Masaryk University Faculty of Economics and Administration MASTER THESIS

Size: px
Start display at page:

Download "Masaryk University Faculty of Economics and Administration MASTER THESIS"

Transcription

1 Masaryk University Faculty of Economics and Administration MASTER THESIS BA. Isaac Tetteh Brno, 2014

2

3 Masaryk University Faculty of Economics and Administration Use of Project Management Methods Master thesis Author: Isaac Tetteh: ( ) Brno, 2014 Supervisor: Ing. Petr SMUTNÝ, Ph.D.

4 Masaryk University Faculty of Economics and Administration Department of Corporate Economy Academic year 2012/2013 ASSIGNMENT OF DIPLOMA THESIS For: Tetteh Isaac Field: Business Management Title: Use of Project Management Methods P r i n c i p l e s o f t h e s i s w r i t i n g: Objective of the thesis: The aim of the thesis is alternatively either to: a) analyze the course of actions of a real-life project and assess its effectiveness, or b) to create a plan for a new real-life project and prove its feasibility and effectiveness. This is to be done with the use of correct project management methods. Approach and methods used: The thesis will consist of two parts: Theoretical part will contain research of possible methods and their evaluation with respect to the project solved in the second (practical) part of the thesis. The second part will consist of application of chosen method(s) onto a particular project. This part will include analysis and economical assessment. Self-study and research of suggested as well as other relevant literature and resources will be an integral part of the work process. Author is expected to define the problem and identify methods to be used to reach the aim of the thesis.

5 The extent of graphical works: according to the supervisor's guidelines, the assumption is about 10 charts and graphs The thesis length without appendices: pages List of specialist literature: Advanced project management: best practices on implementation. ISBN CROW, Jeff. Applying project management in the workplace. 4th ed. Portland: Blackbird Publishing, s. ISBN Project Management (with MS Project CD Rom). ISBN MINTZER, Rich. The everything project management book: tackle any project with confidence and get it done on time. Avon: Adams Media Corporation, xii, 289 s. ISBN Diploma thesis supervisor: Ing. Petr Smutný, Ph.D. Date of diploma thesis assignment: 1/11/2012 Submission deadline for Diploma thesis and its entry in the IS MU is provided in the valid Academic Calendar. Department Head Dean In Brno on 1/11/2012

6 Abstract Project management has become crucial in the management of organizations, be it profit or nonprofit oriented. Today, many organizations largely depend on projects to achieve their strategic objectives. However, the success of these projects is to a large extent depends on the knowledge, skills, tools and techniques apply by the project manager. Facing resources constraints, organizations find ways of utilizing the limited available resources to achieve the most result by coordinating and managing those resources with possible maximum efficiency. Non-governmental organizations (NGO s) though not profit making organization as such, play a major role in national development in both developed and developing countries and more often than not, depend on projects in carrying out their activities. This thesis is set to examine how the general application of project management tools and techniques can help NGOs (though non-profit making organizations but also face resources both human and capital constraints) carry out these projects effectively and efficiently. Key Words: Project, project management, project management methods, Non-Governmental organization, business development.

7 Statement I hereby declare that this Diploma thesis, Use of Project Management Methods is entire my own work and has not been taken from the work of others except that such work has been cited and acknowledged according to legislation, internal regulations of Masaryk University and internal management acts of Masaryk University and the Faculty of Economics and Administration. In Brno,... Isaac Tetteh

8 Acknowledgements First of all, I would like to thank God for having seen me through this work, without Him nothing could be achieved. My profound gratitude goes to my supervisor and mentor, Ing. Petr SMUTNÝ, Ph.D., his patience in his mentorship contributed tremendously to the success of this work. His support and advice could not be overemphasized. My deepest appreciation goes to the management of Women in Progress, who made data available for this work. I would also like to thank my parents, Mr. and Mrs. Quaye for their encouragement and support, physically and spiritually. Finally, let me say thank you to all my friends who contributed in one way or the other to get this work done.

9 Special Dedication I dedicate this thesis to the memory of my late grandmother, Mad. Aba Amponsah, whose support and inspirations has brought me this far. Her good parental care to me has invaluably contributed in many ways to my academic achievement. May her soul rest in perfect peace!!!

10 Intentionally left blank

11 Contents Chapter 1: Introduction The objective of the thesis Methodology Chapter 2. Overview of project management Some terminologies use in project management Project environment The role of project manager Project lifecycle Managing the constraints Chapter 3. Project management processes Project Initiation Project Overview Statement Project Stakeholder management Project requirement collection Developing Project Objective Project Planning Process Group Project Execution Process Group Project monitoring and controlling process group Project Closing Process Group Project Management Knowledge Areas Chapter 4. Project Integration Management Developing project charter Developing project management plan... 37

12 4.3. Direct and manage project Monitor and control project work Perform integrated change control Close project or phase Chapter 5. Project Scope Management Scope management plan Project scope definition Work breakdown structure Validate Scope Project Scope Control Chapter 6. Project Time Management Network Diagrams Critical Path analysis Chapter 7. Project Cost Management Project Risk Management Project Risk Identification Risk assessment Risk Responses Chapter 9. Project management in the NGO sector: A case study of Business Development by Women in Progress Ghana Introduction Brief background of the NGO The Project Initiation Identification of stakeholders The Project Requirements Collection The Project Planning... 59

13 The Project Scope Definition Work Breakdown Structure (WBS) The Project Time The initial Project Budget Project Risk Planning Project Realization Project Result Analysis of the Project Planning and Realization Analysis of the Result Recommendations Conclusion References: Appendix: Calculation of Critical Path Figures: Figure 1. Cost and staffing levels across a generic Project life cycle 22 Figure 2. Impact of Variable Based on Project Time.23 Figure 3. The scope triangle 24 Figure 4. Project management process groups...25 Figure 5. Example of project overview statement...28 Figure 6. Stakeholders power/interest grid: Source...29 Figure 7. Example of WBS of a simple house project Figure 8A. Activity-on-node Figure 8B. Activity-on-arrow..47

14 Figure 9. Example of critical path of a project...49 Figure 10. Probability/impact chart Figure.11. Stakeholders power/interest grid Figure 12. Critical path analysis of the project...70 Figure 13. Risk probability/impact chart.74 Tables: Table 1. The 7-S of project management...20 Table 2. Project stakeholders...57 Table.3. Initial project budget estimate 63 Table 4. Project scheduling 70 Table 5. Actual project budget. 75

15 Chapter 1: Introduction Project management has been in existence since time immemorial, from the construction of the ancient Egyptian pyramids to the industrial revolutions of 1760 s through 1840 s in Europe a nd the United States. However, the term project management was not used until the 1950 s when some companies begun to create tools and techniques such as the Program Evaluation and Review Technique (PERT) by the US defense contractor, RAND and Critical Path Analysis by the chemical company, Du Pont for the planning of their production activities, and the later establishment of project management professional institutions (IPMA 1965 and PMI 1969). Today, the advancement of technology with the application of computer software in project planning have made project management an important means of addressing problems or taking opportunities, making the discipline even more attractive to many individuals and organizations in the performance of their activities. Project has therefore become integral part of modern organizations, both profit and on-profit oriented. However, the success or failure of an organization in achieving the project s objectives is to a large extent depends on the knowledge and skills of the project manager (the person assigned by the sponsor to lead the team that is responsible for achieving the project objectives). This thesis is to examine the general application of project management methodologies in the NGO sector by analyzing the effectiveness of this application in the course of action of a reallife-project in the NGO sector. The thesis has been divided into two main parts. In the first part, I will be reviewing some selected project management literatures that will help in the analysis of the second part by way of choosing the best possible tools and techniques which will help analyze a chosen project as a case study. In the second part, I will be analyzed and assess a project, Business Development which was carried out by an NGO, Women in Progress in Ghana. The aim of the project was to help develop a group of local women entrepreneurial abilities. Even though this project was like any other project that is carried out by profit oriented organizations, incidentally, it was carried out by an NGO. In this thesis, I will be analyzing the course of action, thus the project management 15

16 processes and project management knowledge areas that were applied to execute the project by the project manager and her team. Like projects carried out by profit-oriented organizations, NGOs projects also face resource constraints, both human and capital which requires proper management effort to enable a successful results. Ironically, there are increasingly failures in the execution of majority of these projects due to a number of reasons, chiefly amongst them, lack of proper project management methodology The objective of the thesis The objective of this thesis is to analyze the course of actions of a project, business development, a Ghanaian based NGO s project, and assess the effectiveness of the methodology used to carry out the project. Where appropriate, possible suggestions would be made as to how similar projects can be improved in the future by a rightful selection of project management tools and techniques Methodology The thesis is divided into two main parts. In the first part, secondary source of materials will be used by way of reviewing some selected Project Management literatures to determine a generic methodology that is applicable in project management irrespective of the project kind. In the second part, a comparative analysis of the reviewed literatures and the NGO s project under review will be made regarding the use of project management methodologies. This will give us a clearer picture as to whether a proper project management methodology was used from the project initiation, planning through its closing bearing in mind, there is no single way of managing projects. 16

17 Chapter 2. Overview of project management Questions have been raised as to why much attention be paid to Project management? Is project management different from general management of an organization? There are a lot of similarities, but there are enough differences to treat project management as a discipline separate from general management. Projects are more schedule-intensive than most of the activities that general managers handle (Lewis, 2007). The Project Management Institute (PMI) defines project as a temporary endeavor undertaken to produce a unique product, service, or result (PMI, 2013, p. 3). This means that a project is done only once. If it becomes repetitive, it s ceases to be a project; it then becomes operation (a routine activity). A project have definite starting and ending dates, and budget, a clearly defined scope of work to be done, as well as specific performance requirements that must be met. A project is a time and cost constrained operation to realize a set of defined deliverables (the scope to fulfill the project s objectives) up to quality standards and requirements (IPMA, 2006, p.13) It can also be defined as a unique process, consisting of a set of coordinated and controlled activities with start and finish dates, undertaken to achieve an objective conforming to specific requirements, including the constraints of time, cost and resources (ISO, 2003, p. 2). Per definition, project has certain characteristics that differentiate it from general management. It is design to create something unique which has not been done before and is to achieve a specific objective of an organization. According to Maylor, every project is unique; that is the exact project has not been performed before. The project has a degree of novelty, in terms of time, place, and team carrying out the task, product, service or the result being provided. Temporary: meaning the project does have a beginning and an end, and requires a group of people to carry out the task. Focused, which means that the task of the project is to deliver a particular product, service or result. 17

