STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1078
|
|
- Madlyn Brooks
- 7 years ago
- Views:
Transcription
1 STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1078 QUALIFICATION AND EVALUATION OF STRUCTURAL STEEL FABRICATORS December 31, General Levels of Fabricator Qualification Fabricator Evaluation Quality Control Specialist Qualifications Level 1 through Quality Control Specialist Qualifications Level SF and UF Rating System Fabricator Rating Review Process Fabricator Documentation Responsibility Appendix I: Facilities Inspection Check List Appendix II: Rating Forms Shop Drawing Rating Form Material Test Report Rating Form Fabrication Rating Form Fracture Critical Fabrication Rating Form Appendix III: Rating Calculations General. Perform work according to item 513 using fabricators on the Pre-qualified Fabricators List in effect on the date of the Contract letting. Inform the District Construction Adminstrator (DCA) and the Office of Materials Management (OMM) of the selected fabricator. The pre-qualification process, evaluation process and associated documentation requirements are listed in this specification. Fabricators shall make written request to the OMM for inspection of a fabrication facility. Fabricators with acceptable facilities, the required credentials and a reputation for similar and quality work, will be included on the qualified fabricator list at the assigned fabrication level. The OMM updates this list based on performance. 1
2 Levels of Fabrication Qualification. The OMM assigns a fabrication level specified in based upon the evaluation process specified in Fabricator Evaluation. The OMM evaluates fabricators requesting pre-qualification. The evaluation includes inspection of the facility, work history, sample work, and qualifications listed below. A. Facilities located within the continental limits of the United States B. Three reference letters from other State agencies or customers. C. List of bridge projects completed within the last three years. D. Fabrication Level AISC Certification SF No AISC Category required UF No AISC category required 1 Category SBr with P1 endorsement ( See H) 2 thru 5 Category MBr with P1 endorsement ( See H) 6 Category MBr with P1 and F endorsements( See H) E. Welding procedure qualifications per F. Qualified welders per G. Inspection personnel meeting requirements of or H. Instead of the specified AISC paint endorsement. The fabricator may establish a formal agreement with an independent painter meeting the qualifications of SSPC QP3. The OMM will evaluate the painter s facility for acceptance. The independent painter shall perform all painting work. All applicable ratings points will be reflected on the fabricator s performance rating. The independent painter shall perform all specified QC check points and provide a painting quality control specialist, Paint (QCS) meeting the requirements of The fabricator s paint QCS shall be responsible for final acceptance of the structural steel members at the painter s facility. I. Completion of fabricator questionnaire included in this specification (Appendix I) Quality Control Specialist Qualifications; Level 1 through 6. The fabricator shall designate at least one individual as a Fabrication Quality Control Specialist (QCS) and one as a Paint Quality Control Specialist or one person to serve both functions. 2
3 The Fabrication QCS and Paint QCS shall be full time employees of the fabricator, except level 1 and 2 fabricators may supply outside personnel meeting the required qualifications. Using outside personnel does not eliminate the requirement of full-time quality control. The fabricator is responsible for providing supervisory personnel and any additional QC inspection personnel to ensure satisfactory materials and workmanship. Using production staff or additional QC staff for specific quality control functions does not eliminate the Fabrication and Paint QCS s responsibility for documentation, QC and final acceptance of fabricated components at required points. A. The Fabrication QCS shall be certified as an AWS, CWI Inspector in accordance with the provisions of AWS QC-1, Standard for Qualification and Certification of Welding Inspectors and shall demonstrate an understanding of the plans and specifications pertaining to the project. The Fabrication QCS shall have the following duties: 1. Be responsible for inspecting the work at all quality control (QC) points described in Item 513 and this supplement. 2. Be responsible for documenting and accepting all inspection points listed in (Appendix II) for each main material piece showing conformance with the requirements of 513, 514, this supplement and other contract documents. 3. Be responsible for assuring all equipment is in working order and inspected at the required intervals. 4. Have direct authority to stop work and report non-conforming work to the Fabricator and inspector. 5. Have tools and equipment necessary to perform quality control (QC) on the work. 6. Perform quality control full time until the work is complete and accepted by the inspector. B. The Paint Quality Control Specialist (QCS) shall be qualified as specified in C. The fabricator shall perform nondestructive testing (NDT) of weldments with personnel qualified in accordance with the American Society for Nondestructive 3
4 Testings (ASNT) ANSI/ASNT SNT-TC-1A, Standard for Qualification and Certification of Nondestructive Testing Personnel. Only individuals qualified for NDT Level II may perform nondestructive testing. The fabricator shall perform nondestructive testing under the authority of the Fabrication QCS or the Fabrication QCS, if qualified, may perform the testing The OMM will evaluate the qualifications of quality control specialist, NDT personnel and any other outside agency personnel. Notify the OMM if changes in the QC specialists or NDT staff are required Quality Control Specialist Qualification; Level SF and UF. The fabricator shall designate one employee to perform the Quality control functions specified for the Fabrication QCS and Paint QCS. The employee is not required to be an AWS Certified Welding Inspector or formally trained in coating inspection, but shall understand the plans and specifications pertaining to the project Rating System, Level 1 through 6: A. Material Acceptance Process The OMM will inspect and release each project at the fabricators facility. The fabricator shall be responsible for the following: 1. Supplying contractor accepted shop drawings and material test reports to the OMM according to and Fabricating structural members. 3. Performing QC and providing documentation at specified check hold or witness points according to Appendix II and as defined below. After shop inspection acceptance, the fabricator shall ship members to the construction project and supply a TE-24 to the Engineer. Final acceptance will be based upon the Engineer s approval that the structural member can be successfully incorporated into the structure. B. Quality Control Check Points 4
5 Check points require QC inspection and documentation by the fabricator before the fabrication process continues. Hold points require QC inspection and documentation by the fabricator before QA inspection can be performed. The fabrication process can continue only after the QA inspection has been performed. Witness points require concurrent QC inspection by the fabricator and QA inspection by The OMM to physically witness the welding or nondestructive testing. C. Fabrication Levels 1 thru 5 Evaluation Process. The OMM will perform the evaluation of product quality. Evaluation includes quality assurance reviews of material test reports, QC documentation, and QA inspections. Rating forms associated with these evaluations are in Appendix II. Quality issues discovered in the field and associated with the fabricator s methods, are also evaluated. Pre-qualified fabricators are provisional until they validate their quality by performing all check point inspections and the following hold or witness points: Radiographic hold point, Ultrasonic Inspection witness point, Magnetic Particle Inspection witness point, and final inspection hold point. The fabricator shall continue performing the above listed hold or witness points until the OMM has notified the fabricator that a passing rating was achieved on three consecutive projects. After notification that the provisional status has been removed, the fabricator shall maintain work quality by performing all check point inspections. Final inspection will be the only required hold point. A passing rating is 88% or more. Ratings below 88% are failing. No fabricator shall have three failing ratings within any 12 month period. No Fabricator performing less than three projects in a 12 month period shall have three failing ratings within five consecutive jobs. Fabricators not meeting these requirements will be removed from the pre- 5
