Museum Station Easy Access Upgrade Traffic, Transport & Access Impact Assessment

Size: px
Start display at page:

Download "Museum Station Easy Access Upgrade Traffic, Transport & Access Impact Assessment"

Transcription

1 Transport for NSW Museum Station Easy Access Upgrade Traffic, Transport & Access Impact Assessment 2 June 2014

2

3 Contents Page number Glossary Abbreviations v vi 1. Introduction Background Study area Document review Report structure 4 2. Existing situation Station patronage Modal splits Road network Parking facilities Public transport Rail Bus Taxi facilities Kiss-and-ride facilities Cyclists facilities Pedestrian facilities Pedestrian access points Pedestrian analysis Pedestrian movement Wayfinding Proposed railway station upgrade Overview Project scope Installation of new lifts Construction impact assessment Construction proposal Scope Program 30 Parsons Brinckerhoff A-TAP-1820-RP-0003-RevD i

4 Contents (Continued) Page number Work sites Site 2 (Lift 1) methodology Hours of work Site access and parking Construction vehicle types and volumes Proposed haulage routes Pedestrian management Impact assessment Traffic Parking Public transport Pedestrians Cyclists Hyde Park events Cumulative construction impacts Liaison with stakeholders City of Sydney Roads and Maritime Services Legislative context Environmental Planning and Assessment Act 1979 (EP&A Act) Roads Act 1993 No Major Events Act 2009 No Disability Discrimination Act 1992 No Operational impact assessment Changes to station operation Patronage Pedestrian impacts Pedestrian assessment Pedestrian amenity Mitigation measures Construction mitigation measures Traffic management Events Operation mitigation measures Conclusion 59 ii A-TAP-1820-RP-0003-RevD Parsons Brinckerhoff

5 List of tables Page number Table 2.1 Museum Station 2011 weekday entries and exits 5 Table 2.2 On-street parking restrictions and supply 8 Table 2.3 Train services along rail corridor 9 Table 3.1 Lift location and description 28 Table 4.1 Proposed work sites 31 Table 4.2 Pedestrian impact areas 41 Table 5.1 Future predicted patronage at Museum Station 51 List of figures Page number Figure 1.1 Study area 2 Figure 1.2 Museum Station transport context 3 Figure 2.1 Existing parking situation 9 Figure 2.2 Bus services near Museum Station 11 Figure 2.3 Elizabeth Street bus stop 12 Figure 2.4 Liverpool Street bus stop 12 Figure 2.5 Pedestrian access and volumes at Museum Station 14 Figure 2.6 Castlereagh Street entrance from street level 15 Figure 2.7 Main Liverpool Street entrance from street level 16 Figure 2.8 Main Liverpool Street entrance (Stair 1) from street level 16 Figure 2.9 Main Liverpool Street entrance (Stair 2) from street level (not open, is closed to public access) 16 Figure 2.10 Main Liverpool Street entrance (north-eastern access) from concourse level 16 Figure 2.11 Liverpool Street entrance opposite Downing Centre from street level 17 Figure 2.12 Liverpool Street entrance south-eastern corner from street level 17 Figure 2.13 Bathurst Street entrance located on the eastern side of Elizabeth Street from street level 18 Figure 2.14 Bathurst Street entrance located on the eastern side of Elizabeth Street from street level 18 Figure 2.15 Hyde Park Square via escalators adjacent to the Telstra building 19 Figure 2.16 Hyde Park Square via stairs adjacent to the Telstra building 19 Figure 2.17 Hyde Park Square via stairs from 227 Elizabeth Street building sliding door entrance on Bathurst Street 20 Figure 2.18 Hyde Park Square via stairs from 227 Elizabeth Street building sliding door entrance on Bathurst Street 20 Figure 2.19 Hyde Park Square subway between entries 6, 7, 8 and Museum Station 20 Figure 2.20 Museum Station entrance from Hyde Park Square 20 Figure 2.21 Ticket barriers and access gates at the southern end of the station 21 Figure 2.22 ticket barriers and access gates at the northern end of the station 21 Figure 2.23 Fruin Level of Service Definitions 23 Figure 2.24 Street signage on Castlereagh Street 25 Figure 2.25 Street signage on Liverpool Street 25 Figure 2.26 Link to Museum Station subway entrance from Hyde Park Square 25 Figure 2.27 Concourse level directional signage at southern entry 25 Figure 2.28 Museum Stations signage on sliding door entrance to 227 Elizabeth Street (Bathurst Street entry) 26 Figure 3.1 New lift locations (concourse level) 28 Parsons Brinckerhoff A-TAP-1820-RP-0003-RevD iii

6 Figure 4.1 Proposed ground level work site arrangements 31 Figure 4.2 Proposed concourse level work site arrangements 32 Figure 4.3 Proposed platform level work site arrangements 32 Figure 4.4 Phase 1 of Lift 1 construction 33 Figure 4.5 Phase 2 of Lift 1 construction 34 Figure 4.6 Phase 3 of Lift 1 construction 35 Figure 4.7 Phase 4 of Lift 1 construction 36 Figure 4.8 Established site 1 Elizabeth Street cross section 37 Figure 4.9 Proposed construction vehicle haulage routes 40 Figure 4.10 Proposed pedestrian diversions 42 Figure 4.11 Elizabeth Street night time traffic profile for January 44 Figure 4.12 Elizabeth Street night time traffic profile for February 45 Figure 4.13 Elizabeth Street night time traffic profile for March 45 Figure 5.1 Proposed station easy access ground level 53 Figure 5.2 Proposed station easy access concourse level 54 Figure 5.3 Proposed station easy access platform level 54 List of appendices Appendix A Pedestrian count raw data Appendix B Museum Station drawings Appendix C Pedestrian assessment report Appendix D Construction plant and equipment iv A-TAP-1820-RP-0003-RevD Parsons Brinckerhoff

7 Glossary Enabling Works Permanent Works Principal Services Services Brief Technical Advisor Temporary Works Works including temporary or permanent relocation of existing infrastructure or services to enable the Permanent Works to be undertaken The final permanent works Transport Projects Division (TPD), Transport for NSW (TfNSW) The activities to be undertaken as defined in this document TPD Document _8, Proposed Variation - Revision of Concept Design Documentation for Museum Station (PSC 2320), Annexure 1 Services Brief, Ver. 6.0, 05 March 2014 The Professional Services Contractor as defined in the Contract to undertake the Services Works including the installation of walkways and erection of hoardings and signage to enable the existing infrastructure to remain operational and the Permanent Works to be undertaken concurrently Parsons Brinckerhoff A-TAP-1820-RP-0003-RevD v

8 Abbreviations BRS CBD CCTV CTMP DDA DSAPT EP&A LOS PPM REF ROL TAP TCP TfNSW TGSI TMP TOM TPD TVM Business Requirements Specification Central Business District Close circuit television Construction Traffic Management Plan Disability Discrimination Act Disability Standards for Accessible Public Transport Environmental Planning and Assessment Act Level of Service Pedestrians per minute Review of Environmental Factors Road Occupancy Licence Transport Access Program Traffic Control Plan Transport for NSW Tactile Ground Surface Indicator Traffic Management Plan Traffic Operations Manager Transport Projects Division Ticket vending machine vi A-TAP-1820-RP-0003-RevD Parsons Brinckerhoff

9 1. Introduction Transport for NSW (TfNSW) has commissioned Parsons Brinckerhoff to undertake a Traffic, Transport and Access Impact Assessment for the Museum Station Easy Access Upgrade. This report assesses the existing situation, the proposed upgrades to Museum Station, the impacts during construction and operation, and the measures to ameliorate any impacts. 1.1 Background Museum Station is being upgraded for easy access as part of the NSW Government s Transport Access Program (TAP). The aim of the TAP is to provide a better experience for public transport customers by delivering accessible, modern, secure and integrated transport infrastructure where it is most needed. The following objectives and upgrades are proposed at Museum Station: improving customer experience improving accessibility in accordance with the Disability Discrimination Act (DDA) and the Disability Standards for Accessible Public Transport (DSAPT) improving mode access facilities and integration with the surrounding precinct where possible, increase station capacity to address identified congestion issues (if any) and to accommodate patronage growth to 2036 upgrade station facilities and equipment to current standard minimise construction impacts to passengers and station operations improve amenity for transport staff minimise the cost of ownership and maintenance. Parsons Brinckerhoff A-TAP-1820-RP-0003-RevD 1

10 1.2 Study area The study area is shown in Figure 1.1 and encompasses the surrounding adjacent road network to the project site including Elizabeth Street and Castlereagh Street to the west, Bathurst Street to the north, and Liverpool Street to the south. The project site (Museum Station) itself is located in the south-western corner of Hyde Park South. The transport context within the study area surrounding Museum Station is shown in Figure 1.2. Figure 1.1 Study area A-TAP-1820-RP-0003-RevD Parsons Brinckerhoff

11 Source: Google Maps Figure 1.2 Museum Station transport context Parsons Brinckerhoff A-TAP-1820-RP-0003-RevD 3

12 1.3 Document review The following documents were reviewed as part of this study: Museum Station Precinct Easy Access Upgrade, Business Requirements Specification, November 2012, Version 0.1, Transport for NSW. Compendium of Sydney Rail Travel Statistics 8 th Edition v1.1, November 2012, NSW Bureau of Transport Statistics. Guide to Traffic and Transport Management for Special Events, Version 3.4, August 2006, Roads and Maritime Services. 1.4 Report structure This report has the following structure: Chapter 2 describes the existing situation including traffic, transport and access conditions Chapter 3 discusses the proposed Museum Station easy access upgrades Chapter 4 details the impacts of the proposal during construction Chapter 5 details the impacts of the proposal during operation Chapter 6 proposes mitigation measures to reduce or remove any project related impacts Chapter 7 provides a conclusion to the study A-TAP-1820-RP-0003-RevD Parsons Brinckerhoff

