Portfolio, Programme and Project Management Maturity Model - a Guide to Improving Performance

Size: px
Start display at page:

Download "Portfolio, Programme and Project Management Maturity Model - a Guide to Improving Performance"

Transcription

1 Portfolio, Programme and Project Management Maturity Model - a Guide to Improving Performance By Andy Murray Improving Performance Using Maturity Models The 1990's saw a dramatic increase in the number of people with the job title Project Manager as organisations addressed the problem of an ever changing world through Managing by Projects. Many organisations adopted the PRINCE2 method as a means to gain some consistency of project management approach across their now swelling ranks of project managers. With both an increasing need for Project Managers and an increasing number of people claiming to be Project Managers, many organisations based their recruitment and development strategies on certification of project management competence. Having a PRINCE2 Practitioner certificate became an indication of competence (even though it is only an indicator of knowledge). Experience has shown that successful implementation of a project management method requires more than just training your project managers. A successful organisation requires processes, technology, policies and standards for project management - which also need to be integrated with other management systems for them to work effectively and efficiently. In the absence of an organisation wide project infrastructure, project results depend entirely on the availability of certain high performing individuals. This does not necessarily provide the basis for long-term or consistent project performance. However, such infrastructure doesn't establish itself overnight. It may take several years; it may take a programme of change to institutionalise. Therefore it is not surprising that the more advanced organisations are now asking themselves, "Where have we got to and what more do we need to do?" This is where maturity modelling can help. Project and programme management maturity models describe the project and programme related activities within Key Process Areas (KPAs) that contribute to achieving successful outcomes. A good model, such as the OGC's P3M3, recognises not only the project management activities being carried out at the individual project level, but also those ac tivities within an organisation that build and maintain a programme and project infrastructure of effective project approaches and management practices. By undertaking a maturity assessment against an industry standard model, such as P3M3, an organisation will be able to verify what they have achieved, where their strengths and weaknesses are, and then identify a prioritised action plan to take them to an improved level of capability. What Are Maturity Models? "A maturity model is a structured collection of elements that describe characteristics of effective processes. A maturity model provides: Portfolio, Programme and Project Management Maturity Model 1

2 A place to start The benefit of a community's prior experiences A common language and a shared vision A framework for prioritizing actions A way to define what improvement means for your organisation A maturity model can be used as a benchmark for assessing different organisations for equivalent comparison."- Wikipedia The Software Engineering Institute (SEI) developed the first Capability Maturity Model (CMM ) back in the 1980s. This was a result of research that indicated the quality of software applications were directly related to the quality of the processes used to develop them. CMM was originally intended as a government tool to evaluate the ability of contractors to deliver a software project. Though it originates from the software development industry it is widely used as a general model of the maturity of processes (e.g. Project and Programme Management). Maturity models have five levels: 1. Initial (chaotic, ad hoc, heroic) - the starting point for use of a new process. 2. Repeatable (process discipline) - the process is used repeatedly. 3. Defined (institutionalised) - the process is defined/confirmed as a standard business process. 4. Managed (quantified) - process management and measurement takes place. 5. Optimising (process improvement) - deliberate process optimisation/improvement. Portfolio, Programme and Project Management Maturity Model (P3M3) The Office of Government Commerce (OGC) is a department within the UK Government with a remit to help public sector organisations improve their efficiency, gain better value for money from procurements and deliver improved success from programmes and projects. They are the owners of PRINCE2, Managing Successful Programmes (MSP), Management of Risk (M_o_R ) and the IT best practice framework, ITIL. In 2003 the OGC released their first draft of a Portfolio, Programme and Project Management Maturity Model (P3M3). The model was refined and formally published in February 2006 after incorporating latest maturity modelling practices and after consultation with interested consultants, practitioners and their accreditation partner APM Group. The P3M3 describes the portfolio, programme and project-related activities within process areas that contribute to achieving a successful project outcome. The levels described within the P3M3 indicate how key process areas can be structured hierarchically to define a progression of capability which an organisation can use to set goals and plan their improvement journey. The levels facilitate organisational transitions from an immature state to become a mature and capable organisation with an objective basis for judging quality and solving programme and proj ect issues. The distinct yet connected disciplines of portfolio, programme and project management are nested within the P3M3 model: Portfolio, Programme and Project Management Maturity Model 2

3 Portfolio, Programme and Project Management Maturity (P3M3) Programme and Project Management Maturity (P2M3) Project Management Maturity (P1M3) This means that organisations can use the model to evolve their maturity across all disciplines in an integrated approach or by addressing Project Management then Programme Management and then Portfolio Management in sequence. Using Maturity Models for Performance Improvement The beauty of maturity models is that they enable organisations to breakdown a broad process improvement goal into manageable tasks. The lower level KPAs need to be in place for the higher level KPAs to be effective. Therefore the lower level KPAs should be addressed first. Step 1 - Where Are You Today? In order to identify a prioritised roadmap for process improvement it is important to understand what KPAs you currently do well and what KPAs are causing you performance issues. Maturity modelling applies the concept that there's little point in fixing things that are not broken or that are not causing problems. Additionally, for large organisations it is likely that you have islands of good practice. What is it that department X does differently to department Y or Z? It may be that you have many of the KPAs covered but not universally across the organisation. Adopting good practice from within your own organisation can significantly accelerate adoption rates and hence performance improvement. The best way to understand current capability is to conduct a baseline assessment against the maturity model through a process of inspection and structured interviews. Step 2 - Where Do You Want To Be? Not all organisations need to be at Level 5 maturity. The ideal maturity level for an organisation will depend on how important programmes and projects are to their overall performance. If you are a R&D organisation, say developing aerospace technology for governments, then your organisation's performance is likely to be highly dependent on your programme and project management capability. If you are a retailer by contrast then your organisation's overall performance is likely to be less dependent on programme and project management capability. The output from Step 1 will help identify some realistic goals. For example, there are 13 KPAs that need to be addressed to get to level 2 maturity. If the initial assessment has shown that 8 of the 13 are ok then a realistic goal would be to change the 5 weak KPAs to strong KPAs within 6 months to consolidate at level 2 before addressing how to get to level 3. With an estimated 90% of organisations operating at Level 1 or Level 2 maturity, setting targets by the quantity of strong KPAs is more inspiring than aiming to be level 2 of 5 in capability. For example "We will be in the top 10% of corporate organisations by achieving a strong capability in 25 Key Process Areas" Step 3 - How Will You Get There Experience has shown that it takes between 3 and 12 months to raise maturity by one level. Portfolio, Programme and Project Management Maturity Model 3

