2011 EXECUTIVE REPORT. The Data Center Build-or-Buy Decision: 6 Key Factors You Should Consider

Size: px
Start display at page:

Download "2011 EXECUTIVE REPORT. The Data Center Build-or-Buy Decision: 6 Key Factors You Should Consider"

Transcription

1 2011 EXECUTIVE REPORT The Data Center Build-or-Buy Decision: 6 Key Factors You Should Consider

2 The Data Center Build-or-Buy Decision: 6 Key Factors You Should Consider Executive Summary Even through challenging economic times, the need for physical data center capacity continues to grow. For some businesses, the driver is expansion into new markets or geographies. For others, it s the need to deal with growing amounts of data generated by applications with high-capacity demands, evolving end-user abilities, or regulatory bodies that demand ever-increasing quantities of meticulous documentation. If your data center is running out of space or power, which is increasingly an important constraint you have two options. You can build and operate a new facility, or you can lease the capacity you need from one of a growing number of colocation providers who can solve your problem immediately. Colocation, often referred to as colo, differs from traditional hosting, where the hosting company provides the hardware and some or all of the software required to run your applications. In a colocation arrangement, you own all the hardware, and you typically provide the technicians to support it as well. What you don t have to worry about is floor space, cooling, power (and its distribution), cabling, fire suppression and physical security. The build-or-buy decision between construction and colocation should be weighed carefully, as the choice will affect your company and your bottom line quite literally for decades. This paper will review six key factors that affect that choice, some of which extend beyond a basic TCO analysis. 1. Strategic Considerations: Do you really want to get into the construction business? Before beginning a formal total cost of ownership (TCO) analysis, you need to make the more fundamental decision of whether or not you want to take on the responsibility of building a data center from the ground up. Given the cost more on this subject below a new data center is Copyright 2011 IT Business Edge and CyrusOne. All rights reserved. Page 2

3 going to be at the top of your priority list, which means that other priorities may not receive the attention they deserve. If you decide to move ahead, your first concern will be location, and it s unlikely that the best choice will be in close proximity to your existing facility. In most cases, the optimal location for a new data center is an area where the cost of electricity is low. A second consideration is the cost of land and construction. A third is the availability of a labor pool for staffing the data center once it has been built. Balancing these factors isn t always easy. The same is true of design and construction. You re not personally going to configure AutoCad to lay out the data center or visit the site on a daily basis to supervise its construction, but you ll be involved constantly. And once construction is complete, you will be required to keep the lights on for years to come. Use of capital is a second strategic consideration. By building a data center, you are choosing to fund infrastructure at the expense of other initiatives that may reduce costs or deliver competitive advantage, a decision that shouldn t be taken lightly. Cost of electricity is just one of several factors that must be weighed prior to choosing the site for a new data center. (Source: 2. Timing: Do you need capacity yesterday? Building a data center from the ground up is a complicated process with a time frame of eight to twelve months at minimum, often extending beyond two years. With the colocation option, you can typically be up and running in a few weeks. For this reason, colocation offers a big advantage Copyright 2011 IT Business Edge and CyrusOne. All rights reserved. Page 3

4 if your need for capacity is urgent. The importance of getting up and running in a hurry will be determined by business drivers. For example, if the need for more capacity is driven by slow but steady business growth, you may be comfortable with a time frame of a year or more. On the other hand, if it s driven by rapid expansion or the acquisition of a new business, you will need to act quickly. In fact, the costs of delay can be calculated. Lost sales or penalties for non-compliance with a myriad of regulations can be tremendously expensive. Calculating these costs with your sales and compliance teams aids the decision-making process and helps build the business case. 3. How much is too much? One of the big problems in building a data center is determining the appropriate capacity. In many cases, the amount of white space needed is determined by a careful analysis of your current environment. However this is often a poor indicator of what your footprint will resemble in a new facility, as your space and hardware requirements may evolve in unpredictable ways. Relocating your data center environment presents opportunities to reduce your current footprint by completing a technology refresh, consolidating equipment in your racks, or expanding your environment vertically instead of over more floor space. To ensure flexibility moving forward, users will often elect to reserve right of first refusal space adjacent to their data center cage or data hall. This allows them to grow contiguously, retaining control over a seamless footprint. Copyright 2011 IT Business Edge and CyrusOne. All rights reserved. Page 4

5 4. Have you brushed up on your fluid dynamics? The design of a modern data center can be extremely challenging, in part due to the complex cooling requirements, which often reach beyond traditional hot and cold aisles. In low density environments, a shared cooling approach can be taken, where under-utilized cooling resources can be diverted to handle hot spots. In high density environments, a zoning approach is preferred, where high density servers are segregated and cooled separately using dedicated equipment. Either approach typically involves computerized modeling of the fluid dynamics to determine optimal placement of infrastructure across the data center floor. 5. Environmental Issues As such large consumers of electricity, data centers are often the target of environmental scrutiny. But because they are widely acknowledged as the backbone of our now digital economy, even environmental activist groups have come to understand their necessity and have focused their efforts on efficiency. The most efficient data centers are often the newest, most technologically advanced, which can require a significant upfront capital outlay. Utilizing colocation allows you to operate within a very efficient data center while reallocating that otherwise used capital towards your core business drivers. 6. Where will you get the money? All the decisions already outlined related to location, capacity, and design will be reflected in the total cost of construction (and therefore the TCO), but the decision to build or lease may ultimately hinge on more complex financial issues, as the build choice will be a capital expenditure (CAPEX) while leasing will be an operating expense (OPEX). It is beyond the scope of this paper to discuss all the implications of CAPEX vs. OPEX funding, which include interest costs, depreciation, the impact of inflation over time and more. What s important to bear in mind is that the CAPEX approach involves different interpretations and often debate. It s a board-level decision that typically involves intense preparation. In many cases, it s Copyright 2011 IT Business Edge and CyrusOne. All rights reserved. Page 5