13 2. Existing situation This section describes the existing station patronage, modal splits, pedestrian access, public transport services, adjacent road network and on-street parking provision. 2.1 Station patronage The 2012 Compendium of Sydney Rail Travel Statistics was reviewed to determine the typical weekday and weekend patronage at Museum Station. Table 2.1 shows the weekday entry and exit volumes for the station, which ranks 21 st in the metropolitan rail network for patronage. Table 2.1 Museum Station 2011 weekday entries and exits Time period In Out 02:00 to 06: :00 to 09: ,050 09:30 to 15:00 1,950 2,380 15:00 to 18:30 6,020 1,140 18:30 to 02:00 1, hours 10,450 10,450 Source: Transport for NSW Typically, station exits on a Saturday are 33% of normal weekday volumes whilst station exits on a Sunday are generally 24% of normal weekday volumes. According to barrier counts conducted in 2011, the busiest hour in the AM peak is between 8.00 am and 9.00 am with 2,966 exits. For information on the movement of these passengers through the station tunnels and ticket barriers refer to section Modal splits There is currently limited existing information about modal splits for travel to and from Museum Station. Museum Station is primarily known as a destination station. Due to its CBD location, the majority of users arrive in the AM and depart in the PM, as evidenced in the patronage data provided above in Table 2.1. As Museum is a CBD destination station, the majority of access to and from the station is expected to be by walking. This view is supported by the absence of car parking, kiss-and-ride facilities and bicycle storage facilities for users of the station. Analysis and observations of the travel patterns indicate that a proportion of station users transfer between rail and bus. These users are likely to arrive by rail at Museum Station from the south and west and travel to the east by bus, and vice versa. Museum Station would be the first CBD rail station accessed by bus services originating from the east. Having said this, the volume of passengers transferring to/from bus at Museum Station is estimated to be reasonably low. Parsons Brinckerhoff A-TAP-1820-RP-0003-RevD 5

14 2.3 Road network Museum Station is located in Hyde Park South on the north eastern corner of the intersection of Elizabeth Street and Liverpool Street. The northern most entrance to the station is located in Hyde Park opposite Bathurst Street. As a consequence, the key intersections which are potentially impacted by the proposal are Elizabeth Street and Liverpool Street and Elizabeth Street and Bathurst Street. All roads in the area are controlled by City of Sydney. Elizabeth Street is a key north-south corridor which is heavily utilised by buses. Elizabeth Street is generally configured with three lanes in either direction with the kerbside lane operating as a bus lane in both directions between 6.00 am and am and between 3.00 pm and 8.00 pm Monday to Friday. Parking is generally permitted in these lanes outside the operating hours of the bus lanes. Elizabeth Street south of Liverpool Street carries approximately 1,400 vehicles combined in both directions during a weekday AM peak and approximately 1,500 vehicles in the PM peak (Source: Wentworth Avenue Cycleway Project, City of Sydney, September 2010). In addition to this, counts were provided by RMS for Elizabeth Street southbound, north of Liverpool Street (directly adjacent the site) for a period between 01 January 2014 and 23 March The data indicates that in the southbound direction Elizabeth Street carries approximately 1,200 vehicles per hour in the weekday AM peak and 1,500 vehicles per hour in the PM peak. Data provided by TfNSW shows that, included in the numbers above, there are currently up to 110 buses per hour in the AM peak and up to 180 buses per hour in the PM peak travelling southbound along Elizabeth Street. Elizabeth Street has a posted speed limit of 50 km/h. Liverpool Street is a major east-west corridor which connects with Oxford Street to the east and Harbour Street to the west. Liverpool Street is configured with three lanes in either direction east of Elizabeth Street. A bus lane operates in the eastbound direction between Elizabeth Street and College Street between 3.00 pm and 7.00 pm on weekdays, with restricted parking outside of these hours. During the morning peak, a clearway is enforced between 6.00 am and am Monday to Friday in the westbound direction and outside of these hours, restricted parking is available. Liverpool Street west of College Street carries approximately 1,600 vehicles combined in both directions during a weekday AM peak and approximately 1,500 vehicles in the PM peak (Source: Wentworth Avenue Cycleway Project, City of Sydney, September 2010). Liverpool Street has a posted speed limit of 50 km/h. Castlereagh Street is a north-south corridor which operates as a one-way southbound street and is heavily utilised by buses. Castlereagh Street, south of Liverpool Street generally configures with two southbound lanes and parking on either side of the road. Castlereagh Street south of Bathurst Street carries approximately 400 vehicles during a weekday AM peak and approximately 500 vehicles in the PM peak (Source: Sydney CBD Cycleways Project, RMS, May 2012). Castlereagh Street has a posted speed limit of 50 km/h. Bathurst Street is a key east-west corridor which operates as a one-way eastbound street with four trafficable lanes between Castlereagh Street and Elizabeth Street, two of which are left turning and two right turning. Bathurst Street commences at Harbour Street to the west and continues to the east where it intersects with Elizabeth Street. Bathurst Street east of Castlereagh Street carries approximately 1,000 vehicles during the weekday AM peak and approximately 1,200 vehicles in the PM peak (Source: Sydney CBD Cycleways Project, RMS, May 2012). Bathurst Street has a posted speed limit of 50 km/h. College Street is generally two lanes in either direction with a dedicated bi-directional cycleway facility on the western side of the road. Parking is provided on the eastern side of the road between Park Street and Liverpool Street. College Street has a posted speed limit of 50 km/h with a 40 km/h school zone operating during school drop and pick up periods approximately between Stanley Street and William Street. The school zone serves the Sydney Grammar School. College Street north of Liverpool Street carries approximately 1,600 vehicles combined in both directions during a weekday AM peak and approximately 1,900 vehicles in the PM peak (Source: Wentworth Avenue Cycleway Project, City of Sydney, September 2010) A-TAP-1820-RP-0003-RevD Parsons Brinckerhoff

15 Park Street is generally configured with two lanes in either direction including bus lanes with dedicated cycle and parking lanes on both sides of the road in the section between Elizabeth Street and College Street. Park Street has a posted speed limit of 50 km/h. 2.4 Parking facilities There is no commuter parking provided at this station. There are a number of paid parking stations in close vicinity including the Goulburn Street Car Park on the corner of Elizabeth Street and Goulburn Street, and World Square on the corner of Pitt Street and Goulburn Street. The nearest disabled parking spaces are located on the western side of Castlereagh Street just north of Liverpool Street. Limited time restricted street parking is permitted on: Elizabeth Street between Bathurst Street and Liverpool Street Liverpool Street between Elizabeth Street and College Street. Table 2.2 details the parking restrictions and parking supply. Parsons Brinckerhoff A-TAP-1820-RP-0003-RevD 7

16 Table 2.2 On-street parking restrictions and supply Parking restrictions and supply# Street and Location 1P 10am 3pm Mon Fri and 4P 8am 8pm Sat, Sun and Public Holidays Taxi Zone 8pm 6am 2P 8am 3pm Mon Fri and 4P 8am 10pm Sat, Sun and Public Holidays 1P 8am 3pm Mon Fri and 4P 8am 10pm Sat, Sun and Public Holidays No Parking 3pm 7pm Mon Fri Loading 10am 3pm Mon Fri 7am 10am Sat and 2P 8pm 10pm Mon Fri and 4P 10am 10pm Sat, 8am 10pm Sun & Public Holidays 1P 10am 3pm Mon Fri and 2P 8pm 10pm Mon Fri and 4P 8am 10pm Sat, Sun & Public Holidays Elizabeth Street between Bathurst Street and Liverpool Street (eastern side) Elizabeth Street between Bathurst Street and Liverpool Street (western side) Liverpool Street between Elizabeth Street and the mid-block crossing (northern side) Castlereagh Street south of Liverpool Street (eastern side) # the number of on-street parking spaces is calculated by utilising a length of 6 m per light vehicle within the designated parking length A-TAP-1820-RP-0003-RevD Parsons Brinckerhoff

17 Existing on-street parking, bus/taxi zones, no parking and no stopping are shown in Figure 2.1. Figure 2.1 Existing parking situation 2.5 Public transport Rail Museum Station is the 21 st busiest railway station on the CityRail network by passenger volumes. Museum Station has two platforms. Platform 1 is located on the western side for northbound trains and services the Inner West and South Lines. Platform 2 is located on the eastern side for southbound trains and services the Bankstown and Airport & East Hills Lines. Table 2.3 outlines the services along these rail corridors. Table 2.3 Train services along rail corridor Rail line Services Frequency of services in the AM peak Inner West Line Liverpool via Regents Park Every 5 10 minutes South Line Campbelltown via Granville Every 5 10 minutes Bankstown Line Lidcombe or Liverpool via Sydenham Every 5 20 minutes Airport & East Hills Line Macarthur via Airport or Sydenham Every 5 10 minutes Source: NSW Transport Info Parsons Brinckerhoff A-TAP-1820-RP-0003-RevD 9

18 2.5.2 Bus There is a strong presence of bus services surrounding the station on Elizabeth Street and Liverpool Street which are important corridors for the CBD eastern region bus network. Figure 2.2 details the routes which operate on these streets. Two major bus stops are located in short walking distance of the station s principal entrances, one on Elizabeth Street and the other on Liverpool Street. These two stops serve buses operating between the CBD (Circular Quay) and the eastern and south-eastern Sydney suburbs surrounding La Perouse, Randwick and Bondi. The M40 continues to the northern suburb of Chatswood. The bus stop located on the eastern side of Elizabeth Street between Bathurst Street and Liverpool Street, as shown in Figure 2.3, is utilised by the following bus routes; 333, 373, 374, 376, 377, 380, 391, 392, 394, 396, 397, 399, 890, L94, X73, X74, X77, X92, X94, X96 and the M40. The bus zone length provided at this stop is approximately 57 m long. The bus stop located on the western side of Elizabeth Street between Bathurst Street and Liverpool Street is utilised by the following bus routes; 301, 302, 303, 308, 309, 310, 333, 339, 343, 373, 374, 376, 377, 380, 391, 392, 394, 396, 397, 399, 892, X03, X09, X10, X39, L94 and the M10, M20, M40 and M50. The bus zone length provided at this stop is approximately 50 m long. The bus stop located on the northern side of Liverpool Street between Elizabeth Street and College Street, as shown in Figure 2.4, is serviced by the following bus routes; 311, 333, 373, 377, 378, 380, 392, 394, 396, 397, 399, 890, L94, X39, X73, X74, X77, X92, X94, X96 and the M40. The bus zone length provided at this stop is approximately 41 m long. The bus stop located on the southern side of Liverpool Street between Elizabeth Street and College Street is serviced by the following bus routes; 311, 378. The bus zone length provided at this stop is approximately 25 m long. The bus stop located on the eastern side of Castlereagh Street between Liverpool Street and Goulburn Street, as shown in Figure 2.5, is serviced by the following bus routes, 301, 302, 303, 339, 422, 423, 426, L23, L28 and X03. These buses operate between the CBD (Circular Quay) and the inner south and inner south-western suburbs such as Mascot, Pagewood, Kingsford, Kingsgrove, Kogarah and Dulwich Hill. The bus zone length provided at this stop is approximately 32 m long. Bus services within this area arrive every few minutes during the peak period, with regular services, limited stop services, express services and Metro buses all operating via Liverpool Street and Elizabeth Street A-TAP-1820-RP-0003-RevD Parsons Brinckerhoff

19 Source: NSW Transport Info Figure 2.2 Bus services near Museum Station Parsons Brinckerhoff A-TAP-1820-RP-0003-RevD 11