18 Project involves risk, which means that there are elements of uncertainties which need to be managed by the project manager and his team to accomplish a project. Project also faces resources constraints. That means that, there is always a limited resource which requires maximum management effort to achieve efficiency in results (Maylor, 2010) Some terminologies use in project management The following terminologies are associated with project management and are often use by professionals of project management. Work breakdown structure (WBS): is a deliverable oriented decomposition of a project into smaller components. Stakeholders: Any individual or group with an interest in the project process or outcome, (Maylor, 2010, p. 77). Triple constraints: this is managing time, cost and other resources of a project in a way that will keep the project scope in a balance. Baseline: approved plan for a project or schedule in the project. Activity: individual works that constitute the project. Duration: The numbers of minutes, hours, days, months, or years use to complete an activity in a project. Milestone: selected key events on the project base on their importance The life cycle of a project: the series of phases or activities that a project passes through from the beginning to the end. Scope: this is all the works that constitute the project 18

19 Program: a group of related projects managed in a coordinated way to obtain benefits and control not available from managing them individually (PMI, 2013, p. 9). Project portfolio: a collection of projects or programs and other work that are grouped together to facilitate effective management of that work to meet strategic business objectives (PMI, 2013, p. 9). Process: set of interrelated or interacting activities which transforms inputs into outputs (ISO, 2003, p. 2) Project environment This is the general environment in which the project is taking place. There are a number of factors that affect the product, service or result of a project and those factors can be grouped into internal or external. These factors are used to scan the project environment in order to identify those elements that can influence the progress of the project. External factors: there are a number of ways in which project external environment can be analyzed by individuals and organizations. One way to do so is the use of SLEPT (social, legal, economic, political, and technological) to analyze or assess the project environment so as to identify the elements that are likely to affect the smooth execution of the project. Socially, the life style of people where the project is taking place is always important to the success of the project. For example, projects like that of the NGO s are likely to secure the necessary support and funding if the people are development oriented. If the legal system of the environment in which the project is being carried out is transparent then stakeholders have confidence that project will not delay due to potential litigation and partial judgment that will bring the project to a standstill in case some individuals or groups stand against it. 19

20 Projects are usually successful where the political environment is quite stable. Projects that are carried out in environments where there is political instability are less likely to materialize due to potential political upheavals which may render the project environment unsafe for project team to work. Technology has become much important in project management as many individuals and organizations now depend on computer software to plan their project schedule, budget etc. With the advancement of communication technology, project team members are able to communicate easily through s, phone calls, text messages etc. Internal factors: The internal factors that affect projects were adopted form the original 7-S developed by McMcKinsey and Co., management consultants. Analysis of these elements can help project manager understand the project internal factors that can influence the outcome of the project. See the table below. Table 1. The 7-S of project management. Source: (Maylor, 2010, p. 28). 20

21 2.3. The role of project manager According to Lewis, the primary responsibility of the project manager is to ensure that all work is completed on time, within budget and scope, and at the correct performance level (Lewis, 2007, p. 24). That means that, the role of project manager is to get the work done at efficient and effective way by meeting the requirements of the sponsor. This is done by coordinating the resources (both human and capital) in a way that will yield maximum results. It is not the role of the project manager to do the actual work, but to plan, direct, monitor, and control the work such as managing the stakeholders especially the project team members, try to gear up motivation among the team so as to get everybody giving in the best to successfully get the job done. That is, the project manager must have people skills. The project manager must understand the mission and vision of the organization first, then they must see how the project they are managing meshes with the organization s mission, and they must steer the project to ensure that the interests of the organization are met (Lewis, 2007, p. 27). In addition to management skills, the project manager has to exercise leadership role for a successful completion of a project. According to Parker, Leadership is the art of getting others to want to do something that you believe should be done (Packard, 1962, cited in Lewis, 2007, p. 29). This means that as the project manager deals with the administrative aspects such as budgets, schedules, logistics etc. he also plays the leadership role that will get his team work on the project with enthusiasm by motivating and giving them the necessary authority to carry out their various functions Project lifecycle Like everyday activity we do as humans which has to be taking through some processes in order to come to a conclusion point at a certain stage, projects also goes through certain process in order to deliver the product, service or the result for which the project is being undertaking. The life cycle of a project is the series of phases or activities that the project passes through from the beginning to the end, which are usually sequential. In their fifth edition, the PMI identified certain stages that a project passes through during its life cycle. These are: starting the project, 21

22 organizing and preparing, carrying out the project work, and closing the project as a whole (PMI, 2013). These processes form the lifespan of a project irrespective of its size, nature or location. See Figure 1 below. Figure 1. Cost and staffing levels across a generic Project life cycle. Source: (PMI, 2013, p. 39). The stages are related to the project cost and staffing in most cases. Generally, cost and staffing levels are low at the beginning of a project, reaches its peak as the work is being executed, and declines as the project comes to an end. This means that at the initiation and the planning stage the risk of the project is relatively low and gets higher at the implementation or execution stage. Hence, the earlier changes are identified and fix, the lower the cost to the project. It is therefore important that at the initiation and planning stages, opinions, request and demands of all stakeholders are considered in order to minimize the risk of future changes resulting from demands of a stakeholder, see figure 2 below. 22

23 Figure 2. Impact of Variable Based on Project Time. Source: (PMI, 2013, p. 40) The risk of the project decreases over the life of a project as decisions are reached and deliverables are accepted by stakeholders, (PMI, 2013). However, it is important to note that some projects are much more expensive at the initial stages as more resources and time are needed to plan than the actual execution. 2.5 Managing the constraints There are five parameters that influence a project, and the success or failure of a project is to a large extent depends on how these parameters are managed. Wysocki identified five constraints that every project faces in its life cycle. These are: Scope, Quality, Cost, Time and Resources. These constraints form an interdependent set - a change in one constraint can require a change in another constraint in order to restore the equilibrium of the project. In this context, the set of five parameters form a system that must remain in balance for the project to be in balance (Wysocki, 2009, p. 10). Figure 3 below shows the project scope triangle. 23

24 Figure 3. The scope triangle. Source: (Wysocki, 2009, p. 13). All these five constraints need to be managed in a manner that a change in one which at all times results in a change in one or more parameters is held in balance. For example, future requests by a stakeholder or a resignation of a key team member without an immediate equal replacement will results in the imbalance of the scope triangle which will automatically affect the end product or result of the project. Chapter 3. Project management processes The project management institute (PMI) defines project management as the application of knowledge, skills, tools, and techniques to project activities to meet the project requirements ' (PMI, 2013, p. 47). This means that project management is all about managing resources efficiently and effectively in order to get a project completed successfully. The PMI identified some five process groups that form the building block for any project life cycle. These process groups are as follows: Initiation process group Planning process group 24

25 Execution process group Monitoring and Control process group Closing process group Each of these processes takes place at least once in the life cycle of every project. It is important however, to note that whiles this is in the case of a single phase project, some or all of the process groups may be repeated in projects that are executed in two all more phases (Wysocki, 2009). Figure 4 below shows the five processes. Figure 4. Project management process groups. Source: (PMI, 2013, P.50) This is the generic life cycle of every project irrespective of size or complexity. The initiation process is the definition of a new project or a new phase of an existing project by way of obtaining authorization to plan the project. The planning process is the establishment of the project scope, definition of the objectives, as well as the determination of the required actions that are needed to be taken to reach the objectives of the project. Executing process group is the activities that are performed to enable completion of the work defined in the planning stage. 25

26 Monitoring and controlling process group are the processes required to track, review, and regulate the progress and performance of the project; identify any areas in which changes to the plan are required; and initiate the corresponding changes (PMI, 2013, P.49). Closing process group is the activities that are needed to be performed to finally bring the project to a closure. In addition to the five process group, the PMI identified ten knowledge areas that a project manager must be familiar with for a successful implementation of a project work. These knowledge areas are: Project Integration Management, Project Scope Management, Project Time Management, Project Cost Management, Project Quality Management, Project Human Resources Management, Project Communications Management, Project Risk Management, Project Procurement Management, and Project Stakeholder Management (PMI, 2013, p.60) Project Initiation Project initiation is the first stage of every project, after the individual or the organization has recognized the need to carry out a project for a specific purpose. This Process Group includes all processes related to answering the question what do you need to do? (Wysocki, 2009, p.28) It consist of such processes of initial scope definition, identification of stakeholders, (both internal and external), as well as the selection of project manager. All this information is captured in the project charter and the stakeholder register (PMI, 2013). According to Wysocki, project initiation, which he calls project scoping consists of recruiting the project manager, eliciting the true needs of the client, documenting the client s needs, negotiating with the client about how those needs will be met, writing project overview statement (a one-page description of the project), gaining senior management approval to plan the project (Wysocki, 2009). The mission of every project is to achieve a vision which is the needs of the sponsor of the project. These needs must be clearly defined but as it usually turns out to be, the project sponsor may not have a clear definition as to what exactly the problem or opportunity is. It is therefore 26

27 important that, as many stakeholders are included as possible in the definition of the project scope from the very onset to enable as much as stakeholders requirements captured even though these may change as the project progresses. This helps minimize the risk that some stakeholders raising concerns or new demands later in the project that are likely to have negative impact on the whole project. At this stage, it is important also to evaluate alternatives to determine the feasibility of the project by way of making clear descriptions of the project objectives, including the reasons why a specific project is the best alternative to satisfy the sponsor s requirements. The documentation for this decision may also contain the initial project scope statement, deliverables, project duration, and a forecast of the resources for the organization s investment analysis. (PMI, 2013) Project Overview Statement. This is an output of condition of satisfaction which is a structured conversation between the sponsor of the project and the project manager that seeks to clearly define what the project is all about. The POS is a short document (ideally one page) that concisely states what is to be done in the project, why it is to be done, and what business value it will provide to the enterprise when completed (Wysocki, 2009, p. 91). The project overview statement document seeks to get the approval from the necessary authorities to proceed to the next stage of the project which is the planning stage. It clearly states the Problem or opportunity, Project goal, Project objectives, Success criteria, Assumptions, risks, and obstacles of the project. See example of project overview statement below. 27

