1 The German Transrapid guideway Conclusions on the guideway's first use in Shanghai Prof. Dr.-Ing. Jürgen Feix, Dipl.-Ing. Roman Brylka CBP Consulting Engineers, Georg-Muche-Strasse 1, Munich, Germany, Phone: +49/(0)89/ / Fax: +49/(0)89/ , [email protected], [email protected], Keywords Girder, guideway, hybrid, Munich, optimization, Shanghai, Transrapid Abstract In the article, there will be taken a look at the different guideway types of the Transrapid from both a technical and an economic point of view. The different guideway concepts result from the projects Berlin-Hamburg and Shanghai, as well as from the present project in Munich, Germany. The analysis of design and production of the first guideway in China has led to conclusions concerning the ultimate potential of these processes. The results will be applied to the future track in Munich, Germany. 1 Introduction On December, 31st 2002, the maiden voyage of the Transrapid (TR 08) successfully took place in Shanghai. The regular operation of the first Transrapid world-wide started at the beginning of Looking at these milestones and considering the fact that, in the twenties and thirties of the last century, the engineer Hermann Kemper was the first to reflect upon an electromagnetic railway, and that the fundamental patent on the maglev railway was taken out as early as 1934, it is obvious that not only the vehicle but also the guideway of the maglev train show a long time and many stages of development. Figure 1: Maiden voyage TR 08 on 31. December 2002 in Shanghai In 1979, the first passenger traffic upon a licensed magnetic lane (TR 05) was made possible on the occasion of the International Traffic Exhibition in Hamburg. In 1983, the Transrapid testing facility in the Emsland (TVE) was put into operation. Upon this test track the vehicle was developed until it was ready to go into production (TR 06 to TR 08). To this day, all system components, for example the guideway girders, have been tested as well as licensed at the TVE so that these components can be used on commercial tracks.
2 In the following, the guideway concepts of the Transrapid will be looked at from both a technical and an economic point of view, starting with the track Berlin-Hamburg and the project in Shanghai. The analysis of design and production of the first guideway in China has led to conclusions concerning the ultimate potential of these processes. The results will be applied to the future track in Munich. 2 Guideway concepts According to the significant system document Transrapid, the one lane track as well as the two lane track of the magnetic levitation transport system consist of guideway girders that have been specially manufactured, equipped and installed. The system document describes the two different types of guideways the Transrapid track consists of: Elevated guideway Elevated guideways come to use upon tracks that may not separate ecologically or agriculturally connected areas. In addition, elevated guideways do not interfere with existing infrastructures. There are two primary characteristics of this guideway type: - First, the elevated guideway can be easily adjusted to the topography given, i.e. hill, mountain or the crossing of traffic routes, due to variable pillar heights. - Second, this guideway can be used at gradient heights of 3, 5 m to 20 m. At-grate guideway In contrast to the elevated guideway, the at-grate guideway is used in flat and even areas, in cuts, through tunnels as well as upon primary structures, for example bridges and station buildings. According to the system document Transrapid, the primary characteristic of the at-grate guideway is its gradient height of 1, 25 m to 3, 5 m. 2.1 Berlin - Hamburg In July 1997, the Federal Government of Germany decided to include a magnetic levitation transport system, connecting the cities of Berlin and Hamburg, in the federal traffic route plan of 1992 (BVWP 92). This decision was taken due to the results of an evaluation concerning national economy as well as business management. MAGLEV - Guideway Girder Constructions Isolated Foundation Plate Constructions Strip Foundation From 1994 to 1996, additional laws and resolutions established a legal basis for the concrete process of planning, whereupon the definite stage of planning began. However, in February 2000, the Federal Government of Germany that had been newly elected in 1998, German Rail and the Transrapid consortium decided not to carry out the Transrapid track due to financial reasons. Fig. 2 shows the standard configuration that has been specified for the guideway of the maglev system between Berlin and Hamburg at a length of 292 km. Girder Height 2,00 m 31 m Girder Guideway 2 x 31 m Girder Height 1,00 m 12,4 m Girder Guideway 2 x 12,4 m Figure 2: Guideway concept B - HH Const. Height 0,40 m Plate Guideway 6,2 m Type I Type II Type III
3 The guideway was divided into the following components: Superstructure: Substructure: girders, respectively plate, including bearings pillars with bearing brackets and foundation In this project, each lane was to be allocated its own guideway, called double-track guideway Guideway consisting of girders The system-technical demands of the guideway can be derived from the fact that the vehicle levitates in a designed distance of approximately10 mm to its guideway, even at speeds up to 500 km/ h. For example, the guideway girders of the track Berlin-Hamburg had to be double-span systems (31 m span and a construction height of 2, 0 m (type I)), in order to meet the rigorous system-technical demands on deformation. As far as planning and construction were concerned, the tender documents demanded guideway girders with a steel construction as well as plate guideways consisting of either steel or concrete. Since 1996, employees of the engineers office CBP, Munich, and the building company Max Bögl, Neumarkt / Oberpfalz, have been developing guideway systems for the Transrapid. These companies have had their hybrid guideway girder patented, which was presented on the occasion of the tender procedure for Berlin-Hamburg as the world-wide first model of a hybrid maglev guideway construction. In the following, the most important types of guideway girders will be briefly introduced. a) Steel guideway girder The steel guideway girder type I was designed as a double span girder with a length of 2 x 31 m = 62 m. It was intended to be applied for a system length of approximately 31 m. The dimensions of the steel girder type I that are relevant to its alignment, are as follows: span length approx. 31 m girder length approx. 62 m minimum gradient height 2,20 m maximum gradient height 20,00 m construction height 2,00 m This girder is a double span girder with short cantilevers at its ends. The ends rest upon the points of support of the substructures. There are two points of support for each bearing axis so that each guideway girder lies upon 6 points of support (bearings). The end supports of two neighbouring guideway girders rest upon common substructures. Within the support axes at the end of each girder there is one bearing that is generally mobile as well as one bearing that is lengthwise mobile but fixed in transverse direction. With a height of 1, 55 m between the space curve (gradient) and the lower edge of the supporting steel bracket, as well as with an overall construction height of 250 mm for the bearing construction, there will be a difference of 1, 8 m in height between the space curve and the upper edge of the substructure/ bearing bases. Figure 3: Steel guideway girder type I, B-HH