20 Figure 2.3 Elizabeth Street bus stop southbound Figure 2.4 Liverpool Street bus stop eastbound 2.6 Taxi facilities An 84 m length of taxi zone is located on the eastern side of Elizabeth Street to the immediate north of Museum Station s main entry on the corner of Elizabeth Street and Liverpool Street. This taxi zone operates between 8.00 pm and 6.00 am. The taxi zone reverts back to restricted parking between am and 3.00 pm and operates as a bus lane during the AM and PM peaks. 2.7 Kiss-and-ride facilities There is currently no formal provision for a kiss-and-ride facility. 2.8 Cyclists facilities There are no cyclist facilities provided at this station. However there are a number of cycle rings on smart poles along Elizabeth Street. There is a two-way segregated cycleway on the western side of College Street. The cycleway runs along the length of College Street and connects to on-street cycle routes at both the northern and southern ends for trips to CBD north and towards Central Station, East Sydney and South Sydney A-TAP-1820-RP-0003-RevD Parsons Brinckerhoff

21 2.9 Pedestrian facilities Museum Station has several existing pedestrian access points that are provided at both ground and concourse levels. The access points connect to the station via a network of tunnels which are shown in Figure 2.5. Currently entries 3 and 4 are accessible by escalator with all other entries accessible by stairs. Therefore the station is not currently accessible to mobility impaired passengers (no entrances are currently DDA compliant). The pedestrian volumes are shown in Figure 2.5, which were collected on 16 May and 29 May 2013, and are discussed further in section Some of the pedestrian access points and tunnels are only open between 6.00 am to 8.00 pm Monday to Friday (Entries 1, 3, 4 and 6). Pedestrian access points are described in further detail below and are presented in Figure 2.6 to Figure The main footpaths connecting to the main Museum Station entrance at ground level are located on the eastern side of Elizabeth Street and the northern side of Liverpool Street. Both of these footpaths are 3.7 m wide. Where bus shelters have been installed the effective width of the footpath as a pedestrian thoroughfare narrows to 1.7 m and 1.8 m. Parsons Brinckerhoff A-TAP-1820-RP-0003-RevD 13

22 Figure 2.5 Pedestrian access and volumes at Museum Station A-TAP-1820-RP-0003-RevD Parsons Brinckerhoff

23 2.9.1 Pedestrian access points Entry 1 Castlereagh Street portal entrance adjacent to the Downing Centre (Mark Foy Building) This entrance provides a subway connection (Tunnel 14) below the Elizabeth Street and Liverpool Street intersection and enters Museum Station at concourse level (via Tunnel 11). This entrance has one set of stairs extending from street level (Castlereagh Street) to the subway itself as shown in Figure 2.6. The distance from the entrance to the station ticket gates is approximately 120 m. Figure 2.6 Castlereagh Street entrance from street level Parsons Brinckerhoff A-TAP-1820-RP-0003-RevD 15

24 Entry 2 Main Liverpool Street portal entrance (located on the north-eastern corner of the Elizabeth Street and Liverpool Street intersection) The main Museum Station entrance (refer to Figure 2.7) is provided on Liverpool Street and includes two sets of staircases which connect with the concourse level within close proximity of the ticket barriers and access gates. One of staircases is positioned to the west (in an east-west direction) and is currently opened to pedestrians (refer to Figure 2.8). The other staircase is positioned to the north-east (in a north-south direction) and is currently closed to pedestrians (refer to Figure 2.9 and Figure 2.10). Figure 2.7 Main Liverpool Street entrance from street level Figure 2.8 Main Liverpool Street entrance (Stair 1) from street level Figure 2.10 Main Liverpool Street entrance (northeastern access) from concourse level Figure 2.9 Main Liverpool Street entrance (Stair 2) from street level (not open, is closed to public access) A-TAP-1820-RP-0003-RevD Parsons Brinckerhoff

25 Entry 3 Liverpool Street north entrance opposite Downing Centre This entrance provides both a set of stairs and escalators which lead to a subway that connects at concourse level (Via Tunnel 11) as shown in Figure This subway connects with the Castlereagh Street and Liverpool Street subways. The distance from the entrance to the station ticket gates is approximately 70 m. Figure 2.11 Liverpool Street entrance opposite Downing Centre from street level Entry 4 Liverpool Street south entrance (located on the south-eastern corner of the Elizabeth Street and Liverpool Street intersection) This entrance provides a set of escalators which lead to a subway that connects at concourse level (via Tunnel 11) as shown in Figure This subway connects with the Castlereagh Street and Liverpool Street subways. The distance from the entrance to the station ticket gates is approximately 70 m. Source: Transport for NSW Figure 2.12 Liverpool Street entrance south-eastern corner from street level Parsons Brinckerhoff A-TAP-1820-RP-0003-RevD 17

26 Entry 5 Bathurst Street entry (located on the eastern side of Elizabeth Street south of Bathurst Street) This entrance is provided from the eastern side footpath of Elizabeth Street and includes two sets of staircases that lead to a split subway (two tunnels that lead to the same end location, Tunnels 1 and 2). This subway connects directly to the ticket barriers and access gates at the northern end of the concourse level (refer to Figure 2.13 and Figure 2.14). One of these tunnels extends under Elizabeth Street and connects with Hyde Park Square. The distance from the entrance to the station ticket gates is approximately 40 m. Tunnels 1 and 2 currently do not meet the requirements for DDA compliance in accordance with AS Figure 2.13 Bathurst Street entrance located on the eastern side of Elizabeth Street from street level Figure 2.14 Bathurst Street entrance located on the eastern side of Elizabeth Street from street level A-TAP-1820-RP-0003-RevD Parsons Brinckerhoff

27 Entry 6 Hyde Park Square via escalators adjacent to the Telstra building (located on the southwestern side of the Elizabeth and Bathurst Street intersection) This entrance as shown in Figure 2.15 provides a set of escalators which lead to a subway that connects at concourse level (via Tunnels 1 and 2). This entrance also connects with two other Hyde Park Square entrances (referred to as Entry 7 and Entry 8). The distance from the entrance to the station ticket gates is approximately 100 m. Figure 2.15 Hyde Park Square via escalators adjacent to the Telstra building Entry 7 Hyde Park Square entrance via stairs adjacent to the Telstra Building (located on the southwestern side of the Elizabeth and Bathurst Street intersection) This entrance as shown in Figure 2.16 provides two sets of staircases which lead to a subway that connects at concourse level (via Tunnels 1 and 2). This entrance also connects with two other Hyde Park Square entrances (referred to as Entry 6 and Entry 8). The distance from the entrance to the station ticket gates is approximately 100 m. Figure 2.16 Hyde Park Square via stairs adjacent to the Telstra building Parsons Brinckerhoff A-TAP-1820-RP-0003-RevD 19

28 Entry 8 Hyde Park Square via stairs from 227 Elizabeth Street building sliding door entrance on Bathurst Street (located on the north-western side of the Elizabeth and Bathurst Street intersection) This entrance as shown in Figure 2.17 and Figure 2.18 provides two sets of staircases which lead to a subway that connects at concourse level (via Tunnels 1 and 2). This entrance also connects with two other Hyde Park Square entrances (referred to as Entry 6 and Entry 7). The distance from the entrance to the station ticket gates is approximately 100 m. Figure 2.17 Hyde Park Square via stairs from 227 Elizabeth Street building sliding door entrance on Bathurst Street Figure 2.18 Hyde Park Square via stairs from 227 Elizabeth Street building sliding door entrance on Bathurst Street Entries 6, 7 and 8 lead to Museum Station via a subway and staircase under Elizabeth Street and via Tunnels 1 and 2 as shown in Figure 2.19 and Figure Figure 2.19 Hyde Park Square subway between entries 6, 7, 8 and Museum Station Figure 2.20 Museum Station entrance from Hyde Park Square A-TAP-1820-RP-0003-RevD Parsons Brinckerhoff

29 Figure 2.21 Ticket barriers and access gates at the southern end of the station Figure 2.22 ticket barriers and access gates at the northern end of the station Parsons Brinckerhoff A-TAP-1820-RP-0003-RevD 21

30 2.9.2 Pedestrian analysis Pedestrian analysis in station spaces involves deriving a Fruin Level of Service (LoS) as a means of defining where problem areas of congestion may occur. The Fruin Level of Service table for corridors and stairs are provided in Figure A-TAP-1820-RP-0003-RevD Parsons Brinckerhoff

31 Figure 2.23 Fruin Level of Service Definitions Parsons Brinckerhoff A-TAP-1820-RP-0003-RevD 23

32 LoS A is the best level, meaning that the area is operating well below capacity, with a high degree of comfort for passengers. LoS F means that the area is operating above capacity and queuing and delays are likely. An important consideration is the amount of time an area spends at a particular LoS. If capacity is only just exceeded for a short amount of time, any queues are likely to dissipate once the flow of passengers reduces, while a flow that exceeds capacity by a large margin and/or exceeds capacity for a long stretch of time could result in queues that grow, long delays and frustration for passengers. If the queue of passengers has not dissipated by the time the next train arrives, the operation of the station may be compromised. It is this ebb and flow of demand which requires a more considered approach than simply aiming for a particular LoS as the LoS is influenced by the demand and the time period considered. A train can unload a large volume of people who may experience considerable congestion, but if the assessment time period is too long, then the congestion can be hidden. For example, a calculation over 15 minutes may yield an excellent LoS result, but if this demand was actually concentrated over a single minute followed by 14 minutes of no demand then the actual congestion experienced may be grossly underestimated. In order to determine whether the pedestrian infrastructure is operating at an acceptable LoS it is important to understand the activity within that space and the expectations of the pedestrians. It is the conflicts that arise from a particular LoS which determine its acceptability. A poor Fruin LoS in a corridor may be acceptable if the movement is one way (few movement conflicts) and occurs in the AM peak (does not conflict with user expectations). A lower density in a concourse area with cross flows may result in numerous conflicts as people are unable to pass each other without significant change in speed and direction this may be unacceptable. Relatively poor Levels of Service are frequently encountered in and around stations in the AM peak period. This is not necessarily a problem if these conditions match the expectations of the station users. If the flow is largely in a single direction then movement can occur without discomfort at Los E or even F in most CBD stations with platforms served by stairs, these stairs operate at a poor LoS immediately after arrival of a train and its alighting passengers. It would be unrealistic to expect these stairs to operate at LoS C in these circumstances, to simply concentrate on achieving LoS C would result in unfeasibly wide stairs which would empty the platform in seconds Pedestrian movement To determine the volume of pedestrians moving throughout the station, site inspections and pedestrian counts were conducted on 16 May and 29 May The counts were conducted for the AM peak 90 minutes from 7.45 am to 9.15 am. The data was collected at five minute intervals to capture peak flow volumes. The raw data can be found in Appendix A. A summary of the data is provided in Figure 2.5. The data shows that the busiest platform in the AM peak is the inbound platform (to St James) with total exits from that platform of approximately 2,700 passengers. On the southern side of the station, Tunnel 11 is the most heavily used tunnel with 1,655 exiting and 214 entering passengers. The busiest street level entries are Entry 2 and Entry 4 on the eastern side of Elizabeth Street, adjacent to Liverpool Street. The station is largely a destination station in the AM peak, with only around 12% of the station throughput boarding a service at Museum. The impact of this boarding demand is reduced because it tends to arrive at the station with a fairly even profile compared to the alighting demand which has very peaked profiles associated with train arrivals. An assessment was conducted of Museum Station to determine the pedestrian Level of Service which currently exists. The pedestrian assessment report can be found in Appendix C. The results show that currently all areas operate within the LoS C requirement, except at the stairway in Tunnel 9 which operates at a LoS D and both of the stairways in Tunnel 10 which operate at a LoS E. This LoS is considered currently acceptable because: it is of a short duration A-TAP-1820-RP-0003-RevD Parsons Brinckerhoff

