are of the opinion that the causes of failure to meet expected user objectives can be attributed to (1) - lack of communication between supplier and customer and (4) - possible lack of best practices for software development and IT management. One can thus summarise their perception to include improvement of communication, the need to review software development practices by the developers and better IT management is called for. Factors to Improve User Satisfaction: A User Perspective The following factors are considered to evaluate customer satisfaction in figure 1:! improving communication between suppliers and users through regular meetings or informal discussions! frequent participation of users in the software development process by providing regular feedback! suppliers should consider user satisfaction seriously rather than just abiding strictly by the specifications agreed upon initially on award of a contract! a chief information officer (CIO) in charge of issues pertaining to IT should be appointed on the user side! each user department must recruit its own software developers, IT manager, System Analysts, Database Administrators, etc.! more effort should be devoted to the elimination of errors in software.
9 5. 4. Mean Score (1) (2) (3) (4) (5) (6) Figure 1. Factors to improve user satisfaction. The responses for factors that may enhance customer satisfaction with respect to software were assigned values on a scale from 1 to 5 as shown below: Strongly Agree (SA) Agree (A) Neutral (N) Disagree (D) Strongly Disagree (SD) The mean score of the responses lies mostly in the Agree to strongly Agree category (mean score of between 1.5 and 2) for most of the factors, except for the factor (5). Therefore, from a user s point of view, most of the factors considered have to be addressed during project management. CONCLUSION AND FUTURE WORK Based on the survey that we conducted in Mauritius and reported on in this paper, we conclude that a large number of companies are either not comfortable with existing methodologies, which have western origins, or are not using any methodology at all. Naturally, it is important to use some or other methodology rather than not use any methodology at all. The absence of a methodology advances chaos in a software development process and may contribute to the failure of a project. In such situations software development as well as project management tend to be performed on an ad hoc basis, thereby leading to inefficient management of time, budget and quality. From the results of our survey, we observe that project management concepts, especially those of western origins, may not be universally applicable, as is demonstrated in the Mauritius case. Developing countries have to constantly face a shortage of skilled staff, difficult economic and social conditions, weak political institutions, as well as deeply rooted cultural and religious beliefs. Therefore, there is a need to encourage the emergence of project management methodologies of a certain indigenous nature, which can cope with the actual status of such countries and stand a better chance of survival (Strucenbruck and Zomorrodian, 1987). REFERENCES 1. Adler, N. J. (1983). Cross-cultural management research: the ostrich and the trend. Academy of management review. 8(2), CCTA: Central Computer and Telecommunications Agency. (2). Project Management industry initiatives. Accessed , online at 3. Helmerich, A. (2). Background and History of the Euromethod Project. Accessed , online at 4. Hofstede G. (1983). Cultural dimensions for project management. International Journal of Project Management. 1(1), Hughes, B. and Cotterell, M. (2). Software Project Management, 3 rd edition. McGraw-Hill: London, UK. 6. Moore, J. (2). ISO 127 and Related Software Life-Cycle Standards. Accessed 3.9.2, online at
10 7. Murithi, N.; Crawford, L. (3). Approaches to project management in Africa: implications for international development projects. International Journal of Project Management. 21(5), Nessan, J. (1993). Developing the African Manager: The good, the bad and the competent, Management Education and Development. 24(4), OGC: Office of Government Commerce. (2). Introduction to PRINCE2 Management Overview. Accessed , online at 1. Ralph, L. K. (1999). Using Project Management to become ISO 9 certified. Information Technology: The Executive s Journal, Ralph, L.K. and Ludin, I.S. (1996). Developing a Project Management Methodology for IS Environments. Managing System Development. 16(5), Stuckenbruck, L. C. and Zomorrodian, A. (1987). Project management: the promise for developing countries. International Journal of Project Management. 5(3), Turner, J.R. (1993). The handbook of project-based management: improving the processes for achieving strategic objectives, McGraw-Hill: London, UK. Cited in Ndiritu Murithi, Lynn Crawford 3, Approaches to project management in Africa: implications for international development projects, International Journal of Project Management, 21(5),
