1 Yamunotri Ropeway Project TECHNICAL REPORT Prepared By YAMUNOTRI PROJECT COMPANY PRIVATE LIMITED 0 P age
2 PREFACE This report addresses the concerns of the MOEF Committee regarding the issue of disturbance to the ecology of the mountain during the construction of the tower foundations of the cable car proposed to be installed at Yamunotri. Uttarakhand is one of the foremost touristic states in India and is also considered as Switzerland of India due to the presence of picturesque snow mountain range of Himalayas. Among many places of tourism interest, Char Dham (Yamunotri, Gangotri, Kedarnath and Badrinath) is the most sought after pilgrimage destination in Uttarakhand as well as in India. One of the major factor influencing the pilgrim flow is the quality of access to these Dham that is hindered by difficult physical terrain and climatic conditions. Uttarakhand Government has taken many initiatives addressing to these constraints and to ensure solutions to make tourism more convenient and experimental. Yamunotri is the source of the holy river Yamuna. It is situated at an altitude of 3,253 m in the Gharwal Hills, Uttarkashi District, Uttarakhand. It is one of the four sites of chota char dham pilgrimage Yamunotri, Gangotri, Kedarnath and Badrinath. The main attraction of the region is the Yamunotri temple devoted to the Goddess Yamuna. Yamunotri has an all year cold climate. Summers during April to July are pleasant with temperature ranges within 6 C to 20 C and May-June are the warmest months. The temperature during winters from October to March dips as low as 4 deg. C. and is characterized by heavy snowfall. The shrine attracts devotees in large numbers from May to October and the temple remains closed from November to April. 1 P age
3 CONTENTS 1.0 About Yamunotri Assessment of Yamunotri Attractions in Yamunotri The Temple Saptarishi Kund Surya Kund Divya Shilla Excursions Barkot Hanuman Chatti Janki Chatti Kharsali Village Major Points To Maintain Ecology During Construction Stability of Proposed Alignment Lower Terminal Point TR TR TR TR TR TR TR TR TR TR TR Upper Terminal Point Landslide And Sesmic Hazard Vulnerability Risk Assessment And Disaster Management Plan Risk Assessment Identification of Impacts During Construction Phase Identification of Impacts Operation Phase Anticipated Impact And Mitigation Measure P age
4 7.1 Land Environment Anticipated Impact Mitigation Measures Water Environment Anticipated Impact Mitigation Measures Air Environment Anticipated Impact Mitigation Measures Noise Environment Impact Prediction Mitigation Measures Biological Environment Anticipated Impact Mitigation Measures Socio Economic And Health Anticipated Impact Mitigation Measures Health And Wealth Being of Construction Workers Mitigation Measures Solid Waste And Environment Anticipated Impact Mitigation Measures 17 3 P age
5 1. ABOUT YAMUNOTRI Accessibility: Air: Nearest airport is Jolly Grant, Dehradun. Rail: Nearest railhead is at Rishikesh. Road: Dehradun to Yamunotri 173 km. via Mussoorie 30 km, Barkot 93.7 km, Sayana Chatti 27 km, Hanuman Chatti 6 km, Janki Chatti 3 km and Yamunotri 6 km. Rishikesh to Yamunotri 222 km. via Narendranagar 16 km, Chama 46 km, Brahmkhal 15 km, Barkot 40 km, Sayana Chatti 27 km, Hanuman Chatti 6 km, Janki Chatti 3 km and Yamunotri 6 km. Languages: Hindi, Garhwali and English Food: Only local eating houses (dhabas) are available. Non-vegetarian food and alcoholic drinks are prohibited in Yamunotri. Snowfall: Average snowfall is 2-3 m. Accommodation: There are ashrams, dharamshalas, and a few guesthouses in Yamunotri. The Garhwal Mandal Vikas Nigam (GMVN) Tourist houses at Janki Chatti and Yamunotri can be checked out. These are mostly in the form of dormitories. One can find simple vegetarian food in these places. Yamunotri Temple JankiChatti Kharsali 4 P age
6 2. ASSESSMENT OF YAMUNOTRI 2.1 ATTRACTIONS IN YAMUNOTRI THE TEMPLE The shrine of Yamunotri, situated at an elevation of about 3,235 m is a point of paramount religious importance for Hindus and an essential pilgrimage. Situated in the direction opposite to Gangotri, the road bifurcates from a place called Dharasu, somewhere between Rishikesh-Uttarkashi and goes on to Yamunotri. The shrine can also be visited from Dehradun via Mussoorie. Yamunotri in the Garhwal Himalayas in the state of Uttarakhand is the first stopover for the Char Dham Yatra. Yamunotri is the westernmost shrine of Char Dhams. The shrine attracts devotees in large numbers from May to October. The temple remains closed from November to April. Dedicated to Goddess Yamuna, Yamunotri Shrine is perched atop a flank of the Bandar Poonchh peak (3165 m above sea level). The temple of Yamunotri falls on the left of River Yamuna. The present temple was built by Maharani Guleria of Jaipur in the late nineteenth century SAPTARISHI KUND This is the source of Yamuna but being a little difficult to access; few people go there and most offer their prayers in the temple itself. A twelve kilometre difficult trek route will take you to Saptrishi kund. A natural glacial kund, the trek up to Saptrishi kund eases out around the base of Kalinda parvat. Dark blue waters, slate stones on the banks, and a rare variety of lotus adorning the water, Saptrishi Kund is a sight to behold SURYA KUND Close to the temple is this hot water spring called Surya Kund, Surya or Sun being the mythological father of Yamuna. People not just refresh here but also make prasada for offering. The temperature of the springs is as high as 88 degrees. 5 P age
7 2.1.4 DIVYA SHILLA This is a stone that is worshipped before entering the temple. 2.2 EXCURSIONS BARKOT Barkot is the junction point to Yamunotri. The route to Yamunotri from Dehradun and Rishikesh meets at Barkot. It is a small hamlet, 49 km from Yamunotri. It has an ancient temple and can provide good facilities to the traveler. Barkot is a place of great scenic beauty with spectacular views of snow-capped mountains all around. A magnificent view of the eternal snow peaks of bandar punch can be seen from here. At the time of char dham yatra most of the people, from western part of India stay in Barkot HANUMAN CHATTI Hanuman Chatti lies enroute to Yamunotri. The 13 kilometre distance is usually covered in 6 hours. The riverside walk is like a picturesque countryside walk. Hanuman Chatti is located at the confluence of River Hanuman Ganga and Yamuna. It is also the starting point of trek to Dodi Tal. Hanuman Chatti is a confluence point of two holy rivers (Yamuna and Hanuman Ganga). Trekking route to Dodi Tal starts from here JANKI CHATTI Three kilometres from Yamunotri is Janki Chatti, famous for its hot water springs. You can have a refreshing dip here in the water or make a night halt, as accommodation facility is available here KHARSALI VILLAGE Kharsali village is situated on opposite side of Jankichatti. The approximate population of Kharsali village is All the pujari (Pandey) of Yamunotri Temple are from Kharsali village. 6 P age
8 3. MAJOR POINTS TO MAINTAIN ECOLOGY DURING CONSTRUCTION We have listed down below the major points which will be kept in mind during the construction period so as to enable us to maintain the pristine ecology of the terrain enroute the Cable Car Alignment. The cable cars are generally aligned on high ground spanning between hilltops and cannot be concealed. Unfortunately, this results in significant visual impacts. The preferred alignment has been selected after careful consideration of environment and engineering issues and has attempted to minimise the visual intrusion of the development into the sensitive landscape. The advantage of the system proposed is the small number of towers required. The station building height will be kept low so that the visual intrusion into the valley is minimized. The terminal stations will be landscaped to match the natural landscape of the area. The built structure will be so designed so that it blends with the natural environment and appears as an extension of the natural environment. Locally available materials will be given preference. The landscape plans will be guided by the patterns of the existing natural landscape as much as possible and indigenous plants will be encouraged. Buffer plantations will be carried out to minimize the visual intrusion and to enhance the overall aesthetics of the area. 3.1 STABILITY OF PROPOSED ALIGNMENT A geological survey was carried out by Geological Survey of India for the proposed alignment. The geological conditions at the terminal stations and all the line towers were studied to examine the feasibility of the proposed alignment from stability point of view. In area around Jankichatti, the glacial landforms have given rise to gently sloping undulating and hummocky topography in which perched blocks are prominent standout features. Superimposition of V shaped profile over the original U shaped one has been observed in the upper reaches of Yamuna River. The valley development kept place with the upliftment of the terrain leading to formation of narrow, deep valleys and at places gorges. The glacio fluvial terraces are extensively used for settlements and agriculture. Fluvial terraces are sparsely developed and occur as thin strips and remnant patches along the proposed alignment of ropeway near Jankichatti. In the Yamunotri Jankichatti section, the valley shows a straight NE-SW trend. In general slope along the proposed alignment rocks exposed in the area north easterly dipping at 45 o to 75 o and joints planes are mostly perpendicular to the foliation planes, while some planes sub vertically dipping NW were also observed. The regional strike of various lithologies has SE NW trend and the bedding/foliation planes of all the rock formations strike across the river dipping towards up stream. The rocks exposed along the proposed ropeway alignment are mainly constituted by granite gneiss, streaky gneiss, quartzite and biotite schist and associated metabasics. 7 P age
9 Around Yamunotri shrine mainly white quartzite, schist and porphyroblastic gneiss are exposed. The profusely jointed white quartzite which is exposed just behind the Yamunotri temple is also thinly bedded, recrystallised, hard and compact. The general strike of the beds in the quartzite is N 50 o W S 50 o E / dips 45 o 50 o towards N 40 o E. A few joints are observed 80 o due West; 85 o due S 50oW; 40 o due S 40 o W; 45 o due N 40 o E. At the contact of Gneissose rock and quartzite of central crystalline is exposed along Garur Ganga, about 60 m upstream of proposed UTP location. The streaky gneiss is well exposed in the right bank of Yamuna Rievr along foot track to Yamunotri. The rock is medium to coarse grained and foliated Lower Terminal Point: The area for the terminal station is a part of glacio fluvial terrace of thickness of ±150 m. No bed rock is exposed at this location and the nearby area is occupied by few boulders of gneissic rocks which are embedded in unconsolidated material which is moronic in nature. At this point, slope is of the order 5 o to 10 o in the direction towards N 300 o. However, at the scarp face of overburden on the left bank of river slope is about 60 o to 75 o towards N 300 o to 320 o. From the stability point of vies, the location is safe for the terminal station TR-1: The tower is located on the same terrace as Kharsali Village. The point is located on the slope of scarp face of overburden material and is occupied by bushes only. At this point, the slope is of the order of 40 o to 50 o in the direction towards N 300 o TR-2: The point is located near the toe hill on the river terrace which is located on the left bank of the river near Jankichatti area. The area forms a part of the flood plain of the Yamuna River. No bedrock is exposed at this location. However, at the back about 5 m distance back slope exposes gneissic rock which are up stream dipping at 40 o - 50 o towards N 30 o. At this point, slope is of the order 5 o onto 15 o in the direction towards N 10 o. Overburden thickness is ± 5m. Overburden is composed of unconsolidated soil and RBM material. The location is safe for tower erection TR-3: The tower is located on the same river terrace. At this point slope is in the order of 0 o to 5 o in the direction towards N 300 o. Flat surface is available for foundation. However, at the back about 50 m distance the backslope is gently dipping. Overburden thickness would be about ± 80 m. The point is safe for tower erection TR-4: The point is located in the forest area, near the toe hill on the river terrace which is located on the left bank of river near Jankichatti area. The area forms a part of the flood plain of Yamuna River. However, at the back about 30 m distance the back slope exposes gneissic rock which are upstream dipping at N 300 o. Overburden thickness would be about ± 80 m. Overburden material is composed of RBM, old slided material and few boulders of gneissic rock are seen to be embedded in unconsolidated material. The point is safe for tower erection TR-5: The point is located near the toe hill on the river terrace which is located on the left bank of the river near Jankichatti area. The area forms a part of the flood plain of the Yamuna River. No bedrock is exposed at this location. However, at 8 P age
