INVESTMENT GRADE AUDIT. City of Marathon. Final Report. Presented on: January 6, Submitted By:

Size: px
Start display at page:

Download "INVESTMENT GRADE AUDIT. City of Marathon. Final Report. Presented on: January 6, 2012. Submitted By:"

Transcription

1 INVESTMENT GRADE AUDIT at City of Marathon Final Report Presented on: January 6, 2012 For Submitted By: US Hwy. 19 North; Suite 210 Clearwater, Florida (727)

2 TABLE OF CONTENTS 1. EXECUTIVE SUMMARY ENERGY CONSULTANT INFORMATION BRIEF DESCRIPTION OF FACILITIES BASELINE MEASURES SUMMARY OF SAVINGS EXISTING FACILITY OPERATIONS CITY HALL BUILDING DESCRIPTION OPERATING & OCCUPANCY SCHEDULES HEATING VENTILATION AIR-CONDITIONING SYSTEM OVERVIEW DOMESTIC HOT WATER LOADS MISCELLANEOUS LOADS LIGHTING SYSTEMS WATER SYSTEMS FIRE STATION #14: GENERAL INFORMATION BUILDING DESCRIPTION OPERATING & OCCUPANCY SCHEDULE HEATING VENTILATION AIR-CONDITIONING SYSTEM OVERVIEW DOMESTIC HOT WATER LOADS MISCELLANEOUS LOADS LIGHTING SYSTEMS WATER SYSTEMS CITY MARINA BUILDINGS GENERAL INFORMATION BUILDING DESCRIPTION OPERATING & OCCUPANCY SCHEDULE HEATING VENTILATION AIR-CONDITIONING SYSTEM OVERVIEW DOMESTIC HOT WATER LOADS MISCELLANEOUS LOADS LIGHTING SYSTEMS WATER SYSTEMS COMMUNITY PARK GENERAL INFORMATION BUILDING DESCRIPTION EXTERIOR DECORATIVE LIGHTING DESCRIPTION OPERATING & OCCUPANCY SCHEDULE HEATING VENTILATION AIR-CONDITIONING SYSTEM OVERVIEW DOMESTIC HOT WATER LOADS MISCELLANEOUS LOADS LIGHTING SYSTEMS WATER SYSTEMS... 26

3 2.5 TEEN CENTER GENERAL INFORMATION BUILDING DESCRIPTION OPERATING & OCCUPANCY SCHEDULE HEATING VENTILATION AIR-CONDITIONING SYSTEM OVERVIEW DOMESTIC HOT WATER LOADS MISCELLANEOUS LOADS LIGHTING SYSTEMS WATER SYSTEMS JESSE HOBBS PARK GENERAL INFORMATION PARK AND LIGHTING DESCRIPTION OPERATING & OCCUPANCY SCHEDULE SOMBRERO BEACH PAVILIONS AND SOMBRERO BEACH BIKE PATH LIGHTING GENERAL INFORMATION PAVILIONS SOMBRERO BEACH ROAD BIKE PATH LIGHTING DESCRIPTION TURTLE LIGHTING SYSTEM ENERGY RATES ENERGY CONSUMPTION CITY HALL FIRE STATION CITY MARINA BUILDING COMMUNITY PARK TEEN CENTER JESSE HOBBS PARK SOMBRERO BEACH ROAD LIGHTING BASELINE MEASURES ANALYSIS METHODOLOGY DESCRIPTION OF METHODS ENERGY CONSERVATION MEASURE DESCRIPTION RECOMMENDED ENERGY CONSERVATION MEASURES APPENDICES... 76

4 8.1 CITY HALL LIGHTING INVENTORY CITY MARINA BATH HOUSE LIGHTING INVENTORY CITY MARINA LIGHTING INVENTORY COMMUNITY PARK PHASE 1 AND 2 LIGHTING INVENTORY FIRE STATION 14 LIGHTING INVENTORY JESSE HOBBS LIGHTING INVENTORY SOMBRERO BEACH AND TURTLE LIGHTING INVENTORY TEEN RECREATION CENTER... 76

5 1. EXECUTIVE SUMMARY 1.1 ENERGY CONSULTANT INFORMATION Energy Systems Group is pleased to provide this Performance Based Retrofit Analysis Service to City of Marathon. The purpose of this analysis and report is to identify Performance Based retrofit opportunities using the following determining factors; location, maintainability and flexibility of new equipment, indoor air quality, energy efficiency, cost effectiveness, constructability, and any proposed future modifications. This objective is met by analyzing the facility in three phases described below: 1. Existing: Describe the existing facility energy usage profile and identify the major energy using systems in the facility. 2. Baseline Measures: Incorporate operational changes that represent compliance with prevailing codes and engineering standards (i.e. American Society of Heating Refrigeration & Airconditioning Engineering ) or simulate upcoming changes in the facility which affect energy consumption. The resulting Baseline is used as the basis for all of the energy conservation measures calculations. 3. Energy Conservation Measures: Identify energy retrofit improvement projects that would result in a significant energy usage reduction and/or identify energy related capital improvement projects that would result in an improvement in the facility s condition, operation, environment, etc. while reducing energy consumption. 1.2 BRIEF DESCRIPTION OF FACILITIES The following City of Marathon facilities were included in this study: City Hall City Hall 9805 Overseas Highway Marathon, FL City Hall is a combination of two (2) manufactured buildings that were assembled in 2006 and Each building has its own electric meter. The Energy Utilization Index (EUI) is 52.4 and the Energy Cost Index (ECI) is $1.80 at City Hall 4. At City Hall 6 the (EUI) is and the (ECI) is $2.27. Fire Station 14: Fire Station Overseas Highway Marathon, FL Fire Station 14 is a 16,782 square foot two story facility constructed in The building has one electric meter. The (EUI) is 59.4 and the (ECI) is $1.90. City of Marathon 1 January 6, 2012

6 City Marina Building: City Marina Building th Street, Ocean Marathon, FL City Marina has two (2) one-story buildings consisting of approximately 12,576 square feet in total. The original structure was constructed in 1963 and the newer bathhouse was constructed in There are two (2) electric meters serving these buildings, a third meter provides power to the Marina Docks and a fourth meter provides power to the lift station adjacent to the bathhouse. The original structure has an (EUI) of 29.7 and an (ECI) of $0.96. The bathhouse has an (EUI) of and an (ECI) of $3.99. Community Park: Community Park th Street Marathon, FL Community Park Phase 1 and 2 has multiple small buildings and recreational fields. The buildings combined are approximately 1,900 square feet. There are three (3) electric meters serving the Park. Teen Center: Teen Center rd Street Marathon, FL Teen Center. is a building leased out by the City. The single story structure is approximately 2,077 square feet and was originally constructed in There is one electric meter serving the building. The (EUI) is 33.6 and the (ECI) is $1.15 Jesse Hobbs Park: Jesse Hobbs Park 41 st Street Marathon, FL Jesse Hobbs Park consists of a lighted basketball court and sandy playground. There is one electric meter serving this park. Sombrero Beach Park: Sombrero Beach Park 2130 Sombrero Beach Road Marathon, FL Sombrero Beach Park is a park and beach. There are nine (9) low pressure sodium turtle lights adjacent to the beach parking area. These lights are maintained by the local utility company. Sombrero Beach Bike Path: Sombrero Beach Bike Lane Lighting Marathon, FL City of Marathon 2 January 6, 2012

7 Sombrero Beach Bike Path The lighting along Sombrero Beach Road illuminates the bike path. The existing decorative pedestrian lighting was installed in 2009 through a project funded by the FDOT and transitioned to the City. Utility Summary The table below summarizes the utility consumption over a twelve month period from October 2010 to September Bldg. Name Electric Water kwh/yr kw/yr $/Yr. kgal/yr $/Yr City Hall 4 Trailer 61, , Flat Rate 1, City Hall 6 Trailer 84, , , Fire Station , , , City Marina Building 87, ,610 2,160.2* 20,846.32* City Marina See 94,415-10,266 Bathhouse above See above Community Park Phase 1 97, , , Community Park Phase 2 86, , , , Teen Center 20,455-2, , Jesse Hobbs Park 3, Sombrero Beach Road Lighting 66,356-7, TOTAL 894,087 3, ,592 4,861 47,121 * Combined water consumption for all Marina facilities. 1.3 BASELINE MEASURES Currently no Baseline adjustments are factored into this report. City of Marathon 3 January 6, 2012

8 1.4 SUMMARY OF SAVINGS The Energy Conservation Measures investigated in this technical analysis are presented below. An Energy Conservation Measure summary table is presented later in this section. Detailed analyses and economics associated with the Energy Conservation Measures are provided in later sections of this report. RECOMMENDED ENERGY CONSERVATION MEASURES (ECMs) City Hall ECM 1 Replace Existing Manual Thermostats w/ Programmable The project scope of work is to replace the existing thermostats with new programmable units. Fire Station 14 ECM 1 Install Comprehensive Lighting System and Lighting Controls Conversion The scope of this work includes the retrofit/replacement of the existing lighting system at the Fire Station Building. Interior lighting controlled by manual switches will be updated to automated occupancy sensor controls in select areas. City Marina Building ECM 1 Comprehensive Lighting System Conversion: The scope of this work includes the retrofit/replacement of the existing lighting system in the City Marina Building. ECM 2 Provide a New Programmable Thermostat The project scope of work is to install a new programmable thermostat in the City Marina Building. City Marina Bathhouse ECM 1 Comprehensive Lighting System and Lighting Controls Conversion The scope of this work includes the retrofit of the existing interior lighting system in the Marina Bathhouse. Interior lighting controlled by manual switches will be updated to automated occupancy sensor controls in select areas. ECM 2 Comprehensive Water Conversion The scope of this work includes the replacement of less efficient water closets, flush valves, shower heads and sink aerators with new efficient types. City of Marathon 4 January 6, 2012

9 Community Park ECM 1 Comprehensive Lighting System and Lighting Controls Conversion: The scope of this work includes the retrofit of the existing exterior HID decorative acorn lighting and the retrofit of the existing interior lighting systems in the Community Park administrative building, concession stand building, and Amphitheater storage rooms. Interior lighting controlled by manual switches will be updated to automated occupancy sensor control in select areas. ECM 2 Provide New Programmable Thermostats The project scope of work is to install new programmable thermostats. Teen Center ECM 1 Lighting System Conversion The scope of this work includes the replacement and retrofit of the existing interior and exterior lighting systems in the Teen Center. Interior lighting controlled by manual switches will be updated to automated occupancy sensor control in select areas. ECM 2 Comprehensive Water Conversion The scope of this work includes the replacement of older water closets, flush valves, and sink aerators with new efficient types. Jesse Hobbs Park ECM 1 Comprehensive Lighting System Conversion The scope of this work includes the replacement/ retrofit of the existing exterior lighting at the Jesse Hobbs Park Community Center. Sombrero Beach Road and Turtle Lighting ECM 1 Retrofit Existing HID lighting with new LED lighting The scope of this work includes the retrofit of the existing 133 HID decorative lights and 9 HID turtle lights with new energy efficient LED lighting. City of Marathon 5 January 6, 2012

