1 REQUIRED DISTANCE FROM GAS PIPES, LIQUID PROPANE TANKS, AND ELECTRIC LINES. Subpart 1. General distances. The minimum isolation distances in item A or B must be maintained during construction, repair, or sealing of a well or boring, and installation of a pipe with flammable or volatile gas, an overhead or underground electric transmission, distribution, service, supply, feeder, branch, or conductor line hereinafter called electric line or line, or a liquid propane tank. The distances are measured horizontally from the closest part of the well or boring to the closest part of the pipe, tank, or line; or closest part of the vertical projection on the earth of an overhead or buried pipe, tank, or line. The minimum isolation distance between a well or boring and a pipe with flammable or volatile gas, an electric line, or a liquid propane tank is: A. ten feet; or B. five feet if: (1) the person constructing the well or boring, or the person installing the pipe, line, or tank, marks the well or boring with a permanent sign warning of the location of the electric line, liquid propane tank, or gas pipe; and; (2) during construction of the well or boring: (a) the electric line has been deenergized and visibly grounded, or insulating barriers not a part of, or an attachment to, the equipment or machinery have been erected to prevent physical contact with the line during well or boring construction; and (b) the propane tank does not contain flammable or volatile gas. A pipe with flammable or volatile gas means a product in the gaseous state such as natural gas; it does not refer to (liquid) gasoline. Natural gas is the most common gas in this category, but other flammable gasses such as oxygen are also included. The separation distance is required from aboveground and buried electric lines, gas pipes, and liquid propane (LP) tanks. The separation distance applies to all types of new wells or borings installed near an existing utility, or a utility installed near an existing well or boring. The distance is measured horizontally from the vertical projection of an overhead or underground utility onto the ground. Deenergization does not apply when collecting a water sample; however, appropriate safety precautions should be followed. The earth is not an insulating barrier. 187

2 An electric transmission line includes private electric service line(s) to or between a house or other building(s), but does not include electric wiring within a building. Between July 15, 1974, and August 4, 2008, the rules required a 25-foot separation to an electric line over 50 kilovolts. This requirement was removed in August Even though it is no longer a requirement, maintaining distances greater than 10 feet may be a good idea where high voltages exist, or where other conditions such as line sag increase the potential for contact with the conductor, or where future utility or construction work is planned. As indicated later in this rule part, this rule does not exempt persons from requirements of the Occupational Safety and Health Administration (OSHA). OSHA requires a 10-foot (radial) separation between an electric line less than 50kV and the closest part of a mast. For lines over 50kV, the distance is increased 0.4 inch for each one kv over 50kV. Current OSHA standards should be consulted. A well or boring may be drilled between 5 and 10 feet from an electric line, a gas pipe, or an LP tank if the well or boring is placarded and the safety precautions are followed. The person constructing a well or boring between 5 and 10 feet from the utility, or the person installing the utility between 5 and 10 feet from a well or boring is responsible for installing the sign. The permanent sign warning of the location of an electric transmission line and/or gas pipe must be constructed of a weatherproof material (i.e., plastic, steel, brass or aluminum, not paper) that will remain legible for the life of the well or boring. If the permanent sign becomes unreadable or detached from a well or boring, then the well owner must replace this sign. ATTACHMENT OF PERMANENT SIGNS WARNING OF ELECTRIC AND GAS HAZARDS ABOVE-GRADE For wells and borings completed above-grade, the permanent sign must be attached in a visible location to the well or boring outer casing, or the protective overshot casing with appropriate adhesive or with a stainless steel or metal clamp, band, or strap. The sign may also be screwed or bolted to a concrete pump pedestal. The sign should not be attached to the cap. AT-GRADE For wells and borings completed at-grade, the permanent sign must be attached to the casing with a metal strap, attached to the inside of the vault with suitable adhesives or screws, attached to the exterior of the vault with bolts, or cemented or bolted to the concrete pad surrounding the vault. The sign may not be placed into the vault without attachment, nor attached to the vault cover or cap. Subp. 2 [Repealed, 33 SR 211] Subp. 3. Exceptions. Subpart 1 does not apply to: A. an electrical service line for the well or boring; B. a television, fiber optic, or other low voltage electric line with a voltage less than 50 volts; C. a temporary liquid propane tank used during the construction, repair, or sealing of a well or boring; D. an overhead electric line when the repairing or sealing of a well or boring does not involve the use of a drilling machine or hoist; or E. a buried electric line or buried gas pipe when the repairing or sealing of a well or boring does not involve excavation. 188

3 The requirements of this part are minimum standards, and do not exempt persons from more restrictive requirements of the Occupational Health and Safety Administration. It is recommended that the appropriate utility company be contacted for any additional safety precautions or requirements prior to any construction, repair, or sealing work. In summary: for gas pipes, LP tanks, and electric lines SEPARATION BETWEEN WELL OR BORING AND HAZARD RESTRICTIONS > 10 feet No MDH restrictions (consult OSHA regulations for additional requirements) feet Gas pipe placard. LP tank placard, remove gas or move tank during well or boring construction. Electric line placard and either deenergize and ground, or install insulating barriers (consult OSHA regulations for additional requirements). < 5 feet Not permitted. STAT AUTH: MS s 103I.101; 103I.111; 103I.205; 103I.221; 103I.301; 103I.401; 103I.451; 103I.501; 103I.525; 103I.531; 103I.535; 103I.541; 103I.621; ; ; ; ; ; ; HIST: 17 SR 2773; 33 SR LOCATION OF WELL OR BORING WITHIN BUILDING. Subpart 1. Location in a building. A well or boring must not be located within a building, and a building must not be constructed to enclose a well or boring, unless the building (well house) meets the requirements of this part. Environmental bore holes and monitoring wells are exempt from this subpart if sealed within 72 hours of the time construction begins on the well or boring. A well or boring may not be constructed inside a building. A building, building addition, deck or other structure may not be built over or within 3 feet of an existing well or boring, except for a well house, (see Minnesota Rules, part ). If a well or boring is inside a building, and the building above the well or boring is torn down, burns down, or is otherwise removed, a new building may not be built over the well or boring. 189