33 does not result in passenger conflicts does not interfere with other station operations or movements is probably not unexpected by commuters alighting from peak AM services. In additional to this, some delays and congestion were evident at the gate lines, with maximum queues identified of 11 people per gate. On-site observations identified queuing at the gate line which occasionally stretched back into the adjacent tunnels Wayfinding Wayfinding signage is provided in a variety of forms at various locations informing pedestrians of access paths to and from Museum Station including: ground level street signage at key station entrances on Liverpool Street, Elizabeth Street and Castlereagh Street (refer to Figure 2.24 and Figure 2.25) directional signs to street locations from the station concourse directing pedestrians to Liverpool Street (south), Liverpool Street (north) and Castlereagh Street (refer Figure 2.27) ground level signage on sliding door entrance and within Hyde Park Square subway (refer to Figure 2.26 and Figure 2.28). Figure 2.24 Street signage on Castlereagh Street Figure 2.25 Street signage on Liverpool Street Figure 2.26 Link to Museum Station subway entrance from Hyde Park Square Figure 2.27 Concourse level directional signage at southern entry Parsons Brinckerhoff A-TAP-1820-RP-0003-RevD 25

34 Figure 2.28 Museum Stations signage on sliding door entrance to 227 Elizabeth Street (Bathurst Street entry) A-TAP-1820-RP-0003-RevD Parsons Brinckerhoff

35 3. Proposed railway station upgrade 3.1 Overview The easy access upgrade to Museum Station proposed as part of the TAP includes new ramps, new lifts, a modified ticket window and staff amenities, family accessible toilets, platform works (to provide Level Access) and building modifications. Drawings of the proposed design are included in Appendix B. 3.2 Project scope The permanent works associated with the project will provide the station with: improved presentation and accessibility of station entries at the southern end of Hyde Park South two new lifts (Lifts 1 and 2 17 persons) connecting concourse level to platform level at the south end a new lift from surface level (Lift 3 17 persons) connecting Liverpool/Elizabeth Street entry to concourse level new stair runs within tunnels 8 and 10 to connect new lift lobbies to platform area new ramps as required re-grading of southern portion of Platform 1 (approximately 18m) adjusted office and staff amenities public toilets including family accessible toilets modifications and upgrades to ticket window, automatic ticket barrier and wide access gate CCTV coverage, containment and cabling security and access control coverage and containment modification and expansion of fire and smoke detection system way finding signage station passenger information induction loops. Parsons Brinckerhoff A-TAP-1820-RP-0003-RevD 27

36 3.3 Installation of new lifts Access and pedestrian movement to and from the station, from ground level, concourse level and platform level will be modified with the installation of three new lifts. These lifts are located at the southern end of Museum Station. The objective, capacity and location of each of the three lifts being installed is described in Table 3.1. Table 3.1 Lift location and description Lift no Location Description 1 Platform level, south-western end 17 person capacity, provides access between the platform level and concourse level 2 Platform level, south-eastern end 17 person capacity, provides access between the platform level and concourse level 3 Concourse level, southern end (adjacent to existing Liverpool Street portal entrance) 17 person capacity, provides access between the concourse level and ground level Figure 3.1 presents the locations of the new lifts at the southern end of the station. Source: Parsons Brinckerhoff/Group GSA Figure 3.1 New lift locations (concourse level) A-TAP-1820-RP-0003-RevD Parsons Brinckerhoff

37 4. Construction impact assessment 4.1 Construction proposal The works as described in section 3 will impact on those areas surrounding the existing Hyde Park Café at the south-western corner of Hyde Park South Scope An overview of the proposed construction scope is provided below. 1. Surface level works Stage 1 by TfNSW: New step ramp to be cut into the existing floor at the station entrance. Demolition of existing Hyde Park Café building. New 17 person, double fronted glass through' lift (Lift 3) connecting the Station Entry at Street level to the South Concourse area. Steel lift shaft structure with temporary cladding. Ground to be graded out from existing kerb adjacent to the demolished café to achieve levelling around the new lift. New temporary bitumen paving to all demolished areas. Temporary ramp to access lift doors towards west side of the lift 3 shaft. New openings to be created within existing station entry building to access the future lift lobby. Stage 2 to be built by others: Stage 2a) Build new Lift lobby / foyer structure towards east of lift shaft. Install finishes to later design and detail. Stage 2b) Possible new retail building to replace the existing Hyde Park Café. Stage 3 by TfNSW: Remove temporary lift shaft cladding. Install permanent lift shaft cladding. Disable the West side lift entrance and provide permanent lift 3 shaft cladding over. Activate East side lift entrance. Remove temporary ramp on West side of lift entrance. Provide new paving and planting to later design and detail. Provide services fit-out and signage for new lift lobby. Commission new station entrance. Parsons Brinckerhoff A-TAP-1820-RP-0003-RevD 29

38 2. Below ground works: Existing retail kiosk at concourse level to be demolished to make way for Lift 3 installation. Two new 17 person through lifts (Lift 1 and Lift 2) to be provided, connecting the South Concourse area with the platform level. New lift lobbies off the existing pedestrian tunnels at concourse and platform levels to provide adequate accessible circulation space. Two of the existing platform access stairs to be demolished and replaced by new stairs within Tunnel 7 and Tunnel 9 to connect new lift lobbies to platform area. New Family Accessible Toilet to be provided adjacent to the existing public amenities. Existing public amenities to be modified to provide an ambulant accessible cubicle each within the male and female amenities. Refurbishment of male and female toilets. New cleaner s store within vestibule for female amenities. New accessible staff amenities (one unisex accessible toilet and shower facility and one unisex toilet facility) and locker area to replace existing facilities. Existing booking office to be reconfigured to provide one accessible height booking office window and desk, one cash counting desk and one hot desk for station staff. Hearing augmentation loops to be provided at the new booking office window. Existing automatic ticket barriers to be relocated to provide more circulation space at top of the stairs leading to platforms. Existing Station Passenger information (SPI) and public phone to be moved to new location away from the booking office windows. Existing Closed Circuit Television (CCTV) racks to be moved to a new CCTV room to make way for Lift 2 lobby at concourse level. Existing mezzanine above the CCTV room to be cut back to switch room wall. Installation of new Tactile Ground Surface Indicators (TGSI) at top and bottom of all stairs within South Concourse and the platform areas. Installation of new TGSIs at the platform coping area. Lighting and CCTV upgrade to all pedestrian tunnels in the South Concourse area. Existing security gate near existing cleaner s store to be on fire trip release. New roller shutter at top of Stair 2 to be on fire trip release Program The total duration for construction of the works is approximately 12 months. Construction is anticipated to commence in January However, early work would be required to relocate utilities in the footpath. This work, which would generally take place at night, would start towards the end of Work sites There are a number of work sites identified for this assessment, located at both ground level and within the station and pedestrian underpasses. All work sites would be separated from the surrounding area with fencing or hoardings to protect the public. The proposed work sites, their function and timing are provided in Table 4.1 whilst diagrams showing the locations of the work sites are provided in Figures 4.1 and 4.2. The location of the work sites would impact on parking, traffic and pedestrians which are discussed in section A-TAP-1820-RP-0003-RevD Parsons Brinckerhoff

39 Table 4.1 Proposed work sites Site ID Work site location Activities affecting access Site timing 1 Within the south western corner of Hyde Park South including Hyde Park café 2 Lift 1 Elizabeth Street works Install Lifts 2 and 3; reconstruct Hyde Park Café and main entrance building. House the site office and spoil and construction material storage. The site has access to/from Elizabeth Street To relocate utilities in the footpath, install piles and excavate shaft for Lift 1. The site affects Elizabeth Street. Full time for 12 months Full time for 6 months 3 Tunnel 9 To break out wall for Lift 1 lobby and install internal bracing. Realign tunnel floor for accessible ramp. 4 Tunnel 7 To break out wall for Lift 2 lobby and install internal bracing During rail possession tunnel closure During rail possession tunnel closure 5 Existing concourse station facilities shop, toilets and station rooms To install Lift 3 and make adjustments to station rooms and toilets. Full time 6 Tunnel 10 Removal of existing staircase, excavation, construction of new tunnel floor and staircase. 7 Tunnel 8 Removal of existing staircase, excavation, construction of new tunnel floor and staircase. During rail possession tunnel closure During rail possession tunnel closure Figure 4.1 Proposed ground level work site arrangements Parsons Brinckerhoff A-TAP-1820-RP-0003-RevD 31

40 Figure 4.2 Proposed concourse level work site arrangements Figure 4.3 Proposed platform level work site arrangements A-TAP-1820-RP-0003-RevD Parsons Brinckerhoff

41 4.1.4 Site 2 (Lift 1) methodology The proposed Lift 1 is located underneath the southbound lanes of Elizabeth Street and therefore requires careful planning to minimise disruption to traffic. The following methodology is planned for this site Phase 1 Phase 1 involves the relocation and protection of utilities in the footpath along the eastern side of Elizabeth Street. The existing Telstra line will be relocated into the roadway (lane two), outside of the area of construction. This work will require the closure of the footpath, the bus lane and lane two southbound. This work would be undertaken as night works from pm to 5.00 am Monday to Thursday and take place over two weeks. Source: Robert Bird Group Figure 4.4 Phase 1 of Lift 1 construction Parsons Brinckerhoff A-TAP-1820-RP-0003-RevD 33

42 Phase 2 Phase 2 involves piling of the shaft edge to provide temporary retention of the shaft during excavation. Some of these piles are located within the bus lane and construction would require closure of the bus lane and footpath with lanes two and three southbound remaining open. This work would take place on weekends (outside of the bus lane hours when parking is normally allowed in the bus lane) and is proposed during reduced traffic periods. Source: Robert Bird Group Figure 4.5 Phase 2 of Lift 1 construction A-TAP-1820-RP-0003-RevD Parsons Brinckerhoff