6 qualified fabricator list for 12 months. The fabricator may be reinstated as a provisionally prequalified fabricator at the next lower qualification level after the 12 months disqualification. Reinstatement requires compliance to and Any rating below 70 percent will cause immediate removal from the pre-qualified fabricators list for 12 months. Reinstatement is as described above. Structural members shipped from the shop without prior hold point inspections or waiving of such inspection by the OMM, will result in a failing rating. Qualified fabricators that have not performed work for the Department within a 12 month will be considered a provisional qualified fabricator for one project. Fabricators are provision in levels 4 through 6 until passing ratings are achieved in those levels. Passing ratings achieved in lower levels only validate levels 1 thru 3. D. Level 6 Evaluation Process Provisional and qualified fabricators must validate their quality as specified for levels 1 through 5 plus perform witness points during the performance of fracture critical welding and Ultrasonic inspection of fracture critical welds as follows: 1. Provisional fabricators require OMM witnessing of 50% of each fracture critical weldment and 100% of the Ultrasonic inspection. 2. Qualified fabricators require OMM witnessing of 25% of each fracture critical weldment and 100% of the Ultrasonic inspection Rating System Level UF: A. Level UF Material Acceptance Process The OMM will inspect and accept each project at the fabricators facility. The fabricator shall perform the following: 6
7 1. Supply contractor with shop drawings and material test reports according to (A) and (A). 2. Complete fabrication of the UF level fabricated members. 3. Perform quality control consisting of: verifying fabrication matches the shop drawings; verifying fabrication and coatings meet the contract requirements; and documenting per Schedule inspections with the OMM. 5. Obtaining acceptance from the OMM inspector. After fabricated members are accepted the fabricator shall supply the Engineer with a TE-24 for each shipment. Final acceptance will be based upon the Engineer s approval that the structural member can be successfully incorporated into the structure. B. Level UF Evaluation Process The OMM will perform the evaluation of product quality. Evaluation includes quality assurance reviews or audits of: shop drawings, material test reports, QC documentation, and QA inspections or audits. Quality issues discovered in the field and associated with the fabricator s methods are also evaluated. Failure to conform to the material acceptance process will result in a written violation notice. The third violation in any 12 month period will disqualify the fabricator from the pre-qualified fabricator list for 12 months. The fabricator may be reinstated after the 12 month disqualification. Reinstatement requires compliance to and Rating System Level SF: A. Level SF Material Acceptance Process The fabricator shall perform for the following: 1. Coordinate shop drawings with the Contractor per (B) 2. Complete fabrication of Level SF standard fabricated members. 7
8 3. Certify material according to (B). 4. Perform quality control consisting of: verifying fabrication matches the shop drawings, verifying fabrication and coatings meet the contract requirements, and documenting per Notify the OMM that the SF members are being shipped to the project. 6. Supply shop drawings along with a TE-24 to the Engineer. Final acceptance will be based upon the Engineer s approval that the fabricated member can be successfully incorporated into the structure. B. Level SF Evaluation Process The OMM will audit the fabricator s work and documentation. The OMM reserves the right to audit any project. The minimum number of audits is one out of every ten completed projects produced by the fabricator. Fabricators new to the Department s quality assurance programs can expect more frequent audits Failure to conform to the material acceptance process will result in a written violation notice. The third violation in any 12 month period will disqualify the fabricator from the pre-qualified fabricator list for 12 months. The fabricator may be reinstated after the 12 month disqualification. Reinstatement requires compliance to and Fabricator Rating or Violation Review Process. The fabricator may appeal a performance rating or audit first to the OMM then to a board created by the Department. The fabricator shall make a written appeal to the OMM within ten days of receiving the Department's performance rating or written violation notice. The OMM will review the evidence and may revise the rating or violation. If a revision is not issued the fabricator may appeal to the Board. The fabricator shall schedule an informal hearing with the OMM and the Board. The fabricator will have the opportunity to present their case. The department may present evidence or testimony in rebuttal. 8
9 The Board is comprised of the Deputy Director, Division of Construction Management or his/her representative, the Administrator of The OMM or his representative and the Chief Structural Steel Inspector from the OMM. The Board will hear appeals concerning the Fabricator s performance rating or written violation notice on a specific bridge bidding item. The board will not hear appeals for disqualification of a fabricator. The Board will issue its decision within fifteen days of the hearing Fabricator Documentation Responsibility. The fabricator shall record and keep documentation records for each bid line number, concerning: A. Fabricator approval B. Shop drawings C. Material test reports D. Welding qualifications E. Quality control inspection F. Non-Destructive Testing of welds G. Coating system measurements H. Copies of independent painters documentation The fabricator shall make documentation available for auditing, inspection and copying upon the department s request. The fabricator shall archive documentation for five (5) years past the date of final shipment. The fabricator shall establish a documentation system that records all material quality checks, dimensional checks, weld inspection checks, coating inspection checks, etc. to validate that product quality meets the contract requirements. The fabricator shall review the QA rating forms (Appendix II) when establishing the documentation system. Evaluation of the fabricator s performance will include validation of the fabricator s documentation. This validation is intended to assure that inspection or auditing an individual component reflects the quality of all components. The fabricator shall provide a letter of acceptance signed by the Quality Control Specialist for 9
10 each QA inspection check point with a listing of each main member piece marks, dates of QC acceptance and specific check point data required in the QA rating forms. 10
11 Appendix I OHIO DEPARTMENT OF TRANSPORTATION Office of Materials Management 1600 West Broad Street, Columbus, Ohio phone: / fax: Fabricator Questionnaire 1. Company Name: 2. Address: 3. Phone: Fax: 4. AISC Certification, enclose a copy of certification: 5. Company Representative a. President: b. Chief Engineer: c. Shop Superintendent: d. Fabrication Quality Control Specialist, enclose certifications: e. Paint Quality Control Specialist, enclose certifications: f. NDT Staff or Agency, enclose certifications: 6. Building Facilities: a. Indoor heated fabrication area, length and width (ft): b. Indoor heated paint area, length and width (ft): 11
12 c. Lay down assembly area, length and width (ft): d. QA Inspection Office area meets specification 513: 7A. Lifting Equipment: 1. Overhead equipment maximum piece lifting capacity (Lbs.) 2. Mobile equipment maximum piece lifting capacity (Lbs.) 7B. Material Preparation: 1. Shearing and planed edges, comments: 2. Cutting, manual guided methods required for levels 1 thru 3, 3. Cutting Automated guided methods required for levels 4 thru 6, maximum length: 4. Bending processes available, comments: 5. Reentrant corners and rounding edges, comments: 7C. Welding Processes 1. Levels 1 and 2 must have SMAW, check for calibration paperwork: 2. Level 3 thru 6 must have SMAW and FCAW or SAW, check for calibration paperwork: 3. Electrode oven, check operation and calibration paperwork: 4. Level 6, flux hoppers check for calibration paperwork: 5. Current approved PQR, separate submission required. 6. Complete package of WPS, separate submission required. 7. Qualified welders, separate submission required. 7D. NDT Technicians or Agency: 1. Level 3 fabrication requirements: a. Magnetic Particle Inspection(MPI): Dry powder with aluminum prods or probe check machine calibration per ASTM E709 each 6 month: b. MPI ANSI/ASNT SNT-TC-1A Level II, enclose certifications: 2. Level 4 thru 6 fabrication requirements: a. MPI as per level 3 above : b. Ultrasonic Testing (UT) Equipment: AWS D1.5 section 6.15 and qualification 6.17: c. UT ANSI/ASNT SNT-TC-1A Level II, enclose certifications: 12