4 The purposes of the rule are to: (1) allow for service, repair, and sealing of the well or boring including access for a drilling machine, if necessary; (2) prevent contamination due to spills and leaks inside the building which would be contained by the walls and footings of the building; (3) reduce the release of toxic (hydrogen sulfide, radon) or flammable (methane) gas into a habited or confined space; and (4) protect worker safety inside a confined area. The 72-hour rule applies only to monitoring wells and environmental bore holes. The time starts when drilling begins, and sealing must be completed within 72 hours. Subp. 2. Requirements for a building (well house) containing a well or boring. A building (well house) containing a well or boring must: A. have adequate access for a drilling machine and hoist to construct, maintain, repair, and seal the well or boring; B. be constructed at or above the established ground surface. If a floor drain is installed, it must discharge to the established ground surface, a gravel pocket, or a sewer constructed to prevent backup of sewage within 50 feet of the well or boring; C. not be used to store materials or chemicals that may cause contamination of the well, boring, or groundwater, including fertilizers, pesticides, petroleum products, paints, and cleaning solvents; D. have a concrete floor sloped to divert water away from the casing; E. have a watertight gasket or caulk between the casing and the floor; F. have any door hinged to swing outward; G. be constructed according to this part exclusively to contain and protect the well, boring, pump, and water treatment equipment and water treatment chemicals; no other uses of the building are permitted; and H. not be contained in, or part of, another building, except that a well house may be constructed with not more than one wall in common with another building. The common wall must not allow access to, or be open to, the well house. This subpart details the requirements for buildings containing a well or boring, sometimes referred to as well houses. While simple repairs and pump replacement may often be done by hand or with simple tools, some work, particularly extensive repairs or sealing may require a full-sized drilling machine. Refer to Minnesota Rules, part for information regarding connections to a casing. Caulk may be silicone or other nontoxic materials. Well houses may not be below ground, or built into hillsides (walkouts). The floor of the well house must be at or above the established ground surface. Well houses may be attached to other structures, such as a lean-to built against a home or other building. Well houses may not be a building or room enclosed within another building. 190

5 Floor drains in well houses are not recommended. A floor drain must be constructed to prevent backup or flooding of the well house. This can be accomplished by use of an air gap as detailed in the Minnesota Plumbing Code, Chapter A well house must not have toilets, sinks, or other plumbing fixtures. Water treatment chemicals such as chlorine or polyphosphate may be stored in a well house. A well house for a remedial well may enclose the well and remediation equipment, including water treatment equipment, water treatment chemicals, and remediation product tanks, subject to appropriate backflow prevention. Subp. 3. Requirements for a well or boring inside a building. A well or boring located in a separate building (well house) must: A. have casing extending at least 12 inches above the established ground surface, and at least 12 inches above the building floor; and B. be located according to part , except that this does not apply to a removable well house. The preceding subpart (2) detailed the requirements for the well house, this subpart details requirements for a well or boring within a well house. Minnesota Rules, part requires the well or boring to be at least 3 feet from a wall. A well or boring in a well house is not required to be 3 feet from the walls of the well house except for the common wall of a building if the well house is a lean-to on the side of a building. STAT AUTH: MS s 103I.101; 103I.111; 103I.205; 103I.221; 103I.301; 103I.401; 103I.451; 103I.501; 103I.525; 103I.531; 103I.535; 103I.541; 103I.621; ; ; ; ; ; ; HIST: 17 SR 2773; 33 SR

6 DISTANCE FROM A BUILDING. A minimum horizontal isolation distance of three feet must be maintained between a well or boring and the farthest exterior projection of a building, including the walls, roofs, decks, overhangs, and other permanent structures unless the well or boring is located in a building constructed according to part A building, deck, or other permanent structure, except a well house, must not be built to enclose a well or boring. The well or boring must be accessible for repair and sealing. Environmental bore holes and monitoring wells are exempt from this subpart if sealed within 72 hours of the time construction begins on the well or boring. A minimum 3-foot horizontal separation distance must be maintained between a well or boring and the furthest projection of any building or structure. Building projections include roof overhangs and gutters and any attachments to a building including, but not limited to, additions, steps, canopies, porches, or decks. The 3-foot distance is measured from the outermost portion of the well or boring, including the vertical projection of the well or boring, to the closest part of the building, building projection, or structure. Buildings, building projections, or other structures may not be built over the top of a well or boring, and may not be built to surround a well or boring. Clear access must be provided so that a well drilling machine and hoist may back up to the well or boring to perform maintenance, repair, and permanent sealing. If a well or boring is located inside a building and the building is torn down or otherwise removed, a new building may not be constructed over the well or boring. STAT AUTH: MS s 103I.101; 103I.111; 103I.205; 103I.221; 103I.301; 103I.401; 103I.451; 103I.501; 103I.525; 103I.531; 103I.535; 103I.541; 103I.621; ; ; ; ; ; ; HIST: 17 SR 2773; 33 SR [Repealed, 17 SR 2773] 192

Grounding and Bonding Against Static Electricity. Jon Koppari, CSP, MS Occupational Safety and Health Instructor OSHA Training Institute

Grounding and Bonding Against Static Electricity. Jon Koppari, CSP, MS Occupational Safety and Health Instructor OSHA Training Institute Grounding and Bonding Against Static Electricity Jon Koppari, CSP, MS Occupational Safety and Health Instructor OSHA Training Institute Objectives Identify Sources of Ignition. Identify Hazards associated

More information

Proposed standard significant deficiency language is provided in italics. Notes to staff are provided in blue and are [bracketed].