6 politically much simpler to take the OPEX route and lease. An OPEX choice has two other financial advantages: The up-front costs are very low, and you avoid any commitment to long-term operating costs. Colocation is a must-consider option For all the reasons cited in this paper, colocation is gaining favor as an option. According to a Frost & Sullivan survey conducted in 2010, enterprises will increase data center floor space 15 percent per year through 2013, but the percentage of that space they actually own will decrease 6 percent. In other words, a large number of companies are utilizing colocation platforms. Whether you choose to go colo will depend on your unique requirements and concerns. But without question, colocation should be one of the options you explore. Copyright 2011 IT Business Edge and CyrusOne. All rights reserved. Page 6

7 CyrusOne CyrusOne specializes in enterprise data center colocation, offering the highest power redundancy (2N architecture) and highest power-density infrastructure, supporting 250+ watts per square foot across the entire data center floor. Headquartered in Houston, Texas and with 18 facilities across the United States and London, CyrusOne is renowned for exemplary customer service. The company s customers include 15 of the Top Global 100 Companies, five of the top 10. CyrusOne is a wholly owned subsidiary of Cincinnati Bell (NYSE: CBB). For more information, visit Mike Stevens - author Mike Stevens began his career as technical writer in semiconductor manufacturing, and then switched to marketing. At his own Silicon Valley-based agency, he worked with an impressive list of clients, including HP, EMC, Amazon.com, Microsoft and Oracle. His primary focus for the last seven years has been enterprise software. He is also the author of Fortuna, a high tech thriller published by Oceanview Press and available on amazon.com. IT Business Edge IT Business Edge delivers the information, analysis and context business technology decision makers need to maximize returns on IT investments and align IT initiatives with business objectives. As a Technology Intelligence Agent, IT Business Edge provides content different from that of a traditional IT publisher, news service or analyst firm. Our editors monitor all these sources plus many others for critical IT information that they translate into actionable advice for high-level IT and business managers. Subscribers access our practical content and useful decision-making tools through a rich Web site, targeted newsletters and varied RSS feeds. All these outlets feature our business-focused blogs, exclusive interviews with field experts and industry insiders, plus our database of more than 20,000 abstracts summarizing content from 2,500-plus sources. Visit our Web site at Copyright 2011 IT Business Edge and CyrusOne. All rights reserved. Page 7

EXECUTIVE REPORT. The Data Center Build-or-Buy Decision: 6 Key Factors You Should Consider

EXECUTIVE REPORT. The Data Center Build-or-Buy Decision: 6 Key Factors You Should Consider EXECUTIVE REPORT The Data Center Build-or-Buy Decision: 6 Key Factors You Should Consider Executive Summary Even through challenging economic times, the need for physical data center capacity continues

More information

Data Center Trend: Distributed Power in the White Space

Data Center Trend: Distributed Power in the White Space Data Center Trend: Distributed Power in the White Space By Jason Anderson Product Line Manager Eaton Executive summary Cloud computing vendors and colocation data centers make every effort to maximize

More information

Server Consolidation for SAP ERP on IBM ex5 enterprise systems with Intel Xeon Processors:

Server Consolidation for SAP ERP on IBM ex5 enterprise systems with Intel Xeon Processors: Server Consolidation for SAP ERP on IBM ex5 enterprise systems with Intel Xeon Processors: Lowering Total Cost of Ownership An Alinean White Paper Published by: Alinean, Inc. 201 S. Orange Ave Suite 1210

More information

White Paper. Co-location. Co-location. Co-location. Considerations That Impact Your Business

White Paper. Co-location. Co-location. Co-location. Considerations That Impact Your Business White Paper Co-location. Co-location. Co-location. Considerations That Impact Your Business Your Business is Dynamic - Is your IT Infrastructure Keeping Pace? Whether you operate a small or medium-sized

More information

Simplifying the Management of Tier 1 ERP Systems for Mid-Sized Companies 2009 WHITE PAPER

Simplifying the Management of Tier 1 ERP Systems for Mid-Sized Companies 2009 WHITE PAPER Simplifying the Management of Tier 1 ERP Systems for Mid-Sized Companies 2009 WHITE PAPER Simplifying the Management of Tier 1 ERP Systems for Mid-Sized Companies By Mike Stevens When CEOs, CFOs and CIOs

More information

EMC PERSPECTIVE Managing Energy Efficiency in the Data Center

EMC PERSPECTIVE Managing Energy Efficiency in the Data Center EMC PERSPECTIVE Managing Energy Efficiency in the Data Center A tactical approach can deliver immediate problem resolution plus long-term savings and efficiencies Managing Energy Efficiency in the Data

More information

Cisco Unified Data Center: The Foundation for Private Cloud Infrastructure

Cisco Unified Data Center: The Foundation for Private Cloud Infrastructure White Paper Cisco Unified Data Center: The Foundation for Private Cloud Infrastructure Providing Agile and Efficient Service Delivery for Sustainable Business Advantage What You Will Learn Enterprises

More information

CYRUSONE COMPANY OVERVIEW BUILT FOR TOMORROW. READY TODAY.

