OUR COMPANY Página 1 de 20
|
|
|
- Sydney Parker
- 10 years ago
- Views:
Transcription
1 OUR COMPANY Página 1 de 20 BENTOS, was incorporated in 1994 to satisfy the growing needs of companies in the field of marine services. These services focus on the following areas: design support and operation of maritime works and submarine cables (communications and power cables). The company is backed by the experience of its professionals who have performed for years as consultants for international companies or have performed research at universities. This group of professionals has interacted closely in recent years achieving consolidation in the joint execution of various projects in a work style characterized by their capabilities and adequate operating costs. In addition, our firm has maintained a sound policy of training, which has enabled us to have an appropriate infrastructure and economic resources to rely on to undertake work of different size and scope with assured solvency. WORK AREAS Our company is prepared to undertake all tasks involved in a marine study: i.e., design of the work, logistics and field operations, data analysis, relations with the authorities and preparation of reports. The work areas of BENTOS are as follow: Coastal Oceanography: Studies of currents, tides, wave climate, meteorology, dispersion, sediment transport and numerical modeling. Hydrography: Single beam and multibeam bathymetry, surveying and geodesy. Geophysics: Side scan sonar, sub bottom profiler (pinger and chirp), boomer, sparker magnetometry. Submarine Cables: DTS, and Survey. Definition of routes, logistics, submarine cable laying and repair. Submarine image: ROV, video, photography. Technical Diving: Diving for inspections of constructed works and submerged structures, submarine sampling, in situ submarine tests, installation and review of submarine instruments. Environment: Marine environmental studies.
2 OUR COMPANY Página 2 de 20 In addition, BENTOS is the exclusive representative of the following firms in Chile: CHESAPEAKE TECHNOLOGIES INC.: geophysics data processing software. FALMOUTH SCIENTIFIC INC: Oceanographic equipment. HYDROID: AUVs. HYPACK: Hydrographic software. HYPERLITE: transportable hyperbaric chambers. IMAGENEX TECHNOLOGY CORP.: Sonars. KC-DENMARK: sampling equipment. MOORING SYSTEMS INC.: Sediment sampling equipment and instrument anchoring. RBR: submergible sensors and data loggers. R2SONIC: multibeam sonars. SEQUOIA SCIENTIFIC: sensors of solids in suspension. TELEDYNE BLUE VIEW: Imaging sonars. TELEDYNE RD INSTRUMENTS: acoustic Doppler profilers and CTDs. TRITEX: submarine ultrasound thickness meter. WOODS HOLE GROUP: Integration of sensors, laboratories and other services.
3 OUR COMPANY Página 3 de 20 COMPANY PERFORMANCE RECORD BENTOS has performed the following studies: STUDIES FOR COASTAL ENGINEERING Mid tension underwater power cable provision and installation. Canal Huar, X Region. SAESA Multibeam Bathymetry Survey, Side Scan Sonar, Sub Bottom Profiler and coastal topography. Punta Guatral and Isla Huar Island, Tenth Administrative Region. Consorcio SOB for SAESA, Offshore Multibeam Bathymetry Survey, 1250 km m. Northern Chile. RESERVED CUSTOMER Outside Plant. Fiber Optic and Power Cable Installation. Robinson Crusoe Island. L3 MARIPRO Official Multibeam Bathymetry Survey and Marine Geophysics Survey (Sub Bottom Profiler, Sid Scan Sonar, Magnetometer and Sedimentology Sampling). OCTOPUS LNG. Bahía de Concepción, VIII Región. GEOVENOR EXPLORA Multibeam Bathymetry Survey. LAKE VILLARRICA, IX REGIÓN. UNIVERSIDAD GENT (BÉLGICA), UNIVERSIDAD ZURICH (SUIZA) UNIVERSIDAD AUSTRAL CHILE Official Siglebeam Bathymetry and Side Scan Sonar Survey. Bahía Chapaco, Third Administrative Region. COMPAÑÍA MINERA DEL PACÍFICO S.A. (CAP-MINERÍA) Official Beach Line. Bahía Chapaco, Third Administrative Region. COMPAÑÍA MINERA DEL PACÍFICO S.A. (CAP-MINERÍA) Multibeam Bathymetry Survey for a submarine cable route, Robinson Crusoe Island, Fifth Administrative Region, Chile. L-3 MARIPRO Official Tide Study. Desalination Plant and Tocopilla Marine Terminal Project, Second Administrative Region, Chile. FREEPORT-McMORAN COPPER & GOLD INC Measurements of Directional Waves, Currents and Sea Level. Pampa Pongo, Province of Nazca, Peru. PRDW ALDUNATE VÁSQUEZ Installation of HA03 and IS14 Monitoring Stations, Bahía Cumberland, Robinson Crusoe Island, Fifth Administrative Region. PREPARATORY COMMISSION FOR THE COMPREHENSIVE NUCLEAR TEST-BAN-TREATY ORGANIZATION (CTBTO)
4 OUR COMPANY Página 4 de 20 Multibeam Bathymetry Survey and Current Measurements in Canal de Chacao, Tenth Administrative Region. PONTIFICAL CATHOLIC UNIVERSITY OF CHILE Oceanographic Study with approval of the Hydrographic and Oceanographic Service of the Chilean Navy (SHOA). Bahía Chapaco, Third Administrative Region. COMPAÑÍA MINERA DEL PACÍFICO S.A. (CAP-MINERÍA) Multibeam Bathymetric and Marine Sub Bottom Profiler Survey. Bahía Chapaco, Third Administrative Region. COMPAÑÍA MINERA DEL PACÍFICO S.A. (CAP-MINERÍA) Marine Geophysical Exploration. Mejillones, Second Administrative Region. Gas Atacama Project. GASATACANA CHILE S.A Marine Geophysical Exploration. First Administrative Region. Quebrada Blanca Project Phase 2. COMPAÑÍA MINERA TECK QUEBRADA BLANCA S.A Environmental Impact Declaration of Dredging for Port Deepening and Baseline Study for the Dredging Extraction and Dredging Material Disposal Area. Iquique, First Administrative Region, Chile. IQUIQUE TERMINAL INTERNACIONAL S.A Determination of the Official Beach Line and Study of Tides at Punta Guatral and Bahía Yecho, for Aysén-Central Chile Interconnected Grid System (SIC) Transmission Study. Tenth and Eleventh Administrative Regions, Chile. CENTRALES HIDROELÉCTRICAS DE AYSÉN S.A Multibeam Bathymetry Survey and Measurement of Directional Waves. Marine Studies, Bahía Islay Marine Terminal, Arequipa, Peru. TERMINAL INTERNACIONAL DEL SUR S.A Shallow Seismic Survey, Liquid Bulk Terminal Project, Electroandina, Second Administrative Region, Chile. EMPRESA CONSTRUCTORA BELFI Official Current Study, Waves and Tides. Deep Undersea Discharge Pipe Project, Huasco, Third Administrative Region, Chile. COMPAÑÍA MINERA DE PACÍFICO S.A., Measurement of Currents, Antofagasta, Second Administrative Region, Chile. ANTOFAGASTA TERMINAL INTERNACIONAL Multibeam Bathymetric and Marine Sub Bottom Profiler Survey. Bahía Cumberland, Robinson Crusoe Island, Fifth Administrative Region, Chile. COMPREHENSIVE NUCLEAR TEST - BAN TREATY ORGANIZATION (CTBTO) Multibeam Bathymetric Survey, Side Scan Sonar and Marine Subsoil Profiler Survey. Directional Wave and Current Measurement. Sedimentology Sampling. De Rocha District, Uruguay. MINERA ARATIRÍ S.A. - AUSENCO MANAGEMENT Complementary Services for the Second Stage of Dredging of Front B of the Port of Arica. ICSARA 2. TERMINAL PUERTO DE ARICA S.A