4 A recommended approach to improve process capability is to appoint process owners for the KPAs to be addressed. For example you could appoint one person to drive improvement for Business Case Development and Benefits Management KPAs and another person to drive improvement for Requirements Management and Configuration Management KPAs. An improvement roadmap should be produced showing the priority of the KPAs to be addressed and the set of initiatives which will improve them. The improvement roadmap should be used to drive and measure progress. It is important to recognise that if you are changing processes, policies, standards, job descriptions or reporting structures then you will be changing how some people will work. Therefore, as with any initiative that affects people's current working practices, power or authority, it should be treated as a change initiative. If the change is likely to be significant, it is recommended to establish a change programme to help with the transition. Using change methods such as Six Sigma help to structure the roadmap and ensure that the solution sticks. Step 4 - How Will You Know? To increase capability organisations need to collect metrics in order to provide a platform for continuous improvement. Therefore regardless of your baseline maturity it is recommended that the improvement roadmap identifies what metrics should be collected to demonstrate performance improvement. The establishment of Key Performance Indicators (KPIs) will not only enable organisations to determine when they have achieved their goal but can also be used to prove the Business Case for the process improvement journey (i.e. what is your return on the capability investment?). If your KPIs are showing that you have achieved your current maturity goal then you may wish to consider gaining accreditation for that level of maturity (for recognition or for marketing purposes) or wish to repeat the exercise to determine what is required to get to the next level of maturity. Using P3M3 for Benchmarking The first maturity model was developed as a means for the US Government to make better procurement decisions by comparing contractors' capabilities. P3M3 can be used in the same way. If you tender for government business then procurement professionals give more credence to an independently awarded certificate than a company's own claims of capability. Procurement professionals also give more weight to an organisational certificate than they do an individual's certificate (currently organisations submit PRINCE2 practitioner certificates with their proposal as an indicator of project management capability. With 200,000 PRINCE2 practitioners worldwide it is difficult for buyers to differentiate between them). Certification against P3M3 is now possible. The OGC's accreditation partner APM Group Ltd (APMG) have taken the OGC models and established an accreditation process for gauging the maturity level of organisations for their portfolio, programme and project management activities. Depending on the scope of the assessment certificates can be awarded for: PRINCE2 Project Management Programme and Project Management Portfolio, Programme and Project Management Portfolio, Programme and Project Management Maturity Model 4

5 Certificates are awarded for the maturity level obtained, although few if any organisations would want a certificate for level 1 maturity. The highest awarded certificate to date (April 2006) is for Level 3 in Project Management. Using P3M3 for Skills Development A recent web search revealed some 300+ separate training modules relating to portfolio, programme and project management. The UK's National Occupational Standards for Project Management shows some 51 separate competencies for project management. A common dilemma which faces many HR professionals is deciding how to spread a finite training budget across a myriad of competencies. Which ones will yield the greatest impact on performance within this financial year? As part of the accreditation assessment method, APMG mapped the levels of process maturity to levels of people maturity (i.e. the portfolio, programme and project management skills). Using P3M3 and the APMG's competency map it is now possible to identify a roadmap of training modules that relate to your organisation's capability (e.g. there's little point in investing in training related to level 4 KPAs if your organisation is at level 2). Today there are numerous skills assessment tools available for HR teams to benchmark the people in their organisation. A common feature across all such tools is the ability to structure the assessment around a competency framework. Combining skills assessments with organisational assessment means that it is now possible to identify and sequence both the organisational changes and people changes as part of a coherent improvement plan. Using P3M3 for Benefits Management Since P3M3 describes a hierarchy of Key Process Areas (KPAs) that correlate to improved performance, it provides an excellent framework for assessing the impact of improvement projects. For example, if you are considering implementing an enterprise planning tool (such as Primavera) you can use the P3M3 model to assess how the tool contributes to the KPAs that are important to your organisation. Knowing what KPAs you need to target will help you scope which features to buy and/or implement. If you are introducing features that do not improve any of your target KPAs then it should prompt questions as to why those features are being introduced at all. Understanding your current capability against the P3M3 model also enables you to do a "before" and "after" assessment to quantify the impact of introducing such tools. P3M3 can also be used to address the impact of: Mergers & Acquisitions Organisation Re-structure Training & Development programmes Deployment of new technology Changes to Roles, Responsibilities, Objectives Implementing a governance framework Portfolio, Programme and Project Management Maturity Model 5

6 Benefits A maturity model such as P3M3 provides a framework for identifying and prioritising those changes which will yield the greates impact on your organisation. It helps set expectations as to what is required in what sequence and in what timescale. Benefits from using the P3M3 as a basis for process improvement are: Improved schedule and budget predictability Improved cycle time Increased productivity Improved quality (as measured by defects) Increased customer satisfaction Improved employee morale Increased return on investment Decreased cost of quality Andy Murray is a PRINCE2 Registered Consultant and a director of Outperform UK Ltd. Andy holds a Diploma in Company Direction from the Institut e of Directors (IOD) the final step to becoming a Chartered Director. Andy has been using PRINCE2 since it was first launched in 1996 and has helped implement PRINCE2 in more than 20 organisations in more than 10 countries. Outperform UK Ltd is an Accredited Consulting Organisation (ACO) licensed to consult in the OGC's best practice products. Outperform is a corporate member of the Association for Project Management (APM), a corporate member of the Best Practice User Group and is ISO9001 certified. Project Smart is the project management resource that helps managers at all levels to improve their performance. We provide an important knowledge base for those involved in managing projects of all kinds. With regular updates it keeps you in touch with the latest project management thinking. Portfolio, Programme and Project Management Maturity Model 6