Proposed standard significant deficiency language is provided in italics. Notes to staff are provided in blue and are [bracketed]. Significant Deficiencies: A Quick Fact Sheet for Hawaii PWSs Definition: Significant deficiencies are currently defined in HAR 11-20-46.1 as any defect in a system s design, operation and maintenance,

More information

DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY. a guide to PREVENTING SEWER BACKUPS AND FLOODING

DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY. a guide to PREVENTING SEWER BACKUPS AND FLOODING DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY a guide to PREVENTING SEWER BACKUPS AND FLOODING Sewer backups and flooding can damage District homes and businesses. Sewer blockages are most commonly found

More information

Does Part of My Basement Floor Have to Be Removed to Install. Where Does the Water from the Sump Pump Go?...Page 5

Does Part of My Basement Floor Have to Be Removed to Install. Where Does the Water from the Sump Pump Go?...Page 5 PROTECTIVE PLUMBING - WHAT IS IT? TABLE OF CONTENTS Protective Plumbing What is it?...page 1 What is Foundation Drainage?...Page 2 What is a Sump Pumping System?...Page 4 Does Part of My Basement Floor

More information

Plumbing Installations. A homeowner guide to the City of Winnipeg plumbing requirements for a single-family dwelling

Plumbing Installations. A homeowner guide to the City of Winnipeg plumbing requirements for a single-family dwelling Plumbing Installations A homeowner guide to the City of Winnipeg plumbing requirements for a single-family dwelling February 2001 contents General Information 3 Inspection 4 New Drain and Vent Installations

More information

SWIMMING POOL, SPA, & HOT TUB GUIDELINES

SWIMMING POOL, SPA, & HOT TUB GUIDELINES SWIMMING POOL, SPA, & HOT TUB GUIDELINES Pool permit cost is based on the total value of the project. See Permit Fee Schedule Table 1A. A. Adopted construction codes and installation requirements 1. 2015

More information

Mandatory Part 1.4 BUILD OVER OR NEAR SEWERS, STORMWATER DRAINS AND WATER MAINS

Mandatory Part 1.4 BUILD OVER OR NEAR SEWERS, STORMWATER DRAINS AND WATER MAINS Mandatory Part 1.4 BUILD OVER OR NEAR SEWERS, STORMWATER DRAINS AND WATER MAINS Table of Contents Purpose... 2 Commencement... 2 Application... 2 Referral Agency... 2 Compliance with the QDC... 2 Associated

More information

Downspout Disconnection Program FAQs

Downspout Disconnection Program FAQs Why is the Village making downspout disconnection mandatory? A mandatory downspout disconnection has been the law for several years in La Grange Park. All gutter downspouts must be disconnected from the

More information

LIQUEFIED PETROLEUM GASES

LIQUEFIED PETROLEUM GASES CHAPTER 38 LIQUEFIED PETROLEUM GASES SECTION 3801 GENERAL 3801.1 Scope. Storage, handling and transportation of liquefied petroleum gas (LP-gas) and the installation of LP-gas equipment pertinent to systems

More information

IAC 7/2/08 Agriculture and Land Stewardship[21] Ch 44, p.1

IAC 7/2/08 Agriculture and Land Stewardship[21] Ch 44, p.1 IAC 7/2/08 Agriculture and Land Stewardship[21] Ch 44, p.1 CHAPTER 44 ON-SITE CONTAINMENT OF PESTICIDES, FERTILIZERS AND SOIL CONDITIONERS [Prior to 7/27/88, see 21 Ch 9] PESTICIDES 21 44.1(206) Definitions.

More information

Inspection Item COMMENTS

Inspection Item COMMENTS APPENDIX 9 AFFORDABLE HOUSING PROGRAM INSPECTION CHECKLIST Participating Jurisdiction: Homeowner Name: Assisted Property Address: Date of Physical Inspection of Property: Total Square Footage of Property:

More information

GUIDELINES FOR UTILITY INSTALLATIONS Part 1 - Wire Lines and Communications Cables

GUIDELINES FOR UTILITY INSTALLATIONS Part 1 - Wire Lines and Communications Cables Engineering Department SEPTEMBER, 2007 GUIDELINES FOR UTILITY INSTALLATIONS Part 1 - Wire Lines and Communications Cables General Requirements This section applies to all public and private utilities,

More information

Mobile Home Pre-Inspection Checklist

Mobile Home Pre-Inspection Checklist Mobile Home Pre-Inspection Checklist TWO (2) STEP INSPECTION PROCESS STEP ONE: CALL FOR THE FIRST INSPECTION WHEN THESE ITEMS ARE COMPLETE. 1. Septic tank installed and plumbing complete. (SEE PLUMBING

More information

Preventing water damage in the basement

Preventing water damage in the basement Preventing water damage in the basement Thousands of home insurance claims are filed every year. Some losses are major, others aren t, but they re always an inconvenience and usually avoidable! As prevention

More information

2014 NEC Guide Lines for Home Owner Doing Electrical Work on their Property

2014 NEC Guide Lines for Home Owner Doing Electrical Work on their Property 2014 NEC Guide Lines for Home Owner Doing Electrical Work on their Property A brief summary of the most used code references for residential wiring State of Idaho Division of Building Safety Electrical

More information

MARICOPA COUNTY ENVIRONMENTAL HEALTH CODE

MARICOPA COUNTY ENVIRONMENTAL HEALTH CODE MARICOPA COUNTY ENVIRONMENTAL HEALTH CODE CHAPTER II SEWAGE AND WASTES SECTION 6 CHEMICAL TOILETS, PORTABLE RESTROOM UNITS, PORTABLE WASTE HOLDING TANKS REGULATION 1. Definitions a. "Chemical toilet" means

More information

UltraTech International, Inc. Canadian Secondary Containment Requirements

UltraTech International, Inc. Canadian Secondary Containment Requirements UltraTech International, Inc. 11542 Davis Creek Court Jacksonville, Florida 32256 Canadian Secondary Containment Requirements The Canadian Council of Ministers of the Environment (CCME) is the major intergovernmental

More information

a guide to PREVENTING HOME FLOODING DURING STORMS

a guide to PREVENTING HOME FLOODING DURING STORMS DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY a guide to PREVENTING HOME FLOODING DURING STORMS DCWATER.COM Updated August 15, 2012 Flooding can damage District homes and businesses. It results when the

More information

PRIVATE WELL SEPARATION

PRIVATE WELL SEPARATION PRIVATE WELL SEPARATION This is an explanation to explain what you have to do with your well, and/or the other sources of water that you may have, in order to receive public water. The term well includes

More information

Protect Your Home From Flooding. A guide for Lethbridge Residents

Protect Your Home From Flooding. A guide for Lethbridge Residents Protect Your Home From Flooding A guide for Lethbridge Residents Every year, millions of litres of water flow into the City of Lethbridge s stormwater and wastewater collection systems from residential

More information

SECTION 02763 POINT REPAIRS TO SANITARY SEWERS. A. Repairs to existing sewer lines by replacing short lengths of failed pipe.