28 Figure 5. Example of project overview statement. Source: (Wysocki, 2009, P.94) The simplicity of project overview statement makes it easier to work with as authority can quickly read and decide whether there is any merit for further consideration of the proposed project. If the POS makes sense to the authorities, they give the green light for the project manager to proceed to the project planning stage, otherwise they may quickly reject it before time and other resources are wasted Project Stakeholder management Project stakeholder is any party with an interest in the project process or outcome (Maylor, 2010, P.77). Thus, those individuals, groups, or organizations which are actively involve or are interested in the result of the project. Stakeholder management is crucial to the success of every project in every organization, and engaging the right people at the right time is very important to 28

29 its success. Most projects have more than one stakeholder or stakeholder group, presenting the project manager with a major challenge that of resolving their often divergent and potentially conflicting requirements (Maylor, 2010, p. 77). And more often than not, a project success depends on project manager s ability to manage these conflicting interests. Maylor identified three categories of project stakeholders: Internal team which includes people and groups that are directly involved in the project and are the most important to be managed. Core externals those entities outside the project but are important to its success, and The rest of the world those individuals and groups who are not directly connected with the project but require monitoring. There are three steps in doing stakeholder analysis in a project. The first step in the Stakeholder Analysis is brainstorm among the project team to determine who the stakeholders in the project are. This is by way of thinking of all the people who are affected in one way or the other by the project, and whose influence or power affect the end result of the project. After identifying all the stakeholders in the project, the project manager then prioritize them by mapping them out on stakeholder Power/Interest Grid, in order to classify them by their power and interest in the project. See example below Figure 6. Stakeholders power/interest grid. Source: A stakeholder s position on the grid shows his or her importance in the project: High power, 29

30 interested people are the people the project manager must fully engage and make much effort to satisfy. High power, less interested people: Project Manager must do his best to keep them satisfied, but not so much that they become bored with Project Manager s message. Low power, interested people: keep these people adequately informed, and talk to them to ensure that no major issues are raise by them. Low power, less interested people: again, these people must be monitored, but need not to be bored with excessive communication. Finally, the Project Manager needs to understand the key stakeholders in order to know how they are likely to react to the project. He also needs to know how best to engage them in the project and how best to communicate with them so as to attract their support. The Project Manager s ability to carefully follow this procedure can go a long way to help him manage stakeholders for the success of the project Project requirement collection Requirements are those things that define deliverables and that the project manager should discover before planning. It helps define the product or service that constitutes the deliverable of the project and is the basis to determine what is really the needs of the client of the project. Being able to clearly identify project requirement indicates that the sponsor and provider, in this case, the project manager clearly understands what result the project should produce. It takes both the sponsor and the project manager to identify those requirements. It is important that as a project manager, you are able to clearly identify what the true needs of the client are from his or her wants. This can be done by using requirement gathering tools such as prototyping, interviews, facilitated workshops, group creativity techniques, group decisionmaking techniques, questionnaires and surveys, observations, and business cases. 30

31 3.1.4 Developing Project Objective The purpose of developing project objective is to clearly define the end product or result of the project by defining it in such a way that everybody (stakeholders) understands it the way it is. One way of doing this is to use the SMART strategy. The acronym SMART stands for: Specific, Measurable, Achievable, Relevant, and Time-Oriented. Specific: Specific seeks to answers the questions what is to be done, and how will you know it is done? It is also meant to describe the results of the work to be done and description is written in such a way that anyone reading the objective will most likely interpret it the same way. Measurable: Measurable answers the question how will you know it meets expectations of the stakeholders? As well as defines the objective using evaluative terms such as quantity, quality, frequency, costs, and deadlines, etc. It refers to the extent to which something can be evaluated against certain standards. Achievable: Achievable answers the questions can the person doing the work do it? Does the person have the experience, knowledge or capability of fulfilling the expectation? It also answers the question can it be done giving the time frame and resources? Relevant: Relevant answers the questions, should it be done and why, and what will be the impact? Is the objective aligned with the organization s strategic plans? Time-oriented: Time-oriented answers the question, when will it be done? It refers to the fact that an objective has end points and check points built into it. This gives the project manager and his team a sense of urgency in the whole project (Wysocki, 2009). Seeking answers to these questions helps the project manager determine whether or not the project is feasible and that it should be carried out or not. 31

32 3.2. Project Planning Process Group According to Wysocki, the planning process group includes all processes related to answering the question how will you do it? (Wysocki, 2009, p. 29). These processes are as follows: Defining all of the tasks in the project, estimating how long it will take to complete each tasks and the entire project, estimating the resources required to complete the work, estimating the total cost of the work, sequencing the work, building the initial project schedule, analyzing and adjusting the project schedule, writing a risk management plan, documenting the project plan, gaining senior management approval to launch the project (Wysocki, 2009). In their fifth edition, the PMI describes the planning process group as those processes performed to establish the total scope of the effort, define and refine the objectives, and develop the course of action required to attain those objectives (PMI, 2013, p. 55). This process helps develop the project management plan and the project documents that will be used to carry out the entire project work. This means that the planning Process Group is use to determine the strategy that will enable a successful completion of the project. The planning process group produces the project management plan and other project documents as an output which contains the details of the project scope, time, cost, quality, communications, human resources, risks, procurements, and stakeholder engagement. However, as the actual implementation takes place, it is likely that the initial plan will change which requires necessary updates to suite the intended result. It is important therefore, that at this stage the project manager and his/her team involve all the necessary stakeholders for the purposes of getting as much requirements as possible from them. By so doing the stakeholders are most likely to accept the end product or result as they will be aware of what the project is likely going to produce. The project plan needs approval from the appropriate authorities to enable it proceeds to the execution stage. 32

33 3.3. Project Execution Process Group The PMI defines the execution process group as those processes performed to complete the work defined in the project management plan to satisfy the project specifications. This Process Group involves coordinating people and resources, managing stakeholder expectations, as well as integrating and performing the activities of the project in accordance with the project management plan (PMI, 2013, p. 56). It is at this stage that many changes do occur to the initial project plan which requires the necessary updates to meet the project specifications. This includes changes to expected activity durations, changes in resource productivity and availability, and unanticipated risks. These changes usually affects the project management plan in such a way that it may require further analysis and actions which can lead to a change to the project plan. It is worth noting that, it is at this stage that the major part of expenses of the project occurs and the responses to the new changes affect the deliverables of the project negatively or positively depending on how the project manager response to those changes Project monitoring and controlling process group The Project Management Institute in their fifth edition defines, the monitoring and controlling process group as those processes required to track, review, and orchestrate the progress and performance of the project; identify any areas in which changes to the plan are required; and initiate the corresponding changes (PMI, 2013, p. 57). By monitoring and controlling the project, the project manager is able to identify all deviations from the project management plan and take corrective measures so as to meet the intended end product or result. This process group consists of: Controlling changes by recommending corrective or preventive action in anticipation of possible problems, 33

34 Monitoring and comparing the ongoing project tasks against the project management plan and the project performance measurements, and Influencing those factors that could circumvent integrated change control or configuration management so only approved changes are implemented (PMI, 2013). The monitoring and controlling process gives the project manager and the project team a holistic picture about the project, helping them identify the areas that demand major attention and where there is the likelihood that the project may inter into problems, corrective or preventive actions are taken to bring the project into compliance with the project management plan. Again, this can result in updating of the project management plan which may require approval from the necessary stakeholders Project Closing Process Group This is the final stage of a project where all the necessary activities are carried out across all the project management process groups to officially bring the project to an end. This is done to make sure that all the defined activities are completed within all the process groups to formally conclude that the project is complete. The PMI identified the following as the activities perform to bring a project to a closure: Obtain acceptance by the customer or sponsor to formally close the project or phase. Conduct post-project or phase-end review. Record impacts of tailoring to any process. Document lessons learned. Apply appropriate updates to organizational process assets. 34

35 Archive all relevant project documents in the project management information system (PMIS) to be used as historical data, Close out all procurement activities ensuring termination of all relevant agreements, and Perform team members assessments and release project resources (PMI, 2013). The above processes are done irrespective of whether or not the project was fully completed. In instances where there is termination or conciliation of a project the necessary closing procedure must be taken to document the reasons why the project was terminated Project Management Knowledge Areas As I mentioned earlier, the PMI in their fifth edition identified ten project management knowledge areas that project managers should be familiar with in order to carry out their projects successfully. These are: Project Integration Management, Project Scope Management, Project Time Management, Project Cost Management, Project Quality Management, Project Human Resources Management, Project Communications Management, Project Risk Management, Project Procurement Management, and Project Stakeholder Management. For the purposes of this work, our discussions will be focused on project integration, scope, time, cost, and risk. However, that is by no means to undermine the importance of other knowledge areas in project management (PMI, 2013). Chapter 4. Project Integration Management. Project integration management is a project management knowledge area that includes the processes and activities needed to identify, define, combine, unify, and coordinate the various processes and project management activities within the process groups. It involves making choices regarding resource allocation, making trade-offs between and among competing objectives and alternatives, and managing the interdependencies among the knowledge areas. This includes activities needed to manage project documents to ensure consistency with the 35

36 project management plan and the overall project objective. According to the PMI (2013) Project Integration Management includes the following processes, Develop project charter Develop project management plan Direct and manage project execution Monitor and control project work Perform integrated change control Close project or phase Developing project charter The project charter develops a document that formally authorizes a project or phase and document initial requirements that satisfy the stakeholders' needs and expectations. This is done by the project manager working with other stakeholders to create the document that formally states the project and its purpose. It documents the business needs, assumptions, constraints, and the requirements of the product, service, or result that the project is intended to achieve. It establishes agreement between the project sponsor and the performing team, which in the case of external project a formal contract is signed to that effect. For internal organizational project, the charter is still used to establish internal agreements to ensure efficient delivery. Inputs of the project charter include project statement of work, business case, agreements between requesting and performing teams, enterprise environmental factors, and organizational process assets. 36