10 the back about 10 m distance back slope exposes gneissic rock which are up stream dipping at 40 o -50 o towards N 30 o. At this point, slope is of the order 5 o to 15 o in the direction towards N 300 o TR-6: The point is located in the forest area. At this point the slope is of the order of 20 o to 30 o. in the direction towards N 290 o. Overburden is composed of RBM and is about 10 m thickness. The location is safe for tower erection TR-7: The point falls within forest area and located about 80 m above the river level and covered with bushes. Back slope is covered with trees and rocks dipping upstream. Bedrock will be available ± 1 m depth. At this point, foliation is same as slope which is at 40 o to 50 o in the direction towards N 10 o. The location is safe for tower location TR-8: The point is located about 30 m above river level and is covered with bushes. Back slope is of the order of 50 o to 60 o in the direction N 20 o. Bedrock will be available ± 1 m depth.. Overburden material is composed of old slide debris material which is covered with grass, bushes and trees and the location is safe for tower erection TR-9: The point is located on the right bank almost on the riverbed on the RBM. The point is mainly covered with bushes and river borne material. Bedrock will be available ±10 m depth. Overburden material is composed of river bore material. The location is suitable for tower erection TR-10: The point is located at the top of a hill about 40 to50 m above river level. On the left, gneissic rock is exposed around and below this point. The overburden is old debris, which is sloping at 40 to 60 o. towards N 300 o direction. The location is suitable for tower erection TR-11: This location is a part of the UTP area. No in situ rock outcrop is present at this point. Thickness of the overburden at this location would be 40 m and surface slopes at 60 o to 70 o towards N 210 o -220 o. Bedrock is exposed along the nallah section. The right slope with at the scarp face of the overburden is about 60 o to 75 o towards N 300 o -320 o direction. Location is very near to the scarp face of the overburden. The sliding in the overburden mass at scarp face is observed. As the entire UTP area is covered with bushes only, no tree cutting is involved. Flat surface is not available for foundation. The location is suitable for tower erection as no other location is available around this area as far as the alignment is considered Upper Terminal Point: The entire UTP area fall within Reserve Forest Land. The triangular shaped UTP area falls on the left bank of Yamuna River and Garur Ganga. The rocks exposed around this location are schist, quartzite and porphyroblastic gneiss. White quartzite is exposed in Yamunotri temple area and contact between quartzite an gneiss is well exposed on the back slope on the right bank of Garur Ganga. The litho tectoic contact is trending at N 290 o. The quartzite is exposed in the back slope above right bank of Garur Ganga and is covered with mixed forest and bushes. The rocks are dipping into the hills. Minor creep has bee 9 P age
11 noticed. Foliation joints 30 o - 40 o / N o. The foliation in the gneissic rock strike at N 295 o dipping 40o towards N 40 o as observed in Garur Ganga. No in situ rock outcrop present at this point and nearby area is occupied by boulders of gneissic rock embedded in unconsolidated moronic glacial material. Overall thickness of the overburden material varies around ± m which slopes at 10 o to 70 o. At the higher level particularly at UTP location, more or less flat surface is succeeded by steeper slopes at scarp face of overburden Tower foundation will be overburden material. The proposed ropeway alignment comprises of rocks if granite gneiss of Central crystalline with rugged topography and falls in reserve forest area. The bed rock may not be available within reasonable depth at the locations of the proposed LTP and UTP. Hence the foundations will have to be designed on the overburden material. Post construction safety measures like avalanche deflector will be installed. Detailed geotechnical investigations will be carried out for each tower location. The structures will be designed considering adequate factor of safety for seismic loads and dynamic loading due to high wind speeds. 3.2 LANDSLIDE AND SEISMIC HAZARD VULNERABILITY The Himalayas being geologically young and susceptible to earthquakes and intensive soil erosion are highly prone to occurrences of landslides. Himalayas each year witness a series of landslides both small and large, especially in the post monsoon period. These natural disasters have occurred in all the sections of the Himalayas from outer to Higher Himalayas. The proposed alignment falls in landslide hazard zone. Uttarakhand state is also prone to earthquakes. During the past 200 years Uttarakhand has experienced 116 earthquakes. Uttarakhand has been placed in the zone V and IV as per the Seismotectonic Atlas of India published by the GSI in the year Major parts of Uttarkashi district fall in high hazard zone and earthquakes of M>6<7 can be expected in this region every 100 years. Adequate safety measures will be ensured during the construction of the terminal stations and the line towers and are discussed in the Environment Management Plan. The structures will be designed for appropriate factor of safety for seismic and dynamic loads due to high wind speeds and a minimum factor of safety of 5 will be assumed for the design of the ropeway. The area near Upper terminal station falls in avalanche prone area and will be provided with avalanche deflector system. Detailed geotechnical investigations will be caried out for the design of foundations which will be certified by an independent competent agency appointed by the Government of Uttarakhand. At present construction of hotels, residential buildings, roads, government office buildings, guesthouses and other miscellaneous structures are being constructed on the hill slopes and proper precautions in design, landslide protection, etc have been taken into consideration. The cable car is a very small project and the foundations of the 11 towers are 1/10 th the size of a G + 2 building foundations. The foundations are shallow and the depth of the foundation will not exceed 1 metre since they will be designed as gravity foundations. The excavation of the foundations will be by labour and the use of heavy machinery will be avoided. This results in the least disturbance to the surrounding soil. 10 P age
12 4. RISK ASSESSMENT AND DISASTER MANAGEMENT PLAN Ropeways are liable to suffer from environmentally induced threats, risks and hazards as well as human -caused occurrences. Disasters due to technical failures and natural causes have been identified. Natural disasters include earthquakes, landslides, rock falls, storms, avalanches, lightening etc and technical failures may include rope with broken wires in service, drive / return sheave shaft failure / tension system failure, mount assembly parts failure, over speeding of ropeway / brake failure, rollback, slippage / fall of cabin, entanglement of cabin, swinging of cabin resulting in fall of passengers outside cabin, cabin derailment at station etc. while accidents include fire in fuel storage areas. Personnel for disaster failure have been identified and properly documented in the disaster management plan. The various cells - technical, team for rescue (trained and skilled operators) will be clearly indicated. 4.1 Risk Assessment: Identify all potentially hazardous scenarios associated with the fuel storage at site that will impose risk to cable car passengers and workers during construction and operational phases; Conduct Quantitative Risk Assessment to assess the associated risk and express the risks in both individual and societal terms; Identify practicable and cost effective risk mitigation measures if required. The following are the issues to be addressed with reference to technical and natural failures: Reasons Prevention Action required to be taken Socketing failure Proper material used, design of socket and periodic Maintenance guidelines to be followed regularly inspection Splicing failure Periodic inspection Training manpower, tools Fall / slippage of cabin (Grip failure, Hanger failure, failure of joints, overloading) Cabin door opening (collisions, jerking, component failure ) Mount assembly parts failure, tower failure (rusting, overusage, ascertained deterioration, natural calamity) to check for fatigue or corrosion of the anchor bolts on a sample tower Components to be replaced as per life cycles Simple precaution like locking before leaving, cabin follow rules Continuous monitoring, life cycle of components to be whether a continuous uphill load imposed by the subtended angle of the haul rope on any vertical tower and tackles Replacement at proper time intervals to be done Seat fasteners for seats to prevent falling of passengers Life cycle monitoring Prevent water retention and resultant corrosion 11 P age
13 Hitting of cabin (Improper demarcation of area, improper passenger management) might lead to excessive fluctuating loads on the anchor bolts; Proper signage, proper demarcation and cordoning of cabin, training of operators Training of operators, proper maintenance Electrocution (Lighting) Proper rope earthing Periodic monitoring Entanglement of cabin (High wind, breakage of catenary wire) Install and monitor Wind speed, condition of wires Natural causes like earthquakes, landslides, wind storm, hailstorm, flood, jungle fire Earthquake resistant constructions, proper retention of landslide prone areas, early warning systems Periodic inspection of catenary wire, monitoring Early warning systems 12 P age
