1 FEBRUARY, 2011 PHOTOVOLTAIC SYSTEM DESIGN AND INSTALLATION From the pre-feasibility study to the commissioning
2 FEBRUARY, 2011 TABLE OF CONTENT PROJECT OVERVIEW 3 PHASE 1: PRE-FEASIBILITY STUDY 4 A- Site selection 4 B- Collect of information and technical surveys 4 PHASE 2: PHOTOVOLTAIC SYSTEM DESIGN 5 A- Estimating system output 5 B- Select the mounting system 6 PHASE 3: BUSINESS PLAN 7 A- Feed-in-tariff 7 B- What to consider for solar PV finance 7 PHASE 4: PERMISSION PLANNING 8 A- Documentation 8 B- Support scheme 8 C- Grid connection permit 8 PHASE 5: SELECTION OF SUPPLIERS 9 A- Components of a PV system 9 B- Selection criteria 9 PHASE 6: SYSTEM INSTALLATION 10 A - Set up the photovoltaic generator 10 B - Wiring and commissioning 10 C - Grid connection 10 PHASE 7: MANAGEMENT OF THE INSTALLATION 11 A - Monitoring system 11 B - Maintenance 11 PHASE 8: END-LIFE OF THE INSTALLATION 12 A - More than 25 years of production 12 B - Decommissioning 12 C - Recycling 12
3 PAGE 3 PROJECT OVERVIEW Building-up a large-scale photovoltaic installation requires several steps and preliminary surveys in order to confirm the reliability of the project. Each phase is essential and it takes around 6 months to achieve the project. PHASE STEP DURATION Phase 1 Pre-feasibility study 2 weeks Phase 2 Photovoltaic system design 2 weeks Phase 3 Business plan 2 weeks Phase 4 Planning permission 8 weeks Phase 5 Selection of suppliers & providers 4 weeks Phase 6 System installation 4 weeks Phase 7 PV installation management For 25 years Phase 8 End-life installation After 25 years
4 PAGE 4 PHASE 1: PRE-FEASIBILITY STUDY Thatʼs the first step of the project. When the decision is made to invest in a photovoltaic system, it is required to collect all the useful information in order to identify the interest and the feasibility of the project. A- Site selection One of the great advantages of solar photovoltaic is the simplicity of its installation, and a certified installer will do most of the work for you. However, essential criteria are required: -Orientation: Ideally, the surface should be south facing at a angle. Most farm and industrial building roofs are not at this angle, but the mounting system can be adjusted to provide the output needed. -Location: Avoid shade, although solar systems do not need direct sunlight to generate electricity, they will work much better the more they receive. The South of England is best suited because it is generally sunnier, but most parts of England have sufficient daylight to make it viable. -Presence of grid utility to feed the electricity network authority. The production of electricity will be sold to the national grid. Suitable electrical installation must be close the installation and meet local utility interconnection requirements. - The photovoltaic system size depends on the project budget, the size of the roof (for roof mounted systems) or the land (for ground mounted systems) and on the type of solar used. B- Collect of information and technical surveys Before moving forward in the project, two things to do: - Collect the useful information: geographical position, building or land dimensions, sun irradiation, cadastre, maps, pictures, etc. - Topographical, building structure and environmental impact surveys.
5 !"$%&'())('*+%,-*./ PHASE 2: PHOTOVOLTAIC SYSTEM DESIGN PAGE 5! 0123$ :10$,52450$:1;<3$450 The photovoltaic installation design is done by an renewable energy consultancy specialised in photovoltaic system design and able to provide the most appropriate system based on the following criteria: )-%./$01230*/%4561$7%859$6% 8:$2$%*2$%1;<%+$$2*/%159$6%<=%$/$01230*/%>$63+6%=<2%)-%9<;$2%6561$76%=<2%:<7$6?%6561$76%1:*1%31$2*01%;31:% - Sunlight and weather resistant materials for all outdoor equipment. - Array location to minimise shading from foliage, vent pipes, and adjacent structures. -1:$%"13/315%9<;$2%+23>%*>%:*@$%<%A*11$25%A*0B"9%0*9*A3/315?%*>%6561$76%1:*1%31$2*01%*>%30/">$% System design in compliance with all applicable building and electrical codes. -A*11$25%A*0B"9%*6%;$//C%% System design with a minimum of electrical losses due to wiring, fuses, switches, and inverters. - System design meets local utility interconnection requirements. - Roof area or other installation site is capable of handling the desired system size. &C(C(C%D23>EF1$2*013@$%G/5%HI<%J*11$25%J*0B"9K% 8:36%159$%<=%6561$7%</5%<9$2*1$6%;:$%1:$%"13/315%36%*@*3/*A/$C%430$%"13/315%<"1*+$6%*2$%2*2$L%1:36%6561$7%;3//% <27*//5%92<@3>$%1:$%+2$*1$61%*7<"1%<=%A3//%6*@3+6%1<%1:$%0"61<7$2%9$2%><//*2%<=%3@$617$1C% M<;$@$2L%3%1:$%$@$1%<=%*%<"1*+$L%1:$%6561$7%36%>$63+$>%1<%6:"1%><;%"13/%"13/315%9<;$2%36% 2$61<2$>C% 85930*/%4561$7%N<79<$16O%% A- Estimating system output )-%P22*5O%%P%)-%P22*5%36%7*>$%"9%<=%)-%7<>"/$6L%;:30:%*2$%$@32<7$1*//5E6$*/$>%0<//$013<6%<=%)-%N$//6Q 1:$%>$@30$6%1:*1%0<@$21%6"/3+:1%1<%$/$ C%%8:$%7<61%0<77<%)-%7<>"/$%1:*1%36%,E1<E&,%6R"*2$% =$$1%3%63S$%*>%;$3+:6%*A<"1%TEU%/A6CV=1 & C%G=1$%6$16%<=%=<"2%<2%7<2$%67*//$2%7<>"/$6%*2$%=2*7$>%<2% PV systems produce power in proportion to the