SECTION 02763 POINT REPAIRS TO SANITARY SEWERS. A. Repairs to existing sewer lines by replacing short lengths of failed pipe. SECTION 02763 PART 1 G E N E R A L 1.01 SECTION INCLUDES A. Repairs to existing sewer lines by replacing short lengths of failed pipe. 1.02 UNIT PRICES A. Measurement for point repairs is on a unit price

More information

COMMONLY USED RESIDENTIAL BUILDING CODES

COMMONLY USED RESIDENTIAL BUILDING CODES COMMONLY USED RESIDENTIAL BUILDING CODES INTERNATIONAL RESIDENTIAL CODE (2009) form revised 5/10 FOUNDATION 1. DESIGN OF FORMWORK. Section 1906.1 IBC 2009, Section R404.1.2.3.6 IRC 2009, ACI 318 Section

More information

Rainwater is directed away from walls at surface. Any water infiltrating is captured in drains below foundation

Rainwater is directed away from walls at surface. Any water infiltrating is captured in drains below foundation Ground Surface Rainwater is directed away from walls at surface. Any water infiltrating is captured in drains below foundation Ground Surface Soil Ground Water Level Basement Wall Groundwater drains to

More information

Plumbing. Helpful Hints Residential Construction. Lincoln County. Bert Polk Plumbing Inspector

Plumbing. Helpful Hints Residential Construction. Lincoln County. Bert Polk Plumbing Inspector Plumbing Helpful Hints Residential Construction Bert Polk Plumbing Inspector Lincoln County 2015 Waste and vent fittings Vent 90 medium 90 long 90 1/16 bend,1/8 bend,1/6 bend, medium 90 san tee combination

More information

Excavation Procedure. MIDGA Reviewed: 07/29/14 Effective: 06/20/09 Supersedes: Original Preparer: Owner: Approver: Safety Safety Safety

Excavation Procedure. MIDGA Reviewed: 07/29/14 Effective: 06/20/09 Supersedes: Original Preparer: Owner: Approver: Safety Safety Safety Procedure No.: SOP-0203 Page: 1 of 5 Preparer: Owner: Approver: Safety Safety Safety 1. PURPOSE The purposes of this procedure is to ensure safe excavation, reduce the potential of damaging underground

More information

SIERRA LAKES COUNTY WATER DISTRICT P.O. Box 1039, Soda Springs, CA 95728-1039 (7300 Short Road, Serene Lakes)

SIERRA LAKES COUNTY WATER DISTRICT P.O. Box 1039, Soda Springs, CA 95728-1039 (7300 Short Road, Serene Lakes) SIERRA LAKES COUNTY WATER DISTRICT P.O. Box 1039, Soda Springs, CA 95728-1039 (7300 Short Road, Serene Lakes) Maintenance Office Administrative Office Billing Office 530-426-7802 530-426-7800 916-332-4872

More information

Plumbing Installations A homeowner guide to the City of Winnipeg plumbing requirements for a single-family dwelling

Plumbing Installations A homeowner guide to the City of Winnipeg plumbing requirements for a single-family dwelling PLANNING, PROPERTY AND DEVELOPMENT DEPARTMENT Plumbing Installations A homeowner guide to the City of Winnipeg plumbing requirements for a single-family dwelling October 2014 contents General Information

More information

INSTALLATION OF A BAY WINDOW

INSTALLATION OF A BAY WINDOW INSTALLATION OF A BAY WINDOW Installation of a Bay Window These instructions relate to the replacement of an existing bay window or replacement of a straight window with a new bay window, in an opening

More information

foot skylight) is enough to knock a worker off their feet. A 10 mph wind gust on a 5 x 6 skylight develops a wind force of 270 lbs.

foot skylight) is enough to knock a worker off their feet. A 10 mph wind gust on a 5 x 6 skylight develops a wind force of 270 lbs. Skylight Installation Instructions This document provides instruction and guidelines for installation of both curb mount (CM) and self flashing (SF) unit skylights on flat, pitched (> or equal to 3/12

More information

Building, Plumbing, Electrical and Residential Water and Sewer Inspection Requirements

Building, Plumbing, Electrical and Residential Water and Sewer Inspection Requirements Building, Plumbing, Electrical and Residential Water and Sewer Inspection Requirements Charles County Government Planning and Growth Management P.O. Box 2150, La Plata, MD 20646 (301) 645-0692 Schedule

More information

Subpart 1. Installation. All plumbing systems must be. installed and tested according to this chapter and chapter 4715,

Subpart 1. Installation. All plumbing systems must be. installed and tested according to this chapter and chapter 4715, 4658.4500 PLUMBING SYSTEMS; NEW CONSTRUCTION. Subpart 1. Installation. All plumbing systems must be installed and tested according to this chapter and chapter 4715, the Minnesota Plumbing Code. Subp. 2.

More information

Plugging Home Drains to Prevent Sewage Backup

Plugging Home Drains to Prevent Sewage Backup AE-1476 Plugging Home Drains to Prevent Sewage Backup Why plug drains For homes in areas of the country prone to flooding or heavy rain, taking a few steps to prepare for water levels that could result

More information

Pre-Drywall Inspection Report

Pre-Drywall Inspection Report SM MEDALLION INSPECTIONS helping people make informed decisions Pre-Drywall Inspection Report 5657 Garden Valley Place Milton, Georgia 30024 Prepared for Betsy and Paul Dougherty January12, 2015 Medallion

More information

When Should Examination Preparation Begin?

