Commercial and Residential Underground & Aboveground LPGTank Requirements
|
|
- Ashley McLaughlin
- 7 years ago
- Views:
Transcription
1 SOUTH SALT LAKE CITY FIRE MARSHAL Commercial and Residential Underground & Aboveground LPGTank Requirements 2/19/2013 [This document is designed to assist with the installation and inspection of above and below ground liquid propane tanks.]
2 Commercial and Residential Underground & Aboveground LPG Tank Requirements The following information is to be used whenever commercial or residential underground or aboveground propane tanks are installed. This information is to correlate with the International Fire Code and NFPA 58. Plans must be submitted and a permit secured prior to any underground or above ground LPG tank installation exceeding 125 gallons with the exception of 500 gallon or smaller LPG tanks installed at Single Family Residence occupancies. Permit Required, Construction Documents 1. An operational permit is required for the storage and use of LPG containers. However a permit is not 2. Plans and an application for permit shall comply with IFC Types of licenses Class I: A licensed dealer who is engaged in the business of installing gas appliances or systems for the use of LPG and who sells, fills, refills, delivers, or is permitted to deliver any LPG Class II: A business engaged in the sale, transportation, and exchange of cylinders, but not transporting or transferring gas in liquid Class III: A business not engaged in the sale of LPG, but engaged in the sale and installation of gas appliances, or LPG systems Class IV: Those businesses listed below: Dispensers Sale of containers greater than 96 pounds water capacity Other LPG businesses not listed above. Underground LPG Tanks 1. Installation of any LPG tank is only to be done by individuals and companies that are certified by the Utah State Fire Marshals Office. Ref. NFPA 58, 4.4* Qualification of Personnel Utah State, R Licensing. 2. Tank Capacities and Type 2
3 The maximum aggregate capacity of any one installation shall not exceed a water capacity of 2,000 gallons. Tanks must be approved for underground installation. See IFC Underground Tank Sand Base Containers shall be set level and shall be surrounded by earth or sand firmly tamped in place. Ref. NFPA 58, (n) Recommended is a 6 to12 inch layer of coarse sand in the bottom of the hole before setting the tank. 4. Water Tables Underground LPG tanks are not allowed in areas with high water tables or in federal flood zones, unless approved by the Fire Marshal. If approved, underground tanks must be anchored or secured to a reinforced concrete foundation. Where straps come in contact with the tank, protection between the tank and the straps is to be provided. Thick tarpaper, celetex, etc. that is water resistant will suffice. NFPA 58, Snow Conditions In locations where monthly maximum depth of snow accumulation is more than the height of the aboveground LPG container,(excluding the dome cover) the following shall apply: i) A stake or other approved marking shall be installed higher than the average snow cover up to a height of 15 ft. ii) The container shall be installed to prevent movement from snow accumulation. 6. Corrosion Protection Equipment In order to reduce the problem of corrosion of underground tanks, sacrificial anodes are to be installed in the ground near the tank. The anodes are connected by a copper cable to the tank. Anodes are usually a soft metal, such as magnesium or zinc. They are made as solid rods or stakes, as well as soft powder in small bags. NFPA 58, (I).When tested the cathodic protection should read 0.8 Volts (DC) or more. If less more protection is required. 7. Tank Coating Underground tanks must be designed and coated for underground installation. They are usually factory coated. However, coatings may have been scratched off during transportation and installation. As a result, (if coating is damaged) the tank must be recoated onsite before it is installed in the ground. NFPA 58, (N) 8. Tank Depth The top of the tank when set in the hole must be at least six (6) inches below grade. If the tank is to be installed in an area where vehicles may travel over the top of the tank, the tank shall be set eighteen (18-inches) below grade. NFPA 58, (A), (B) 3
4 9. Backfill The hole is to be backfilled with rock free dirt or coarse sand. The tanks surface is not to be scratched. A minimum of twelve (12) inches of backfill is to be tamped down around the tank at any one time, and then an additional twelve inches is filled in and tamped, etc. until the hole if full. NFPA 58, (O) 10. Location of Containers The minimum separation between containers that are underground shall be three (3) feet, and the minimum distance from buildings, public ways, or lot lines of adjoining property shall be ten (10) feet from the outside surface of the container. See IFC Emergency Shutoff Valves Compressed gas systems conveying flammable gases shall be provided with approved manual or automatic emergency shutoff valves that can be activated at each point of use and at each source. See IFC For