PORTFOLIO, PROGRAMME & PROJECT MANAGEMENT MATURITY MODEL (P3M3)

PORTFOLIO, PROGRAMME & PROJECT MANAGEMENT MATURITY MODEL (P3M3) PORTFOLIO, PROGRAMME & PROJECT MANAGEMENT MATURITY MODEL (P3M3) 1st February 2006 Version 1.0 1 P3M3 Version 1.0 The OGC logo is a Registered Trade Mark of the Office of Government Commerce This is a Value

More information

Benefits of conducting a Project Management Maturity Assessment with PM Academy:

Benefits of conducting a Project Management Maturity Assessment with PM Academy: PROJECT MANAGEMENT MATURITY ASSESSMENT At PM Academy we believe that assessing the maturity of your project is the first step in improving the infrastructure surrounding project management in your organisation.

More information

Maturity Model. March 2006. Version 1.0. P2MM Version 1.0 The OGC logo is a Registered Trade Mark of the Office of Government Commerce

Maturity Model. March 2006. Version 1.0. P2MM Version 1.0 The OGC logo is a Registered Trade Mark of the Office of Government Commerce Maturity Model March 2006 Version 1.0 P2MM Version 1.0 The OGC logo is a Registered Trade Mark of the Office of Government Commerce This is a Value Added product which is outside the scope of the HMSO

More information

DCA metrics for the approval of Auditing Firms for Certifications Scheme VERSION 1.0

DCA metrics for the approval of Auditing Firms for Certifications Scheme VERSION 1.0 DCA metrics for the approval of Auditing Firms for Certifications Scheme VERSION 1.0 2013, Data Centre Alliance Limited (www.datacentrealliance.org). All rights reserved. This publication may not be reproduced

More information

Association for Project Management Business Management System

Association for Project Management Business Management System Association for Project Management Business Management System December 2012 2 Association for Project Management About APM Formed in 1972, the Association for Project Management (APM) is committed to developing

More information

UoD IT Job Description

UoD IT Job Description UoD IT Job Description Role: Projects Portfolio Manager HERA Grade: 8 Responsible to: Director of IT Accountable for: Day to day leadership of team members and assigned workload Key Relationships: Management

More information

Project Management Certification Options within Australia

Project Management Certification Options within Australia Project Services Pty Ltd 13 Martin Street South Melbourne VIC 3205 A.C.N. 074 006 081 Tel. (03) 9696 8684 Fax. (03) 9686 1404 Project Management Certification Options within Australia Overview Professional

More information

Contents. 2. Why use a Project Management methodology?

Contents. 2. Why use a Project Management methodology? Case Study Ericsson Services Ireland The APM Group Limited 7-8 Queen Square High Wycombe Buckinghamshire HP11 2BP Tel: + 44 (0) 1494 452450 Fax + 44 (0) 1494 459559 http://www.apmgroup.co.uk/ Q:\Users\Marie

More information

Frameworks for IT Management

Frameworks for IT Management Frameworks for IT Management Copyright protected. Use is for Single Users only via a VHP Approved License. For information and printed versions please see www.vanharen.net 18 ITIL - the IT Infrastructure

More information

ITIL Service Lifecycles and the Project Manager

ITIL Service Lifecycles and the Project Manager 1 ITIL Service Lifecycles and the Project Manager The intersection of IT Service and Project Delivery Presented to: Kansas City Mid-America PMI Chapter Mark Thomas January 17, 2011 1 Agenda 2 Introduction

More information

PRINCE2, the PMBOK Guide and ISO 21500:2012. Klas Skogmar. AXELOS.com

PRINCE2, the PMBOK Guide and ISO 21500:2012. Klas Skogmar. AXELOS.com PRINCE2, the PMBOK Guide and ISO 21500:2012 Klas Skogmar AXELOS.com White Paper September 2015 Contents Introduction 3 Relationships between PRINCE2, the PMBOK Guide and ISO 21500 4 Major differences between

More information

MEASURES FOR EXCELLENCE. Software Process Improvement: Management. Commitment, Measures. And Motivation

MEASURES FOR EXCELLENCE. Software Process Improvement: Management. Commitment, Measures. And Motivation MEASURES FOR EXCELLENCE Software Process Improvement: Management Commitment, Measures And Motivation J.W.E. Greene QUANTITATIVE SOFTWARE MANAGEMENT LTD 7 rue Fenoux 93 Blythe Road, Paris 75015 London W14

More information

Agile Project Management White Paper

Agile Project Management White Paper Agile Project White Paper 2 Agile Project Contents Foreword by Richard Pharro, 3 CEO, APMG-International Introducing Agile Project 4 Relationship with DSDM Atern 5 and Key Differences Comparing Agile Project

More information

PROCESS IMPROVEMENT CAPABILITY MATURITY MODEL

PROCESS IMPROVEMENT CAPABILITY MATURITY MODEL PROCESS IMPROVEMENT CAPABILITY MATURITY MODEL Immature versus Mature Software Organisations In an immature software organisation, software processes are generally improvised by practitioners and their

More information

Organisational Change Management Maturity

Organisational Change Management Maturity Organisational Change Management Maturity Change Management Maturity is a key element to true organisational agility; however maturity is being developed in an ad-hoc manner, with few companies reporting