An Evolutionary Software Project Management Maturity Model for Mauritius
Interdisciplinary Journal of Information, Knowledge, and Management Volume 2, 2007 An Evolutionary Software Project Management Maturity Model for Mauritius Aneerav Sukhoo, Andries Barnard, Mariki M. Eloff,
An Assessment of Software Project Management Maturity in Mauritius
Issues in Informing Science and Information Technology An Assessment of Software Project Management Maturity in Mauritius Aneerav Sukhoo, Andries Barnard, Mariki M. Eloff, and John A. Van der Poll University
Frameworks for IT Management
Frameworks for IT Management Copyright protected. Use is for Single Users only via a VHP Approved License. For information and printed versions please see www.vanharen.net 18 ITIL - the IT Infrastructure
Project Management. Interview Questions
Project Management Interview Questions 2 Contents Introduction 3 Preparing for Your Interview 3 Specific Skill Areas 4 Preparing for a PSO Interview 4 Project Manager Interviews-Soft Skills 6 Preparing
Efficiency Criteria in Software Project Management
124 Economy Informatics vol. 13, no. 1/2013 Efficiency Criteria in Software Project Management Cecilia CIOLOCA, Mihai GEORGESCU, Mihai CURTEANU Academy of Economics Studies, Bucharest, Romania [email protected],
Demonstrate and apply knowledge of project management in
Demonstrate and apply knowledge of project management in mechanical engineering 22918 version 2 Page 1 of 5 Level 6 Credits 15 Purpose This unit standard is intended primarily for use in diploma courses
How To Learn Project Management
Engineering Planning and Project Management CEE 9510 Department of Civil and Environmental Engineering Course Outline Intersession 2014 Instructor: Kevin McGuire, M. Eng., P. Eng., PMP Description: This
Contents. 2. Why use a Project Management methodology?
Case Study Ericsson Services Ireland The APM Group Limited 7-8 Queen Square High Wycombe Buckinghamshire HP11 2BP Tel: + 44 (0) 1494 452450 Fax + 44 (0) 1494 459559 http://www.apmgroup.co.uk/ Q:\Users\Marie
APPLICABILITY OF PROJECT MANAGEMENT TECHNIQUES IN SMEs: EVIDENCE FROM GREECE
STUDIA UNIVERSITATIS BABEŞ-BOLYAI, NEGOTIA, L, 1, 2005 APPLICABILITY OF PROJECT MANAGEMENT TECHNIQUES IN SMEs: EVIDENCE FROM GREECE SDROLIAS L. 1, SIRAKOULIS K. 2, TRIVELLAS P. 3, POULIOS T. 4 ABSTRACT.
An Introduction to the PRINCE2 project methodology by Ruth Court from FTC Kaplan
An Introduction to the PRINCE2 project methodology by Ruth Court from FTC Kaplan Of interest to students of Paper P5 Integrated Management. Increasingly, there seems to be a greater recognition of the
Redesigned Framework and Approach for IT Project Management
Vol. 5 No. 3, July, 2011 Redesigned Framework and Approach for IT Project Management Champa Hewagamage 1, K. P. Hewagamage 2 1 Department of Information Technology, Faculty of Management Studies and Commerce,
Integrating knowledge management with project management for project success
Integrating knowledge management with project management for project success Anthony Yeong Independent Consultant Thou Than Lim Decision Modelling Systems2 Abstract This paper aims to study the improvement
Evaluating Pedagogical Quality: An Integral Part of Course Development Strategy
1 20th Annual Conference on Distance Teaching and Learning click here -> Evaluating Pedagogical Quality: An Integral Part of Course Development Strategy L Bagley, PhD Head of Learning Research and Development
Systems Analysis and Design in a Changing World, Fifth Edition
Systems Analysis and Design in a Changing World, Fifth Edition Learning Objectives Explain the elements of project management and the responsibilities of a project manager Explain project initiation and
Challenges of Intercultural Management: Change implementation in the context of national culture
12-ICIT 9-11/4/07 in RoC Going for Gold ~ Best Practices in Ed. & Public Paper #: 07-08 Page- 1 /7 Challenges of Intercultural Management: Change implementation in the context of national culture Prof.