4 Additionally, as far as the track Berlin-Hamburg is concerned, there was intended additionally a steel guideway girder type II with a system length of 12, 40 m. This girder type was designed as a doublespan girder with a length of 24, 80 m. The relevant dimensions of the steel girder type II are: span length approx. 12,40 m girder length approx. 24,80 m minimum gradient height 2,20 m maximum gradient height 10,00 m construction height 1,00 m Figure 4: Steel guideway girders type II, B-HH The steel guideway girder type II (construction height 1, 00 m) rests as a double-span girder with short cantilevers at its ends upon the substructures, too. For each support axis there exist two points of support so that each girder has got 6 points of support (bearings) altogether. The end supports of two neighbouring guideway girders rest upon common substructures. Within the support axes at the end of each girder, there exist both a bearing that is generally mobile as well as a bearing that is lengthwise mobile but fixed in transverse direction. With a height of 1, 55 m between the space curve (gradient) and the lower edge of the supporting steel bracket, as well as with an overall construction height of 250 mm for the bearing construction, there will be a difference of 1, 8 m in height between the space curve and the upper edge of the substructure/ bearing basis. Both of the steel girders show a trapezoid box section tapering downwards. Each section of the entire girder geometrically follows the space curve in an accurate way, a fact that leads to highly complex demands upon the manufacturing process. Therefore, the concept of the steel girder leads to comparatively high manufacturing costs. It shows the following specification: high sound emission, in comparison to concrete girders comparatively low stiffness in vertical direction high temperature gradient (t top t bottom and. t left t right ) b) Hybrid guideway girder Since 1996, the hybrid guideway girder has been developed on the basis of the advantages and disadvantages of the pure steel and the pure concrete guideway girders. When the hybrid girder was developed, the basic idea was to combine different building materials in order to profit from the advantages of the respective material. At the same time, specific disadvantages of each building material could thus be avoided. In contrast to the pre-stressed concrete girder that is apt to carry loads most effectively, the steel construction perfectly meets the system-specific demands on exactness, especially in the functional areas. Moreover, the newly developed Figure 5: Hybrid guideway girder type I, B-HH
5 Hybrid Guideway Girder unites the three important elements of the Transrapid, sliding-rail, guidancerail and stator-pack-fastening to a modular function unit. This concept of a guideway girder allows the accurate reproduction of the guideway s space curve according to the system given. Before assembly of the function-unit-girders only the bracket heads have to be machined, which must be seen a highly economical solution. In accordance to the tender documents of the project Berlin-Hamburg, the hybrid guideway girders type I and II show cross-sections and dimensions relevant to alignment that are similar to those of the steel girders Guideway consisting of plates The concept of the concrete plate guideway (type III) at ground level is based on the quasi-monolithic connection between the guideway plate and the substructure. This plate guideway is composed of plates with a length of approximately 6 m, consisting of reinforced concrete. Every 6 m along the guideway, the plates are clamped on the substructure by means of four attachment axes. plate length approx. 6,20 m minimum gradient height 1,45 m to 1,67 m minimum gradient height on special structures 1,35 m maximum gradient height 2,20 m The design of the track Berlin-Hamburg offered a second variant on the at-grate plate guideway. The alternative concept of the plate guideway type III made of steel is based on the principle of the guideway plate made of concrete, i.e. plate segments with a length of 6 m that are monolithically connected with a continuous strip foundation. In contrast to the guideway plate made of concrete, each segment of the steel guideway plate unites the superstructure and the substructure into one construction unit. The system Transrapid lays down a certain clearance that has to be kept, a fact that means a construction height of 1, 45 m minimum over ground, as far as the at-grate guideway is concerned. Figure 6: Concrete guideway plate type III, B-HH Figure 7: Steel guideway plate type III, B-HH
6 2.2 Shanghai International Airport Long Yang Road Station In November 1999, parallel to the design of the track Berlin Hamburg, the Chinese Ministry of Science and Technology decided to choose a suitable Transrapid track in the Peoples Republic of China, as well as to examine the feasibility of the track under technical and economic criteria. As a consequence, the city of Shanghai decided to draw up a study concerning the feasibility of a link between the new International Pudong Airport and the center of Shanghai by means of a Transrapid track with a length of 30 km. Having examined the technical and economic aspects of the different guideway concepts, the Chinese decided to take the hybrid guideway into consideration. For this reason, CBP and two German building companies (Max Boegl and Gebr. v. d. W.) that are united in the so-called Transrapid Guideway Consulting Group (TGC) accomplished a feasibility study concerning the technical realization of the required guideway, in November and December of the year Besides the realization of the guideway concerning economic aspects as well as durability, these investigations focused primarily upon the keeping of a short production period of 2 years maximum. With regard to the various specific requirements of the project, the hybrid guideway girders, their components and their production processes were subject to an extensive development and optimization Elevated and at-grate guideway Project data Transrapid Shanghai Distance 30 km double track Maintenance connection 3 km single track Stations 2 terminals Quantity of vehicles vehicles to 5 sections Maximum operation speed 430 km/h Run time 8 minutes Turnover 10 minutes Operation period 18 hours / day Figure 8: Project data Transrapid Shanghai Figure 10: Discretely supported at-grate guideway type II The City of Shanghai with its surrounding areas is characterized by the two rivers Yangtse and Huan, which cause a subsoil consisting of alluvial silt. Due to these subsoil conditions, long-term settlements of the buildings had to be drawn into consideration. There had to be chosen a guideway concept that was apt to provide an economic and efficient way of adjusting the guideway additionally at a later time. Due to these requirements, all the plate guideways had to be ruled out because of their quasimonolithic connection between guideway girder and substructure. If plate guideways had been chosen, uneven settings of the subsoil could not have been adjusted but by methods that are both technically complex and extremely expensive. Therefore, a guideway concept with discreetly supported girders was proposed to the Chinese. Especially in case of uneven subsoil settlements, the hybrid guideway girders type I and II used in Shanghai make possible to readjust the bearings in an easy, reliable and economic way. The fact that the girder variants coming to use in Shanghai are reduced to the girder types I and II, presents an additional economic advantage. For it allows the construction of a specified production plant that is exclusively geared to produce hybrid guideway girders of type I and II.