43 Phase 3 Phase 3 is to construct a bridging slab and rear wall to allow excavation of the lift shaft under the bus lane. Whilst these items are constructed the bus lane and footpath will need to be closed with lanes two and three southbound remaining open. This work would take place on weekends (outside of the bus lane hours when parking is normally allowed in the bus lane) and is proposed during reduced traffic periods. Source: Robert Bird Group Figure 4.6 Phase 3 of Lift 1 construction Parsons Brinckerhoff A-TAP-1820-RP-0003-RevD 35

44 Phase 4 Phase 4 is in place during the main construction period for Lift 1 and will be a full time arrangement over a period of approximately 4-5 months. This stage involves placement of an F-Type barrier to separate traffic from the site, (Refer to Figure 4.8 for the rearrangement of the traffic lanes proposed during this stage) and placement of an overhead protection gantry over the footpath, maintaining a 1.8 m wide footpath. The rearranged lanes are proposed as a 3.2 m bus lane, 3.1 m for lane two and 2.8 m for lane three. Qualified traffic controllers will manage all vehicular access to the site as well as pedestrian movements on the footpath adjacent the site access. Source: Robert Bird Group Figure 4.7 Phase 4 of Lift 1 construction A-TAP-1820-RP-0003-RevD Parsons Brinckerhoff

45 Figure 4.8 Established site 1 Elizabeth Street cross section Plant and equipment A full list of equipment, machinery and tools and the timing and staging of their use is provided within Appendix D. The potential plant and equipment relevant for the traffic and transport assessment and accessing the site are listed as follows: Excavator Small truck Small bulldozer Piling rig Bobcat Crane Cherry picker Concrete agitator Concrete pumping truck Hydraulic crane Vibratory roller and other earth compacting equipment Generator and pneumatic tools. Parsons Brinckerhoff A-TAP-1820-RP-0003-RevD 37

46 4.1.5 Hours of work Standard work hours for TfNSW projects are Monday to Friday 7.00 am to 6.00 pm and Saturday 8.00 am to 1.00 pm. Weekend rail possessions are 24 hours per day starting from 9.00 pm on Friday. Weeklong rail possessions are 24 hours per day. The proposal would require some works to occur outside the standard working hours. For example it is proposed to conduct works in Elizabeth Street at night time and works within the station pedestrian tunnels during rail possessions. There are likely to also be works conducted during the weekend day and night. Approval from TfNSW for any out of hour s works would be required and the affected community would be advised. Out of hours works would be conducted in accordance with TfNSW s Rail Infrastructure Noise Guideline Any works that will impact station and rail operations or potentially block station access with no alternative route will be confined to rail possession periods Site access and parking Vehicular access is proposed to the site from Elizabeth Street as shown in Figure 4.1. This would take place across a footpath with high pedestrian volumes and a heavily utilised bus stop nearby. Therefore vehicular access across the footpath would require traffic control to manage the movement of pedestrians during vehicular movements. Larger construction vehicles which do not require direct site access will be accommodated by the provision of a work zone located on Elizabeth Street as shown in Figure 4.1. This work zone would operate between the hours of am to 3.00 pm and would replace approximately 50 m of existing parking (eight parking spaces). The work zone is likely to be required for 12 months. Vehicles utilising this work zone would comprise of semi-trailers delivering major components and concrete trucks for major pours. Major components would be lifted by crane from the road into the site. The footpath would be temporarily closed to pedestrians during the lifting period (no longer than five minutes at a time). Accredited Traffic Controllers will also be deployed at these times to manage not only pedestrian traffic but also passing vehicular traffic during the actual lifting activity. Concrete would be delivered to the site via agitator trucks accessing from Elizabeth Street. No on-street activity would occur during the AM and PM peak periods. Consultation with the City of Sydney regarding temporary work zones and the temporary removal of on-street parking would be required. For further details about permits and road occupancy licences refer to section Staff parking A maximum of approximately 40 construction staff would be located on the work site at any one time. To reduce impact on the area surrounding the site it is not proposed to provide for construction staff parking. Construction staff will be expected to make their own way to the site and if choosing to drive, can utilise the nearby parking stations Construction vehicle types and volumes Construction vehicles will require access to the site for the following: removal of debris and spoil importation of fill delivery of materials and machinery delivery of concrete A-TAP-1820-RP-0003-RevD Parsons Brinckerhoff

47 delivery of lift and ventilation components. It is expected that spoil excavated for the top down construction of lift shafts will be contaminated (general solid waste) and will need to be removed from the site. Clean material would be imported to the site for use as fill. The removal of debris and spoil will be by small dump truck (10 tonne class). Delivery of the majority of materials and machinery would be by utility, hiab trucks or small tippers. However major components may require semi-trailer access. Concrete deliveries will be by standard concrete agitator trucks. A full list of plant and equipment at the construction site is provided in Appendix D. The total vehicle volumes for work could be as high as 25 vehicles per day, with an average of 12 to 20 vehicles per day. Assuming standard working hours this equates to an average of about two vehicles per hour. Potentially a maximum of five vehicles per hour could access the site during peak activity periods. The number of vehicles accessing the work site is not expected to exceed more than five vehicles per hour at any time Scheduling of construction vehicles Construction vehicles accessing Site 1 via Elizabeth Street would generally access at any time that work occurs. This would include work undertaken within the standard working hours as well as any work planned during the night and weekend. Consideration for events would need to be made. Construction vehicles accessing the site via the on-street work zone parking area would be limited to hours outside of the bus lane hours (6.00 am and am and 3.00 pm to 8.00 pm Monday Friday). This works zone would be used primarily for material deliveries to Site Provision for over-dimensioned vehicles No over-dimensioned vehicles are expected for this project Proposed haulage routes For work site 1 arrival routes would be southbound only along Elizabeth Street in to the site. Departure would be southbound via Elizabeth Street and either continuing along Elizabeth Street or turning in to Liverpool Street. The proposed site access locations and haulage routes are shown in Figure 4.9. Parsons Brinckerhoff A-TAP-1820-RP-0003-RevD 39

48 Figure 4.9 Proposed construction vehicle haulage routes A-TAP-1820-RP-0003-RevD Parsons Brinckerhoff

49 4.1.9 Pedestrian management As identified in Table 4.1 work will be undertaken within the pedestrian tunnels and concourse of the station, as well as on the Elizabeth Street footpath. The following work areas would affect pedestrian access, a summary of which is provided in Table 4.2: The Elizabeth Street footpath would need to be closed on weekends during January Diversions are available through Hyde Park South and via the western side of Elizabeth Street for pedestrians requiring accessible access. These diversion routes are shown in Figure Support structures will be constructed within tunnels 7 and 9 which will be designed to allow pedestrian thoroughfare once the station is opened. The supports within the tunnel would encroach into the tunnels by up to 300 mm. Tunnels 7, 8, 9 and 10 may be closed at some stage during construction. These closures would take place alternately and during rail possessions only. During construction of the new Lift lobby / foyer structure towards east of Lift 3 a temporary accessible ramp to Lift 3 would be provided on the west side of the station building. This would allow DDA compliant access to Lift 3 during Stages 2a and 2b of the works (as indicated in Section 4.1.1). Table 4.2 Pedestrian impact areas Impact area Timing Proposal Site 1 construction of eastern Lift 3 foyer and new retail in Hyde Park Café area Site 2 closure of eastern side footpath of Elizabeth Street Site 2 narrowing of eastern side footpath of Elizabeth Street Full time for approximately 12 months during Stages 2a and 2b Limited number of weekends Full time for approximately 12 months Temporary DDA compliant ramp access to Lift 3 Pedestrians diverted via Hyde Park South and west side of Elizabeth Street Locally narrowed section approximately 1.8 m wide Site 3 - narrowing of tunnel 9 Full time for approximately 12 months Locally narrowed section approximately 2.0 m wide Site 4 - narrowing of tunnel 7 Full time for approximately 12 months Locally narrowed section approximately 2.0 m wide Site 3 - closure of tunnel 9 Rail possessions Pedestrians diverted to tunnel 10 Site 4 closure of tunnel 7 Rail possessions Pedestrians diverted to tunnel 8 Site 6 closure of tunnel 10 Rail possessions Pedestrians diverted to tunnel 9 Site 7 closure of tunnel 8 Rail possessions Pedestrians diverted to tunnel 7 Parsons Brinckerhoff A-TAP-1820-RP-0003-RevD 41

50 Figure 4.10 Proposed pedestrian diversions A-TAP-1820-RP-0003-RevD Parsons Brinckerhoff

CONSTRUCTION TRAFFIC MANAGEMENT PLAN (CTMP)

CONSTRUCTION TRAFFIC MANAGEMENT PLAN (CTMP) CONSTRUCTION TRAFFIC MANAGEMENT PLAN (CTMP) [Colston Budd Hunt & Kafes Pty Ltd AS AMENDED BY City of Sydney] 23 March 2010 1. PREAMBLE 1.1 This document constitutes the Demolition and Traffic Management

More information

Construction Traffic Management Plan

Construction Traffic Management Plan Introduction This (CTMP) has been prepared in order to discharge Condition 20 of planning permission ref 07/02879/EFUL for the enabling site works associated with the wider Bath Western Riverside development.

More information

LT McGuinness Site 10 Development, Wellington Waterfront. Construction Traffic Management Plan. 7 October 2014

LT McGuinness Site 10 Development, Wellington Waterfront. Construction Traffic Management Plan. 7 October 2014 LT McGuinness Site 10 Development, Wellington Waterfront Construction Traffic Management Plan 7 October 2014 TDG Ref: 12950 141007 ltm ctmp final report.docx LT McGuinness Site 10 Development, Wellington

More information

Claughton Medical Centre Travel Plan

Claughton Medical Centre Travel Plan Claughton Medical Centre Travel Plan June 2011 1 Contents Page 1. Introduction 2 2. Objectives 3 3. Targets 5 4. Site Audit 6 5. Travel Survey 11 6. Marketing strategy 13 7. Monitoring and review 15 8.

More information

Rockhampton Office Brisbane Office Tarong Site. Barron Gorge Hydro PS Kareeya Hydro PS Mica Creek PS

Rockhampton Office Brisbane Office Tarong Site. Barron Gorge Hydro PS Kareeya Hydro PS Mica Creek PS Business Procedure Traffic Management Document Number OHS-PROC-130 This document applies to the following sites: All Sites Rockhampton Office Brisbane Office Tarong Site Barron Gorge Hydro PS Kareeya Hydro

More information

New College. School Of Divinity.