CYRUSONE COMPANY OVERVIEW BUILT FOR TOMORROW. READY TODAY. CYRUSONE COMPANY OVERVIEW BUILT FOR TOMORROW. READY TODAY. ABOUT CYRUSONE GLOBAL DATA CENTER FACILITIES. A Global Leader 24 high performance data centers worldwide Servicing 9 of top 20 Global Fortune

More information

Colocation, Hybrid Cloud & Infrastructure As A Service

Colocation, Hybrid Cloud & Infrastructure As A Service www.cloud-grid.net 305.438.7402 Colocation, Hybrid Cloud & Infrastructure As A Service IT managers today need to deal with an everincreasing set of business demands. High speed data networks have made

More information

The art of the possible.

The art of the possible. IBM Scalable Modular Data Center The art of the possible. Rapidly deploying cost-effective, energy-efficient data centers APC InfraStruXure Rapidly deploying cost-effective, energy-efficient data centers

More information

DCM 18.1 How to Prepare a Data Center Strategy

DCM 18.1 How to Prepare a Data Center Strategy DCM 18.1 How to Prepare a Data Center Strategy What you need to know to build a business case for data center sourcing Presented by: Steve Miano, Managing Principal, & Gary Davis, Principal/Director, Data

More information

Data Centre Outsourcing a Buyer s Guide

Data Centre Outsourcing a Buyer s Guide Data Centre Outsourcing a Buyer s Guide The inside guide to deciding whether to outsource your data centre facility and operations and how to select an appropriate partner. This Guide will help you Determine

More information

Enterprise Performance Management

Enterprise Performance Management 2 0 1 0 W H I T E P A P E R Enterprise Performance Management Key to Rapid Response for Today s Successful Midsize Companies Enterprise Performance Management Key to Rapid Response for Today s Successful

More information

IBM Global Services September 2008. Disaster recovery strategies for internal recovery

IBM Global Services September 2008. Disaster recovery strategies for internal recovery IBM Global Services September 2008 Disaster recovery strategies for internal recovery Page No.2 Contents 2 Introduction 3 The Y2K effect 4 Fall of distributed systems 4 New challenges 5 New suite of enablers

More information

How To Design A Data Center

How To Design A Data Center Approaches to Achieve Next-Generation Data Center Joe Li Business Head of Mission Critical Infrastructure Solutions What CIOs should know.. High way to Next-Generation Data Center Energy-Efficiency Scalability

More information

SCALABILITY & CAPACITY PLANNING: BUILD VS. BUY

SCALABILITY & CAPACITY PLANNING: BUILD VS. BUY SCALABILITY & CAPACITY PLANNING: BUILD VS. BUY Considerations when Investing in IT Infrastructure Milldam Public Affairs October 3, 2011 A white paper by Overview: This paper explores issues that arise

More information

Best Practices for Wire-free Environmental Monitoring in the Data Center

Best Practices for Wire-free Environmental Monitoring in the Data Center White Paper 11800 Ridge Parkway Broomfiled, CO 80021 1-800-638-2638 http://www.42u.com sales@42u.com Best Practices for Wire-free Environmental Monitoring in the Data Center Introduction Monitoring for

More information

Avoid Rolling the Dice: Solving the CIO s Data Center Dilemma with Colocation

Avoid Rolling the Dice: Solving the CIO s Data Center Dilemma with Colocation EXECUTIVE REPORT Avoid Rolling the Dice: Solving the CIO s Data Center Dilemma with Colocation Overview CIOs today face a litany of challenges and risks when it comes to meeting the goal of making the

More information

CIOs Rising in Performance Needs

CIOs Rising in Performance Needs EXECUTIVE REPORT 5 Colocation Most Significant Addresses Challenges Oil & Gas Companies Facing CIOs Rising in Performance 2013 Needs Built for Tomorrow. Ready today. 1649 W Frankford 1649 Frankford Rd,

More information

A Colocation Buyer s Guide:A What You Should Know Before Making a Colocation Decision

A Colocation Buyer s Guide:A What You Should Know Before Making a Colocation Decision A Colocation Buyer s Guide:A What You Should Know Before Making a Colocation Decision This ebook will help you: Learn the benefits of a colocation solution Decide if you are a good fit for colocation Find

More information

Juniper Networks QFabric: Scaling for the Modern Data Center

Juniper Networks QFabric: Scaling for the Modern Data Center Juniper Networks QFabric: Scaling for the Modern Data Center Executive Summary The modern data center has undergone a series of changes that have significantly impacted business operations. Applications

More information

HOW TO PREPARE A DATA CENTER STRATEGY. What you need to know to build a business case for Data Center sourcing

HOW TO PREPARE A DATA CENTER STRATEGY. What you need to know to build a business case for Data Center sourcing HOW TO PREPARE A DATA CENTER STRATEGY What you need to know to build a business case for Data Center sourcing Presented by: Gary Davis Principal PlanNet Consulting (714) 982-5886 Steve Miano Principal

More information

Can Your Data Center Infrastructure Handle the Heat of High Density? 5 Ways to Test Your Data Center Infrastructure before Installing Blades

Can Your Data Center Infrastructure Handle the Heat of High Density? 5 Ways to Test Your Data Center Infrastructure before Installing Blades Can Your Data Center Infrastructure Handle the Heat of High Density? 5 Ways to Test Your Data Center Infrastructure before Installing Blades Can Your Data Center Infrastructure Handle the Heat of High