additional information see NFPA 58 Chapter 6 & ANNEX K Underground LPG Tank Inspection Checklist Plans are submitted and approved showing tank placement. Tank does not exceed 2,000 gallons water capacity. Tank installed by a Utah Fire Marshals Office, licensed and certified company. Permit for tank installation on site. Tank must be ASME approved as indicated on the tank. Sand base provided. Concrete base with protected tie downs in areas with high water tables. (Must be approved prior to installation) Sacrificial anodes are installed in the ground near the tank. If scratched, tank must be recoated onsite before it is installed in the ground. Proper depth and compacted earth. Depth of tank is suitable for location. Shut off valve accessible. Aboveground LPG Tanks 1. Installer Certification Installation of any LPG tank is only to be done by individuals and companies that are certified by the Utah State Fire Marshals Office. 2. Tank Capacities The maximum aggregate capacity of any one installation shall not exceed a water capacity of 2,000 gallons. See IFC Tank Locations 4
5 Consult IFC Table for location of LPG containers. In many instances tanks will have to be a minimum of 25 feet from buildings, public ways, or lot lines of adjoining property. NFPA & Annex I 4. Tank Security (Lid) Tank has a method of locking and securing the operational valves. See IFC Signs No smoking signs are posted on the tank. Sign to read, NO SMOKING WITHIN 15 FEET. See IFC Combustible Materials Weeds, grass, bush, trash and other combustible materials are kept a minimum of 10 feet away from LPG tanks. See IFC Guard Posts If exposed to vehicular damage due to proximity to alleys, driveways or parking areas, LPG tanks, regulators and piping shall be protected by guard posts constructed of steel, not less than 4 inches in diameter, filled with concrete. Posts are to be spaced not more than 4 feet apart, set not less than 3 feet deep in a concrete footing of not less than a 15-inch diameter. The top of the posts is not to be less than 3 feet above the ground, and located not less than 3 feet from the tank. Other means of tank protection if approved may consist of landscape type boulders, cement walls, etc. See IFC Underneath Buildings LPG containers and polyethylene gas lines cannot be installed underneath any building. See NFPA Painting The LPG tank shall be pained and marked to identify its content. The tank is to have a light color to prevent heat absorption. White, silver, etc. is acceptable. See NFPA 58. (Note: There is not a code governing any specific color or reflective material, NFPA 58, states: Aboveground containers shall be painted. It has been determined however that if containers are filled to the appropriate levels {80%} color is not an issue.) 10. An aboveground LP-Gas container and any of its parts shall not be located within 6 ft of a vertical plane beneath overhead electric power lines that are over 600 volts, nominal. NFPA 58, Installation Foundation Tanks shall be installed upon a firm foundation or be otherwise firmly secured. Recommended is a 4-inch think concrete pad with a minimum ½-inch x 6-inch grade 8 galvanized bolts. Specifically NFPA states, Horizontal ASME 5
6 containers shall be placed on masonry or other non combustible structural supports locatd on concrete or masonry foundations with the container supports. Aboveground LPG Tank Inspection Checklist Plans are submitted and approved showing tank placement. Tank does not exceed 2,000 gallons water capacity. Tank installed by a Utah Fire Marshals Office, licensed and certified company. Permit for tank installation on site. Tank must be ASME approved as indicated on the tank. Tank is located per IFC Table Tank has a method of locking and securing the operational valves. (Lid) No smoking signs are posed on the tank. Weeds, grass, bush, trash and other combustible materials are kept a minimum of 10 feet away from the LPG tank. Guard posts are installed if necessary. LPG cylinders, or piping is not allowed to be installed underneath any building. The LPG tank shall be marked to identify its content. The LPG tank is located in relation to overhead power lines. Tanks shall be painted. Tank is installed upon a firm foundation and/or is firmly secured. Shut off valve accessible. Above Ground Installation 6
7 Above Ground Installation Underground Installation 7
8 8
9 Cylinder Exchange Cabinet 1. Traffic protection to be not less than 4-inch steel piping 4 feet apart filled with and set in concrete, not less than 3 feet above grade level, or other approved types of protection. (Inspection will determine if required). IFC Cage to be located not less than 10 feet from all doorways, telephones and electrical outlets or electrical equipment, and combustible materials. 3. Cage to be located not less than 20 feet from automotive service station fuel dispenser. NFPA Provide an approved fire extinguisher with a current annual Utah State inspection tag, within 75 feet of cage location. Minimum size is a 10 lb. BC rated, 18 lb BC if aggregate is in excess of 720 lbs. (36 ea. 20 lb cylinders) NFPA Provide required signage. NO SMOKING FLAMMABLE GAS PROPANE. 9