5 OUR COMPANY Página 5 de 20 Exploratory and Side Scan Sonar Bathymetry, Dock Dredging Project, ASMAR (T), Talcahuano, Eighth Administrative Region, Chile. PRDW ALDUNATE VÁSQUEZ SERVICIOS LTDA Official Bathymetry Study, Current Study, Tide and Study of Seabed Quality, Caldera, Third Administrative Region. COMPAÑÍA CONTRACTUAL MINERA CANDELARIA Beach Line, Caldera, Third Administrative Region. COMPAÑÍA CONTRACTUAL MINERA CANDELARIA Current Study with Approval of SHOA at the port of San Antonio (Fifth Administrative Region, Chile). EMPRESA PORTUARIA SAN ANTONIO S.A Monobeam Bathymetric Survey at the Port of San Antonio (Fifth Administrative Region, Chile). EMPRESA PORTUARIA SAN ANTONIO S.A Study of the Wave Climate at Bahía Ancón, Peru. TRAMARSA S.A Hydrographic, Geophysical, Coastal Topography and Soil Mechanics Studies for Submarine Power Cables; Alignments in the Chilean Tenth and Eleventh Administrative Regions. CENTRALES HIDROELÉCTRICAS DE AYSÉN S.A Marine Geophysical Studies, Monobeam Bathymetry, Side Scan Sonar, Directional Wave Measurements; Puerto Eten, Chiclayo, Peru. LUMINA COPPER Study of the Technical Feasibility of Implementing a Submarine Optical Fiber Cable Alignment between Puerto Chacabuco and Puerto Natales, Eleventh Administrative Region Chile. SUBSECRETARIAT OF TELECOMMUNICATIONS Hydrographic, Geophysical, Beach Line and Coastal Topography Studies. El Morro Desalination Plant Project, Third Administrative Region. HALCROW GROUP LTD. CHILE, AGENCIA EN CHILE Study Water Quality and Observations of Seals in Dredging Operations and Observations of Seals during Dredging Operations, Fifteenth Administrative Region. TERMINAL PUERTO DE ARICA S.A Bathymetric Support for Work of Dredging and Dredging Takeoffs, Fifteenth Administrative Region. TERMINAL PUERTO DE ARICA S.A Monitoring of Sediment in the Dredging Material Disposal Area (Environmental Oversight Plan), Fifteenth Administrative Region. TERMINAL PUERTO ARICA S.A Marine Seismic Survey in Bahía Talcahuano, Eighth Administrative Region. GEOEXPLORACIONES S.A
6 OUR COMPANY Página 6 de 20 Multibeam bathymetric survey for a submarine cable route, Juan Fernández, Fifth Administrative Region. L3 COMMUNICATIONS MARIPRO INC Study of Wave climate, Bahía Ancón, Peru. TRAMARSA S.A Oceanography, Hydrography, Marine Geophysics and Beach Line Studies with Approval of SHOA, Study and Design for the Improvement and Maritime Connectivity of the Puerto Montt Chiloé Palena Network. Caleta La Arena, Tenth Administrative Region. PRDW AV PORT WORKS DEPARTMENT (DOP) Oceanography, Hydrography, Marine Geophysics and Beach Line Studies with Approval of SHOA, Study and Design for the Improvement and Maritime Connectivity of the Puerto Montt Chiloé Palena Network. Caleta Puelche, Tenth Administrative Region. PRDW AV - PORT WORKS DEPARTMENT (DOP) Oceanography, Hydrography, Marine Geophysics and Beach Line Studies with Approval of SHOA. Puerto Yungay. CENTRALES HIDROELÉCTRICAS DE AYSÉN S.A Oceanography, Hydrography, Marine Geophysics and Beach Line Studies with Approval of SHOA, Puerto Río Bravo. CENTRALES HIDROELÉCTRICAS DE AYSÉN S.A Study of the Wave climate. Ventanilla Project, El Callao, Peru. SANDWELL PERÚ Study of the Wave climate and Geophysical Exploration (Side Scan Sonar, Seismic and Bathymetry Studies). El Galeno Project, Pacasmayo, Peru. MTB PROFESSIONALS Bathymetry and Geophysics Study, URUCU-MANAUS Gas Pipeline, Amazonas, Brazil. PLANAL SERVICOS DE ENGENHARIA Consultancy for the Submarine Alignment Study Conceptual Definitions for the Aysén SIC HVDC Power Transmission System. CENTRALES HIDROELÉCTRICAS DE AYSÉN S.A Cau Cau River Tide and Current Measurements, Valdivia. CONSORCIO CYGSA DDQ LTDA Bathymetric support Services for the Environmental Oversight Plan for Port Dredging, Arica. TERMINAL PUERTO DE ARICA S.A Marine Baseline Study, Caleta Coloso Mining Load-out Terminal, Second Administrative Region. MWH AMERICAS INC. CHILE LTDA Oceanography and Water Quality Studies with Approval of SHOA, Puerto Yungay. Eleventh Administrative Region. CENTRALES HIDROELÉCTRICAS DE AYSÉN S.A
7 OUR COMPANY Página 7 de 20 Oceanography and Water Quality Studies with Approval of SHOA, Puerto Río Bravo, Eleventh Administrative Region. CENTRALES HIDROELÉCTRICAS DE AYSÉN S.A Geophysical Exploration, Melchorita LNG Project, Peru. JAN DE NUL Wave Study, Punta Rincón, Penonomé, Panama. SANDWELL ENGINEERING Wave Study, Punta Cachos, Third Administrative Region, Chile. SANDWELL ENGINEERING Geophysical Exploration, Punta Vegueta Area, Peru. TRAMARSA S.A., Tidal Current Forecasting. Tenth Administrative Region, Chile. NUTRECO CHILE S.A Geophysical Exploration, Bathymetry and Oceanographic Study. Riesco Island, Twelfth Administrative Region, Chile. GOLDER ASSOCIATES SERVICES S.A Location of Submarine Pipelines by means of Marine Subsoil Profiler. Bahía de San Vicente, Eighth Administrative Region, Chile. CADE IDEPE INGENIERÍA Y DESARROLLO DE PROYECTOS LTDA Installation of 120 km of submarine optical fiber cable, Austral Cable Project, Chiloé, Tenth Administrative Region, Chile. NORDDEUTSCHE SEEKABELWERKE GMBH & CO. KG. SUBMARINE CABLE SYSTEMS Geophysical Exploration, Bahía Ancón, Peru. TRAMARSA S.A Dredging Control at Berths 4 and 5 of Puerto San Antonio. Fifth Administrative Region, Chile. EMPRESA PORTUARIA SAN ANTONIO (EPSA), Multibeam Bathymetry, Austral Cable Route, Chiloé, Tenth Administrative Region, Chile. NORDDEUTSCHE SEEKABELWERKE GMBH & CO. KG. SUBMARINE CABLE SYSTEMS Villarrica Lake Bathymetry. Eleventh Administrative Region, Chile. INVERSIONES RADAL LTDA Exploratory Bathymetry in the Las Frutillas Area, Costa Cachagua, Fifth Administrative Region, Chile. COMUNIDAD LOTEO COSTA CACHAGUA Exploratory Bathymetry, Pargua, Tenth Administrative Region, Chile. SKRETTING Official Beach Line, Topography and Exploratory Bathymetry Survey Riesco Island, Seno Otway, Twelfth Administrative Region, Chile. GOLDER ASSOCIATES
8 OUR COMPANY Página 8 de 20 Multibeam bathymetry. Puente Chacao Bridge centerline area and future port facilities, Chacao Channel, Tenth Administrative Region. Chile. EMPRESA CONSTRUCTORA PUENTE CHILOÉ S.A., Survey Study with Marine Subsoil Profiler in Bahía de Quintero, Fifth Administrative Region, Chile. IPS INGENIEROS LTDA Topo-bathymetric Study, Constitución, Seventh Administrative Region, Chile. CELULOSA ARAUCO Y CONSTITUCIÓN S.A Current Measurement, Sea Level and CTDO (Conductivity, Temperature and Dissolved Oxygen). Miski Mayo Port Terminal Project, Bahía Sechura, Department of Piura, Peru. COMPAÑÍA MINERA MISKI MAYO S.A.C., Marine Subsoil Profiler Survey, Harbor Basin, Puerto de Arica, First Administrative Region, Chile. TERMINAL PUERTO ARICA S.A Installation of Real Time Wind, Current and Directional Wave Measurement System. Abastible Terminal, Bahía San Vicente, Eighth Administrative Region, Chile. ABASTIBLE Study of Topography, Marine Bottom Morphology, Tides and Distribution of Sediment Strata, Nueva Aldea Undersea Discharge Pipe Project, Itata River Debouchure, Eighth Administrative Region, Chile. CELULOSA ARAUCO Y CONSTITUCIÓN S.A Directional Wave and Eulerian Current Measurement Services, Banco Inglés, Río de la Plata, Uruguay. CLEDIR Reconnaissance of the Marine Bottom Morphology of the Zorritos Area, Tumbes, by means of the use of Side Scan Sonar. Submarine Gas Pipeline Project. BPZ ENERGY INC., SUCURSAL PERÚ. SEHIDRO Study of Marine Sub-bottom Profiles, Zorritos, Tumbes. Submarine Gas Pipeline Project. BPZ ENERGY INC., SUCURSAL PERÚ. SEHIDRO Current and Directional Wave Study, Playa El Arenal, South Bank of the Maule River, Constitución, Seventh Administrative Region, Chile. CELULOSA ARAUCO Y CONSTITUCIÓN S.A Direct Current Measurement Study. Identification of Maximum Current Values. Punta Soledad Area, Canal de Chacao, Tenth Administrative Region, Chile. EMPRESA CONSTRUCTORA PUENTE CHILOÉ S.A Eulerian Current Study, Pila Norte Area, Canal de Chacao, Tenth Administrative Region, Chile. EMPRESA CONSTRUCTORA PUENTE CHILOÉ S.A., Dredging Takeoff Reports, Iquique. First Administrative Region, Chile. IQUIQUE TERMINAL INTERNACIONAL S.A., 2006.