13 d. Radiographic Testing (RT) Equipment: AWS D1.5 section 6.12 viewer: e. Evaluation of production sample RT film and report per AWS D1.5 section 6.10: f. RT ANSI/ASNT SNT-TC-1A Level II, enclose certifications 7E. Drilling and Punching Processes, check work in process meets 513 7F. Shop Bolting: 1. Skidmore Tension Devise, calibrated yearly: 2. Inspection Torque Wrench: 7G. Coating: 1. Methods available for blast cleaning: 2. Grit and shot mixture, examine sample work for profile: 3. Methods available for painting: 4. Check for operation of painting and paint inspection equipment see 513 and Metalizing methods available or companies used: 100% Zinc wire, method: 6. Galvanizing Companies used: 13
14 FABRICATOR RATING FOR TEST REPORTS Project: Bid line No.: Shop ID.: Bridge No.: Rater/Date: Reviewer/Date: I. General Project Information Y N NA 1. Project number is shown (1 point) 2. Bid line number is called out (1 point) 3. Bridge number is specified (1 point) 4. Name of fabricator is identified (1 point) 5 Bid line numbers are separated (1 point) 6. Material test reports are cross referenced to drawing piece marking system (2 point) II. Complete Mill Test 1. All materials shown on the shop drawings have test reports and shippers (30 points) 2. Test reports meet all contract requirements; CMS, ASTM, CVN and/or Fracture Critical. (35 points) 3. The producing mill is domestic (15 points) 4. Test reports show material size, shape, & length (4 points) 5. Test reports show grade of steel (3 points) 6. Material quantity is shown on the Test Reports (2 points) 7. Test reports show mill s name (2 points) 8. Test reports show purchaser of material (2 points) III. TEST REPORTS RATING TOTAL Y = yes, N = no, NA = not applicable No partial points are available for a yes, no or not applicable section. V. FOLLOW-UP SEQUENCE FOR INCOMPLETE MILL TEST Date Performed Date Due Result 1. Fax and Phone call to the Contractor requesting incomplete information. 2. Non-compliance letter and phone call to Contractor 15 days after sending fax. 3. IOC to District after 10 days from sending non-compliance letter. 14
15 4. District action performed. FABRICATOR: RATING FOR SHOP FABRICATION Project: Bid line No.: Shop ID: Level: Rater/Date: Reviewer/Date: 15
16 Check, Hold or Witness Point Descriptions for Levels of Fabrication 1 thru 5 Fabricator Administration/ Coordination Yes No Contractor accepted shop drawings received per contract, record date (1 point) Prefabrication Meeting, record date ( information only) Fabrication Start, record date ( information only) Contractor accepted material test reports received per contract, record date ( 1 point) ASTM A709, Grade, Physical & Chemical Requirements, CVN Check point one (1) :Fabrication Quality Control Specialist acceptance by cover letter listing piece marks and dates Heat number and member description (1 point) Physical Requirements: Fy (psi), Fu (psi) Elongation% ( 6 points) CVN minimum average energy( ft lb.) (3 point) Chemical Requirements (3 point) Heat No. Steel Stamped and matched to Mill Test Reports per prior to release or abrasive blasting (1 point) ASTM A6 Quality and permissible Variations: Check Point two (2) Fabrication Quality Control Specialist acceptance by cover letter listing piece marks and dates. ASTM A6, Permissible variations in cross-section (1 point) ASTM A6, Permissible variations in Straightness & Storage (1 point) ASTM A6 and , Surface indications, Pitting due to rusting (1 point) ASTM A6, Laminar indications (1 point) Material Preparation per AWS D1.5, AASHTO and 513: Check Point three (3) Fabrication Quality Control Specialist acceptance by cover letter listing piece marks and dates Cutting beyond ( inside) the prescribed lines AWS (1 point) Cutting roughness AWS (1 point) Occasional notches AWS (1 point) Cut Edge Discontinuities AWS (1 point) Reentrant corners AWS and Radii of Beam copes (1 point) Rounding of edges main members AWS (1 point) Shearing distortion (1 point) Bending, 90 degrees to rolling direction, visual inspection look for cracks AASHTO (1 point) Cambering and Sweep of Individual Main Members per , AWS and AASHTO: Check Point four (4) Fabrication Quality Control Specialist acceptance by cover letter listing piece marks and dates. Y N NA 16
17 Cambering or Straightening, Mechanical or Thermal shop procedures posted (1 point) 1150 degrees F pyrometric sticks (follow shop procedure) (5 points) location and shape of heats or jack points( follow shop procedure) (1 point) location and number of support blocks ( follow shop procedure) (1 point) Thermal, Natural Cooling ( follow shop procedure) (5 points) Straightness and camber are per ( 5 points) Complete Penetration Welding per AWS, and AASHTO: Check Point five (5) Fabrication Quality Control Specialist acceptance by frequent audits and documentation of listed data for each splice and dates. Size, grade, piece mark and locations of parts to be fitted (1 point) Clean scale, moisture, grease & foreign material per AWS (2 point) Groove weld fit up tolerance, AWS 3.3 (2 point) Shop Welding Procedure ( WPS) with ODOT approval date posted at work stations (1 point) Welders and tackers are qualified (5 point) Flux and electrode per WPS (1 point) Joint geometry tolerances per AWS figure 2.4 (2 point) Preheat Temperature (F) and Shop Temperature(F) (5 point) Amperage ( Amps),Voltage (Volts),Travel Speed (IPM) (5 point) Back gouge and cleaning per AWS (5 point) Visual inspection width, thickness AWS (5 point) Visual inspection surface finish AWS uin. (2 point) Radiographic Inspection per AWS, and AASHTO: Check Point six (6), Hold Point provisional fabricators. Fabrication Quality Control Specialist acceptance by cover letter listing piece marks, dates and with technician s reports. Radiographic inspection 100% flange butt welds and back up bar splices( OA review required) acceptable film per AWS D1.5 section 6.8 thru 6.12 and CMS (5 point) Radiographic inspection web butt welds, top & bottom 1/3 ( OA review required) acceptable film per AWS D1.5 section 6.8 thru 6.12 and CMS (5 point) Radiographic inspection 100% longitudinal stiffeners butt welds ( OA review required) acceptable film per AWS D1.5 section 6.8 thru 6.12 and CMS (5 point) Radiographic inspection 25% longitudinal web ( OA review required) acceptable film per AWS D1.5 section 6.8 thru 6.12 and CMS (5 point) 17
18 Ultrasonic Inspection per AWS, and AASHTO: Check Point seven (7), Witness Point, provisional fabricators. Fabrication Quality Control Specialist acceptance by cover letter listing piece marks, dates and with technician s reports. Ultrasonic inspection 25% of complete penetration T or corner joints subject to compression or shear. (100% QA witness) acceptable process per AWS D1.5 section 6.13 thru 6.25, and CMS (5 points) Ultrasonic inspection 100% of complete penetration T or corner joints subject to tension or reversal of stress.(100% QA witness) acceptable process per AWS D1.5 section 6.13 thru 6.25, and CMS (5 points) Fillet Welds per AWS, 513 and AASHTO: Check Point eight (8), Fabrication Quality Control Specialist acceptance by frequent audits, documentation of listed data for each member and dates. Size, grade, piece mark and locations of parts to be fitted (1 point) Clean scale, moisture, grease & foreign material per AWS (1 point) Standard fillet weld fit up tolerance, 1/16" AWS 3.3 (1 point) Shop Welding Procedure (WPS) with ODOT approval date posted at work stations. (1 point) Welders and tackers qualified (5 point) Flux and electrodes per WPS (1 point) Preheat Temperature (F) and Shop Temperature(F) (5 points) Amperage (Amps),Voltage (Volts) and Travel Speed (IMP) (5 points) Visual inspection weld size and profile, AWS 3.6 (10 point) Stiffener Fitting per AWS, 513 and AASHTO: Check Point nine (9) Fabrication Quality Control Specialist acceptance by cover letter listing piece marks and dates. Bearing Stiffener, mill bearing, tight other end, (5 point) Intermediate Stiffener without cross frames, tight fit at tension flange, (5 point) Connection Stiffener weld fit at both flanges (2 point) Clearance between clipped stiffener corners and fillets on rolled beams (1 point) Magnetic Particle Inspection per AWS, and AASHTO: Check Point ten (10), Hold and Witness point for provisional fabricators. Fabrication Quality Control Specialist acceptance by cover letter listing piece marks, dates and with technicians report s. Magnetic Particle Inspection 10% of flange to web welds and girder ends after trimming, Dry powder prod method or yoke method. (100% QA witness during MPI inspection with provisional fabricators) acceptable procedure per AWS D1.5 section thru and CMS (5 point) 18