37 Tools such as expert judgment the use of individual or group with specialized knowledge in that area, which can be the project manager and his team or obtained from the organization s own units, consultants, stakeholders, professional associations, field experts, and so on. Other tools such as facilitation techniques including brainstorming, and meetings can be used Developing project management plan This is the documentation of the actions necessary to define, prepare, integrate, and coordinate all subsidiary plans in the project. It is an important document in project management that defines the basis of all the tasks that need to be performed in the project. It contains the following subsidiary plans according to the PMI: scope management plan, requirements management plan, schedule management plan, cost management plan, quality management plan, process improvement plan, human resource management plan, communications management plan, risk management plan, procurement management plan, stakeholder management plan, among others. It has inputs such as project charter, outputs from other processes, enterprise environmental factors, and organizational process assets. Tolls used to develop the project management plan are expert judgment and facilitation technique Direct and manage project. This is the act of performing the actual work in the project which is defined in the project management plan in order to attain the goal of the project. It is at this stage that the project manager takes the necessary actions to implement the defined activities in the project plan as well as the approved changes that occur in the initial plan. It is also at this moment that the project manager takes corrective and preventive actions to ensure that the project objective is achieved according to the plan. 37

38 During the direct and manage project process, the project performance data which contains information about the completion status of the project is also generated and communicates to the appropriate stakeholders regarding the completion status of the project. Direct and manage include but not limited to activities such as perform activities to accomplish project objectives, provide, train, and manage the team members assigned to the project; obtain, manage, and use resources including materials, tools, equipment, and facilities, establish and manage project communication channels, both external and internal to the project team, generate work performance data, such as cost, schedule, technical and quality progress, and status to facilitate forecasting, manage risks and implement risk response activities, manage stakeholders and their engagement, collect and document lessons learned and implement approved process improvement activities. Some of the tools and techniques used for direct and manage project work are: expert judgment, project management information system, and meetings among stakeholders Monitor and control project work Monitor and control project work is the means by which activities in the project are track, review, and regulate in order to determine the progress of the work being done to meet the performance objectives defined in the project management plan. This enables the stakeholders understand the current state of the project, whether the project is being carried out within the defined scope of the project. It involves activities such as comparing the actual performance of the project against the project management plan, assessing performance to determine whether any corrective or preventive actions are needed so that the necessary actions can be taken, identifying new risks and analyzing them to enable appropriate response being taking, maintaining an accurate, timely information base concerning the project s result. It is also about providing information about progress and status, providing forecasts to update current cost and current schedule, and monitoring implementation of approved changes. Tools and techniques used are: Expert judgment, meetings, analytical techniques, and project management information system. 38

39 4.5. Perform integrated change control Perform integrated change control is the process of reviewing all change requests, approve changes, and manage changes to the Project Management Plan. It enable the responsible individual such as the project manager or the project sponsor or in the case where there is change control board to review and consider all requested changes by any stakeholder and either approve or reject them. It is important to note that these changes if approved affect other aspects of the project such as cost, time, resources as well as the quality of the end result and therefore could result in changes in the entire project management plan leading to changes in the overall objective of the project. Hence it should be done with caution by the responsible person. Some tools and techniques used for integrated change control are expert judgment and, meetings Close project or phase This is the act of finalizing all activities across all of the process groups to formally bring the project to an end. It involves activities such as documenting the lessons learned, formally ending all project work as well as releasing resources of the project for other projects or activities (PMI, 2013). It is at this stage that the work being done is measured against the project plan to ensure that all the planned works were carried out. It is worth noting that, this process is done even if the project was terminated to justify why the project has to be terminated. All documented lessons are archived for future reference and it becomes asset to the organization. Tools and techniques used to close project or phase are Expert judgment, analytical techniques, and meetings among the appropriate stake holders. Chapter 5. Project Scope Management. Project scope refers to all the work involved in creating the product, service or result of the project and the processes used to create them. In their 2006 edition, IPMA defined project scope 39

40 as setting the project boundaries so far as the project deliverables are concern and this done by way of trying to identify in details, all the works to be done as compares to project initiation stage, in order to give clearer view about the entire project (IPMA, 2006, p. 58). Project scope management therefore includes all the processes involved in defining and controlling what is or is not included in a project. The main objective of scoping the project is to ensure that the project team and stakeholders have the same understanding of what product, service or result will be produced by the project and what processes will be used in achieving that goal. These processes include the following: Scope planning: Deciding how the scope will be defined, verified, and controlled. Scope definition: Reviewing the project charter and preliminary scope statement and adding more information as requirements are developed and change requests are approved. Creating the work breakdown structure (WBS): Subdividing the major project deliverables into smaller, more manageable components. Scope verification: Formalizing acceptance of the project scope. Scope control: Controlling changes to project scope as and when they occur (PMI, 2013) Scope management plan. The scope management plan is a document that includes descriptions of all the activities needed to complete in the project, creation of the WBS, verify completion of the project deliverables, and control requests for changes to the project scope. The key inputs in this process include the project charter, preliminary scope statement, and project management plan. Tools and Techniques for scope planning include standards, meetings as well as expert judgment. 40

41 5.2. Project scope definition Project scope definition is the process of developing a more detailed description of the project s product, service or result. The main purpose of the scope definition is to clearly describe the boundaries of the project taking into account the requirements from all the stakeholders in the project. Clearly describing the boundaries and getting the stakeholders agreeing to it is very important. Therefore, the defined scope of the project usually included in the contractual agreements between the sponsor and the service provider in the case of external projects. Even in internal projects this is still import between the sponsor and the project team. In the project scope definition, it is important that the elements within the scope and out of the scope are well defined in order to clearly understand what should be under the project control. Hence, it is important the project manager and his team identify more elements in detailed and divide them between what is within scope and out of scope. Project scope statement is the document use for this purpose. The preliminary scope statement, project charter, organizational process assets, and approved change requests provide a basis for creating the project scope statement. Tools and techniques used for scope definition are expert judgment, product analysis, alternatives generation, and facilitated workshops (PMI, 2013) Work breakdown structure The work breakdown structure (WBS) is a deliverable-oriented grouping of the work involved in a project that defines the total scope of the project. According to Kerzner, a WBS is a productoriented family tree subdivision of the hardware, services, and data required to produce the end product (Kerzner, 2003, P.396). This family tree structure tries to capture all the work of the project in an organized way into tasks that are defined, estimated and tracked. 41

42 It is a fundamental document that provides the basis for planning and managing project schedules, costs, resources, and changes. The root of the tree is labeled by the name of the problem or opportunity to be addressed. Project scope statement and project management plan are the main input for creating a WBS and it serves as input to the following key project management activities: Cost estimation and budgeting, resource planning, risk management planning, and activity definition. Tools and techniques used for work breakdown structure are decomposition, and expert judgment and it has output such as scope baseline and project documents updates. The scope baseline contains project documents such as project statement of work and the WBS dictionary. The WBS dictionary contains detailed information about deliverables, activities, and scheduling information of each component in the WBS. The following information are contained in the WBS dictionary: code of account identifier, description of work, assumptions and constraints, responsible organization, schedule milestones, associated schedule activities, resources required, cost estimates, quality requirements, acceptance criteria, technical references, and agreement information. (PMI, 2013). See figure below for a simple WBS of a house project. 42

43 Figure 7. Example of WBS of a simple house project. Source: (Norman, Brotherton, Fried, P.30) 5.4. Validate Scope This is the process of formalizing acceptance of the completed project deliverables. This is to ensure that a product, service, or result meets the needs of the sponsor or customer and other identified stakeholders in the project. It is important to note the difference between validate scope and quality control. Whiles validation of scope is concerned with acceptance of deliverables by external entities such as the project sponsor or customer and other stakeholders, quality control is the evaluation of whether or not a product, service, or result complies with a regulation, requirement, or specification, which is purely internal process. Some of the tools use for this process is inspection group decision-making techniques 43

44 5.5. Project Scope Control The project scope control is the process of influencing the factors that brings about project scope changes by way of controlling the impact of those factors. This is to ensure that all requested changes and recommended corrective actions are processed through the project integrated change control process. Scope control manages the actual changes to the scope management plan so as to reduce or eliminate project scope 'creep' - adding more features to the already approved project scope as a result of poor requirement collection (Wysocki, 2009, p. 13). Tools and techniques used for scope control are change control systems, configuration management, and variance analysis - technique for determining the cause and degree of difference between the baseline and actual performance. Chapter 6. Project Time Management Project time management is one of the most if not the most important aspects in project management since it forms the bases upon which all activities in the project are scheduled. It is the process of planning and controlling the amount of time needed to finish a specific activity in a project. That means that, it includes both planning and controlling components of project management. The planning component provides time estimation for both the duration of a project activities, that is, how long will it take in terms of clock time to complete the task, and the actual effort or labor time required to complete the task. The duration is used to estimate the total time needed to complete the project (Wysocki, 2009). It means that, project time management is about scheduling the activities in the project in order to determine when an activity will have to start and finish, and the resources needed to complete that activity. The most important thing in project time management is how the scheduling is done. In their 2006 edition, the Association for Project Management defines project schedule as the process used to determine the overall project duration and when activities and events are planned to happen. This includes identification of activities and their logical dependencies, and estimation 44

45 of activity durations, taking into account requirements and availability of resources (APM, 2006, p. 36). Project scheduling takes into account issues such as the entire duration needed to complete the project, the early and late start dates i.e. earliest and latest date that an activity can start and finish without delaying the completion of the project, float or slack which is the time an activity can be delayed without delaying the entire project completion. The PMI in their fifth edition identified seven time management processes that can be followed for a successful completion of a project. These are: Plan Schedule Management: The process of establishing the policies, procedures, and documentation for planning, developing, managing, executing, and controlling the project schedule. Define activities: This is the process of identifying and documenting the specific actions to be performed to produce the project deliverables. Sequence activities: The process of identifying and documenting relationships among the project activities. Estimate activity Resources: The process of estimating the type and quantities of material, human resources, equipment, or supplies required to perform each activity. Estimate activity Durations: The process of estimating the number of work periods needed to complete individual activities with estimated resources. Develop schedule: The process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule model. Control schedule: The process of monitoring the status of project activities to update project Progress and manage changes to the schedule baseline to achieve the plan (PMI, 2013) 45