Installation of Underground LP-Gas Systems
NPGA #412-94 Installation of Underground LP-Gas Systems SCOPE This bulletin provides guidelines for the installation and inspection of underground LP-Gas systems and outlines song of the unique problems
More informationLIQUEFIED PETROLEUM GASES
CHAPTER 38 LIQUEFIED PETROLEUM GASES SECTION 3801 GENERAL 3801.1 Scope. Storage, handling and transportation of liquefied petroleum gas (LP-gas) and the installation of LP-gas equipment pertinent to systems
More informationOREGON FIRE CODE Interpretations and Technical Advisories
OREGON FIRE CODE Interpretations and Technical Advisories A collaborative service by local and state fire professionals, along with our stakeholders and customers, to provide consistent and concise application
More informationPressure Vessels (Air Compressors) and LPG Tanks
Pressure Vessels (Air Compressors) and LPG Tanks 1. Identification of Workplace Hazard Any container, tank or vessel that contains pressurized material is a potential hazard to employees due to the force
More informationOPERATIONS & MAINTENANCE (O&M) FOR PROPANE STORAGE FACILITIES
OPERATIONS & MAINTENANCE (O&M) FOR PROPANE STORAGE FACILITIES Reference: National Fire Protection Association (NFPA) Pamphlet No. 58 Liquefied Petroleum Gas Code, 2001, Chapter 11 Type of Facility: Petroleum
More informationTYPICAL FIRE SAFETY INSPECTION VIOLATIONS
TYPICAL FIRE SAFETY INSPECTION VIOLATIONS The following is a list of typical violations often found by inspectors and a generic solution. You can use this list to improve the safety of your facility, to
More informationGas Meter Clearances and Service Installation Requirements
March 2016 Gas Meter Clearances and Service Installation Requirements Builder/Owner/Developer Requirements Call PSE's Customer Construction Services 1 888 321 7779 or visit PSE.com/CustomerConstruction
More informationThe following definitions apply with regard to requirements specified in this document:
GUIDELINES FOR INSTALLATION OF TEMPORARY AND PERMANENT ABOVEGROUND DIESEL FUEL TANKS FOR EMERGENCY AND STANDBY POWER SYSTEMS LOCATED OUTSIDE OF BUILDINGS For Use by Unidocs Member Agencies or where approved
More informationwww.klmtechgroup.com TABLE OF CONTENT
Page : 1 of 13 Project Engineering Standard www.klmtechgroup.com KLM Technology #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor Bahru Malaysia ELECTIRAL GROUNDING TABLE OF CONTENT
More informationGas Meter Clearances and Service Installation Requirements
March 2015 Gas Meter Clearances and Service Installation Requirements Builder/Owner/Developer Requirements Call PSE s Customer Construction Services 1-888-321-7779 or visit PSE.com/CustomerConstruction
More information2010 Residential Water Heater Replacement Check List
2010 Residential Water Heater Replacement Check List The intent of this check list is to provide installers a general reference for the enforcement of code requirements in the Greater San Diego Area. This
More informationApplication for the Construction or Installation of Aboveground Storage Tank (AST) Systems or Associated Underground or Over-water Piping Systems
Page 1 of 5 Application for the Construction or Installation of Aboveground Storage Tank (AST) Systems or Associated Underground or Over-water Piping Systems New Hampshire Department of Environmental Services
More informationALVERNIA UNIVERSITY OSHA REGULATION: 29 CFR 1910.252 WELDING, CUTTING, AND BRAZING ( HOT WORK ) SECTION: 3600
OSHA REGULATION: 9 CFR 90.5 WELDING, CUTTING, AND BRAZING ( HOT WORK ) A. POLICY. This procedure follows requirements set forth in 9 CFR 90.5.. This policy applies to all Hot Work operations being done
More informationChapter 3 Pre-Installation, Foundations and Piers
Chapter 3 Pre-Installation, Foundations and Piers 3-1 Pre-Installation Establishes the minimum requirements for the siting, design, materials, access, and installation of manufactured dwellings, accessory
More informationRequirements for Hydrogen Storage and Use
Requirements for Hydrogen Storage and Use I. INTRODUCTION Fire and Life-Safety Group (FLS) The following is a summary of the fire and building code requirements for the storage and use of hydrogen. These
More informationTown of Bellingham Fire Department
Town of Bellingham Fire Department OFFICE OF THE Fire Prevention Division Captain Robidoux- jrobidoux@bellinghamma.org Lieutenant Bangma- jbangma@bellinghamma.org Fire Safety Inspection Guidelines for
More informationResidential Deck Safety, Construction, and Repair
Juneau Permit Center, 4 th Floor Marine View Center, (907)586-0770 This handout is designed to help you build your deck to comply with the 2006 International Residential Building code as modified by the
More informationENVIRONMENT, SAFETY, HEALTH, AND QUALITY DIVISION
ENVIRONMENT, SAFETY, HEALTH, AND QUALITY DIVISION Chapter 40: Chemical Lifecycle Management Chemical Storage Asset Requirements Product ID: 223 Revision ID: 1487 Date published: 20 May 2013 Date effective:
More informationSECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.