19 Magnetic Particle Inspection 10% of Bearing Stiffener Welds, Dry powder prod method or yoke method. (100% QA witness during MPI inspection with provisional fabricators) acceptable procedure per AWS D1.5 section thru and CMS (5 point) Shop Laydown per AWS, 513, and AASHTO: Check Point eleven (11) Fabrication Quality Control Specialist acceptance by frequent audits, documentation of listed data for each member and dates. Hole patterns, size, spacing, gage, accuracy per CMS (2 point) Hole deburring per CMS (1 point) Blocking horizontal & vertical bearings, after all welding is complete. 1/8" + or - per CMS (5 point) Blocking camber points specified, after all welding is complete (5 point) Sweep or Horizontal curvature of curved members, after all welding is complete 3/8" top to bottom and 1/8"/10'-0" AWS 3.5 and Fitup at bolted splice, 1/4" max gap Shop applied bolts, nuts and washers accepted by TE-24 Shop installed bolts calibration devise periodically examined per Shop Bolts tightened per Flatness at bearing seats, after all welding is complete AWS ( 2 point) Cleaning per 514, SSPC and ASTM: Check Point twelve (12) Fabrication Quality Control Specialist acceptance by documentation of listed data for each member and dates. Shop solvent cleaning per SSPC-SP1 where necessary (5 point) Shop grinding edges 1/16", material thicker than 1 ½" shall be checked for removal of the heat effected zone. (1 point) Shop blast cleaned SSPC-SP10, Automated process: Test 20 percent of the main members or one member per shift, whichever is greater. This test shall consist of taking 5 random readings per member. Test 15 percent of all secondary members. The test of a secondary member consists of taking one random reading. The test shall be performed with replica tape per ASTM D4417 method C, 1.5 to 3.5 mil profile (10 points) Shop blast cleaned SSPC-SP10, Manual process: Test each main member. This test shall consist of taking 5 random readings per member. Test 15 percent of all secondary members. The test of a secondary member consists of taking one random reading. The test shall be performed with replica tape per ASTM D4417 method C, 1.5 to 3.5 mil profile (10 points) Steel, Ambient (Dry bulb) and Wet bulb Temperatures, Humidity and Dew Point recorded prior to blasting and at the start of each shift (5 degree F above dew point). (2 point) 19
20 Abrasive produces angular profile (1 point) Abrasive mix for oil contamination start of each shift (1 point) Removal of abrasives & residue by vacuum or double blowing (5 point) Test blow air for oil or other contaminants. Blotter test for 30 seconds at the start of each shift. Not required with vacuum (1 point) Condition all fins slivers and burred or sharp edges per ASTM A6. Re-blast to 1.5 to 3.5 mil profile, unless conditioned area is less than one square foot per main member (1 point) Painting per 514, SSPC and ASTM: Check Point thirteen (13). Painting Quality Control Specialist acceptance by documentation of listed data for each member and dates. Time and dates between blasting and painting (1 point) Ambient temperature & humidity ( minimum 40 o F and 5 o F above dew point) (5 point) Temperature of paint storage location (max/ min) (2 point) Paint TE-24, manufactures name and lot numbers (2 point) Painter mixes paint with a high shear mixer and strains (5 point) Painter is checking operation of automated agitation system with every new paint batch (5 point) Prime inside of bolt holes, behind stiffener clips (5 point) Prime thickness 3 to 5 mils: 3 gage readings for each spot measurement with 5 spot measurements in each 100 square foot (see additional instructions with paint system notes)(10 point) Workman like finish; mud cracking, holidays, pores, runs or sags. (5 point) Prime has dried sufficiently prior to handling (1 point) Cleaning ASTM A709 Grade 50W steel (A588) Check point fourteen (14). Painting Quality Control Specialist acceptance by documentation of listed data for each member and dates. Shop solvent cleaning per SSPC-SP1 where necessary (5 point) Shop grinding edges 1/16"(1 point) Shop blast fascia members cleaned SSPC-SP6 achieved Abrasive mix for oil contamination start of each shift (1 point) Removal of abrasives & residue by vacuum or double blowing (1 point) Test blow air for oil or other contaminants. Blotter test for 30 seconds at the start of each shift. Not required with vacuum (1 point) Condition all fins slivers and burred or sharp edges per ASTM A6. Re blast to 1.5 to 3.5 mil profile, unless conditioned area is less than one square foot per main member (1 point) Repair procedures, QA Inspection: Hold point fifteen (15), Required for all Fabricators. Fabrication Quality Control Specialist acceptance by documentation of listed data for each repaired member and dates. 20
21 QC/ documentation describing problem and proposed repair method (1 point) QA /The Office of Structure Engineering acceptance of the proposed repair methods (1 point) Fabricator follows repair methods ( 2 points) NDT acceptance by QC and QA/The Office of Structure Engineering ( 2 points) Contractor acceptance and The Office of Structure Engineering received Shop drawings revised to show as built condition ( 1 point) Final Shop, Shipping or Storage, QA Inspection: hold Point sixteen (16), Required for all Fabricators. Fabrication Quality Control Specialist presents member and required QC documentation from check points 1 thru 15 for QA acceptance. NA = Not Applicable, No partial points are available for a Yes, No or NA answer Sum of {Y/(Y + N) x Section %} Fabricator Administration (Y) / (Y + N) X 1 = Check Point 1 (Y) / (Y + N) X 15 = Check Point 2 (Y) / (Y + N) X 1 = Check Point 3 (Y) / (Y + N) X 1 = Check Point 4 (Y) / (Y + N) X 1 = Check Point 5 (Y) / (Y + N) X 15 = Check Point 6 (Y) / (Y + N) X 17 = Check Point 7 (Y) / (Y + N) X 15 = Check Point 8 (Y) / (Y + N) X 7 = Check Point 9 (Y) / (Y + N) X 3 = Check Point 10 (Y) / (Y + N) X 7 = Check Point 11 (Y) / (Y + N) X 3 = Check Point 12 (Y) / (Y + N) X 3 = Check Point 13 (Y) / (Y + N) X 3 = Check Point 14 (Y) / (Y + N) X 1 = Check Point 15 (Y) / (Y + N) X 7 = Summation Fabricator rating for performance of QA Inspection = 21
22 FABRICATOR RATING FOR SHOP FABRICATION LEVEL 6 (FCM) Project: Bid Line No.: Shop ID: Rater/Date: Reviewer/Date: Check, Hold or Witness Point Descriptions for Levels of Fabrication 6 Fracture Critical. Supplement to Fabricator Rating Levels 1 through 5. Add or modify the following for Fracture critical materials or welds. ASTM A709, Grade, Physical & Chemical Requirements, CVN Check point one (1) :Fabrication Quality Control Specialist acceptance by cover letter listing piece marks and dates Yes No NA CVN minimum average energy( ft lb.) P frequency (10 point) Material Preparation per AWS D1.5, AASHTO and 513: Check Point three (3) Fabrication Quality Control Specialist acceptance by cover letter listing piece marks and dates Heat Bending, 90 degrees to rolling direction, visual inspection look for cracks AWS (10 point) Complete Penetration Welds per AWS, : Hold and Witness Point Five (5) Fabrication Quality Control Specialist acceptance by witnessing: Provisional qualified fabricators require Office of Materials Management witnessing of 50% of each fracture critical weld and qualified fabricators require 25% Welders and tackers are qualified for FCM (2 point) Flux and electrodes per WPS, Lot testing of Flux and electrodes, Temperature of Flux oven (2 points) Preheat Temperature (F) and shop temperature (F) (3 point) Ultrasonic Inspection per AWS, 513 and AASHTO: Hold and witness point, Seven (7) Fabrication Quality Control Specialist acceptance by witnessing: Provisional and qualified fabricators require Office of Materials Management witnessing of 100% of the fracture critical welds ultrasonic inspection. Ultrasonic inspection 100% of complete penetration butt welds in FCM tension or reversal of stress flanges or back up bars.(100% QA witness) acceptable process per AWS D1.5 section 6.13 thru 6.25, and CMS (5 points) Ultrasonic inspection 25% of complete penetration butt welds in FCM compression flange or back up bar.(100% QA witness) acceptable process per AWS D1.5 section 6.13 thru 6.25, and CMS (5 points) Ultrasonic inspection 25% of complete penetration T or corner joints FCM subject to compression or shear. (100% QA witness) acceptable process per AWS D1.5 section 6.13 thru 6.25, and CMS (5 points) 22