14 5. IDENTIFICATION OF IMPACTS DURING CONSTRUCTION PHASE No. Components Aspect Potential Impact 1 Topography and Geology Site development Minor negative impact Construction activity leading 2 Soil to topsoil removal and erosion. Minor negative impact 3 Ecology Flora and Trimming of trees Diversion of forest land Minor Negative impact Fauna No significant 4 Water quality Surface runoff from project site Improper debris disposal. negative impact. Short term Socio- Increased employment 5 economic Environment generation Transient Labour population Minor Positive impact Minor Negative impact Minor negative impact Dust emissions from confining to the site Ambient Air construction activities (ropeway premises. No significant 6 Quality stations and development at Kharsali Village impact beyond construction zone. Noise generated from Minor negative impact near 7 Noise construction activities, operation of construction equipment and traffic due to noise generation sources inside premises. No significant impact on materials. ambient noise levels at sensitive receptors. Short term From the above it can be surmised that the impacts have minor negativity and with proper mitigation measures they will be negated. 13 P age
15 6. IDENTIFICATION OF IMPACTS DURING OPERATION PHASE No. Components Aspect Potential Impact 1 Soils Ecology 2 Flora Fauna and Disturbance of soil near proposed ropeway stations Degradation of soil quality due to development at Kharsali Village Disturbance due to Diversion of forest land Cutting of trees Disturbance to flora and fauna Minor negative impact Negative impact 3 Water Quality Discharge of Domestic effluent No significant adverse Use of approximately 100 i t 4 Water usage 5 6 Socioeconomy Ambient Quality Air m 3 /day of water to be sourced from Garhwal Impact Jal on Sansthan and mule operators Increased Revenue generation Increased employment generation Improved infrastructure and better utility Emissions from DG sets 7 Noise Noise from DG Sets 8 Traffic Pattern Development of environment friendly and convenient alternate means of transportation Minor negative impact Minor Negative impact Minor positive impact Minor positive impact Minor positive impact Minor Negative Impact Minor negative impact Moderate negative impact inside premises. No significant impact at Sensitive receptors. Major positive impact We have outlined in brief below the various impacts and their mitigation measures wherein it can be safely concluded that the cable car is a non polluting mode of transport and is a boon to the pilgrims as their journey will be safe and stressfree. 14 P age
16 7. ANTICIPATED IMPACT AND MITIGATION MEASURES We have given below the summary of the various likely impacts and their mitigation measures. 7.1 LAND ENVIRONMENT Anticipated Impact Some of the anticipated impact, especially during the construction phase which need to be addressed, are There may be a change in the topography and drainage pattern Top soil erosion Soil contamination due to project activities Loss of productive soil and impact on natural drainage pattern Mitigation Measures Some mitigation measures are identified and given below. These measures may be used wherever applicable Natural drainage patterns can often be maintained by preparing sodden waterways or installing culverts. Engineering plans can be drawn to reduce the area of earth cuts on fills below what might otherwise be acceptable, provide physical support for exposed soil or rock faces, concentrate or distribute - as appropriate the weight loading of foundations to areas or state better able to support that weight, The topsoil stockpile is to be protected or can be utilized. 7.2 WATER ENVIRONMENT Anticipated Impact Impact of water resources due to shifting of water courses, if any Impact of water withdrawal on surface water / ground water resources-impact on exploitation of surface / ground water Waste water from washing of cable cars Waste water generation from toilets Mitigation Measures Water conservation in landscaping STP for collection, treatment and disposal of sewage / waste waters 7.3 AIR ENVIRONMENT Anticipated Impact Construction phase would involve site clearances and preparation, infrastructure development, aerial ropeway construction and other related activities Operational phase would involve emission from vehicular movement and diesel generators. 15 P age
17 7.3.2 Mitigation Measures Provision for spraying water to reduce dust emissions during the construction phase Proper maintenance of vehicles and DG sets. 7.4 NOISE ENVIRONMENT Impact Prediction Impact of vibrations on the surrounding environment Noise due to demolition / construction activities Impact due to present and future transportation activities by road Operation of DG sets Mitigation Measures Identification and adoption of mitigating measures for noise abatement including noise barriers for point sources and line sources and measures to minimize effect of vibrations due to construction activities are to be detailed. Acoustic enclosure to be provided for DG sets. 7.5 BIOLOGICAL ENVIRONMENT Anticipated Impact Loss of forest cover Habitat fragmentation and blocking of migratory corridors due to project activities Loss of plants of economic importance Mitigation Measure Mitigating measures to compensate the loss of forest cover by replantation. Restoration/Regeneration of rare plants of economic importance including medicinal plant species. There are no migratory bird paths in the corridoor 7.6 SOCIO ECONOMIC AND HEALTH Anticipated Impact: Details of public and private land in the proposed and immediate surroundings, socioeconomic status of the affected owners of the private lands, if any should be properly compiled Impact of the project on socio cultural aspects should be assessed Damages to any historical sites if present in the area should be reported Mitigation Measures: Mitigating measures should take into account the needs of the people based on primary data as obtained through need assessment survey/study. Local people especially the woman and women self help group should be involved in selecting alternative location to be made available to the affected people if applicable. 16 P age
18 7.7 HEALTH AND WEALTH BEING OF CONSTRUCTION WORKERS Construction activities are emitting large pollution to environment. Large volumes of suspended particulate matters are released during construction work leading to air pollution. Unhygienic site sanitation facilities cause damage to environment and to health of the construction workers Mitigation Measures The objective is to ensure health and safety of the workers during construction, with effective provisions for the basic facilities of sanitation, drinking water, safety of equipments or machinery etc. Following are some of the recommendations to be followed: Comply with the safety procedures, norms and guidelines (as applicable) as outlined in IS5228, IS 5229 and IS 5230, code of practice for construction of aerial ropeways, Bureau of Indian Standards Provide clean drinking water to all workers Provide adequate number of decentralized latrines and urinals to construction workers. Guarding all parts of dangerous machinery. Precautions for working on machinery. Maintaining hoists and lifts, lifting machines, chains, ropes, and other lifting tackles in good condition. Durable and reusable formwork systems to replace timber formwork and ensure that formwork where used is properly maintained. Ensuring that walking surfaces or boards at height are of sound construction and are provided with safety rails or belts. Provide protective equipment; helmets etc. Provide measures to prevent fires. Fire extinguishers and buckets of sand to be provided in the fire-prone area and elsewhere. Provide sufficient and suitable light for working during night time. Dangers, health hazards, and measures to protect workers from materials of construction, transportation, storage etc. Safety policies of the construction firm/division/company. 7.8 SOLID WASTE AND ENVIRONMENT Anticipated Impact: Impact due to non-hazardous and hazardous solid waste generated during the construction and operational stages should be assessed Mitigation Measures: Mitigation measures to comply the norms will be planned. Options for minimization of solid waste and environmentally compactable / recycling of waste to conserve natural resources should be planned. Management and disposal of temporary structures, made during construction phase will be planned. 17 P age
19 Yamunotri Ropeway Project TRAFFIC REPORT Prepared By YAMUNOTRI PROJECT COMPANY PRIVATE LIMITED
20 CONTENTS 1. Introduction to the Report About Uttarakhand About Yamunotri Need for the Project Terms of Reference Scope of the Ropeway Project Market Assessment of Tourism Overview of Tourism A Global Scenario Contribution of Tourism Sector to India s GDP and Employment Religious Tourism in India Existing Hilltop Pilgrimage destinations using Ropeway Mansa Devi and Chandi Devi, Uttarakhand Naina Devi, Himachal Pradesh Assessment of Yamunotri Attractions in Yamunotri The Temple Saptarishi Kund Surya Kund Divya Shilla Excursions Barkot Hanuman Chatti Janki Chatti Kharsali Village Traffic Analysis Base Foot falls and Percentage Using Ropeway Growth in Pilgrims Using Ropeway Ropeway Project The Way Out Potential for other tourism activity 20 2 P age
21 7. The Concessionaire Business Area P age
22 1. INTRODUCTION TO THE REPORT 1.1 ABOUT UTTARAKHAND The state of Uttarakhand, erstwhile Uttaranchal, was formed on 9 th November 2000 as the 27 th State of India, when it was carved out of northern Uttar Pradesh. Located at the foothills of the Himalayan mountain ranges, it is largely a hilly State, having international boundaries with China (Tibet) in the north and Nepal in the east. On its north-west lies Himachal Pradesh, while on the south is Uttar Pradesh. It is rich in natural resources especially water and forests with many glaciers, rivers, dense forests and snow-clad mountain peaks. The state has a vast tourism potential in adventure, leisure, and ecotourism. According to Census of India, 2011, Uttarakhand has a total population of Lakh with a decadal growth rate of percent for the year Out of total population, 51 percent are males while 49 percent are females. The population density of the state is 189 persons per sq.km while the literacy rate is 79.6 percent which is higher than the national average of 74 percent. 4 P age
23 The table below shows the Domestic and Foreign tourist arrival in Uttarakhand. According to the statistics available, the share of Uttarakhand to the total tourist in India (domestic tourist) has increased in past few years while in case of foreign tourist, the growth is almost stagnant. It can also been observed that the tourist inflows in the state, both domestic and foreign, has shown a significant increase in past 2-3 years. Tourist Arrivals in the State State/Coun try Domestic Foreign Domestic Foreign Domestic Foreign U khand 2,05,46,323 99,910 2,19,34,567 1,06,470 3,02,06,030 1,27,258 All India 56,29,82,298 1,41,12,590 65,00,38,673 1,37,17,522 74,02,14,297 1,78,52,777 % U kha Gr nd ow All th India Share of Uttarakhan d to India Source: Ministry of Tourism, GOI According to published figures by Ministry of Tourism, Government of India, for the year 2010, the state has improved its rank from 8 th to 7 th in case of domestic tourist visits while it has lowered in case of foreign tourist i.e., from 15 th in 2009 to 16 th in The tourism industry is a major contributor to the economy of Uttarakhand, with hill stations at Mussorie, Almora, Ranikhet and Nainital being some of the most frequented destinations. Some of the holy Hindu shrines also belong to this region. For almost 2000 years, pilgrims have been visiting the temples at Haridwar, Rishikesh, and Char Dham (Yamunotri, Gangotri, Kedarnath and Badrinath). 1.2 ABOUT YAMUNOTRI Yamunotri is the source of the holy river Yamuna. It is situated at an altitude of 3,253 m in the Gharwal Hills, Uttarkashi District, Uttarakhand. It is one of the four sites of chota char dham pilgrimage Yamunotri, Gangotri, Kedarnath and Badrinath. The main attraction of the region is the Yamunotri temple devoted to the Goddess Yamuna. Yamunotri has an all year cold climate. Summers during April to July are pleasant with temperature ranges within 6 C to 20 C and May-June are the warmest months. The temperature during winters from October to March dips as low as 4 deg. C. and is characterized by heavy snowfall. The shrine attracts devotees in large numbers from May to October and the temple remains closed from November to April. 5 P age