intensity of sunlight striking the solar array *11*0:$>%1<+$1:$2%A5%612"16%3%;:*1%36%0*//$>%*%9*$/C%8:36%9*$/%36%15930*//5%*2<">%&'ET,%6R"*2$%=$$1% surface. The intensity of light on a surface varies throughout a day, as well as day to day, 3%*2$*%=<2%$*6$%<=%:*>/3+%<%*%2<<=C%8:36%*//<;6%6<7$%*66$7A/5%*>%;323+%="013<6%1<%A$%><$% so <%1:$%+2<">%3=%0*//$>%=<2%A5%1:$%361*//*13<%3612"013<6C% the actual output of a solar power system can vary substantial. There are other factors that affect the output of a solar power system. These factors need to be understood so that the 1:$%6</*2%7<>"/$6%31<%1:$%612"01"2*/%*>%$/$01230*/%6561$76%<=%1:$%:<7$C%8:$%;323+%6561$76%30/">$% customer has realistic expectations of overall system output and economic benefits under >360<$016%=<2%1:$%>0%*>%*0%63>$6%<=%1:$%3@$21$2L%+2<">E=*"/1%92<1$013<L%*>%<@$20"22$1% variable weather conditions over time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alculate your roof size to determine the maximum size of your PV system - Analyse the orientation of your roof, incline and shading to determine how much sunlight your system is able to capture and if your system operates near its rated efficiency - Solar radiation of your geographical region!! )-%P22*5% )-%P22*5% N320"31% N<7A3$2%% D2<">E]*"/1% )2<1$01<2%% [N% ]"6$>% 4;310:% [NVPN% F@$21$2% PN% ]"6$>% 4;310:% \13/315% 4;310:% W*3%4$2@30$% )*$/%! \13/315%! D23>EF1$2*013@$%)-%4561$7%;V<%J*11$25%J*0B"9% % &C(C&C%D23>EF1$2*013@$%X31:%J*11$25%J*0B"9% 8:36%159$%<=%6561$7%30<29<2*1$6%$$2+5%61<2*+$%3%1:$%=<27%<=%*%A*11$25%1<%B$$9%Y023130*/%/<*>Z%0320"316%3%1:$% calculate the production forecast on 25 years :<"6$%<9$2*13+%>"23+%*%"13/315%<"1*+$C%X:$%*%<"1*+$%<00"26%1:$%"31%>360<$016%=2<7%1:$% "13/315%*>%9<;$26%69$03=30%0320"316%3%1:$%:<7$C%8:$6$%023130*/%/<*>%0320"316%*2$%;32$>%=2<7%*% A photovoltaic design software is used to choose the output of, inverters and!"$%&''(%%! )*+$%,%
6 PAGE 6 B- Select the mounting system A wide range covering all possible scenarios of photovoltaic installation, from the building integration to the PV plant on ground. Ground mounting system On roof mounting system BIPV - Roof mount is often the most convenient and appropriate place to put the PV array is on the roof of the building. The PV array may be mounted above and parallel to the roof surface with a standoff of several inches for cooling purposes. Sometimes, such as with flat roofs, a separate structure with a more optimal tilt angle is mounted on the roof. - Ground mounted solution that can be used in almost all kinds of situations, from residential to large commercial, right through to utility scale. - Building-Integrated PV Array (BIPV) is another type of system allows easy integration of framed photovoltaic into the roofs of buildings, old and new, whatever the existing structure. This smart and innovative system has been developed to be a versatile integrated solution. Up to this point, selection, installation, and performance of PV systems have been discussed. System documentation should include an ownerʼs manual and copies of relevant drawings for whatever system maintenance might be required in the future.
7 PAGE 7 PHASE 3: BUSINESS PLAN A- Feed-in-tariff At this step of the project, it is valued the profitability according to the electricity production forecast on 25 years running of the PV installation considering the total investment. Feed In Tariff rewards solar PV up to 5MW capacity. The FIT is designed to enable a Return on Investment (ROI) of 5-10 per cent each year for well-sited PV installations. Scale Generation tariff Export tariff Tariff life time 2010/ / /13 4kW (new building) kW (retrofit) kW kW kW-5MW Stand-alone system B- What to consider for solar PV finance: - Generation Tariff: the price your energy supplier gives you for every unit of electricity produced, irrespective of whether you use it or export it. - Export Tariff: a minimum of 3p/kWh for all electricity exported to the Grid, this can be more depending on supplier and if you enter into a power purchase agreement. As an interim measure, payment of export tariffs to generators of 30kW or less will be made on the basis of deemed or estimated exports. The amount of electricity deemed to be exported for solar PV generators will be 50 per cent as a proportion of the metered generation output. (This will not apply if export meters are fitted). - Lower bills: account for the reduction in your energy bills if you use your own power. - Index linked: tariffs are linked to the Retail Price Index for electricity meaning your tariff will keep pace with inflation. - Tariff digression: the earlier you invest in renewable technologies, the greater the financial benefits. After 2012 the tariffs start to reduce, owing to the projected expansion of the PV market (up to 250MW of new solar capacity by 2011, compared to 22MW in 2009) which is expected to lead to lower technology costs. - Capital grants: the scheme generally prohibits recipients of grants from receiving FITs as this would mean they get a double benefit.