23 Ultrasonic inspection 100% of complete penetration T or corner joints FCM subject to tension or reversal of stress.(100% QA witness) acceptable process per AWS D1.5 section 6.13 thru 6.25, and CMS (5 points) FCM Repair procedure per AWS hold and witness point Five-A (5A) Fabrication Quality Control Specialist acceptance by witnessing: Provisional qualified fabricators require Office of Materials Management witnessing of 50% of each fracture critical weld and qualified fabricators require 25%. Sketch of discontinuity with member piece mark and location on member (1 point) QA witness of discontinuity for determination of critical or non critical repairs (2 point) Noncritical repair, WPS and repair procedure pre approved ( 1 point) Critical repair, WPS and repair procedure approved for each repair by The Office of Structure Engineering (2 point) Welders and tacker, are qualified for FCM(1 point) Preheat temperature prior to air carbon arc (1 point) Grind surfaces to be welded smooth and bright (1 point) Flux and electrode per WPS (1 point) lot testing, Check Temperature of Flux oven Joint geometry tolerances per AWS figure 2.4 (2 point) Preheat Temperature (F) and shop temperature (F) (1 point) Amperage ( Amps), Voltage (Volts) and Travel Speed (IPM) (1 point) Visual inspection width, thickness AWS (2 point) Visual inspection surface finish AWS uin. (2 point) Visual inspection weld size and profile, AWS 3.6 (2 point) Non destructive testing as specified by repair procedure( 5 points) Fabricator Rating: Summation of Appendix II check lists Fabricator Rating For Performance Of Test Reports x30% Fabricator Rating For Performance Of Shop Fabrication x 70% = = Fabricator Rating Fabricator Rating District s Construction Comments = 23
Reproduced with the permission of the American Welding Society (AWS), Miami, Florida - 09/15/2011. 7. Stud Welding
7. Stud Welding 7.1 Scope Section 7 contains general requirements for welding steel studs to steel (see 7.2.7 and 1.2.2 for approved steels). In addition, it stipulates specific requirements for the following:
More information9. QUALITY CONTROL/QUALITY ASSURANCE
Interim Guidelines: Chapter 9 - Quality Control/Quality Assurance 9. QUALITY CONTROL/QUALITY ASSURANCE Quality control is principally the responsibility of the contractor, while Quality Assurance is performed
More informationField Welding Inspection Guide
Field Welding Inspection Guide Assistance in interpretation of any specification or questions concerning field welding issues can be obtained from the Office of Materials Management, Structural Welding
More information11. NONDESTRUCTIVE TESTING
11. NONDESTRUCTIVE TESTING Nondestructive testing includes magnetic particle testing (MT), Liquid Dye Penetrant testing (PT), Radiographic Testing (RT) and Ultrasonic Testing (UT). The purpose of nondestructive
More informationBRIDGE FIELD PAINTING, REPAINTING, 412 AND PAINT RESIDUE CONTAINMENT. A. Field Painting, Bridge Repainting and Residue Containment:
412.1 DESCRIPTION BRIDGE FIELD PAINTING, REPAINTING, 412 This specification contains the requirements for the removal, containment, and disposal of existing paint on steel surfaces, preparing the steel
More informationFIELD ACCEPTANCE OF FIELD WELDING GUIDE
Page 1 of 17 Oklahoma DOT Materials & Testing January 14, 2004 Publication: GFA-FW (Updated to reference current Structural Materials Branch of the ODOT Materials Division URL 07/06/2016) FIELD ACCEPTANCE
More informationSPECIAL INSPECTION AND TESTING AGREEMENT INTERNATIONAL BUILDING CODE
Community Development Permit Services SPECIAL INSPECTION AND TESTING AGREEMENT INTERNATIONAL BUILDING CODE PROJECT NAME PROJECT ADDRESS PERMIT NUMBER CITY RECEIVED STAMP AND INITIALS Instructions: BEFORE
More informationACCREDITATION CRITERIA FOR FABRICATOR INSPECTION PROGRAMS FOR STRUCTURAL STEEL. AC172 February 2015 (Effective April 1, 2015)
ACCREDITATION CRITERIA FOR FABRICATOR INSPECTION PROGRAMS FOR STRUCTURAL STEEL AC172 February 2015 (Effective April 1, 2015) Requirements related to the Designated Accreditation Representative (DAR) and
More informationCOLORADO MODEL. 35 x 65 SPECIFICATIONS
COLORADO MODEL 35 x 65 SPECIFICATIONS Dimensions: Roof Dimensions 35-0 x 65-0 Column Dimensions (center to center) 31-0 x 30-6 Minimum Clearance 14-0 Roof Height @ Peak ±18-8 Curved Roof ±42-6 radius Square
More informationSTATEMENT OF WORK (SOW) On-Call Certified Welding Inspections and Nondestructive Testing
1.0 INTRODUCTION Colorado Springs Utilities (UTILITIES) is seeking qualified firms to provide verification welding inspection services, nondestructive testing services, and technical reporting to Colorado
More information3 Year On-Call Steel Fabrication Inspection Services. Request for Proposal. Iowa Department of Transportation
3 Year On-Call Steel Fabrication Inspection Services Request for Proposal Iowa Department of Transportation Introduction The Iowa Department of Transportation s Office of Materials is interested in Certified
More informationA. The CONTRACTOR shall provide pipe coating, complete and in place, in accordance with the Contract Documents.
POLYURETHANE COATING ON STEEL PIPE PART 1 -- GENERAL 1.1 THE REQUIREMENT A. The CONTRACTOR shall provide pipe coating, complete and in place, in accordance with the Contract Documents. 1.2 REFERENCE SPECIFICATIONS,
More informationDENVER MODEL 30 X 30 SPECIFICATIONS
DENVER MODEL 30 X 30 SPECIFICATIONS Dimensions: Roof Dimensions 30-0 x 30-0 (4) Columns (Center to Center) 25-6½ x 25-6½ Minimum Clearance 8-0 Roof Height @ Peak Dependent on Col. Ht. Hip Roof 4:12 pitch
More informationACCREDITATION CRITERIA FOR INSPECTION PROGRAMS FOR MANUFACTURERS OF METAL BUILDING SYSTEMS AC472
ACCREDITATION CRITERIA FOR INSPECTION PROGRAMS FOR MANUFACTURERS OF METAL BUILDING SYSTEMS AC472 August 2012 (Effective September 1, 2012) (Editorially revised September 4, 2013) (Editorially revised February
More informationPOLYURETHANE LINING AND COATING ON PIPE RAW WATER
POLYURETHANE LINING AND COATING ON PIPE RAW WATER PART 1 -- GENERAL 1.1 THE REQUIREMENT A. The CONTRACTOR shall provide pipe coating, complete and in place, in accordance with the Contract Documents. 1.2
More informationIHSS-N1 WELDED HONEYCOMB CORE SPECIFICATION. Generated: Sergiy Papyshev Engineering. Approved: Don Prysi Manufacturing. Approved: Merzuk Ramic Quality
IHSS-N1 WELDED HONEYCOMB CORE SPECIFICATION Generated: Sergiy Papyshev Engineering Approved: Don Prysi Manufacturing Approved: Merzuk Ramic Quality Approved: Steven Barnett Administrative DATE DATE DATE
More informationSPECIFICATIONS FOR SUPPLY, FABRICATION AND DELIVERY OF STRUCTURAL STEEL
SPECIFICATIONS FOR SUPPLY, FABRICATION AND DELIVERY OF STRUCTURAL STEEL 1.0 DESCRIPTION The Work shall consist of:.1 The supply of materials and fabrication of structural steel components (e.g. girders,
More informationJames M. Pleasants Company
James M. Pleasants Company SUBMITTAL DATA GAINESVILLE MECHANICAL DECEMBER 20, 2013 PROJECT: GSU: J-183 HUMANITIES LAW BLDG. QUOTE NO:12116 ENGINEER: STEVENS & WILKINSON GASKETED PLATE HEAT EXCHANGER Tag:
More informationSection 8.1 Volume I QUALITY ASSURANCE PROGRAM OF PRECAST PRESTRESSED CONCRETE PRODUCTS
Section 8.1 Volume I QUALITY ASSURANCE PROGRAM OF PRECAST PRESTRESSED CONCRETE PRODUCTS 8.1.1 PURPOSE This procedure provides guidelines related to the implementation of quality control and quality assurance
More informationNDT Procedure for Liquid Penetrant Inspection TRINITY NDT. An ISO 9001:2008 Certified Company
NDT Procedure for Liquid Penetrant Inspection A Nondestructive testing (NDT) Procedure suitable for General Liquid/Dye Penetrant Inspections. This is a sample LPT procedure and may be required to be modified
More informationSection 707. STRUCTURAL STEEL CONSTRUCTION
707.01 Section 707. STRUCTURAL STEEL CONSTRUCTION 707.01. Description. This work consists of fabricating, shop cleaning and coating, providing, delivering, and erecting structural steel and other materials.