24 Accessibility: Air: Rail: Road: Nearest airport is Jolly Grant, Dehradun. Nearest railhead is at Rishikesh. Dehradun to Yamunotri 173 km. via Mussoorie 30 km, Barkot 93.7 km, Sayana Chatti 27 km, Hanuman Chatti 6 km, Janki Chatti 3 km and Yamunotri 6 km. Rishikesh to Yamunotri 222 km. via Narendranagar 16 km, Chama 46 km, Brahmkhal 15 km, Barkot 40 km, Sayana Chatti 27 km, Hanuman Chatti 6 km, Janki Chatti 3 km and Yamunotri 6 km. Languages: Food: Hindi, Garhwali and English Only local eating houses (dhabas) are available. Non-vegetarian food and alcoholic drinks are prohibited in Yamunotri. Snowfall: Average snowfall is 2-3 m. Accommodation: There are ashrams, dharamshalas, and a few guesthouses in Yamunotri. The Garhwal Mandal Vikas Nigam (GMVN) Tourist houses at Janki Chatti and Yamunotri can be checked out. These are mostly in the form of dormitories. One can find simple vegetarian food in these places. Yamunotri Temple JankiChatti Kharsali 6 P age
25 1.3 NEED FOR THE PROJECT The growth of traffic to Yamunotri has been phenomenal especially during the last 10 years. During 2001 to 2011, the traffic to Yamunotri has increased from 54,074 to 4,69,561 a compounded annual growth rate of 24.13%. The further growth in pilgrims to Yamunotri has to be matched with facilities available en route to reach Yamunotri. Government of Uttarakhand as their strategy to develop tourism in the state has identified many tourism development projects. These initiatives will not only address the inadequacy of the tourism destinations, but will also enhance the tourism prospect, that happens to be one of the economic driver of the state. Uplifting the infrastructure of the Yamunotri is one of such initiative taken by Government of Uttarakhand. The last point to reach Yamunotri shrine by vehicle is Janki Chatti. The actual temple is only accessible by a five kilometer walk from the town of Janki Chatti. The 5 km route of Yamunotri from Janki Chatti is traversed by the pilgrims either on foot or by the means of ponies, and palkies. The elevation of Yamunotri from Janki Chatti is about 600 m and the journey is quite tiresome. For this reason, construction of a ropeway system shall provide comfort, safe and fast journey. The benefits of a ropeway system between Kharsali village (connected to Janki Chatti by pedestrian bridge) to Yamunotri Shrine therefore justify its construction. Therefore, Government of Uttarakhand proposes to develop a passenger ropeway between Kharsali to Yamunotri. This passenger ropeway project has been awarded to a private company through Public Private Participation on Build, Operate and Transfer ( BOT ) basis with a concession period of 30 years. 7 P age
26 2. TERMS OF REFERENCE The Government of Uttarakhand, to exploit the State s unlimited tourism potential, has formed an Uttarakhand Tourism Development Board ( UTDB ) with the responsibility for the development and promotion of tourist destinations in the state. UTDB has taken several initiatives, in association with private sector and other industry players, towards the development of diverse tourist attractions in the state. As one of such initiatives, UTDB and its nominated agencies/advisors/consultants on behalf of Uttarakhand (GoU) (the Authority ) is engaged in the development of tourism and as part of this endeavor, the Authority has decided to undertake development of passenger ropeway between Kharsali and Yamunotri (the Project ) through Public Private Participation on Build, Operate and Transfer (the "BOT") basis. Yamunotri Project Company Pvt. Ltd. ( Concessionaire or YPCPL ), a company incorporated by UIPC under the provisions of Companies Act, 1956, having its registered office at A-21, Green Park, Aurobindo Marg, New Delhi as Special Purpose Vehicle ( SPV ) for undertaking the development of the project. The Selected Bidder has, purchased (at par value) UIPC s 100% equity shareholding in Yamunotri Project Company Pvt. Ltd. as per the terms of the Authority. 2.1 SCOPE OF THE ROPEWAY PROJECT The scope of the work will broadly include planning, designing, investing, constructing, marketing, and the operation and maintenance thereof. Brief details of the project S.N. Key Information Details 1. Length of the Ropeway m 2. Project Title Yamunotri Ropeway Project 3. Location Kharsali, Uttarkashi District, Uttarakhand, India 4. Project area / Development norms a) Lower Terminal point (LTP) at Kharsali Village (1.564 hectares approx.). b) Upper Terminal Point (UTP) at Yamunotri (0.990 hectares approx.) c) Right of Use (RoU) for Ropeway Corridor (3.072 hectares approx.) 8 P age
27 5. Minimum Development Obligations/Mandatory Project Facilities Type of Ropeway System: Mono-cable Detachable Gondola System. Drive Gear with entire driving arrangement, Cabins, Hanger, Carriage and Haulage Rope to be mandatorily procured imported. The electrical items in the above system such as electrical drive system, motor, control panels, electrical fixtures and fittings, etc. can be procured indigenously from reputed suppliers such as ABB, Siemens, L&T or equivalent. LTP AT KHARSALI VILLAGE Ropeway Tower and Terminal Station (Boarding & De-boarding, D.G. Room, Administration block, Gondola parking space, Clock room, Toilets) Parking slots as per the basic requirement Accommodation - Minimum 20 rooms in any type, form (i.e. rooms or dormitory) Waiting lounge Public Convenience facilities Basic infrastructural facilities like sewage system, drinking water, medical facilities, electricity, telecommunication etc. UTP AT YAMUNOTRI Ropeway Tower and Terminal Station (Boarding & De-boarding, D.G. Room, Administration block, Gondola parking space, Clock room, Toilets) Pedestrian bridge connecting UTP and pathway to Yamunotri temple Waiting lounge Public Convenience facilities Basic infrastructural facilities like sewage system, drinking water, medical facilities, electricity, telecommunication etc. The Concessionaire may use its discretion to decide on the scale and size of the components, except the Ropeway and its associated structures, which shall be as per the specifications and applicable guidelines. The Concessionaire is required to adopt an approved technology specifically for construction and operation of the Ropeway and its associated structures as per the IS codes and other specifications mentioned in the draft Concession Agreement including procurement of the associated equipment from the reputed vendors / manufacturers as per the list provided in the draft Concession Agreement or approved by the Authority. 9 P age
28 6. Concession Period 30 (thirty) years including construction period from the Appointed Date as per the terms of the Concession Agreement, with provision of renewal for another 10 (ten) years provided that the Concessionaire refurnish the ropeway machinery within the initial 30 (thirty) years from the Appointed Date so that the Project and Project Facilities can be transferred back to the Authority in good working condition at the expiry of the Concession Period. The refurbishment would be required to be completed by the Concessionaire during the period between 28 th and 30 th year from the Appointed Date. 7. Environmental Clearance Consent to Establish by State Pollution Control Board An Environment Impact Assessment (EIA) study has been completed for the Project by SENES Consultants Pvt. Ltd. The project has been accorded the Environmental Clearance under Environmental Impact Assessment Notification, 2006 vide letter no /2007- IA-III dated 8 th Sept The Concessionaire is required to adhere to the observations made by the MoEF Board, mentioned in the letter no /2007-IA-III dated 8 th Sept (Annex-I to Schedule E of draft Concession Agreement) and to the Environment Management Plan, Disaster Management Plan and the monitoring system as mentioned in the EIA study approved by the MoEF board for the Project. Consent to Establish provided by State Pollution Control Board vide their letter no. UIPPCB/HO/NOC-1322/09/252 dated (Annex-II to Schedule E of draft Concession Agreement) 8. Construction Period 48 months from the Appointed Date 9. Project Land Forest Land: The Forest Land Lease Deed Agreement executed on 1 st October, Private Land: The Land Lease Agreement executed on 5 th September, P age
29 3. MARKET ASSESSMENT OF TOURISM 3.1 OVERVIEW OF TOURISM The World Tourism Organization defines Tourists as people traveling to and staying in places outside their usual environment for not more than one consecutive year for leisure, business and other purposes". Travel & Tourism is an important economic activity in most countries around the world. As well as its direct economic impact, the industry has significant indirect and induced impacts. With economy prosperity and growth coupled with high disposable income, globalization, and increase in standard of living; more freedom has been given than ever before to people, to travel around, which continues to fuel growth. Travel and tourism have also been a major contributor to growth in other sectors like hospitality, health care, travel operators, retail etc. Similarly, growing international trade particularly from emerging markets will sustain business travel demand. Nations have started understanding the importance of tourism s contribution to the national economy and in recent years, the sector has gained significance as important economic driver A GLOBAL SCENARIO In 2011, Tourism contributed 9% of global GDP or a value of over US$ 6 trillion and accounted for 255 million jobs. Over the next ten years this industry is expected to grow by an average of 4% annually, taking it to 10% of global GDP, or approx. US$10 trillion. By 2022, it is anticipated that Travel and Tourism will account for 328 Mn jobs i.e.1 in every 10 jobs in the world was one of the most challenging years ever experienced by the global Travel & Tourism industry. However, latest research by World Tourist Council suggests that, despite political upheaval, economic uncertainty and natural disasters, the industry s direct contribution to world GDP grew by nearly 3% to US$ 2 trillion and directly generated 1.2 million new jobs. This was supported by a 3% increase in visitor exports to US $1.2 trillion, with almost 3% growth in capital investment, which rose to over US$0.7 trillion. 11 P age