7 2.2.2 Cross sections Within the framework of new development and optimization mentioned before, the cross-sections of the hybrid guideway girders type I and II were revised in detail as well. The reorganization of the cross-sections was only made possible because the Chinese owner removed all restrictions other than system-specific or functional. This fact contrasted the project Berlin Hamburg in an important way and made possible a profound and new development of the guideway girders. As mentioned above, the stiffness and the dynamic behaviour of the guideway girders are fundamentally important for the overall system Transrapid. Due to extensive parameter studies concerning the optimization of the carrying behaviour as well as of economic aspects, the span length of the girder type I was reduced from 31 m to 25 m. Based on the system-oriented clearance diagram of the vehicle, the cross section of the hybrid guideway girder type I was redesigned. The influence of temperature differences of the girder s crosssection was considered in particular. The cross-section of the hybrid guideway girder type I (Fig. 12) now represents the optimal shape. It meets the static and dynamic demands on the guideway girder and, additionally, minimizes the costs of material. MAGLEV Guideway Girder Constructions Isolated Foundations Girder Height 2,20 m 25 m Girder Guideway 1 x 25 m Type I Girder Height 1,20 m 12,4 m Girder Guideway 1 x 12,4 m Type II Figure 11: Guideway concept Shanghai In contrast to the girder type I, the cross-section of the girder type II is not designed in the shape of a hollow box, but of a solid concrete cross-section. In order to equip the entire guideway with a homogenous cross-section, the cross-section of the girder type II was developed on the basis of girder type I. The construction height of the girder type II was additionally limited to 1, 20 m in order to achieve a maximum of transparency for the silhouette of the at-grate guideway Structural system of the girders In comparison to the project Berlin Hamburg, the newly Figure 12: Hybrid guideway girder type I, Shanghai developed cross-sections of the project Shanghai were additionally optimized in an essential way. The conversion of double span girders into single span girders in the course of the project Shanghai proved to be economically beneficient. This change of the structural concept led to the fact that forced strains upon the superstructure as well as upon the substructure could be avoided, especially in case of uneven subsoil settlements or temperature gradients. As a result, costs of design, production, transport and assembly on site were reduced at a considerable degree. In addition, this alteration guaranteed a maximum construction period of two years. Figure 13: 1. Single span girder type I, 25 m standard span, Shanghai 2. Double span girder type I, 31 m standard span, Berlin - Hamburg
8 2.2.4 Detailed work preparation Due to the technical and economic solutions described above, the Chinese owner was convinced of the efficiency of the redeveloped hybrid guideway. In January 2001, the contract between the two parties was signed. In order to attain the ambitious goal of the TR 08 s maiden trip in Shanghai as early as 31, December 2002, the transfer of technology was accomplished in two stages. Stage 1: Consultation and training of Chinese engineers in Germany Stage 2: Consultation and support of the Chinese on site in Shanghai During the first stage of the project, the Chinese owner had to be introduced into the special demands of the guideway. Besides, a smooth start of the guideway s design and production had to be ensured. For this reason, Chinese engineers were prepared for the project to come in a ten-week-training, shortly after the signing of the contract. The training focused on the following topics: system-specific requirements of the Transrapid concerning the guideway hybrid guideway girders and their components substructures subsoil and foundations In the training, the main topics were looked at from the point of view of both design and manufacturing. In order to prepare the implementation planning, which was to be carried out by the Chinese engineers offices, the training included the following topics: specific technical principles of design, methods of static and dynamic calculation as well as the application of specific software, which had been developed for the design of hybrid guideway girders in particular. The Chinese side was extensively taught in 3-D implementation planning following the prototype girders I and II. As far as the production of the hybrid girder is concerned, the topic of manufacturing can be divided into two relevant aspects: layout of a plant producing hybrid guideway girders work preparation: construction of prototypes In coordination with the project Shanghai, a layout of a production plant was worked out in the course of the training. Besides, the start of a serial production was prepared. Thanks to the complete design of the prototype girders in 3 D, all conflicts and problems could be detected and resolved during the design period. On the basis of the feasilbility study that had been worked out during the training, a production plant of hybrid guideway girders was constructed in Shanghai from March to September The plant is approximately 1, 8 km long and 300 m wide. Due to the extremely short construction period of the Transrapid in Shanghai, the manufacturing capacity had to be guaranteed by the use of 32 formworks in the production plant. In order to support the Chinese owner, employees of the German companies were Figure 14: Consulted layout of the production plant for Hybrid Girders in Shanghai Figure 15: Maiden voyage TR 08 in Shanghai
9 constantly positioned in Shanghai from February 2001 to December Apart from supporting the Chinese owner with regard to the implementation planning and construction of the guideway, the consultants focused upon the coordination of German and Chinese enterprises. According to plan, the TR 08 ran at a maximum operation speed of 430 km/ h and successfully completed its maiden voyage. At the beginning of 2004, the commercial enterprise was taken up successfully and according to plan as well. The guideway s impressively short construction period of 18 months could only be realized by a permanently thriving cooperation between the Chinese and German project partners during the preparatory period. Besides, shift operation around the clock, seven days a week, led to a rapid construction of the guideway by the Chinese (Fig. 7 and 8). 2.3 Main station Munich Munich Airport The Transrapid track Berlin Hamburg was cancelled in Februar As early as in October of the same year, the German States of Bavaria and Nordrhein-Westfalia decided to run feasibility studies of the airport link in Munich (length of approx. 37 km) and the so-called Metrorapid connection between Dortmund and Düsseldorf (approx. 80 km). At the beginning of 2002, the results of the two feasibility studies were presented. They showed that both tracks were perfectly apt to be operated, from an economic, technical and environmental point of view. In June 2003, Nordrhein-Westfalen stopped the design of the Metrorapid due to financial reasons. Bavaria, however, still advances the project of the Transrapid connection between Munich Airport and the central railway station in the city centre of Munich. In October 2003, stage I of the project began, i.e. production of the documents for the official approval of the plan. In order to run the two feasibility studies mentioned above, the kinds of guideways were chosen in accordance to those of the project Berlin Hamburg (see point 2.1.) Classification of guideway types After by the project Shanghai new ways of the Transrapid guideway were pointed out, the classification of the guideway types in the Bavarian project also show new starting points. If for the project Berlin Hamburg the guideway types were specified into elevated and at-grate guideway, now a distinction of the guideway takes place according to Shanghai to following criteria: a) Construction type The project in Bavaria presents a new standard guideway, following the solutions of the project Shanghai. The development is shown in Fig. 16. Girder Height 2,50 m 25 m Girder Guideway 1 o. 2 x 25 m MAGLEV Guideway (standard) Girder Constructions Individual Foundations Girder Height 1,60 m 12,4 m Girder Guideway 1 o. 2 x 12,4 m Plate Constructions Strip Foundations Const. Height 0,40 m 6,2 m Plate Guideway 6,2 m Type I Type II Figure 16: Guideway concept, Bavaria Type III
10 In the following, the relevant changes are presented. trapezoid cross-sections tapering downwards are no longer used for the guideway girder type I and II the maximum construction height of the girder s cross-section is increased the standard span of the girder type I is reduced from 31 m to 25 m. alternative use of single and double span solutions b) Gradient height Moreover, the guideway is classified with regard to different gradient situations. The assignment of the guideway girders to the route is, therefore, no more strictly gradient-bound. cut section: gradient + 1,45 m over TGS at-grate level: + 1,45 m gradient + 3,50 m over TGS elevated level: gradient > + 3,50 m TGS This way of allocating the guideway girders to the guideway makes it possible for the project in Bavaria to construct the at-grate guideway by discretely supported girders as well, as already practiced in Shanghai. c) Material Different materials ensure a maximum variety of guideway girders. In order to clearly distinguish between the different guideway types, there has to be taken a look at the guideway s material. In the following, the characteristic materials are described. steel guideway: guideway girders type I to III, as used for Berlin Hamburg concrete guideway: plate guideway type III, as used for Berlin - Hamburg hybrid guideway: guideway girder type I and II, as used for Shanghai 3 Optimization potentials during design and realization The design processes of the project Shanghai, and the preliminary work concerning the implementation planning and construction of the guideway, show that a smooth and economic course of the project can be ensured only by a competent and detailed project preparation, especially in the technically critical sections of the guideway. In the following, there will be described exemplarily, which technical and economic investigations are required in order to optimize the efficiency of both the technical concept and economic aspects. 3.1 Technical aspect During the process of developing and optimizing the hybrid guideway it finally turned out that the guideway s carrying and deformation behavior at that time when the vehicle is driving over, can be represented in a realistic way only by dynamic simulations at the overall system (super structure substructure foundation). The same applies to the verification of the factors concerning dynamic load capacity, which have to be explicitly proved in accordance with the system specification.