More informationStructural welding is a process by which the parts that are to be connected are heated and
CHAPTER 6. WELDED CONNECTIONS 6.1 INTRODUCTORY CONCEPTS Structural welding is a process by which the parts that are to be connected are heated and fused, with supplementary molten metal at the joint. A
More informationCOATING & WRAPPING OF UNDERGROUND PIPING
CONSTRUCTION STANDARD SPECIFICATION DOCUMENT NO :SEC-PJ-000-SPC-PI-008 TOTAL PAGES : 8 Page 1 of 8 CONTENTS 1. SCOPE 2. DEFINITION 3. CODES AND STANDARDS 4. MATERIALS Page 2 of 8 1. SCOPE This specification
More informationGENERAL RUBBER LINING PRINCIPLES
GENERAL RUBBER LINING PRINCIPLES I. METAL PREREQUISITES Metal to be lined should meet the requirements as stated in section 8 Metal Fabrication and section 12 Blasting and Cementing Procedures. The surface
More informationWELDING TECHNOLOGY DEGREES AND CERTIFICATES. Welding Technology Degree. Shielded Metal Arc Plate and Pipe (270 hours) Certificate
Area: Technical Education Dean: Dr. Trish Caldwell Phone: (916) 484-8354 Counseling: (916) 484-8572 www.arc.losrios.edu/~welding/ The American Welding Society (AWS) nationally accredits American River
More informationATLANTA MODEL SPECIFICATIONS
ATLANTA MODEL 50 SPECIFICATIONS Dimensions: Roof Dimensions (point to point) 50-0 Column Dimensions (out to out of columns) 44-0 Eave Height 8-0 Roof Height @ Peak ±21-8⅞ Hip Roof 6:12 pitch Square Feet
More informationCONTRACT SPECIFICATIONS - SEISMIC ISOLATION BEARINGS
CONTRACT SPECIFICATIONS - SEISMIC ISOLATION BEARINGS 1.0 DESIGN 1.1 Scope of Work 1.1.1 This work shall consist of furnishing Isolation Bearings and installing Isolation Bearing Assemblies at the locations
More information705 - STRUCTURAL STEEL FABRICATION - BRIDGES SECTION 705 STRUCTURAL STEEL FABRICATION - BRIDGES
SECTION 705 STRUCTURAL STEEL FABRICATION - BRIDGES 705.1 DESCRIPTION Shop fabricate the structural steel according to the Contract Documents. This specification applies to bridges on highways and public
More informationGuide to understanding Welding Procedure Specification (WPS), Procedure Qualification Record (PQR), and Welder Performance Qualification Record (WPQR)
An AEIS White Paper 265 Birdsall Dr. Yorktown Heights, NY 10598 914 214 8460 www.aeis.us Guide to understanding Welding Procedure Specification (WPS), Procedure Qualification Record (PQR), and Welder Performance
More informationPIPING SYSTEM - ABRASIVE SLURRIES Engineering Standard Specification. 96 B. Riutta
PIPING SYSTEM - ABRASIVE SLURRIES Engineering Standard Specification Number: 3503-11.2.610 Rev. 2 Rubber Lined Steel Pipe and Fittings Mechanically Coupled Plain End Type System Issued Revised Approved
More informationTECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE
TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE TECHNICAL SPECIFICATION PART 8000 - PRECAST CONCRETE TABLE OF CONTENTS Item Number Page 8100 PRECAST CONCRETE CONSTRUCTION - GENERAL 8-3 8101 General
More informationSERIES NG 1800 STRUCTURAL STEELWORK
MANUAL OF CONTRACT DOCUMENTS FOR HIGHWAY WORKS VOLUME 2 NOTES FOR GUIDANCE ON THE SPECIFICATION FOR HIGHWAY WORKS SERIES NG 1800 STRUCTURAL STEELWORK Contents Clause Title Page NG 1800 (08/14) General
More informationNDT Procedure for Liquid Penetrant Inspection
NDT Procedure for Liquid Penetrant Inspection A Nondestructive testing (NDT) Procedure suitable for General Liquid/Dye Penetrant Inspections. This is a sample LPT procedure and may be required to be modified
More informationNON DESTRUCTIVE TESTING & ASNT WELD INSPECTION & AWS
NON DESTRUCTIVE TESTING & ASNT WELD INSPECTION & AWS What is ASNT? What is ASNT? The American Society for Nondestructive Testing, Inc. What is ASNT? ASNT is the world's largest technical society for nondestructive
More informationASTM A860/A860M-09 Standard Specification for Wrought High Strength. Ferritic Steel Butt Welding Fittings. 1. Scope :- 2. Reference Documents :-
Standard Specification for Wrought High Strength Ferritic Steel Butt Welding Fittings 1. Scope :- 1.1 This specification covers wrought high strength ferritic steel butt-welding fitting of seamless and
More informationSTRUCTURAL STEEL FABRICATION
SECTION 1080 STRUCTURAL STEEL FABRICATION 1080.1 Scope. This specification covers the fabrication and inspection of bridges and structures made of structural steel and miscellaneous metals. 1080.2 Material.
More informationSECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE
SECTION 15076 CEMENT-MORTAR LINED AND COATED (CML&C) STEEL PIPE PART 1 GENERAL 1.01 DESCRIPTION This section designates the requirements for steel pipe fabrication, test in shop, installation of steel
More informationMechanical Installation
Page -1-1. INTRODUCTION AND PURPOSE 1.1. This specification covers the installation, testing and precommissioning of mechanical equipment. Work is to be performed in conjunction with the manufacturer s
More informationPump Skid Fabrication for Magnetic Coupling. Rick Soltis Chief Mechanic City of Bedford
Pump Skid Fabrication for Magnetic Coupling Rick Soltis Chief Mechanic City of Bedford Contents Magnetic Couplings What They Are, How They Work, Where They re Used Fabrication and Manufacturing of Pump
More informationSECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION 623.10 CONCRETE BONDING COMPOUND.
SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION 623.10 CONCRETE BONDING COMPOUND. 623.10.1 Description. This work shall consist of preparing the surface,
More informationPART 1 GENERAL 1.1 SECTION INCLUDES
J-1 Section 09110 Long Form Specification INTERIOR METAL STUD FRAMING This section includes lightweight, usually 0.036 inch (0.9 mm) thick or lighter, non-axial load bearing metal stud framing including
More informationConceptual Design of Buildings (Course unit code 1C2)
(Course unit code 1C2) Module C Design of Steel Members J.P. Jaspart (University of Liège) 520121-1-2011-1-CZ-ERA MUNDUS-EMMC Bolts are the main type of fasteners used in steel joints. The main geometrical
More informationNorth Carolina FFA Association Agricultural Mechanics Career Development Event
North Carolina FFA Association Three (3) of the following Agricultural Mechanics Performance Skills will be selected for the state competition. North Carolina FFA Association Agricultural Mechanics Performance
More informationGUARDRAIL POST STEEL
GUARDRAIL POST STEEL Guardrail posts meeting materials certification are evaluated and checked for: 1. Dimensional acceptance 2. Physical test results a. Chemical b. Physical 3. Galvanized or painted coating
More information738-B-297 POLYMERIC CONCRETE BRIDGE DECK OVERLAY. (Adopted 02-20-14)
POLYMERIC CONCRETE BRIDGE DECK OVERLAY (Adopted 02-20-14) Description The polymeric concrete bridge deck overlay shall consist of an epoxy polymer that acts together with special aggregate to form an overlay
More informationAISI CHEMICAL COMPOSITION LIMITS: Nonresulphurized Carbon Steels
AISI CHEMICAL COMPOSITION LIMITS: Nonresulphurized Carbon Steels AISI No. 1008 1010 1012 1015 1016 1017 1018 1019 1020 1021 1022 1023 1024 10 1026 1027 1029 10 1035 1036 1037 1038 1039 10 1041 1042 1043
More information\ srl High Technology Gear Reducers and Cardan Shafts CERTIFIED QUALITY SYSTEM: UNI ISO EN 9001:2008 ICIM 2779/2; IQNET N. IT-28236 UNIVERSAL SHAFT
UNIVERSAL SHAFT CAT CERTIFICATION CARDAN SHAFTS - COUPLINGS Alongside with the production of special gearboxes, our company has developed the production of Universal shafts, with the same high quality
More informationSERIES 1800 STRUCTURAL STEELWORK
MANUAL OF CONTRACT DOCUMENTS FOR HIGHWAY WORKS VOLUME 1 SPECIFICATION FOR HIGHWAYS WORKS SERIES 1800 STRUCTURAL STEELWORK Contents Clause Title Page 1800 (08/14) General 2 1801 (08/14) Scope 4 1802 (08/14)
More informationChapter 5 - Aircraft Welding
Chapter 5 - Aircraft Welding Chapter 5 Section A Study Aid Questions Fill in the Blanks 1. There are 3 types of welding:, and, welding. 2. The oxy acetylene flame, with a temperature of Fahrenheit is produced
More informationApplication of Welding Standards in Hong Kong. S. K. Babu Laboratory Manager - Foundation Techniques Ltd
Application of Welding Standards in Hong Kong S. K. Babu Laboratory Manager - Foundation Techniques Ltd Introduction: This paper summarizes the current welding standards practiced in Hong Kong & also outlines
More informationEssentials Welding QA/QC Plan Sample
Essentials Welding QA/QC Plan Sample Good for smaller projects and bid qualifications Has All the Essential Elements of a well-founded Quality Control Plan Contact: Ed Caldeira 410-451-8006 Pat [Pick the
More informationGENERAL WELDING & FABRICATING, INC. 991 Maple Road Elma, New York 14059
QUALITY MANUAL GENERAL WELDING & FABRICATING, INC. 991 Maple Road Elma, New York 14059 Distribution: Position Location Copy # President / CEO Office 1 Operations Manager Office 2 Quality Assurance Office
More informationSECTION 15410 GROUND WATER STORAGE TANKS
SECTION 15410 GROUND WATER STORAGE TANKS PART 1 GENERAL.01 SCOPE A. Section Includes Requirements for designing, fabricating, and erecting a welded steel ground storage tank..02 SYSTEM DESCRIPTION A. Design
More informationCHAPTER 13 LOAD HOOKS
CHAPTER 13 LOAD HOOKS This chapter provides safety standards for the inspection, testing, and maintenance of load hooks installed on cranes or hoists and implements the requirements of ASME B30.10, Chapter
More informationSpecification for Fabrication of Pipeline End Manifold
Specification for Fabrication of Pipeline End Manifold Specification for Fabrication of Pipeline End Manifold 1 of 23 Table of Contents 1.0 SCOPE... 3 2.0 DEFINITIONS... 3 3.0 REFERENCE DOCUMENTS... 3
More informationFIELD WELDER QUALIFICATION PROCESS
FIELD WELDER QUALIFICATION PROCESS Office of Structures Metals Engineering Unit April 2007 Amended October 2008 Table of Contents Page Number Description 1 Introduction 2-6 Qualification Tests Requirements
More informationSECTION 560 COATING NEW STRUCTURAL STEEL
560 COATING NEW STRUCTURAL STEEL. (REV 10-1-132911121-131416-1213) (FA 1-162-1-13) (7-13) SECTION 560 COATING NEW STRUCTURAL STEEL 560-1 Description Coat new structural steel in accordance with the requirements
More informationSSPC-SP 6/NACE NO. 3
Joint Surface Preparation Standard SSPC-SP 6/NACE NO. 3 Commercial Blast Cleaning This SSPC: The Society for Protective Coatings and NACE International standard represents a consensus of those individual
More informationAcceptance Codes APPENDIX - A. Acceptance Criteria
1111 Receipt of a satisfactory Test Report from WSDOT Materials Laboratory is required indicating the lot (or lots) or batch of material meets the requirement of the specifications under which it is listed.
More informationSAFETY FENCES, SAFETY BARRIERS AND PEDESTRIAN GUARDRAILS
SERIES NG 400 SAFETY FENCES, SAFETY BARRIERS AND PEDESTRIAN GUARDRAILS Contents Clause Title Page NG 401 Performance Criteria for Safety Fences and Safety Barriers 2 NG 402 Components for Safety Fences
More informationBODY OF KNOWLEDGE API-653 ABOVEGROUND STORAGE TANK INSPECTOR CERTIFICATION EXAMINATION November 2015, March 2016 and July 2016 (Replaces October 2013)
BODY OF KNOWLEDGE API-653 ABOVEGROUND STORAGE TANK INSPECTOR CERTIFICATION EXAMINATION November 2015, March 2016 and July 2016 (Replaces October 2013) API Authorized Aboveground Storage Tank Inspectors
More informationMaterials. Estimating Steel. Players. Materials. Shop Drawings. Detailing Process. Standard shapes. Fabricated members, Built-up sections
Materials Standard shapes W sections, C channels, Structural T, Angles, Pipes, Tubes, Rods and Plates Fabricated members, Built-up sections Adding plates to beam flanges, Stiffeners to beam webs Built
More informationHamilton Form Company, Ltd Custom Designs, Flexible Solutions
Hamilton Form Company, Ltd Custom Designs, Flexible Solutions 1 IFC 2 CUSTOM DESIGNS, FLEXIBLE SOLUTIONS Hamilton Form has been designing and building custom steel forms for the precast industry since
More informationSurveillance Report. Bascule span to the Railway bridge Jernbanebroen over Limfjorden
Transportudvalget 2013-14 TRU Alm.del endeligt svar på spørgsmål 192 Offentligt Surveillance Report Package / Item: Bascule span to the Railway bridge Jernbanebroen over Limfjorden Supplier: Purpose of
More informationSAMPLE TEST QUESTIONS STEAMFITTER/PIPEFITTER - ITA WEBSITE
1 Which tool is used to correct internal hi-low when preparing a 4-in. steel pipe for welding? A. 4-in. grinder with cutting disc. B. Mini-grinder with flapper disc. C. Pencil grinder with cone stone.
More informationUltrasonic Reference Blocks
Ultrasonic Reference Blocks Custom and Standard Test Blocks for Nondestructive Testing Introduction 3 IIW Type 1 Calibration Block 4 Miniature Angle Beam (ROMPAS) Calibration Block 4 Distance Calibration
More informationMETHOD OF STATEMENT FOR STATIC LOADING TEST
Compression Test, METHOD OF STATEMENT FOR STATIC LOADING TEST Tension Test and Lateral Test According to the American Standards ASTM D1143 07, ASTM D3689 07, ASTM D3966 07 and Euro Codes EC7 Table of Contents
More informationSECTION 03400 PRECAST CONCRETE STRUCTURES
SECTION 03400 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes specifications for precast concrete structures, including fabrication and erection. 1.02 REFERENCE STANDARDS A. American Society for
More informationSUPPLIER QUALITY ASSURANCE REQUIREMENTS
SUPPLIER QUALITY ASSURANCE REQUIREMENTS The following supplier quality assurance requirements, referenced by number on the Purchase Order, are an integral part of each order placed by Continental Disc