More information

Enabling an agile Data Centre in a (Fr)agile market

Enabling an agile Data Centre in a (Fr)agile market Enabling an agile Data Centre in a (Fr)agile market Phil Dodsworth Director, Data Centre Solutions 2008 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without

More information

High Performance Computing (HPC) Solutions in High Density Data Centers

High Performance Computing (HPC) Solutions in High Density Data Centers EXECUTIVE REPORT High Performance Computing (HPC) Solutions in High Density Data Centers How s Houston West data center campus delivers the highest density solutions to customers Overview With the ever-increasing

More information

EXECUTIVE REPORT. Scalability & Capacity Planning: Build vs. Buy

EXECUTIVE REPORT. Scalability & Capacity Planning: Build vs. Buy EXECUTIVE REPORT Scalability & Capacity Overview This paper explores issues that arise when planning for growth of Information Technology infrastructure. The paper explains how colocation of data centers

More information

Data Center Build vs. Buy

Data Center Build vs. Buy 2014 Data Center Build vs. Buy More information available on our website: /page/whitepapers Data Center Build vs. Buy 2014 When considering colocating your data center, first you must understand your technical

More information

New Service Provider Economics with Network Optimization Services. Executive Summary. Key Takeaways

New Service Provider Economics with Network Optimization Services. Executive Summary. Key Takeaways New Service Provider Economics with Network Optimization Services Executive Summary Service providers want to optimize their networks to minimize total cost of ownership (TCO), contain operational risk

More information

W H I T E P A P E R B l a d e S e r v e r s f o r t h e M a sses: Cost Advantages in Midsize and Enterprise Markets

W H I T E P A P E R B l a d e S e r v e r s f o r t h e M a sses: Cost Advantages in Midsize and Enterprise Markets W H I T E P A P E R B l a d e S e r v e r s f o r t h e M a sses: Cost Advantages in Midsize and Enterprise Markets Sponsored by: HP John Humphreys January 2008 Executive Summary Global Headquarters: 5

More information

HOW TO PREPARE A DATA CENTER STRATEGY. What you need to know to build a business case for Data Center sourcing

HOW TO PREPARE A DATA CENTER STRATEGY. What you need to know to build a business case for Data Center sourcing HOW TO PREPARE A DATA CENTER STRATEGY What you need to know to build a business case for Data Center sourcing Presented by: Gary Davis Principal PlanNet Consulting (714) 982-5886 Steve Miano Principal

More information

Sovereign. The made to measure data centre

Sovereign. The made to measure data centre Sovereign D ATA C O N N E C T The made to measure data centre Prime Location Within touching distance of everything that s important. 2 Your Customer-Centric Data Centre For the vast majority of organisations

More information

Convergence of Complexity

Convergence of Complexity Convergence of Complexity Optimize Existing Data Center Space Measure And Allocate Energy Cost Plan for new data centers or additional capacity How to make your Data Center Last Longer, Gartner, December

More information

Colocation and Cloud Hosting Solutions. Build a strong and efficient physical infrastructure that delivers service reliability and profitability

Colocation and Cloud Hosting Solutions. Build a strong and efficient physical infrastructure that delivers service reliability and profitability Colocation and Cloud Hosting Solutions Build a strong and efficient physical infrastructure that delivers service reliability and profitability 2 Dependability and Deployment Speed that Improves Your Bottom

More information

For Sale Mission Critical Facility

For Sale Mission Critical Facility For Sale Mission Critical Facility South Bend, Indiana Fully Leased Investment Price: $2,400,000 Cap: 8.86% For more Information, Contact: (704) 651-2210 Doug@Five9sDigital.com For More Information, Contact:

More information

CLOUD ERP AND ACCOUNTING: SELECTION AND PLANNING GUIDE

CLOUD ERP AND ACCOUNTING: SELECTION AND PLANNING GUIDE CLOUD ERP AND ACCOUNTING: SELECTION AND PLANNING GUIDE Over the last three years, well over half of U.S. companies have elected to take advantage of one or more cloud-based solutions or services, but critical

More information

Optimizing ROI: The Business Case for Cloud-Based Unified Communications. CapEx

Optimizing ROI: The Business Case for Cloud-Based Unified Communications. CapEx A UBM TECH Business Case Builder MAY 2013 CapEx OpEx Risk Optimizing ROI: The Business Case for Cloud-Based Unified Communications With many initiatives competing for finite resources, decision makers

More information

Scalability & Capacity Planning: Build vs. Buy

Scalability & Capacity Planning: Build vs. Buy EXECUTIVE REPORT Scalability & Capacity Overview This paper explores issues that arise when planning for growth of Information Technology infrastructure. The paper explains how colocation of data centers

More information

IMPROVING DATA CENTER EFFICIENCY AND CAPACITY WITH AISLE CONTAINMENT

IMPROVING DATA CENTER EFFICIENCY AND CAPACITY WITH AISLE CONTAINMENT DATA CENTER RESOURCES WHITE PAPER IMPROVING DATA CENTER EFFICIENCY AND CAPACITY WITH AISLE CONTAINMENT BY: STEVE HAMBRUCH EXECUTIVE SUMMARY Data centers have experienced explosive growth in the last decade.