8 PAGE 8 PHASE 4: PERMISSION PLANNING A- Documentation Permission to install is dependent on the view of the local planning authority that will make a decision based on the views of the local planning committee. - Environmental Impact Assessment: an EIA would be required for an installation. - Planning permission: A Planning Application will need to be submitted with necessary supporting documents. The application will usually be decided upon in eight weeks (Government has imposed a target that 80% must be decided in the statutory 8 week period). - Planning decision: local Planning Authority (LPA) validates application and requests any missing documents and acknowledges applicant accordingly. LPA publicises and consults on application as necessary. Application is then assessed by Planning Officer/Planning Committee against valid information e.g. consultation responses, policies, responses to publicity etc. Negotiation with applicant if appropriate. Recommendation to Committee if not delegated and/or recommendation to Development Control Manager. Outcomes: - Planning Permission granted start work within the time limit and comply with conditions. - Permission granted with conditions accept conditions or appeal. - Application not decided in 8 weeks applicant has the right of appeal. - Permission refused Change proposal and submit new application or applicant can appeal. B- Support scheme For installations above 50kWp the installation must be registered on Ofgem's website using Ofgem's ROO-FIT process before an application is made to an Electricity Supplier. All suppliers with more than 50k domestic customers must offer FITs, smaller suppliers can volunteer to do so. A list of Licensees can be found on the Ofgem website. A generator can assign their right to FITs payments to a third party (nominated recipient) by way of bilateral agreement. C- Grid connection permit The connection of the solar PV system to the grid connection point will need to be completed as regulation G59/1 i.e. DNO makes offer to PV generator incorporating NGC requirements, procedure then as for residential systems over 16A per phase. Technical requirements must be in accordance with G59/1
9 PAGE 9 PHASE 5: SELECTION OF SUPPLIERS A- Components of a PV system The main components of a PV system include: - Solar panels, either mounted on the roof or the ground, or replacing the roof material. - Inverters, which turns the electricity from the panels into a form you can use for your home or business. Convert DC power into AC power. - System Monitoring provides feedback to the customer about the power and energy metering. Without proper metering the customer will never know whether the system is operating properly or not. - Mounting systems, on-roof, grounded or BIPV. - Cable and connectors, different length and section. B- Selection criteria When choosing a supplier and specifying a PV system, the following criteria help the decision-making process: - Company profile, reputation and references in similar projects - Technical advantages and innovative products - Quality and certification (such as MCS) - Competitiveness - Warranty and insurance Essential requirements for components - MCS approved - IEC standard - High efficiency cells - 25 years warranty - Quality Insurance package - G83/1 or G59 approved - IEC standard - European efficiency - 5 years warranty - Reliable after sale services - Sufficent load capacity and wind resistance - Long-term liability - 10 years warranty - Easy to install - Full system monitoring - String monitoring - Data record - System failure notification - Online portal PV MODULE INVERTER MOUNTING SYSTEM MONITORING SYSTEM
10 PAGE 10 PHASE 6: SYSTEM INSTALLATION B - Set up the photovoltaic generator The D-Day has started. After months and months, the installation begins and can go on for days depending of the number of to install. Preparation and making the roof tidy, ready to host the mounting system Rails are mounted directly on the roof structure Modules are installed and fixed on the rails C - Wiring and commissioning Thatʼs the final steps to the commissioning. All the installation is wired. After a final inspection, the installation will be ready to produce electricity. Wiring. Each will connected to each other and finally plug to the inverters On grid inverters and their protection devices D - Grid connection There will be a detailed procedure for this set out or referred to in the "construction and adoption" agreement which is not standard. There is no "legally set" process for testing and acceptance followed by adoption.
11 PAGE 11 PHASE 7: MANAGEMENT OF THE INSTALLATION A - Monitoring system With the decision for a PV system, you also decide for a long-term source of income. It means that the system must function smoothly at all times. The best way to manage your PV installation and your production of electricity is to use monitoring devices: Communication hub. It continuously collects all the data from the inverters on the system side, thereby keeping you informed of the systemʻs status at any given time: system monitoring, remote diagnosis, data storage and visualisation of the production of electricity. Web portal for professional management. Whether for a small home system or a large solar park, central administration and monitoring of several PV plants saves time and money. Plant operators, installers and inverter manufacturer service technicians have access to key data at any time, from any location. The yields of all inverters in a plant are compared fully automatically, permitting detection of even the smallest deviations. Large-scale display. A large-format display visualises yield, performance and CO2 reduction of PV systems in large, luminous figures. it derives the display data from the communication hub via the Ethernet interface. B - Maintenance Even if maintenance is minimal, there are no moving parts in the installation, so it is almost maintenance free. However, it is required to regularly inspect the installation: - Keep clean: If the PV installation is located in a dusty place and it doesnʼt rain frequently, it is recommended to clean the (e.g. birds dejection). - Connectors: check if all the connectors are properly plugged and if no scratch or damage appear on cables. - Protection devices: check if all the protection devices are in operation. - Mounting system: check if no damage on the installation racks. - Electrical measurement on specific parts (inverters).