10 ADDITIONAL RECOMMENDATIONS FOR IMPLEMENTATION In addition to the recommended ECM s listed above there are several other recommendations that should be implemented throughout the City due to equipment failure or ease of maintenance which do not necessarily have substantial energy savings or a favorable return on investment. They are as follows: Sombrero Beach Road Lighting: Relocate the existing lighting fuses and surge protection from the in ground hand hole to inside the light pole base. Many of the 133 hand holes are exposed to standing water for long periods of time. The fuses are not meant to be submerged indefinitely and many of them have failed. This has become a huge maintenance problem for the City and should be addressed. Sombrero Pavilions: Provide new exhaust fan to replace existing non-operable fans in both pavilion restrooms. In addition, the existing wall mounted occupancy sensors controlling the lights in each of the pavilion restrooms are broken. It is recommended that these be replaced with maximum 30 minute timer switches that are more durable than the occupancy sensors. Community Park: Install new disconnect switch adjacent to vendor service located beside the Amphitheater. The service is rarely utilized by anyone. This service has a 150kVA step down transformer that is constantly energized and non-loaded. The estimated savings is approximately $60 per month if the transformer is continuously shut off. City of Marathon 6 January 6, 2012

11 NON-RECOMMENDED ENERGY CONSERVATION MEASURES Other energy conservation measures were evaluated for implementation at these sites but are not recommended. The following presents a brief listing of potential energy conservation measures that were considered for implementation. City Hall ECM Install Comprehensive Lighting System Conversion The scope of this work includes the retrofit/replacement of the existing lighting system in the City Hall buildings. However, due to the low hours of operation and high first cost this measure does not generate an acceptable return on investment. ECM Replace Existing HVAC Units w/ New High Efficiency Units The scope of this work includes the replacement of all the wall mounted Bard units with new high efficiency units. This measure was not recommended because these trailers are not scheduled to be in service after the new City Hall is constructed in a few years and the payback for the new units would greatly exceed this time frame. ECM Install Roof Insulation The scope of work for this measure is to double the thickness of the existing roof insulation, which greatly increases the overall R-value of the facility. However, the capital cost of this measure does not generate sufficient savings to have a favorable return on investment. ECM Comprehensive Water Conversion The scope of work for this measure includes the replacement of less efficient water closets, flush valves, and sink aerators with new efficient types. However, the capitol cost of this measure compared to the savings and payback does not yield a favorable return on investment. Fire Station 14 ECM Replace Existing HVAC Units w/ New High Efficiency Units The project scope of work is to replace the two air-cooled condensing units with new high efficiency units. Due to the relatively young age of the equipment, this measure would not yield an acceptable return on investment. ECM Comprehensive Water Conversion The scope of work for this measure includes the replacement of less efficient water closets, flush valves, and sink aerators with new efficient types. However, the capitol cost of this measure compared to the savings and payback does not yield a favorable return on investment. ECM Replace Existing Hot Water Heater with Electric Heat Pump The scope of this measure is to install an electric heat pump hot water heating system in the fire station facility. The return on investment of this measure does not meet acceptable levels due to the low usage profile and increased maintenance required. City of Marathon 7 January 6, 2012

12 ECM Provide VFD s on Existing Air Handler Units The scope of this measure would be to install Variable Frequency Drives (VFDs) and associated control points on the existing variable volume air-handling units. The capital required to complete this project relative to the savings that would be generated yields an unacceptable return on investment. Community Park ECM Replace Existing HVAC units with High Efficiency Window Units The scope of this work includes the replacement of all the window mounted units at the park with new high efficiency units. This measure was not recommended due to the relatively high first cost compared to the savings. ECM Comprehensive Water Conversion The scope of work for this measure includes the replacement of less efficient water closets, flush valves, and sink aerators with new efficient types. However, the capitol cost of this measure compared to the savings and payback does not yield a favorable return on investment. City Marina Bathhouse ECM Replace Existing Hot Water Heater with Electric Heat Pump The scope of this measure is to install an electric heat pump hot water heating system in the marina facilities. The return on investment of this measure does not meet acceptable levels due to the low usage profile and increased maintenance required. Teen Center ECM Replace Existing HVAC Units with New High Efficiency Unit The scope of work includes the replacement of the oldest air-conditioning unit with new high efficiency unit. The unit would be provided with a new programmable thermostat. This measure was not recommended due to the relatively high first cost compared to the savings. Jesse Hobbs Park No Measures City of Marathon 8 January 6, 2012

13 Sombrero Beach Road Lighting and Pavilions ECM Install Solar Powered Lighting System The scope of this work includes replacing the existing 133 HID lights with a solar powered lighting system. Due to the physical constraints for photovoltaic panels and battery cabinets and a high cost of materials, this project does not generate an acceptable payback for the City. ECM Comprehensive Water Conversion The scope of work for this measure includes the replacement of less efficient water closets, flush valves, and sink aerators with the most efficient types. However, the capitol cost of this measure compared to the savings and payback does not yield a favorable return on investment. 33 rd Street Boat Ramp Restrooms ECM Comprehensive Water Conversion The scope of work for this measure includes the replacement of less efficient water closets, flush valves, and sink aerators with new efficient types. However, the capitol cost of this measure does not yield a favorable return on investment. City of Marathon 9 January 6, 2012

14 ECM Savings and Cost Summary Table UTILTIY SAVINGS MAINT. SAVING Captial SPB Building ECM # ECM Description KWH/Yr KW/Yr Therms/Yr Kgal/Yr $/Yr Material Labor Cost Yr. City Hall 1 Replace Existing Manual Tstat with Programmable Tstat 6, $688 $0 $0 $3, Fire Station 14 1 Install Lighting System Conversion 13, $1,656 $3,353 $0 $35, City Marina 1 Install Lighting System Conversion 5, $584 $1,211 $0 $25, City Marina 2 Install Programmable Tstat $46 $0 $0 $ City Marina Bathhouse City Marina Bathhouse 1 Install Lighting System Conversion 1, $166 $17 $0 $2, Install Water Conversion 8, $4,097 $49 $0 $20, Community Park 1 Install Lighting System Conversion 44, $5,298 $10,482 $0 $56, Community Park 2 Install Programmable Tstat 1, $138 $0 $0 $ Teen Center 1 Install Lighting System Conversion 3, $329 $485 $0 $11, Teen Center 2 Install Water Conversion $361 $4 $0 $1, Jesse Hobbs Park 1 Install Lighting System Conversion $25 $1,132 $0 $6, Sombrero Beach Road 1 Install LED Retrofit Lighting 44, $4,815 $20,086 $0 $148, TOTAL 128, $17,902 $35,544 $0 $320, City of Marathon 10 January 6, 2012

15 2. EXISTING FACILITY OPERATIONS 2.1 CITY HALL GENERAL INFORMATION City Hall is a combination of two (2) manufactured buildings that resembles two (2) single story office buildings with ramps leading up to the raised entryways. The administrative building consists of four (4) manufactured buildings connected together. The planning and building department facility consists of six (6) manufactured buildings connected together. The buildings are comprised of offices, conference room, break room, and restrooms. The two (2) buildings combined are approximately 8,352 square feet. The two buildings were assembled in 2006 and 2008 respectively. Each trailer is served by a separate electric meter BUILDING DESCRIPTION City Hall is constructed of two (2) manufactured buildings with a polyvinyl exterior. The flat roofs are coated with tar OPERATING & OCCUPANCY SCHEDULES The building is typically occupied Monday through Friday from 07:30AM to 5:30PM. Operating & Occupancy Summary Table Building Weekday Hours Weekend Hours Typical Occupancy City Hall 7:30AM 5:30PM N/A HEATING VENTILATION AIR-CONDITIONING SYSTEM OVERVIEW The buildings are conditioned using packaged BARD units HEATING SYSTEMS The heating system in use at this building is from auxiliary electric strip heaters mounted in the BARD units. City of Marathon 11 January 6, 2012

16 COOLING SYSTEMS City Hall is cooled by a total of ten (10) 3-ton exterior wall mounted BARD units. The BARD units are ducted above the ceiling tiles into the various spaces. The equipment is in good condition. There is a dedicated window unit that supplements the cooling in the server room. System ID Manufacturer/ Model # Capacity (Tons) Est. Eff. (EER) B-1 thru B-10 BARD/WA372A Area Served Each Bard unit serves an individual trailer Notes (10) Nonprogrammable T-stats Window Unit LG Server Room City of Marathon 12 January 6, 2012

17 CONTROLS SYSTEMS The control system for this facility is stand-alone non-programmable thermostats. The majority of the thermostats are digital with a couple manual DOMESTIC HOT WATER LOADS There is one electric hot water heater that serves the Building and Planning trailers. This unit was not accessible. The Administrative trailers have a small 1 kw water heater in the break room under the sink and (2) 4.8 kw insta-hots below the sinks located in the handicap stalls. When these sinks were turned on no hot water flowed MISCELLANEOUS LOADS Miscellaneous loads account for a portion of the overall energy usage. Miscellaneous loads can be categorized as, general office equipment, supplemental cooling equipment and kitchen equipment (refrigerator, microwave, coffee maker, vending machine, etc.) City of Marathon 13 January 6, 2012

18 2.1.6 LIGHTING SYSTEMS The current lighting systems in use at this facility are comprised mostly of fluorescent fixtures. The linear fluorescent fixtures are currently equipped with dated T8 lighting components. The parking lot is equipped with HID flood lighting WATER SYSTEMS The existing bath room fixtures are the efficient 1.6gal/flush tank type and standard aerators. City of Marathon 14 January 6, 2012

19 2.2 FIRE STATION #14: GENERAL INFORMATION Fire Station #14 is located directly on US-1 adjacent to Marathon Airport in Marathon Key. The facility includes an Emergency Operations Center, three vehicle bays, private sleeping quarters, exercise room and a hazmat decontamination chamber BUILDING DESCRIPTION The building is approximately 16,782 square feet of concrete masonry with a stucco exterior and flat roof. The structure is designed to withstand 200 mile per hour hurricane winds and was constructed in OPERATING & OCCUPANCY SCHEDULE The building is typically occupied 24 hours a day 7 days a week. Operating & Occupancy Summary Table Building Weekday Hours Weekend Hours Typical Occupancy Fire Station #14 24/7/365 24/7/ HEATING VENTILATION AIR-CONDITIONING SYSTEM OVERVIEW The building is air conditioned by two split system air conditioners HEATING SYSTEMS The heating system in use at this facility is from an electric heater located in approximately half of the variable air volume boxes. City of Marathon 15 January 6, 2012