9 OUR COMPANY Página 9 de 20 3D Modeling Study, Canal de Chacao, Tenth Administrative Region, Chile. EMPRESA CONSTRUCTORA PUENTE CHILOÉ S.A., Relative Humidity Measurements at Torre Sur, Canal de Chacao, Tenth Administrative Region, Chile. EMPRESA CONSTRUCTORA PUENTE CHILOÉ S.A., Detail Wave Study and Dynamic Simulation for LNG Dock at Bahía Quintero, Fifth Administrative Region, Chile. ENAP REFINERÍAS S.A Marine Subsoil Acoustical Exploration Study in Bahía de Quintero, Fifth Administrative Region, Chile. Monobuoy Capacity Increase Project, Quintero. GEOVENOR S.A Dredging Control Studies at Puerto de Antofagasta. Bathymetry, Takeoffs, Submarine Inspection in Puerto de Antofagasta, Antofagasta, Second Administrative Region, Chile. ANTOFAGASTA TERMINAL INTERNACIONAL S.A Maximum 19-year Eulerian Current Study by means of ADCP. Chelín Aquaculture Facility, Tenth Administrative Region, Chile. MARINE HARVEST CHILE S.A Eulerian Current Study by means of. Puchilco Aquaculture Facility, Tenth Administrative Region, Chile. MARINE HARVEST CHILE S.A Detailed Engineering, Port Infrastructure Improvement at Puerto Edén, Twelfth Administrative Region, Chile. GSI INGENIEROS CONSULTORES LTDA Oceanography and Bathymetry Studies, Puerto de Arica Terminal. First Administrative Region, Chile. TERMINAL PUERTO ARICA S.A Bathymetry and Side Scan Sonar Studies in Roca Remolinos and Pila Norte Area, Canal de Chacao, Tenth Administrative Region, Chile. EMPRESA CONSTRUCTORA BELFI S.A Submarine Filming, Roca Remolinos Area, Canal de Chacao, Tenth Administrative Region, Chile. EMPRESA CONSTRUCTORA BELFI S.A Study of Current and Tide Prediction in the Canal de Chacao, Tenth Administrative Region, Chile. EMPRESA CONSTRUCTORA PUENTE CHILOÉ S.A Bathymetric Survey, ITATA Project, Seventh Administrative Region, Chile. CELULOSA ARAUCO Y CONSTITUCIÓN S.A Oceanographic, Bathymetric and Topographical Studies, Ilo Port Project, Peru. SOUTHERN PERÚ COPPER CORPORATION Dredging Control Studies at Puerto de Iquique. Bathymetry, Takeoffs and Submarine Inspection at Puerto de Iquique, Iquique, First Administrative Region, Chile. IQUIQUE TERMINAL INTERNACIONAL S.A
10 OUR COMPANY Página 10 de 20 Study of Wave climate, Bahía Coronel. Measurements of Waves and Preparation of Wave Climate, Bahía Coronel, Eighth Administrative Region, Chile. GEOCEANO MARINE Study Marine Subsoil Profiles, Bahía Quintero, Fifth Administrative Region, Chile. GEOVENOR - ENAP REFINERÍA ACONCAGUA Marine Baseline Study, Bahía Chilota, Twelfth Administrative Region, Chile. GEOVENOR Exploratory Bathymetry, Bahía Coronel, Eighth Administrative Region, Chile. COMPAÑÍA PUERTO DE CORONEL S.A Operation and Maintenance of the Robinson Crusoe Island Hydroacoustic Station (HA03), Fifth Administrative Region, Chile. CHILEAN NUCLEAR ENERGY COMMISSION (to 2010). Operation and Maintenance of the Robinson Crusoe Island Infrasound Station (IS14), Fifth Administrative Region, Chile. GEOPHYSICS DEPARTMENT, UNIVERSITY OF CHILE Environmental Study, Elevated Discharge Pipe, Constitución Market Pulp Mill, Seventh Administrative Region, Chile. (Environmental Study for the Improvement of the Discharge of Mill Effluent to the Sea). CELULOSA ARAUCO Y CONSTITUCIÓN Monitoring of Dredging Operations, Puerto de Antofagasta, Second Administrative Region, Chile. Monitoring of Suspended Solids in the Water Column. EMPRESA CONSTRUCTORA TECSA S.A Directional Wave Measurements, Bahía de Mejillones, Second Administrative Region, Chile. COMPAÑÍA PORTUARIA MEJILLONES S.A Bathymetry of the Harbor Basin North Area, Puerto de Antofagasta, Second Administrative Region, Chile. EMPRESA PORTUARIA ANTOFAGASTA Aquaculture Concession Maps, Tenth Administrative Region, Chile. Preparation and printing of marine concession maps. FUNDACIÓN CHINQUIHUE Aquaculture Environmental Report Project for 40 Salmonid Fish Farming Facilities in the Tenth Administrative Region, Chile. Eulerian Current Study by means of ADCP, Exploratory Bathymetry (DGPS), installation of geo-referenced monuments (DGPS), water column structure (CTDO). MARINE HARVEST S.A Submarine Inspection of Berths 1, 2 and 3. Berth 4 and 5 Improvement Project, Antofagasta Terminal Internacional. Puerto de Antofagasta, Second Administrative Region, Chile. ANTOFAGASTA TERMINAL INTERNACIONAL S.A. (ATI) Hydroacoustic Station HA03 under the Complete Nuclear Test Ban Treaty (signed by the Republic of Chile on and ratified on ). Operation Services
11 OUR COMPANY Página 11 de 20 for the Juan Fernández Island, Chile, Hydroacoustic Station. PREPARATORY COMMISSION FOR THE COMPREHENSIVE NUCLEAR TEST BAN TREATY ORGANIZATION (CTBTO) Wind Measurement, Bridge over the Canal de Chacao. Tenth Administrative Region, Chile. MINISTRY OF PUBLIC WORKS Oceanography, Bathymetry and Topography Studies. Berth 4 and 5 Improvement Project, Antofagasta Terminal Internacional. Puerto de Antofagasta, Second Administrative Region, Chile. ANTOFAGASTA TERMINAL INTERNACIONAL S.A. (ATI) Aquaculture Concession Maps, Hornopirén Area, Tenth Administrative Region, Chile. Preparation of marine concession maps for use in regularizing the concessions involved. UNDERSECRETARIAT OF FISHING Aquaculture Concession Maps, Castro Area, Tenth Administrative Region, Chile. Preparation of marine concession maps for use in regularizing the concessions involved. UNDERSECRETARIAT OF FISHING Directional Wave Study. Camisea Project, Bahía Paracas, Pisco, Peru. CONSTRUCTORA BELFI COSAPI S.A Implementation of a System of Navigation Aids, Bahía Paracas, Pisco, Peru. CONSTRUCTORA BELFI COSAPI S.A Official Bathymetry. Compañía Minera Collahuasi Marine Terminal, Punta Patache, First Administrative Region, Chile. AGUNSA S.A Wind Study, Project for an International Concession for a Bridge over the Canal de Chacao. Marine and Wind Studies, Chacao, Tenth Administrative Region, Chile. MINISTRY OF PUBLIC WORKS Determination of beach line. Lowest Tide Line and Beach Lands. Bahía Mejillones Sur. Second Administrative Region, Chile. COMPLEJO PORTUARIO MEJILLONES Cadastral Survey of the Status of Ramps in the Tenth Administrative Region, Chile. Ministry of Public Works. Tenth Administrative Region, Chile. EPTISA CHILE Current Study with ADCP at Salmon Fattening Facilities (Punta Cachihué, Butachauques Island). Chiloé Island, Tenth Administrative Region Chile. CULTIVOS MARINOS CHILOÉ Wind Study, Project for an International Concession for a Bridge over the Canal de Chacao. Marine and Wind Studies, Chacao, Tenth Administrative Region, Chile. MINISTRY OF PUBLIC WORKS Marine Studies: Waves Currents, Tides, Winds, Bathymetry, Submarine Inspection. Short Seismic Resistant Dock for Post-Panamax Vessels, Berth 4 - Puerto de Iquique,
12 OUR COMPANY Página 12 de 20 First Administrative Region, Chile. IQUIQUE TERMINAL INTERNACIONAL S.A Study for the Location of Submarine Hydrophones and Data Transfer Cables. United Nations Nuclear Test Ban Treaty. Robinson Crusoe Island, Fifth Administrative Region, Chile. SCIENCE APPLICATIONS INTERNATIONAL CORPORATION INC Oceanographic Study: Winds and Marine Currents (ADCP). CAM-1 Project, Magallanes, Twelfth Administrative Region, Chile. LENGA INGENIERÍA Oceanographic Study: Wave Climate. CAM-1 Project, Magallanes, Twelfth Administrative Region, Chile. LENGA INGENIERÍA Current Study with ADCP at Salmon Fattening Facilities (Lalin, Teliupta, Huelmo, Apiao and Conchas Blancas). Chiloé Island, Tenth Administrative Region Chile. MARINE HARVEST CHILE S.A Hindcasting of Waves for Salmon Farming Facilities on Chiloé Island, Tenth Administrative Region, Chile. MARINE HARVEST CHILE S.A Bathymetry. Higuerillas Undersea Discharge Pipe Project. Con-Con, Fifth Administrative Region, Chile. ESVAL S.A Official Bathymetry, Puerto Ballena Project, Bahía Pargua, Tenth Administrative Region, Chile. NUTRECO CHILE S.A Topo-bathymetry Study, Puerto Bories, Puerto Natales, Thirteenth Administrative Region, Chile. PRDW SUD AMÉRICA Oceanographic Study: Winds, Tides and Waves. Puerto Ballena Project, Bahía Pargua, Tenth Administrative Region, Chile. TROUW CHILE S.A Bathymetry. Bahía Pargua, Tenth Administrative Region, Chile. DANISCO CULTOR CHILE S.A Bathymetry. Bahía Puerto Montt, Tenth Administrative Region, Chile. SOCOVESA VALDIVIA S.A Oceanographic Study: Currents and Tides, Greater Chimbote Undersea Discharge Pipe Project, Presidential Ministry of Peru. PARSONS ENGINEERING & SCIENCE USA Marine Studies: Waves, Currents, Wind, Tides, Bathymetry, side scan sonar, magnetometry. Internacional Concession for a Bridge over the Canal de Chacao. Marine and Wind Studies, Chacao, Tenth Administrative Region, Chile. Ministry of Public Works. CONSORCIO INGENIERÍA CUATRO LTDA. & COWI ENGINEERS AND PLANNERS (DENMARK) Wave Study for a Study of Movement of Moored Vessels, Mejillones, Second Administrative Region, Chile. PUERTO DE MEJILLONES S.A