More information

Data Center Checklist

Data Center Checklist Data Center Checklist The use of colocation and services has continued to increase, rapidly becoming the solution of choice for organizations requiring an efficient, secure, cost-effective way to manage

More information

Determining Total Cost of Ownership for Data Center and Network Room Infrastructure

Determining Total Cost of Ownership for Data Center and Network Room Infrastructure Determining Total Cost of Ownership for Data Center and Network Room Infrastructure White Paper #6 Revision 3 Executive Summary An improved method for measuring Total Cost of Ownership of data center and

More information

Responding to the Data Center Crisis: The Build or Buy Dilemma

Responding to the Data Center Crisis: The Build or Buy Dilemma Responding to the Data Center Crisis: The Build or Buy Dilemma Executive Summary Nearly half of US businesses will run out of capacity in their data centers within the next two years, and so they must

More information

Dealing with Thermal Issues in Data Center Universal Aisle Containment

Dealing with Thermal Issues in Data Center Universal Aisle Containment Dealing with Thermal Issues in Data Center Universal Aisle Containment Daniele Tordin BICSI RCDD Technical System Engineer - Panduit Europe Daniele.Tordin@Panduit.com AGENDA Business Drivers Challenges

More information

Cisco Data Center Facilities Assessment Service

Cisco Data Center Facilities Assessment Service Cisco Data Center Facilities Assessment Service Increase the availability, capacity, and life of your data center facility. Service Overview Data centers must respond to changing business needs, environmental

More information

Data Center Rack Level Cooling Utilizing Water-Cooled, Passive Rear Door Heat Exchangers (RDHx) as a Cost Effective Alternative to CRAH Air Cooling

Data Center Rack Level Cooling Utilizing Water-Cooled, Passive Rear Door Heat Exchangers (RDHx) as a Cost Effective Alternative to CRAH Air Cooling Data Center Rack Level Cooling Utilizing Water-Cooled, Passive Rear Door Heat Exchangers (RDHx) as a Cost Effective Alternative to CRAH Air Cooling Joshua Grimshaw Director of Engineering, Nova Corporation

More information

High-performance. High-density. Highly committed. Built for tomorrow. Ready today.

High-performance. High-density. Highly committed. Built for tomorrow. Ready today. High-performance. High-density. Highly committed. Built for tomorrow. Ready today. Built for tomorrow. Ready today. In today s environment, the focus should be on investing time in your company and not

More information

Business Case for S/Gi Network Simplification

Business Case for S/Gi Network Simplification Business Case for S/Gi Network Simplification Executive Summary Mobile broadband traffic growth is driving large cost increases but revenue is failing to keep pace. Service providers, consequently, are

More information

Realizing the Value Proposition of Cloud Computing

Realizing the Value Proposition of Cloud Computing Realizing the Value Proposition of Cloud Computing CIO s Enterprise IT Strategy for Cloud Jitendra Pal Thethi Abstract Cloud Computing is a model for provisioning and consuming IT capabilities on a need

More information

Predictive Data Center Infrastructure Management (DCIM)

Predictive Data Center Infrastructure Management (DCIM) Predictive Data Center Infrastructure Management (DCIM) A toolset to maximize the return on capital expenditure in the physical data center Sherman Ikemoto, Matt Warner, Akhil Docca, Hassan Moezzi 11/21/2012

More information

WHITE PAPER. Data Center Fabrics. Why the Right Choice is so Important to Your Business

WHITE PAPER. Data Center Fabrics. Why the Right Choice is so Important to Your Business WHITE PAPER Data Center Fabrics Why the Right Choice is so Important to Your Business Introduction Data center fabrics are emerging as the preferred architecture for next-generation virtualized data centers,

More information

CASE STUDY. CyrusOne Helps City of Houston to Go Green and Reduce Energy Consumption through Data Center Consolidation

CASE STUDY. CyrusOne Helps City of Houston to Go Green and Reduce Energy Consumption through Data Center Consolidation CASE STUDY CyrusOne Helps City of Houston to Go Green and Reduce Energy Consumption through Data Center Consolidation To handle the administrative needs of America s fourth-largest city, the City of Houston

More information

Best Practices for Wire-free Environmental Monitoring in the Data Center

Best Practices for Wire-free Environmental Monitoring in the Data Center White Paper Best Practices for Wire-free Environmental Monitoring in the Data Center April 2012 Introduction Monitoring for environmental threats in the data center is not a new concept. Since the beginning

More information

EXECUTIVE REPORT. Can Your Data Center Infrastructure Handle the Heat of High Density?

EXECUTIVE REPORT. Can Your Data Center Infrastructure Handle the Heat of High Density? EXECUTIVE REPORT Can Your Data Center Infrastructure Handle the Heat of High Density? If you re losing sleep wondering how your company can migrate to high density computing architectures, you re not alone.

More information

WHITE PAPER CONTINUITY, CAPITAL AND SECURITY: THE IMPACT OF HIGH DENSITY DATA CENTERS

WHITE PAPER CONTINUITY, CAPITAL AND SECURITY: THE IMPACT OF HIGH DENSITY DATA CENTERS WHITE PAPER CONTINUITY, CAPITAL AND SECURITY: THE IMPACT OF HIGH DENSITY DATA CENTERS Executive Summary Big data is changing the world, particularly for enterprises, service providers and government entities

More information

KNOW BEFORE YOU GO: THE PATH TO THE CLOUD

KNOW BEFORE YOU GO: THE PATH TO THE CLOUD tech line / mar 2015 KNOW BEFORE YOU GO: THE PATH TO THE CLOUD Deciding between cloud and premise-based contact center solutions? Start the evaluation process with full knowledge of the key differentiators.