New College. School Of Divinity. THE UNIVERSITY OF EDINBURGH. New College. School Of Divinity. A GUIDE TO ACCESS AND FACILITIES. Address New College. School of Divinity. University Of Edinburgh. 1 Mound Place. Edinburgh. E,H,1, 2,L,U,.

More information

THE UNIVERSITY OF EDINBURGH, Alexander Graham Bell Building, King s Buildings,

THE UNIVERSITY OF EDINBURGH, Alexander Graham Bell Building, King s Buildings, THE UNIVERSITY OF EDINBURGH, Alexander Graham Bell Building, King s Buildings, A GUIDE TO ACCESS AND FACILITIES, Address Alexander Graham Bell Building, University of Edinburgh. King s Buildings. Edinburgh,

More information

THE UNIVERSITY OF EDINBURGH. Alexander Graham Bell Building. King s Buildings

THE UNIVERSITY OF EDINBURGH. Alexander Graham Bell Building. King s Buildings THE UNIVERSITY OF EDINBURGH Alexander Graham Bell Building King s Buildings A GUIDE TO ACCESS AND FACILITIES Alexander Graham Bell Building King s Buildings Edinburgh EH93JF United Kingdom http://www.ed.ac.uk/maps/buildings/

More information

Engineering Standard

Engineering Standard Public Transport Services Engineering Standard Stations - Bicycle Facilities PART 129013 AR-PW-PM-SPE-00129013 (D073) Document Control Document Status Document Amendment Record Revision Change Description

More information

Median Bus Lane Design in Vancouver, BC: The #98 B-Line

Median Bus Lane Design in Vancouver, BC: The #98 B-Line Li 1 Median Bus Lane Design in Vancouver, BC: The #98 B-Line Simon Li, P.Eng. PTOE Acting Program Manager, Road and Bridge Projects TransLink (Greater Vancouver Transportation Authority) 1600 4720 Kingsway

More information

CONSTRUCTION TRAFFIC MANAGEMENT PLAN V11, 26/09/12

CONSTRUCTION TRAFFIC MANAGEMENT PLAN V11, 26/09/12 If the project you are constructing was subject to planning permission and a condition requiring a Construction Traffic Management Plan (CTMP) was applied to the planning consent, this condition will need

More information

We would be pleased to discuss these issues with you at your convenience.

We would be pleased to discuss these issues with you at your convenience. Public Transport Users Association Inc. Ross House, 247 Flinders Lane Melbourne 3000 Reg. No. A-6256L Email: [email protected] Dear Councillor Queen Victoria Market Redevelopment Project The Public Transport

More information

Why build the Silvertown Tunnel?

Why build the Silvertown Tunnel? Why build the Silvertown Tunnel? Over the last 30 years east London has changed with the redevelopment of former industrial areas into major commercial and residential districts. The development of Canary

More information

THE UNIVERSITY OF EDINBURGH. Pleasance Sports Centre and Gym. The Pleasance.

THE UNIVERSITY OF EDINBURGH. Pleasance Sports Centre and Gym. The Pleasance. 0,1,3,1, 6,5,0, 2,5,8,5,. THE UNIVERSITY OF EDINBURGH Pleasance Sports Centre and Gym. The Pleasance. A GUIDE TO ACCESS AND FACILITIES. Address. Pleasance Sports Centre and Gym, The University of Edinburgh,

More information

University Arms Hotel, Cambridge

University Arms Hotel, Cambridge Traffic Management Plan For University Arms Hotel, Cambridge Prepared By: James Batterbee Number: M1342 / Rev B Date: 29 th August 2014 CONTENTS: (1) INTRODUCTION (2) VEHICLE ACCESS & EGRESS AND PEDESTRIAN

More information

Evanston Main Street Station TOD Plan and Study. Appendix A.1: Station Area Existing Conditions

Evanston Main Street Station TOD Plan and Study. Appendix A.1: Station Area Existing Conditions Evanston Main Street Station TOD Plan and Study Appendix A.1: Station Area Existing Conditions EvanstonMainStreetStation TODPlanandStudy A 1 AppendixA.1: ExistingConditions Table of Contents Station Locations

More information

1st CONFERENCE IN ETHNOMUSICOLOGY AND ANTHROPOLOGY OF MUSIC Methods, approaches and perspectives for the study of music within culture

1st CONFERENCE IN ETHNOMUSICOLOGY AND ANTHROPOLOGY OF MUSIC Methods, approaches and perspectives for the study of music within culture 1st CONFERENCE IN ETHNOMUSICOLOGY AND ANTHROPOLOGY OF MUSIC Methods, approaches and perspectives for the study of music within culture Universitat Autònoma de Barcelona (UAB) 2nd-3rd, July 2015 Barcelona,

More information

Construction Management Plan (CMP) Application

Construction Management Plan (CMP) Application About this form Principal Contractor (Applicant) Applicant Details (Person lodging application and main contact for CMP) DA and Site Details Development Consent for Works you are carrying out Construction

More information

1. REPORT CONTEXT Description of the development (include all of the following that are known at the time of the application):

1. REPORT CONTEXT Description of the development (include all of the following that are known at the time of the application): Transportation Assessment and Management Study Guidelines for Consultants INTRODUCTION This document is intended to provide guidelines for transportation consultants who produce Transportation reports

More information

THIS PAGE INTENTIONALLY LEFT BLANK

THIS PAGE INTENTIONALLY LEFT BLANK THIS PAGE INTENTIONALLY LEFT BLANK Construction Traffic Management Plan 2 Contents 1. Introduction... 4 1.1 Conditions of Consent... 4 2. Goals of the CTMP... 6 2.1 Objectives... 6 2.2 Predicted Construction

More information

CITY OF VINCENT CONSTRUCTION MANAGEMENT PLAN GUIDELINES

CITY OF VINCENT CONSTRUCTION MANAGEMENT PLAN GUIDELINES CITY OF VINCENT CONSTRUCTION MANAGEMENT PLAN GUIDELINES INTRODUCTION What is a Construction Management Plan? The City of Vincent requires careful management of construction involving excavation and retention

More information

Transportation Management Plan Template

Transportation Management Plan Template DATE: TO: FROM: SUBJECT: Date Name Position Transportation Service Center Name Position Transportation Service Center Transportation Management Plan Job Number(s) Control Section(s) Route Details County

More information

CONSTRUCTION TRAFFIC MANAGEMENT PLAN Issue 2, V5, 11/11/13

CONSTRUCTION TRAFFIC MANAGEMENT PLAN Issue 2, V5, 11/11/13 Note: Please refer to the end of this document for guidance notes about completing this form Q1. What is the full postal address of the site? Your response Q2. Planning reference and revision number (if

More information

Wilmington to Newark Commuter Rail Improvement Project

Wilmington to Newark Commuter Rail Improvement Project Wilmington to Newark Commuter Rail Improvement Project The Delaware Transit Corporation (DTC), a subsidiary of the Delaware Department of Transportation (DelDOT), is undertaking a rail capacity expansion

More information

Chapter 13 Route Window C11 Isle of Dogs station. Transport for London

Chapter 13 Route Window C11 Isle of Dogs station. Transport for London Chapter 13 Route Window C11 Isle of Dogs station ISLE OF DOGS STATION 13 Route Window C11 Isle of Dogs station Introduction 13.1 The Crossrail Line lies completely in tunnel through this section, just

More information

Maximum speed. Stop and Give way to Manually operated temporary No entry for give way traffic on STOP and GO signs vehicular traffic major road

Maximum speed. Stop and Give way to Manually operated temporary No entry for give way traffic on STOP and GO signs vehicular traffic major road Signs giving orders Signs with red circles are mostly prohibitive. Plates below signs qualify their message. Entry to 20 mph zone End of 20 mph zone Maximum speed National speed limit applies School crossing

More information

Bus Users in Sydney. Transport Data Centre ISSUES PAPER 2002/02 DECEMBER 2002 ISSN 1325-9253 ISBN 0 7313 2821 3

Bus Users in Sydney. Transport Data Centre ISSUES PAPER 2002/02 DECEMBER 2002 ISSN 1325-9253 ISBN 0 7313 2821 3 ISSUES PAPER 2002/02 DECEMBER 2002 ISSN 1325-9253 ISBN 0 7313 2821 3 Bus Users in Sydney Bus Users in Sydney presents the latest information on bus travel and bus travellers living in the Sydney Statistical

More information

PEDESTRIAN PLANNING AND DESIGN MARK BRUSSEL

PEDESTRIAN PLANNING AND DESIGN MARK BRUSSEL PEDESTRIAN PLANNING AND DESIGN MARK BRUSSEL CONTENT OF LECTURE a) Walking as a transport mode b) Walking in Sub Sahara Africa c) Policies for pedestrians d) Pedestrian characteristics e) Network planning

More information

STATE TRANSIT BUS INFRASTRUCTURE GUIDE

STATE TRANSIT BUS INFRASTRUCTURE GUIDE PROC 48.14 STATE TRANSIT BUS INFRASTRUCTURE GUIDE State Transit P.O Box 2557 Strawberry Hills NSW 2012 Facsimile (02) 9245 5710 www.sydneybuses.nsw.gov.au ISSUE 2 ` Table of Contents 1 INTRODUCTION...

More information

Major Improvement Schemes in Basingstoke

Major Improvement Schemes in Basingstoke Major Improvement Schemes in Basingstoke 1. Welcome Welcome to this exhibition, which provides information about the planned highway improvements being delivered in Basingstoke from 2015 2018. A30 Winchester

More information

Construction Management Plan Template

Construction Management Plan Template Plan Template Planning Permit Number:... Date Planning Permit Issued:... Approval Stamp (Office Use only): Standard Plan Template Project details Company Operational Details.. Directors Name Company Name

More information

Lawson Outline Plan External Traffic Analysis Working Paper

Lawson Outline Plan External Traffic Analysis Working Paper Total Lawson Development ACTPLA 16 January 2009 Document No.: Prepared for ACTPLA Prepared by Maunsell Australia Pty Ltd Level 2, 60 Marcus Clarke Street, Canberra ACT 2600, Australia T +61 2 6201 3000

More information

Introduction. Pre-Arrival. Arrival & Car Parking Facilities. Main Entrance, Reception & Ticketing Area

Introduction. Pre-Arrival. Arrival & Car Parking Facilities. Main Entrance, Reception & Ticketing Area Access Statement for Chester Backpackers - Chester Introduction We are a 35 bed, independent hostel situated in Chester. The Hostel is situated over 4 Floors and offers dormitory rooms to private en-suite

More information

CUSTOMS BROKER EXAM REVIEW COURSE LOCATION/DIRECTIONS ATLANTA CHARLESTON CHARLOTTE DALLAS LOS ANGELES NEW YORK WASHINGTON, D.C.