46 By carefully following these processes, the project manager is able to come up with a plan such as network diagrams like the CPM, or PERT both of which try to capture the sequential and parallel relationships among project activities (Lewis, 2007, p.71), and shows the interdependencies of the activities in the project. This is used as a guide to the project manager and his team to carry out the project work Network Diagrams Network diagrams are important tools which are used to show the sequence in which project works are carried out. It tries to show which activity needs to be performed before which, and how certain activities depends on the others. Examples below show activity-on-node, and activity-on-arrow diagrams. Figure 8A. Activity-on-node. 46

47 Figure 8B. Activity-on-arrow Source: (Lewis, 2007, p. 72). In activity-on-node above, task A is done before B, and B is done before D, while Task C is done in parallel with A and B. The work is shown as a box or node, and the arrows show the sequence in which the work is performed. Events are not shown in activity-on-node networks unless they are milestones - points in the project at which major portions of the work are completed (Lewis, 2007, p. 72). In the case of activity-on-arrow notation, the arrow represents the work being done and the circle represents an event. An event is binary; that is, it has either occurred or it has not whiles an activity, on the other hand, can be partially complete. These diagrams aid the project manager to estimate the project in terms of time as to when an activity is to be completed as well as duration of the entire project completion. Network diagrams helps the project manager to determine the critical path, which is defined as the longest series of activities (that cannot be done in parallel) and which therefore determine how early the project can be completed. Because the critical path has no slack, all activities on the critical path must be completed as scheduled, otherwise, the end date will begin to slip which can delay the entire project Critical Path analysis As mentioned earlier, the critical path in a project is the longest series of activities (that cannot be done in parallel) and which therefore determine how early the project can be completed. This means that activities that fall within the critical path must be given more attention as a delay in 47

48 any of them will cause delay in the entire project completion, hence it is important that at all times, the project manager knows which activities falls within the critical path. This is done by determine the earliest start time (EST) and the latest start time (LST) of each activity. The difference between the EST and LST is the float or slack - the time for which any of the activities in the project can be delayed without affecting the duration of the whole project completion. Firstly, all activities in the project must be identified and the determination of which activity depends on which. With the completion date of the entire project in mind, which is almost always dictated by the project sponsor, the project manager tries to assign duration (for which an activity can be completed) to all activities identified in the project, then try to know the earliest possible date that an activity can start as well as the latest possible date that an activity can start by doing forward-pass and backward-pass analysis. For example, if we want to know the earliest possible time that a current activity can start, we start from the starting node which is always start from time zero and add it to duration of the current activity and that gives us the EST for that activity. In the same manner, if we want to calculate the LST of a current activity, which we usually start from the finishing node, we take the LST of the finish node and substrate the duration of the activity and that gives us the LST for that activity. Having calculated the EST and the LST for each activity in the project, the project manager is able to determine the float by subtracting the EST from the LST of each activity. Activities with zero float or slack indicate the critical path in the project where there can be no delay in those activities. 48

49 Figure 9. Example of critical path of a project, Source: (Lock, 2007, p. 199). Chapter 7. Project Cost Management Project cost management is one of the most important aspects in project management that require much attention since its mishandling can lead the project into a complete failure. It can affect the end result by either not meeting the performance requirement set by the sponsor or a total cancelation of the entire project if not carefully managed. It is the process of estimating how much the whole project will cost by breaking down the project into component and determining the cost (Mintzer, 2002). This is done by taking into account the entire scope of the project i.e. all the activities needed to be done in the whole project, the materials and equipment involve as well as the labor factors. In his 2009 edition, Kerzner identified some tools and techniques that can be used for project budgeting which includes Recent experience in similar work Professional and reference material 49

50 Market and industry surveys Knowledge of the operations and processes Estimating software and databases if available Interviews with subject matter experts (Kerzner, 2009). There are two ways that a project budget can be plan according to Mintzer. It can be done either be top down or bottom up budgeting. The top down budgeting is the one which start the estimation of the entire project and then allocate funds to the various areas of the project or from the top management to the lower-level managers. Example could be that of big project from large corporations or government budget for a certain ministry (Mintzer, 2002) On the other hand, bottom up budgeting is a budget is the one which start from the team members of the project and the works they need to do taking into consideration other miscellaneous and make the estimation through to the total budget. The latter is commonly use in smaller project like that of NGO s as it is able to give the project manager a clearer view as to how much the whole project will cost knowing all the tasks that needs to be performed in the project This means that, in order to make a good budget for a project, it is important that the project manager is able to identify all the requirements in the project so that the scope of the project is clearly defined. Failure to identify some items in the project can have negative implications on the project since their acquisition price may be increased as the time draws close as compare to that of those which were adequately researched before purchased or hired. 50

51 8. Project Risk Management Risk is the unforeseen circumstances that are inherent in human activities which project management is no exception. This may appear to be a broader definition encompassing all human endeavors, in the context of project management; risk can be defined as the uncertainties that may negatively affect the project by challenging the project s constraints or parameters (Mintzer, 2002, p.158). This can result in loss of time, money, labor, or the project as a whole. However, risk can have a positive influence in project as well. At the project level, this may be the development of new capabilities by the organization as a result of the project or unexpected uses for the project outcome. At the task level, an early finish may result in the opportunity for another activity to start early, or for the development of a better way of completing that task (Maylor, 2010, p.219). The unique nature of project makes risk an import aspect which needs to be managed if the project is to be successful. Project manager s ability to identify, assesses, and manages project risks will have a profound impact on the result of the project. Project risk can stem out form within the project, i.e. internal risks which are those uncertainties associated with project time, cost, and quality, or from outside the project, external project risks, which are usually environmental issues. Risk management can be divided into three main components: risk identification, risk assessment, and risk responses. This helps in the analysis by identifying, quantifying and finding a way to manage those risks Project Risk Identification According to Maylor, project risk identification is the process of predicting the key risk outcomes indicators that something is going wrong in a project (Maylor, 2010, p.220). Internal aspects to be looked at when identifying project risks are project time, cost, and quality. Project activities should be analyze in order to identify the critical path in the whole project so that the activities 51

52 can be managed for a successful result. Mintzer identified the following as some of the causes of risks stemming out from project time: Poor estimation of task durations or the duration of the entire project Improper determination of activity dependencies Not allowing proper time in scheduling for monitoring and testing. There are other risks associated with project cost which includes: improper estimate of cost for resources, uncontrolled spending, etc. others can include: wrong person assigning to a task, and poor communication among team members (Mintzer, 2002, p.171). The cost, if badly estimated can have serious consequences on the project, since underestimation for instance can mean low quality of a project or can result in a complete failure of the whole project. Quality assurance in project process and activities is important to its success. For instance, if some deliverables in the project are being outsource from external suppliers, there is the possibility that such deliverable may not meet the required standard of the project. Apart from these internal risks, there can be other external factors such as legal and health and safety risk issues which requires management effort. Tools and techniques that can be used in risk management include brainstorming among team members, seeking consultants advice, as well as meetings among the appropriate stakeholders Risk assessment This is the process of analyzing the identified risks in the project in order to determine their level of impact on the project. This is by way of assessing the likelihood of that event occurring and its impact on the project by trying to seek answer to questions such as: Is the risk it going to be critical will it cause a total failure of one or more parts of a project? Major will it hold up or increase costs in one or more areas? Minor will it cause inconvenience but not set the project back financially or in time? (Mintzer, 2010, p.23). 52

53 There are a number of ways by which project risk assessment can be done including qualitative and quantitative analysis. Quantitative risk analysis though minimally used in risk assessment, is the use of mathematical method to determine the likelihood of an event occurring. This takes the form of numerical calculations such as percentage of probability that an event occurring. Qualitative analysis on the other hand, is the determination of the likelihood or the probability of an event occurring and the level of its impact on the project which can be rated as low, medium, or high. This can be done using probability impact chart. See example below. Figure 10. Probability/impact chart. Source: (Maylor, 2010, p.223) Those elements with high probability and impact are critical risk elements that can cause a complete failure in the whole project and therefore need proactive measures such as mitigation to manage. The elements with high probability and medium impact are major and need to be monitored and some actions to manage. And elements with medium probability and low impact or vice versa can be monitored with minimal attention Risk Responses Having identified the risk elements to be managed, some measures are required in order to ensure that the likelihood of those eventualities occurring is reduced or somehow mitigated. This can 53

Develop Project Charter. Develop Project Management Plan

Develop Project Charter. Develop Project Management Plan Develop Charter Develop Charter is the process of developing documentation that formally authorizes a project or a phase. The documentation includes initial requirements that satisfy stakeholder needs

More information

PROJECT MANAGEMENT PLAN TEMPLATE < PROJECT NAME >

PROJECT MANAGEMENT PLAN TEMPLATE < PROJECT NAME > PROJECT MANAGEMENT PLAN TEMPLATE < PROJECT NAME > Date of Issue: < date > Document Revision #: < version # > Project Manager: < name > Project Management Plan < Insert Project Name > Revision History Name

More information

Best Practices Statement Project Management. Best Practices for Managing State Information Technology Projects

Best Practices Statement Project Management. Best Practices for Managing State Information Technology Projects State of Arkansas Office of Information Technology 124 W. Capitol Ave. Suite 990 Little Rock, AR 72201 501.682.4300 Voice 501.682.4020 Fax http://www.cio.arkansas.gov/techarch Best Practices Statement

More information

A Guide To The Project Management Body of Knowledge (PMBOK) Significant Changes from the 3 rd edition to the 4 th edition

A Guide To The Project Management Body of Knowledge (PMBOK) Significant Changes from the 3 rd edition to the 4 th edition A Guide To The Project Body of Knowledge (PMBOK) Significant Changes from the 3 rd edition to the 4 th edition Major Changes The adoption of the verb-noun format for process names Amplification as to Enterprise

More information

Minnesota Health Insurance Exchange (MNHIX)

Minnesota Health Insurance Exchange (MNHIX) Minnesota Health Insurance Exchange (MNHIX) 1.2 Plan September 21st, 2012 Version: FINAL v.1.0 11/9/2012 2:58 PM Page 1 of 87 T A B L E O F C O N T E N T S 1 Introduction to the Plan... 12 2 Integration

More information

Project Management Certificate (IT Professionals)

Project Management Certificate (IT Professionals) Project Management Certificate (IT Professionals) Whether your field is architecture or information technology, successful planning involves a carefully crafted set of steps to planned and measurable goals.