More information

Data Center Facility Basics

Data Center Facility Basics Data Center Facility Basics Ofer Lior, Spring 2015 Challenges in Modern Data Centers Management, Spring 2015 1 Information provided in these slides is for educational purposes only Challenges in Modern

More information

Reducing Total Cost of Ownership through Outsourced Hosted Virtual Desktops

Reducing Total Cost of Ownership through Outsourced Hosted Virtual Desktops Reducing Total Cost of Ownership through Outsourced Hosted Virtual Desktops July 2009 Table of Contents Introduction... 3 What are Outsourced Hosted Virtual Desktops?... 3 How Outsourced Hosted Virtual

More information

High-performance. High-density. Highly committed.

High-performance. High-density. Highly committed. High-performance. High-density. Highly committed. 4211 Southwest Freeway, Houston, TX 77027 + Built for tomorrow. Ready today. In today s environment, the focus should be on investing time in your company

More information

Are Your Capacity Management Processes Fit For The Cloud Era?

Are Your Capacity Management Processes Fit For The Cloud Era? Are Your Capacity Management Processes Fit For The Cloud Era? An Intelligent Roadmap for Capacity Planning BACKGROUND In any utility environment (electricity, gas, water, mobile telecoms ) ensuring there

More information

colocation vs. managed servers - the difference

colocation vs. managed servers - the difference colocation vs. managed servers - the difference Do you have the highest levels of security, redundancy, reliability, infrastructure and technical expertise necessary to operate your Internet operations?

More information

Radware ADC-VX Solution. The Agility of Virtual; The Predictability of Physical

Radware ADC-VX Solution. The Agility of Virtual; The Predictability of Physical Radware ADC-VX Solution The Agility of Virtual; The Predictability of Physical Table of Contents General... 3 Virtualization and consolidation trends in the data centers... 3 How virtualization and consolidation

More information

SmartDesign Intelligent, Integrated Infrastructure For The Data Center. Solutions For Business-Critical Continuity

SmartDesign Intelligent, Integrated Infrastructure For The Data Center. Solutions For Business-Critical Continuity SmartDesign Intelligent, Integrated Infrastructure For The Data Center Solutions For Business-Critical Continuity Prepare Your Data Center For What s Next Efficiency. Availability. Capacity. Control. One

More information

DRIVING BUSINESS VALUE WITH VBLOCK INFRASTRUCTURE PLATFORMS

DRIVING BUSINESS VALUE WITH VBLOCK INFRASTRUCTURE PLATFORMS DRIVING BUSINESS VALUE WITH VBLOCK INFRASTRUCTURE PLATFORMS Private clouds, built on pervasive virtual infrastructures, are increasingly appealing to organizations looking to deliver IT resources to end

More information

Common mistakes in datacentre planning

Common mistakes in datacentre planning Common mistakes in datacentre planning White Paper Last edited: March 2013 Document Control Document Information Title Author Common mistakes in datacentre planning Nick Ewing This document is based upon

More information

Business Case for BTI Intelligent Cloud Connect for Content, Co-lo and Network Providers

Business Case for BTI Intelligent Cloud Connect for Content, Co-lo and Network Providers Business Case for BTI Intelligent Cloud Connect for Content, Co-lo and Network Providers s Executive Summary Cloud computing, video streaming, and social media are contributing to a dramatic rise in metro

More information

Global Headquarters: 5 Speen Street Framingham, MA 01701 USA P.508.872.8200 F.508.935.4015 www.idc.com

Global Headquarters: 5 Speen Street Framingham, MA 01701 USA P.508.872.8200 F.508.935.4015 www.idc.com WHITE PAPER Solutions for the Datacenter's Thermal Challenges Sponsored by: IBM and Intel Jed Scaramella January 2007 Matthew Eastwood IDC OPINION Global Headquarters: 5 Speen Street Framingham, MA 01701

More information

Power Distribution Units (PDUs): Power monitoring and environmental monitoring to improve uptime and capacity planning

Power Distribution Units (PDUs): Power monitoring and environmental monitoring to improve uptime and capacity planning Power Distribution Units (PDUs): Power monitoring and environmental monitoring to improve uptime and capacity planning 2009, Raritan Inc. Overview Corporate America is more dependent than ever on computing

More information

6 Best Practices for Reducing Your Data Storage Footprint

6 Best Practices for Reducing Your Data Storage Footprint E-Guide 6 Best Practices for Reducing Your Data Storage Footprint Reducing your data footprint will help you maximize the usage of your IT infrastructure but footprint reduction goes well beyond just managing

More information

A Roadmap to Total Cost of Ownership

A Roadmap to Total Cost of Ownership A Roadmap to Total Cost of Ownership Building the Cost Basis for the Move to Cloud A white paper by Penny Collen The Roadmap to Total Cost of Ownership Getting a clear and complete financial picture of

More information

IBM Portable Modular Data Center Overview for Critical Facilities Round Table

IBM Portable Modular Data Center Overview for Critical Facilities Round Table Brian Canney Global Services Executive, IBM GTS Site and Facilities Services April 2011 IBM Portable Modular Data Center Overview for Critical Facilities Round Table 2009 IBM Corporation Key messages Containers

More information

LIFECYCLE COSTING FOR DATA CENTERS: DETERMINING THE TRUE COSTS OF DATA CENTER COOLING

LIFECYCLE COSTING FOR DATA CENTERS: DETERMINING THE TRUE COSTS OF DATA CENTER COOLING LIFECYCLE COSTING FOR DATA CENTERS: DETERMINING THE TRUE COSTS OF DATA CENTER COOLING Summary Experts estimate that the average design life of a data center is 10-15 years. During that time, equipment