30 3.1.2 CONTRIBUTION OF TOURISM SECTOR TO INDIA S GDP AND EMPLOYMENT The direct contribution of Travel & Tourism to India s GDP in 2011 was INR 1,689.8 Bn (1.9% of GDP) and is estimated to have touched INR 1,818.5 Bn in 2012, a rise of 7.6%. This primarily reflects the economic activity generated by industries such as hotels, travel agents, airlines and other passenger transportation services (excluding commuter services). Though, it also includes, for example, the activities of the restaurant and leisure industries directly supported by tourists. The direct contribution of Travel & Tourism to GDP is expected to grow by 7.7% pa to INR 3,805.2 Bn by Travel & Tourism generated 24,975,000 jobs directly in 2011 (5.0% of total employment) and it is estimated to grow by 3.0% in 2012 to 25,733,500 (5.0% of total employment). This includes employment by hotels, travel agents, airlines and other passenger transportation services (excluding commuter services). It also includes, for example, the activities of the restaurant and leisure industries directly supported by tourists. By 2022, Travel & Tourism will account for 30,198,000 jobs directly, an increase of 1.6% per annum over the period of next ten years. NATIONAL SCENARIO Inn 3.2 RELIGIOUS TOURISM IN INDIA India perhaps is the only country in the world which is rich in religious and cultural diversity due to population of over 1.1 billion consisting of Hindus (70%), Muslims (20%), Christians, Sikhs, Buddhist, Zoroastrians and others (10%). Majority of Indians thrive on the unconditional belief and faith in religion/ god. It is always proclaimed that in India miracles work more than the human and that is mainly due to their belief in God. It is estimated that India has the largest collection of holy places in the world i.e. Hindu shrines, Muslim mosques, Sikh gurudwaras, Christian churches, Buddhist monasteries, Parsies agiaries etc. spread all over the country leading to millions of pilgrims visiting these holy places at a regular frequency. 12 P age
31 3.3 EXISTING HILLTOP PILGRIMAGE DESTINATIONS USING ROPEWAY Some of the most visited hilltop pilgrimage destinations of India are: MANSA DEVI AND CHANDI DEVI, UTTARAKHAND Mansa Devi and Chandi Devi are located at hilltop - Bilwa hill and Neel hill, in Haridwar. These two temples are one the Panch Tirth within Haridwar. The temple is considered a must visit for the pilgrims going to Haridwar. To reach Mansa Devi shrine one has to either follow the trekking route up to this holy shrine or ride on the recently introduced rope-way service. The rope-way service known as "Mansa Devi Udankhatola" was introduced for the benefit of the pilgrims. The rope-way carries the pilgrims from the lower station directly to the Mansa Devi Temple. The total length of the rope-way is 540 meters (1,770 ft) and the height it covers is 178 meters (584 ft). To reach the Chandi Devi temple one has to either follow the three kilometre trekking route from Chandighat or take a recently introduced ropeway service. The rope-way carries the pilgrims from the lower station located near Gauri Shankar Temple on the Nazibabad Road directly to the Chandi Devi Temple located at an altitude of 2,900 metres (9,500 ft). The total length of the ropeway route is about 740 metres (2,430 ft) and height is 208 metres (682 ft). The temples, give scenic views of river Ganga and Haridwar. After the implementation of ropeway system the numbers of visitors to the shrine have increased enormously. Naina Devi temple is one of the most notable places of worship in Himachal Pradesh. Located in district Bilaspur, it is one of the 51 Shakti peeths where limbs of Sati fell on Earth. This holy place witnesses the huge crowd of pilgrims and devotees round the year. The temple is connected with National Highway No. 21. The temple at the top of the hill can be reached via road and then by concrete steps (that finally reach the top). There is also a cable car facility available for NAINA DEVI, HIMACHAL PRADESH 13 P age
32 pilgrims from the base of the hill to the top. Other infrastructural development which carried out to facilitate the pilgrims was the availability of free accommodation, food, 24- hours electrification, medical facilities, road construction, etc. 14 P age
33 4. ASSESSMENT OF YAMUNOTRI 4.1 ATTRACTIONS IN YAMUNOTRI THE TEMPLE The shrine of Yamunotri, situated at an elevation of about 3,235 m is a point of paramount religious importance for Hindus and an essential pilgrimage. Situated in the direction opposite to Gangotri, the road bifurcates from a place called Dharasu, somewhere between Rishikesh-Uttarkashi and goes on to Yamunotri. The shrine can also be visited from Dehradun via Mussoorie. Yamunotri in the Garhwal Himalayas in the state of Uttarakhand is the first stopover for the Char Dham Yatra. Yamunotri is the westernmost shrine of Char Dhams. The shrine attracts devotees in large numbers from May to October. The temple remains closed from November to April. Dedicated to Goddess Yamuna, Yamunotri Shrine is perched atop a flank of the Bandar Poonchh peak (3165 m above sea level). The temple of Yamunotri falls on the left of River Yamuna. The present temple was built by Maharani Guleria of Jaipur in the late nineteenth century SAPTARISHI KUND This is the source of Yamuna but being a little difficult to access; few people go there and most offer their prayers in the temple itself. A twelve kilometre difficult trek route will take you to Saptrishi kund. A natural glacial kund, the trek up to Saptrishi kund eases out around the base of Kalinda parvat. Dark blue waters, slate stones on the banks, and a rare variety of lotus adorning the water, Saptrishi Kund is a sight to behold. 15 P age
34 4.1.3 SURYA KUND Close to the temple is this hot water spring called Surya Kund, Surya or Sun being the mythological father of Yamuna. People not just refresh here but also make prasada for offering. The temperature of the springs is as high as 88 degrees DIVYA SHILLA This is a stone that is worshipped before entering the temple. 4.2 EXCURSIONS BARKOT Barkot is the junction point to Yamunotri. The route to Yamunotri from Dehradun and Rishikesh meets at Barkot. It is a small hamlet, 49 km from Yamunotri. It has an ancient temple and can provide good facilities to the traveler. Barkot is a place of great scenic beauty with spectacular views of snow-capped mountains all around. A magnificent view of the eternal snow peaks of bandar punch can be seen from here. At the time of char dham yatra most of the people, from western part of India stay in Barkot HANUMAN CHATTI Hanuman Chatti lies enroute to Yamunotri. The 13 kilometre distance is usually covered in 6 hours. The riverside walk is like a picturesque countryside walk. Hanuman Chatti is located at the confluence of River Hanuman Ganga and Yamuna. It is also the starting point of trek to Dodi Tal. Hanuman Chatti is a confluence point of two holy rivers (Yamuna and Hanuman Ganga). Trekking route to Dodi Tal starts from here. 16 P age
35 4.2.3 JANKI CHATTI Three kilometres from Yamunotri is Janki Chatti, famous for its hot water springs. You can have a refreshing dip here in the water or make a night halt, as accommodation facility is available here KHARSALI VILLAGE Kharsali village is situated on opposite side of Jankichatti. The approximate population of Kharsali village is All the pujari (Pandey) of Yamunotri Temple are from Kharsali village. 17 P age
36 5. TRAFFIC ANALYSIS The growth of traffic to Yamunotri has been increasing by 10% during the last 5 years. The tourist traffic to other dhams - Gangotri, Kedarnath and Badrinath have also increased during this period. Table indicates number of visitors to Yamunotri. Years Yamunotri Growth % ,27, ,22, % ,54,466 10% ,89,912 10% ,28,904 10% ,71,794 10% The traffic increase has been an average 10% for the last 5 years and the anticipated traffic growth in the future will be an average of 3% as the tourist season is only for approximate 7 months. This increase in traffic is nominal and after 5 years from commissioning the cable car the traffic growth will be stagnant. At present the piligrims take the whole day of approx minimum 6 hours to complete the trek. There are no proper sanitation facilities and rest areas along the route. The present route is steeply inclined and narrow and the ponies are also not able to trot safely and frequently slide down causing mishaps. The piligrims who walk to the temple frequently fall sick due to the rarified atmosphere and are short of breath due to the altitude. From all the above the cable car will provide a safe and comfortable journey and the total time estimated will be around 2hrs including the darshan. The cable car is a non polluting safe mode of transport and it has no air and noise pollution issues. Particulars 5.1BASE FOOTFALLS & PERCENTAGE USING ROPEWAY Base Footfalls (pilgrims) - FY 2017 Pilgrims that would use Ropeway Peak Season 5,52,895 80% Off Season 1,04,480 75% 18 P age
37 5.2 GROWTH IN PILGRIMS USING ROPEWAY Years Traffic Growth % % % 19 P age
38 6. ROPEWAY PROJECT THE WAY OUT Looking at the complex terrain and the problems faced by the growing number of visitors, there is a definite need for a ropeway connecting Kharsali Village to Yamunotri. The ropeway project will have a positive impact on the tourist s inflow to Yamunotri as it is much safer, and time and cost effective mode to reach the Temple from the base station. Increase in tourist inflow will also give a major boost to the local economy by generating direct or indirect employment for the local inhabitant. The proposed ropeway project will also generate employment for the localities. Furthermost, the local business community offering services like lodging & boarding, food etc. will also be benefited from the proposed ropeway project. 6.1 POTENTIAL FOR OTHER TOURISM ACTIVITY: The proposed ropeway project could act as boon for other tourism activities like cultural tourism as the region offer distinctive culture and lifestyle. The adequate sunshine, flora and fauna, herbs, etc offers opportunities for medical/wellness tourism. The site gets adequate amount of snow during winter, which can facilitate winter sports & skiing tourism. The panoramic beauty of the Himalaya in the close vicinity can facilitate to mountain hiking and nature trails. There are several possibilities to add various summer time attractions for specific market segment. It is being contemplated that with the Ropeway project getting on stream, there is a possibility that the temple can remain open even in the part or the full winter season. Further, with the snow clad mountains, there could be a great potential for winter sports being promoted on the lines of Gulmarg. 20 P age
39 7. THE CONCESSIONAIRE Yamunotri Project Company Pvt Ltd ( YPCPL ) has been incorporated as SPV to undertake the implementation of Monocable Detachable Gondola Lift (Passenger Ropeway) between Kharsali village and Yamunotri on BOT basis and will not engage in any other business/activity. 7.1 BUSINESS AREA As per the Memorandum and Articles of Association of YPCPL the Company s main objects to be pursued are: To undertake the project of the construction, development, maintenance and management of Yamunotri Ropeway Project through Public-Private-Partnership on BOT basis. Thus, as per the Memorandum of Association, YPCPL is duly authorized to execute and subsequently operate and maintain the proposed Project Road. 21 P age
TERMS OF REFERENCE FOR SCOPING OF EIA STUDY
TERMS OF REFERENCE FOR SCOPING OF EIA STUDY Ours project is a proposed large scale unit and categorized as 5(h)-B as per the EIA notification 2006 of MoEFCC, New Delhi and subsequent amendments. Looking
How To Conduct An Environmental Impact Assessment
Proposed Terms of Reference for EIA studies 1. Introduction The proposed expansion of Bulk Drugs & Intermediates manufacturing unit by M/s. Sri Krishna Pharmaceuticals Limited (Unit V). is located at Plot
trekking to Yamunotri By Venkatesh Dutta
trekking to Yamunotri By Venkatesh Dutta Perched at an altitude of 3293 meters above sea level, Yamunotri is located in the Uttarkashi district of the northern state of Uttaranchal. It is very close to
Proposed Terms of Reference for EIA studies
1 Proposed Terms of Reference for EIA studies Base line data collection will be collected for the Post-Monsoon season 2016 (September to November 2016) in study area and 10 kms radius from project site.