12 Recycling of PAGE 12 PHASE 8: END-LIFE OF THE INSTALLATION A - More than 25 years of production Depending on the feed-in-tariff scheme and the right to run the installation, the PV system can still run after 25 years. Indeed, the end of the FIT contract between the installationʼs owner and the grid authority, doesnʼt mean the will stop produce electricity. The production of electricity will be use for your own consumption and will allow you to reduce your electricity bills. B - Decommissioning In some cases, land or roof are a concession for 25 years, and it will be required to dismount the full PV system. In that case, at the construction of the system, special material are used in order to recycle them after the life-time (e.g. use of ground screws instead of concrete foundation to avoid ground contamination). C - Recycling The PV industry is working to create truly sustainable energy solutions that take into consideration the environmental impacts of all stages of the product life cycle, from raw material sourcing through end-of-life collection and recycling. Although the PV industry is young, leading manufacturers embrace the concept of producer responsibility and have come together to put in place a voluntary, industry-wide take-back and recycling programme. By addressing future recycling needs now, it can be offered a truly sustainable energy solution today to help prevent climate change tomorrow. MAKING THE PHOTOVOLTAIC INDUSTRY DOUBLE GREEN LIFE CYCLE OF CRYSTALLINE SILICON MODULES Recycling of photovoltaic Re-use Raw materials Production process Production of photovoltaic Recycling process Module Installation of Collection of end-of-life photovoltaic Collection of Disinstallation of end-of-life Producing green energy Producing green energy Use of photovoltaic LIFE CYCLE OF THIN FILM MODULES
13 PAGE 13
Using the sun to generate electricity
Using the sun to generate electricity Image source: http://www.globalsolarcenter.com/files/2009/04/commercial-solar.jpg Solar panels information sheet What are the benefits? How does it work? What is the
DELIVERING BUSINESS ENERGY GO GREEN AND SAVE MONEY
DELIVERING BUSINESS ENERGY CO M M E R C I A L S O L A R S O LU T I O N S GO GREEN AND SAVE MONEY PAY LESS FOR YOUR ELECTRICITY WHAT YOU SAVE ENERGYAID MODEL HOW YOU GET LOW COST ELECTRICITY Green electricity
Technology Fact Sheet for Mitigation
Technology Fact Sheet for Mitigation Solar PV systems (>1MW) i Technology: Solar PV systems (>1MW) Sector : Energy Subsector : Technology characteristics Introduction Solar photovoltaic, or simply photovoltaic
SOLAR PV SYSTEM INFORMATION PACK
SOLAR PV SYSTEM INFORMATION PACK Apollo Solar the solar pv professionals If you are considering going green and earning money from solar energy, look no further than Apollo Solar we are fully qualified
Solar power system installation for homes & businesses
Solar power system installation for homes & businesses 02 For more information visit www.ac-solar.co.uk Welcome to AC Solar AC Solar is one of the UKs leading domestic Solar PV installers, with wide experience
Electricity from PV systems how does it work?
Electricity from photovoltaic systems Bosch Solar Energy 2 Electricity from PV systems Electricity from PV systems how does it work? Photovoltaics: This is the name given to direct conversion of radiant
Fact Sheet March 2013. Solar Photovoltaic Systems Electricity from Sunshine
Fact Sheet March 2013 Solar Photovoltaic Systems Electricity from Sunshine Farming connect Introduction Farming has always been about harvesting energy from the sun after all, every green leaf is a solar
SA Power Networks Planning for Solar PV? Customer information guide to network connected solar PV inverter systems
SA Power Networks Planning for Solar PV? Customer information guide to network connected solar PV inverter systems Contents Introduction 3 How solar PV power systems work 4 Solar modules 5 Is solar power
Solar PV checklist Questions to ask installers
Solar PV checklist Questions to ask installers When it comes to choosing a solar photovoltaic (PV) installation, there are a lot of variations which can make it difficult to compare quotes and to be sure
The Solar Power Specialists. Elm Park House, Elm Park Court, Pinner, Middlesex, HA5 3NN Solutions House, Unit A19, 20 Heron Road, Belfast, BT3 9LE
The Solar Power Specialists GB: 0845 64 39 772 NI: 0845 50 40 444 Email: [email protected] Visit: www.metartecsolar.com Elm Park House, Elm Park Court, Pinner, Middlesex, HA5 3NN Solutions House,
Solar Power HourSM. Solar educa on for your community.
Solar Power HourSM Solar educa on for your community. 1 Contents About. 1 Commonly Asked Questions.. 2-3 The Solar Site Assessment.. 3-4 Selecting a Solar Installer. 5-7 Certified Installers by State.