When Should Examination Preparation Begin? Texas State Board of Plumbing Examiners Tradesman Plumber-Limited Licensee Examination Review Course The following Examination Review Course is designed to assist a registered Plumber s Apprentice in preparing

More information

SECTION 221413 FACILITY STORM DRAINAGE PIPING

SECTION 221413 FACILITY STORM DRAINAGE PIPING SECTION 221413 FACILITY STORM DRAINAGE PIPING PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01

More information

ARLINGTON HEIGHTS MUNICIPAL CODE CHAPTER 22 SEWERS

ARLINGTON HEIGHTS MUNICIPAL CODE CHAPTER 22 SEWERS ARLINGTON HEIGHTS MUNICIPAL CODE CHAPTER 22 SEWERS Article I General Provisions Section 22-101 Definitions Section 22-102 Supervision of Sewer System Section 22-103 Inspections Section 22-104 Use of Public

More information

RESIDENTIAL ELECTRICAL REQUIREMENTS (REVISED 3/28/2008) PERMIT REQUIREMENTS:

RESIDENTIAL ELECTRICAL REQUIREMENTS (REVISED 3/28/2008) PERMIT REQUIREMENTS: RESIDENTIAL ELECTRICAL REQUIREMENTS (REVISED 3/28/2008) PERMIT REQUIREMENTS: Signed completed Electrical Permit application form. Minnesota law requires all electrical work is to be performed by licensed,

More information

Jay R. Smith Mfg. Co.

Jay R. Smith Mfg. Co. Jay R. Smith Mfg. Co. Automatic Backwater Valve SMITH CUSTOMER DRIVEN FLOOD-GATE FEATURES Index Page Flood-Gate Features and Applications 2 How Flood-Gate Works 3 Flood-Gate Operation & Approvals 4 Valve

More information

ARTICLE II (2) ARTICLE II - REQUIRED USE OF PUBLIC SEWERS. PARAGRAPH 020001 Purpose and Application.

ARTICLE II (2) ARTICLE II - REQUIRED USE OF PUBLIC SEWERS. PARAGRAPH 020001 Purpose and Application. ARTICLE II - REQUIRED USE OF PUBLIC SEWERS. PARAGRAPH 020001 Purpose and Application. Article II provides rules governing the allowable connection to the City POTW and the construction and inspection of

More information

contractors, etc. and establish relationships with lease and rental companies.

contractors, etc. and establish relationships with lease and rental companies. The following may serve as a checklist when preparing for a Tropical Storm or Hurricane. Although Tornadoes usually provide little advance warning, locations subject to Tornadoes may apply much of the

More information

Improper storage of potential pollutants will increase the risk of water pollution that may occur because of spills.

Improper storage of potential pollutants will increase the risk of water pollution that may occur because of spills. WQ-3 Best Management Practice (BMP) Water Quality Protection Guideline Secondary Containment Design and Operation Standards Section 1. Introduction According to the EPA, the majority of water pollution

More information

Town House 11265 Center Highway North Huntingdon, PA 15642

Town House 11265 Center Highway North Huntingdon, PA 15642 APPENDIX C SPECIFICATIONS FOR THE CONSTRUCTION OF BUILDING LATERAL SANITARY SEWERS DECEMBER 2004, INCLUDING AMENDMENTS ADOPTED ON FEBRUARY 6, 2008 AND APRIL 2, 2008; EFFECTIVE ON MAY 1, 2008 Town House

More information

CLIENT. Inspection Report. 271 Front St. Alert Bay, B.C. Island Building Inspections V ANCOUVER I SLAND B. C.

CLIENT. Inspection Report. 271 Front St. Alert Bay, B.C. Island Building Inspections V ANCOUVER I SLAND B. C. CLIENT Inspection Report 271 Front St. Alert Bay, B.C. Island Building Inspections 2013 V ANCOUVER I SLAND B. C. Elevation Photos For the Property at 271 Front Street Alert Bay, BC ELEVATION PICTURES Front

More information

CHAPTER 11 STORM DRAINAGE

CHAPTER 11 STORM DRAINAGE CHAPTER 11 STORM DRAINAGE SECTION 11 GENERAL 11.1 Scope. The provisions of this chapter shall govern the materials, design, construction and installation of storm drainage. 11.2 Where required. All roofs,

More information

2. What building projects are exempted? (permit not required)

2. What building projects are exempted? (permit not required) BUILDING AND SAFETY DEPARTMENT 1. What building projects require a permit? Following is a list of projects that require building permits based on Appendix chapter 1 of the California Building Code and

More information

ELECTRICAL GUIDELINES FOR SINGLE-FAMILY HOME OWNERS:

ELECTRICAL GUIDELINES FOR SINGLE-FAMILY HOME OWNERS: ELECTRICAL GUIDELINES FOR SINGLE-FAMILY HOME OWNERS: Chapter 12 of the Burlington Code of ordinances allows owner occupants of single family homes to do their own wiring if they choose. If you choose to

More information

SAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT

SAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT SAMPLE SCHEDULE OF S 1.00 General Conditions 1.01 Project Management 1.02 General Superintendent 1.03 Superintendents 1.04 Safety Engineer 1.05 Scheduling 1.06 Field Engineering 1.07 Bonds 1.08 Trailer

More information

BOROUGH OF NATIONAL PARK APPLICATION FOR A CERTIFICATE OF OCCUPANCY FOR CHANGE OF OCCUPANCY ADDRESS OF PROPERTY FOR INSPECTION CURRENT OWNER

BOROUGH OF NATIONAL PARK APPLICATION FOR A CERTIFICATE OF OCCUPANCY FOR CHANGE OF OCCUPANCY ADDRESS OF PROPERTY FOR INSPECTION CURRENT OWNER BOROUGH OF NATIONAL PARK APPLICATION FOR A CERTIFICATE OF OCCUPANCY FOR CHANGE OF OCCUPANCY ADDRESS OF PROPERTY FOR INSPECTION # BLOCK LOT VACANT YES NO CURRENT OWNER NAME ADDRESS TELEPHONE # PROSPECTIVE

More information

Walking and Working Surface Checklist:

Walking and Working Surface Checklist: Walking and Working Surfaces Purpose: This information is presented to improve the level of safety in our operations, and to inform you that we will comply with the OSHA Standard 29 CFR 1910.23. Responsibility:

More information

Common Electrical Hazards in the Workplace Including Arc Flash. Presented by Ken Cohen, PhD, PE & CIH (Ret.)