More information

Australian Computer Society. Policy Statement

Australian Computer Society. Policy Statement Australian Computer Society Policy Statement on SOFTWARE QUALITY ACCREDITATION www.acs.org.au October 2004 ACS POLICY STATEMENT ON SOFTWARE QUALITY ACCREDITATION 2004 CONTENTS Summary of ACS Position...5

More information

CSL classroom courses that will be offered up to June 2016 (unless marked otherwise)

CSL classroom courses that will be offered up to June 2016 (unless marked otherwise) CSL classroom courses that will be offered up to June 2016 (unless marked otherwise) Core curriculum courses Automated external defibrillator (AED) Automated external defibrillator (AED) re-qualification

More information

Demonstrate and apply knowledge of project management in

Demonstrate and apply knowledge of project management in Demonstrate and apply knowledge of project management in mechanical engineering 22918 version 2 Page 1 of 5 Level 6 Credits 15 Purpose This unit standard is intended primarily for use in diploma courses

More information

IBM and the IT Infrastructure Library.

IBM and the IT Infrastructure Library. IBM Global Services September 2004 IBM and the IT Infrastructure Library. How IBM supports ITIL and provides ITIL-based capabilities and solutions Page No. 2 Contents ITIL Planning for Service 2 Executive

More information

The Rehabilitation Hospital at King Fahad Medical City

The Rehabilitation Hospital at King Fahad Medical City The Rehabilitation Hospital at King Fahad Medical City Management of Risk Case Study ACCREDITED CONSULTING ORGANIZATION International The Rehabilitation Hospital at King Fahad Medical City (KFMC) in the

More information

Specialist Cloud Services Lot 4 Cloud EDRM Consultancy Services

Specialist Cloud Services Lot 4 Cloud EDRM Consultancy Services Specialist Cloud Services Lot 4 Cloud EDRM Consultancy Services Page 1 1 Contents 1 Contents... 2 2 Transcend360 Introduction... 3 3 Service overview... 4 3.1 Service introduction... 4 3.2 Service description...

More information

The ITIL v.3 Foundation Examination

The ITIL v.3 Foundation Examination The ITIL v.3 Foundation Examination ITIL v. 3 Foundation Examination: Sample Paper B, version 3.1 Multiple Choice Instructions 1. All 40 questions should be attempted. 2. There are no trick questions.

More information

ITIL & The Service Oriented Approach. Vivek Shrivastava

ITIL & The Service Oriented Approach. Vivek Shrivastava Vivek Shrivastava Speaker Introduction Vivek Shrivastava Experienced in numerous aspects of IT during a 15 year career (Dev, QA, Bus Analysis, Project Management, Process Improvement, Service Management,

More information

PRINCE2 Introduction PRINCE2 Introduction

PRINCE2 Introduction PRINCE2 Introduction Managing Successful Projects with PRINCE2 PRINCE2 Introduction PRINCE2 Introduction A Summary of PRINCE2 Managing Successful Projects with PRINCE2 OGC/APM Group Accredited Event UKAS/APMG Certificate 001

More information

The Asset Management Landscape

The Asset Management Landscape The Asset Management Landscape ISBN 978-0-9871799-1-3 Issued November 2011 www.gfmam.org The Asset Management Landscape www.gfmam.org ISBN 978-0-9871799-1-3 Published November 2011 This version replaces

More information

Procurement Programmes & Projects P3M3 v2.1 Self-Assessment Instructions and Questionnaire. P3M3 Project Management Self-Assessment

Procurement Programmes & Projects P3M3 v2.1 Self-Assessment Instructions and Questionnaire. P3M3 Project Management Self-Assessment Procurement Programmes & Projects P3M3 v2.1 Self-Assessment Instructions and Questionnaire P3M3 Project Management Self-Assessment Contents Introduction 3 User Guidance 4 P3M3 Self-Assessment Questionnaire

More information

Director Global IT Service Delivery Information Services

Director Global IT Service Delivery Information Services Director Global IT Service Delivery Information Services Reporting to: Chief Information Officer Salary: Competitive package Job Family and level: 7 Contract Status: Permanent Hours of Work: Full time

More information

CASE STUDY: Land Registry SECTOR: Government Land Registry win itsmf Service Management Team of the Year Award

CASE STUDY: Land Registry SECTOR: Government Land Registry win itsmf Service Management Team of the Year Award CASE STUDY: Land Registry SECTOR: Government Land Registry win itsmf Service Management Team of the Year Award MSM integrated IT Service Management software solutions have been adopted by organisations

More information

Comparing the Differences and Complementary features of PRINCE2 and the PMI PMBOK Guide

Comparing the Differences and Complementary features of PRINCE2 and the PMI PMBOK Guide Comparing the Differences and Complementary features of PRINCE2 and the Guide PRINCE2 is the UK Government s structured project management method. PMI stands for the Project Management Institute producing

More information

Making A Case For Project Management

Making A Case For Project Management AN INTERTHINK CONSULTING WHITE PAPER Making A Case For Project Management An Overview Of Interthink Consulting's Project Management Business Case Approach Contents: Introduction Defining Organizational

More information

Project, Programme and Portfolio Management Delivery Plan 6

Project, Programme and Portfolio Management Delivery Plan 6 Report title Agenda item Project, Programme and Portfolio Management Delivery Plan 6 Meeting Performance Management and Community Safety Panel 27 April 2009 Date Report by Document number Head of Strategy

More information

Delivering e-procurement Local e-gov National e-procurement Project Overarching Guide to e-procurement for LEAs

Delivering e-procurement Local e-gov National e-procurement Project Overarching Guide to e-procurement for LEAs 1. Introduction Background The National e-procurement Project (NePP) and Centre for Procurement Performance (CPP) are working to support and enable schools to meet their e- Government targets and to gain