20 COOLING SYSTEMS The facility is served from two direct expansion air handler units. The air handler units are located in the 1 st and 2 nd floor mechanical closets. The condensers are located outside on the west side of the building. The systems are in good condition. System ID Manufacturer/ Model # Capacity (Tons) Est. Eff. (EER) Area Served AH-1 TRANE TWG025A14 1 ST Floor CU-1 TRANE TTP024C100A3 20 TRANE AH-2 2 nd Floor TWG025A140B0 Notes CU-2 TRANE TZAA324-2A 20 City of Marathon 16 January 6, 2012

21 CONTROL SYSTEMS The control system for this facility is a TRANE energy management system with remote temperature sensors DOMESTIC HOT WATER LOADS There are two Lochinar electric hot water heaters serving this facility. The 80 gallon hot water heater is located in the Laundry room and serves the two (2) commercial washers and the women s locker room. The 30 gallon hot water heater is located in the Custodial room on the 2nd floor and serves the men s locker room. City of Marathon 17 January 6, 2012

22 2.2.6 MISCELLANEOUS LOADS Miscellaneous loads account for a portion of the overall energy usage. Miscellaneous loads can be categorized as general office equipment, exhaust fans, laundry room equipment (washers and dryers), and kitchen equipment (refrigerators, microwave, coffee maker, vending machine, ice machine etc.) LIGHTING SYSTEMS The existing lighting system in use at this building is comprised mainly of dated T8 linear fluorescent compact fluorescent and HID lighting systems. The interior lighting controls consist of standard wall switches, occupancy sensor switches and wall mounted timer switches. The existing high bay lighting in the truck bay is not used and is shut off at the breaker.. City of Marathon 18 January 6, 2012

23 2.2.8 WATER SYSTEMS The existing restroom fixtures are newer 1.6gal/flush tankless types. City of Marathon 19 January 6, 2012

24 2.3 CITY MARINA BUILDINGS GENERAL INFORMATION City Marina in Marathon administers a 226-ball mooring field that occupies most of Boot Key Harbor, in addition to a large anchorage area south of the main Harbor channel, between Sister Creek and the Boot Key Bridge. The Marina facility has two (2) one-story buildings consisting of approximately 12,576 square feet. The original building is used as an entertainment area with offices and work rooms. The new facility is used as a Bath House. The original structure was built in 1963 and the Bath House was added in There are two (2) electric meters serving these buildings, a third meter provides electricity to the Marina dock service and the fourth meter to a lift station BUILDING DESCRIPTION The original Marina building consists of mostly open bays with storage closets and a large area for lounging. The Bath House offers marina customers laundry facilities, as well as, private restroom and shower facilities. The original building is constructed of concrete masonry with a concrete deck. The Bath House is constructed of concrete masonry with a stucco finish and has a reflective metal roof OPERATING & OCCUPANCY SCHEDULE Normal business hours are 8:00am - 5:45pm, 7 days a week. Access to the shower and laundry facilities at the bath house is available 24 hours a day, 7 days a week. Operating & Occupancy Summary Table Building Weekday Hours Weekend Hours Typical Occupancy Marina Building 8:00 AM to 5:45 PM 8:00 AM to 5:45 PM 15 Bath House 24/7/365 24/7/ live a boards with approximately 97 persons total City of Marathon 20 January 6, 2012

25 2.3.4 HEATING VENTILATION AIR-CONDITIONING SYSTEM OVERVIEW The offices at the Marina are air conditioned with a mini-split system HEATING SYSTEMS There is no heating system at this facility COOLING SYSTEMS The office area at the original Marina building is served by a mini-split system. There are no other cooling systems on site. The AC unit is in good condition. System ID Manufacturer/ Model # Capacity (Tons) Est. Eff. (EER) Area Served Notes Mini Split Mitsubishi MSY-GA24NA 2 Front Office Area CONTROL SYSTEMS No thermostat DOMESTIC HOT WATER LOADS An electric hot water heater with a 120 gallon capacity serves the domestic hot water loads for the Bath House and is located in the Janitorial closet. City of Marathon 21 January 6, 2012

26 2.3.6 MISCELLANEOUS LOADS Miscellaneous loads account for a portion of the overall energy usage. Miscellaneous loads can be categorized as laundry facility equipment, general office equipment, exhaust fans and light kitchen equipment (microwave, coffee maker, vending machine, ice machines, etc.) LIGHTING SYSTEMS The existing lighting system in use at the original Marina building is comprised mainly of dated T12 linear fluorescents, incandescent and some HID lighting systems on the exterior. The interior lighting controls currently consist of standard wall mount switches. The lighting at the Bath House is comprised of T8 linear fluorescents and the exterior lighting is compact fluorescent. The lighting controls at the Bath House consist of standard wall switches and occupancy sensor switches in the private restrooms. City of Marathon 22 January 6, 2012

27 2.3.8 WATER SYSTEMS The existing restroom fixtures at the original Marina building are older tank top water closets, flush valves and standard aerators. These facilities are not open to the public and are used only by Marina staff. The plumbing fixtures at the Bath House are the 1.6gal/flush tank type. There are six (6) washing machines that are card activated and are top loaders. City of Marathon 23 January 6, 2012

28 2.4 COMMUNITY PARK GENERAL INFORMATION Community Park in Marathon is located directly on U.S.-1 at th Street, Ocean (MM 49). There are four lighted tennis courts, combination hockey/basketball court (3 courts), two little league fields, and two soccer fields. There is also a skating park, two shuffleboard courts, two bocce ball courts, a batting cage, concession stand, amphitheater, picnic areas, and restrooms BUILDING DESCRIPTION There are several smaller buildings located throughout Community Park. The original Phase 1 construction consists of an administrative office building, restroom building and open pavilion. Phase 2 consists of a concession building, restroom building and amphitheater. Most of the buildings are wood frame construction with metal roofs with the exception of the amphitheater which is concrete with a stucco finish and flat roof EXTERIOR DECORATIVE LIGHTING DESCRIPTION The existing decorative exterior post top mounted light fixtures are the acorn type. The existing lamp source is 175 watt metal halide and they are approximately 13 tall. The lighting is fed from two different sources and voltages due to the construction phasing of the project. The lighting is controlled by time clocks and photocell.. City of Marathon 24 January 6, 2012

29 2.4.4 OPERATING & OCCUPANCY SCHEDULE The Community Park is open every day from 7:00am to 10:00pm. The concession building and amphitheater operating schedules vary with the events schedule. Operating & Occupancy Summary Table Building Weekday Hours Weekend Hours Typical Occupancy Community Park 7:00AM to 10:00 PM 7:00AM to 10:00PM Varies HEATING VENTILATION AIR-CONDITIONING SYSTEM OVERVIEW Window units provide cooling to the Administrative office and the Amphitheater electrical and storage rooms HEATING SYSTEMS The park buildings do not have heating systems COOLING SYSTEMS The park buildings that are conditioned include the administration office, and the amphitheater electrical and storage rooms. Each room is cooled from window units that are in good to fair condition. System ID Manufacturer/ Model # Capacity (Tons) Est. Eff. (EER) Area Served Notes Window Unit LG Administrative Office Energy Star Rated Window Unit Friedrich Amphitheater Energy Star Rated Window Unit Friedrich Amphitheater Energy Star Rated City of Marathon 25 January 6, 2012

30 CONTROL SYSTEMS The controls for the window units are built into the unit. There is no separate control DOMESTIC HOT WATER LOADS An electric water heater with a 30 gallon capacity serves the Phase 2 concession building. The water heater is located in the storage room on an elevated platform MISCELLANEOUS LOADS Miscellaneous loads account for a portion of the overall energy usage. Miscellaneous loads can be categorized as general office equipment, exhaust fans and light kitchen equipment (microwave, coffee maker, vending machine, etc.) LIGHTING SYSTEMS The existing lighting system in the Community Park buildings is comprised mainly of dated T8 linear fluorescent and compact fluorescent lighting systems. The interior lighting controls currently consist mainly of standard wall mount switches and a few occupancy sensors in the restrooms WATER SYSTEMS The existing restroom fixtures are 1.6gal/flush with flush valves and the faucets have standard aerators. City of Marathon 26 January 6, 2012

31 2.5 TEEN CENTER GENERAL INFORMATION Teen Center in Marathon is a single story building with multipurpose rooms, locker rooms, classrooms, and an office. The center is in good condition. The facility is approximately 2,077 square feet and was constructed in There is one electric meter serving this facility BUILDING DESCRIPTION The building is constructed of concrete masonry with a stucco exterior and concrete deck. The windows are the jalousie type and there are glass sliders. The sliders are covered with aluminum hurricane sheaths OPERATING & OCCUPANCY SCHEDULE The building is typically occupied Monday through Friday from 3:00pm to 6:30pm during the school year. The summertime hours are 8:00 AM to 5:00 PM. The facility is closed on Saturday and Sunday. Operating & Occupancy Summary Table Building Summertime Weekday Schooltime Weekday Typical Occupancy Hours Hours Teen Center 8:00AM to 5:00 PM 3:00PM to 6:30PM HEATING VENTILATION AIR-CONDITIONING SYSTEM OVERVIEW The Teen Center is conditioned by a split system air conditioning unit with two condensers HEATING SYSTEMS The heating system in use at this building is an auxiliary strip heater in the AHU. City of Marathon 27 January 6, 2012

32 COOLING SYSTEMS The Marathon Teen Center is served from one AHU located in the hallway/storage area. The AHU is a plenum return unit. There are two condensing units located on the exterior of the building. The AHU is in poor condition and the two condensing units have recently been replaced. System ID AHU Manufacturer/ Model # BDP Company/517A 090 Capacity (Tons) Est. Eff. (EER) Area Served ALL Notes The AHU looks to be the original unit. CU-1 Goodman ALL The unit has been recently replaced. CU-2 Rheem 13A3AA2A01 ALL The unit has been recently replaced CONTROL SYSTEMS The control system for this facility is a non-programmable thermostat. City of Marathon 28 January 6, 2012