02150-1 of 6 SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING 02150.01 GENERAL A. Description Removal or abandonment of existing utilities and underground structures shall include, but not necessarily
More informationDennis Fire Department Fire Prevention Mark Dellner Fire Chief
Dennis Fire Department Fire Prevention Mark Dellner Fire Chief FIRE SAFETY INSPECTION GUIDELINES FOR COMMERCIAL PROPERTIES (MA Fire Prevention Regulations 527 CMR, MGL Chapter 148) FIRE PREVENTION CHECKLIST-
More informationSPECIFICATIONS FOR THE INSTALLATION OF FIRE ALARM SYSTEMS, SPRINKLER SYSTEMS, AND MASTER BOXES IN THE POQUONNOCK BRIDGE FIRE DISTRICT
SPECIFICATIONS FOR THE INSTALLATION OF FIRE ALARM SYSTEMS, SPRINKLER SYSTEMS, AND MASTER BOXES IN THE POQUONNOCK BRIDGE FIRE DISTRICT The purpose of these specifications is to insure that there are minimum
More informationStatic Electricity. A Health and Safety Guideline for Your Workplace. What Are Some Sources of Static Electricity? What is Static Electricity?
A Health and Safety Guideline for Your Workplace What is static electricity? What causes it? How is it hazardous? And, most importantly, how can it be controlled? All of these questions will be answered
More informationEthanol Vehicle and Infrastructure Codes and Standards Citations
Ethanol Vehicle and Infrastructure Codes and Standards Citations This document lists codes and standards typically used for U.S. ethanol vehicle and infrastructure projects. To determine which codes and
More informationCOMMERCIAL COOKING HOODS, VENTILATION & FIRE SUPPRESSION SYSTEM GUIDELINES AND PROCEDURES
COMMERCIAL COOKING HOODS, VENTILATION & FIRE SUPPRESSION SYSTEM GUIDELINES AND PROCEDURES These guidelines are to be used for ALL commercial cooking hoods, ventilation systems and related fire suppression
More informationSECTION 1 GENERAL REQUIREMENTS
Page 1 of 6 SECTION 1 GENERAL REQUIREMENTS 1. SCOPE OF WORK: The work to be performed under the provisions of these documents and the contract based thereon includes furnishing all labor, equipment, materials,
More informationNFPA31FuelOilPiping 1 Revised 3-1-11
NFPA 31 Fuel Oil Piping, Installation and Testing Chapter 8 Fuel Piping Systems and Components 8.1 Scope. This chapter shall apply to piping systems and their components used to transfer fuel oil from
More informationMONARCH FIRE PROTECTION DISTRICT
MONARCH FIRE PROTECTION DISTRICT 13725 OLIVE BLVD., CHESTERFIELD, MO 63017 314-514-0900, EXT. 309 fireprevention@monarchfpd.org www.monarchfpd.org TENT / BOOTH REQUIREMENTS To help insure the safety, health
More informationSECTION 15 AIR RELEASE VALVE ASSEMBLIES. 15-1 General
SECTION 15 AIR RELEASE VALVE ASSEMBLIES 15-1.01 Scope 15-1 General This section describes the requirements for furnishing and installing Air Release Valve Assemblies of the size and type shown on the plans,
More informationA. Fire Protection Plan. B. Access and Parking
Standards for Construction Site Fire Safety For Use by Unidocs Member Agencies or where approved by your Local Jurisdiction Authority Cited: California Fire Code (CFC) These standards are intended to prescribe
More informationSWIMMING POOL, SPA, & HOT TUB GUIDELINES
SWIMMING POOL, SPA, & HOT TUB GUIDELINES Pool permit cost is based on the total value of the project. See Permit Fee Schedule Table 1A. A. Adopted construction codes and installation requirements 1. 2015
More informationMOBILE HOME LAW. Revised November 2001
MOBILE HOME LAW Revised November 2001 TABLE OF CONTENTS: SECTION 1: SECTION 2: SECTION 3: SECTION 4: SECTION 5: SECTION 6: SECTION 7: SECTION 8: SECTION 9: SECTION 10: SECTION 11: SECTION 12: INTENT DEFINITIONS
More informationInstallation Guidance: CNG Refueling Stations
Installation Guidance: CNG Refueling Stations Gas Technology Institute > Delaware Valley Regional Planning Commission (DVRPC) Webinar Gas Technology Institute (GTI) Overview Natural Gas Research and Development
More informationSpecifications for Residential Property Owners Connection to New Public Sewer
Specifications for Residential Property Owners Connection to New Public Sewer Spalding Tract property owners are required to connect to the community sewer system when construction is complete and the
More informationAIR RELEASE, CLEANOUT, AND SEWER MANHOLES
AIR RELEASE, CLEANOUT, AND SEWER MANHOLES **From Hartford IM BLDG(10) DESCRIPTION. This work shall consist of the construction of air release, cleanout, and sanitary sewer manholes; and the furnishing
More information505.3.6 For a building with a crawl space, see Figure 10. 505-1
505 WATER SERVICE INSTALLATION 505.1 DEFINITION A service line is comprised of the piping and related appurtenances including the connection installed from the Des Moines Water Works water main to the
More informationPropane Gas Underground Systems: Residential Infrastructure Requirements and Energy Benefits
Propane Gas Underground Systems: Residential Infrastructure Requirements and Energy Benefits AIA Best Practices The Propane Education & Research Council and HanleyWood are registered providers with the
More informationNFPA 30-2008: Basic Requirements for Storage Tanks
NFPA 30-2008: Basic Requirements for Storage Tanks New York City Metro Chapter Society of Fire Protection Engineers New York, NY February 22, 2011 NFPA 30, Flammable and Combustible Liquids Code Storage
More informationCATHODIC PROTECTION SYSTEM DESIGN
CATHODIC PROTECTION SYSTEM DESIGN Presented By DENIS L ROSSI P.E. CORROSION ENGINEER New England C P Inc. Corrosion Fundamentals What is corrosion? It is defined as the degradation or deterioration of
More informationList of Frequently Utilized Storage Tank Standards and Practices
List of Frequently Utilized Storage Tank Standards and Practices Below is a list of frequently used storage tank standards and practices from organizations that are referenced in 25 PA Code, Chapter 245.