The principles of PRINCE2
The principles of PRINCE2 The project management framework known as PRINCE2 is based upon a set of principles. These principles are the bedrock and foundations upon which everything else in the framework
OTC 12979. Managing the Cost & Schedule Risk of Offshore Development Projects Richard E. Westney Westney Project Services, Inc.
OTC 12979 Managing the Cost & Schedule Risk of Offshore Development Projects Richard E. Westney Westney Project Services, Inc. Copyright 2001, Offshore Technology Conference This paper was prepared for
ISO 14001: THE DRIVERS FOR INSTALLATION AND MAINTENANCE REPORT 2012
ISO 14001: THE DRIVERS FOR INSTALLATION AND MAINTENANCE REPORT 2012 The drivers, installation, and maintenance of the ISO 14001 environmental management system standard among Australian and New Zealand
The unclear relationship between change, release and project management
Processes 467 The unclear relationship between change, release and project management 7.7 The unclear relationship between change, release and project management Do you have a clear picture of the interfaces
IRNOP VIII. Brighton, United Kingdom, 2007. Title: A study of project categorisation based on project management complexity
IRNOP VIII Brighton, United Kingdom, 2007 Title: A study of project categorisation based on project management complexity Authors: Alicia Aitken, Dr Lynn Crawford ESC Lille, France and Bond University,
Contents. viii. 4 Service Design processes 57. List of figures. List of tables. OGC s foreword. Chief Architect s foreword. Preface.
iii Contents List of figures List of tables OGC s foreword Chief Architect s foreword Preface Acknowledgements v vii viii 1 Introduction 1 1.1 Overview 4 1.2 Context 4 1.3 Purpose 8 1.4 Usage 8 2 Management
Table of Contents. 1. Introduction to Project Management
Information Technology Project Management Compiled by: EDMOND NG November 2001 Information Technology Project Management Objectives This document is created for the purpose of helping organisations understand
Selecting a project management methodology
VICTORIAN GOVERNMENT CIO COUNCIL Project Management Selecting a project management methodology Guideline This guideline provides advice for selecting and tailoring a project management methodology. Keywords:
PROJECT MANAGEMENT PRACTICE IN NIGERIAN PUBLIC SECTOR AN EMPIRICAL STUDY
PROJECT MANAGEMENT PRACTICE IN NIGERIAN PUBLIC SECTOR AN EMPIRICAL STUDY OLATEJU, Olawale I. Department of Business Administration and Management Technology, Lagos State University, P.M.B. 0001, LASU POST
ELE4402. Software Engineering Project Management. Study Book. Faculty of Engineering & Surveying. Bachelor of Software Engineering.
ELE4402 Software Engineering Project Management Faculty of Engineering & Surveying Bachelor of Software Engineering Study Book Written by Dr Wei Xiang BEng, MEng, PhD Lecturer in Computer System Engineering
Software Development Risk Assessment
Software Development Risk Assessment Note: The purpose of this prompt list is to provide project managers with a tool for identifying and planning for potential project risks. It is process-based and supports
Implementing the European Foundation for Quality Management Excellence Model
Implementing the European Foundation for Quality Management Excellence Model Dr. Paul WATSON, United Kingdom Key words: Total Quality Management, Continuous Improvement. ABSTRACT The European Foundation
How to Save a Failing Project: Chaos to Control By Authors Ralph R. Young, Steven M. Brady, & Dennis C. Nagle, Jr. (A book review by R.