Common Electrical Hazards in the Workplace Including Arc Flash. Presented by Ken Cohen, PhD, PE & CIH (Ret.) Common Electrical Hazards in the Workplace Including Arc Flash Presented by Ken Cohen, PhD, PE & CIH (Ret.) 1 What s New In February 1972, OSHA incorporated the 1971 edition of the National Fire Protection

More information

EXHIBIT "A. Technical Specifications for Water and Sewer Service Lines

EXHIBIT A. Technical Specifications for Water and Sewer Service Lines EXHIBIT "A Technical Specifications for Water and Sewer Service Lines Water and Sewer Line Bedding and Backfill: Drawings show cross-section of trench, pipe laid on top of 6" min. bedding material, bedding

More information

ADD WATERPROOF VENEER TO EXTERIOR WALLS

ADD WATERPROOF VENEER TO EXTERIOR WALLS Protecting Your Property From Flooding ARE YOU AT RISK? If you aren t sure whether your house is at risk from flooding, check with your local floodplain manager, building official, city engineer, or planning

More information

Specifications for Residential Property Owners Connection to New Public Sewer

Specifications for Residential Property Owners Connection to New Public Sewer Specifications for Residential Property Owners Connection to New Public Sewer Spalding Tract property owners are required to connect to the community sewer system when construction is complete and the

More information

School Construction Authority Architecture & Engineering

School Construction Authority Architecture & Engineering SCOPING GUIDELINES 1.0 GENERAL GUIDELINES 2.0 BUILDING ENVELOPE SCOPING GUIDELINES 3.0 CATEGORIES AND COMPONENTS: The Flood Elimination/Below Grade Capital Category may include some or all of the following

More information

CITY OF WHITE BEAR LAKE BUILDING INSPECTION DEPARTMENT 4701 Highway 61 White Bear Lake, MN 55110 Fax: 651-429-8503. Re-Roofing: Asphalt Shingles

CITY OF WHITE BEAR LAKE BUILDING INSPECTION DEPARTMENT 4701 Highway 61 White Bear Lake, MN 55110 Fax: 651-429-8503. Re-Roofing: Asphalt Shingles CITY OF WHITE BEAR LAKE BUILDING INSPECTION DEPARTMENT 4701 Highway 61 White Bear Lake, MN 55110 Fax: 651-429-8503 Re-Roofing: Asphalt Shingles This is a summary of the standard requirements based on the

More information

DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL

DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL 1.01 DESCRIPTION A. Furnish and install all storm drains, including manholes, inlets, service lines and other appurtenant

More information

TABLE OF CONTENTS. 437-004-2850 Temporary Lighting and Wiring... S-2 Temporary Wiring... S-2 Temporary Lighting... S-3

TABLE OF CONTENTS. 437-004-2850 Temporary Lighting and Wiring... S-2 Temporary Wiring... S-2 Temporary Lighting... S-3 Oregon Administrative Rules and Health Division ELECTRICITY S TABLE OF CONTENTS 437-004-2810 General Requirements... S-1 437-004-2850 Temporary Lighting and Wiring... S-2 Temporary Wiring... S-2 Temporary

More information

STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM

STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM Installed in Pre-engineered Steel Buildings Provides Lowest Cost Construction Method for CORROSIVE AND WET Environments PREFERRED SOLUTIONS, INC.

More information

SEWER BACKUP PREVENTION PROGRAM

SEWER BACKUP PREVENTION PROGRAM SEWER BACKUP PREVENTION PROGRAM The Village of La Grange Park is pleased to announce a program to assist single-family homeowners with the cost of plumbing improvements to address sanitary sewer related

More information

Prevention through Design: Eliminating Confined Spaces and Minimizing Hazards

Prevention through Design: Eliminating Confined Spaces and Minimizing Hazards Prevention through Design: Eliminating Confined Spaces and Minimizing Hazards American Industrial Hygiene Association Developed by the AIHA Confined Spaces Committee Approved by the AIHA Board of Directors

More information

Pressure Vessels (Air Compressors) and LPG Tanks

Pressure Vessels (Air Compressors) and LPG Tanks Pressure Vessels (Air Compressors) and LPG Tanks 1. Identification of Workplace Hazard Any container, tank or vessel that contains pressurized material is a potential hazard to employees due to the force

More information

Dukes of Hazard Activity Time:

Dukes of Hazard Activity Time: Dukes of Hazard Activity Time: TEACHERS: Read Populution and Water Source Protection on page 80 of Peel Water Story book. Objectives: Students will: Identify household hazardous waste (HHW) materials around

More information

Acumen Enterprises, Inc.

Acumen Enterprises, Inc. Hourly rates Discount w/o Rebate Electrician $78.00 10% $70.20 $70.73 HVAC Technician $78.00 10% $70.20 $70.73 Insulator $42.00 10% $37.80 $38.08 Sheet Metal Worker $74.00 10% $66.60 $67.10 Plumber/Pipefitter

More information

Does Wall Township require an inspection by the building department on resale of a home?

Does Wall Township require an inspection by the building department on resale of a home? Selling your home Does Wall Township require an inspection by the building department on resale of a home? No. We do not require a Certificate of Continued Occupancy on the resale of home. A Smoke Detector,

More information

(Adopted July 7, 1989)(Amended December 7, 1990) (Amended May 13, 1994) FUGITIVE EMISSIONS OF VOLATILE ORGANIC COMPOUNDS

(Adopted July 7, 1989)(Amended December 7, 1990) (Amended May 13, 1994) FUGITIVE EMISSIONS OF VOLATILE ORGANIC COMPOUNDS (Adopted July 7, 1989)(Amended December 7, 1990) (Amended May 13, 1994) RULE 1173. FUGITIVE EMISSIONS OF VOLATILE ORGANIC COMPOUNDS (a) (b) Purpose This rule is intended to control volatile organic compounds

More information

ELECTRICAL SERVICE REQUIREMENTS FOR MOBILE HOME DEVELOPMENTS

ELECTRICAL SERVICE REQUIREMENTS FOR MOBILE HOME DEVELOPMENTS Prepared by: ABB1 ELECTRICAL SERVICE REQUIREMENTS FOR MOBILE HOME DEVELOPMENTS 052521 Asset Type: Electric Metering Function: Construction Issued by: Quoc Hoang (QxH1) Date: 07-01-16 Rev. #06: This document

More information

SAFETY AND HEALTH PROGRAM

SAFETY AND HEALTH PROGRAM PROGRAM NUMBER NO. PAGES 05-005 10 REVISION ISSUE DATE Revision 2 11/1/2005 SAFETY AND HEALTH PROGRAM Confined Space Entry 1.0 INTRODUCTION Confined Space Entry is a serious workplace hazard, capable of