A SOLAR GUIDE - EVERYTHING YOU NEED TO KNOW
WE BRING GREEN SOLUTIONS TO YOU A SOLAR GUIDE - EVERYTHING YOU NEED TO KNOW Provided by A COOLER PLANET A Cooler Planet 1 The Complete Solar Guide WHY GO SOLAR? TOP FIVE FACTORS TO CONSIDER FOR ADDING
Solar Solutions and Large PV Power Plants. Oscar Araujo Business Development Director - Americas
Solar Solutions and Large PV Power Plants Oscar Araujo Business Development Director - Americas Solar Business of Schneider Electric The Solar Business of Schneider Electric is focused on designing and
Photo Kirklees IS SOLAR ENERGY FOR ME? A guide to going solar
Photo Kirklees IS SOLAR ENERGY FOR ME? A guide to going solar WHY SOLAR? Economics Solar energy can reduce bills, earn you money and protect you from rising energy prices. Solar is a free source of energy
Corona Department of Water & Power (DWP) Solar Partnership Program Guidelines and Application
Corona Department of Water & Power (DWP) Solar Partnership Program Guidelines and Application DWP s new Solar Partnership Program is available to help offset your investment in a PV system and get you
Yield Reduction due to Shading:
1x4 1x16 10 x CBC Energy A/S x Danfoss Solar Inverters CBC-40W Poly 40 W TLX 1,5k 5 ; 1x11 3x4 0 1,5kW 1536 x CBC Energy A/S 1 x Power-One CBC-40W Poly 40 W TRIO-7,6-TL-OUTD 30 ; 4x14 0 7,6kW Location:
Solar technology. A guide to solar power at utility scale. in Africa
Solar technology A guide to solar power at utility scale in Africa About solar power Solar electricity is generated using a free and abundant energy source the sun. In a single hour, the sun transmits
Solar Panels for your Home and Business
Solar Panels for your Home and Business Call: 01834 888 330 www.silverstonegreenenergy.co.uk Whether we are working on a 33,000 Volt solar farm or a system for your home, our electrical engineers use the
Design of Grid Connect PV systems. Palau Workshop 8 th -12 th April
Design of Grid Connect PV systems Palau Workshop 8 th -12 th April INTRODUCTION The document provides the minimum knowledge required when designing a PV Grid connect system. The actual design criteria
NBF. Electrical. www.nbfelectrical.com.au WHY GO SOLAR? NBF ELECTRICAL EXPLAINS WHY
Electrical NBF www.nbfelectrical.com.au WHY GO SOLAR? NBF ELECTRICAL EXPLAINS WHY contact NBF Electrical Nathan Fielke Mobile: 0433 145 587 Fax: (08) 8346 4044 ABN 75 536 121 682 CEC A3966385 PGE197475
BEST PRACTICE REGULATION OF THE AUSTRALIAN SOLAR INDUSTRY CLEAN ENERGY COUNCIL FEBRUARY 2015
BEST PRACTICE REGULATION OF THE AUSTRALIAN SOLAR INDUSTRY CLEAN ENERGY COUNCIL FEBRUARY 2015 1 This paper outlines the current regulatory framework for the Australian solar industry, and the range of initiatives
Solar and Wind Energy for Greenhouses. A.J. Both 1 and Tom Manning 2
Solar and Wind Energy for Greenhouses A.J. Both 1 and Tom Manning 2 1 Associate Extension Specialist 2 Project Engineer NJ Agricultural Experiment Station Rutgers University 20 Ag Extension Way New Brunswick,
RENEWABLE ENERGY INVESTMENTS
RENEWABLE ENERGY INVESTMENTS FREQUENTLY ASKED QUESTIONS SOLAR PV What are photovoltaics (PV)? First used in about 1890, the word photovoltaic has two parts; photo derived from the Greek for light, and
EFFICIENT EAST-WEST ORIENTATED PV SYSTEMS WITH ONE MPP TRACKER
EFFICIENT EAST-WEST ORIENTATED PV SYSTEMS WITH ONE MPP TRACKER A willingness to install east-west orientated photovoltaic (PV) systems has lacked in the past. Nowadays, however, interest in installing
Consumer guide. be brighter. actewagl.com.au/solar [email protected] 13 14 93
be brighter. Consumer guide. Your guide on how solar works, how much you can save on your electricity bills and how to choose the right provider and system for you. actewagl.com.au/solar [email protected]
Listed are common requirements that apply to existing solar installations when altered, added to or reconfigured.
SOLAR ALTERATIONS REQUIREMENTS August 2015 These requirements address typical alterations to solar installations; they cannot address every scenario. In Victoria, an alteration to a solar installation
SOLAR TECHNOLOGY CHRIS PRICE TECHNICAL SERVICES OFFICER BIMOSE TRIBAL COUNCIL
SOLAR TECHNOLOGY CHRIS PRICE TECHNICAL SERVICES OFFICER BIMOSE TRIBAL COUNCIL SOLAR TECHNOLOGY Photovoltaics Funding Options Solar Thermal Photovoltaics 1. What are they and how do they work? 2. The Solar
Residential Solar Service Agreement (RSSA) Customer Sited Solar Photovoltaic Systems
Residential Solar Service Agreement (RSSA) Customer Sited Solar Photovoltaic Systems This Agreement is made and entered into this day of, 20, ( Effective Date ) by and between the Orlando Utilities Commission
Running the Electric Meter Backwards: Real-Life Experience with a Residential Solar Power System
Running the Electric Meter Backwards: Real-Life Experience with a Residential Solar Power System Brooks Martner Lafayette, Colorado University of Toledo Spring 2015 PHYS 4400 - Principles and Varieties
SOLAR PV STANDARD ELECTRICAL PLAN Microinverter Systems for Single Family Dwellings
*** Provide this document to the inspector along with ALL system installation instructions *** Project Address: Scope: Standard plan for the installation of grounded microinverter solar PV systems, not
Feed in Tariffs for Microgeneration. Jos Mister Energy Saving Trust
Feed in Tariffs for Microgeneration Jos Mister Energy Saving Trust Funding and Finance Feed in Tariffs Clean Energy Cashback April 2010 Renewable Heat Incentive April 2011 Business support Enhanced Capital
12 SOLAR PHOTOVOLTAIC POWER SUPPLY SYSTEMS by John Ware. PV modules are current-limiting
12 SOLAR PHOTOVOLTAIC POWER by John Ware IT IS PLANNED for BS 7671:2008 to include a new Section 712 providing additional requirements for safety applicable to solar photovoltaic (pv) power supply systems.