More informationLouisiana Administrative Code Title 51 Part XIII. Sewage Disposal
Louisiana Administrative Code Title 51 Part XIII. Sewage Disposal Regulations Regarding Septic Tank Installations with Field Beds/Absorption Trenches For Individual Residential Installations Chapter 3.
More informationFire and Life Safety Requirements for Special Events and Temporary Use of the Facilities at the Kitsap County Fairgrounds.
Fire and Life Safety Requirements for Special Events and Temporary Use of the Facilities at the Kitsap County Fairgrounds. PURPOSE This document is developed to assist event planners and responsible parties
More informationAutomatic fire-extinguishing systems for commercial cooking
Automatic fire-extinguishing systems for commercial cooking Leading Items First Ignited in Eating and Drinking Establishment Structure Fires, 2000-2004 Annual Averages Cooking materials, incl. food and
More informationThe following definitions apply with regard to requirements specified in this document:
GUIDELINES FOR INSTALLATION OF TEMPORARY AND PERMANENT ABOVEGROUND DIESEL FUEL TANKS FOR EMERGENCY AND STANDBY POWER SYSTEMS LOCATED OUTSIDE OF BUILDINGS For Use by Unidocs Member Agencies or where approved
More informationSMALL GAS OPERATOR OPERATION AND MAINTENANCE PLAN
SMALL GAS OPERATOR OPERATION AND MAINTENANCE PLAN Facility Name: Address: QUALIFIED PERSONNEL All tasks shall be completed by a person that is qualified to that task (see operators qualification of individuals
More informationNMSU FIRE DEPARTMENT Commercial Kitchen Fire Suppression Worksheet
This Commercial Kitchen Automatic Fire has been created to assure all documentation has been submitted to assist you in assuring proper plans and documentations has been submitted and reviewed by New Mexico
More informationJune 2007 CHAPTER 7 - CULVERTS 7.0 CHAPTER 7 - CULVERTS 7.1 GENERAL
7.0 7.1 GENERAL For the purpose of this manual, culverts are defined as structures that are completely surrounded by soil and located below the surface of the roadway parallel to the general direction
More informationNotes. Material 1. Appropriate Flammable Liquids
29 CFR 1910.106 Flammable Materials Flammable Liquids Preparation 1. Read Applicable Background information and related Company Policy Chapter. 2. Make Copies of this Lesson Plan for Personnel 3. Make
More informationSTRUCTURES. 1.1. Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL.
STRUCTURES 1. General. Critical structures may impact the integrity of a flood control project in several manners such as the excavation for construction of the structure, the type of foundation, backfill
More informationCANTON FIRE DEPARTMENT
CANTON FIRE DEPARTMENT Dean Floyd Fire Chief FIRE SAFETY INSPECTION GUIDELINES FOR COMMERCIAL PROPERTIES FIRE PREVENTION CHECKLIST- To review prior to your inspection. 1. Is the address of your property
More informationGeneral Fire Code Requirements Within Commercial Tenant Spaces
FIRE DEPARTMENT in cooperation with Scope: General Fire Code Requirements Within Commercial Tenant Spaces This handout is designed to assist owners, architects, contractors and others in understanding
More informationFall protection systems and practices Duty to have fall protection Protection at or above 6' level.