More information

Inspections Standard Operating Procedure 5 Aboveground Storage Tanks

Inspections Standard Operating Procedure 5 Aboveground Storage Tanks Aboveground Storage Tanks Aboveground Storage Tank Inspection This Standard Operating Procedure describes the steps that campus units that manage aboveground oil storage tanks (ASTs) or containers must

More information

CHAPTER 11 STORM DRAINAGE

CHAPTER 11 STORM DRAINAGE CHAPTER STORM DRAINAGE SECTION PC 0 GENERAL 0. Scope. The provisions of this chapter shall govern the materials, design, construction and installation of storm drainage. Storm water discharge shall be

More information

1-800-327-8276 www.jfcson.com

1-800-327-8276 www.jfcson.com Trenchless Cost Effective Internal Pipe Rehabilitation 101 East Broadway, Hackensack, N.J. 07601 Folsom, NJ Linden, NJ Beltsville, MD Sylmar, CA 1-800-327-8276 www.jfcson.com In-Weg Internal Joint Sealing

More information

SOP 4: Spill Response and Cleanup Procedures SOP 4: SPILL RESPONSE AND CLEANUP PROCEDURES

SOP 4: Spill Response and Cleanup Procedures SOP 4: SPILL RESPONSE AND CLEANUP PROCEDURES SOP 4: SPILL RESPONSE AND CLEANUP PROCEDURES Municipalities are responsible for any contaminant spill or release that occurs on property they own or operate. Particular areas of concern include any facilities

More information

GROWTH MANAGEMENT DEPARTMENT 201 SE 3 rd ST, (Second Floor), Ocala, FL 34471 (352) 629-8421; FAX: (352) 629-8264

GROWTH MANAGEMENT DEPARTMENT 201 SE 3 rd ST, (Second Floor), Ocala, FL 34471 (352) 629-8421; FAX: (352) 629-8264 BUILDING CODE GUIDELINES FOR ELECTRICAL INSPECTIONS Building Code compliance is the obligation of design professionals and/or contractors. Plan Review and Inspection Guidelines are intended to be used

More information

Flood Checklist ACTION TO BE TAKEN BEFORE THE FLOOD SEASON

Flood Checklist ACTION TO BE TAKEN BEFORE THE FLOOD SEASON Flood Checklist The following may serve as a checklist when preparing for a flood. This checklist should be tailored to processes/operations, flood protection equipment and flood potentials at your specific

More information

Wilo SP Series Submersible Sump Pumps ECS. ECS19-15.25 ECS22-15.33 ECS24-15.50 Installation and operating instructions

Wilo SP Series Submersible Sump Pumps ECS. ECS19-15.25 ECS22-15.33 ECS24-15.50 Installation and operating instructions Wilo SP Series Submersible Sump Pumps ECS ECS19-15.25 ECS22-15.33 ECS24-15.50 Installation and operating instructions PREINSTALLATION CHECK Inspect this pump before it is used. Occasionally, pumps can

More information

FALL PROTECTION- Part 2 SELF INSPECTION CHECKLIST

FALL PROTECTION- Part 2 SELF INSPECTION CHECKLIST OPTIONAL INFORMATION Name of School: Date of Inspection: Vocational Program/Course/Room: Signature of Inspector: FALL PROTECTION- Part 2 Instructions: This checklist covers fall protection systems criteria

More information

Hazardous Waste Accumulation, Storage, & Labeling

Hazardous Waste Accumulation, Storage, & Labeling Nadine Deak, Kalamazoo District Office 269-567-3592 or deakn@michigan.gov Jenny Bennett, Gaylord District Office 989-705-2421 or bennettj6@michigan.gov Hazardous Waste Accumulation, Storage, & Labeling

More information

SRA-125/SRAX-125 Double-Rail Lift-Out Rail System Installation & Service Manual with Parts List

SRA-125/SRAX-125 Double-Rail Lift-Out Rail System Installation & Service Manual with Parts List SRA-125/SRAX-125 Double-Rail Lift-Out Rail System Installation & Service Manual with Parts List For MG, WG, WGL, and Grinder Pumps for Effluent & Sewage CAUTION! Read these safety warnings first before

More information

Maryland Containment System Testing Protocol. The individual performing the inspection and testing as outlined in this protocol must be either:

Maryland Containment System Testing Protocol. The individual performing the inspection and testing as outlined in this protocol must be either: MARYLAND DEPARTMENT OF THE ENVIRONMENT Oil Control Program, Suite 620, 1800 Washington Blvd., Baltimore MD 21230-1719 4 410-537-3442 410-537-3092 (fax) 1-800-633-6101 http://www.mde.state.md.us Maryland

More information

www.citiesinspection.com October 5, 2015 Dear Client,

www.citiesinspection.com October 5, 2015 Dear Client, www.citiesinspection.com October 5, 2015 Dear Client, On 9/14/2015, Cities Inspection Service, Inc. completed a building inspection of the property located at 123 Oak Street, Someplace, Minnesota for you.

More information

Well Records and Maintenance Guidelines

Well Records and Maintenance Guidelines 1 Well Records and Maintenance Guidelines If you have a home well, you alone are responsible for maintaining the safety of our drinking water supply. When your well system is suitably located, correctly

More information

Properly maintaining your septic system will help reduce the. It s Your Septic System. Homeowner s Guide. Here s How to Take Care of It

Properly maintaining your septic system will help reduce the. It s Your Septic System. Homeowner s Guide. Here s How to Take Care of It Homeowner s Guide for Maintenance and Care of On-Site Sewage Systems It s Your Septic System Here s How to Take Care of It Properly maintaining your septic system will help reduce the possibility of health

More information

2010 Residential Water Heater Replacement Check List

2010 Residential Water Heater Replacement Check List 2010 Residential Water Heater Replacement Check List The intent of this check list is to provide installers a general reference for the enforcement of code requirements in the Greater San Diego Area. This

More information

EFFECTIVE FEBRUARY 2014. note: drainage permit required to call for a dampproof inspection

EFFECTIVE FEBRUARY 2014. note: drainage permit required to call for a dampproof inspection EFFECTIVE FEBRUARY 2014 note: drainage permit required to call for a dampproof inspection 1. ROOF DRAINS/DECK DRAINS (INTERIOR ) All roof and deck drains within the perimeter of the building shall be APPROVED

More information

Home Inspection Report

Home Inspection Report 4949 Brownsboro Rd Suite 293 Louisville, KY 40223 (502) 414-1440 tripleainspections@gmail.com Inspected By: William Carter, HI-1956 Home Inspection Report Prepared For: Edward Cullen Property Address:

More information

3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees.