How to Save a Failing Project: Chaos to Control By Authors Ralph R. Young, Steven M. Brady, & Dennis C. Nagle, Jr. (A book review by R. Max Wideman) The views expressed in this article are strictly those
Methods Commission CLUB DE LA SECURITE DE L INFORMATION FRANÇAIS. 30, rue Pierre Semard, 75009 PARIS
MEHARI 2007 Overview Methods Commission Mehari is a trademark registered by the Clusif CLUB DE LA SECURITE DE L INFORMATION FRANÇAIS 30, rue Pierre Semard, 75009 PARIS Tél.: +33 153 25 08 80 - Fax: +33
A COMPARISON OF PRINCE2 AGAINST PMBOK
Introduction This comparison takes each part of the PMBOK and gives an opinion on what match there is with elements of the PRINCE2 method. It can be used in any discussion of the respective merits of the
Deploying a CRM system in practice Understanding the user experience Received (in revised form): 5th February, 2007
Deploying a CRM system in practice Understanding the user experience Received (in revised form): 5th February, 2007 Yuksel Ekinci is one of the leading international academics in service quality and customer
DESCRIPTION OF COURSES
DESCRIPTION OF COURSES MGT600 Management, Organizational Policy and Practices The purpose of the course is to enable the students to understand and analyze the management and organizational processes and
Influence of Project Management Software Tools Usage on Project Success
Influence of Project Management Software Tools Usage on Project Success Kristina Brodar University of Zagreb Faculty of Organization and Informatics, Varaždin [email protected] Igor Pihir University of Zagreb
Research Report IT barometer 2009. A survey on the importance of IT in Finnish companies from the perspective of IT and business management
Research Report IT barometer 2009 A survey on the importance of IT in Finnish companies from the perspective of IT and business management 1. Introduction... 3 1.1. Research Data... 3 1.2. Summary... 4
Workplace Productivity Snapshot
Workplace Productivity Snapshot 2 WORKPLACE PRODUCTIVITY SNAPSHOT How To Use This Tool This self-assessment productivity tool is designed for the owners and managers of small-to-medium businesses. It is
MODELING OF RISK ASSESSMENT FOR INTEGRATED PROJECT MANAGEMENT SYSTEM IN CONSTRUCTION
MODELING OF RISK ASSESSMENT FOR INTEGRATED PROJECT MANAGEMENT SYSTEM IN CONSTRUCTION Amiruddin Ismail 1, Abbas M. Abd 1 and Zamri Bin Chik 1 1 Civil and Structural Engineering Department, Faculty of Engineering,
Improving Project Governance
Improving Project Governance By Phil Mann 31 October 2012 Overview This whitepaper provides a synopsis of the Victorian Government s Ombudsman s Own motion investigation into ICT-enabled, November 2011.
Course Overview. Course Learning Objectives
TCMG-506-6R1 University of Bridgeport Technology Management Advanced Program and Project Management ---------------------------------------------------------------------------------------------------------------------
A Study on Errors in Railway Employee Appraisal
Global Journal of Finance and Management. ISSN 0975-6477 Volume 6, Number 8 (2014), pp. 783-788 Research India Publications http://www.ripublication.com A Study on Errors in Railway Employee Appraisal
Project Management Standards: A Review of Certifications/Certificates
Project Standards: A Review of Certifications/Certificates Standards for Project Supporting Certification and Certificates Certificate Certification The Project Body of Knowledge PMBOK Guide Projects in
Quality Standard Customer Service Complaints Handling
Quality Standard Customer Service Complaints Handling Version 1 Date:- 2 nd December 2010 Page 1 Contents INTRODUCTION 4 OVERVIEW OF THE COMPLAINTS STANDARD 5 FRAMEWORK 6 MANDATORY SECTIONS 7 SECTION 1
Developing CMMI in IT Projects with Considering other Development Models
Developing CMMI in IT Projects with Considering other Development Models Anahita Ahmadi* MSc in Socio Economic Systems Engineering Organizational Process Development Engineer, International Systems Engineering
Scheduling Resources and Costs
Student Version CHAPTER EIGHT Scheduling Resources and Costs McGraw-Hill/Irwin Copyright 2011 by The McGraw-Hill Companies, Inc. All rights reserved. Gannt Chart Developed by Henry Gannt in 1916 is used
Bureau of Standards Jamaica Quarterly Training Schedule July - September 2015
Bureau of Standards Jamaica Quarterly Training Schedule July - September 2015 () The mission of the BSJ Training unit is to promote a culture of quality within the Jamaican society, by providing high and
International Business & Economics Research Journal June 2013 Volume 12, Number 6
Establishing The Challenges Affecting South African SMEs Michael C. Cant, University of South Africa, South Africa Johannes A. Wiid, University of South Africa, South Africa ABSTRACT Cant and Ligthelm
Reputation and the Board. Guidance for PR Consultants and Board Directors
Reputation and the Board Guidance for PR Consultants and Board Directors Contents Foreword... 3 About This Guidance... 4 What is Reputation?... 4 Why is Reputation Important?... 4 Reputation: A Board s
2 Organizations and Organizational Structures 2.1 Functional and Project Organizations, Typical Goals and Performance Measures
2 Organizations and Organizational Structures 2.1 Functional and Project Organizations, Typical Goals and Performance Measures The history of organizations is probably as long as the history of mankind.