More information

Data Center Knowledge, Vision Control

Data Center Knowledge, Vision Control Data Center Knowledge, Vision Control Objective Overview of the progressive trends in Data Centers, driven by Intelligent Infrastructure Solutions Data Center Layout Secured Storage Back up Core Backbone

More information

Managing Data Center Growth Explore Your Options

Managing Data Center Growth Explore Your Options Managing Growth Explore Your Options Managing Growth: Managing The increasing demand on data centers has forced many IT managers to look for new ways to manage data center growth, either by consolidating,

More information

CASE STUDY. CyrusOne Helps City of Houston to Go Green and Reduce Energy Consumption through Data Center Consolidation

CASE STUDY. CyrusOne Helps City of Houston to Go Green and Reduce Energy Consumption through Data Center Consolidation CASE STUDY CyrusOne Helps City of Houston to Go Green and Reduce Energy Consumption through Data Center Consolidation Abstract To handle the administrative needs of America s fourth-largest city, the City

More information

Cloud Provider Solutions

Cloud Provider Solutions Cloud Provider Solutions Accelerate operations including development, testing and quality assurance, production hosting, and security and compliance with scalable, reliable, and compliant cloud-based data

More information

Power and Cooling for Ultra-High Density Racks and Blade Servers

Power and Cooling for Ultra-High Density Racks and Blade Servers Power and Cooling for Ultra-High Density Racks and Blade Servers White Paper #46 Introduction The Problem Average rack in a typical data center is under 2 kw Dense deployment of blade servers (10-20 kw

More information

C24 - Inside the Data Center Andrew J. Luca

C24 - Inside the Data Center Andrew J. Luca C24 - Inside the Data Center Andrew J. Luca Inside the Data Center What an auditor needs to know Course Objectives Understand the looks and feel of a data center Know what to look for and what questions

More information

GREEN HOUSE DATA. Managing IT in Uncertain Economic Times: Is a An External Private Cloud the Way to Go? Built right. Just for you.

GREEN HOUSE DATA. Managing IT in Uncertain Economic Times: Is a An External Private Cloud the Way to Go? Built right. Just for you. Built right. Just for you. Managing IT in Uncertain Economic Times: Is a An External Private Cloud the Way to Go? Presented by: Shawn Mills, Founder and CEO of Green House Data Green House Data 340 Progress

More information

Next Generation Data Centre Transformation Bob Plumridge EMEA Chief Technology Officer

Next Generation Data Centre Transformation Bob Plumridge EMEA Chief Technology Officer Next Generation Data Centre Transformation Bob Plumridge EMEA Chief Technology Officer 2010 Hitachi Data Systems. All rights reserved. DATA AND INFORMATION GROW AT EXTRAORDINARY RATES The Regulations In

More information

Agility Logistics Datacenter Trends in Enterprises. Ben N. Hasnai VP IT Infrastructure and Operations

Agility Logistics Datacenter Trends in Enterprises. Ben N. Hasnai VP IT Infrastructure and Operations Agility Logistics Datacenter Trends in Enterprises Ben N. Hasnai VP IT Infrastructure and Operations Agility Business Globally Head office Revenue Market position Lines of business Operations Employees

More information

Distributed versus centralized power backup strategies

Distributed versus centralized power backup strategies Distributed versus centralized power backup strategies Choosing the right UPS deployment architecture for your data center By Ed Spears Product Manager, Eaton Power Quality Solutions Operation Eaton Corporation

More information

SIX IMPORTANT CONSIDERATIONS WHEN CHOOSING A COLOCATION PROVIDER

SIX IMPORTANT CONSIDERATIONS WHEN CHOOSING A COLOCATION PROVIDER WHITE PAPER SIX IMPORTANT CONSIDERATIONS WHEN CHOOSING A COLOCATION PROVIDER David Meredith SVP and Global GM, CenturyLink Technology Solutions SIX IMPORTANT CONSIDERATIONS WHEN CHOOSING A COLOCATION PROVIDER

More information

The Benefits of Virtualizing Citrix XenApp with Citrix XenServer

The Benefits of Virtualizing Citrix XenApp with Citrix XenServer White Paper The Benefits of Virtualizing Citrix XenApp with Citrix XenServer This white paper will discuss how customers can achieve faster deployment, higher reliability, easier management, and reduced

More information

APC APPLICATION NOTE #92

APC APPLICATION NOTE #92 #92 Best Practices for Designing Data Centers with the InfraStruXure InRow RC By John Niemann Abstract The InfraStruXure InRow RC is designed to provide cooling at the row and rack level of a data center

More information

Flash storage addresses emerging storage dynamics and sparks a shift to primary storage alternatives. December 2015 TBR

Flash storage addresses emerging storage dynamics and sparks a shift to primary storage alternatives. December 2015 TBR Flash storage addresses emerging storage dynamics and sparks a shift to primary storage alternatives December 2015 TBR T EC H N O LO G Y B U S I N ES S R ES EAR C H, I N C. Contents Introduction... 3 Violin

More information

Data Center Technology: Physical Infrastructure

Data Center Technology: Physical Infrastructure Data Center Technology: Physical Infrastructure IT Trends Affecting New Technologies and Energy Efficiency Imperatives in the Data Center Hisham Elzahhar Regional Enterprise & System Manager, Schneider