Free electricity for your home, offices or factory with solar PV panels
Free electricity for your home, offices or factory with solar PV panels Who we are Easy Being Green helps customers reduce their household s energy consumption by using energy saving products. Easy Easy
Solar energy is available as long as the sun shines, but its intensity depends on weather conditions and geographic
Solar Energy What is Solar Energy? The radiation from the sun gives our planet heat and light. All living things need energy from the sun to survive. More energy from sunlight strikes the earth in one
SOLARCARE SERIES PRODUCT AND APPLICATION GUIDE
SOLARCARE SERIES PRODUCT AND APPLICATION GUIDE for solar energy management LEATEC Delivering Solutions for Energy Management SOLAR ENERGY DATA CENTER BUILDING 4 to8 String Monitoring with 0.% Accuracy
Everything you wanted to know (in simple language) about
DYSON E S We s e t E R t h e N E R G V I C E Y S s t a n d a r d s Everything you wanted to know (in simple language) about Solar Energy but were too afraid to ask This is your perfect little ray of sunshine
Frequently Asked Questions SOLAR ENERGY:
Frequently Asked Questions SOLAR ENERGY: Why should I have Solar Power? There are lots of reasons that make installing Solar Power Generation worthwhile: Environmental Green advantages Zero carbon emissions
Gross/Active PV Surface Area: 13.094,40 / 13.086,29 m². Energy Produced by PV Array (AC):
1x17 1x17 1x 8 x Trina Solar Trina TSM-PC5A 6 6 W 5 ; x Danfoss Solar Inverters TLX 1,5k 1,5kW Location: Arrondissement d'issoire Climate Data Record: Arrondissement d'issoire PV Output:.8, kwp Gross/Active
Solar Power at Vernier Software & Technology
Solar Power at Vernier Software & Technology Having an eco-friendly business is important to Vernier. Towards that end, we have recently completed a two-phase project to add solar panels to our building
e-factsheet Feed-in Tariffs what we have to offer
e-factsheet Feed-in Tariffs what we have to offer 2 of 12 Feed-in Tariffs (FITs) make renewable generation more financially rewarding for smaller installations and help reduce the UK s carbon emissions.
Tel: 01665833270 / mob: 07709165734 Email: [email protected] Solar PV Information Pack
Robert Porteous Roofing, scaffolding & Solar PV specialists Tel: 01665833270 / mob: 07709165734 Email: [email protected] Solar PV Information Pack About Our company: Our company is an MCS accredited
Solar Power Frequently Asked Questions
General information about solar power 1. How do I get solar power? Solar Power Frequently Asked Questions Many companies install solar power systems including some electricity retailers. It is worth comparing
Guide to Installing a Solar Electric System
Guide to Installing a Solar Electric System PHOTO CREDIT: BROTHERS ELECTRIC AND SOLAR This guide is designed to provide Seattle City Light customers with information on grid-connected solar electric systems.
Solar systems provide a range of flexible heating
f a c t s h e e t 7 Solar Power Production photo by Alex Nikada Why solar? Solar systems provide a range of flexible heating and electricity options and are particularly wellsuited to remote or off-grid
6 YEAR * PAYBACK A GUIDE TO DOMESTIC RENEWABLE HEAT INCENTIVE (RHI) SOLAR THERMAL SOLUTIONS
6 YEAR * PAYBACK A GUIDE TO DOMESTIC RENEWABLE HEAT INCENTIVE () SOLAR THERMAL SOLUTIONS RENEWABLE HEAT INCENTIVE KINGSPAN SOLAR RENEWABLE HEAT INCENTIVE () EXPLAINED The Renewable Heat Incentive is intended
Solar PV Panels. A talk by Ham and Petersham Street Champions
Solar PV Panels A talk by Solar PV Panels An Overview: Chris Photovoltaics PHOTO = Light VOLTAIC = Electric Solar PV panels capture the sun's energy and convert the sunlight into electricity. On-Roof PV
ANALYSIS 2: Photovoltaic Glass Replacement
ANALYSIS 2: Photovoltaic Glass Replacement Problem Identification Bridgeside II is designed to accommodate 80 percent lab space and 20 percent office space. Laboratory equipment can consume a considerable
Solar Energy Opportunities for the Australian Nursery Industry
Solar Energy Opportunities for the Australian Nursery Industry Introduction Solar energy is a freely available source of renewable energy that is suitable for utilisation at almost all locations in Australia.