3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees. The following shall serve as the minimum requirements for contractors performing work in relation to the Authority s potable water and sanitary sewer system(s), appurtenances and service connections. General:

More information

Septic Tank Maintenance Information

Septic Tank Maintenance Information Septic Tank Maintenance Information This section has been adapted from materials developed by the Rouge RAP Advisory Council On-site Septic Subcommittee, which included representatives from Oakland, Wayne

More information

Air-Conditioning, Heating, and Refrigeration Institute. Sheet Metal and Air-Conditioning Contractors National Association

Air-Conditioning, Heating, and Refrigeration Institute. Sheet Metal and Air-Conditioning Contractors National Association Air-Conditioning, Heating, and Refrigeration Institute Sheet Metal and Air-Conditioning Contractors National Association GUIDELINE B-1997 ACKNOWLEDGEMENT These guidelines for Roof Mounted Outdoor Air-

More information

ELECTRIC METERING COMMERCIAL & INDUSTRIAL

ELECTRIC METERING COMMERCIAL & INDUSTRIAL ELECTRIC METERING COMMERCIAL & 1.0 INDEX 1.0 INDEX 2.0 SCOPE 3.0 GENERAL REQUIREMENTS 4.0 METER LOCATIONS 5.0 UNDERGROUND TERMINATIONS 6.0 METERING TRANSFORMER ENCLOSURES 7.0 SINGLE CUSTOMER METER INSTALLATIONS

More information

Trenching and Excavation Safety

Trenching and Excavation Safety 1.0 ACTIVITY DESCRIPTION 1.1 This document provides basic safety guidelines related to excavation and trenching in pipeline construction activities. These guidelines are applicable to the locating, marking

More information

LED MOTION ACTIVATED FLOOD LIGHT

LED MOTION ACTIVATED FLOOD LIGHT Utilitech & UT Design are registered trademarks of LF, LLC. All Rights Reserved. ITEM #0611551, #0611550 LED MOTION ACTIVATED FLOOD LIGHT MODEL #SE1036-BP2-02LF0-U, SE1036-WH3-02LF0-U Français p. 10 Español

More information

Container Management for Hazardous Waste Generators Technical Guidance Document HW-2005-G1

Container Management for Hazardous Waste Generators Technical Guidance Document HW-2005-G1 Kansas Department of Health and Environment Bureau of Waste Management 1000 SW Jackson, Suite 320, Topeka, Kansas 66612-1366 Container Management for Hazardous Waste Generators Technical Guidance Document

More information

EXCAVATION AND PILING NEAR SEWERS, STORMWATER DRAINS AND WATER MAINS

EXCAVATION AND PILING NEAR SEWERS, STORMWATER DRAINS AND WATER MAINS NMP 1.4 EXCAVATION AND PILING NEAR SEWERS, STORMWATER DRAINS AND WATER MAINS Index Purpose... 2 Application... 2 Referral Agency... 2 Associated Requirements... 2 Referenced Standards...2 Definitions...

More information

Top 10+ Mistakes of DWV plumbing design

Top 10+ Mistakes of DWV plumbing design Top 10+ Mistakes of DWV plumbing design Listed below are the some of the most frequently missed items, noticed by our inspectors, at plumbing rough-in when non-plumbers attempt plumbing design. Most of

More information

BASEMENT FLOODING PART II: Reducing Flooding Risks on Your Property HISTORIC CHICAGO BUNGALOW ASSOCIATION

BASEMENT FLOODING PART II: Reducing Flooding Risks on Your Property HISTORIC CHICAGO BUNGALOW ASSOCIATION BASEMENT FLOODING PART II: Reducing Flooding Risks on Your Property HISTORIC CHICAGO BUNGALOW ASSOCIATION HCBA 2 Launched in September, 2000 HCBA is a nonprofit organization whose mission is to help owners

More information

Requirements for Hydrogen Storage and Use

Requirements for Hydrogen Storage and Use Requirements for Hydrogen Storage and Use I. INTRODUCTION Fire and Life-Safety Group (FLS) The following is a summary of the fire and building code requirements for the storage and use of hydrogen. These

More information

SECTION 22 LIGHTNING PROTECTION SYSTEM

SECTION 22 LIGHTNING PROTECTION SYSTEM SECTION 22 LIGHTNING PROTECTION SYSTEM 22.01 SCOPE: A. These Specifications shall form a part of the Contract Documents and shall govern construction work for all buildings to be built or modified for

More information

Land Use and Environmental Service Agency (Code Enforcement) NC Plumbing Code. Table of Contents

Land Use and Environmental Service Agency (Code Enforcement) NC Plumbing Code. Table of Contents Chapter 1 Administration Chapter 3 General Regulations Chapter 5 Water Heaters Chapter 7 Sanitary Drainage Chapter 9 Vents Chapter 11 Storm Drainage Policy Statements Table of Contents Chapter 2 Definitions

More information

Electrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, 2016. Underground branch circuit feeding a detached garage:

Electrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, 2016. Underground branch circuit feeding a detached garage: Electrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, 2016 * Garage construction requires permits (electrical, building) * Permits must be applied for at the time. * Dial

More information

Managing Floor Drains and Flammable Traps

Managing Floor Drains and Flammable Traps Managing Floor Drains and Flammable Traps Contents: Problem... 1 Solution... 2 Maintenance... 2 Waste Management Options... 2 For More Information... 4 BMP Chart... 5 This fact sheet discusses recommended

More information

Electrical Service Guidelines

Electrical Service Guidelines Electrical Service Guidelines Middle Tennessee Electric Membership Corporation Revised: May 23, 2013 MTEMC's Electrical Guidelines TABLE OF CONTENTS Right-of-Way Clearance Guide 3 MTEMC Requirements 4

More information