More information

The business value of improved backup and recovery

The business value of improved backup and recovery IBM Software Thought Leadership White Paper January 2013 The business value of improved backup and recovery The IBM Butterfly Analysis Engine uses empirical data to support better business results 2 The

More information

Choosing Between Premises-Based and Hosted Communications Solutions

Choosing Between Premises-Based and Hosted Communications Solutions WHITEPAPER Choosing Between Premises-Based and Hosted Communications Solutions An Objective Look at the Pros and Cons of Each E. Brent Kelly Sr. Analyst & Partner Sponsored by: Copyright 2012 Wainhouse

More information

White Paper Cisco Unified Communications: New Deployment Models for Communications and Collaboration

White Paper Cisco Unified Communications: New Deployment Models for Communications and Collaboration White Paper Cisco Unified Communications: New Deployment Models for Communications and Collaboration What You Will Learn According to a new survey by Forrester Research, 7 out of 10 enterprises are investing

More information

Business Case for Data Center Network Consolidation

Business Case for Data Center Network Consolidation Business Case for Data Center Network Consolidation Executive Summary Innovations in cloud, big data, and mobility as well as users expectations for anywhere, anytime, and any device access are defining

More information

Future IT Capacity Planning Depends On Flexibility

Future IT Capacity Planning Depends On Flexibility A Custom Technology Adoption Profile Commissioned By HP July 2014 Future IT Capacity Planning Depends On Flexibility Introduction Businesses today depend more than ever on technology systems for both internal

More information

Information Technology Outsourcing. Infrastructure and Application Outsourcing: The Reasons, Risks and Rewards. Secure-24 is a. leading provider of

Information Technology Outsourcing. Infrastructure and Application Outsourcing: The Reasons, Risks and Rewards. Secure-24 is a. leading provider of Information Technology Outsourcing IT Innovation. Business Value. Infrastructure and Application Outsourcing: The Reasons, Risks and Rewards As new business models are embedding IT more deeply into the

More information

Say Yes to Virtualization: Server virtualization helps businesses achieve considerable reductions in Total Cost of Ownership (TCO).

Say Yes to Virtualization: Server virtualization helps businesses achieve considerable reductions in Total Cost of Ownership (TCO). BUSINESS SOLUTIONS Say Yes to Virtualization: Server virtualization helps businesses achieve considerable reductions in Total Cost of Ownership (TCO). Virtualizing servers is yielding dramatic cost savings

More information

Increasing Energ y Efficiency In Data Centers

Increasing Energ y Efficiency In Data Centers The following article was published in ASHRAE Journal, December 2007. Copyright 2007 American Society of Heating, Refrigerating and Air- Conditioning Engineers, Inc. It is presented for educational purposes

More information

hosting Hosting Simplified HOSTING SOLUTIONS RELIABLE FLEXIBLE SCALABLE FOR DEMONSTRABLE BUSINESS IMPACT PROFITABLE

hosting Hosting Simplified HOSTING SOLUTIONS RELIABLE FLEXIBLE SCALABLE FOR DEMONSTRABLE BUSINESS IMPACT PROFITABLE go hosting Hosting Simplified HOSTING SOLUTIONS FOR DEMONSTRABLE BUSINESS IMPACT RELIABLE FLEXIBLE SCALABLE PROFITABLE WHO WE ARE Go4Hosting is a leading provider of managed hosting, cloud hosting, website

More information

Data Center Equipment Power Trends

Data Center Equipment Power Trends Green field data center design 11 Jan 2010 by Shlomo Novotny Shlomo Novotny, Vice President and Chief Technology Officer, Vette Corp. explores water cooling for maximum efficiency - Part 1 Overview Data

More information

Calculating Total Power Requirements for Data Centers

Calculating Total Power Requirements for Data Centers Calculating Total Power Requirements for Data Centers By Richard Sawyer White Paper #3 Executive Summary Part of data center planning and design is to align the power and cooling requirements of the IT

More information

Leveraging Radware s ADC-VX to Reduce Data Center TCO An ROI Paper on Radware s Industry-First ADC Hypervisor

Leveraging Radware s ADC-VX to Reduce Data Center TCO An ROI Paper on Radware s Industry-First ADC Hypervisor Leveraging Radware s ADC-VX to Reduce Data Center TCO An ROI Paper on Radware s Industry-First ADC Hypervisor Table of Contents Executive Summary... 3 Virtual Data Center Trends... 3 Reducing Data Center

More information

Top 5 Trends in Data Center Energy Efficiency

Top 5 Trends in Data Center Energy Efficiency Top 5 Trends in Data Center Energy Efficiency By Todd Boucher, Principal Leading Edge Design Group 603.632.4507 @ledesigngroup Copyright 2012 Leading Edge Design Group www.ledesigngroup.com 1 In 2007,

More information

Upper Perkiomen School District

Upper Perkiomen School District Upper Perkiomen School District Network Infrastructure Review Executive Summary Prepared by 1001 James Drive, Suite A15 Leesport, PA 19533 610 916 9400 www.jlrconsulting.com Date: March 10, 2015 Report

More information

Essential NCPI Management Requirements for Next Generation Data Centers

Essential NCPI Management Requirements for Next Generation Data Centers Essential NCPI Requirements for Next Generation Data Centers By Ted Ives White Paper #14 1 Executive Summary The management of physical infrastructure in data centers can no longer be considered independently

More information