Duty to have fall protection Protection at or above 6' level. Walking/working surfaces inspected before work begins. Employees can only work on surfaces strong enough to support them. Page 1 Protection
More informationCathodic Protection Use On Tank Bottoms & Underground Piping In Power Generation Plants
Cathodic Protection Use On Tank Bottoms & Underground Piping In Power Generation Plants PG&E Office San Francisco January 18, 2007 Craig K. Meier Corrosion Control Incorporated Corrosion process for tanks
More informationGuidelines for Earthquake Bracing Residential Water Heaters
Guidelines for Earthquake Bracing Residential Water Heaters Department of General Services Division of the State Architect In accordance with the Health and Safety Code Section 19215, the Division of the
More informationCompressed Gas Cylinder Program
Department of Environmental Health & Safety Procedures Compressed Gas Cylinder Program March 2010 Compressed Gas Cylinder Program Page 1 of 8 Table of Contents I. Introduction II. III. IV. Policy Scope
More informationSpecification Guidelines: Allan Block Modular Retaining Wall Systems
Specification Guidelines: Allan Block Modular Retaining Wall Systems The following specifications provide Allan Block Corporation's typical requirements and recommendations. At the engineer of record's
More informationGUIDELINES - Gas Inspection Regulations 1. Recommendations for camping site owners
GUIDELINES - Gas Inspection Regulations 1. Recommendations for camping site owners Offer gas tests by recognized experts for camping guests. Keep a record for gas tests. Write down the date and who tested
More informationENGINEERED DRAWINGS FOR PETROLEUM STORAGE TANKS
Facility Name: ENGINEERED DRAWINGS FOR PETROLEUM STORAGE TANKS The following is intended to be used as a guideline for information required to appear on engineered drawings involving petroleum storage
More informationSpray Booth Guideline
Department of Development Service 135 North D Street, Perris CA. 92570 Phone: (951) 443-1029 Fax: (951) 943-3293 PURPOSE The intent of this guideline is to provide the information necessary to ensure that
More information(1) Discuss the determination of the need for public visitation. Visitor center density within 100 miles.
Chapter 4 Specifications Designs 3. Visitors Centers 3. Visitors Centers. The Introduction (Chapter 1) for these design data collection guidelines contains additional information concerning: preparing
More informationDuring severe flood events, such as those
Recommended Practice for Home Heating Oil Tank Flood Resistance During severe flood events, such as those occurring from Hurricane Irene and Super- Storm Sandy, many coastal and low elevation inland areas
More informationTrenching and Excavation Safety
1.0 ACTIVITY DESCRIPTION 1.1 This document provides basic safety guidelines related to excavation and trenching in pipeline construction activities. These guidelines are applicable to the locating, marking
More informationThe Verdura Wall check with your local building department
The Verdura Wall The Verdura Wall by Soil Retention Products, Inc of Carlsbad, California can be constructed as a gravity retaining structure or a geosynthetic reinforced segmental retaining wall, depending
More informationFlammable Liquids Bulk Storage: Guidelines for British Columbia s Provincial Industrial Railways
Flammable Liquids Bulk Storage: Guidelines for British Columbia s Provincial Industrial Railways Guidelines Respecting the Design, Location, Construction, Operation and Maintenance of Stationary Bulk Storage
More informationSECTION FC 2706 NON-PRODUCTION CHEMICAL LABORATORIES
New York City Administrative Code - Title 29 New York City Fire Code SECTION FC 2706 NON-PRODUCTION CHEMICAL LABORATORIES 2706.1 Scope. This section shall govern the storage, handling and use of laboratory
More informationChapter 7 Plumbing Connections
Chapter 7 Plumbing Connections 7-1 General All plumbing equipment and installations must be designed, constructed, and installed in accordance with this code and where not specific, to the applicable provisions
More informationUnderground Storage Tanks
Underground Storage Tanks An Informational and Guidance Document for the University Community. Please contact Yale Environmental Health and Safety for latest Regulatory Requirements. A typical UST installation
More informationPTS HELICAL PIERS INSTALLATION SPECIFICATIONS NOTICE