Benefits of conducting a Project Management Maturity Assessment with PM Academy:
PROJECT MANAGEMENT MATURITY ASSESSMENT At PM Academy we believe that assessing the maturity of your project is the first step in improving the infrastructure surrounding project management in your organisation.
GAP ANALYSIS OF APPROACHES TO IMPLEMENTATION OF MANAGEMENT SYSTEMS
52 PROCEEDINGS OF THE SCIENTIFIC CONFERENCE QUALITY AND LEADING INNOVATION 2014 GAP ANALYSIS OF APPROACHES TO IMPLEMENTATION OF MANAGEMENT SYSTEMS DOI: 10.12776/QALI.V1.#5 MIROSLAV HRNIAR ABSTRACT Purpose:
GLOBAL BEST PRACTICES
GLOBAL BEST PRACTICES Performance Management Review* If it s important, measure it, act and improve it! Are you a company experiencing good overall results, but you know you could do better? employees
Pearson Education Limited 2003
156 Activities Activity 9.1 (PP. 357 358) [Project planning exercise] You are required to construct a project plan for the following information system development project. Your objective is to schedule
CHAPTER 5: CONSUMERS ATTITUDE TOWARDS ONLINE MARKETING OF INDIAN RAILWAYS
CHAPTER 5: CONSUMERS ATTITUDE TOWARDS ONLINE MARKETING OF INDIAN RAILWAYS 5.1 Introduction This chapter presents the findings of research objectives dealing, with consumers attitude towards online marketing
Developing an Integrated Monitoring and Evaluation Flow for Sustainable Investment Projects
Developing an Integrated Monitoring and Evaluation Flow for Sustainable Investment Projects Florin TACHE 1 ABSTRACT Under the circumstances of certain weaknesses in the monitoring and evaluation processes
RELATIONSHIP BETWEEN THE USE OF MANAGEMENT INFORMATION SYSTEMS AND EMPLOYEE JOB PERFORMANCE: EVIDENCE FROM KENINDIA ASSURANCE COMPANY LIMITED
RELATIONSHIP BETWEEN THE USE OF MANAGEMENT INFORMATION SYSTEMS AND EMPLOYEE JOB PERFORMANCE: EVIDENCE FROM KENINDIA ASSURANCE COMPANY LIMITED Owino Phyllis Osodo Beatrice Jemaiyo The Catholic University
Software Project Management (Second Edition)
Software Project Management (Second Edition) Bob Hughes and Mike Cotterell, School of Information Management, University of Brighton The McGraw-Hill Companies London Burr Ridge, IL New York St Louis San
Nydia González 1, Franck Marle 1 and Jean-Claude Bocquet 1. Ecole Centrale Paris, FRANCE
INTERNATIONAL CONFERENCE ON ENGINEERING DESIGN, ICED 07 28-31 AUGUST 2007, CITE DES SCIENCES ET DE L'INDUSTRIE, PARIS, FRANCE Nydia González 1, Franck Marle 1 and Jean-Claude Bocquet 1 1 Ecole Centrale
TRAINING NEEDS IN CONSTRUCTION PROJECT MANAGEMENT IN PORTUGAL
INTERNATIONAL CONGRESS ON PROJECT ENGINEERING VALENCIA, September 13-15, 2006 TRAINING NEEDS IN CONSTRUCTION PROJECT MANAGEMENT IN PORTUGAL J. C. Teixeira (s), B. R. Pires Abstract Training in construction
Introduction to the ITS Project Management Methodology
Introduction to the ITS Project Management Methodology In September 1999 the Joint Legislative Committee on Performance Evaluation and Expenditure Review (PEER) produced a report entitled Major Computer
SBM1202 Project Management Fundamentals 4 Project/Program Quality, Risk & Procurement Management
SBM1202 Project Management Fundamentals 4 Project/Program Quality, Risk & Procurement Management UOS CODE SBM1202 SUMMARY UOS NAME Project Management Fundamentals 4 CREDIT POINTS 6 STATUS Core This unit
Job description - Fundraising Database Reporting and Solutions Analyst
Job description - Fundraising Database Reporting and Solutions Analyst Main purpose of job The Fundraising Database Reporting and Solutions Analyst will lead on the requirement gathering, design and creation