13 OUR COMPANY Página 13 de 20 Wave Study for Numerical Modeling, Mejillones, Second Administrative Region, Chile. BELFI S.A. & ATRIA BAIRD Wave Climate Characterization. Mejillones, Second Administrative Region, Chile. COMPLEJO PORTUARIO MEJILLONES S.A Official Bathymetry and Tide Study, Puerto Ballena Project. Pargua, Tenth Administrative Region, Chile. TROUW CHILE S.A Current Study, Puerto Ballena Project. Pargua, Tenth Administrative Region Chile. AUSTRAL UNIVERSITY OF CHILE Bathymetry. FONDEF Project D , Canal de Yal and Adjacent Areas. Chonchi, Chiloé Island, Tenth Administrative Region, Chile. UNIVERSITY OF CONCEPCIÓN Lagrangian Current Study, Puerto Ballena Project. Pargua, Tenth Administrative Region, Chile. AUSTRAL UNIVERSITY OF CHILE Technical Diving at the San Isidro Combined Cycle Power Plant, Quillota, Fifth Administrative Region, Chile. CENTRAL DE CICLO COMBINADO SAN ISIDRO S.A Characterization of the Wave Climate, Mejillones, Second Administrative Region, Chile. COMPLEJO PORTUARIO MEJILLONES S.A Characterization of the Wave Climate, Quintero, Fifth Administrative Region, Chile. GASMAR S.A Characterization of the Wave Climate, Mejillones, Second Administrative Region, Chile. PUERTO MEJILLONES S.A Tide Study, Puerto Ballena Project, Tenth Administrative Region, Chile. TROUW CHILE S.A Submarine Inspection by Video Filming for Complejo Portuario Mejillones S.A., Mejillones, Second Administrative Region, Chile. AQUAMBIENTE LTDA Bathymetry. Boise Cascade Port Project. IIque, Tenth Administrative Region, Chile. UNIVERSITY OF CONCEPCIÓN Characterization of Long Period Waves, Mejillones, Second Administrative Region, Chile. COMPLEJO PORTUARIO MEJILLONES S.A Official Bathymetry for the Bahía Quintero Oil Terminal Project, Copec S.A., Quintero, Fifth Administrative Region, Chile. GREM INGENIERÍA LTDA Bathymetry: Fishing Management Area Project at 4 Localities near Los Vilos, Los Vilos, Fourth Administrative Region, Chile. BIOMAR LTDA
14 OUR COMPANY Página 14 de 20 Tsunami Flooding Map for Puerto Mejillones, Mejillones, Second Administrative Region, Chile. COMPLEJO PORTUARIO MEJILLONES S.A Determination of the Highest Tide and Lowest Tide Lines, Mejillones, Second Administrative Region, Chile. COMPLEJO PORTUARIO MEJILLONES S.A Bathymetric Inspection, Puerto de Antofagasta Artificial Harbor Basin Approach, Empresa Portuaria de Chile, EMPORCHI. Antofagasta, Second Administrative Region, Chile. ADMINISTRACIÓN PUERTO DE ANTOFAGASTA ENVIRONMENTAL STUDIES Marine Bioassays and Water Quality Study on Mining Industrial Effluent, Bahía Chapaco, Third Administrative Region. COMPAÑÍA MINERA DEL PACÍFICO S.A (in progress). Preliminary Archeological Evaluation of Shipwreck items found in the Iquique Roadstead, Stage 0 of the Submarine Archeological Studies Corresponding to the Dredging to Deepen the Port at Berth Nº 4 of Puerto de Iquique, First Administrative Region, Chile. IQUIQUE TERMINAL INTERNACIONAL S.A Environmental Impact Declaration of Dredging to Deepen the Port and Baseline Study of the Dredging Material Disposal Area, Iquique, First Administrative Region, Chile. IQUIQUE TERMINAL INTERNACIONAL S.A Environmental Impact Declaration, ASMAR (T) Dock Dredging Project, Talcahuano, Eighth Administrative Region, Chile. PRDW ALDUNATE VÁSQUEZ SERVICIOS LTDA Environmental Impact Declaration, Second Stage Dredging of Front 2B at Puerto de Arica, TERMINAL PUERTO DE ARICA S.A Oceanography Studies: Water Quality with Approval of SHOA, Puerto Yungay, CENTRALES HIDROELÉCTRICAS DE AYSÉN S.A Oceanography Studies: Water Quality with Approval of SHOA, Puerto Río Bravo, CENTRALES HIDROELÉCTRICAS DE AYSÉN S.A Study and Design for the Improvement, Maritime Connectivity of Puerto Montt Chiloé Palena Maritime Network, Caleta La Arena, Tenth Administrative Region. PRDW AV PORT WORKS DEPARTMENT (DOP) Study and Design for the Improvement, Maritime Connectivity of Puerto Montt Chiloé Palena Maritime Network, Tenth Administrative Region. PRDW AV - PORT WORKS DEPARTMENT (DOP)
15 OUR COMPANY Página 15 de 20 Environmental Impact Declaration, Second Stage Dredging of Front 2B at Puerto de Arica. TERMINAL PUERTO DE ARICA S.A Support Services for the Environmental Oversight Plan for Port Dredging, Arica. TERMINAL PUERTO DE ARICA S.A Water Quality and Sediment Quality Studies and Subtidal Benthic Studies, Puerto Yungay, Eleventh Administrative Region. CENTRALES HIDROELÉCTRICAS DE AYSÉN S.A Water Quality and Sediment Quality Studies and Subtidal and Intertidal Benthic Studies, Puerto Río Bravo, Eleventh Administrative Region. CENTRALES HIDROELÉCTRICAS DE AYSÉN S.A Marine Baseline, Caleta Coloso Mining Load-out Terminal, Second Administrative Region, Chile. MWH AMERICAS INC. CHILE LTDA Marine Environmental Baseline, Riesco Island, Seno Otway, Twelfth Administrative Region, Chile. GOLDER ASSOCIATES Environmental Impact Declaration, Salmonid Fattening Facility in the Sea, Caleta Ayacara, Tenth Administrative Region, Chile. SALMONES CHILOÉ S.A., Environmental Impact Declaration, Salmonid Fattening Facility in the Sea, Caleta Buill, Tenth Administrative Region, Chile. SALMONES CHILOÉ S.A., Environmental Impact Declaration, Salmonid Fattening Facility in the Sea, Estero Huequi, Tenth Administrative Region, Chile. SALMONES CHILOÉ S.A., Environmental Impact Declaration, Berth 3 Dredging Project at Puerto de Arica, First Administrative Region, Chile. TERMINAL PUERTO DE ARICA S.A Environmental Impact Declaration, Seismic-resistant Dock Construction at Berth 3, Puerto de Arica, First Administrative Region, Chile. TERMINAL PUERTO ARICA S.A Baseline Study, Artisanal Fishing Dock Implementation and Expansion, Bahía Chilota, Twelfth Administrative Region, Chile. GEOVENOR Monitoring of Levels of Turbidity in the Water During Dredging Work, Puerto de Antofagasta, Second Administrative Region, Chile. Monitoring of Suspended Solids in the Water Column. EMPRESA CONSTRUCTORA TECSA S.A Environmental Study for an Elevated Discharge Pipe, Constitución Market Pulp Mill, Constitución, Seventh Administrative Region, Chile. (Environmental Study for the Improvement of the Discharge of Mill Effluent to the Sea). CELULOSA ARAUCO Y CONSTITUCIÓN
16 OUR COMPANY Página 16 de 20 Environmental Impact Declaration for the siting of a Salmonid Fattening Facility in the Sea, Sánchez Island, Eleventh Administrative Region, Chile. MARINE HARVEST S.A Environmental Impact Declaration for the siting of a Salmonid Fattening Facility in the Sea, Verdugo Island, Eleventh Administrative Region, Chile. MARINE HARVEST S.A Environmental Impact Declaration. Antofagasta Terminal Internacional Berth 4 and 5 Improvement Project, Puerto de Antofagasta, Second Administrative Region, Chile. ANTOFAGASTA TERMINAL INTERNACIONAL S.A. (ATI) Preparation of Concession and Geographic Location Map Format, Chiloé Island Area, Tenth Administrative Region, Chile. UNDERSECRETARIAT OF FISHING Preliminary Site Characterization (PSC), for a future salmonid fattening facility at a site on Seno Lyell, Capitán Aracena Island, Twelfth Administrative Region, Chile. PESCA CHILE S.A Environmental Impact Declaration, Salmonid Fattening Facility in the Sea, Huequi Peninsula, West-Northwest Area of Punta Quillón, Municipal District of Chaitén, Tenth Administrative Region, Chile. PACIFIC SEAFOOD S.A Environmental Impact Declaration, Salmonid Fattening Facility in the Sea, Caleta Buill, Northwest Area of Caleta Buill, Municipal District of Chaitén, Tenth Administrative Region, Chile. PACIFIC SEAFOOD S.A Environmental Impact Declaration, Salmonid Fattening Facility in the Sea, Caleta Ayacara, Northwest Area de Caleta Ayacara, Municipal District of Chaitén, Tenth Administrative Region, Chile. PACIFIC SEAFOOD S.A Environmental Impact Declaration, Salmonid Fattening Facility in the Sea, North of Caleta and Punta Calle, Estero Comau, Municipal District of Chaitén, Tenth Administrative Region, Chile. PACIFIC SEAFOOD Consultancy for Evaluation of Marine Environmental Monitoring, Punta Chungo Concentrate Load-out Terminal, Los Vilos, Fourth Administrative Region, Chile. MINERA LOS PELAMBRES Environmental Impact Declaration. Project for a Short Seismic Resistant Dock for Post- Panamax Vessels, Berth 4 - Puerto de Iquique, First Administrative Region, Chile. IQUIQUE TERMINAL INTERNACIONAL S.A Environmental Impact Declaration, Salmonid Fattening Facility in the Sea, Canal Jacaf, Punta Porvenir and Wargny Island, Eleventh Administrative Region, Chile. CULTIVOS MARINOS CHILOÉ LTDA Environmental Impact Declaration, Salmonid Fattening Facility in the Sea, Estero Queulat, Eleventh Administrative Region, Chile. SALMONES UNIMARC S.A