CUSTOMS BROKER EXAM REVIEW COURSE LOCATION/DIRECTIONS ATLANTA CHARLESTON CHARLOTTE DALLAS LOS ANGELES NEW YORK WASHINGTON, D.C. CUSTOMS BROKER EXAM REVIEW COURSE LOCATION/DIRECTIONS ATLANTA CHARLESTON CHARLOTTE DALLAS LOS ANGELES NEW YORK WASHINGTON, D.C. DIRECTIONS: ATLANTA One Atlantic Center 1201 West Peachtree Street Atlanta,

More information

Route Optimisation / Traffic Signals Efficiency

Route Optimisation / Traffic Signals Efficiency Route Optimisation / Traffic Signals Efficiency Glossary Auckland Council Advanced Real-time Traffic Information System Auckland Transport Closed Circuit Television (Traffic cameras) Full Time Equivalent

More information

AUSTRALIAN HUMAN RIGHTS COMMISSION NOTICE OF DECISION ON APPLICATION FOR TEMPORARY EXEMPTIONS: AUSTRALASIAN RAILWAY ASSOCIATION

AUSTRALIAN HUMAN RIGHTS COMMISSION NOTICE OF DECISION ON APPLICATION FOR TEMPORARY EXEMPTIONS: AUSTRALASIAN RAILWAY ASSOCIATION AUSTRALIAN HUMAN RIGHTS COMMISSION DISABILITY DISCRIMINATION ACT 1992 (Cth), Section 55 DISABILITY STANDARDS FOR ACCESSIBLE PUBLIC TRANSPORT 2002 (Cth), Section 33A.1 DISABILITY (ACCESS TO PREMISES BUILDINGS)

More information

TRANSPORT ASSESSMENT GUIDANCE

TRANSPORT ASSESSMENT GUIDANCE TRANSPORT ASSESSMENT GUIDANCE Contents 1 INTRODUCTION...1 Purpose of the Guidance...1 Policy Context...1 Who Should Read This Document?...2 Structure of Guidance...3 2 ASSESSMENT PRINCIPLES AND PROCESS...4

More information

Downtown Tampa Transportation Vision

Downtown Tampa Transportation Vision Downtown Tampa Transportation Vision Executive Summary August 1, 2006 Hillsborough County Metropolitan Planning Organization County Center, 18 th Floor Tampa, Florida 33602 813-272-5940 www.hillsboroughmpo.org

More information

Goals & Objectives. Chapter 9. Transportation

Goals & Objectives. Chapter 9. Transportation Goals & Objectives Chapter 9 Transportation Transportation MISSION STATEMENT: TO PROVIDE A TRANSPORTATION NETWORK CAPABLE OF MOVING PEOPLE AND GOODS EFFICIENTLY AND SAFELY. T he transportation system

More information

Significant investment and improvement of infrastructure and transport networks, delivered at no cost and no risk

Significant investment and improvement of infrastructure and transport networks, delivered at no cost and no risk December 2014 FACT SHEET: TRANSPORT AND INFRASTRUCTURE Significant investment and improvement of infrastructure and transport networks, delivered at no cost and no risk The Gold Coast Integrated Resort

More information

Madras College Site Traffic Management Plan (South Street) August 2015

Madras College Site Traffic Management Plan (South Street) August 2015 Madras College Site Traffic Management Plan (South Street) August 2015 South Street, St. Andrews, KY16 9EJ Kilrymont Road, St. Andrews, KY16 8DE Telephone (01334) 659402 Telephone (01334) 659401 Email

More information

DELIVERY & SERVICING PLAN. REDWOOD PARTNERSHIP Consulting Engineers Transportation Planners

DELIVERY & SERVICING PLAN. REDWOOD PARTNERSHIP Consulting Engineers Transportation Planners Redwood Partnership Transportation Limited Maritime House Basin Road North Portslade Brighton BN41 1WR T: 01273 414515 F: 01273 376824 E: [email protected] www.redwoodpartnership.co.uk REDWOOD

More information

Construction Traffic Management Plan

Construction Traffic Management Plan Construction Traffic Management Plan Proposed Additional Classroom Accommodation for Woolacombe Primary School Produced for and on behalf of Built Environments Team Devon County Council NPS South West

More information

Ipswich City Council Subordinate Local Law 5.1 (Parking) 2013

Ipswich City Council Subordinate Local Law 5.1 (Parking) 2013 Ipswich City Council Subordinate Local Law 5.1 (Parking) 2013 1 Contents PART 1 PRELIMINARY... 2 1 Short title... 2 2 Authorising local law... 2 3 Object... 2 4 Definitions the dictionary... 2 PART 2 PERMITS...

More information

Pilot Staff Bike Share Project. Induction Notes

Pilot Staff Bike Share Project. Induction Notes Pilot Staff Bike Share Project Induction Notes www.capetown.gov.za/travelsmart [email protected] Contents Contents... i Introduction.... 1 How do I get access to the bicycles?... 1 Location

More information

3 Tappan Zee Bridge Rehabilitation Options

3 Tappan Zee Bridge Rehabilitation Options 3 Tappan Zee Bridge Rehabilitation Options 3.1 Introduction This chapter describes possible options that rehabilitate and enhance the existing Tappan Zee Bridge. Four Rehabilitation Options have been developed:

More information

Site Layout & Traffic Plan

Site Layout & Traffic Plan Location Site address: Norbury Manor Business Enterprise College, Kensington Avenue, Thornton Heath, Croydon CR7 8BT. The new block will be constructed on the existing hard play area. The construction

More information

Transport Construction Authority Report for Auburn Stabling Project. Traffic Impact Assessment

Transport Construction Authority Report for Auburn Stabling Project. Traffic Impact Assessment Transport Construction Authority Report for Auburn Stabling Project November 2010 Contents 1. Introduction 1 2. Existing Conditions 2 2.1 Site Description 2 2.2 Existing Operations 4 2.3 Existing Road

More information

Frequently Asked Questions (FAQs)

Frequently Asked Questions (FAQs) Frequently Asked Questions (FAQs) Why are we charging for parking? Due to the implementation of paid parking within the Parliamentary Triangle, the Department of Parliamentary Services (DPS) is implementing

More information

Traffic Management During Construction

Traffic Management During Construction Traffic Management During Construction The construction of Dublin Port Tunnel couldn t begin until a traffic management plan had been developed and agreed to facilitate construction of the Tunnel and to

More information

Contents. Booking Transport Getting Around Building Plans Services & Facilities Food & Drink Daytime Visits Access List

Contents. Booking Transport Getting Around Building Plans Services & Facilities Food & Drink Daytime Visits Access List Access Guide Contents Booking Transport Getting Around Building Plans Services & Facilities Food & Drink Daytime Visits Access List 2 4 7 10 16 19 20 21 To request an alternative format, please telephone

More information

Local Information. Below you will find travel tips and estimated costs for travel both to and from the airport and around town.

Local Information. Below you will find travel tips and estimated costs for travel both to and from the airport and around town. Local Information Travel/Transportation Below you will find travel tips and estimated costs for travel both to and from the airport and around town. Transportation To/From Airports Below, a list of transportation

More information

November 2014. Transforming Sydney. 60% more trains. Faster, more frequent services. No timetable just turn up and go

November 2014. Transforming Sydney. 60% more trains. Faster, more frequent services. No timetable just turn up and go November 2014 Transforming Sydney 60% more trains Faster, more frequent services No timetable just turn up and go Transforming Sydney A once in a generation transformation of Sydney s rail network Sydney

More information

Submission from Living Streets Aotearoa Wellington City Public Transport Spine Study

Submission from Living Streets Aotearoa Wellington City Public Transport Spine Study Submission from Living Streets Aotearoa Wellington City Public Transport Spine Study Contact person: Ellen Blake Email: [email protected] Phone: 021 1067139 Date: 30 September 2013 About

More information

Erection of replacement warehouse building and erection of two buildings in connection with builder s merchants

Erection of replacement warehouse building and erection of two buildings in connection with builder s merchants Plan: O 02/00708/FUL Thames Ward (A) Address: Development: Applicant: London Works, Ripple Road, Barking Erection of replacement warehouse building and erection of two buildings in connection with builder

More information

Mike Goggin Director, Stations & Customer Service

Mike Goggin Director, Stations & Customer Service Foreword Foreword Railway stations have perhaps never enjoyed the profile they have had until the last few years. In recent times we have had both the Better Rail Stations Report published by Government

More information

Customer Satisfaction Index 2014

Customer Satisfaction Index 2014 Customer Satisfaction Index 01 Contents Executive summary Customer satisfaction methodology Initiatives to improve customer satisfaction November 01 results Overall train network Overall bus regions Overall

More information

THE UNIVERSITY OF EDINBURGH OLD COLLEGE

THE UNIVERSITY OF EDINBURGH OLD COLLEGE THE UNIVERSITY OF EDINBURGH OD COEGE A GUIDE TO ACCESS AND FACIITIES Old College University of Edinburgh Old College South Bridge Edinburgh EH8 9Y Phone 0131 650 2008 http://www.ed.ac.uk/maps Disabled

More information

Temporary Traffic Management

Temporary Traffic Management Temporary Traffic Management Tom Kiddle 4 th July 2012 Temporary Traffic Management Auckland Transport TTM Operation Requirements AT TTM Audits Qualified Persons on site Pedestrian Management 1 AT Temporary

More information

Appendix G. Security management plan

Appendix G. Security management plan Appendix G Security management plan Security Management Plan Prepared by: Kann Finch Group Project Energy Australia Belmore Park Zone 1- Sub-station component General Design Requirements The perimeter

More information

Hotel Accessibility Pack

Hotel Accessibility Pack Hotel Accessibility Pack Thank you for considering the Hilton Dublin City. We are pleased to provide you with some information regarding our hotel that you may find useful when planning your visit to our

More information

OVERVIEW PROJECT SUMMARY

OVERVIEW PROJECT SUMMARY OVERVIEW Cesar Chavez showcases how to successfully redesign a primary arterial route into a neighborhood destination, improving modal share, water sensitive design, biodiversity and safety whilst maintaining

More information

9988 REDWOOD AVENUE PROJECT TRAFFIC IMPACT ANALYSIS. April 24, 2015

9988 REDWOOD AVENUE PROJECT TRAFFIC IMPACT ANALYSIS. April 24, 2015 9988 REDWOOD AVENUE PROJECT TRAFFIC IMPACT ANALYSIS April 24, 2015 Kunzman Associates, Inc. 9988 REDWOOD AVENUE PROJECT TRAFFIC IMPACT ANALYSIS April 24, 2015 Prepared by: Bryan Crawford Carl Ballard,

More information

GTA Cordon Count Program

GTA Cordon Count Program Transportation Trends 2001-2011 Executive Summary Project No. TR12 0722 September 2013 1.0 Introduction The Cordon Count program was established to collect traffic data as a tool for measuring travel trends

More information

Integrated Public Transport Service Planning Guidelines. Sydney Metropolitan Area

Integrated Public Transport Service Planning Guidelines. Sydney Metropolitan Area Integrated Public Transport Service Planning Guidelines Sydney Metropolitan Area December 2013 CONTENTS 1. INTRODUCTION 3 1.1 Purpose 3 1.2 Background 3 1.3 Travel in Sydney Metropolitan Area 5 1.4 Objectives

More information

Walkable Communities Florida Department of Transportation State Safety Office Pedestrian and Bicycle Program April 1995 www.dot.state.fl.us/safety Twelve Steps for an Effective Program Page 1 Twelve Steps

More information

Grüezi and welcome to Swissôtel Nankai Osaka!