We're with you... solar. Call 1800 332 332 today FOR THE LIFE OF THE SYSTEM YEAR WARRANTY * YEAR OLD BACKED BY CSR BRADFORD CSR A AUSTRALIAN COMPANY
We're with you... FOR THE LIFE OF THE SYSTEM 25 YEAR WARRANTY * Electricity prices are predicted to continue to rise in the future. If you're serious about installing energy in your home, look no further
Irradiance. Solar Fundamentals Solar power investment decision making
Solar Fundamentals Solar power investment decision making Chilean Solar Resource Assessment Antofagasta and Santiago December 2010 Edward C. Kern, Jr., Ph.D., Inc. Global Solar Radiation Solar Power is
SHARP SOLAR Frequently Asked Questions for PV Integrators Revised 05/04/2010
SHARP SOLAR Frequently Asked Questions for PV Integrators Revised 05/04/2010 How do I determine the PTC rating of a module? PTC refers to PVUSA Test Conditions, which were developed to test and compare
Replacing Fuel With Solar Energy
Replacing Fuel With Solar Energy Analysis by Michael Hauke, RSA Engineering January 22, 2009 The Right Place for Solar Energy Harvesting solar energy at South Pole can reduce the fuel consumption needed
SOLAR FARM KITS Off grid/battery backup
SOLAR FARM KITS Off grid/battery backup BROCHURE 2012 Solar Farm kits Pty Ltd 30 Justin Ave North Tamborine QLD 4272 P: 1300 695 928 M: 0432 050 824 E: [email protected] W: www.solarfarmkits.com.au
SOLAR POWER. Information Book
SOLAR POWER Information Book OUR BUSINESS Easy Being Green; Is Australia s largest energy saving company Has helped over 800,000 Australians go solar or become more energy efficient Is Australian owned
The days of cheap abundant electricity are over! This article forms part
Solar Power for Metal Finishers By Helmut Hertzog of Atlantic Solar The days of cheap abundant electricity are over! This article forms part of a series of articles where we will explore the possibility
Solar PV Installations for Social Housing Providers
Solar PV Installations for Social Housing Providers a bright idea, a greener community. t: 0141 435 7774 e: [email protected] Solar PV Installations for Social Housing Providers Campbell
32/1/2013-14/PVSE(Part-II) Ministry of New and Renewable Energy SPV Off Grid Division
Annexure-A 32/1/2013-14/PVSE(Part-II) Ministry of New and Renewable Energy SPV Off Grid Division Scheme: Installation of 10,000 nos. of solar photovoltaic water pumping systems for irrigation purpose implemented
What are the basic electrical safety issues and remedies in solar photovoltaic installations?
What are the basic electrical safety issues and remedies in solar photovoltaic installations? Presented by: Behzad Eghtesady City of Los Angeles Department of Building and Safety Topics Covered Photovoltaic
PVWATTS DERATING FACTORS FOR SOLARBRIDGE PANTHEON MICROINVERTERS AND ACPV SYSTEMS
PVWATTS DERATING FACTORS FOR SOLARBRIDGE PANTHEON MICROINVERTERS AND ACPV SYSTEMS AUTHOR Vincent Bartlett Senior Member of Technical Staff Version 1.5 March 22, 2013 SolarBridge Technologies 1 INTRODUCTION
MORE POWER. A BETTER INVESTMENT.
SUNPOWERCORP.COM US HEADQUARTERS SunPower Corporation 3939 N. 1st Street San Jose, California 95134 USA 1-800-SUNPOWER sunpowercorp.com MORE POWER. A BETTER INVESTMENT. Established Incorporated in 1985
Solar Photovoltaic Frequently Asked Questions
Table of Contents 1. What is Solar Energy?... 2 2. What are the basic component of a Solar PV system?.2 3. What are the different types of PV systems ATL offers?...2 4. What is the difference between mono-crystalline
Solar Energy Systems. Matt Aldeman Senior Energy Analyst Center for Renewable Energy Illinois State University
Solar Energy Solar Energy Systems Matt Aldeman Senior Energy Analyst Center for Renewable Energy Illinois State University 1 SOLAR ENERGY OVERVIEW 1) Types of Solar Power Plants 2) Describing the Solar
The city of Malmö, Sweden
The city of Malmö, Sweden 1. Introduction Malmö is a municipality of 280 000 inhabitants located in Southern Sweden. It is the third largest city in Sweden. It developed from a garrison town in the late
One. Invest with confidence Smart Solar Inverter Solutions. solarinvertersolutions.com. Residential, commercial and large scale applications
MAKING MODERN LIVING POSSIBLE Invest with confidence Smart Solar Inverter Solutions Residential, commercial and large scale applications One inverter supplier of reliable, flexible and user friendly inverter
Commercial Outlook for Solar Power Generation
Commercial Outlook for Solar Power Generation International Conference on Alternative Energy 2010 March 27, 2010 Karachi Expo Center Nadeem Haque Nadeem Haque Energy Potential Inc. Topics 1. Market Scenario
Solar Power for Agriculture and Our Experiences at the Middlesex County EARTH Center Rutgers Cooperative Extension William T. Hlubik Agricultural and Resource Management Agent Rutgers Cooperative Extension
Bankable Data and Interoperability Standards
Alternative Energy E Magazine emagazine Issue Oct / Nov 2012 http://sunspec.org/bankable- data- interoperability- standards/ Bankable Data and Interoperability Standards Data quality derives from the combination
Future Business Opportunities Emerging Technologies & New Markets
Transforming Scotland Solar can no longer be ignored with Solar Future Business Opportunities Emerging Technologies & New Markets Ray Noble STA Solar PV Specialist National Solar Centre Associate Co-Chair
Exploration of Solar Power for the Modern Poultry Farm
Exploration of Solar Power for the Modern Poultry Farm Dennis Brothers, Jess Campbell, Jeremiah Davis, Gene Simpson, Jim Donald National Poultry Technology Center, May 2016 The ever evolving modern poultry
Solar Energy. Airports Going Green Aimee Fenlon
Solar Energy Airports Going Green Aimee Fenlon 1 Renewable vs. Non-Renewable Electrical Generation Renewables: Source Advantages Disadvantages Solar PV No CO2; Needs no Fuel Intermittent no power at night,
WATERPROOF PHOTOVOLTAIC SYSTEM
WATERPROOF PHOTOVOLTAIC SYSTEM Nola, the biggest BIPV plant in the world. 25 MWp 9 KWp 7 KWp 580 KWp 110 KWp 20 KWp 430 KWp Synthetic layer - 50 KWp Synthetic layer - 30 KWp Synthetic layer -9 KWp STOPPING
Your guide to electricity from Photovoltaic Panel systems
Solar Power Explained: Your guide to electricity from Photovoltaic Panel systems Background Photovoltaic (PV) systems have been in use for over 50 years generating electricity directly from the sun as
Energy Savings through Solar Energy for Municipalities
Energy Savings through Solar Energy for Municipalities September 2014 2014 Sunvestment Group www.sunvestmentgroup.com Topics to Cover Who We Are RER Energy Group Sunvestment Group Why Now for Solar Energy
Community Solar Roof Guide
Community Solar Roof Guide Installing a community owned solar roof has become a reality in the UK since the introduction of the Feed-in-Tariff in April 2010, which pays renewable energy generators a premium
Additional Solar System Information and Resources
Additional Solar System Information and Resources Background information a. Roughly 400 schools in NJ already have solar systems, producing more than 91 MW, out of approximately 2500 K- 12 schools in NJ.