FORM A PTS HELICAL PIERS INSTALLATION SPECIFICATIONS NOTICE The following suggested specifications are written as a guide to assist the specifier in writing his own specifications. Specific circumstances
More informationMobile Home Pre-Inspection Checklist
Mobile Home Pre-Inspection Checklist TWO (2) STEP INSPECTION PROCESS STEP ONE: CALL FOR THE FIRST INSPECTION WHEN THESE ITEMS ARE COMPLETE. 1. Septic tank installed and plumbing complete. (SEE PLUMBING
More informationGALVANIC CATHODIC PROTECTION 1.0 CONTENTS. 1.1 Aluminium Anodes. 1.2 Zinc Anodes. 1.3 Magnesium Anodes SECTION
SECTION 1 GALVANIC CATHODIC PROTECTION 1.0 CONTENTS 1.1 Aluminium Anodes 1.1.1 Aluminium Tank Anodes 1.1.2 Aluminium Hull Anodes 1.1.3 Aluminium Platform / Jetty Anodes 1.2 Zinc Anodes 1.2.1 Zinc Tank
More informationOntario Fire Code SECTION 5.13 DIP TANKS. Illustrated Commentary. Office of the Ontario Fire Marshal
Ontario Fire Code SECTION 5.13 DIP TANKS Illustrated Commentary Office of the Ontario Fire Marshal Dip Tanks Illustrated Commentary 1 5.13.1. Location 5.13.1.1. Dip tank operations involving flammable
More informationGuidelines for Earthquake Bracing of Residential Water Heaters
Guidelines for Earthquake Bracing of Residential Water Heaters Department of General Services Division of the State Architect 1102 Q Street, Suite 5100 Sacramento, CA 95814 Phone: (916) 324-7099 Fax: (916)
More informationLAYING BLOCK AND BRICK
LAYING BLOCK AND BRICK Products highlighted in this section: SAKRETE Type N Mortar Mix SAKRETE Type S Mortar Mix Brick And Block Laying Basics The first step in building a brick or block wall is to construct
More informationTechnical Requirements for Aboveground Storage Tanks (ASTs) Storing Class IIIB Liquids (other than used oil)
Technical Requirements for Aboveground Storage Tanks (ASTs) Storing Class IIIB Liquids (other than used oil) References: Comm 10 2009 EDITION / NFPA 30 2008 EDITION ITEM DESCRIPTION Comm 10 / NFPA General
More informationFIRE AND LIFE SAFETY REQUIREMENTS FOR CONVENTIONS, TRADE SHOWS AND EXHIBITS November 2011
FIRE AND LIFE SAFETY REQUIREMENTS FOR CONVENTIONS, TRADE SHOWS AND EXHIBITS November 2011 COLORADO SPRINGS FIRE DEPARTMENT Division of the Fire Marshal If you have any questions or comments regarding the
More informationPolicy on Water Heater Installations Policy No. UPC 510-1-94 Effective: September 1, 1995 Revised: February 10, 1996
CITY OF SAN JOSE BUILDING DIVISION POLICY Policy on Water Heater Installations Policy No. UPC 510-1-94 Effective: September 1, 1995 Revised: February 10, 1996 All new and replacement water heaters installed
More informationADMINISTRATIVE SERVICES MANUAL
Purpose Responsibilities Proper Storage and use of flammable liquids can significantly reduce the possibility of accidental fires and injuries. To minimize risk to life and properly, the requirements of
More information1997 Uniform Administrative Code Amendment for Earthen Material and Straw Bale Structures Tucson/Pima County, Arizona
for Earthen Material and Straw Bale Structures SECTION 70 - GENERAL "APPENDIX CHAPTER 7 - EARTHEN MATERIAL STRUCTURES 70. Purpose. The purpose of this chapter is to establish minimum standards of safety
More informationG-704-0 SPECIFICATION: GAS METER AND REGULATOR INSTALLATION REQUIREMENTS. 3 and Gas Yellow Book. REVISIONS: (See ) 1/15/14 5 Years
LAST REVIEW DATE: REVIEW CYCLE: 1/15/14 5 Years SPECIFICATION: TITLE: VOLUME: G-704-0 3 and Gas Yellow Book REVISIONS: (See ) 1) This specification is being issued for the first time. G-704-0 Gas Operations
More informationMAINTENANCE OF SMALL WATER SUPPLY, SANITATION AND IRRIGATION SCHEMES
MAINTENANCE OF SMALL WATER SUPPLY, SANITATION AND IRRIGATION SCHEMES John van Rijn INDEVELOPMENT MAINTENANCE OF SMALL WATER SUPPLY, SANITATION AND IRRIGATION SCHEMES Any part of this publication may be
More informationSteel Tank Institute AST Inspections. Dana Schmidt, PE STI/SPFA
Steel Tank Institute AST Inspections Dana Schmidt, PE STI/SPFA Agenda Brief review of SPCC Rule SPCC relevance to small tanks and small facilities. SP001 Standard for Inspection of Aboveground Storage
More informationARTICLE II (2) ARTICLE II - REQUIRED USE OF PUBLIC SEWERS. PARAGRAPH 020001 Purpose and Application.
ARTICLE II - REQUIRED USE OF PUBLIC SEWERS. PARAGRAPH 020001 Purpose and Application. Article II provides rules governing the allowable connection to the City POTW and the construction and inspection of
More informationCOMPRESSED GASES. 1.2 The contents of each cylinder and container must be clearly identified (by tag or stamp) on the cylinder.