TERMS OF REFERENCE FOR THE RAPID EIA STUDY
TERMS OF REFERENCE FOR THE RAPID EIA STUDY 1 SUMMARY OF EIA METHODOLOGY STEP I : SCOPING OF THE ASSESSMENT Own with prevailing regulatory setting and criteria Identification of Environmental Assessment
not to be republished NCERT MAJOR LANDFORMS OF THE EARTH
6 You must have seen some of the landform features as shown in the Figure 6.1 below. You will notice that the surface of the earth is not the same everywhere. The earth has an infinite variety of landforms.
Development proposals will require to demonstrate, according to scale, type and location, that they:-
Appendix 2 : Relevant Development Plan Policies Angus Local Plan Review 2009 Policy S1 : Development Boundaries (a) Within development boundaries proposals for new development on sites not allocated on
APPENDIX I (See Paragraph -6) FORM I
APPENDIX I (See Paragraph -6) FORM I (I) Basic Information: Sl.. Item Details 1 Name of the project/s Removal of sand from Sand bar SB-G2 2 S.. in the schedule G 3 Proposed capacity / area/length / tonnage
PROPOSED TERMS OF REFERENCE
PROPOSED TERMS OF REFERENCE ABOUT THE PROJECT: Rampura Marble Mine (ML No.- 420/91) is proposed by M/s Continental Minerals Pvt. Ltd. The Mine Lease area consists of 3.0 ha, which is located at Khasra
Definition of Tower from the Bradley County Zoning Resolution
Definition of Tower from the Bradley County Zoning Resolution 43. TOWER. Any outdoor structure designed and constructed to support one (1) or more transmitting or receiving devices for telephone, radio
ENVIRONMENT MANAGEMENT PLAN
ENVIRONMENT MANAGEMENT PLAN LIMESTONE 1. INTRODUCTION: The proposed Bagdhara Limestone area, near Village- Bagdhara, Taluka- Jamjodhpur and District-Jamnagar, Gujarat has been granted to Dipakkumar Anantray
RISK ASSESSMENT REPORT
RISK ASSESSMENT REPORT Submitted by: Rakesh Kumar, Partner M/s Maluka Bricks Industry Village Maluka, Sub-Tehsil Bhagta Bhaika, Tehsil & District Bathinda. (Punjab) (M): 0-98141-22141 1 ACTIVITY 2 1. Construction,
2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited
(IV) Proposed Terms of Reference for EIA Studies Project Category Project Proponent Location Paraspani Thermal Power Plant (2x800 MW) Coal based Thermal Power Project A [1(d) Thermal Power Plant 500 MW]
TERMS OF REFERENCE. BEFORE CONSTRUCTION: Sl No TOR RESPONSE 1. Legalities of the land: Is the land The Project is clear from all angles.
TERMS OF REFERENCE Name of the Project: M/s Suadela Constructions Pvt. Ltd. Address: Sy.No. 321/2B(P),321/2C(P),322/1,323/1(P),323/1(P),323/3,323/4,323/5(P), 323/6,323/7,325/1(P),325/2,327,328/1,328/2(P),328/3,328/4,330,331,332/2
STUDY OF AMBIENT AIR QUALITY MONITORING ON HIMALAYAN REGIONS GARHWAL AND KUMAON, UTTARAKHAND, INDIA
STUDY OF AMBIENT AIR QUALITY MONITORING ON HIMALAYAN REGIONS GARHWAL AND KUMAON, UTTARAKHAND, INDIA Jagdish Meena P 1, *Apurva Pathak K 2, Anand Soni K 3, Devendra Soni K 4 and Arvind Kumar 5 1, 3, 4,5
APPENDIX I. (See Paragraph-6) FORM 1
APPENDIX I (See Paragraph-6) FORM 1 (I) Basic Information S.. Item Details 1. Name of the Project/s Dankari Granite Black Stone Quarry 2. Sl. in the schedule Sairat case no- 91/ 12-13 3. Proposed capacity
(1) Discuss the determination of the need for public visitation. Visitor center density within 100 miles.
Chapter 4 Specifications Designs 3. Visitors Centers 3. Visitors Centers. The Introduction (Chapter 1) for these design data collection guidelines contains additional information concerning: preparing
RISK ASSESSMENT REPORT
RISK ASSESSMENT REPORT Submitted by: M/s D.D. Bricks Co. Prop. : Harbhagwan Village: Mohan Ke Uttar Tehsil: Guru Harsahai District: Ferozepur, Punjab (M): 0-99993-38601 Construction, operation or decommissioning
ENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS
ENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS PREPARED BY: DEPARTMENT OF ENVIRONMENT AND LANDS INDUSTRIAL ENVIRONMENTAL ENGINEERING DIVISION APRIL 16, 1992 - TABLE OF
Fauna- No particular type of fauna finds except snakes, hynus & Jackals, wild cat, wildhen etc. are found in and around the area.
Environmental Management Plan Baseline information Topography:- The general slope of the area is towards east and gently sloping from 25 0 to 30 0 except southern part which is sloping towards south The
ENVIRONMENTAL MANAGEMENT PLAN. Nilaya Hills/ Heights Promoted by M/s RBS Developers (Group Housing & Commercial Building Project)
ENVIRONMENTAL MANAGEMENT PLAN Of Nilaya Hills/ Heights Promoted by M/s RBS Developers (Group Housing & Commercial Building Project) at Khasra Nos. 1353Min,1354Min,1355, 1356, 1358, 1357, 1587 Ka, 1587Kha,
ENVIRONMENT MANAGEMENT PLAN
ENVIRONMENT MANAGEMENT PLAN 1 [Type the company name] ENVIRONMENT MANAGEMENT PLAN LIMESTONE (BUILDING) 1.0. INTRODUCTION: The proposed M/s. Building Lime Stone Mine of Shree Jitubhai Parbatbhai Chudashma
WEATHERING, EROSION, AND DEPOSITION PRACTICE TEST. Which graph best shows the relative stream velocities across the stream from A to B?
NAME DATE WEATHERING, EROSION, AND DEPOSITION PRACTICE TEST 1. The diagram below shows a meandering stream. Measurements of stream velocity were taken along straight line AB. Which graph best shows the
Final Environmental Impact Assessment of Smt. Singam Bhavani Laterite Mining ADDITIONAL STUDIES
ADDITIONAL STUDIES 7.0 DISASTER MANAGEMENT PLAN It is presumed that the proposed mining process would be designed and engineered with all possible safety measures and standard code of practices. In spite
ENVIRONMENT MANAGEMENT PLAN
ENVIRONMENT MANAGEMENT PLAN ENVIrONMENT MaNaGEMENT plan 1. INTRODUCTION: Shri Ratilal Ravji Solanki have a Blacktrap mining lease project for an area of 1.00.00 Ha located on Survey no. 984 paiki, Village:
SCHEDULE 2 TO THE DEVELOPMENT PLAN OVERLAY Shown on the planning scheme map as DPO2 WAVERLEY GOLF COURSE, LYSTERFIELD VALLEY
SCHEDULE 2 TO THE DEVELOPMENT PLAN OVERLAY Shown on the planning scheme map as DPO2 WAVERLEY GOLF COURSE, LYSTERFIELD VALLEY 1.0 Conditions and requirements for permits A permit to use and develop the
Package Treatment Plant Policy and Procedure
Package Treatment Plant Policy and Procedure PURPOSE There has been increased interest in the use of package treatment plants for new development proposals in the County. Current review procedures are
HOMEOWNER S GUIDE. to LANDSLIDES. and MITIGATION RECOGNITION, PREVENTION, CONTROL, Compiled by Dr. Scott F. Burns Tessa M. Harden Carin J.
HOMEOWNER S GUIDE to LANDSLIDES RECOGNITION, PREVENTION, CONTROL, and MITIGATION Compiled by Dr. Scott F. Burns Tessa M. Harden Carin J. Andrew Federal Emergency Management Agency Region 10 If you are
GEOTECHNICAL ISSUES OF LANDSLIDES CHARACTERISTICS MECHANISMS PREPARDNESS: BEFORE, DURING AND AFTER A LANDSLIDE QUESTIONS FOR DISCUSSIONS
GEOTECHNICAL ISSUES OF LANDSLIDES CHARACTERISTICS MECHANISMS PREPARDNESS: BEFORE, DURING AND AFTER A LANDSLIDE QUESTIONS FOR DISCUSSIONS Huge landslide Leyte, Phillipines, 1998 2000 casulties Small debris
Frequently Asked Questions (FAQs) on Hydropower
Frequently Asked Questions (FAQs) on Hydropower What are the advantages of Hydropower? A renewable source of energy - saves scarce fuel reserves. Non-polluting and hence environment friendly. Long life
720 Contour Grading. General. References. Resources. Definitions
720 Contour Grading General Contour grading directs water to a desired point, prevents erosion, provides noise deflection, provides visual fit of the facility into the landscape, and protects desirable
Environmental Management Plan
Environmental Management Plan ENVIRONMENTAL MANAGEMENT PLAN An Environmental Management Plan is prepared for construction phase, post construction phase (commissioning & operation) and for post project
Key Facts. Passenger growth at the airport is projected to grow to approximately 3 million passengers per annum by 2030.