Solar Electric Power System Owner s Manual
GE Energy Solar Electric Power System Owner s Manual v4.2nmtr Safety...3 Documents...4 Congratulations...5 Principles of Operation...5 Measuring Your Power and Energy...7 Table of Contents Estimating Your
Training Systems for Renewable Energies. Acquiring Practical Skills and Project-oriented Expertise
Training Systems for Renewable Energies Acquiring Practical Skills and Project-oriented Expertise Qualifications through Quality Inexhaustible, sustainable, real the future is green The move away from
SOLAR ELECTRIC MODULE ES-124 & ES-62T Owners Manual and Installation Guide
SOLAR ELECTRIC MODULE ES-124 & ES-62T Owners Manual and Installation Guide circuit. Reverse connection will damage the module and may result in fire. CAUTIONS Solar electric modules produce DC electricity
Solar Kit. Complete solution to optimize your photovoltaic system
Solar Kit Complete solution to optimize your photovoltaic system April 2012 Mounting and selection quick guide On Grid Solar Kit rooftop installation INSTALLATION WITH OVERLAID SUB-STRUCTURE (A.1, A.2)
Introduction for Photovoltaic Power System Test in China. Zou Xinjing Institute of Electrical Engineering Chinese Academy of Sciences Nov.
Introduction for Photovoltaic Power System Test in China Zou Xinjing Institute of Electrical Engineering Chinese Academy of Sciences Nov. 6, 2012 Content Testing Status of PV power systems in China Test
LEHI CITY POWER NET METERING STANDARDS For Customer-Owned Electric Generating Systems
LEHI CITY POWER NET METERING STANDARDS For Customer-Owned Electric Generating Systems A. General This Net Metering Standard for Customer-Owned Grid Connected Electric Generating Systems sets forth the
Solar power plants for residential, commercial, utility and off-grid applications Part 2
Solar power plants for residential, commercial, utility and off-grid applications Part 2 Professor Chem Nayar INTERNATIONAL CONFERENCE 2014 POWER AND ENERGY SYSTEMS: TOWARDS SUSTAINABLE ENERGY, BANGALORE
SOLAR PV INFORMATION. January, 2015
January, 2015 SOLAR PV INFORMATION Thank you for the opportunity to present you with information about Solar Photovoltaic (PV) Energy Systems in the East Texas area. This document will give you a brief
Financial Analysis of Solar Photovoltaic Power plant in India
Financial Analysis of Solar Photovoltaic Power plant in India M. Ganga Prasanna, S. Mahammed Sameer, G. Hemavathi Department of Management Studies MadanapalleInstitute of Technology& Science Post Box No:
CertainTeed SOLAR. Solar From A Proven Source
CertainTeed SOLAR Solar From A Proven Source Solar Makes $ense The number of homeowners going solar has increased by an average of every year for the last 10 years. About half a million homeowners in the
Solar Benefits Colorado Program FAQ http://www.mygroupenergy.com/colorado
Solar Benefits Colorado Program FAQ http://www.mygroupenergy.com/colorado Program Questions What is Solar Benefits Colorado? The Solar Benefits Colorado program is an effort of the City and County of Denver,
Solar power Availability of solar energy
Solar Energy Solar Energy is radiant energy produced in the sun as a result of nuclear fusion reactions. It is transmitted to the earth through space by electromagnetic radiation in quanta of energy called
Green Education through Green Power: Photovoltaics as a Conduit to Interdisciplinary Learning
Green Education through Green Power: Photovoltaics as a Conduit to Interdisciplinary Learning The proposed project will enable ABC University to: 1) develop an interdisciplinary educational program to
GREEN ENERGY FOR THE BLUE PLANET.
1 GREEN ENERGY FOR THE BLUE PLANET. ECOLOGY & ECONOMY SOLAR POWER HAS MANY SUNNY SIDES. THE SUN IS NOT ONLY THE SOURCE OF ALL LIFE ON EARTH, IT IS ALSO THE LARGEST SOURCE OF ENERGY. ITS OUTPUT IS UNLIMITED