Grüezi and welcome to Swissôtel Nankai Osaka! Grüezi and welcome to Swissôtel Nankai Osaka! Dear Guest, Thank you very much for booking Swissôtel Nankai Osaka and we are very much looking forward to welcoming you to our hotel which is located in the

More information

Appendix A Proposed development layout

Appendix A Proposed development layout Appendix A Proposed development layout PRELIMINARY All areas have been measured from current drawings. They may vary 0 5m 20m 20.05.14 because of (eg) survey, design development, construction tolerances,

More information

The Northumberland Estates Proposed Residential Development, Prudhoe Town Centre D/I/D/63558/603. Framework Residential Travel Plan

The Northumberland Estates Proposed Residential Development, Prudhoe Town Centre D/I/D/63558/603. Framework Residential Travel Plan The Northumberland Estates Proposed Residential Development, Prudhoe Town Centre D/I/D/63558/603 Framework Residential Travel Plan September 2013 CONTROL SHEET CLIENT: PROJECT TITLE: REPORT TITLE: THE

More information

Construction Management Plan

Construction Management Plan Prepared by Expertise Building & (EBCPL) Construction Management Plan GAP BLUFF PRECINCT OFFICERS MESS THE ARMOURY GAP BLUFF COTTAGE CAMP COVE PRECINCT CONSTABLE S COTTAGE 33 CLIFF STREET GREEN POINT COTTAGE

More information

23 February 2015. Enfield Intermodal Logistics Centre

23 February 2015. Enfield Intermodal Logistics Centre Enfield Intermodal Logistics Centre Overarching Operational Traffic Management Plan February 2015 Table of Contents 1. Introduction... 2 2. Purpose of the Plan... 2 3. Objective of the Plan... 3 4. Road

More information

MEMORANDUM. Robert Nichols, Acting Corridor Design Manager Northgate Link Extension

MEMORANDUM. Robert Nichols, Acting Corridor Design Manager Northgate Link Extension MEMORANDUM DATE: September 23, 2014 TO: Robert Nichols, Acting Corridor Design Manager Northgate Link Extension FROM: SUBJECT: COPIES: Katherine Casseday, PE, PTOE, Casseday Consulting Tony Lo, PE, Parsons

More information

DISTRICT 3 TRAFFIC MANAGEMENT PLAN CHECKLIST

DISTRICT 3 TRAFFIC MANAGEMENT PLAN CHECKLIST State of California Business, Transportation and Housing Agency DISTRICT 3 TRAFFIC MANAGEMENT PLAN CHECKLIST District / EA: District 3/ EA 03-3E380 Date Prepared: 1/10/2013 Prepared By: Robert Himes Stage

More information

RICHARD REID & ASSOCIATES LTD CITYMAKERS

RICHARD REID & ASSOCIATES LTD CITYMAKERS RICHARD REID & ASSOCIATES LTD CITYMAKERS 3/9 Tudor Street Devonport Auckland 0624 NEW ZEALAND T: (09) 445 3289 M: (027) 640 8367 F: (09) 445 4307 [email protected] www.richardreid.co.nz 2 December

More information

CROYDON MAJOR ACTIVITY CENTRE PARKING STUDY

CROYDON MAJOR ACTIVITY CENTRE PARKING STUDY CROYDON MAJOR ACTIVITY CENTRE PARKING STUDY December 2011 EXECUTIVE SUMMARY Strategic Context The Croydon Town Centre has been classified as a Major Activity Centre (MAC) in the Melbourne 2030 metropolitan

More information

TRANSPORT PLAN COMMUNICATION Cape Town Stadium: Soccer Cape Town City FC vs. Kaiser Chiefs

TRANSPORT PLAN COMMUNICATION Cape Town Stadium: Soccer Cape Town City FC vs. Kaiser Chiefs TRANSPORT PLAN COMMUNICATION Cape Town Stadium: Soccer Cape Town City FC vs. Kaiser Chiefs Date: 2016-08-26 (Friday) Gates Open: 17:30 Supporting Act(s) / Game(s): none Main Act / Game: 19:30 End: 21:15

More information

Advantages and Disadvantages of One Way Streets October 30, 2007

Advantages and Disadvantages of One Way Streets October 30, 2007 Advantages and Disadvantages of One Way Streets October 30, 2007 0 P age Background As the revitalization of the Central Waterfront area moves forward, one issue that might need closer analysis is the

More information

TRAFFIC MANAGEMENT PLAN

TRAFFIC MANAGEMENT PLAN CLIENT: LONDON UNDERGROUND LIMITED CONTRACT REF: TLL 7917 NORTHERN LINE EXTENSION MAIN WORKS CONTRACT TRAFFIC MANAGEMENT PLAN Issue and Revision Control Distribution and revision control is managed through

More information

Overview... Bus Options... Carpooling, Biking or Walking to School... Driving to Campus: The Loop... The Queue: Managing Lincoln Ave Traffic...

Overview... Bus Options... Carpooling, Biking or Walking to School... Driving to Campus: The Loop... The Queue: Managing Lincoln Ave Traffic... Overview... Bus Options... Carpooling, Biking or Walking to School... Driving to Campus: The Loop... The Queue: Managing Lincoln Ave Traffic... 2 3 4 5 6 What is the Queue?... 7 How the Queue and Loop

More information

ROAD MANAGEMENT PLAN RN6452 - Main Road (Belair Blackwood) RN6467 - Shepherds Hill Road (Blackwood - Seymour St)

ROAD MANAGEMENT PLAN RN6452 - Main Road (Belair Blackwood) RN6467 - Shepherds Hill Road (Blackwood - Seymour St) ROAD MANAGEMENT PLAN RN6452 - Main Road (Belair Blackwood) RN6467 - Shepherds Hill Road (Blackwood - Seymour St) #424408-v4-RN_6452_Main_Road Belair-Blackwood_(RRD_0_-_RRD_2_98)_- _Road_Management_Plan.DOC

More information

THE UNIVERSITY OF EDINBURGH. ECA Evolution House.

THE UNIVERSITY OF EDINBURGH. ECA Evolution House. THE UNIVERSITY OF EDINBURGH. ECA Evolution House. A GUIDE TO ACCESS AND FACILITIES. Address: ECA Evolution House, 78 West Port, Edinburgh, E,H,1 2,L,E. Telephone number: 0131 651 5800. Campus map link:

More information

Principles of Traffic Management on sites / road network

Principles of Traffic Management on sites / road network IOSH Ireland, Construction Specialist Section Springfield Hotel, Leixlip, County Kildare. 25 March 2015 Principles of Traffic Management on sites / road network Padraig Watters, Chartered Engineer This

More information

Site Traffic Management Plan

Site Traffic Management Plan Masterton Primary School Aberdour Road Dunfermline Fife KY11 8HY Telephone: 01383 602455 Email: [email protected] Head Teacher: Mr Stephen Humphries Site Traffic Management Plan Date December

More information

Stop The stop sign, a red octagon with white lettering, means come to a full stop and be sure the way is clear before proceeding.

Stop The stop sign, a red octagon with white lettering, means come to a full stop and be sure the way is clear before proceeding. Tr a f f i c S i g n s 7 7. TRAFFIC SIGNS Many collisions and near crashes occur as a result of drivers who ignore or fail to respond appropriately to traffic signs. It is essential that the meaning of

More information

Demolition & Construction Management Plan

Demolition & Construction Management Plan Demolition & Construction Management Plan 72 76 Cadogan lane SW1 Demolition & Construction Management Plan Issue Date: March 2013 Contents: 1.0 Introduction 1.1 Objectives of the Plan 1.2 Project Overview

More information

GENERAL GUIDE FOR WORKPLACE TRAFFIC MANAGEMENT

GENERAL GUIDE FOR WORKPLACE TRAFFIC MANAGEMENT 1 This General Guide provides information on how to manage traffic risks at a workplace. It is supported by specific guidance material on traffic management for shopping centres, construction workplaces,

More information

INSTITUTIONAL MASTER PLAN NOTIFICATION FORM / PROJECT NOTIFICATION FORM BOSTON UNIVERSITY MEDICAL CENTER

INSTITUTIONAL MASTER PLAN NOTIFICATION FORM / PROJECT NOTIFICATION FORM BOSTON UNIVERSITY MEDICAL CENTER INSTITUTIONAL MASTER PLAN NOTIFICATION FORM / PROJECT NOTIFICATION FORM BOSTON UNIVERSITY MEDICAL CENTER JUNE 7, 2013 SUBMITTED TO: BOSTON REDEVELOPMENT AUTHORITY ONE CITY HALL SQUARE BOSTON, MA 02201

More information

Station planning standards and guidelines

Station planning standards and guidelines London Underground Station planning standards and guidelines 2012 edition MAYOR OF LONDON Transport for London 1 Foreword 1 Applications 2 1.1 Introduction 3 1.2 Scope and applicability 4 1.3 Philosophy

More information

STANDARD ELEMENTS OF A CONSTRUCTION MANAGEMENT PLAN

STANDARD ELEMENTS OF A CONSTRUCTION MANAGEMENT PLAN STANDARD ELEMENTS OF A CONSTRUCTION MANAGEMENT PLAN JULY 2015 Standard Elements of a Construction Management Plan (CMP) This guidance tool was developed through partnership between the Department of Planning

More information

Lincoln Downtown Master Plan Update

Lincoln Downtown Master Plan Update Lincoln Downtown Master Plan Update Table of Contents Executive Summary........................................... 1 Complete Streets Framework.................................... 3 Promenade Creating

More information

Granger Bay Boulevard and Green Point Roundabout

Granger Bay Boulevard and Green Point Roundabout Granger Bay Boulevard and Green Point Roundabout INTRODUCTION Aurecon was appointed for the design and construction supervision of the Granger Bay Boulevard and Green Point roundabout that provides access

More information