More informationTechnical Notes NDT 001 Specific Requirements for Non- Destructive Testing Laboratories
ACCREDITATION SCHEME FOR LABORATORIES Technical Notes NDT 001 Specific Requirements for Non- Destructive Testing Laboratories Technical Notes NDT 001, Apr 14 The SAC Accreditation Programme is managed
More informationT A B L E T 1 T E S T S A N D I N S P E C T I O N C A B L E P C U T A N D P C U T - A
T A B L E T 1 1 of 7 Tests & Inspection Cable PCUT & PCUT-A (Table T1) T E S T S A N D I N S P E C T I O N C A B L E P C U T A N D P C U T - A No. Test Scale MOC Requirements G 20:10:001:01 Defined Test
More informationD1.8 Seismic Supplement Welding Manual. A General Overview of AWS D1.8 Welding Code - Seismic Supplement
D1.8 Seismic Supplement Welding Manual A General Overview of AWS D1.8 Welding Code - Seismic Supplement 2 D1.8 Seismic Supplement Welding Manual Table of Contents Introduction...2 Background...4 Purpose
More informationSECTION 460 STRUCTURAL STEEL AND MISCELLANEOUS METALS
SECTION 460 STRUCTURAL STEEL AND MISCELLANEOUS METALS 460-1 Description. 460-1.1 General: Prepare, fabricate, assemble, erect, and perform all nondestructive testing for structural steel or miscellaneous
More informationINSTRUCTIONS THOROUGHLY BEFORE BEGINNING***************
Bill of Materials: RAC0012 Green Wing Aerodynamic Skirt Kit Item Part Number Description Quantity 1 RMC0218 Gen 2 Trailer Skirt Roadside 1 2 RMC0219 Gen 2 Trailer Skirt Curbside 1 3 RMC0041 Trailer Skirt
More informationJoint Surface Preparation Standard. NACE No. 1/SSPC-SP 5 White Metal Blast Cleaning
Item No. 21065 Joint Surface Preparation Standard NACE No. 1/SSPC-SP 5 White Metal Blast Cleaning This NACE International (NACE)/SSPC: The Society for Protective Coatings standard represents a consensus
More informationSECTION 02845 GUARDRAILS
SECTION 02845 GUARDRAILS PART 1 - GENERAL 1.01 SCOPE OF WORK A. Furnish all labor, materials, equipment and incidentals necessary and repair, replace or install all types of guardrails as specified herein
More informationCLARK COUNTY DEPARTMENT OF BUILDING & FIRE PREVENTION 4701 W. Russell Road Las Vegas, NV 89118 (702) 455-3000 Fax (702) 221-0630
CLARK COUNTY DEPARTMENT OF BUILDING & FIRE PREVENTION 4701 W. Russell Road Las Vegas, NV 89118 (702) 455-3000 Fax (702) 221-0630 Ronald L. Lynn, Director/Building & Fire Official Samuel D. Palmer, P.E.,
More informationWHAT EVERY ENGINEER SHOULD KNOW ABOUT WELDING
WHAT EVERY ENGINEER SHOULD KNOW ABOUT WELDING From amperage to preheat, there s more to welding procedures than meets the eye By Duane K. Miller, P.E. WITHIN THE WELDING INDUS- TRY, THE TERM WELDING PROCEDURE
More informationRepair of a Hull 15 m below the Waterline
Repair of a Hull 15 m below the Waterline Fig. 1 This 189 m vessel required an underwater repair after it had its hull pierced sufficiently enough to let seawater enter its water ballast tank. Since circumstances
More informationSupplier Quality Assurance Requirements Manual
12716 EAST PINE STREET TULSA, OK 74116 Supplier Quality Assurance Requirements Manual Approved: Mike Collins Quality Assurance Manager Precise Machining & Manufacturing 1 Record of Revisions Revision D
More informationTOP RUNNING SINGLE GIRDER BRIDGE CRANE
SECTION 14630 TOP RUNNING SINGLE GIRDER BRIDGE CRANE 1.01 SUMMARY PART 1- GENERAL A. The work required under this section shall include the designing, manufacturing, shipping, installing and field testing
More informationTechnical Services. Product MM INCH Installation direction Seams treatment GTI CONNECT (interlocking)
INSTALLATION INSTRUCTIONS FOR GTI CONNECT TILES This document refers to the following products: Product MM INCH Installation direction Seams treatment GTI CONNECT (interlocking) 635 X 635 mm 25.5 x 25.5
More informationPTS HELICAL PIERS INSTALLATION SPECIFICATIONS NOTICE
FORM A PTS HELICAL PIERS INSTALLATION SPECIFICATIONS NOTICE The following suggested specifications are written as a guide to assist the specifier in writing his own specifications. Specific circumstances
More informationGK Packing System Welding Instructions
GK Packing System Welding Instructions Roxtec GmbH Neuer Höltigbaum 1-3, 22143 Hamburg GERMANY Tel +49 (040) 657398-0, Fax +49 (040) 657398-50 EMAIL info@de.roxtec.com, www.roxtec.de Welding instructions
More informationSECTION 08332 COILING COUNTER DOORS. Display hidden notes to specifier. (Don't know how? Click Here)
SECTION 08332 COILING COUNTER DOORS Display hidden notes to specifier. (Don't know how? Click Here) PART 1 GENERAL 1.1 SECTION INCLUDES A. Coiling Metal Counter Doors. B. Coiling Counter Fire Doors. 1.2
More informationSOLDERING PROCEDURE SPECIFICATIONS PROCEDURE QUALIFICATION RECORDS. and SOLDERER PERFORMANCE QUALIFICATION RECORDS
SOLDERING PROCEDURE SPECIFICATIONS PROCEDURE QUALIFICATION RECORDS and SOLDERER PERFORMANCE QUALIFICATION RECORDS COPPER DEVELOPMENT ASSOCIATION INC. 260 Madison Avenue New York, NY 10016 (212) 251-7200
More informationINSTALLATION RECOMMENDATIONS. Outdoor Rubber Tiles
INSTALLATION RECOMMENDATIONS Outdoor Rubber Tiles Prior to Installation: The Outdoor Rubber Tiles and accessory transition pieces intended for this installation have been shipped to you via a freight carrier
More informationThe Keep It Simple, Steel (KISS) Standard
The Keep It Simple, Steel (KISS) Standard A standard Electronic Data Interchange (EDI) format for the exchange of Bill of Material (BOM) information within the steel fabrication industry Updated in March
More informationWelding of Boilers, Pressure Vessels and Pressure Piping
WELDING OF BOILERS, PRESSURE VESSELS 1 Welding of Boilers, Pressure Vessels and Pressure Piping Repealed by Chapter B-5.1 Reg 1 (effective January 1, 2007) Formerly Saskatchewan Regulation 61/78 (effective
More informationSECTION 15125 HIGH DENSITY POLYETHYLENE (HDPE) PIPE AND FITTINGS FOR WATER DISTRIBUTION AND TRANSMISSION
SECTION 15125 HIGH DENSITY POLYETHYLENE (HDPE) PIPE AND FITTINGS FOR WATER DISTRIBUTION AND TRANSMISSION PART 1 GENERAL.01 SECTION INCLUDES Furnishing and installing 4 inch through 16 inch high density
More informationwww.klmtechgroup.com TABLE OF CONTENT
Page : 1 of 45 Project Engineering Standard www.klmtechgroup.com KLM Technology #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor Bahru Malaysia TABLE OF CONTENT 1.0 SCOPE 2 2.0 CONFLICTS
More informationSECTION 1081 COATING OF STRUCTURAL STEEL
SECTION 1081 COATING OF STRUCTURAL STEEL 1081.1 Scope. This specification covers coating new and existing bridges and structures made of structural steel and miscellaneous metals. 1081.2 Systems of Coatings.
More informationSTANDARD SPECIFICATION SECTION 15257 STEEL PIPE, FUSION-BONDED EPOXY LINED AND COATED
STANDARD SPECIFICATION SECTION 15257 STEEL PIPE, FUSION-BONDED EPOXY LINED AND COATED PART 1 - GENERAL 1.01 DESCRIPTION This section includes materials, fabrication, installation, and testing of fusion-bonded
More informationWELDING INSPECTION REPORT
STATE OF CALIFORNIA--BUSINESS,TRANSPORTACTION AND HOUSING AGENCY Arnold Schwarzenegger, Governor DEPARTMENT OF TRANSPORTATION DIVISION OF ENGINEERING SERVICES Office of Structural Materials Quality Assurance
More informationHigh Strain Dynamic Load Testing of Drilled Shafts
Supplemental Technical Specification for High Strain Dynamic Load Testing of Drilled Shafts SCDOT Designation: SC-M-712 (9/15) September 3, 2015 1.0 GENERAL This work shall consist of performing high-strain
More informationCOATINGS MANUAL HRSD 9.0 THIRD PARTY INSPECTION GUIDELINES. 9.1 The Value of Third Party Inspection. 9.2 When to Use Third Party Inspection
9.0 THIRD PARTY INSPECTION GUIDELINES 9.1 The Value of Third Party Inspection 9.2 When to Use Third Party Inspection 9.3 Qualifications for Third Party Inspectors 9.4 Documentation System for Third Party
More information1.2 For piping systems that operate at hoop stress of 20% or more of the Specified Minimum Yield Strength the following shall apply.
1.0 JOINT FIT-UP AND ALIGNMENT 1.1 For piping systems that operate at hoop stress of less than 20% and the internal adjoining ends do not vary more than 1 / 8 in. and adequate penetration and fusion can
More information