More information

ICT Indicators. The scope of the ICT function covers all aspects of infrastructure, systems, processes and disciplines required to support:

ICT Indicators. The scope of the ICT function covers all aspects of infrastructure, systems, processes and disciplines required to support: ICT Indicators ICT value for money indicators guidance 1) Introduction This document sets out the indicators for the ICT Function. The guidance below starts by defining the scope of the function and goes

More information

3 Keys to Preparing for CRM Success: Avoid the Pitfalls and Follow Best Practices

3 Keys to Preparing for CRM Success: Avoid the Pitfalls and Follow Best Practices CRM Expert Advisor White Paper 3 Keys to Preparing for CRM Success: Avoid the Pitfalls and Follow Best Practices Ten years ago, when CRM was nascent in the market, companies believed the technology alone

More information

Criticism of Implementation of ITSM & ISO20000 in IT Banking Industry. Presented by: Agus Sutiawan, MIT, CISA, CISM, ITIL, BSMR3

Criticism of Implementation of ITSM & ISO20000 in IT Banking Industry. Presented by: Agus Sutiawan, MIT, CISA, CISM, ITIL, BSMR3 Criticism of Implementation of ITSM & ISO20000 in IT Banking Industry Presented by: Agus Sutiawan, MIT, CISA, CISM, ITIL, BSMR3 Outline What is IT Service Management What is ISO 20000 Step by step implementation

More information

Cisco IT Technology Tutorial Overview of ITIL at Cisco

Cisco IT Technology Tutorial Overview of ITIL at Cisco Cisco IT Technology Tutorial Overview of ITIL at Cisco Ian Reddy, IT Manager David Lietzell, IT Program Manager May 2009 Produced by the Cisco on Cisco team within Cisco IT 2007 Cisco Systems, Inc. All

More information

Senior Project Manager (Web Content Management)

Senior Project Manager (Web Content Management) Senior Project Manager (Web Content Management) IT Services Portfolio & Project Management Office Salary Grade 8-40,046 to 45,053 per annum Fixed term contract for 2 years (** see below for contract information)

More information

The Future of Best Practices in IT Service Management - ITIL Version 3 Explained

The Future of Best Practices in IT Service Management - ITIL Version 3 Explained The Future of Best Practices in IT Service Management - ITIL Version 3 Explained Reg Harbeck CA Monday, August 13, 2007 Session 1455 ITIL V3: The Processes Governance Processes: Service Measurement Service

More information

Volunteer Managers National Occupational Standards

Volunteer Managers National Occupational Standards Volunteer Managers National Occupational Standards Contents 00 Forward 00 Section 1 Introduction 00 Who are these standards for? 00 Why should you use them? 00 How can you use them? 00 What s in a Standard?

More information

Specialist Cloud Services Lot 4 Cloud Printing and Imaging Consultancy Services

Specialist Cloud Services Lot 4 Cloud Printing and Imaging Consultancy Services Specialist Cloud Services Lot 4 Cloud Printing and Imaging Consultancy Services Page 1 1 Contents 1 Contents... 2 2 Transcend360 Introduction... 3 3 Service overview... 4 3.1 Service introduction... 4

More information

Can Complement PMBOK and Your PMP

Can Complement PMBOK and Your PMP How PRINCE2 Can Complement PMBOK and Your PMP JAY M. SIEGELAUB PMI/ Westchester Chapter January 8, 2004 What is PRINCE2? PROJECTS IN CONTROLLED ENVIRONMENTS! Registered trademark! UK Government recognized

More information

White Paper: AlfaPeople ITSM 2013. This whitepaper discusses how ITIL 3.0 can benefit your business.

White Paper: AlfaPeople ITSM 2013. This whitepaper discusses how ITIL 3.0 can benefit your business. White Paper: AlfaPeople ITSM 2013 This whitepaper discusses how ITIL 3.0 can benefit your business. Executive Summary Imagine trying to run a manufacturing business without a comprehensive and detailed

More information

How are companies currently changing their facilities management delivery model...?

How are companies currently changing their facilities management delivery model...? Interserve and Sheffield Hallam University market research 2012 Page 2 www.commercial.interserve.com How are companies currently changing their facilities management delivery model...? we have a strategy

More information

Diploma In Coaching For High Performance & Business Improvement

Diploma In Coaching For High Performance & Business Improvement THE HOUSTON EXCHANGE POWERFUL, PROFITABLE CONVERSATIONS Diploma In Coaching For High Performance & Business Improvement A professional coaching qualification for Leaders, Managers and HR professionals

More information

ANZSIGINSIGHT. A Critical Assessment of P3M3 in Australian Federal Government Agencies. Project, Programme and Portfolio Maturity Levels

ANZSIGINSIGHT. A Critical Assessment of P3M3 in Australian Federal Government Agencies. Project, Programme and Portfolio Maturity Levels ANZSIGINSIGHT A Critical Assessment of P3M3 in Australian Federal Government Agencies Project, Programme and Portfolio Maturity Levels October, 2011 A Critical Assessment of P3M3 in Australian Federal

More information

ITIL: What is it? How does ITIL link to COBIT and ISO 17799?

ITIL: What is it? How does ITIL link to COBIT and ISO 17799? ITIL: What is it? How does ITIL link to COBIT and ISO 17799? 1 What is ITIL? The IT Infrastructure Library A set of books comprising an IT service management Best Practices framework An industry of products,

More information

Application Value Assessment

Application Value Assessment Value Assessment Journey to Realising the Value of an Organisation s Portfolio Fujitsu UK & Ireland - Business & Services By Chris Waite, Fujitsu Businesses today operate in highly competitive environments

More information

{Add company name} {Add geographical location} {Add/edit as required} Programme manager. {Add local information}

{Add company name} {Add geographical location} {Add/edit as required} Programme manager. {Add local information} Job Description Portfolio or Programme Manager Organisation: Location: Reports to: Supervises: Working conditions: Last updated: {Add company name} {Add geographical location} {Add/edit as required} Programme

More information

A world of HR at your fingertips

A world of HR at your fingertips A world of at your fingertips Bradfield group 1 Contents The Bradfield Group... 4 Our Services... 11 Training... 6 Implants... 12 Leadership Courses... 7 Projects... 13 The Bradfield Certificate in Leadership...