11 Simulations of a vehicle driving over the guideway work with the help of software applications that have been developed for this particular purpose. Figure 17: Dynamic analysis of the type III concrete at-grate guideway 3.2 Economical aspect During the system development, the primary criteria are safety and durability of the guideway. However, economic aspects concerning design and construction of the commercial track of the Transrapid have to be taken into account as well. For example, during the design period of the project Shanghai there was paid attention to develop a girder arrangement with a reduced number of girder types, in order to reduce the manufacturing costs. Further, an efficient and economical production of girders can be realized by standardizing the guideway concept (steel-, hybrid or plate guideway). The more one standardized type of a guideway girder is used on the track, the more the production plant and its machinery get profitable. Depending on the project and thus depending on the respective construction period and length of track, investment costs can be reduced in a highly efficient way. To this aim, concepts of construction are developed with regard to either centralized or decentralized manufacturing processes. Profound analysis and the identification of the individual parameters of the investment costs make it possible to recognize beforehand potential risks and thus to minimize them by necessary adjustments in the stages of planning. 4 Conclusion In an impressive way the project Shanghai proves that almost impossible tasks can be realized, if owner, operators, planners and building companies work towards the same objectives. Apart from that, a comparison of the guidelines and conditions of the Transrapid track Berlin- Hamburg and of the guideway in Shanghai shows that one can obtain technically and economically optimized solutions only by reducing the fixed points and requirements as far as possible. The demands on the future Transrapid track in Bavaria have been adapted accordingly so that innovative guideway concepts can be made use of in Germany as well. Experience in the development of new guideway concepts, in the engineering and support of the project Shanghai and in the analysis of future maglev projects has shown that costs can most effectively be reduced by a punctual, prudent and competent management and design of a project.
12 5 References 1. Transrapid Maglev System, herausgegeben durch MVP und TRI; Hestra Verlag Darmstadt, [Systemspezifikation, MSB - Systemdokument, Transrapid; Thyssen Henschel Magnetfahrtechnik 3. Fechner, H.: Der Transrapid Berlin Hamburg; Von der Planung zur Realisierung, Betontag 1999, Seite 302 ff. Berlin: Ernst & Sohn. 4. Feix, J.: Entwicklung des hybriden Fahrwegträgers; Bauingenieur, Band 77, April 2002, Seite 153 ff. 5. Feix, J.; Brylka, R.: Development of the Hybrid Guideway Girder and first application in Shanghai, Vortrag Maglev Feix, J.; Reichel, D.: Der hybride Fahrwegträger für den Transrapid; Betontag 2001, Seite 262 ff. Berlin: Ernst & Sohn. 7. Feix, J.; Brylka, R.: Bau des hybriden Fahrwegs für den Transrapid in Shanghai. Der Eisenbahningenieur 53 (2002) Seite Feix, J.: Realisierung der ersten Transrapid - Anwendungsstrecke in Shanghai, China; Betontag 2003, Ernst & Sohn.
Operating Concept and System Design of a Transrapid Maglev Line and a High-Speed Railway in the pan-european Corridor IV
Operating Concept and System Design of a Transrapid Maglev Line and a High-Speed Railway in the pan-european Corridor IV A. Stephan & E. Fritz IFB Institut für Bahntechnik GmbH, Niederlassung, Germany
TRANSRAPID SHANGHAI Construction of the First Commercial Operational Line
EBERHARD GROSSERT, D. Se. GP Dr. Grossert Planungsgesellschaft mbh Inselwall14, 38114 Braunschweig, Germany Meinekestr. 24, 1719 Berlin, Germany Traffic Planning Preliminary Communication U. D. C.: 625.111
MGB Maglev Guideway Bögl. Progress is built on ideas.