17 OUR COMPANY Página 17 de 20 Audit on a Marine Environmental Study. Puerto Caucedo Multimodal Terminal Project, Dominican Republic, ARDEN & PRICE CONSULTING- PANAMÁ Environmental Impact Declaration, Project for Fattening Clams, Oysters and Red Abalone from Shellfish Seed, Chingüitad Area, Tenth Administrative Region, Chile. A. KARKLING Environmental Impact Declaration, Project for Fattening Clams from Shellfish Seed, Liucura Area, Canal Yal, Tenth Administrative Region, Chile. TORALLA S.A Environmental Audit on Puerto San Vicente. San Vicente, Eighth Administrative Region, Chile. SAN VICENTE TERMINAL INTERNACIONAL Aquatic Baseline Study, Yulton, Meullín, Elizalde, Caro, Cóndor and Riesco Lakes; Cóndor, Blanco, Dangle, Candelaria and Cuervo Rivers for Proyecto ALUMYSA Ltda. Aysén, Eleventh Administrative Region, Chile. CH2M HILL CHILE LTDA Environmental Monitoring, Water Quality in Bahía Chacabuco (Seno Aysén) Shipping Facility, May 1999, Bahía Chacabuco, Eleventh Administrative Region, Chile. COMPAÑÍA MINERA CDE FACHINAL LTDA Environmental Impact Study, Antofagasta Desalination Plant Project, Antofagasta, Second Administrative Region, Chile. CONSORCIO US FILTER CORP-SK Environmental Assessment of Hydrocarbon Spill from the Vessel Irish Sea grounded at Paso Shoal. Twelfth Administrative Region, Chile. ULTRAGAS S.A Consultancy for the Definition of a Technical-Economic Bid Proposal for Submittal in the Tender for the Operation of the Punta Chungo Concentrate Load-out Terminal (Minera Los Pelambres), Los Vilos, Fourth Administrative Region, Chile. AGUNSA S.A Definition of the Environmental Policy of Minera Anaconda Chile S.A. COMPAÑÍA MINERA ANACONDA CHILE S.A Bioassays of Resistance of Marine Organisms to Heat and Chlorination, Proyecto Tocopilla Combined Cycle Thermal Electric Power Plant, Tocopilla, Second Administrative Region, Chile. ELECTROANDINA S.A Study of Archeological, Socioeconomic and Flora and Fauna Environmental Impact, La Pintana Garbage Transfer Station Project, Kiasa S.A. La Pintana, Santiago Metropolitan Region, Chile. SK ECOLOGÍA S.A Study of Determination of the State of Gonadal Maturity in Specimens of Carmelitas and Pejerrey Chileno Fish in the Lolenco Bridge Area, Curacaví. Concón-Maipú Oil Pipeline Construction Project, Sonacol S.A., Curacaví, Santiago Metropolitan Region, Chile. S & P INGENIERÍA AMBIENTAL LTDA
18 OUR COMPANY Página 18 de 20 Environmental Monitoring: Water Quality in (Seno Aysén) Shipping Facility, December Bahía Chacabuco, Eleventh Administrative Region, Chile. COMPAÑÍA MINERA CDE FACHINAL LTDA Archeological Exploration, Illapel River Reservoir Project. Illapel, Fourth Administrative Region, Chile. INGENDESA S.A Archeological Exploration, Chonchi Electric Power Transmission Line Project, Chonchi, Chiloé Island, Tenth Administrative Region, Chile. INGENDESA S.A Archeological Exploration, Laguna Barroso Intake Project for Codelco Chile s, Andina Division. Santiago Metropolitan Region, Chile. INGENDESA S.A Archeological Exploration, Electric Power Supply Project for the Companies Atacama Minerals and El Peñón, Second Administrative Region, Chile. INGENDESA S.A Oceanographic Study for Engineering and Environmental Applications, Mejillones, Second Administrative Region, Chile. COMPLEJO PORTUARIO MEJILLONES S.A Review of the Literature on Cultural Resources in the Site Area of the Pascua Baker Polpaico Electric Power Transmission Line Project. Fifth to Eleventh Administrative Regions, Chile. INGENDESA S.A Environmental Monitoring: Water Quality in General Carrera Lake (Chile Chico, Bahía Jara and Puerto Ingeniero Ibáñez) and Bahía Chacabuco, Eleventh Administrative Region, Chile. COMPAÑÍA MINERA CDE FACHINAL LTDA Archeological Exploration, Villarrica Lake, Eleventh Administrative Region, Chile. INGENDESA S.A Environmental Impact Study: Marine Environment, Cuervo River. Seno Aysén, Eleventh Administrative Region, Chile. PROYECTO ALUMYSA LTDA Environmental Impact Study: Marine Environment, Bahía Chacabuco. Seno Aysén, Eleventh Administrative Region, Chile. PROYECTO ALUMYSA LTDA Manual of Environmental Specifications for Port Construction. Uruguay. MINISTRY OF PUBLIC WORKS AND TRANSPORTATION, REPUBLIC OF URUGUAY Terrestrial Baseline Study, Santiago Metropolitan Region, Chile. MEGÁRIDOS S.A Base Socioeconomic Baseline Study, Santiago Metropolitan Region, Chile. MEGÁRIDOS S.A Terrestrial Baseline Study, Santiago Metropolitan Region, Chile. AGUA POTABLE LO CASTILLO S.A
19 OUR COMPANY Página 19 de 20 Review Committee for the Chilean Standard Guideline for Marine Water Sampling, NCh 411/9.c97. Santiago, Chile. NATIONAL STANDARDS INSTITUTE Review Committee for the Chilean Standard Guideline for the Sampling of Rivers and Watercourses, NCh 411/6.c97. Santiago, Chile. NATIONAL STANDARDS INSTITUTE Terrestrial Baseline Study, Cabo Negro, Twelfth Administrative Region, Chile. AMONÍACO MAGALLANES Baseline Study, Marine Environment. Third Methanol Train, Rada Pelícano, Twelfth Administrative Region, Chile. METHANEX CHILE LTDA Evaluation of the Efficiency of Cooling Water Baffle Heat Exchange, Rada Pelícano, Twelfth Administrative Region, Chile. METHANEX CHILE LTDA Exploration of the Substrate for Aquaculture with Submarine Video Filming. Bahía Taltal, Second Administrative Region, Chile. CULTIVOS FLAMENCOS LTDA In addition, BENTOS has participated by supplying technical equipment for the performance of the following studies: Environmental Impact Study: Marine Environment, Mejillones, Second Administrative Region, Chile. PUERTO MEJILLONES S.A Environmental Impact Study of the Bahía Gente Grande Industrial Complex. Porvenir, Twelfth Administrative Region, Chile. FORESTAL TRILLIUM LTDA Environmental Impact Study of the Marine Environment, Mejillones Sulfuric Acid Plant, Second Administrative Region, Chile. COCAR S.A Baseline Study of the Marine Environment, Methanol Train III, Rada Pelícano, Twelfth Administrative Region, Chile. METHANEX CHILE LTDA Environmental Impact Study of the Marine Environment, Porvenir, Twelfth Administrative Region, Chile. COMPAÑÍA CHILENA DE NAVEGACIÓN INTEROCEÁNICA Marine Monitoring Program, Mejillones, Second Administrative Region, Chile. PUERTO MEJILLONES S.A Evaluation of the Efficiency of Cooling Water Baffle Heat Exchange, Rada Pelícano, Twelfth Administrative Region, Chile. METHANEX CHILE LTDA Marine Monitoring Program, Mejillones Thermal Electric Power Plant. Mejillones, Second Administrative Region, Chile. EDELNOR S.A
20 OUR COMPANY Página 20 de 20 Environmental Impact Study of the Marine Environment, Iquique, First Administrative Region, Chile. CENTRAL TÉRMICA PUNTA PATACHE Environmental Impact Study of the Marine Environment, Caldera, Third Administrative Region, Chile. CENTRAL TÉRMICA CALDERA Bathymetry. Riesco Island, Twelfth Administrative Region, Chile. FORESTAL TRILLIUM LTDA Evaluation of the Population of Argopecten purpuratus in the Third and Fourth Administrative Regions, Chile. FONDO DE INVESTIGACIÓN PESQUERA Health Assessment of Clam Resources in Bahía Coquimbo. Coquimbo, Fourth Administrative Region, Chile. FOURTH ADMINISTRATIVE REGION REGIONAL GOVERNMENT Submarine Video Filming for Control of Environmental Management and Diffusion Measures, Caldera, Third Administrative Region, Chile. COMPAÑÍA CONTRACTUAL MINERA CANDELARIA Marine Monitoring Program at Bahía Caldera. Caldera, Third Administrative Region, Chile. COMPAÑÍA CONTRACTUAL MINERA CANDELARIA Environmental Impact Study of the Marine Environment, Río Cóndor Project, Puerto Arturo, Twelfth Administrative Region, Chile. FORESTAL TRILLIUM LTDA COMPANY DATA Corporate Name : SERVICIOS Y EQUIPOS MARINOS LTDA. Chilean Taxpayer Number : RUT Business Purpose : Services Address : Avda. Suecia 3005, Ñuñoa, Santiago, Chile. Telephone : 56 (2) Fax : 56 (2) [email protected] [email protected] Web Site : Legal Representatives : Bruno Ladrón de Guevara Hannig Luis Jollán Vernal
SIDE SCAN SONAR (SSS)
SIDE SCAN SONAR (SSS) BENTOS Servicios y Equipos Marinos Ltda. Avda. Suecia 3005, Ñuñoa, Santiago Telephone: (56 2) 296 373 60 Fax: (56 2) 296 373 77 E-mail: [email protected] THE SIDE SCAN SONAR (SSS), WHAT
SEABEAM ELAC1185 MULTIBEAM ECHOSOUNDER
SEABEAM ELAC1185 MULTIBEAM ECHOSOUNDER BENTOS Servicios y Equipos Marinos Ltda. Avda. Suecia 3005, Ñuñoa, Santiago Telephone: (56 2) 296 373 60 Fax: (56 2) 296 373 77 E-mail: [email protected] GENERAL ASPECTS