More information

Program Lifecycle Methodology Version 1.7

Program Lifecycle Methodology Version 1.7 Version 1.7 March 30, 2011 REVISION HISTORY VERSION NO. DATE DESCRIPTION AUTHOR 1.0 Initial Draft Hkelley 1.2 10/22/08 Updated with feedback Hkelley 1.3 1/7/2009 Copy edited Kevans 1.4 4/22/2010 Updated

More information

ITIL Introducing continual service improvement

ITIL Introducing continual service improvement ITIL Introducing continual service improvement The objectives of continual service improvement Service improvement must focus on increasing the efficiency, maximizing the effectiveness and optimising the

More information

Good Practice Framework. Performance Management

Good Practice Framework. Performance Management Good Practice Framework Performance Management Decision Gatewa y Good Practice Framework Strategic Planning STRATEGIC PLANNING Policy Context Needs Assessment Strategic Review Outcomes Continuous Improvement

More information

Project and Programme Management Capability Improvement Study

Project and Programme Management Capability Improvement Study irresistible creativity to inspire and change the world Project and Programme Management Capability Improvement Study Independent Reporter (Part C) Mandate CN/025 Office of Rail Regulation and Network

More information

The NHS Knowledge and Skills Framework (NHS KSF) and the Development Review Process

The NHS Knowledge and Skills Framework (NHS KSF) and the Development Review Process The NHS Knowledge and Skills Framework (NHS KSF) and the Development Review Process [This is the final draft of the NHS KSF Handbook that will be used for national roll-out if implementation of Agenda

More information

Tutorial: Towards better managed Grids. IT Service Management best practices based on ITIL

Tutorial: Towards better managed Grids. IT Service Management best practices based on ITIL Tutorial: Towards better managed Grids. IT Service Management best practices based on ITIL EGI Technical Forum 2011, Lyon (France) September 22, 2011 Dr. Thomas Schaaf www.gslm.eu EMERGENCE TECH LTD. The

More information

PRINCE2 and governance

PRINCE2 and governance PRINCE2 and governance Andy Murray, lead author of PRINCE2 (2009) and Director of Outperform UK Ltd White Paper November 2011 2 PRINCE2 and governance Contents 1 Purpose of this white paper 3 2 What is

More information

Change Management Professional Horizons for Success. The Enabling Change SIG. Robert Cole Hannah Melville Mark Hamlyn

Change Management Professional Horizons for Success. The Enabling Change SIG. Robert Cole Hannah Melville Mark Hamlyn Change Management Professional Horizons for Success The Enabling Change SIG Robert Cole Hannah Melville Mark Hamlyn Positioning qualifications in a model The model to the right reflects the types of qualifications

More information

Executive Development Workshop. A Systems Approach to Inventory Management

Executive Development Workshop. A Systems Approach to Inventory Management Executive Development Workshop A Systems Approach to Inventory Management OVERVIEW Inventory management is important from the view point that it enables to address two important issues - maintaining adequate

More information

Certified Change Management Professional (CCMP )

Certified Change Management Professional (CCMP ) The Association of Change Management Professionals Certified Change Management Professional (CCMP ) Chapter One The Beginning ACMP: Advancing the discipline of change management CCMP Presentation Page:

More information

Nydia González 1, Franck Marle 1 and Jean-Claude Bocquet 1. Ecole Centrale Paris, FRANCE

Nydia González 1, Franck Marle 1 and Jean-Claude Bocquet 1. Ecole Centrale Paris, FRANCE INTERNATIONAL CONFERENCE ON ENGINEERING DESIGN, ICED 07 28-31 AUGUST 2007, CITE DES SCIENCES ET DE L'INDUSTRIE, PARIS, FRANCE Nydia González 1, Franck Marle 1 and Jean-Claude Bocquet 1 1 Ecole Centrale

More information

HKITPC Competency Definition

HKITPC Competency Definition HKITPC Competency Definition for the Certification copyright 2011 HKITPC HKITPC Competency Definition Document Number: HKCS-CD-L1L2 Version: 1.0 Date: June 2011 Prepared by Hong Kong IT Professional Certification

More information

Improving Organizational Project Management Maturity A Siemens Case Study

Improving Organizational Project Management Maturity A Siemens Case Study Improving Organizational Project Management Maturity A Siemens Case Study Glenn Strausser Senior Consultant Siemens Corporate Research Princeton, NJ glenn.strausser@ieee.org Joseph Sopko Senior Consultant

More information

Quality Systems Frameworks. SE 350 Software Process & Product Quality 1

Quality Systems Frameworks. SE 350 Software Process & Product Quality 1 Quality Systems Frameworks 1 What is a Quality System? An organization uses quality systems to control and improve the effectiveness of the processes used to deliver a quality product or service A Quality

More information

NATIONAL COMPETENCY STANDARDS FOR QUANTITY SURVEYORS - CONSTRUCTION ECONOMISTS

NATIONAL COMPETENCY STANDARDS FOR QUANTITY SURVEYORS - CONSTRUCTION ECONOMISTS NATIONAL COMPETENCY STANDARDS FOR QUANTITY SURVEYORS - CONSTRUCTION ECONOMISTS THE AUSTRALIAN INSTITUTE OF QUANTITY SURVEYORS THE AUSTRALIAN INSTITUTE OF QUANTITY SURVEYORS NATIONAL COMPETENCY STANDARDS