Bournemouth Airport & Business Park 7 7 Bournemouth Airport & Business Park Introduction 7.1 Bournemouth Airport is a key asset for the region, one of the UK s fastest growing regional airports and is
PROPOSED TERMS OF REFERENCE
Annexure-IV PROPOSED TERMS OF REFERENCE 1.0 Proposed Scope of Work for EIA Study The components of the EIA study include: Detailed description of all elements of the project activities (existing and proposed
ENVIRONMENTAL MANAGEMENT PLAN :-
ENVIRONMENTAL MANAGEMENT PLAN :- The Environment Management Plan (EMP) is required to ensure sustainable development in the area of the proposed project. Hence it needs to be all encompassive plan for
TRAFFIC MANAGEMENT PLAN
TRAFFIC MANAGEMENT PLAN For: The construction and operation of a Photovoltaic (PV) Facility in Dabenoris, South Africa Prepared for: Alternative Energy Solutions (Pty) Ltd PO Box 4939 Tygervalley, South
ENVIRONMENT MANAGEMENT PLAN
6. REHABILITATION AND RESETTLEMENT (R & R) PLAN Since the project is private land, there is no reserves forest or protected forest land within the applied area. There is no human settlements within the
ENVIRONMENT MANAGEMENT PLAN
ENVIRONMENT MANAGEMENT PLAN Page 33 ENVIRONMENT MANAGEMENT PLAN BLACK TRAP 1.0. INTRODUCTION: The proposed M/s. Black Trap Mine of Govindbhai Karshanbhai Ram area at near Vill.Chuldi, Tal.Malia-Hatina,
3.0 Table of Development Note: This table must be read in conjunction with the explanation provided in Part 5, Division 1, Chapter 2 Using Domains.
Part 5 Division 2 Chapter 2 Domains Domains Park Living 1.0 Intent The purpose of this domain is to provide a variety of opportunities for low density residential activity within areas of semi-rural landscapes,
environment briefing02
PRODUCED BY THE SAFETY, HEALTH & ENVIRONMENT GROUP OF THE ENERGY NETWORKS ASSOCIATION - JULY 2006 environment briefing02 transporting electricity Overhead Lines or Underground Cables? Introduction The
A new Garden Neighbourhood for West Guildford An opportunity for Smart Growth. university of surrey November 2013
A new Garden Neighbourhood for West Guildford An opportunity for Smart Growth university of surrey November 2013 A new Garden Neighbourhood for West Guildford Preface Since the County and Borough Councils
APPENDIX 4. Risk Tables
APPENDIX 4 Tables Preliminary Qualitative Criteria The qualitative risk assessment criteria have been developed to identify key risks to the environment, society, heritage and business reputation. The
Department of State Development, Infrastructure and Planning. State Planning Policy state interest guideline. State transport infrastructure
Department of State Development, Infrastructure and Planning State Planning Policy state interest guideline State transport infrastructure July 2014 Great state. Great opportunity. Preface Using this state
PLANNING APPLICATION: 12/00056/APP
PLANNING APPLICATION: 12/00056/APP In the event that a recommendation on this planning application is overturned the Committee is reminded of the advice contained on the front page of the agenda for Reports
TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN
1. GENERAL TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN The main objective of the EIA study is to assess the positive and negative impacts likely to accrue
Project Details- Minor Minerals (Other Than Sand)
Project - Minor Minerals (Other Than Sand) Sr. ABOUT THE PROPOSAL 1. Name of Lease Holder M/s. KARMANBHAI JODHABHAI RABARI (Partner) 2. Location address Mr. Karmanbhai Jodhabhai Rabari Survey No- 194 Paikee,
Why build the Silvertown Tunnel?
Why build the Silvertown Tunnel? Over the last 30 years east London has changed with the redevelopment of former industrial areas into major commercial and residential districts. The development of Canary
DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES. Run-off Analysis Methods
DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES Run-off Analysis Methods This document sets forth the minimum design, technical criteria and specifications for the
MOBILE HOME LAW. Revised November 2001
MOBILE HOME LAW Revised November 2001 TABLE OF CONTENTS: SECTION 1: SECTION 2: SECTION 3: SECTION 4: SECTION 5: SECTION 6: SECTION 7: SECTION 8: SECTION 9: SECTION 10: SECTION 11: SECTION 12: INTENT DEFINITIONS
Addendum D. Nomination of Moody Wash ACEC
Addendum D Nomination of Moody Wash ACEC Moody Wash ACEC is hereby nominated by Citizens for Dixie s Future to: BLM St. George Field Office 345 East Riverside Drive St. George, UT 84790 Moody Wash is a
Speed Limit Policy Isle of Wight Council
APPENDIX C - 59 Speed Limit Policy Isle of Wight Council June 2009 Contents Section 1 Introduction 1.1 Links with the Local Transport Plan Section 2 Speed Limits on Urban Roads and Residential Areas 2.1
EnVirOnMEnT ManaGEMEnT PLan. FOr. M/S. LiME STOnE MinE OF. Dhirajlal Panchanbhai Vachhani. area. PrOPOSEd PrOdUCTiOn:-36000 TPa
EnVirOnMEnT ManaGEMEnT PLan FOr M/S. LiME STOnE MinE OF dhirajlal PanChhanBhai VaChhani area (SUrVEY no.49 PaiKi, ViLL.Unadari, TaL.Una, dis.junagadh) PrOPOSEd PrOdUCTiOn:-36000 TPa PrOJECT COST: - 15
M/s SANGHVI GRUHA NIRMAN PVT. LTD. PROPOSED. REDEVELOPMENT OF BUILDING (JANKI BHAVAN) At
M/s SANGHVI GRUHA NIRMAN PVT. LTD. PROPOSED REDEVELOPMENT OF BUILDING (JANKI BHAVAN) At Final Plot No. 1274, situated at T.P.S. IV, Mahim, Hatiskar Marg, Prabhadevi, Mumbai 400 025. EXECUTIVE SUMMARY PREPARED
Chapter 7. Topography, geology, soils and groundwater. Chapter 7
Chapter 7 Topography, geology, soils and groundwater Chapter 7 7.0 Topography, geology, soils and groundwater 7.1 Introduction and approach A detailed assessment of the existing topographic, geological,
PROPOSAL FOR HOUSTON COUNTY BAN ON SILICA SAND MINING / PROCESSING ACTIVITY. Introduction and Assumptions
PROPOSAL FOR HOUSTON COUNTY BAN ON SILICA SAND MINING / PROCESSING ACTIVITY Introduction and Assumptions 1. The existing section 27 Mineral Extraction of the Zoning Ordinance would remain and continue
CONSTRUCTION TRAFFIC MANAGEMENT PLAN V11, 26/09/12
If the project you are constructing was subject to planning permission and a condition requiring a Construction Traffic Management Plan (CTMP) was applied to the planning consent, this condition will need
4 Alternatives and Design Evolution
4 Introduction 4.1 This Chapter describes the considerations and constraints influencing the siting, layout and massing of the Development. It also describes the main alternatives to the Development that
1. GENERAL STATEMENT OF COMPANY HEALTH, SAFETY AND ENVIRONMENTAL POLICY
1. GENERAL STATEMENT OF COMPANY HEALTH, SAFETY AND ENVIRONMENTAL POLICY Dumfries Timber Co. Ltd. is committed to comply with our legal duties in order to provide a safe and healthy working environment
"Description of the urban and architectural development conceptual design of the historical city centre of Gorzow Wlkp. R3DC4T
"Description of the urban and architectural development conceptual design of the historical city centre of Gorzow Wlkp. R3DC4T Gorzów Wielkopolski Gorzów Wielkopolski is an important regional city centre
Project Details- Minor Minerals (Other Than Sand)
Project - Minor Minerals (Other Than Sand) Sr. ABOUT THE PROPOSAL 1. Name of Lease Holder M/s. ABDUL MUNAF MOHAMMEDMIYA MALEK Mr.Abdul Munaf Mohammedmiya malek (Proprietor) 2. Location address OPP Block
THE PROVISIONAL CENTRAL PRODUCT CLASSIFICATION
THE PROVISIONAL CENTRAL PRODUCT CLASSIFICATION GROUP 867 ARCHITECTURAL, ENGINEERING AND OTHER TECHNICAL SERVICES Excerpt from CPCprov-en-Publication.doc - United Nation Statistic Division Group Class Subclass
Landslides & Mudflows
1 2 - What is a Landslide? - Geologic hazard Common to almost all 50 states Annual global Billions in losses Thousands of deaths and injuries 3 1 - What is a Landslide? - Gravity is driving force Some
PLANNING & REGULATION COMMITTEE 16 JANUARY 2012
Division(s): Sutton Courtenay & Harwell Contact Officer: John Duncalfe ([email protected]) Tel: 01865 815356 PLANNING & REGULATION COMMITTEE 16 JANUARY 2012 TO CRUSH, SCREEN, BLEND AND STOCK
How To Plan A Buffer Zone
Backyard Buffers Protecting Habitat and Water Quality What is a buffer? A buffer (also called a riparian buffer area or zone) is the strip of natural vegetation along the bank of a stream, lake or other
No. Name of Legislation Applicable Issues and Requirements Demonstration of Compliance 1. Health and Safety at Work Act 1974
The Police Treatment Centres Health and Safety Legal Compliance Register No. Name of Legislation Applicable Issues and Requirements Demonstration of Compliance 1. Health and Safety at Work Act 1974 2.