Page 1 of 5 COMPRESSED GASES A compressed gas is defined as any mixture of gases in a container with a pressure exceeding 40 psi. at 70 o F, or 104 psi. at 130 o F; or any flammable liquid with an absolute
More informationFACILITY FIRE PREVENTION AND EMERGENCY PREPAREDNESS INSPECTION CHECKLIST
FACILITY FIRE PREVENTION AND EMERGENCY PREPAREDNESS INSPECTION CHECKLIST Date of Inspection: Conducted by: Location: Reviewed by: Date of Review: Comments or additional corrective action taken as a result
More informationMANUFACTURED HOUSING USED AS DWELLINGS
MANUFACTURED HOUSING USED AS DWELLINGS SECTION AE101 SCOPE AE101.1 General. These provisions shall be applicable only to a manufactured home used as a single dwelling unit and shall apply to the following:
More informationRESIDENTIAL PLUMBING ALTERATIONS PERMIT REQUIREMENTS
RESIDENTIAL PLUMBING ALTERATIONS PERMIT REQUIREMENTS The following guidelines are intended to assist with the permit acquisition process with regard to Plumbing Alterations. Not all information, or additional
More informationSIERRA LAKES COUNTY WATER DISTRICT P.O. Box 1039, Soda Springs, CA 95728-1039 (7300 Short Road, Serene Lakes)
SIERRA LAKES COUNTY WATER DISTRICT P.O. Box 1039, Soda Springs, CA 95728-1039 (7300 Short Road, Serene Lakes) Maintenance Office Administrative Office Billing Office 530-426-7802 530-426-7800 916-332-4872
More informationFor the purposes of this Part, the following words shall have the following meanings:
LOUISIANA REVISED STATUTES TITLE 51. TRADE AND COMMERCE CHAPTER 2. PARTICULAR GOODS PART XIV-B. MINIMUM STANDARDS FOR INSTALLATION OF MANUFACTURED HOMES Current through all 2010 Regular Session Acts 912.21.
More informationResidential Foundations and Basements
Residential Foundations and Basements Disclaimer All of the following information is based on the 2006 International Residential Code with Kentucky Amendments. As some information is paraphrased, article
More informationHOT WORK PERMIT PROCEDURES
COLUMBIA UNIVERSITY ENVIRONMENTAL HEALTH & SAFETY HOT WORK PERMIT PROCEDURES COLUMBIA UNIVERSITY MEDICAL CENTER February 2010 1 TABLE OF CONTENTS A. PURPOSE 3 B. SCOPE 3 C. POLICIES AND PROCEDURES 3-4
More informationAPPLICATION FOR GRAYWATER IRRIGATION SYSTEM PERMIT SIMPLE RESIDENTIAL GRAVITY SYSTEMS, NO STORAGE
APPLICATION FOR GRAYWATER IRRIGATION SYSTEM PERMIT SIMPLE RESIDENTIAL GRAVITY SYSTEMS, NO STORAGE Please read the California Plumbing Code Chapter 16A-1 Design Requirements before completing this form.
More informationSECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)
SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701) 55-1 GENERAL The Contractor shall perform all work required by the plans for construction of pipe for storm drains, precast polymer trench drains
More informationBuilding, Plumbing, Electrical and Residential Water and Sewer Inspection Requirements
Building, Plumbing, Electrical and Residential Water and Sewer Inspection Requirements Charles County Government Planning and Growth Management P.O. Box 2150, La Plata, MD 20646 (301) 645-0692 Schedule
More informationThe work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.
Section 33 0200- Page 1 of 4 PART 1 - GENERAL 1.1 DESCRIPTION OF WORK The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.
More information2. What building projects are exempted? (permit not required)
BUILDING AND SAFETY DEPARTMENT 1. What building projects require a permit? Following is a list of projects that require building permits based on Appendix chapter 1 of the California Building Code and
More informationSpecifications for Lightning Protection. ASAE Engineering Practice
Chapter 8: Lightning Specifications for Lightning Protection ASAE safety standards are not laws. They are recommended voluntary standards used by designers, engineers, manufacturers and users of the equipment,
More information3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees.
The following shall serve as the minimum requirements for contractors performing work in relation to the Authority s potable water and sanitary sewer system(s), appurtenances and service connections. General:
More informationCopper and Copper Alloy Tube, Pipe and Fittings
Copper and Copper Alloy Tube, Pipe and Fittings COPPER and COPPER ALLOY TUBE and PIPE Seamless Copper Pipe: Copper pipe is almost pure copper manufactured to the requirements of ASTM B 42 - Standard Specification
More informationELECTRIC/DIESEL FIRE PUMP CHECK LIST
BUILDING NAME: DESIGNER: SCO REPRESENTATIVE: PUMP MANUF.: LOCATION: INSTALLER: DATE: OWNER NAME: INSTALLATION Certificate for flushing and hydrostatic test furnished Piping been hydrostatically tested
More informationSECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS
SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS Section Page 36-1 GENERAL... 36.1 36-2 PIPEMAKING EQUIPMENT... 36.1 36-3 TRENCH EXCAVATION... 36.1 36-4 SPECIAL FOUNDATION TREATMENT...
More information