MGB Maglev Guideway Bögl Progress is built on ideas. 2 Foreword Johann Bögl Stefan Bögl Since more than a decade now, the Max Bögl Group is engaged in trendsetting development and construction of modern
The future is already here
Transrapid International A joint company of Siemens and ThyssenKrupp The future is already here The Transrapid maglev system in Shanghai The future is already here in Shanghai Shanghai is a city of superlatives
Transrapid Project Shanghai
Transrapid Project Shanghai Dipl. Ing. Dieter Hoffmann, Siemens AG Abstract Following brief negotiations initiated at the end of the year 2000, the contract for the supply of the airport link using the
Numerical Analysis of the Moving Formwork Bracket Stress during Construction of a Curved Continuous Box Girder Bridge with Variable Width
Modern Applied Science; Vol. 9, No. 6; 2015 ISSN 1913-1844 E-ISSN 1913-1852 Published by Canadian Center of Science and Education Numerical Analysis of the Moving Formwork Bracket Stress during Construction
Analysis of the Response Under Live Loads of Two New Cable Stayed Bridges Built in Mexico
Analysis of the Response Under Live Loads of Two New Cable Stayed Bridges Built in Mexico Roberto Gómez, Raul Sánchez-García, J.A. Escobar and Luis M. Arenas-García Abstract In this paper we study the
Technology and System Layout of the Transrapid Maglev Project
Technology and System Layout of the Transrapid Maglev Project Christian Rausch Transrapid International GmbH & Co. KG, Berlin ABSTRACT: At the start of the project planning, the basic requirements for
Safe & Sound Bridge Terminology
Safe & Sound Bridge Terminology Abutment A retaining wall supporting the ends of a bridge, and, in general, retaining or supporting the approach embankment. Approach The part of the bridge that carries
The Shanghai Maglev Route
The Shanghai Maglev Route 1 Contents 1. About the Shanghai Maglev... 3 2. Background information about EMS Technology... 4 3. Your train... 5 3.1 Getting to know the cab... 5 3.2 Central DMI screen additional
Force measurement. Forces VECTORIAL ISSUES ACTION ET RÉACTION ISOSTATISM
Force measurement Forces VECTORIAL ISSUES In classical mechanics, a force is defined as "an action capable of modifying the quantity of movement of a material point". Therefore, a force has the attributes
Dynamic Simulation of the Maglev Guideway Design
Dynamic Simulation of the Maglev Guideway Design by Ren Shibo Submitted to the Faculty of Civil Engineering and Geosciences in Partial Fulfillment of the Requirements for the Degree of Master of Science
3.1 Historical Considerations
3. Recommended Scope of Bridge improvements 3.1 Historical Considerations In the fall of 2000, an outside consultant, Fraser Design, suggested that the existing 4 th St. Bridge is potentially eligible
How To Write An Analysis System For Bridge Test
Study of Analysis System for Bridge Test Chen Ke, Lu Jian-Ming, Research Institute of Highway, 100088, Beijing, China ([email protected], [email protected]) Summary Analysis System for Bridge Test (Chinese
Optimum proportions for the design of suspension bridge
Journal of Civil Engineering (IEB), 34 (1) (26) 1-14 Optimum proportions for the design of suspension bridge Tanvir Manzur and Alamgir Habib Department of Civil Engineering Bangladesh University of Engineering
Bridge Type Selection
Bridge Type Selection The major consideration for bridge type selection for bridges on the State Aid system is initial cost. Future maintenance costs, construction time, and location are considered when
Automated planning of timetables in large railway networks using a microscopic data basis and railway simulation techniques
Automated planning of timetables in large railway networks using a microscopic data basis and railway simulation techniques A. Radtke 1 & D. Hauptmann 2 1 Institut für Verkehrswesen, Eisenbahnbau und betrieb,
Appendix A. About RailSys 3.0. A.1 Introduction
Appendix A About RailSys 3.0 This appendix describes the software system for analysis RailSys used to carry out the different computational experiments and scenario designing required for the research
Slab Track Austria. System ÖBB-PORR elastically supported slab
Slab Track Austria System ÖBB-PORR elastically supported slab 5. 2. 3. 4. 7. 6. Five holes for spindles 2. ÖBB-PORR slab 3. elastomeric layer 4. concrete joint sealing compound 5. rail support seat 6.
Shanghai s maglev project
Shanghai s maglev project levitating beyond transportation theory by Kevin C Coates Kevin C Coates is a Washington, DC-based energy and transportation policy consultant. He is presently writing a book
Design of Bridges. Introduction. 3 rd to 4 th July 2012. Lecture for SPIN Training at the University of Dar es Salaam
Design of Bridges Introduction 3 rd to 4 th July 2012 1 FUNCTION OF A BRIDGE To connect two communities which are separated by streams, river, valley, or gorge, etc. 2 EVOLUTION OF BRIDGES 1. Log Bridge
Field Damage Inspection and Static Load Test Analysis of Jiamusi Highway Prestressed Concrete Bridge in China
Advanced Materials Research Vols. 163-167 (2011) pp 1147-1156 Online available since 2010/Dec/06 at www.scientific.net (2011) Trans Tech Publications, Switzerland doi:10.4028/www.scientific.net/amr.163-167.1147
Is load testing during initial acceptance inspection still the contemporary method?
Is load testing during initial acceptance inspection still the contemporary method? Alfons Petry TUV Industry Service TUV South Group, Germany Key words: Safety, commissioning test, load test, ADIASYSTEM,
9.3 Two-way Slabs (Part I)
9.3 Two-way Slabs (Part I) This section covers the following topics. Introduction Analysis and Design Features in Modeling and Analysis Distribution of Moments to Strips 9.3.1 Introduction The slabs are
INTRODUCTION TO BEAMS
CHAPTER Structural Steel Design LRFD Method INTRODUCTION TO BEAMS Third Edition A. J. Clark School of Engineering Department of Civil and Environmental Engineering Part II Structural Steel Design and Analysis
Elevated Roads for Sri Lanka
Elevated Roads for Sri Lanka M.T.R. Jayasinghe (Senior Professor, Structural Engineering, University of Moratuwa) Senior Professor M.T.R. Jayasinghe is a Professor of Structural Engineering, University
UNIVERSITY OF CAMBRIDGE INTERNATIONAL EXAMINATIONS Cambridge International Level 3 Pre-U Certificate Principal Subject
UNIVERSITY OF CAMBRIDGE INTERNATIONAL EXAMINATIONS Cambridge International Level 3 Pre-U Certificate Principal Subject PHYSICS 9792/02 Paper 2 Part A Written Paper May/June 2012 PRE-RELEASED MATERIAL The
4 SENSORS. Example. A force of 1 N is exerted on a PZT5A disc of diameter 10 mm and thickness 1 mm. The resulting mechanical stress is:
4 SENSORS The modern technical world demands the availability of sensors to measure and convert a variety of physical quantities into electrical signals. These signals can then be fed into data processing
INCREASE OF DURABILITY AND LIFETIME OF EXISTING BRIDGES. PIARC TC 4.4 EXPERIENCE.
INCREASE OF DURABILITY AND LIFETIME OF EXISTING BRIDGES. PIARC TC 4.4 EXPERIENCE. M.Sc. Gediminas Viršilas Head of Bridge Division, Lithuanian Road Administration Working group 2 of PIARC Technical Committee
DESIGN OF SLABS. 3) Based on support or boundary condition: Simply supported, Cantilever slab,
DESIGN OF SLABS Dr. G. P. Chandradhara Professor of Civil Engineering S. J. College of Engineering Mysore 1. GENERAL A slab is a flat two dimensional planar structural element having thickness small compared
Value Engineering vs. Alternate Designs in Bridge Bidding
Value Engineering vs. Alternate Designs in Bridge Bidding Compares the advantages and disadvantages of alternate designs and value engineering in bidding of bridges as experienced in the State of Florida.