PROJECT AUDIT METHODOLOGY
PROJECT AUDIT METHODOLOGY 1 "Your career as a project manager begins here!" Content Introduction... 3 1. Definition of the project audit... 3 2. Objectives of the project audit... 3 3. Benefit of the audit
Implementation of TQM in Manufacturing Industries in the Kingdom of Saudi Arabia
Implementation of TQM in Manufacturing Industries in the Kingdom of Saudi Arabia Anisur Rahman 1 and Muhammad T. Attar 2 1,2 Griffith School of Engineering, Griffith University, Gold Coast Campus, QLD
Social Media Marketing in Selected UK Luxury Hotels
Social Media Marketing in Selected UK Luxury Hotels Mandy Claudia Leue, Timothy Jung, and Tim Knowles Department of Food and Tourism Management Manchester Metropolitan University [email protected], [email protected],
Portfolio, Programme and Project Management Maturity Model - a Guide to Improving Performance
Portfolio, Programme and Project Management Maturity Model - a Guide to Improving Performance By Andy Murray Improving Performance Using Maturity Models The 1990's saw a dramatic increase in the number
Benefits realisation. Gate
Benefits realisation Gate 5 The State of Queensland (Queensland Treasury and Trade) 2013. First published by the Queensland Government, Department of Infrastructure and Planning, January 2010. The Queensland
HCPC 2015 Employee Exit Interview Report
HCPC 2015 Employee Exit Interview Report Section Page 1. Introduction 3 2. Scope 3 3. Employee turnover rates 3 4. Summary of findings 3 5. Analysis of data 4 6. Conclusions and actions 11 2 1. Introduction
Plug IT In 5 Project management
Plug IT In 5 Project management PLUG IT IN OUTLINE PI5.1 Project management for information systems projects PI5.2 The project management process PI5.3 The project management body of knowledge LEARNING
Are waterfall and agile project management techniques mutually exclusive? by Eve Mitchell, PwC. 22 MARCH 2012 www.pmtoday.co.uk
Are waterfall and agile project management techniques mutually exclusive? by Eve Mitchell, PwC 22 MARCH 2012 www.pmtoday.co.uk Projects need to be managed to be successful Change is a ubiquitous feature
SURVEY REPORT: IMPROVING INTEGRATION OF PROGRAM MANAGEMENT AND SYSTEMS ENGINEERING
2013 SURVEY REPORT: IMPROVING INTEGRATION OF PROGRAM MANAGEMENT AND SYSTEMS ENGINEERING Results of a Joint Survey by PMI and INCOSE Whitepaper presented at the 23 rd INCOSE Annual International Symposium,
Agile for Project and Programme Managers
Agile for Project and Programme Managers Author Melanie Franklin Director Agile Change Management Limited Introduction I am involved in a mixture of assignments for different organisations across Europe
Information Technology Project Oversight Framework
i This Page Intentionally Left Blank i Table of Contents SECTION 1: INTRODUCTION AND OVERVIEW...1 SECTION 2: PROJECT CLASSIFICATION FOR OVERSIGHT...7 SECTION 3: DEPARTMENT PROJECT MANAGEMENT REQUIREMENTS...11
PORTFOLIO, PROGRAMME & PROJECT MANAGEMENT MATURITY MODEL (P3M3)
PORTFOLIO, PROGRAMME & PROJECT MANAGEMENT MATURITY MODEL (P3M3) 1st February 2006 Version 1.0 1 P3M3 Version 1.0 The OGC logo is a Registered Trade Mark of the Office of Government Commerce This is a Value
IMPORTANCE OF QUANTITATIVE TECHNIQUES IN MANAGERIAL DECISIONS
IMPORTANCE OF QUANTITATIVE TECHNIQUES IN MANAGERIAL DECISIONS Abstract The term Quantitative techniques refers to the methods used to quantify the variables in any discipline. It means the application