More information

Annexure A 2015/16. Performance Plan. Director: Community Services - 1 -

Annexure A 2015/16. Performance Plan. Director: Community Services - 1 - Performance Plan Director: Community Services - 1 - The Performance Plan sets out: a) Key Performance Areas that the employee should focus on, performance objectives, key performance indicators and targets

More information

Software Engineering: Analysis and Design - CSE3308

Software Engineering: Analysis and Design - CSE3308 CSE3308/DMS/2004/25 Monash University - School of Computer Science and Software Engineering Software Engineering: Analysis and Design - CSE3308 Software Quality CSE3308 - Software Engineering: Analysis

More information

Driving Supplier Performance Improvement:

Driving Supplier Performance Improvement: Driving Supplier Performance Improvement: Using established HR techniques and on-line tools to enhance supplier performance management. Although supplier performance management can be complex and time

More information

Digital Marketing Institute s. Professional Diploma in Digital Selling. Validated by the Syllabus Advisory Council (SAC)

Digital Marketing Institute s. Professional Diploma in Digital Selling. Validated by the Syllabus Advisory Council (SAC) Digital Marketing Institute s Professional Diploma in Digital Selling Validated by the Syllabus Advisory Council (SAC) Content Professional Diploma in Digital Selling Welcome Course overview Course content

More information

Description of Program Management Processes (Initiating, Planning) 2011 PROGstudy.com. All rights reserved

Description of Program Management Processes (Initiating, Planning) 2011 PROGstudy.com. All rights reserved Description of Program Management Processes (Initiating, Planning) Topics Covered Program Management Process Groups salient features Description of all processes in Initiating Process Group: Initiate Program

More information

D-G4-L4-126 Police contact management and demand reduction review Deloitte LLP Service for G-Cloud IV

D-G4-L4-126 Police contact management and demand reduction review Deloitte LLP Service for G-Cloud IV D-G4-L4-126 Police contact management and demand reduction review Deloitte LLP Service for G-Cloud IV September 2013 Contents 1 Service Overview 1 2 Detailed Service Description 2 3 Commercials 6 4 Our

More information

Customer Relationship Management

Customer Relationship Management Customer Relationship Management by Professor Adrian Payne Director Centre for Relationship Marketing, Cranfield University Introduction Customer Relationship Management (CRM) is developing into a major

More information

ISO20000: What it is and how it relates to ITIL v3

ISO20000: What it is and how it relates to ITIL v3 ISO20000: What it is and how it relates to ITIL v3 John DiMaria; Certified Six Sigma BB, HISP BSI Product Manager; ICT (ISMS,ITSM,BCM) Objectives and Agenda To raise awareness, to inform and to enthuse

More information

The MBA has long been the degree of choice

The MBA has long been the degree of choice Master MBA Finance of Business & Accounting Administration Specialisation The MBA has long been the degree of choice for the business professional and senior manager in all fields and industries. Our MBA

More information

Welcome to the Eastwood Harris Pty Ltd Introduction to PRINCE2 TM Revised 2009 and Microsoft Office Project. Page 1

Welcome to the Eastwood Harris Pty Ltd Introduction to PRINCE2 TM Revised 2009 and Microsoft Office Project. Page 1 Welcome to the Eastwood Harris Pty Ltd Introduction to PRINCE2 TM Revised 2009 and Microsoft Office Project Page 1 Purpose of the Presentation Present an overview of the changes to the PRINCE2 methodology

More information

The MBA has long been the degree of choice

The MBA has long been the degree of choice Master MBA Marketing of Business Specialisation Administration The MBA has long been the degree of choice for the business professional and senior manager in all fields and industries. Our MBA with a Specialisation

More information

Brand metrics: Gauging and linking brands with business performance

Brand metrics: Gauging and linking brands with business performance Brand metrics: Gauging and linking brands with business performance Received (in revised form): rd February, 00 TIM MUNOZ is a managing partner of Prophet (www.prophet.com), a management consulting firm

More information

ACCREDITATION. APM Corporate CASE STUDY

ACCREDITATION. APM Corporate CASE STUDY Introduction FCO Services delivers secure services across the globe that meet the demanding needs of government in some of the most challenging environments. As a Trading Fund, FCO Services provides competitive,

More information

Contents. viii. 4 Service Design processes 57. List of figures. List of tables. OGC s foreword. Chief Architect s foreword. Preface.

Contents. viii. 4 Service Design processes 57. List of figures. List of tables. OGC s foreword. Chief Architect s foreword. Preface. iii Contents List of figures List of tables OGC s foreword Chief Architect s foreword Preface Acknowledgements v vii viii 1 Introduction 1 1.1 Overview 4 1.2 Context 4 1.3 Purpose 8 1.4 Usage 8 2 Management

More information

How To Implement Itil V3

How To Implement Itil V3 2009 NMCI Conference: Implementing ITIL Session 1: ITSM Process ITSM COE Agenda Background ITSM Overview ITIL and Service Delivery Adopting ITIL to NGEN SE&I Activities 2 Background Develop Government

More information

Shropshire Highways Draft Asset Management and Communications Strategy and Implications of Department for Transport Incentivised funding

Shropshire Highways Draft Asset Management and Communications Strategy and Implications of Department for Transport Incentivised funding Committee and Date Cabinet 14 th October 2015 Shropshire Highways Draft Asset Management and Communications Strategy and Implications of Department for Transport Incentivised funding Responsible Officer

More information

January 2016. Brand and Campaigns Executive: Information for Candidates

January 2016. Brand and Campaigns Executive: Information for Candidates January 2016 Brand and Campaigns Executive: Information for Candidates Thank you for expressing interest in the role of Brand and Campaigns Executive. We have compiled this information pack to tell you