Experience Clean Water Studies
Clean Water Studies Reservoir Chonchi. Intake works construction Conchi (2000) Concession zone expansion in Calama Calama (2000) Diego de Almagro main water pipe cadastre Chañaral (1995) Water improvements
HV Submarine Cable Systems Design, Testing and Installation
HV Submarine Cable Systems Design, Testing and Installation CIGRE Ireland Technical Seminar 6 th October 2010 Robert Donaghy Senior Consultant Engineer, ESB International Presentation Overview Applications
Contents. 1. PROFILE p2. 2. SERVICES 2.1 Offshore Support Services p 4 Offshore support p 6 ROV operations p 8
OCTOBER 2013 22 Contents 1. PROFILE p2 2. SERVICES 2.1 Offshore Support Services p 4 Offshore support p 6 ROV operations p 8 2.2 Hydrographic & Geophysical services p 10 Bathymetric surveys p 12 High resolution
Hector Espinosa Senior Engineer Consultant of Project Nexus
CURRICULUM VITAE Hector Espinosa Senior Engineer Consultant of Project Nexus HISTORY Twenty five years of experience in structural and civil engineering, port and harbors, project development and construction,
Chilean port system Cargo handled in 1997
1 1.1 Introduction In December 1997 the Chilean Government obtained approval from Congress for a new law which provides for the establishment of ten independent Empresas Portuarias ( Port Companies ) to
The Integration of Hydrographic and Oceanographic Data in a Marine Geographic Information System U.S. Hydro 2015
The Integration of Hydrographic and Oceanographic Data in a Marine Geographic Information System U.S. Hydro 2015 Karen Hart CARIS USA Oceanography and Hydrography Defined Oceanography: The branch of Earth
Graydon UK Limited A world leader in international credit reports www.graydon.co.uk
International Report Supplied on 04 February 2013 Client Reference Graydon Order Number 6407152 Identification Details IDENTIFICATION COMPANY NAME ABASTECEDORA DE COMBUSTIBLES SA TRADE NAME ABASTIBLE SA
Hydrography at IHO cat A level: Scientific Education, at Sea Training, and Interaction with the Industry. N. Debese, R. Moitié, N.
Hydrography at IHO cat A level: Scientific Education, at Sea Training, and Interaction with the Industry N. Debese, R. Moitié, N. Seube analysis CHC 2010-2 Located in Brest: takes benefits of the French
Overview of Submarine Cable Route Planning & Cable Route Survey Activities. Graham Evans Director EGS Survey Group www.egssurvey.
Overview of Submarine Cable Route Planning & Cable Route Survey Activities Graham Evans Director EGS Survey Group www.egssurvey.com Presentation Summary Submarine cable systems concept to reality Objectives
GEO-MARINE TECHNOLOGY, INC. A Geological, Geophysical, and Hydrographic Survey Consultancy
COMPANY PROFILE OUR MISSION AND TRADE OUR MISSION: OUR TRADE: We are high-quality data analysts who combine scientific expertise with state-of-the-art software to efficiently provide solid technical products
Why Submarine Cables?
Nalaka Siriwardena Engineer/SEA-ME-WE 4 Project Engineer/Projects Why Submarine Cables? Cost effective on large routes High bandwidth due to the evolution of technology such as DWDM High Quality with low
National Reports to Regional Hydrographic Commissions
National Reports to Regional Hydrographic Commissions 1. Hydrographic Office/Service 1.1 Direction Adjunct General Oceanography, Hydrography and Meteorology The Hydrography, belonging to the General Office
Daniel González Roubillard
Daniel González Roubillard E- Mail: [email protected] Web Site: www.a2b-eng.com Civil Constructor Claims & Contract Consultant 30 years of professional experience in the engineering and construction
The San Juan Bay Estuary Program and its Initiatives toward a Climate Ready Estuary
The San Juan Bay Estuary Program and its Initiatives toward a Climate Ready Estuary CACCE Conference-Workshop 2012 Dr. Jorge Bauza-Ortega Scientific Advisor San Juan Bay Estuary Program Today presentation
Applications of Integrated Vessel-based LiDAR, Multibeam Bathymetry, and Geophysical Surveys for Geohazard Assessments and Site Characterization
Applications of Integrated Vessel-based LiDAR, Multibeam Bathymetry, and Geophysical Surveys for Geohazard Assessments and Site Characterization James Fisher Engineering Geologist Todd Mitchell Survey
Home Builders Conference San Pablo - Brazil October 2007
Home Builders Conference San Pablo - Brazil October 2007 Investment Highlights Favorable economic environment in Chile Consistent growth Low interest rates and low inflation Government stability Largest
Developing Ocean Energy in Ireland. Belmullet Wave Energy Test Site
Developing Ocean Energy in Ireland Belmullet Wave Energy Test Site Where does our energy come from? Most of the energy we use in Ireland comes from fossil fuels such as oil, coal, peat and gas. We burn
An Overview of Seabed Surveys (High resolution Geophysical Site Surveys)
An Overview of Seabed Surveys (High resolution Geophysical Site Surveys) Anna Fulop Chief Geoscientist Fugro Survey Limited 22 April 2015 Agenda Introduction Site survey - purpose and requirements Principles,
GROWING ALONG WITH PERÚ
GROWING ALONG WITH PERÚ GROWING ALONG WITH PERU Andino Investment Holding S.A.A. is a Peruvian Holding leading to serve the Logistics Chain for foreign trade for over 40 years, and provide port and airport
WWNWS2/3/2-XV Meeting 2 15 July 2010 Agenda Item 3.2. MSI Self Assessment NAVAREA XV. Submitted by CHILE SUMMARY
WWNWS WWNWS2/3/2-XV Meeting 2 15 July 2010 Agenda Item 3.2 MSI Self Assessment NAVAREA XV Submitted by CHILE SUMMARY Executive Summary: NAVAREA XV provides the paper of MSI self assessment for WWNWS2 Action
Ocean Engineering, Surveying and Mapping Services
Ocean Engineering, Surveying and Mapping Services FUGRO PELAGOS, INC. Fugro collects and interprets data related to the earth s surface and the soils and rocks beneath. It provides advice based on the
Corporate Presentation
1 Corporate Presentation 2 We are a peruvian Holding leading to serve the Logistics Chain for Foreign Trade for over 40 years, and provide Port and Airport Infrastructure. AIH Presence through the Logistics
Permanent Reservoir Monitoring (PRM) System Installation: The Installers Perspective
Permanent Reservoir Monitoring (PRM) System Installation: The Installers Perspective Introduction Global Marine Systems Limited (Global Marine) has a vast wealth of knowledge in designing planning and
WWNWS3/3/2-XV Meeting 3 29 August 2011 Agenda Item 3.2. MSI Self Assessment NAVAREA XV. Submitted by Chile SUMMARY
WWNWS WWNWS3/3/2-XV Meeting 3 29 August 2011 Agenda Item 3.2 MSI Self Assessment NAVAREA XV Submitted by Chile SUMMARY Executive Summary: NAVAREA XV provides the paper of MSI self assessment for WWNWS3
Endesa Chile YE14 Results
Endesa Chile YE14 Results January 30th 2015 Highlights Operating revenues increased 21%, mainly due to higher energy sales, as a consequence of higher sale price of electricity in Chile, Colombia and Peru,
Proven expertise and total reliability to support globally recognised oil and gas clients
Oil & Gas Services B ibby HydroMap works closely with clients from the oil and gas industry to provide a variety of services relevant to all construction and monitoring phases. Our flexiblity and range
Turnkey Submarine Cable Systems
Turnkey Submarine Cable Systems Submarine Telecommunications Systems at NSW Today NSW is one of the world s leading suppliers of fiber-optic submarine cable systems, energy cables, custom-made underwater
COMPANY PROFILE PELICAN COMPANY LIMITED
COMPANY PROFILE PELICAN COMPANY LIMITED, Vung Tau 2013 Page 2 1. About Us Based in the city of, and established in 2010 by the professionals in their field of expertise, Pelican Company Limited provides
Candelaria and Ojos del Salado Chile
TSX : LUN OMX : LUMI 2016 Candelaria Key Facts Open Pit and Underground Mine Copper, gold, and silver 2016 estimate 124,000-128,000 tonnes copper Cash costs of $1.45 per lb copper after by-product credits
BTG Pactual& CelfinSouthern Cone Andean Conference 2013. Santiago, June 5 and 6, 2013
BTG Pactual& CelfinSouthern Cone Andean Conference 2013 Santiago, June 5 and 6, 2013 COMPANY STRUCTURE Affiliates that consolidate 60% 68% 50% 100% Besalco Construcciones Besalco MD Montajes Kipreos Hospital
Avenida Cardonal 2501, Puerto Montt, Reg. X COUNTRY OF PRODUCTION: CHILE
Integrated Farm Assurance G.R.- VERS. 4.0 Mar11 Aquaculture Module (Crustaceans, Finfish, Molluscs)- CPCC Version 4.0_Mar11 GLOBALG.A.P. Registration Number: DNV CERT07782011GGACHIAACCREDIA Certificate.