33 2.5.5 DOMESTIC HOT WATER LOADS There is no domestic hot water heater at this facility MISCELLANEOUS LOADS Miscellaneous loads account for a portion of the overall energy usage. Miscellaneous loads can be categorized as general office equipment, exhaust fans and light kitchen equipment (microwave, coffee maker, vending machine, etc.) LIGHTING SYSTEMS The existing lighting system in use at this building is comprised mainly of dated T12 and fluorescent and some incandescent and HID lighting systems. The interior lighting controls are standard wall mounted switches WATER SYSTEMS The existing restroom fixtures are older 3.5gal/flush tank type and standard aerators on the faucets. City of Marathon 29 January 6, 2012

34 2.6 JESSE HOBBS PARK GENERAL INFORMATION Jesse Hobbs Park in Marathon is a small community park located at the corner of U.S.-1 and 41st Street, Gulf. There is a sandy playground and lighted basketball court PARK AND LIGHTING DESCRIPTION The basketball court is lighted by HID lamps and is controlled by a local switch. The playground is lit up by halogen lighting on timeclock controls OPERATING & OCCUPANCY SCHEDULE The park is open year round. Operating & Occupancy Summary Table Building Weekday Hours Weekend Hours Typical Occupancy Jesse Hobbs Park 07:30AM to 10:00 PM 07:30AM to 10:00 PM N/A City of Marathon 30 January 6, 2012

35 2.7 SOMBRERO BEACH PAVILIONS AND SOMBRERO BEACH BIKE PATH LIGHTING GENERAL INFORMATION Sombrero Beach is located about two miles down Sombrero Beach Road leading to the Atlantic Ocean side of Marathon, away from the main highway. Facilities at Sombrero Beach and Sombrero Beach Road include picnic pavilions volleyball courts, barbecue pits, showers, restrooms, and a lighted bike path. From April through October, Sombrero Beach is a designated Loggerhead turtle nesting beach PAVILIONS There are two restroom pavilions at the Park. The pavilions are constructed of concrete masonry. Each pavilion has a men s and women s restroom OPERATING & OCCUPANCY SCHEDULE There is no fee to use the park or beach, and hours of operation are 7:30 a.m. to sunset LIGHTING SYSTEM The existing lighting in the Pavilion restrooms is fluorescent wall packs. The controls are wall mounted occupancy sensor. Most of these sensors no longer function properly WATER SYSTEMS The existing restroom fixtures are 1.6gal/flush and the faucets have standard aerators. City of Marathon 31 January 6, 2012

36 MISCELLANEOUS LOADS Miscellaneous loads account for a portion of the overall energy usage. Miscellaneous loads can be categorized as general purpose receptacles as indicated in the picture below SOMBRERO BEACH ROAD BIKE PATH LIGHTING DESCRIPTION The existing light fixtures along Sombrero Beach Road bike path are decorative bell shaped 100 watt HID light fixtures. The current lamp source is high pressure sodium. The lighting along Sombrero Beach Road operates from dusk to dawn via photocell controlled circuits TURTLE LIGHTING SYSTEM There are nine (9) low pressure sodium lights designed to illuminate the designated parking along the beach and prohibit the loggerhead turtles from traveling to the light. These lights are maintained by the local utility company. City of Marathon 32 January 6, 2012

37 3. ENERGY RATES Florida Keys Electric Cooperative, Inc. provides electricity to the various Municipal buildings, and the Parks and Recreation Buildings. The Florida Keys Aqueduct Authority provides the buildings with water, sewer and solid waste services. The following lists the services used and their corresponding rate structures. Utility Rate: Not including customer monthly charges. The following lists the services used and their corresponding rate structures. (Electric) Florida Keys Electric Cooperative, Inc. Schedule: General Service (GENSV) RATE: Charge Charge per kwh $ Power Cost Factor per kwh $ Additional Charges: Taxes/Fees 11.06% Total Energy Charge per kwh $ Schedule: General Service Demand (GSDV) RATE: Charge Charge per kwh $ Power Cost Factor per kwh $ Demand Charge per kw $5.65 Additional Charges: Taxes/Fees 11.06% Total Energy Charge per kwh $ Total Demand Charges per kw $ (Water) Florida Keys Aqueduct Authority/City of Marathon RATE: Water Charge per 1,000gal Sewer Charge per 1,000gal 0-6,000 gallons $5.47 $8.04 6,001-12,000 gallons $8.00 $ ,001-30,000 gallons $8.96 $ ,001-50,000 gallons $9.99 $8.04 Over 50,000 gallons $10.97 $8.04 City of Marathon 33 January 6, 2012

38 4. ENERGY CONSUMPTION 4.1 CITY HALL. City Hall has two electric meters serving the facility. The first table below represents the energy consumption at City Hall 4 and the second table is for City Hall 6. The rate structure is GSDV. Read Date On-Peak (KWH) Facility Utility History - Project Buildings City Hall Overseas Highway Electric Meter # FKEC FKAA Account # Account # Off-Peak (KWH) Total kw Total Cost ($) (AVG. $/kwh) (Gallons) Total Cost ($) (AVG. $/Gal) Oct-09 6, $ $0.120 Nov-09 6, $ $0.119 Dec-09 6, $ $0.133 Jan-10 6, $ $0.113 Feb-10 4, $ $0.118 Mar-10 4, $ $0.124 Apr-10 4, $ $0.122 May-10 5, $ $0.116 Jun-10 6, $ $0.113 Jul-10 7, $ $0.123 Aug-10 6, $ $0.121 Sep-10 6, $ $0.127 $ Oct-10 5, $ $0.121 $ Nov-10 4, $ $0.116 $ Dec-10 4, $ $0.115 $ Jan-11 4, $ $0.114 $ Feb-11 3, $ $0.126 $ Mar-11 3, $ $0.120 $ Apr-11 5, $ $0.114 $ May-11 5, $ $0.113 $ Jun-11 5, $ $0.117 $ Jul-11 6, $ $0.120 $ Aug-11 6, $ $0.119 $ Sep-11 6, $ $0.117 $ Total 133, $15, N/A 0 $1, N/A Avg. 5, $ $ $ City of Marathon 34 January 6, 2012

39 Read Date On-Peak (KWH) Facility Utility History - Project Buildings City Hall 6 - Events Field Overseas Highway Electric Meter # FKEC FKAA Account # Account # Off-Peak (KWH) Total kw Total Cost ($) (AVG. $/kwh) (Gallons) Total Cost ($) (AVG. $/Gal) Oct-09 7, $ $0.119 Nov-09 6, $ $0.119 Dec-09 5, $ $0.133 Jan-10 4, $ $0.116 Feb-10 17, $1, $0.108 Mar-10 4, $ $0.123 Apr-10 4, $ $0.121 May-10 5, $ $0.116 Jun-10 7, $ $0.113 Jul-10 9, $1, $0.122 Aug-10 8, $1, $0.120 Sep-10 8, $1, $ ,200 $ $0.021 Oct-10 6, $ $ ,700 $ $0.022 Nov-10 5, $ $ ,200 $ $0.023 Dec-10 5, $ $ ,200 $ $0.019 Jan-11 3, $ $ ,500 $ $0.022 Feb-11 17, $1, $ ,500 $ $0.021 Mar-11 4, $ $ ,000 $ $0.026 Apr-11 5, $ $ ,200 $ $0.023 May-11 6, $ $ ,300 $ $0.025 Jun-11 6, $ $ ,000 $ $0.026 Jul-11 8, $ $ ,700 $ $0.024 Aug-11 7, $ $ ,700 $99.00 $0.027 Sep-11 8, $ $0.115 Total 175, $20, N/A 68,200 $1, N/A Avg. 7, $ $ $ City of Marathon 35 January 6, 2012

40 4.2 FIRE STATION Fire Station has one electric meter serving the facility. The rate structure is GSDV. The table below represents the energy consumption at Fire Station: Read Date On-Peak (KWH) Facility Utility History - Project Buildings Firehouse # Overseas Highway Electric Meter # FKEC FKAA Account # Account # Off-Peak (KWH) Total kw Total Cost ($) (AVG. $/kwh) (Gallons) Total Cost ($) (AVG. $/Gal) Oct-09 26, $3, $0.114 Nov-09 23, $2, $0.113 Dec-09 22, $2, $0.127 Jan-10 16, $1, $0.109 Feb-10 20, $2, $0.108 Mar-10 20, $2, $0.113 Apr-10 26, $2, $0.112 May-10 26, $2, $0.108 Jun-10 26, $2, $0.108 Jul-10 28, $3, $0.118 Aug-10 27, $3, $0.116 Sep-10 25, $3, $ ,500 $ $0.014 Oct-10 24, $2, $ ,100 $ $0.016 Nov-10 22, $2, $ ,800 $ $0.016 Dec-10 20, $2, $ ,000 $ $0.016 Jan-11 20, $2, $ ,600 $ $0.016 Feb-11 22, $2, $ ,100 $ $0.014 Mar-11 21, $2, $ ,100 $ $0.009 Apr-11 26, $2, $ ,700 $ $0.009 May-11 27, $2, $ ,800 $ $0.009 Jun-11 25, $2, $ ,600 $ $0.012 Jul-11 27, $3, $ ,500 $ $0.013 Aug-11 26, $2, $ ,500 $ $0.011 Sep-11 27, $2, $0.111 Total 582, $64, N/A 198,300 $2, N/A Avg. 24, $2, $ ,525 $ $ City of Marathon 36 January 6, 2012

41 4.3 CITY MARINA BUILDING The City Marina Bulding has four electric meters. The rate structure is GENSV. The tables below represent the energy consumption at the City Marina: Read Date On-Peak (KWH) Facility Utility History - Project Buildings City Marina NEX to Gen Plant th Street Electric Meter # FKEC FKAA Account # Account # Off-Peak (KWH) Total kw Total Cost ($) (AVG. $/kwh) (Gallons) Total Cost ($) (AVG. $/Gal) Oct-09 8, $ $0.118 Nov-09 7, $ $0.118 Dec-09 7, $1, $0.131 Jan-10 7, $ $0.112 Feb-10 7, $ $0.113 Mar-10 6, $ $0.119 Apr-10 6, $ $0.118 May-10 7, $ $0.114 Jun-10 9, $1, $0.111 Jul-10 9, $1, $0.118 Aug-10 9, $1, $0.116 Sep-10 9, $1, $ ,900 $ $0.009 Oct-10 8, $ $ ,800 $ $0.009 Nov-10 7, $ $ ,500 $1, $0.009 Dec-10 4, $ $ ,700 $1, $0.010 Jan-11 4, $ $ ,500 $2, $0.010 Feb-11 9, $1, $ ,400 $2, $0.010 Mar-11 6, $ $ ,500 $3, $0.010 Apr-11 6, $ $ ,400 $2, $0.010 May-11 7, $ $ ,300 $1, $0.010 Jun-11 7, $ $ ,800 $1, $0.009 Jul-11 8, $ $ ,900 $1, $0.009 Aug-11 8, $ $ ,500 $ $0.009 Sep-11 6, $ $0.112 Total 183, $20, N/A 2,160,200 $20, N/A Avg. 7, $ $ ,017 $1, $ City of Marathon 37 January 6, 2012