More information

Delivering progress towards meeting HMG targets on the SME growth agenda

Delivering progress towards meeting HMG targets on the SME growth agenda Delivering progress towards meeting HMG targets on the SME growth agenda Action Plan Version 1.1 dated 16 th August 2013 Author: Robert Astall, Head of Commercial Profession and Capability Background The

More information

Bhattacharya Uttam, Rahut Amit Kumar, De Sujoy

Bhattacharya Uttam, Rahut Amit Kumar, De Sujoy AUDIT MATURITY MODEL Bhattacharya Uttam, Rahut Amit Kumar, De Sujoy Cognizant Technology Solutions, Kolkata, India uttam.bhattacharya@cognizant.com / amit.rahut@cognizant.com / sujoy.de@cognizant.com ABSTRACT

More information

PRCA Communications Management Standard (CMS) for In-House Teams

PRCA Communications Management Standard (CMS) for In-House Teams PRCA Communications Management Standard (CMS) for In-House Teams PRCA Communications Management Standard (CMS) for In-House Teams Contents Introduction 4 The Communications Management Standard for In-House

More information

PORTFOLIO MANAGEMENT TRAINING

PORTFOLIO MANAGEMENT TRAINING PORTFOLIO MANAGEMENT TRAINING OBJECTIVE To qualify students in the portfolio management, one of the main strategic alignment tools between the project management and the organizational strategy. TRAINING

More information

SAP Solutions Analyst (Finance and Payroll)

SAP Solutions Analyst (Finance and Payroll) SAP Solutions Analyst (Finance and Payroll) IT Services Application Services Salary Grade 8-40,847-45,954 per annum Open Ended Contract Ref: CSE00899 At Leicester we re going places. Ranked in the top-12

More information

BS OHSAS 18001 Occupational Health and Safety Management It s your duty. Your implementation guide

BS OHSAS 18001 Occupational Health and Safety Management It s your duty. Your implementation guide BS OHSAS 18001 Occupational Health and Safety Management It s your duty Your implementation guide BS OHSAS 18001 - Occupational Health and Safety Management Background BS OHSAS 18001 is the globally recognized

More information

Microsoft Enterprise Project Management. James Wright Christopher Pond

Microsoft Enterprise Project Management. James Wright Christopher Pond Microsoft Enterprise Project Management James Wright Christopher Pond EPM Solution: Executive Overview and Discussion 1 Agenda 9:30 09:45 Introduction 9:45 10:45 Microsoft Project Server 2010 James Wright

More information

Skatteudvalget 2014-15 (2. samling) SAU Alm.del Bilag 48 Offentligt. Programme, Project & Service Management Analysis

Skatteudvalget 2014-15 (2. samling) SAU Alm.del Bilag 48 Offentligt. Programme, Project & Service Management Analysis Skatteudvalget 2014-15 (2. samling) SAU Alm.del Bilag 48 Offentligt Programme, Project & Service Management Analysis Table of Content 1 Executive Summary... 3 1.1 Scope of Work... 3 1.2 Methodology for

More information

How To Improve Your Business Recipe Cards

How To Improve Your Business Recipe Cards white paper Measure. Manage. Improve: Unlocking the Business Value of Software Development Optimization EXECUTIVE SUMMARY In 2011 the Standish Group s CHAOS Manifesto showed that 37% of software projects

More information

Network Rail Infrastructure Projects Joint Relationship Management Plan

Network Rail Infrastructure Projects Joint Relationship Management Plan Network Rail Infrastructure Projects Joint Relationship Management Plan Project Title Project Number [ ] [ ] Revision: Date: Description: Author [ ] Approved on behalf of Network Rail Approved on behalf

More information

Process Improvement. Objectives

Process Improvement. Objectives Process Improvement Ian Sommerville 2004 Software Engineering, 7th edition. Chapter 28 Slide 1 Objectives To explain the principles of software process improvement To explain how software process factors

More information

IT Project Management

IT Project Management IT Project Management IT Project Management provides a structured approach to making things happen and in doing so, enables initiatives (projects) to be delivered to time, quality and budget. www.business.wales.gov.uk/superfastbusinesswales

More information

Water-Scrum-Fall Agile Reality for Large Organisations. By Manav Mehan Principal Agile consultant Manav.Mehan@tcs.com

Water-Scrum-Fall Agile Reality for Large Organisations. By Manav Mehan Principal Agile consultant Manav.Mehan@tcs.com Water-Scrum-Fall Agile Reality for Large Organisations By Manav Mehan Principal Agile consultant Manav.Mehan@tcs.com Interests and Experience Leading Change and Transformation in Large, Complex organisations

More information

Performance Management Checklist 180

Performance Management Checklist 180 Performance Management Checklist 180 Introduction Performance management is an integrated approach to helping an organisation to achieve its aims and objectives by monitoring and improving the performance

More information

1. What is PRINCE2? Projects In a Controlled Environment. Structured project management method. Generic based on proven principles

1. What is PRINCE2? Projects In a Controlled Environment. Structured project management method. Generic based on proven principles 1. What is PRINCE2? Projects In a Controlled Environment Structured project management method Generic based on proven principles Isolates the management from the specialist 2 1.1. What is a Project? Change

More information

The six digital imperatives. Moving your organisation towards Digital Excellence (and how we can help)

The six digital imperatives. Moving your organisation towards Digital Excellence (and how we can help) The six digital imperatives Moving your organisation towards Digital Excellence (and how we can help) Digital Excellence: a good place to aim for. Digital used to be just another channel to market. Now

More information

Head of CIO Office Information Services

Head of CIO Office Information Services Head of CIO Office Information Services Reporting to: Chief Information Officer Salary: Grade 6-47,787-57,031 per annum (pro rata) depending on skills and experience. Salary progression beyond this scale

More information