Overhang Bracket Loading. Deck Issues: Design Perspective
Deck Issues: Design Perspective Overhang Bracket Loading Deck overhangs and screed rails are generally supported on cantilever brackets during the deck pour These brackets produce an overturning couple
Preliminary steel concrete composite bridge design charts for Eurocodes
Preliminary steel concrete composite bridge 90 Rachel Jones Senior Engineer Highways & Transportation Atkins David A Smith Regional Head of Bridge Engineering Highways & Transportation Atkins Abstract
Floor systems - key elements for sustainable multi-storey buildings
Floor systems - key elements for sustainable multi-storey buildings Döring, B., AAINA GmbH, Institute for sustainable construction Aachen, Germany (Presenting), [email protected]; Kuhnhenne, M., RWTH Aachen,
ALIGNMENT ASSUMPTIONS
JUNE 2013 LETBANESEKRETARIATET ALIGNMENT ASSUMPTIONS REPORT ADDRESS COWI A/S Visionsvej 53 9000 Aalborg Denmark TEL +45 56 40 00 00 FAX +45 56 40 99 99 WWW cowi.com JUNE 2013 LETBANESEKRETARIATET ALIGNMENT
Planning Information. Passenger and Freight Elevators.
A company of ThyssenKrupp Elevator Thyssen Aufzüge tk This planning information will give you an overview of the most important planning criteria of passenger and freight elevators. However you should
Simulation in design of high performance machine tools
P. Wagner, Gebr. HELLER Maschinenfabrik GmbH 1. Introduktion Machine tools have been constructed and used for industrial applications for more than 100 years. Today, almost 100 large-sized companies and
Brown Hills College of Engineering & Technology Machine Design - 1. UNIT 1 D e s i g n P h i l o s o p h y
UNIT 1 D e s i g n P h i l o s o p h y Problem Identification- Problem Statement, Specifications, Constraints, Feasibility Study-Technical Feasibility, Economic & Financial Feasibility, Social & Environmental
RHEDA MRT The ballastless track for underground and surface commuter transit
RHEDA MRT The ballastless track for underground and surface commuter transit 2 3 Cities on the move Living and working today confront people with increasing demands for mobility. Planners and engineers
Design of Steel Structures Prof. S.R.Satish Kumar and Prof. A.R.Santha Kumar. Fig. 7.21 some of the trusses that are used in steel bridges
7.7 Truss bridges Fig. 7.21 some of the trusses that are used in steel bridges Truss Girders, lattice girders or open web girders are efficient and economical structural systems, since the members experience
Elegant sculpture in flexible shoring
Elegant sculpture in flexible shoring Edificio Ágora, Valencia, Spain In his hometown of Valencia, the Spanish star architect Santiago Calatrava has realized the Ciudad de las Artes y de las Ciencias.
Dispelling the Top Ten Myths of Maglev by Laurence E. Blow President, MaglevTransport, Inc.
Dispelling the Top Ten Myths of Maglev by Laurence E. Blow President, MaglevTransport, Inc. Dispelling the Myths of Maglev Overview In keeping with the objectives of the newly established North American
A CASE-STUDY OF CUA_DAT CFRD IN VIETNAM
A CASE-STUDY OF CUA_DAT CFRD IN VIETNAM Giang Pham Hong, Michel Hotakhanh, Nga Pham Hong, Hoai Nam Nguyen, Abstract:Dams have been taken an important role in time and surface redistribution of water for
Challenging Skew: Higgins Road Steel I-Girder Bridge over I-90 OTEC 2015 - October 27, 2015 Session 26
2014 HDR Architecture, 2014 2014 HDR, HDR, Inc., all all rights reserved. Challenging Skew: Higgins Road Steel I-Girder Bridge over I-90 OTEC 2015 - October 27, 2015 Session 26 Brandon Chavel, PhD, P.E.,
SITE SPECIFIC WIND TURBINE FOUNDATION CERTIFICATION
SITE SPECIFIC WIND TURBINE FOUNDATION CERTIFICATION Mary Prabha, Nishikant Dash, Stefan Baars, GL Renewables Certification, 1st Floor, No.- 494, U.P Royal Building, 4th Cross, Sampige Road, Malleswaram,
www.germanrailgroup.eu
www.germanrailgroup.eu German RailGroup Engineering & Consulting GbR Hilpertstraße 20 64295 Darmstadt, Germany Phone + 49 (6151) 8 85-300 Fax + 49 (6151) 8 85-244 [email protected] Your network for
Chapter Forty-seven. RURAL TWO-LANE/MULTILANE STATE HIGHWAYS (New Construction/Reconstruction) BUREAU OF DESIGN AND ENVIRONMENT MANUAL
Chapter Forty-seven RURAL TWO-LANE/MULTILANE STATE HIGHWAYS (New Construction/Reconstruction) BUREAU OF DESIGN AND ENVIRONMENT MANUAL Illinois RURAL TWO-LANE/MULTILANE STATE HIGHWAYS December 2009 2 Illinois
The Bonelle Tool and Cutter Grinder
The Bonelle Tool and Cutter Grinder The grinder was constructed about 1987 and exhibited at the 89th Model Engineering exhibition where it was awarded a bronze medal (see ME Vol164 No 3868 page 273). Subsequently
Back to Elements - Tetrahedra vs. Hexahedra
Back to Elements - Tetrahedra vs. Hexahedra Erke Wang, Thomas Nelson, Rainer Rauch CAD-FEM GmbH, Munich, Germany Abstract This paper presents some analytical results and some test results for different
Maglev. Payame Noor University (PNU), Tehran, 3 Civil Engineering Division, Azad University, Ramsar, Iran. 1. Introduction
6 Maglev Hamid Yaghoubi 1,2, Nariman Barazi 2 and Mohammad Reza Aoliaei 3 1 Iran Maglev Technology (IMT), Tehran, 2 Civil Engineering Division, Department of Engineering, Payame Noor University (PNU),
REPAIR AND STRENGTHENING OF HISTORICAL CONCRETE BRIDGE OVER VENTA RIVER IN LATVIA
1 REPAIR AND STRENGTHENING OF HISTORICAL CONCRETE BRIDGE OVER VENTA RIVER IN LATVIA Verners Straupe, M.sc.eng., Rudolfs Gruberts, dipl. eng. JS Celuprojekts, Murjanu St. 7a, Riga, LV 1024, Latvia e-mail:
CONTRACT SPECIFICATIONS - SEISMIC ISOLATION BEARINGS
CONTRACT SPECIFICATIONS - SEISMIC ISOLATION BEARINGS 1.0 DESIGN 1.1 Scope of Work 1.1.1 This work shall consist of furnishing Isolation Bearings and installing Isolation Bearing Assemblies at the locations
ME 111: Engineering Drawing
ME 111: Engineering Drawing Lecture # 14 (10/10/2011) Development of Surfaces http://www.iitg.ernet.in/arindam.dey/me111.htm http://www.iitg.ernet.in/rkbc/me111.htm http://shilloi.iitg.ernet.in/~psr/ Indian
E-82. Access Roads and Crane Platforms. 77m steel tower. 1 of 12. Specification Access Roads and Crane Platforms E-82/ 77m steel tower.