42 Read Date Facility Utility History - Project Buildings Marina Bath House th Street Meter # On-Peak (KWH) FKEC Account # Off-Peak (KWH) Total kw Total Cost ($) (AVG. $/kwh) Oct-09 4,241 $ $0.117 Nov-09 5,216 $ $0.115 Dec-09 8,102 $1, $0.127 Jan-10 11,012 $1, $0.107 Feb-10 14,374 $1, $0.107 Mar-10 13,293 $1, $0.112 Apr-10 12,934 $1, $0.111 May-10 8,968 $ $0.109 Jun-10 6,040 $ $0.109 Jul-10 4,581 $ $0.121 Aug-10 4,022 $ $0.119 Sep-10 3,611 $ $0.125 Oct-10 4,421 $ $0.116 Nov-10 6,417 $ $0.107 Dec-10 8,222 $ $0.106 Jan-11 11,142 $1, $0.103 Feb-11 13,757 $1, $0.113 Mar-11 13,026 $1, $0.107 Apr-11 11,413 $1, $0.105 May-11 7,917 $ $0.105 Jun-11 5,975 $ $0.111 Jul-11 4,676 $ $0.117 Aug-11 4,081 $ $0.116 Sep-11 3,368 $ $0.115 Total 190,809 $21, N/A Avg. 7,950 $ $ City of Marathon 38 January 6, 2012

43 Read Date Facility Utility History - Project Buildings Marina Bath House th Street Meter # On-Peak (KWH) FKEC Account # Off-Peak (KWH) Total kw Total Cost ($) (AVG. $/kwh) Oct $30.48 $0.381 Nov $33.46 $0.310 Dec $43.40 $0.247 Jan $47.32 $0.193 Feb $60.62 $0.163 Mar $61.90 $0.170 Apr $52.50 $0.186 May $44.39 $0.206 Jun $39.38 $0.233 Jul $37.00 $0.278 Aug $34.16 $0.308 Sep $32.76 $0.349 Oct $33.22 $0.316 Nov $37.03 $0.247 Dec $41.01 $0.218 Jan $56.66 $0.164 Feb $73.47 $0.157 Mar $63.08 $0.160 Apr $56.45 $0.167 May $45.80 $0.193 Jun $39.13 $0.239 Jul $37.32 $0.265 Aug $31.99 $0.340 Sep $30.35 $0.375 Total 5,057 $1, N/A Avg. 211 $44.29 $ City of Marathon 39 January 6, 2012

44 Read Date Facility Utility History - Project Buildings Marina Dock Service th Street Meter # On-Peak (KWH) FKEC Account # Off-Peak (KWH) Total kw Total Cost ($) (AVG. $/kwh) Oct-09 6,243 $ $0.125 Nov-09 3,858 $ $0.126 Dec-09 2,224 $ $0.134 Jan-10 2,929 $ $0.113 Feb-10 2,043 $ $0.116 Mar-10 2,129 $ $0.121 Apr-10 1,702 $ $0.122 May-10 2,338 $ $0.115 Jun-10 5,306 $ $0.110 Jul-10 5,651 $ $0.120 Aug-10 5,709 $ $0.118 Sep-10 6,197 $ $0.123 Oct-10 4,831 $ $0.116 Nov-10 3,876 $ $0.109 Dec-10 2,960 $ $0.111 Jan-11 2,770 $ $0.109 Feb-11 2,752 $ $0.119 Mar-11 2,924 $ $0.113 Apr-11 3,440 $ $0.109 May-11 4,331 $ $0.107 Jun-11 3,657 $ $0.113 Jul-11 4,107 $ $0.117 Aug-11 3,554 $ $0.117 Sep-11 3,884 $ $0.114 Total 89,415 $10, N/A Avg. 3,726 $ $ City of Marathon 40 January 6, 2012

45 4.4 COMMUNITY PARK Community Park has three electric meters serving the facilities. The rate structure is GSDV. The table below represents the energy consumption at Community Park: Read Date On-Peak (KWH) Facility Utility History - Project Buildings Community Park - 34th Street Park (Admin Bldg) Meter # FKEC FKAA Account # Account # Off-Peak (KWH) Total kw Total Cost ($) (AVG. $/kwh) (Gallons) Total Cost ($) (AVG. $/Gal) Oct-09 6, $ $0.121 Nov-09 8, $ $0.117 Dec-09 13, $1, $0.129 Jan-10 12, $1, $0.110 Feb-10 8, $ $0.112 Mar-10 9, $1, $0.117 Apr-10 8, $ $0.117 May-10 9, $1, $0.113 Jun-10 7, $ $0.114 Jul-10 7, $ $0.124 Aug-10 7, $ $0.121 Sep-10 6, $ $0.128 Oct-10 6, $ $ ,800 $ $0.008 Nov-10 8, $ $ ,300 $ $0.008 Dec-10 9, $1, $ ,400 $ $0.008 Jan-11 12, $1, $ ,400 $ $0.008 Feb-11 10, $1, $ $ $0.350 Mar-11 9, $1, $ ,500 $ $0.011 Apr-11 7, $ $ ,800 $ $0.012 May-11 7, $ $ ,200 $ $0.010 Jun-11 5, $ $ ,300 $ $0.008 Jul-11 6, $ $ ,100 $1, $0.008 Aug-11 6, $ $ ,200 $ $0.010 Sep-11 6, $ $ $ Total 203, $23, N/A 653,300 $5, N/A Avg. 8, $ $ ,442 $ $ City of Marathon 41 January 6, 2012

This report presents the findings and recommendations of the assessment of energy use and

This report presents the findings and recommendations of the assessment of energy use and This report presents the findings and recommendations of the assessment of energy use and environmental stewardship of Arlington Street Church, Boston, MA. As stewards of the earth it is important that

More information

SAVE ENERGY AT HOME INSULATE AND AIR SEAL

SAVE ENERGY AT HOME INSULATE AND AIR SEAL SAVE ENERGY AT HOME INSULATE AND AIR SEAL Check the roof insulation level and add insulation to maintain minimum R-38 (6 of blown cellulose or equal). Use R-19 between frame or R-10 rigid insulation for

More information

2015 RACE TO ZERO STUDENT DESIGN COMPETITION

2015 RACE TO ZERO STUDENT DESIGN COMPETITION 2015 RACE TO ZERO STUDENT DESIGN COMPETITION Team Members / Industrial Partners A. TEAM and INDUSTRY PARTNERSHIPS B C D E F G H I A. TEAM B C D E F G H I J A C D E F G H I J B. DESIGN GOALS Project Site

More information

Energy Depot for Business Energy Audit Question Set

Energy Depot for Business Energy Audit Question Set This questionnaire matches the one you can use to perform an online energy audit of your business. You complete the online questionnaire, or if you prefer, you can print this form and answer the questions

More information

Sustainable Design and Energy-Efficient Building Techniques for Existing Housing

Sustainable Design and Energy-Efficient Building Techniques for Existing Housing Sustainable Design and Energy-Efficient Building Techniques for Existing Housing PATH Energy Retrofit Project Henderson, Nevada NREL Research Site, Lebanon NJ Energy Retrofit Goals PROJECT GOALS Identify,

More information

The main steam enters the building in the basement mechanical room; this is where the condensate line also leaves the building.

The main steam enters the building in the basement mechanical room; this is where the condensate line also leaves the building. MSV: Square Footage: 24,844 No. of Floors: 1 Year Built: 1963 Type of Use: Lounge and dining area open all night for snacks Steam Water-cooled condenser, 50-Ton York unit with a 6 cylinder-reciprocating

More information

Codes and High Performance Hot Water Systems. Gary Klein Affiliated International Management, LLC 916 549 7080 gary@aim4sustainability.

Codes and High Performance Hot Water Systems. Gary Klein Affiliated International Management, LLC 916 549 7080 gary@aim4sustainability. Codes and High Performance Hot Water Systems Gary Klein Affiliated International Management, LLC 916 549 7080 gary@aim4sustainability.com Annual Energy Use for Heating Water Natural Gas Gallons Per Day

More information

Case Studies: Infrared Heating in Industrial Applications

Case Studies: Infrared Heating in Industrial Applications Case Studies: Infrared Heating in Industrial Applications Chao Chen, Puget Sound Energy ABSTRACT Puget Sound Energy (PSE) is a utility which serves more than one million electric customers and over 700,000

More information

CHAPTER 10: APPLIANCES AND LIGHTING

CHAPTER 10: APPLIANCES AND LIGHTING Chapter 10: Appliances and Lighting 151 CHAPTER 10: APPLIANCES AND LIGHTING According to the U.S. Environmental Protection Agency, appliances and home electronics account for 20% of energy bills in the

More information

Sample Customer 123 Conservation Way TAMPA FL 33626 Tracking Number: 000675309

Sample Customer 123 Conservation Way TAMPA FL 33626 Tracking Number: 000675309 Thank you for completing the Online Home Energy Audit. Based on the answers that you provided in the questionnaire, the following is a complete analysis of your household's energy consumption. We have

More information

ASHRAE Level I Energy Audit June 2011

ASHRAE Level I Energy Audit June 2011 Knight Law Center Eugene, Oregon ASHRAE Level I Energy Audit June 2011 Prepared for University of Oregon by, PORTLAND SACRAMENTO HOUSTON ORLANDO 421 SW Sixth Ave Suite 200 Portland, OR 97204 1721 2 nd

More information

www.citiesinspection.com October 5, 2015 Dear Client,

www.citiesinspection.com October 5, 2015 Dear Client, www.citiesinspection.com October 5, 2015 Dear Client, On 9/14/2015, Cities Inspection Service, Inc. completed a building inspection of the property located at 123 Oak Street, Someplace, Minnesota for you.