More information

PMP Examination Tasks Puzzle game

PMP Examination Tasks Puzzle game PMP Examination Tasks Puzzle game Here is a great game to play to test your knowledge of the tasks you will be tested on in the actual examination. What we have done is take each of the domain tasks in

More information

The 10 Knowledge Areas & ITTOs

The 10 Knowledge Areas & ITTOs This document is part of a series that explain the newly released PMBOK 5th edition. These documents provide simple explanation and summary of the book. However they do not replace the necessity of reading

More information

A COMPARISON OF PRINCE2 AGAINST PMBOK

A COMPARISON OF PRINCE2 AGAINST PMBOK Introduction This comparison takes each part of the PMBOK and gives an opinion on what match there is with elements of the PRINCE2 method. It can be used in any discussion of the respective merits of the

More information

Project Management Standards: A Review of Certifications/Certificates

Project Management Standards: A Review of Certifications/Certificates Project Standards: A Review of Certifications/Certificates Standards for Project Supporting Certification and Certificates Certificate Certification The Project Body of Knowledge PMBOK Guide Projects in

More information

PROJECT MANAGEMENT METHODOLOGY SECTION 3 -- PLANNING PHASE

PROJECT MANAGEMENT METHODOLOGY SECTION 3 -- PLANNING PHASE PROJECT MANAGEMENT METHODOLOGY SECTION 3 -- PLANNING PHASE Table of Contents Introduction...3-1 Overview...3-1 The Process and the Project Plan...3-1 Project Objectives and Scope...3-1 Work Breakdown Structure...3-1

More information

STARTING A PROJECT. Sergey V. Nesterov MD, PhD, PMP

STARTING A PROJECT. Sergey V. Nesterov MD, PhD, PMP STARTING A PROJECT Sergey V. Nesterov MD, PhD, PMP QUESTIONS to ask at the start 1. What is the situation? 2. What do you need to do? 3. Why do you need to do it? 4. What will you do? 5. How will you do

More information

Project Management Guidelines

Project Management Guidelines Project Management Guidelines Overview Section 86-1506 (5) directs the NITC to adopt guidelines regarding project planning and management. The goal of project management is to achieve the objectives of

More information

Project Scope Management in PMBOK made easy

Project Scope Management in PMBOK made easy By Dr. TD Jainendrakumar The main objective of any project is to fulfill the scope of the project on time and within the budget. What is Project Scope? Scope refers to all the work involved in creating

More information

Project Management Guidebook

Project Management Guidebook METHOD 12 3 empowering managers to succeed Project Management Guidebook ISBN 0-473-10445-8 A bout this e-book This e-book was created by Method123 (see www.method123.com) to help provide you with a simple

More information

Masaryk University Faculty of Informatics. Master Thesis. Project Management in Matrix Organization

Masaryk University Faculty of Informatics. Master Thesis. Project Management in Matrix Organization Masaryk University Faculty of Informatics Master Thesis Project Management in Matrix Organization Student: Agron Zylali, 395777 Brno 2014 Statement I declare that I have worked on this thesis independently

More information

NFSA Project Management Guidelines

NFSA Project Management Guidelines NFSA Project Management Guidelines Project Management Guide Purpose of this Guide This Guide outlines the NFSA Project Management Guidelines, and includes: NFSA Project Life Cycle Governance Roles and

More information

IT Project Management Methodology. Project Scope Management Support Guide

IT Project Management Methodology. Project Scope Management Support Guide NATIONAL INFORMATION TECHNOLOGY AUTHORITY - UGANDA IT Project Management Methodology Project Scope Management Support Guide Version 0.3 Version Date Author Change Description 0.1 23 rd Mar, 2013 Gerald

More information

PROJECT MANAGEMENT PLAN CHECKLIST

PROJECT MANAGEMENT PLAN CHECKLIST PROJECT MANAGEMENT PLAN CHECKLIST The project management plan is a comprehensive document that defines each area of your project. The final document will contain all the required plans you need to manage,

More information

PORTFOLIO, PROGRAMME & PROJECT MANAGEMENT MATURITY MODEL (P3M3)

PORTFOLIO, PROGRAMME & PROJECT MANAGEMENT MATURITY MODEL (P3M3) PORTFOLIO, PROGRAMME & PROJECT MANAGEMENT MATURITY MODEL (P3M3) 1st February 2006 Version 1.0 1 P3M3 Version 1.0 The OGC logo is a Registered Trade Mark of the Office of Government Commerce This is a Value

More information

output: communications management plan

output: communications management plan Q1. (50 MARKS) A. List the nine PMBOK knowledge areas and give a one sentence description of the purpose of each knowledge area along with at least one output (document etc.) and its purpose. 1.Project

More information

SOFTWARE PROJECT MANAGEMENT

SOFTWARE PROJECT MANAGEMENT SOFTWARE PROJECT MANAGEMENT http://www.tutorialspoint.com/software_engineering/software_project_management.htm Copyright tutorialspoint.com The job pattern of an IT company engaged in software development

More information

Application of Standard Project Management Processes in Fiber Optic Cable Plant Project Management. Introduction. Alfred Sankara, DigiBridge TelCo

Application of Standard Project Management Processes in Fiber Optic Cable Plant Project Management. Introduction. Alfred Sankara, DigiBridge TelCo Application of Standard Project Management Processes in Fiber Optic Cable Plant Project Management Alfred Sankara, DigiBridge TelCo Introduction The Project Management Institute (PMI) is the world's leading

More information

Step by Step Project Planning

Step by Step Project Planning Step by Step Project Planning Contents Introduction The Planning Process 1 Create a Project Plan...1 Create a Resource Plan...1 Create a Financial Plan...1 Create a Quality Plan...2 Create a Risk Plan...2

More information

Comparing PMBOK Guide 4 th Edition, PMBOK Guide 5 th Edition and ISO 21500

Comparing PMBOK Guide 4 th Edition, PMBOK Guide 5 th Edition and ISO 21500 Project Training Company Comparing PMBOK Guide 4 th Edition, Edition and STS Sauter Training & Simulation S.A. Avenue de la Gare 10 1003 Lausanne Switzerland Web: www.sts.ch E-mail: office@sts.ch Phone:

More information

PROJECT AUDIT METHODOLOGY

PROJECT AUDIT METHODOLOGY PROJECT AUDIT METHODOLOGY 1 "Your career as a project manager begins here!" Content Introduction... 3 1. Definition of the project audit... 3 2. Objectives of the project audit... 3 3. Benefit of the audit

More information

Certificate In Project Management (CIPM)

Certificate In Project Management (CIPM) Conceptualize Plan Plan & Deliver Organize Implement Control Change if Required Integrate Deliver & Closeout Knowledge Leverage Certificate In Project Management (CIPM) Course Overview The Certificate

More information

The Project Planning Process Group

The Project Planning Process Group 3 The Project Planning Process Group............................................... Terms you ll need to understand: Activity Activity attributes Activity list Activity on arrow diagram (AOA) Activity

More information

Partnering for Project Success: Project Manager and Business Analyst Collaboration

Partnering for Project Success: Project Manager and Business Analyst Collaboration Partnering for Project Success: Project Manager and Business Analyst Collaboration By Barbara Carkenord, CBAP, Chris Cartwright, PMP, Robin Grace, CBAP, Larry Goldsmith, PMP, Elizabeth Larson, PMP, CBAP,

More information

Description of Program Management Processes (Initiating, Planning) 2011 PROGstudy.com. All rights reserved

Description of Program Management Processes (Initiating, Planning) 2011 PROGstudy.com. All rights reserved Description of Program Management Processes (Initiating, Planning) Topics Covered Program Management Process Groups salient features Description of all processes in Initiating Process Group: Initiate Program

More information

Program Management Professional (PgMP) Examination Content Outline

Program Management Professional (PgMP) Examination Content Outline Program Management Professional (PgMP) Examination Content Outline Project Management Institute Program Management Professional (PgMP ) Examination Content Outline April 2011 Published by: Project Management

More information

THE PROJECT MANAGEMENT KNOWLEDGE AREAS

THE PROJECT MANAGEMENT KNOWLEDGE AREAS THE PROJECT MANAGEMENT KNOWLEDGE AREAS 4. Project Integration Management 5. Project Scope Management 6. Project Time Management 7. Project Cost Management 8. Project Quality Management 9. Project Human

More information

Introduction to the ITS Project Management Methodology

Introduction to the ITS Project Management Methodology Introduction to the ITS Project Management Methodology In September 1999 the Joint Legislative Committee on Performance Evaluation and Expenditure Review (PEER) produced a report entitled Major Computer

More information

Agenda. 0 Agenda review 2 minutes. 0 Chapter of the week 50 minutes. 0 Q&A of chapter 10 minutes. 0 Break 10 minutes. 0 Exercises 25 minutes

Agenda. 0 Agenda review 2 minutes. 0 Chapter of the week 50 minutes. 0 Q&A of chapter 10 minutes. 0 Break 10 minutes. 0 Exercises 25 minutes Agenda 0 Instructor Introduction 3 minutes 0 Agenda review 2 minutes 0 Chapter of the week 50 minutes 0 Q&A of chapter 10 minutes 0 Break 10 minutes 0 Exercises 25 minutes 0 Round table 15 minutes 0 Closure

More information

Demonstrate and apply knowledge of project management in

Demonstrate and apply knowledge of project management in Demonstrate and apply knowledge of project management in mechanical engineering 22918 version 2 Page 1 of 5 Level 6 Credits 15 Purpose This unit standard is intended primarily for use in diploma courses

More information

Project Management Institute. Construction. Extension to. A Guide to the Project Management Body of Knowledge. PMBOK Guide 2000 Edition.