E82/ 77m steel tower 1 of 12 E82 77m steel tower PMCWSP023E8277m Zuwegung und Kranstellfläche Rev005gereng E82/ 77m steel tower 2 of 12 CONTENTS 1. Assembling the tower and wind energy converter 3 2. Crane
1.2 Advantages and Types of Prestressing
1.2 Advantages and Types of Prestressing This section covers the following topics. Definitions Advantages of Prestressing Limitations of Prestressing Types of Prestressing 1.2.1 Definitions The terms commonly
The Gotthard Base Tunnel
The Gotthard Base Tunnel The tunnel On 11 December 2016, the Gotthard Base Tunnel will come into scheduled operation. At 57 kilometres in length, it is the longest rail tunnel in the world. It has virtually
Chapter 2 Basis of design and materials
Chapter 2 Basis of design and materials 2.1 Structural action It is necessary to start a design by deciding on the type and layout of structure to be used. Tentative sizes must be allocated to each structural
VITOSOL r 200-T SP2A. VITOSOL 200-T Type SP2A
Technical Data Manual Model Nos. and pricing: see Price List Vacuum tube collector based on the heat pipe principle For the utilisation of solar energy VITOSOL r 200-T SP2A Product may not be exactly as
HS-Steel-Classic. Curing chambers for the concrete block industry in a proven steel version
ANLAGENTECHNIK HS-Steel-Classic Curing chambers for the concrete block industry in a proven steel version + special galvanising + simple assembly due to snap-in connections and building kit system We build
CONCEPTUAL REHABILITATION ALTERNATIVE
Appendix D While federal law requires preservation/rehabilitation of historic bridges be considered, there is no standard procedure to determine when rehabilitation is appropriate and when replacement
Modeling Beams on Elastic Foundations Using Plate Elements in Finite Element Method
Modeling Beams on Elastic Foundations Using Plate Elements in Finite Element Method Yun-gang Zhan School of Naval Architecture and Ocean Engineering, Jiangsu University of Science and Technology, Zhenjiang,
Copyright 2011 Casa Software Ltd. www.casaxps.com. Centre of Mass
Centre of Mass A central theme in mathematical modelling is that of reducing complex problems to simpler, and hopefully, equivalent problems for which mathematical analysis is possible. The concept of
4B-2. 2. The stiffness of the floor and roof diaphragms. 3. The relative flexural and shear stiffness of the shear walls and of connections.
Shear Walls Buildings that use shear walls as the lateral force-resisting system can be designed to provide a safe, serviceable, and economical solution for wind and earthquake resistance. Shear walls
Advance your thinking. Experience the future Transrapid
Advance your thinking. Experience the future Transrapid efficient rail solutions Floating on cloud nine Innovation in travel The invention of the railroad revolutionized travel more than anything that
REHABILITATION OF THE FIGUEIRA DA FOZ BRIDGE
REHABILITATION OF THE FIGUEIRA DA FOZ BRIDGE A.Rito Proponte, Lda, Lisbon, Portugal J. Appleton A2P Consult, Lda, Lisbon, Portugal ABSTRACT: The Figueira da Foz Bridge includes a 405 m long cable stayed
METHOD STATEMENT HIGH STRIAN DYNAMIC TESTING OF PILE. Prepared by
METHOD STATEMENT HIGH STRIAN DYNAMIC TESTING OF PILE Prepared by Infratech ASTM CO., LTD. Contents Chapter Description Page Contents...... 1 List of Appendix. 1 1. Introduction.. 2 2. Test Method..2 3.
Installation information. METTLER TOLEDO MultiRange DW150 / DW150T wall scale
Installation information METTLER TOLEDO MultiRange DW150 / DW150T wall scale DW150 / DW150T wall scale Contents Contents Page 1. Installation... 2 1.1 Preparatory work... 2 1.2 Installing the wall plates
2.75 6.525 Problem Set 1 Solutions to ME problems Fall 2013
2.75 6.525 Problem Set 1 Solutions to ME problems Fall 2013 2. Pinned Joint problem Jacob Bayless a) Draw a free-body diagram for the pin. How is it loaded? Does the loading depend on whether the pin is
Estimation of Work Hardening in Bent Sheet Metal Products at an Early Stage of Virtual Product Development
Estimation of Work Hardening in Bent Sheet Metal Products at an Early Stage of Virtual Product Development RokneddinAzizi HosseinAmiryousefi Department of Mechanical Engineering Blekinge Institute of Technology
Low Voltage Switchboards The Best Technical Solution for Your Ship
The Best Technical Solution for Your Ship Wärtsilä SAM Electronics Optimal Power Distribution The uninterrupted supply of power to systems and consumers onboard modern ships is an extremly important matter.
Design Project 2. Sizing of a Bicycle Chain Ring Bolt Set. Statics and Mechanics of Materials I. ENGR 0135 Section 1040.