More information

Training for Building Technicians: Energy Efficiency & Sustainability (BEST) Program. Seminar Outline & Sample BEST Exam Questions

Training for Building Technicians: Energy Efficiency & Sustainability (BEST) Program. Seminar Outline & Sample BEST Exam Questions Training for Building Technicians: Energy Efficiency & Sustainability (BEST) Program Seminar Outline & Sample BEST Exam Questions Buildings in the United State consume a significant amount of energy. According

More information

Home Inspection Report

Home Inspection Report Report# 21009 Page 1 of 24 Home Inspection Report Property Address: 123 Maple Lane, St. Augustine, FL 32092 Prepared For: Mr. Smith Prepared By: EDGE Inspections www.edgeinspections.com PO Box 601055 Jacksonville,

More information

Energy Efficiency Tips for Businesses

Energy Efficiency Tips for Businesses Energy Efficiency Tips for Businesses Top 10 Tips Lighting Tips Heating and Cooling Temperature Control Office Equipment Laundry Service Refrigeration Equipment Food Service Equipment Employee Involvement

More information

ENERGY AUDIT IN THE KACST BUILDING

ENERGY AUDIT IN THE KACST BUILDING ENERGY AUDIT IN THE KACST BUILDING S. M. Hasnain, S. H. Alawaji, A. M. Al-Ibrahim and S. M. Smiai Energy Research Institute (ERI) King Abdulaziz City for Science and Technology (KACST) P.O. Box 6086, Riyadh

More information

Economics of Passive Solar and Zero Energy Homes

Economics of Passive Solar and Zero Energy Homes Economics of Passive Solar and Zero Energy Homes Jeff Tiller, PE ASU Energy Center / Department of Technology Southface North Carolina tillerjs@appstate.edu 828-262-6355 Projected Residential Energy Use

More information

Direct Inspections - Tel: (941) 251-1000 - Michael@DirectInspections.com - www.directinspections.com

Direct Inspections - Tel: (941) 251-1000 - Michael@DirectInspections.com - www.directinspections.com Date of inspection: Jun 29, 2015 Property s Address: 123 Oak Street Property s City, State, Zip Code: SARASOTA, FL 34237 Type of home: single family Type of construction: masonry Type of foundation: slab

More information

Mechanical, Plumbing, and Fire Protection Conditions

Mechanical, Plumbing, and Fire Protection Conditions Mechanical, Plumbing, and Fire Protection Conditions Mechanical Conditions The mechanical systems within the building consist of a combination of the original 1926 systems and renovations that occurred

More information

Does Wall Township require an inspection by the building department on resale of a home?

Does Wall Township require an inspection by the building department on resale of a home? Selling your home Does Wall Township require an inspection by the building department on resale of a home? No. We do not require a Certificate of Continued Occupancy on the resale of home. A Smoke Detector,

More information

EarthCents (DSM) Program Summary

EarthCents (DSM) Program Summary EarthCents (DSM) Program Summary Renewable Energy EarthCents Programs Solar Water Heating This program is available to residential customers for the installation of a qualifying solar thermal water heater.

More information

Commercial Energy Efficiency Program. Save money, reduce energy use and earn incentives. Save money, reduce energy use and qualify for incentives

Commercial Energy Efficiency Program. Save money, reduce energy use and earn incentives. Save money, reduce energy use and qualify for incentives Save money, reduce energy use and earn incentives by improving the energy efficiency of your business. Georgia Power s Commercial Energy Efficiency Program makes incorporating energy-efficient improvements

More information

5-Minute Primer for Commercial Building Energy Audits

5-Minute Primer for Commercial Building Energy Audits 5-Minute Primer for Commercial Building Energy Audits Why Energy Audits? Because an energy audit is the first step to saving energy at your facility. Putting together an energy project can be like finding

More information

BPC Green Builders. Green building for new and existing homes. Health Comfort Energy

BPC Green Builders. Green building for new and existing homes. Health Comfort Energy BPC Green Builders Green building for new and existing homes Health Comfort Energy Mechanical Systems Installed HVAC Systems Primary energy source large, roof mounted, solar thermal array (AET flat plate)

More information

ENERGY CONSERVATION GUIDELINES

ENERGY CONSERVATION GUIDELINES MIDWAY INDEPENDENT SCHOOL DISTRICT ENERGY CONSERVATION GUIDELINES The following energy conservation guidelines are applicable to all district personnel and facilities. The directors of departments and

More information

Phase II Audit Report Appendices Energy & Water Audits of LLNL Facilities

Phase II Audit Report Appendices Energy & Water Audits of LLNL Facilities LAWRENCE LIVERMORE NATIONAL LABORATORY Phase II Audit Report Appendices Energy & Water Audits of LLNL Facilities Prepared for the LLNL Energy Management Program by: B.I. Horst P.C. Jacobs, Architectural

More information

Building Condition Assessment Report

Building Condition Assessment Report C2 - Nurses Resident (aka Administration) Building Condition Assessment Report Asset Address Address Construction Year Size (Gross Floor Area) Asset Type Floors Above Ground Inspection Date C2 - Nurses

More information

INVOICE. DATE: May 11, 2005. DESCRIPTION Inspection and report on a property located at OF SERVICES: Perfect Street, Sarasota, Fl.

INVOICE. DATE: May 11, 2005. DESCRIPTION Inspection and report on a property located at OF SERVICES: Perfect Street, Sarasota, Fl. INVOICE DATE: May 11, 2005 CLIENT: The Buyer DESCRIPTION Inspection and report on a property located at OF SERVICES: Perfect Street, Sarasota, Fl. TOTAL FEE: $ See Schedule Tom Villani Hallmark Inspection

More information

Occupancy: Assembly (A-3) and Business -Includes offices, seminar rooms, classrooms, and café facility. Duke University Medical School

Occupancy: Assembly (A-3) and Business -Includes offices, seminar rooms, classrooms, and café facility. Duke University Medical School Introduction Background The Duke School of Nursing building offers a new three-story state of the art facility that has helped strengthen the quality and integrity of the School of Nursing at Duke. The

More information

220.5" Basic Features. Electrical Features

220.5 Basic Features. Electrical Features 8'x20' GENESIS UNIT 19.5" 220.5" Basic Features Durable, heavy duty steel construction to ISO standards Large, 5mm-thick windows with screens, blinds, removable metal window shutters Fully finished rigid

More information

SWF Home Inspections

SWF Home Inspections Cover Page SWF Home Inspections Property Inspection Report Inspection prepared for: Mr & Mrs Home Buyer Real Estate Agent: My Favorite Agent - Date of Inspection: 7/4/2013 Age of Home: 2004 Size: 1568

More information

Building Permit Application

Building Permit Application Building Permit Application Administrative Use Only PARENT PERMIT NUMBER (Required if part of another project) PERMITTEE: PERMITTEE ADDRESS: E-MAIL ADDRESS: ARCHITECT/ENGINEER: PHONE: PHONE: ARCHITECT/ENGINEER

More information

101 Low-Cost /No-Cost. Home Energy-Saving Measures

101 Low-Cost /No-Cost. Home Energy-Saving Measures 101 Low-Cost /No-Cost Home Energy-Saving Measures Your Touchstone Energy Cooperative has compiled this list of low-cost / no-cost energy-saving measures to help you better manage your home s energy costs.

More information

How to Reduce Energy Costs in Your Commercial Building

How to Reduce Energy Costs in Your Commercial Building How to Reduce Energy Costs in Your Commercial Building Mark Steinmetz, Energy Advisor, GDS Associates, Inc., an ActOnEnergy Partner Mary Bentsen, Education and Training Coordinator SAIC, an Ameren Illinois

More information

NYC Department of Education Building Condition Assessment Survey 2014-2015 BROADWAY EDUCATION CAMPUS - MANHATTAN, 26 BROADWAY, MANHATTAN, NY, 10004

NYC Department of Education Building Condition Assessment Survey 2014-2015 BROADWAY EDUCATION CAMPUS - MANHATTAN, 26 BROADWAY, MANHATTAN, NY, 10004 School: InspectionId Asset Data Inspection Type Building Assessment Survey 204-205 BROADWAY EDUCATION CAMPUS - MANHATTAN, 26 BROADWAY, MANHATTAN, NY, 0004 Time In Last Edited 255 MECHANICAL 205-05-8 09:00AM

More information

Current Programs available to Limited Income Customers. Residential and Multifamily

Current Programs available to Limited Income Customers. Residential and Multifamily Current Programs available to Limited Income Customers Residential and Multifamily CAP Program- Residential and Multifamily The City of Austin offers programs to help customers facing temporary and long-term

More information

Arizona Health Care Association DISASTER PLANNING AND EMERGENCY MANAGEMENT GUIDE POST INCIDENT DAMAGE ASSESSMENT CHECKLIST

Arizona Health Care Association DISASTER PLANNING AND EMERGENCY MANAGEMENT GUIDE POST INCIDENT DAMAGE ASSESSMENT CHECKLIST It is essential to perform a Basic Damage Assessment (BDA) following an adverse event to help ensure the safety of building occupants as well as prevent additional losses from occurring. This checklist

More information

energy-saving checklist a guide for rental property owners

energy-saving checklist a guide for rental property owners energy-saving checklist a guide for rental property owners taking responsibility As an individual, your efficient use of energy brings benefits such as lower bills, improved comfort levels in your home

More information

Sea Water Heat Pump Project

Sea Water Heat Pump Project Sea Water Heat Pump Project Alaska SeaLife Center, Seward, AK Presenter: Andy Baker, PE, YourCleanEnergy LLC Also Present is ASLC Operations Manager: Darryl Schaefermeyer ACEP Rural Energy Conference Forum

More information

PROPERTY INSPECTION REPORT

PROPERTY INSPECTION REPORT (850) 297-1998 1716 Monticello Dr Tallahassee, Florida 32303 PROPERTY INSPECTION REPORT THIS INSPECTION IS A DETAILED LISTING OF AREAS VISUALLY INSPECTED AT:, Tallahassee FL Client Tallahassee, FL 32304

More information

Element D Services Plumbing

Element D Services Plumbing PART 1 - GENERAL 1.01 OVERVIEW A. This section addresses domestic cold, hot and hot water return distribution systems within and to five feet beyond building perimeter. PART 2 - DESIGN CRITERIA 2.01 GENERAL

More information

Building Condition Assessment Report

Building Condition Assessment Report Building Condition Assessment Report Asset C3c - Oak Terrace Cottage 121 Address Riverview Lands, 2601 Lougheed Highway, Coquitlam, BC. V5C 4J2 Construction Year Size (Gross Floor Area) 1920. 2,553 Sq.Ft.