NON-TECHNICAL SUMMARY OF ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT FOR THE BAHCE WINDFARM PROJECT (135 MW)
Zorlu Plaza, 34310 Avcılar ISTANBUL / TURKIYE Tel: + 90 (212) 456-2300 Fax: +90 (212) 422-0099 www.zorlu.com.tr NON-TECHNICAL SUMMARY OF ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT FOR THE BAHCE WINDFARM
S/o Vishnudas Chakraborty, residence at R/o Narsinghgarh, District Rajgarh (M.P.).
RISK ASSESSMENT The Crusher stone deposit lease area is located at Village Badodiya Jagir, Tehsil - Narsinghgarh, District - Rajgarh (M.P.). 02.00 Ha quarry lease area with production of 3306 cubic meter/year
THE NATURAL RESOURCES AND ENVIRONMENT ORDINANCE (CAP. 84 - LAWS OF SARAWAK, 1958 Ed.)
THE NATURAL RESOURCES AND ENVIRONMENT ORDINANCE (CAP. 84 - LAWS OF SARAWAK, 1958 Ed.) THE NATURAL RESOURCES AND ENVIRONMENT (PRESCRIBED ACTIVITIES) ORDER, 1994 (Made under section 11A(1)) (Incorporating
Cathkin Relief Road Planning Statement
Cathkin Relief Road Planning Statement The Proposal This statement sets out the background to the Cathkin Relief Road project currently being progressed by South Lanarkshire Council. The project will provide
Index. protection. excavated drop inlet protection (Temporary) 6.50.1 6.51.1. Block and gravel inlet Protection (Temporary) 6.52.1
6 Index inlet protection excavated drop inlet protection (Temporary) 6.50.1 HARDWARE CLOTH AND GRAVEL INLET PROTECTION Block and gravel inlet Protection (Temporary) sod drop inlet protection ROCK DOUGHNUT
ENVIRONMENT MANAGEMENT PLAN
ENVIRONMENT MANAGEMENT PLAN FOR VILLAGE TEHSIL DISTRICT AREA MINERAL : Makrohar : Mada : Singrauli (M.P.) : 1.00 hect : Metal Stone KHASRA No : 176,178 PRODUCTION CAP : 15375 Cu.mt/year Metal Stone APPLICANT
Coventry Development Plan 2016 Appendix 89. Glossary of Key Terms
Coventry Development Plan 2016 Appendix 89 Glossary of Key Terms Area Action Plan A Development Plan Document which focuses upon a specific location or an area subject to significant change. Affordable
Pre- FEASIBILITY REPORT
Pre- FEASIBILITY REPORT In Respect Of JHILIMINDA SAND BED OVER 20.30 ACRES OR 8.215 HA IN VILLAGE JHILIMINDA, ATTABIRA TAHASIL OF BARGARH DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20) Prepared
PROPOSED RESIDENTIAL DEVELOPMENT LAND OFF MACCLESFIELD OLD ROAD, BUXTON. Construction Management Plan
PROPOSED RESIDENTIAL DEVELOPMENT LAND OFF MACCLESFIELD OLD ROAD, BUXTON Construction Management Plan May 2013 CONTENTS Page No: 1.0 INTRODUCTION 1 2.0 PROJECT ORGANISATION AND RESPONSIBILITIES 2 2.1 Client
FULFORD HEATH GOLF CLUB - Ride on Buggy Policy
FULFORD HEATH GOLF CLUB - Ride on Buggy Policy 1. Introduction 1.1 Use is regulated by Fulford Heath Golf Club s policy with due regard to section 6 of The Equality Act 2010 1.2 During normal conditions
Climate Change and Sri Lanka. Ajith Silva Director/ Policy and Planning Ministry of Environment and Natural Resources Sri Lanka
Climate Change and Sri Lanka Ajith Silva Director/ Policy and Planning Ministry of Environment and Natural Resources Sri Lanka Asia Total Area: 65610 Km Land Area : 62705 Km Inland water : 2905 Km 2 Coastal
ENVIRONMENT MANAGEMENT PLAN
ENVIRONMENT MANAGEMENT PLAN OF M/s Baghel Infrastructure Pvt. Ltd. AT Khasra No 1203/1 Vill- Makrohar, Tehsil-Mada, District-Singrauli (M.P.) Production Capacity: 8158Cu.mt/year Metal Stone Area 1.00 Hectare
16. Storm water drainage
16. Storm water drainage There are three principal ways to dispose of rainwater from roofs, courtyards and paved areas: storm water sewers, soakaways and collection in storage tanks. Storm water sewers,
Pre- FEASIBILITY REPORT
Pre- FEASIBILITY REPORT In Respect Of SRIPURA SAND BED-BOVER 35.25 ACRES OR 14.265 HA IN VILLAGE SRIPURA, JHARSUGUDA TAHASIL OF JHARSUGUDA DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20) Prepared
The Terms of reference (ToR) for conducting Rapid EIA study for the proposed project is described below:
Proposed Terms of Reference for EIA Study Objective: In order to identify the environmental impacts due to construction and operation of the proposed project and associated facilities, a study will be
Mechanical Engineering and Material Handling Aspects of NSDF
Mechanical Engineering and Material Handling Aspects of NSDF R. K. Gupta and A. K. Singh BARC- IAEA Regional Training Course on Development of Near Surface Disposal Facility February 15-19, 2010 Mumbai,
Description of Simandou Archaeological Potential Model. 13A.1 Overview
13A Description of Simandou Archaeological Potential Model 13A.1 Overview The most accurate and reliable way of establishing archaeological baseline conditions in an area is by conventional methods of
DISTRICT: UTTARKASHI. District Head Quarters: Uttarkashi. Division: Garhwal
DISTRICT: UTTARKASHI District Head Quarters: Uttarkashi Division: Garhwal District Uttarkashi came into existence on 24 th February 1960. It is bounded by Tibet (China) in the north, Himachal Pradesh in
LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT
LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT Introduction The purpose of this Public Environmental Report (PER) is to provide the Government
CHAPTER 3A Environmental Guidelines for STREAM CROSSING BY ALL-TERRAIN VEHICLES
GOVERNMENT OF NEWFOUNDLAND AND LABRADOR DEPARTMENT OF ENVIRONMENT AND LABOUR CHAPTER 3A Environmental Guidelines for STREAM CROSSING BY ALL-TERRAIN VEHICLES WATER RESOURCES MANAGEMENT DIVISION Water Investigations
Introduction to. Aalborg s Sustainability Strategy 2013-2016
Introduction to Aalborg s Sustainability Strategy 2013-2016 2 Foreword Aalborg should be a sustainable municipality, which will be to the benefit of local citizens, businesses and the environment. With
What do we already know about Bradford-on-Avon community area?
What do we already know about Bradford-on-Avon community area? Bradford-on-Avon is one of the smaller market towns in Wiltshire. It has good public transport connectivity and functions as a popular tourist
Rockhampton Office Brisbane Office Tarong Site. Barron Gorge Hydro PS Kareeya Hydro PS Mica Creek PS
Business Procedure Traffic Management Document Number OHS-PROC-130 This document applies to the following sites: All Sites Rockhampton Office Brisbane Office Tarong Site Barron Gorge Hydro PS Kareeya Hydro
Proposed General Plan Update Goals, Policies, and Implementation Actions
Proposed General Plan Update Goals, Policies, and Implementation Actions The construction and maintenance of infrastructure is necessary to support existing and planned land uses and to achieve Environmental
1.0 Examples on common security provisions/common welfare provisions
1.0 Examples on common security provisions/common welfare provisions Demands for quality Who Period A. Traffic areas on the site 1. Access roads to the site For heavy traffic from the machinery Main contractor
State of Qatar. Ministry of Environment. Intended Nationally Determined Contributions (INDCs) Report. November 19 th, 2015
State of Qatar Ministry of Environment Intended Nationally Determined Contributions (INDCs) Report November 19 th, 2015 State of Qatar is pleased to submit its Intended Nationally Determined Contributions
Guide to agrichemical use in Resource Management Plans Northland Region as at October 2011
Guide to agrichemical use in Resource Management Plans Northland Region as at October 2011 Northland Regional Air Quality Plan Note: This guide is intended to assist users and applicators understanding
Level 1 Award in Health and Safety in a Construction Environment
Level 1 Award in Health and Safety in a Construction Environment Student notes (sample) www.britsafe.org Membership Training Qualifications Audit and Consultancy Audit and Policy Consultancy and Opinion
PROPOSED TOR FOR EIA STUDY
JAWAHARPUR VIDYUT UTPADAN NIGAM LIMITED 2x660 MW JAWAHARPUR THERMAL POWER PROJECT JAWAHARPUR, DISTRICT ETAH, UTTAR PRADESH PROPOSED TOR FOR EIA STUDY SEPTEMBER- 2015 DESEIN PRIVATE LIMITED CONSULTING ENGINEERS
TREK DHARAMSALA LITTLE TIBET
TREK DHARAMSALA LITTLE TIBET 1 ITINERARY- OUTLINE FOR BESPOKE TRIPS This trek is in the Indian Himalaya, in the shadow of the mighty Daula Dhar 5490m. For eight days we are immersed in the culture and
ENVIRONMENT ACT PROPOSED TERMS OF REFERENCE FOR PUBLIC REVIEW AND COMMENT NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
ENVIRONMENT ACT PROPOSED TERMS OF REFERENCE FOR PUBLIC REVIEW AND COMMENT NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS Beaver Bank Bypass Highway 101 to the Beaver Bank Road Halifax County,
A disaster occurs at the point of contact between social activities and a natural phenomenon of unusual scale.
Hazard Mapping and Vulnerability Assessment Mr. Toshiaki Udono Senior Project Manager, Kansai Division, PASCO Corporation, Japan Mr. Awadh Kishor Sah Project Manager, Project Implementation Department,
Planning Information. Passenger and Freight Elevators.
A company of ThyssenKrupp Elevator Thyssen Aufzüge tk This planning information will give you an overview of the most important planning criteria of passenger and freight elevators. However you should
2. PRE-FEASIBILITY REPORT
2. PRE-FEASIBILITY REPORT 2.1 Executive Summary The proposed project is Building stone quarry having lease area of 0.809 ha and falls under Category- A as per EIA Notification 2006 and its amendments of