Design Project 2 Sizing of a Bicycle Chain Ring Bolt Set Statics and Mechanics of Materials I ENGR 0135 Section 1040 November 9, 2014 Derek Nichols Michael Scandrol Mark Vavithes Nichols, Scandrol, Vavithes
Brandangersundet Bridge A slender and light network arch
Brandangersundet Bridge A slender and light network arch Rolf Magne Larssen Dr. ing./ Ph.D. Dr. ing A. Aas-Jakobsen AS Oslo, Norway [email protected] Rolf Magne Larssen, born 1958, received his Ph.D. in structural
EMI in Electric Vehicles
EMI in Electric Vehicles S. Guttowski, S. Weber, E. Hoene, W. John, H. Reichl Fraunhofer Institute for Reliability and Microintegration Gustav-Meyer-Allee 25, 13355 Berlin, Germany Phone: ++49(0)3046403144,
Fuel Cell solutions for maritime and harbour applications Proton Motor Fuel Cell GmbH. Sebastian Dirk Venice, 14th of June
Fuel Cell solutions for maritime and harbour applications Proton Motor Fuel Cell GmbH Sebastian Dirk Venice, 14th of June The Company Proton Motor Proton Motor Fuel Cell GmbH is a leading manufacturer
FEBRUARY 2014 LRFD BRIDGE DESIGN 4-1
FEBRUARY 2014 LRFD BRIDGE DESIGN 4-1 4. STRUCTURAL ANALYSIS AND EVALUATION The analysis of bridges and structures is a mixture of science and engineering judgment. In most cases, use simple models with
Shortlist of projects. References viaducts, bridges and infrastructures
Shortlist of projects Client: Provincia di Roma Assignment: Detailed design inside the PRUSST asse Tiburtino Nodo di Ponte Lucano Team members: VIA Ingegneria srl Mission: Preliminary design-build contract
REHABILITATION OF CONCRETE BEAM BRIDGES IN CROATIAN STATE ROAD NETWORK
REHABILITATION OF CONCRETE BEAM BRIDGES IN CROATIAN STATE Danijel Tenžera, Krešimir Futivić, Boris Ukrainczyk Summary Bridge structures deteriorate with years of use and exposure to adverse environmental
Development of Shanghai Integrated Transport (2010-2015) XIAO Hui and GU Yu
Development of Shanghai Integrated Transport (2010-2015) XIAO Hui and GU Yu Abstract This article summarises the general situation of Shanghai s integrated transport system and then determines the trends
Application and Design of the ebooster from BorgWarner
Application and Design of the ebooster from BorgWarner Knowledge Library Knowledge Library Application and Design of the ebooster from BorgWarner With an electrically assisted compressor, the ebooster,
The Task. for. PERI Construction-Exercise 2003
The Task for PERI Construction-Exercise 2003 Entitled to participate all educational institutions for civil engineering and construction management. The work must be based on the outlined project and can
The ACR : Advanced Design Features for a Short Construction Schedule
Transactions of the 17 th International Conference on Structural Mechanics in Reactor Technology (SMiRT 17) Prague, Czech Republic, August 17 22, 2003 Paper # S01-3 The ACR : Advanced Design Features for
ENGINEERING METROLOGY
ENGINEERING METROLOGY ACADEMIC YEAR 92-93, SEMESTER ONE COORDINATE MEASURING MACHINES OPTICAL MEASUREMENT SYSTEMS; DEPARTMENT OF MECHANICAL ENGINEERING ISFAHAN UNIVERSITY OF TECHNOLOGY Coordinate Measuring
SECOND PENANG BRIDGE PROJECT
INTRODUCTION PROJECT PARTICULARS Jambatan Kedua (JKSB), a wholly-owned company of the Minister of Finance, Incorporated (MoF Inc.) was appointed as the concessionaire for the Second Penang Bridge Project
Introduction to Accuracy and Repeatability in Linear Motion Systems
Introduction to accuracy and repeatability in linear motion systems By Gary Rosengren, Director of Engineering Tolomatic, Inc. About the Author Gary Rosengren is Director of Engineering at Tolomatic and
LOAD TESTING OF SOME NEW BRIDGES IN LATVIA
LOAD TESTING OF SOME NEW BRIDGES IN LATVIA Edmunds Akimovs, Civ.Eng., Bridge Engineer, Consulting Company Inzenierbuve, Address: Azenes st. 20, Riga, LV1048, Latvia. E-mail: [email protected] Ainars
INSTALLATION. General. Important Note. Design. Transport
General The roof trusses you are about to install have been manufactured to precise engineering standards. To ensure that the trusses perform as designed, it is essential that they be handled, erected
CNC Portal Milling Machine FZ 50. CNC Power Milling Technology
CNC Portal Milling Machine FZ 5 CNC Power Milling Technology FZ 5 Portal Milling Machine for Heavy Cutting The newly developed portal milling machine FZ 5 is based on a flexible machine design which can
Informational Workshop Public Meeting Kanawha Falls Bridge Project
Informational Workshop Public Meeting Kanawha Falls Project WV Department of Transportation Division of Highways in Cooperation with the Federal Highway Administration State Project S310-13-0.02 00 Federal
Bringing good things ahead
Bringing good things ahead Whatever your logistic needs, we can offer a conveyor solution. Our flexible systems primary and secondary packaging for single and multi packages, can transport your goods from
What is a Horizontal Curve?
Paul Deutsch What is a Horizontal Curve? Provides a transition between two tangent lengths of roadway. PI PC PT PC (Point of Curvature at beginning of curve) PI (Point of Intersection of tangents) PT (Point
Installation guide for the SafeLine type anchorage device. Tested in compliance with EN 795: 1996. No.: SE-...
Installation guide for the SafeLine type anchorage device Tested in compliance with EN 795: 1996 No.: SE-... Version: 09.10.2008 SE 67 Subject to technical alterations! Contents 1. General information
Rules for Classification and Construction Additional Rules and Guidelines 3 Machinery Installations
VI Rules for Classification and Construction Additional Rules and Guidelines 3 Machinery Installations 5 Guidelines for Design, Equipment and Testing of Gas Welding Installations on Seagoing Ships Edition
STRUCTURAL DEFORMATION CAUSED BY AERODYNAMIC EXCITATIONS DURING THE PASSING OF MAGLEV VEHICLES
BBAA VI International Colloquium on: Bluff Bodies Aerodynamics & Applications Milano, Italy, July, 20-24 2008 STRUCTURAL DEFORMATION CAUSED BY AERODYNAMIC EXCITATIONS DURING THE PASSING OF MAGLEV VEHICLES
The German High Speed Rail System. DB International GmbH Ottmar Grein Bilbao, 24.02.2015
The German High Speed Rail System DB International GmbH Ottmar Grein Bilbao, 24.02.2015 High Speed Rail Senior Consultant Ottmar Grein Personal Data Professional Experience: >30 Years Position: Senior
URBAN INFRASTRUCTURE METRO
URBAN INFRASTRUCTURE METRO WORKSHOP BOGOTA 2012-03-27 CONSULTING DESIGN PROJECT MANAGEMENT SITE SUPERVISION WORKSHOP BOGOTA STRUCTURE 2 Structure 1. Presentation of Mr. Dieter Stephan and of consulting
A Data Mining Analysis to evaluate the additional workloads caused by welding distortions
A Data Mining Analysis to evaluate the additional workloads caused by welding distortions Losseau N., Caprace J.D., Aracil Fernandez F., Rigo P. ABSTRACT: This paper presents a way to minimize cost in
Labor für Stahl- und Leichtmetallbau Munich University of Applied Sciences Head of institute: Prof. Dr.-Ing. Ö. Bucak
Member of staff Dr. Ing. Chr. Schuler Dipl. Ing. A. Lorenz Dipl. Ing. S. Koch Dipl. Ing. J. Lorenz Dipl. Ing. S. Bugger Dipl. Ing. M. Binder Dipl. Ing. S. Rodic Dipl. Ing. M. Meissner Circle of consultants
Flexible Rolling of Tailor Rolled Blanks - innovative light weight design in steel -
Flexible Rolling of Tailor Rolled Blanks - innovative light weight design in steel - Dr.-Ing. Michael Rehse Muhr und Bender KG Tailor Rolled Blanks - a light weight design opportunity - Flexible Rolling