More information

Air Conditioning. The opportunity for energy efficiency. Low cost actions to reduce energy usage now

Air Conditioning. The opportunity for energy efficiency. Low cost actions to reduce energy usage now Fact Sheet #6 Air Conditioning In this fact sheet you will discover: The opportunity for energy efficiency How air conditioning works Low cost actions to reduce energy usage now Investments to reduce costs

More information

Commercial Energy Savings Guide. www.touchstoneenergy.coop

Commercial Energy Savings Guide. www.touchstoneenergy.coop Commercial Energy Savings Guide www.touchstoneenergy.coop NRECA Pocket Savings Guide Pag.indd 1-3 2/7/05 4:19:07 PM Commercial Energy Saving Tips Notes: This guide provides basic hints on ways to reduce

More information

Key energy-efficient features of your new home

Key energy-efficient features of your new home Key energy-efficient features of your new home Your thermal envelope The thermal envelope, or shell, of your home (walls, roof and floor) is designed to keep you dry and comfortable. It protects you from

More information

Home Inspection Report

Home Inspection Report 4949 Brownsboro Rd Suite 293 Louisville, KY 40223 (502) 414-1440 tripleainspections@gmail.com Inspected By: William Carter, HI-1956 Home Inspection Report Prepared For: Edward Cullen Property Address:

More information

2. What building projects are exempted? (permit not required)

2. What building projects are exempted? (permit not required) BUILDING AND SAFETY DEPARTMENT 1. What building projects require a permit? Following is a list of projects that require building permits based on Appendix chapter 1 of the California Building Code and

More information

It s the right time... ... for sustainable development. Paul Westbrook. www.enerjazz.com/house

It s the right time... ... for sustainable development. Paul Westbrook. www.enerjazz.com/house It s the right time...... for sustainable development Introduction Passive Solar - Passive Solar has a slightly different priority in Texas. We want to capture free heat from the sun in the winter, but

More information

ENERGY AUDITS (OR SURVEYS) & ENERGY MANAGEMENT PROGRAMS SECTION B

ENERGY AUDITS (OR SURVEYS) & ENERGY MANAGEMENT PROGRAMS SECTION B ENERGY AUDITS (OR SURVEYS) & ENERGY MANAGEMENT PROGRAMS SECTION B GOALS OF THE ENERGY AUDIT Clearly identify types and costs of energy use Understand how energy is being used--and possibly wasted Identify

More information

PEPPER VINER HOMES WARRANTY GUIDELINES

PEPPER VINER HOMES WARRANTY GUIDELINES PEPPER VINER HOMES WARRANTY GUIDELINES All non-emergency warranty and customer service requests MUST be made in writing. This provides you with documentation and allows Pepper Viner to operate efficiently.

More information

I. ENERGY PLAN STATEMENT:

I. ENERGY PLAN STATEMENT: Brownsville Independent School District Energy Management Plan BISD Board of Trustees Approved (January 19, 2010 Agenda XI. General Function, A. Item 16) PURPOSE: The intent of this plan is to create a

More information

Appendix B. 2010 Florida Building Code Building Section 423.25 Public Shelter Design Criteria

Appendix B. 2010 Florida Building Code Building Section 423.25 Public Shelter Design Criteria Appendix B 2010 Florida Building Code Building Section 423.25 Public Shelter Design Criteria 423.25 Public shelter design criteria. 423.25.1 New facilities. New educational facilities for school boards

More information

Subpart 1. Installation. All plumbing systems must be. installed and tested according to this chapter and chapter 4715,

Subpart 1. Installation. All plumbing systems must be. installed and tested according to this chapter and chapter 4715, 4658.4500 PLUMBING SYSTEMS; NEW CONSTRUCTION. Subpart 1. Installation. All plumbing systems must be installed and tested according to this chapter and chapter 4715, the Minnesota Plumbing Code. Subp. 2.

More information

Nominal Life Expectancy for Building Components

Nominal Life Expectancy for Building Components Nominal Life Expectancy for Building Components Building System Page A. HVAC 2 B. Elevator/Escalator 6 C. Plumbing 7 D. Roofing 8 E. Electrical 10 F. Fire/Life/Safety/Security System 11 G. Interior Finishes

More information

BUNKER HILL ELEMENTARY SCHOOL

BUNKER HILL ELEMENTARY SCHOOL INITIAL YEAR BUILT 1970 BUILDING AREA 98,200 SF CURRENT PROGRAM CAPACITY 332 ENROLLMENT 2008 387 WARD 5 PROPOSED PROGRAM CAPACITY 750 Site Plan BUNKER HILL - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

HOMEOWNER S PERMIT GUIDE

HOMEOWNER S PERMIT GUIDE HOMEOWNER S PERMIT GUIDE WHEN IS A PERMIT REQUIRED? Department of Development and Permits 306 Cedar Road, City Hall 2 nd Floor P.O. Box 15225 Chesapeake, VA 23328 Phone: (757) 382-6018 Fax: (757) 382-8448

More information

FLORIDA SOLAR ENERGY CENTER

FLORIDA SOLAR ENERGY CENTER FLORIDA SOLAR ENERGY CENTER Creating Energy Independence High Performance Existing Homes Partnerships and Research Janet McIlvaine Research Analyst, Florida Solar Energy Center A Research Institute of

More information

City of Cornwall Social Housing Division Top 10 Energy & Water Saving Tips. in Multi-Unit Residential Buildings

City of Cornwall Social Housing Division Top 10 Energy & Water Saving Tips. in Multi-Unit Residential Buildings City of Cornwall Social Housing Division Top 10 Energy & Water Saving Tips in Multi-Unit Residential Buildings Duncan Hill Canada Mortgage and Housing Corporation Andrew Pride Minto Developments Inc. Energy

More information

EnergyPro Building Energy Analysis. Assisted Living Building

EnergyPro Building Energy Analysis. Assisted Living Building EnergyPro Building Energy Analysis Assisted Living Building EnergyPro Building Energy Analysis for an assisted living building Project Scope The purpose of the EnergyPro energy model was to evaluate the

More information

GREEN BAY AREA PUBLIC SCHOOL DISTRICT Board Policy Manual ENERGY MANAGEMENT

GREEN BAY AREA PUBLIC SCHOOL DISTRICT Board Policy Manual ENERGY MANAGEMENT GREEN BAY AREA PUBLIC SCHOOL DISTRICT Board Policy Manual 733 ENERGY MANAGEMENT Energy management is necessary in order for the District to: minimize the impact energy cost increases will have on the budget,

More information

Audit and Billing Analysis Report for the Josephinum Apartments

Audit and Billing Analysis Report for the Josephinum Apartments Audit and Billing Analysis Report for the Josephinum Apartments Prepared for: Shawna Sherman, Enterprise Community Partners Prepared by: Jonathan Heller, PE, LEED AP March 22, 2012 Billing Analysis and

More information

WHEN IS A PERMIT REQUIRED?

WHEN IS A PERMIT REQUIRED? WHEN IS A PERMIT REQUIRED? Any owner, builder, contractor, or other authorized agent who intends to construct, enlarge, alter, repair, move, demolish, or change the occupancy of a building or structure,

More information

Presentation Outline. Common Terms / Concepts HVAC Building Blocks. Links. Plant Level Building Blocks. Air Distribution Building Blocks

Presentation Outline. Common Terms / Concepts HVAC Building Blocks. Links. Plant Level Building Blocks. Air Distribution Building Blocks Presentation Outline Common Terms / Concepts HVAC Building Blocks Plant Level Building Blocks Description / Application Data Green opportunities Selection Criteria Air Distribution Building Blocks same

More information

Mequon - Thiensville School District Long Range Facilities Plan Monthly Project Schedule

Mequon - Thiensville School District Long Range Facilities Plan Monthly Project Schedule Mequon - Thiensville School District Long Range Facilities Plan Monthly Project Schedule Homestead HS Sept.'15 Oct'15 Nov'15 Dec'15 Jan'16 Feb'16 Repair Asphalt @ Main Garage Replace Exterior Hollow Metal

More information

MISCELLANEOUS ELECTRICAL JOBS REQUIRING PERMITS

MISCELLANEOUS ELECTRICAL JOBS REQUIRING PERMITS MISCELLANEOUS ELECTRICAL JOBS REQUIRING PERMITS 01. SAFETY INSPECTION of service equipment at FPL Power Source 02. Construction GFI power outlets (Temp Pole for Construction) 03. 90 day temporary power

More information

Inspecting to a higher standard.

Inspecting to a higher standard. Inspecting to a higher standard. Rob Hopkin Silver Spring, MD 20902 Monday, June 2, 2014 ProTec Inspection Services Inc. 19736 Selby Ave Poolesville, MD 20837 301-972-8531 www.protec-inspections.com rob@protec-inspections.com

More information

LIGHTING and LIGHTING SYSTEMS

LIGHTING and LIGHTING SYSTEMS LIGHTING and LIGHTING SYSTEMS Introduction Lighting is an important area of opportunity for energy savings, since it is a large fraction of use of electricity in residential and commercial buildings. Lighting

More information

Hamilton Board of Education Lalor Elementary School Hamilton, NJ 08610

Hamilton Board of Education Lalor Elementary School Hamilton, NJ 08610 Steven Winter Associates, Inc. 50 Washington Street Telephone (203) 857-0200 Architects and Engineers Norwalk, CT 06854 Facsimile (203) 852-0741 www.swinter.com E-mail: swinter@swinter.com July 17, 2009

More information

Commercial/Office Space

Commercial/Office Space C A S E S T U D I E S Commercial/Office Space Newmark Knight Frank Making -Efficiency Their Standard Orange Health Care Center Gets an -Efficiency Check-up 1 Long Wharf Drive in New Haven owned by Newmark

More information

GROWTH MANAGEMENT DEPARTMENT 201 SE 3 rd ST, (Second Floor), Ocala, FL 34471 (352) 629-8421; FAX: (352) 629-8264

GROWTH MANAGEMENT DEPARTMENT 201 SE 3 rd ST, (Second Floor), Ocala, FL 34471 (352) 629-8421; FAX: (352) 629-8264 BUILDING CODE GUIDELINES FOR ELECTRICAL INSPECTIONS Building Code compliance is the obligation of design professionals and/or contractors. Plan Review and Inspection Guidelines are intended to be used

More information

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS* COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) 2 Fixed Rates Variable Rates FIXED RATES OF THE PAST 25 YEARS AVERAGE RESIDENTIAL MORTGAGE LENDING RATE - 5 YEAR* (Per cent) Year Jan Feb Mar Apr May Jun

More information

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS* COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) 2 Fixed Rates Variable Rates FIXED RATES OF THE PAST 25 YEARS AVERAGE RESIDENTIAL MORTGAGE LENDING RATE - 5 YEAR* (Per cent) Year Jan Feb Mar Apr May Jun

More information

Level 1 Energy Audit Report. For: Gladstone Regional Council

Level 1 Energy Audit Report. For: Gladstone Regional Council Level 1 Energy Audit Report For: Gladstone Regional Council Gladstone Art Gallery & Museum Conducted by: Jamie Rogers - EcoXpert Barnes Electrical Service 1/54 Callemondah Drive Gladstone QLD 4680 Mob:

More information

Schedule of Maintenance Fees

Schedule of Maintenance Fees Schedule of Maintenance Fees Effective July 1, 2015 It is the policy of the Housing Authority of Murray not to charge for NORMAL wear and tear. However, the Housing Authority reserves the right in every

More information

Energy Conservation Audits for Six Performing Arts Facilities A Toronto s Green Theatres Project

Energy Conservation Audits for Six Performing Arts Facilities A Toronto s Green Theatres Project Energy Conservation Audits for Six Performing Arts Facilities A Toronto s Green Theatres Project Anthony Marshall, P.Eng., CEM January 2012 For Creative Trust for Arts & Culture Table of Contents Introduction

More information

Whitley Manufacturing Co., Inc. 201 W. First Street S. Whitley, IN 46787 Phone (260) 723-5131 Sales Fax (260) 723-6396 whitley@whitleyman.