Change Management in Project Work Survey Results
Change Management in Project Work Survey Results Contents 1. Introduction 1 2. Survey and Participants 2 3. Change Management 6 4. Impact of Change Management on Project Effectiveness 12 5. Communications
AIPM PROFESSIONAL COMPETENCY STANDARDS FOR PROJECT MANAGEMENT PART B CERTIFIED PRACTISING PROJECT PRACTITIONER (CPPP)
AIPM PROFESSIONAL COMPETENCY STANDARDS FOR PROJECT MANAGEMENT PART B CERTIFIED PRACTISING PROJECT PRACTITIONER (CPPP) Copyright: Australian Institute of Project Management Document Information Document
IT Governance: framework and case study. 22 September 2010
IT Governance: framework and case study Presenter Yaowaluk Chadbunchachai Advisory Services Ernst & Young Corporate Services Limited Presentation topics ERM and IT governance IT governance framework IT
TEAM PRODUCTIVITY DEVELOPMENT PROPOSAL
DRAFT TEAM PRODUCTIVITY DEVELOPMENT PROPOSAL An initial draft proposal to determine the scale, scope and requirements of a team productivity development improvement program for a potential client Team
business IT BSG Track Record Business Analysis www.bsgdelivers.com // @bsguk Version 1.1
business IT BSG Track Record Business Analysis www.bsgdelivers.com // @bsguk Version 1.1 1 Briefly BSG BSG (UK) is a niche business analysis consultancy. We bring deep technical and domain expertise to
Step by Step Project Planning
Step by Step Project Planning Contents Introduction The Planning Process 1 Create a Project Plan...1 Create a Resource Plan...1 Create a Financial Plan...1 Create a Quality Plan...2 Create a Risk Plan...2
TAGUCHI APPROACH TO DESIGN OPTIMIZATION FOR QUALITY AND COST: AN OVERVIEW. Resit Unal. Edwin B. Dean
TAGUCHI APPROACH TO DESIGN OPTIMIZATION FOR QUALITY AND COST: AN OVERVIEW Resit Unal Edwin B. Dean INTRODUCTION Calibrations to existing cost of doing business in space indicate that to establish human
Gateway review guidebook. for project owners and review teams
Gateway review guidebook for project owners and review teams The State of Queensland (Queensland Treasury and Trade) 2013. First published by the Queensland Government, Department of Infrastructure and
Comparing PMBOK Guide 4 th Edition, PMBOK Guide 5 th Edition and ISO 21500
Project Training Company Comparing PMBOK Guide 4 th Edition, Edition and STS Sauter Training & Simulation S.A. Avenue de la Gare 10 1003 Lausanne Switzerland Web: www.sts.ch E-mail: [email protected] Phone:
Introduction: ITIL Version 3 and the ITIL Process Map V3
Introduction: ITIL Version 3 and the ITIL Process Map V3 IT Process Maps www.it-processmaps.com IT Process Know-How out of a Box IT Process Maps GbR, 2009-2 - Contents HISTORY OF ITIL... 4 The Beginnings...
Programme Managing the Supply Chain Portfolio
Abstract: PM WORLD TODAY FEATURED PAPER JUNE 2010 Programme Managing the Supply Chain Portfolio Professor Dr Pieter Steyn Cranefield College of Project and Programme Management South Africa Effective and
Project Management Office
Whitepaper Project Management Office sqs.com PMO as a strategic success factor for project-based organisations Abstract Project-management-based organisations with either large or numerous projects can
PROJECT MANAGEMENT TOOLS AND TECHNIQUES IN HIGH-TECH SMES IN IRELAND. Alan Murphy, Ann Ledwith
PROJECT MANAGEMENT TOOLS AND TECHNIQUES IN HIGH-TECH SMES IN IRELAND Alan Murphy, Ann Ledwith Department of Manufacturing and Operations Engineering University of Limerick Limerick Ireland Tel: 353 61