Arctic Fibre Submarine Cable System
Arctic Fibre Submarine Cable System Desktop Study & Cable Engineering 10 February 2012 Desktop Study: Phase 1 Scope Philosophy March 7, 2012 DTS Phase 1 Scope of Work Goal: Identify feasible marine survey
./01&2/M./T34 1MP36T ST3T.M./T. 1a$t3l$4 536e-al4 13$7363 83%3te9. Sol9ara 1 Pro;ect. !"l$%e ( Mai$ &e(ort. Te-t. )e*te%,e- 2//0 :; <//0=>=?
./01&2/M./T34 1MP36T ST3T.M./T 1a$t3l$4 536e-al4 13$7363 83%3te9 Sol9ara 1 Pro;ect!"l$%e ( Mai$ &e(ort Te-t )e*te%,e- 2//0 :; =?@ ENVIRONMENTAL IMPACT STATEMENT VOLUME A: MAIN REPORT TEXT CR 7008_09_v4
COMPANY PRESENTATION 1Q 2013
COMPANY PRESENTATION 1Q 213 Agenda Company Overview Business Strategy Financial Profile Chilean Electricity Sector Overview 2 Colbún at a glance Company Overview Business Power Generation & Trade Market
By Chris Gorman, PE M.ASCE PROBLEM:
Improving Bridge Inspection, Scour Monitoring and Infrastructure Management for DOTs using the Echoscope - A true 3D, High-Definition and Real-Time imaging tool. PROBLEM: By Chris Gorman, PE M.ASCE Preserving
THE POWER MARKET IN CHILE WHAT IS GOING ON?
COMITÉ EMPRESARIAL CHILE-JAPON THE POWER MARKET IN CHILE WHAT IS GOING ON? SANTIAGO-CHILE APRIL 2009 CONTENT Overview of the Energy Sector Energy matrix Energy policy The Electricity Sector: regulatory
PRELIMINARY SITE SELECTION CHILEAN MARINE ENERGY RESOURCES
PRELIMINARY SITE SELECTION CHILEAN MARINE ENERGY RESOURCES Client Inter-American Development Bank Contact Juan Paredes Document No 100513/BR/02 Issue B Classification Published Date 15 May 2009 Author:
MARINE GEOPHYSICS. Oil & Gas PROJECT SUMMARY SHEET. Project Title: BP WEST JAVA, ONWJ, PIPELINE INSPECTION BY VESSEL BASED SURVEY.
MARINE GEOPHYSICS BP WEST JAVA, ONWJ, PIPELINE INSPECTION BY VESSEL BASED SURVEY BP Offshore North West Java Indonesia Description: PT EGS Indonesia was awarded a contract for a high order acoustic (multibeam
Consejo Mundial de Energía Foro Biregional de América del Norte y de América Latina y el Caribe
Consejo Mundial de Energía Foro Biregional de América del Norte y de América Latina y el Caribe JUNIO DE 2006 Disclaimer Safe harbor statement under the Private Securities Litigation Reform Act of 1995:
Social and environmental challenges in power system development in Chile
Social and environmental challenges in power system development in Chile Sebastian Mocarquer, Hugh Rudnick 2013 IEEE Power & Energy Society General Meeting Shaping the Future Energy Industry 1 The power
National Glacier Strategy. Gonzalo BARCAZA DIRECCIÓN GENERAL DE AGUAS
National Glacier Strategy Gonzalo BARCAZA DIRECCIÓN GENERAL DE AGUAS Overview Introduction National Glacier Strategy Observation Levels Glaciological Zones Progress Current studies In 2008, Ministry of
INTEGRANDO DATOS MARINOS Y MODELOS AL SERVICIO DE LA OPERATIVA PORTUARIA: EL SISTEMA SAMPA DEL PUERTO DE ALGECIRAS
INTEGRANDO DATOS MARINOS Y MODELOS AL SERVICIO DE LA OPERATIVA PORTUARIA: EL SISTEMA SAMPA DEL PUERTO DE ALGECIRAS Operational Oceanography on the Strait of Gibraltar SAMPA and TRADE Teams Physical environment
Shallow Water Swath Bathymetry from Small Platforms. Advances in Seafloor Mapping Sonar, 30 Dec 2009 Systems Engineering & Assessment Ltd.
Shallow Water Swath Bathymetry from Small Platforms Advances in Seafloor Mapping Sonar, 30 Dec 2009 Systems Engineering & Assessment Ltd. Presentation Requirements, applications and challenges SWATHplus
Horizon Survey and Geotechnical Companies
Oil & Gas Directory Middle East - 2013 147 Horizon Survey and Geotechnical Companies Corporate P r ofile OUR PEDIGREE Horizon provides comprehensive survey and geotechnical services to the offshore industry
Advances in Unmanned Surface Vessels (USV s) James Williams Managing Director
Advances in Unmanned Surface Vessels (USV s) James Williams Managing Director 1 Abstract Advances in Unmanned Surface Vessels (USV s) James Williams, Managing Director, Swathe Services Group, UK Advanced
COMPANY PRESENTATION. BTG Pactual & Celfin Southern Cone / Andean Conference. Santiago, June 5 th -6 th 2013
COMPANY PRESENTATION BTG Pactual & Celfin Southern Cone / Andean Conference Santiago, June 5 th -6 th 213 Colbún at a glance Who are we? We are a Chilean company, leader in the generation of reliable,
RESEARCH IN MARINE ENERGY IN CHILE Fondef Tidal Energy
RESEARCH IN MARINE ENERGY IN CHILE Fondef Tidal Energy Dr. Rodrigo Cienfuegos ([email protected]) Director Fondef 09I1052 Pontificia Universidad Católica de Chile ROAD MAP FOR MARINE ENERGY EXTRACTION
El Desafío Solar de Chile
El Desafío Solar de Chile Rodrigo Palma Behnke SERC Team, Abril, 9 th 2015 Overview Based on the current energy challenge in Chile, a long term vision for solar energy development is presented and analyzed.
Aquaculture Monitoring Standard
Aquaculture Monitoring Standard Fisheries and Oceans Canada Date modified: 2015-07-22 Table of Contents Introduction 3 Definitions 3 I. Survey for Baseline Information [AAR section 8] 4 Predicted Contours
Temporary Entrance to Chile in virtue of the Free Trade Agreement between the Republic of Chile And the United States of Mexico
Temporary Entrance to Chile in virtue of the Free Trade Agreement between the Republic of Chile And the United States of Mexico Guide for Mexican Business People The purpose of the Free Trade Agreement
Dionisio Manlio Varga Director Contract Management, Project Engineer, Industrial Engineer.