Whitley Manufacturing Co., Inc. 201 W. First Street S. Whitley, IN 46787 Phone (260) 723-5131 Sales Fax (260) 723-6396 whitley@whitleyman. Building Type Building Code Whitley Classroom Buildings BOCA, UBC, SBCCI, NEC, ADA Structural Support Outrigger construction standard, Whitley model classrooms. Main support beams to be 12 11.8# per lineal

More information

Energy Efficiency HOSPITALITY. www.energia.ie

Energy Efficiency HOSPITALITY. www.energia.ie Energy Efficiency HOSPITALITY www.energia.ie Your chance to reduce your business energy usage by as much as 20%! 20% is a significant figure and reducing your energy bill by this amount could make a real

More information

125 Mount Auburn Second Floor Office Renovation LEED-CI Silver, September 2008

125 Mount Auburn Second Floor Office Renovation LEED-CI Silver, September 2008 125 Mount Auburn Second Floor Office Renovation LEED-CI Silver, September 2008 The Harvard Law School s 125 Mount Auburn office renovation project team was committed to sustainable design and construction,

More information

Four Point Inspection

Four Point Inspection tpatrick@ispects.me Tampa Bay Area: Southwest Florida: (813) 368-6407 (239) 896-3986 Four Point Inspection Izzo, Frank & Jacqueline 3214 Williamsburg Street Sarasota, FL 34231 9/26/2013 Note to Policyholder:

More information

A TO Z HOME INSPECTIONS PROFESSIONAL HOME INSPECTION SERVICES FOR HOME BUYERS AND SELLERS

A TO Z HOME INSPECTIONS PROFESSIONAL HOME INSPECTION SERVICES FOR HOME BUYERS AND SELLERS A TO Z HOME INSPECTIONS PROFESSIONAL HOME INSPECTION SERVICES FOR HOME BUYERS AND SELLERS Insurance Inspection Report 1234 Main Street Tallahassee, Florida Report Prepared For: Charles Smith Report Prepared

More information

Cost Estimation for Materials and Installation of Hot Water Piping Insulation

Cost Estimation for Materials and Installation of Hot Water Piping Insulation Cost Estimation for Materials and Installation of Hot Water Piping Insulation Prepared for Pacific Northwest National Laboratory Under Contract Number: 18O9O2 By Gary Klein, Managing Partner Affiliated

More information

Equipment Specifications Rebate/Unit Rules

Equipment Specifications Rebate/Unit Rules Fluorescent T8 Fixtures with High Efficiency Electronic Ballasts Replacing T12 Fluorescent with Magnetic Ballast -- Rebate per fixture All 4 foot lamps and ballasts must be on Consortium for Energy Efficiency

More information

Attached is a link to student educational curriculum on plug load that provides additional information and an example of how to estimate plug load:

Attached is a link to student educational curriculum on plug load that provides additional information and an example of how to estimate plug load: Energy Conservation Tip #1 Always turn off all lights when you leave a room or when they are not needed. It is estimated that 26% of a building s electricity is used for lighting. For D-11 this equals

More information

Property Condition Assessment

Property Condition Assessment Property Condition Assessment Business, Wisconsin Inspection Date: 8/2009 Prepared For: Business Owner Report Number: TD999909 Prepared By: Shamrock Building Inspection Consultants LLC N29 W29951 Shel-Mar

More information

ESTIMATING PLUMBING, HEATING, VENTILATING, AND AIR CONDITIONING (HVAC), AND ELECTRICAL WORK

ESTIMATING PLUMBING, HEATING, VENTILATING, AND AIR CONDITIONING (HVAC), AND ELECTRICAL WORK C H A P T E R 7 ESTIMATING PLUMBING, HEATING, VENTILATING, AND AIR CONDITIONING (HVAC), AND ELECTRICAL WORK OBJECTIVES After reading this chapter and completing the review questions, you should be able

More information

Smart Ideas(R) Energy Efficiency Program for ComEd Customers

Smart Ideas(R) Energy Efficiency Program for ComEd Customers October 2015 CUBFacts Smart Ideas(R) Energy Efficiency Program for ComEd Customers **New Appliance and Smart Thermostat Rebates Available!** Discounts on Energy Efficient Lighting You can receive instant

More information

GENERAL ELECTRICAL REQUIREMENTS

GENERAL ELECTRICAL REQUIREMENTS GENERAL ELECTRICAL REQUIREMENTS RECEPTACLE SPACING Within 6-feet of the edge of any door HABITABLE Not more than 12-feet apart along wall ROOMS: At all wall spaces 24 or more wide Within 24 of edge of

More information

Orlando Home Inspection Services

Orlando Home Inspection Services PLEASE NOTE: Orlando Home Inspection Services Serving Central Florida since 1999 P O Box 915451, Longwood, Florida, 32791-5451 Phone: (321) 228-2493 Fax: (407) 374-8505 Web: http://www.orlando-home-inspections.com

More information

FOUR POINT INSPECTION REPORT

FOUR POINT INSPECTION REPORT FOUR POINT INSPECTION REPORT Office Address: 6010 NW 42 nd Ave Fort Lauderdale, FL 33319 Phone: (954)881-4899 Email : ORDER/FILE#: C46 ADDRESS: 2834 ANYWHERE AVENUE, HOLLYWOOD, FL 33000 Note to Policy

More information

SECTION XI OPINION OF PROBABLE COST

SECTION XI OPINION OF PROBABLE COST SECTION XI OPINION OF PROBABLE COST OPINION OF PROPABLE COSTS HARBOR ISLAND THE PAVILION 1) Provide a sprinkler system for the entire building. 8000 SF X $15/SF $120,000 2) Remove and replace existing

More information

November 3, 2015 Bond and District Additional Assistance Election Information

November 3, 2015 Bond and District Additional Assistance Election Information November 3, 2015 Bond and District Additional Assistance Election Information Proposition 432 - $22 million General Obligation Bond 150+ facility projects across all schools Building renovations and improvements

More information

CITY OF FAIRFAX CODE ADMINISTRATION 703-385-7830 / FAX 703-385-9265 www.fairfaxva.gov

CITY OF FAIRFAX CODE ADMINISTRATION 703-385-7830 / FAX 703-385-9265 www.fairfaxva.gov CITY OF FAIRFAX CODE ADMINISTRATION 703-385-7830 / FAX 703-385-9265 www.fairfaxva.gov Finishing a basement to make additional living space in a house is a popular construction project for many homeowners.

More information

Unit 4: Electricity (Part 2)

Unit 4: Electricity (Part 2) Unit 4: Electricity (Part 2) Learning Outcomes Students should be able to: 1. Explain what is meant by power and state its units 2. Discuss the importance of reducing electrical energy wastage 3. State

More information

Summit Series Single Section and Double Section Homes

Summit Series Single Section and Double Section Homes Single Section and Double Section Homes SM-01 All New 20 Wides Now Available! SM-08 Units shown with optional features SM-01-4814 42 Bedrooms 41 Bathrooms 648 Sq. Ft. SM-01-5214 42 Bedrooms 41 Bathrooms

More information

Potential of Energy Efficiency and Renewable Energy Savings To Impact Florida s Projected Energy Use in 2014

Potential of Energy Efficiency and Renewable Energy Savings To Impact Florida s Projected Energy Use in 2014 Potential of Energy Efficiency and Renewable Energy Savings To Impact Florida s Projected Energy Use in 2014 Author Fairey, Philip Publication Number FSEC-RR-58-06 Copyright Copyright Florida Solar Energy

More information

Holz Choices & Specifications

Holz Choices & Specifications March 21, 2011 0. SALES AND DESIGN 1. UTILITIES AND PERMITS Holz Choices & Specifications 2. EXCAVATION AND LOT PREPARATION Job Beginning date of Monday May 2 nd, 2011 ALTERNATE: Garage walls as drawn

More information

BERRI BARMERA COUNCIL LEVEL 1 ENERGY AUDITS OF SELECTED COUNCIL FACILITIES January 2013

BERRI BARMERA COUNCIL LEVEL 1 ENERGY AUDITS OF SELECTED COUNCIL FACILITIES January 2013 BERRI BARMERA COUNCIL LEVEL 1 ENERGY AUDITS OF SELECTED COUNCIL FACILITIES January 2013 ENVIRONARC PO BOX 56 NORTH ADELAIDE 5006 Telephone: 1300 738 611 Facsimile: (08) 8537 0657 Email: environarc@environarc.com.au

More information

Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components

Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components Infrastructure Facility Condition Summary Weighted Avg Condition Score Facility Components Systems Surveyor/ Date Done Comments G Sitework.9 Site Improvements Parking Pedestrian Paving Site Development

More information

Printed Monday, August 27, 2007 Inspected By: Michelle Teague. Client Information: Inspection, Condo City Lane Chicago, IL. Inspected 8/22/07 8:00 AM

Printed Monday, August 27, 2007 Inspected By: Michelle Teague. Client Information: Inspection, Condo City Lane Chicago, IL. Inspected 8/22/07 8:00 AM Pa g e 1 o f 1 5 All About Homes, LLC Michelle M. Teague Owner 312-371-7414 Phone 773-508-6209 Fax www.michelleinspects.com michelle@michelleinspects.com 1725 W. Granville Ave. Chicago, IL 60660 Printed

More information

Table C33. Total fuel oil consumption and expenditures, 2012

Table C33. Total fuel oil consumption and expenditures, 2012 Release date: May 2016 Table C33. fuel oil consumption and, 2012 ) gallons) dollars) Building ( 1,001 to 5,000 204 604 3.0 21 151 522 5,001 to 10,000 74 559 7.6 10 74 253 10,001 to 25,000 67 1,123 16.7

More information