Project Management Institute. Construction. Extension to. A Guide to the Project Management Body of Knowledge. PMBOK Guide 2000 Edition. Project Management Institute Construction Extension to A Guide to the Project Management Body of Knowledge PMBOK Guide 2000 Edition Provisional Construction Extension to A Guide to the Project Management

More information

The Plan s Journey From Scope to WBS to Schedule

The Plan s Journey From Scope to WBS to Schedule The Plan s Journey From Scope to WBS to Schedule Presented by: Rick Clare, CBAP, PMP, OCP, CSM PM Centers USA, LLC. 2013 Company Background Consulting and Training (Virtual, Public and Private Training)

More information

project management @ UniSA a good practice guide for staff

project management @ UniSA a good practice guide for staff project management @ UniSA a good practice guide for staff Project Management @ UniSA Contents Purpose To provide UniSA staff with an introduction to project management theory, and practical advice on

More information

MIS 460 Project Management

MIS 460 Project Management Ursuline College Accelerated Program CRITICAL INFORMATION! DO NOT SKIP THIS LINK BELOW... BEFORE PROCEEDING TO READ THE UCAP MODULE, YOU ARE EXPECTED TO READ AND ADHERE TO ALL UCAP POLICY INFORMATION CONTAINED

More information

IMCPM04 Project Scheduling and Cost Control. Course Outline

IMCPM04 Project Scheduling and Cost Control. Course Outline IMCPM04 Project Scheduling and Cost Control Course Outline January 2012 Project Scheduling and Cost Control Course Aim Project Scheduling and Cost Control is a five-day (5 day) course which provides participants

More information

TDWI strives to provide course books that are content-rich and that serve as useful reference documents after a class has ended.

TDWI strives to provide course books that are content-rich and that serve as useful reference documents after a class has ended. Previews of TDWI course books are provided as an opportunity to see the quality of our material and help you to select the courses that best fit your needs. The previews can not be printed. TDWI strives

More information

Project Management Professional (PMP) Examination Content Outline

Project Management Professional (PMP) Examination Content Outline Project Management Professional (PMP) Examination Content Outline Project Management Institute Project Management Professional (PMP ) Examination Content Outline Revised August 2011 Published by: Project

More information

Department of Administration Portfolio Management System 1.3 June 30, 2010

Department of Administration Portfolio Management System 1.3 June 30, 2010 E 06/ 30/ 2010 EX AM PL 1. 3 06/ 28/ 2010 06/ 24/ 2010 06/ 23/ 2010 06/ 15/ 2010 06/ 18/ 2010 Portfolio System 1.3 June 30, 2010 Contents Section 1. Project Overview... 1 1.1 Project Description... 1 1.2

More information

The purpose of this course is to provide practical assistance for defining and managing project scope.

The purpose of this course is to provide practical assistance for defining and managing project scope. Scope Definition and Scope Management Purpose - To provide practical assistance for defining and managing project scope. This course will focus on tips for creating a scope statement rather than a step-by-step

More information

Project Management Professional (PMP) Examination Content Outline

Project Management Professional (PMP) Examination Content Outline Project Management Professional (PMP) Examination Content Outline Project Management Institute Project Management Professional (PMP) Examination Content Outline June 2015 Published by: Project Management

More information

OPERATIONAL PROJECT MANAGEMENT (USING MS PROJECT)

OPERATIONAL PROJECT MANAGEMENT (USING MS PROJECT) OPERATIONAL PROJECT MANAGEMENT (USING MS PROJECT) 3 DAY COURSE INTRODUCTION The principles of project management are generic and therefore can be applied to all projects regardless of business sector.

More information

<name of project> Software Project Management Plan

<name of project> Software Project Management Plan The document in this file is adapted from the IEEE standards for Software Project Management Plans, 1058-1998, which conforms to the requirements of ISO standard 12207 Software Life Cycle Processes. Tailor

More information

HOW NOT TO ATTRACT AN ENTREPRENEURIAL PM

HOW NOT TO ATTRACT AN ENTREPRENEURIAL PM HOW NOT TO ATTRACT AN ENTREPRENEURIAL PM FORTUNE 500 HIGH-TECH EQUIPMENT AND SERVICES COMPANY Process-focused job description indicates low potential for career enhancement and discourages talent from

More information

Do not open this paper until instructed by the invigilator. Please note: This question paper must not be removed from the examination room.

Do not open this paper until instructed by the invigilator. Please note: This question paper must not be removed from the examination room. APM Introductory Certificate in Project Management Exam paper Candidate Reference Number Date of Exam Location of the Exam General Notes Time allowed 1 hour Answer all 60 multiple choice questions Use

More information

This is the software system proposal document for the <name of the project> project sponsored by <name of sponsor>.

This is the software system proposal document for the <name of the project> project sponsored by <name of sponsor>. Guide to Preparing the SOFTWARE PROJECT MANAGEMENT PLAN R. Buckley CSc 190 Senior Project Department of Computer Science - College of Engineering and Computer Science California State University, Sacramento

More information

ITS Project Management

ITS Project Management ITS Project Management Policy Contents I. POLICY STATEMENT II. REASON FOR POLICY III. SCOPE IV. AUDIENCE V. POLICY TEXT VI. PROCEDURES VII. RELATED INFORMATION VIII. DEFINITIONS IX. FREQUENTLY ASKED QUESTIONS

More information

3 Traditional approach

3 Traditional approach The Unified Approach to Modeling of Software Project Management Processes Šárka Květoňová 1, Zdeněk Martínek 1 1 Dept. of Information Systems, Faculty of Information Technology, Brno University of Technology,

More information

Project Integration Management

Project Integration Management Integration Initiating ning Executing Monitoring & Controlling Closing 4.1 Develop Charter Statement Of Work Business Case 4.2 Develop 4.3 Direct and Manage Work 4.4 Monitor and Control Work 4.5 Perform

More information

http://www.io4pm.org IO4PM - International Organization for Project Management

http://www.io4pm.org IO4PM - International Organization for Project Management THE ONLY BOOK CAN SIMPLY LEARN PROJECT MANAGEMENT! Page 1 Contents ABOUT THE AUTHOR... 3 WHAT IS PROJECT MANAGEMENT?... 5 ORGANIZATIONAL INFLUENCES AND PROJECT LIFECYCLE... 11 PROJECT MANAGEMENT PROCESSES...

More information

Project Knowledge Areas

Project Knowledge Areas From Houston S: The Project Manager s Guide to Health Information Technology Implementation. Chicago: HIMSS; 2011; pp 27 39. This book is available on the HIMSS online bookstore at www. himss.org/store.

More information

MNLARS Project Audit Checklist

MNLARS Project Audit Checklist Audit Checklist The following provides a detailed checklist to assist the audit team in reviewing the health of a project. Relevance (at this time) How relevant is this attribute to this project or audit?

More information

Project Management Courses

Project Management Courses "A well planned project will give results exactly as planned." Project Management Courses Professional Development Training has a specialised division of Project Management experts that will tailor the

More information

ProjectMinds Quick Guide to Project Management

ProjectMinds Quick Guide to Project Management ProjectMinds Quick Guide to Project Management By Manjeet Singh msingh@projectminds.com 1 A D I F F E R E N T K I N D O F C O P Y R I G H T No rights reserved. All the parts of this book can be reproduced,

More information

Interpreting the Management Process in IEEE/EIA 12207 with the Help of PMBOK

Interpreting the Management Process in IEEE/EIA 12207 with the Help of PMBOK Interpreting the Management Process in IEEE/EIA 12207 with the Help of PMBOK Lewis Gray, Ph.D., PMP Abelia Fairfax, Virginia USA www.abelia.com Copyright 2002 by Abelia Corporation. All rights reserved

More information

The Project Management Life Cycle By Jason Westland (A book review by R. Max Wideman)

The Project Management Life Cycle By Jason Westland (A book review by R. Max Wideman) The Project Management Life Cycle By Jason Westland (A book review by R. Max Wideman) 11/17/07 Introduction Editor's Note: We liked so much of this book that we asked for the author's permission to quote

More information

Crosswalk Between Current and New PMP Task Classifications

Crosswalk Between Current and New PMP Task Classifications Crosswalk Between Current and New PMP Task Classifications Domain 01 Initiating the Project Conduct project selection methods (e.g., cost benefit analysis, selection criteria) through meetings with the

More information

ICT Project Management

ICT Project Management THE UNITED REPUBLIC OF TANZANIA PRESIDENT S OFFICE PUBLIC SERVICE MANAGEMENT ICT Project Management A Step-by-step Guidebook for Managing ICT Projects and Risks Version 1.0 Date Release 04 Jan 2010 Contact

More information

pm4dev, 2007 management for development series Introduction to Project Management PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS

pm4dev, 2007 management for development series Introduction to Project Management PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS pm4dev, 2007 management for development series Introduction to Project Management PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS A methodology to manage

More information

www.aryanengineering.com Email: info@aryanengineering.com

www.aryanengineering.com Email: info@aryanengineering.com What is PMP Certification exam? www.aryanengineering.com PMP stands for Project Management Professional certification exam. PMP, is one of the most respected and globally recognized certification is offered

More information

PROJECT SCOPE MANAGEMENT

PROJECT SCOPE MANAGEMENT 5 PROJECT SCOPE MANAGEMENT Project Scope Management includes the processes required to ensure that the project includes all the work required, and only the work required, to complete the project successfully

More information

Input, Output and Tools of all Processes

Input, Output and Tools of all Processes 1 CIS12-3 IT Project Management Input, Output and Tools of all Processes Marc Conrad D104 (Park Square Building) Marc.Conrad@luton.ac.uk 26/02/2013 18:22:06 Marc Conrad - University of Luton 1 2 Mgmt /

More information

Project Management Body of Knowledge (PMBOK) (An Overview of the Knowledge Areas)

Project Management Body of Knowledge (PMBOK) (An Overview of the Knowledge Areas) Project Management Body of Knowledge (PMBOK) (An Overview of the Knowledge Areas) Nutek, Inc. 3829 Quarton Road, Suite 102 Bloomfield Hills, Michigan 48302, USA. Phone: 248-540-4827, Email: Support@Nutek-us.com

More information

Project Management Courses

Project Management Courses "A well planned project will give results exactly as planned." Project Management Courses Professional Development Training has a specialised division of Project Management experts that will tailor the

More information

Managing IT Projects. Chapter 2 The PMI Framework

Managing IT Projects. Chapter 2 The PMI Framework Managing IT Projects Chapter 2 The PMI Framework The PMI Framework The Project Management Institute,USA is an internationally acclaimed organization Devoted to Creation & sharing of knowledge in the area

More information

Software Project Management Plan (SPMP)

Software Project Management Plan (SPMP) Software Project Management Plan (SPMP) The basic template to be used is derived from IEEE Std 1058-1998, IEEE Standard for Software Project Management Plans. The following is a template for the SPMP.