PROFESSIONAL SUMMARY Dionisio Manlio Varga Director Contract Management, Project Engineer, Industrial Engineer. Quinta Santa Patricia A-4 Yanahuara - Arequipa Perú Phone: +51-54-254540/ +51-940417730 6538
Law of Ukraine on the exclusive (marine) economic zone of 16 May 1995
Page 1 Law of Ukraine on the exclusive (marine) economic zone of 16 May 1995 Taking into consideration the relevant provisions of the 1982 United Nations Convention on the Law of the Sea, Ukraine hereby
VOCALS-CUpEx: The Chilean Upwelling Experiment
VOCALS-CUpEx: The Chilean Upwelling Experiment René D. Garreaud 1, José Rutllant 1,2, Ricardo Muñoz 1, David Rahn 1, Marcel Ramos 2 and Dante Figueroa 3 (1) Department of Geophysics, Universidad de Chile;
CMD 2008 Kongsberg Gruppen ASA. Kongsberg Maritime. Kongsberg Maritime Capital Markets Day September 2008. Status and Prospects for the future
Kongsberg Maritime Capital Markets Day September 28 Kongsberg Maritime Status and Prospects for the future Strategic direction /2/ Kongsberg Maritime Business segment description Segments and sub segments
REPAIR AND RETROFIT OF BRIDGES DAMAGED BY THE 2010 CHILE MAULE EARTHQUAKE
Proceedings of the International Symposium on Engineering Lessons Learned from the 2011 Great East Japan Earthquake, March 1-4, 2012, Tokyo, Japan REPAIR AND RETROFIT OF BRIDGES DAMAGED BY THE 2010 CHILE
The concepts developed in this standard include the following: Oceans cover about 70% of the surface of the Earth.
Name Date Grade 5 SOL 5.6 Review Oceans Made by SOLpass - www.solpass.org [email protected] Reproduction is permitted for SOLpass subscribers only. The concepts developed in this standard include
CHILE. Investment projects portfolio. Foreign Investment Committee www.ciechile.gob.cl
CHILE Investment projects portfolio Foreign Investment Committee www.ciechile.gob.cl MINING CHILE Investment projects portfolio José Andrés Herrera Investment Attraction Executive [email protected]
Offshore Renewable Energy in Virginia
Offshore Renewable Energy in Virginia Presented to the Renewable Natural Resources Foundation December, 8 2009 Neil Rondorf Vice President, Maritime Operations Science Applications International Corporation
Cable System Planning and Permitting: Business and Stakeholder Considerations
Cable System Planning and Permitting: Business and Stakeholder Considerations Submarine Cables in the Sargasso Sea: Legal and Environmental Issues in Areas Beyond National Jurisdiction The George Washington
Los Angeles. Trans- Pacific Route. Manzanillo. NORTH SOUTH Americas Route (Pacific)
Maritime space: Opportunity for cargo management Trans- Pacific Route Los Angeles Manzanillo Veracruz New York Freeport Kingston a Regional hub Global hub Routes and Terminal networks NORTH SOUTH Americas
DRAFT STANDARD FORM A APPLICATION FOR CONSENT TO CONDUCT MARINE SCIENTIFIC RESEARCH
Feedback Logout User: Elizabeth Brenner Role: Platform Operator My Profile Reporting Foreign EEZ: CAREER: A functional genomic understanding of microbial s Application Attachments Authorizations Action
The Nippon Foundation / GEBCO Postgraduate Certificate in Ocean Bathymetry Training Program at the
The Nippon Foundation / GEBCO Postgraduate Certificate in Ocean Bathymetry Training Program at the Center for Coastal and Ocean Mapping, University of New Hampshire Dr Rochelle Wigley Project Director
INFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION. Infrastructure Flood Protection Remediation Policies
INFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION Infrastructure Flood Protection Remediation Policies DRAFT POOLBEG PLANNING SCHEME 196 FIGURE 9.1: UTILITIES WAYLEAVES Electricity Cables 8m Wayleave for
Disaster Management Cycle
GIS TOOL FOR CALCULATING REPAIR COST OF BUILDINGS DUE TO EARTHQUAKE EFFECTS (CCRE CISMID) Miguel Estrada Carlos Zavala Fernando Lazares Jorge Morales Japan Peru Center for Earthquake Engineering Research
COWI offshore wind marine engineering services
COWI offshore wind marine engineering services 2 COWI expertise COWI is a highly versatile and multidisciplinary company. We provide services within engineering, environment and economics and operate worldwide
OCEAN LÍDER: Ocean Renewable Energy Leaders
OCEAN LÍDER: Ocean Renewable Energy Leaders Juan Amate López Offshore Projects Manager / Iberdrola I&C 7th October Removing barriers and building competences Ocean Líder : Harvesting the seas Road to Ocean
12.5: Generating Current Electricity pg. 518
12.5: Generating Current Electricity pg. 518 Key Concepts: 1. Electrical energy is produced by energy transformations. 2. Electrical energy is produced from renewable and non-renewable resources. 4. Electrical
INVESTOR PRESENTATION
INVESTOR PRESENTATION Santiago, March 2010 1. EMPRESAS SOCOVESA HISTORY 1965 Real Estate & Construction Company founded by Eduardo Gras Díaz First housing development 16 houses in Temuco 1967 New partners
Empresas CMPC S.A. 05.10. Company Overview Presentation prepared for Itaú Securities 5 th Annual Latin America CEO Conference
Empresas CMPC S.A. 05.10 Company Overview Presentation prepared for Itaú Securities 5 th Annual Latin America CEO Conference 1920 2010 Agenda Overview 3 Business Divisions 7 Social Responsibility and Sustainability
Antamina Closure Plan: A Top Level Practice. Eng. Antonio Mendoza, M.Sc., MBA Environmental Manager 2010
Antamina Closure Plan: A Top Level Practice Eng. Antonio Mendoza, M.Sc., MBA Environmental Manager 2010 Content Evolution of Environmental Regulation Closure Process Antamina Closure Evolution of Environmental
BMP Guidelines. Environmental Impact Assessment (EIA) report for activities related to hydrocarbon exploration and exploitation offshore Greenland
BMP Guidelines for preparing an Environmental Impact Assessment (EIA) report for activities related to hydrocarbon exploration and exploitation offshore Greenland Danish National Environmental Research
Investment opportunities in the Hydrocarbon Sector of Peru
Investment opportunities in the Hydrocarbon Sector of Peru Aurelio Ochoa Alencastre April, 2012 HC OCURRENCE IN PERU THE SUBANDEAN MEGATREND IN PERU 1. West Marañón Basin: Light Oil 2. East Marañón Basin:
2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited
(IV) Proposed Terms of Reference for EIA Studies Project Category Project Proponent Location Paraspani Thermal Power Plant (2x800 MW) Coal based Thermal Power Project A [1(d) Thermal Power Plant 500 MW]
It also covers the following optional activities:
2 PROJECT DESCRIPTION UPDATE 2.1 INTRODUCTION The Original EMPr evaluated the potential impacts of 2D seismic surveys in the Exploration Area. Two seismic surveys were subsequently carried out: one in
Private Investment Promotion Plan
REPUBLIC OF PERU Private Investment Promotion Plan Project: Energy Security of the Country and Peru s South Gas Pipeline Development Private Investment Promotion Agency PROINVERSIÓN Committee in Energy
THE PROVISIONAL CENTRAL PRODUCT CLASSIFICATION
THE PROVISIONAL CENTRAL PRODUCT CLASSIFICATION GROUP 867 ARCHITECTURAL, ENGINEERING AND OTHER TECHNICAL SERVICES Excerpt from CPCprov-en-Publication.doc - United Nation Statistic Division Group Class Subclass
Pipeline Engineering and Field Services
Pipeline Engineering and Field Services Field Services Professionals Your Reliable Partner Mustang s Pipeline Field Services Group is recognized by the industry as a reliable partner for providing a complete
Your Career as a Geologist at Bechtel
Your Career as a Geologist at Bechtel Alumni Student Careers Forum Earth and Planetary Science 325 McCone Hall October 22, 2008 Presenter: Peter Yen Bechtel -San Francisco Alumni Student Careers Forum
Hydrographic and Sediment Surveying
Hydrographic and Sediment Surveying Hydrographic Surveying Invasive Vegetation Mapping Sediment Surveying Land Mapping Sub-Bottom Profiling Bio-Volume Vegetation Mapping Side Scanning Sonar Data Collection
Section E2 Coastal Engineering: Reconstruction Management and Mitigation
271 Section E2 Coastal Engineering: Reconstruction Management and Mitigation 272 Objectives To familiarize the assessor with the process that should be followed in organizing any reconstruction efforts.
Puerto de Gran Escala
Puerto de Gran Escala The case for a new container terminal in central Chile 20 Discussion Paper 2013 20 Alexis Michea Ministry of Transport and Telecommunications, Chile Puerto de Gran Escala (PGE) Discussion
Instrumentation for Monitoring around Marine Renewable Energy Devices
Instrumentation for Monitoring around Marine Renewable Energy Devices 1 Introduction As marine renewable energy has developed, a set of consistent challenges has emerged following attempts to understand
Offshore monitoring for geological storage
Offshore monitoring for geological storage Dr Douglas Connelly National Oceanography Centre University of Southampton Waterfront Campus Southampton [email protected] IEAGHG Taking stock of progress and
Aquaculture is our Business
Aquaculture is our Business B184 Aug 2013 Xylem Analytics a leading manufacturer of premium field, portable, laboratory and online analytical instrumentation Our comprehensive range includes meters, electrodes,
How To Buy Playa Balsal Jaco Property In Costa Rica
Playa Balsal Investment Property Offering Jaco, Puntarenas 1. Property Profile Playa Balsal Jaco, Puntarenas 1. Property Profile Table of Contents: (506) 88476680 1. 2. 3. 4. 5. 6. 7. 8. Beach Frontage