More information

Certification Preparation Course LATVIKON (R.E.P.)Centre

Certification Preparation Course LATVIKON (R.E.P.)Centre PMP Certification Preparation Course LATVIKON (R.E.P.)Centre ABOUT THIS COURSE Your ability as a project manager to demonstrate best practices in Project Management both on the job and through professional

More information

Project Management Fundamentals. Office of the Senior Associate Vice President for Finance

Project Management Fundamentals. Office of the Senior Associate Vice President for Finance Project Management Fundamentals Project Management Institute PMI is an aggregation of best practices from thousands of professional project managers Principles in this training are based on PMI methodologies,

More information

Module 1 Diploma of Project Management

Module 1 Diploma of Project Management Module 1 Diploma of Project Management Project Management Fundamentals in association with This two day course takes participants through all aspects of Project Management and provides in depth examination

More information

AIPM PROFESSIONAL COMPETENCY STANDARDS FOR PROJECT MANAGEMENT PART B CERTIFIED PRACTISING PROJECT PRACTITIONER (CPPP)

AIPM PROFESSIONAL COMPETENCY STANDARDS FOR PROJECT MANAGEMENT PART B CERTIFIED PRACTISING PROJECT PRACTITIONER (CPPP) AIPM PROFESSIONAL COMPETENCY STANDARDS FOR PROJECT MANAGEMENT PART B CERTIFIED PRACTISING PROJECT PRACTITIONER (CPPP) Copyright: Australian Institute of Project Management Document Information Document

More information

Making project management indispensable for business results. Project Management 101

Making project management indispensable for business results. Project Management 101 Making project management indispensable for business results. Project Management 101 Donald E. Moore, MBA, PMP, President of PMI NB Kelly Barter, Chapter Manager of PMI NB AGM April 28, 2011 Topics of

More information

Integration Mgmt / Initiating Process Group 4.1 Develop Project Charter

Integration Mgmt / Initiating Process Group 4.1 Develop Project Charter 1 Mgmt / Initiating Process Group 4.1 Develop Project Charter Project statement of work Business case Agreements Facilitation techniques Project charter 26/02/2013 18:23:36 1 2 Mgmt / Planning Process

More information

Project Management for PhDs. Carlos A. S. Silva Engineering Systems

Project Management for PhDs. Carlos A. S. Silva Engineering Systems Carlos A. S. Silva Engineering Systems 1 Motivation Candidates idea about the topic is not clear Supervisors coaching is not sufficient The result is: PhD taking longer than required Less results than

More information

Metadata-Based Project Management System. A Case Study at M-Files Corporation. Iulia Adomnita

Metadata-Based Project Management System. A Case Study at M-Files Corporation. Iulia Adomnita Metadata-Based Project Management System. A Case Study at M-Files Corporation Iulia Adomnita University of Tampere School of Information Sciences Computer Science M.Sc. Thesis Supervisors: Timo Poranen,

More information

ITS Project Management Methodology

ITS Project Management Methodology ITS Project Management Methodology Information Technology Services Project Management Group 11/17/2014 Version 2.1 Author: ITS Project Management Group Document Control Change Record Date Author Version

More information

(Refer Slide Time: 01:52)

(Refer Slide Time: 01:52) Software Engineering Prof. N. L. Sarda Computer Science & Engineering Indian Institute of Technology, Bombay Lecture - 2 Introduction to Software Engineering Challenges, Process Models etc (Part 2) This

More information

PMP Project Management Professional Study Guide, Third Edition

PMP Project Management Professional Study Guide, Third Edition PMP Project Management Professional Study Guide, Third Edition Joseph Phillips McGraw-Hill is an independent entity from the Project Management Institute, Inc. and is not affiliated with the Project Management

More information

Project Management Concepts and Strategies

Project Management Concepts and Strategies Project Management Concepts and Strategies Contact Hours: 24 Course Description This series provides a detailed examination of project management concepts and strategies. It discusses the seven components

More information

Project Management Process. Prepared by Jay Knape

Project Management Process. Prepared by Jay Knape Project Management Process Prepared by Jay Knape PMI Project Project is... temporary endeavor undertaken to produce a unique products, service or result. UITS Project Definition For Columbus State University

More information

From Body of Knowledge to Embodied Knowledge: Leveraging the Project Management Professional (PMP) Certification

From Body of Knowledge to Embodied Knowledge: Leveraging the Project Management Professional (PMP) Certification From Body of Knowledge to Embodied Knowledge: Leveraging the Project Management Professional (PMP) Certification By Jennifer Tucker, PMP OKA (Otto Kroeger Associates), jtucker@typetalk.com Abstract. The

More information

IT Project Management Practices Guide

IT Project Management Practices Guide IT Project Management Practices Guide Introduction The IT Project Management Practices Guide (Guide) contains a repeatable, institutionwide approach for the management of application development and/or

More information

Project Management Process

Project Management Process Project Management Process Description... 1 STAGE/STEP/TASK SUMMARY LIST... 2 Project Initiation 2 Project Control 4 Project Closure 5 Project Initiation... 7 Step 01: Project Kick Off 10 Step 02: Project

More information

Project Management Plan for

Project Management Plan for Project Management Plan for [Project ID] Prepared by: Date: [Name], Project Manager Approved by: Date: [Name], Project Sponsor Approved by: Date: [Name], Executive Manager Table of Contents Project Summary...

More information

Quick Reference Guide Interactive PDF Project Management Processes for a Project

Quick Reference Guide Interactive PDF Project Management Processes for a Project Project Processes for a Project Click the Knowledge Area title (below and left in blue underline) to view the details of each Process Group. Project Process Groups and Knowledge Areas Mapping Project Process

More information

Project Management Topics

Project Management Topics S E C T I O N II T W O Project Management Topics SECTION II: PROJECT MANAGEMENT TOPICS TABLE OF CONTENTS Introduction 3 1. PROJECT TRIAGE 5 1.1 Gather the Data 7 1.2 Review and Analyze the Data 10 1.3

More information

Retained Fire Fighters Union. Introduction to PRINCE2 Project Management

Retained Fire Fighters Union. Introduction to PRINCE2 Project Management Retained Fire Fighters Union Introduction to PRINCE2 Project Management PRINCE2 PRINCE stands for: PRojects IN Controlled Environments and is a structured method which can be applied to any size or type

More information

Project Management Concepts

Project Management Concepts Project Management Concepts Day Workshop Course PM12 PM12 - Project Management Concepts Course ID: PM12 Credits: 21 PDUs Course Duration: 3 days Course Level: Basic 3 Days 21 PDUs Course Description: In

More information

2015.02.19. BASICS OF PROJECT MANAGEMENT 2015.02.19. István Vidovszky PhD. table of contents

2015.02.19. BASICS OF PROJECT MANAGEMENT 2015.02.19. István Vidovszky PhD. table of contents BASICS OF PROJECT MANAGEMENT BME/BUTE Faculty of Architecture Department of construction technology and management István Vidovszky PhD 2015.02.19. Building Project Management 0 1. definitions 2. history

More information

Project success depends on

Project success depends on Project success depends on many factors both within and outside the control of the project team. One of the aspects that is within the control of the project team is the planning. Almost everything we

More information

General Notes Time allowed 1 hour. Answer all 60 multiple choice questions Use the proforma answer sheet provided.

General Notes Time allowed 1 hour. Answer all 60 multiple choice questions Use the proforma answer sheet provided. Introductory Certificate The APM Project Fundamentals Qualification. Examination paper Candidate Number Date Location Examination Paper Sample Paper v1.4 General Notes Time allowed 1 hour. Answer all 60

More information

Ten Steps to Comprehensive Project Portfolio Management Part 3 Projects, Programs, Portfolios and Strategic Direction By R.

Ten Steps to Comprehensive Project Portfolio Management Part 3 Projects, Programs, Portfolios and Strategic Direction By R. August 2007 Ten Steps to Comprehensive Project Portfolio Management Part 3 Projects, Programs, Portfolios and Strategic Direction By R. Max Wideman This series of papers has been developed from our work

More information

PHASE 3: PLANNING PHASE

PHASE 3: PLANNING PHASE PHASE 3: PLANNING PHASE The Planning Phase focuses principally on required project planning work. Proper comprehensive project planning is essential to a successful IT project, and incomplete project planning

More information

Project Zeus. Risk Management Plan

Project Zeus. Risk Management Plan Project Zeus Risk Management Plan 1 Baselined: 5/7/1998 Last Modified: N/A Owner: David Jones/Zeus Project Manager Page Section 1. Introduction 3 1.1 Assumptions, Constraints, and Policies 3 1.2 Related

More information

PMP Exam Preparation Answer Key

PMP Exam Preparation Answer Key Chapter 2 Answers 1) d) They are all of equal importance unless otherwise stated The Triple Constraint of Project Management is that Scope, Time, and Cost are all equal unless otherwise defined as such.

More information

Project Management. [Student s Name] [Name of Institution]

Project Management. [Student s Name] [Name of Institution] 1 Paper: Assignment Style: Harvard Pages: 10 Sources: 7 Level: Master Project Management [Student s Name] [Name of Institution] 2 Project Management Introduction The project management also known as management