Cisco UCS B200 M3 Blade Server Installation and Service Note

Size: px
Start display at page:

Download "Cisco UCS B200 M3 Blade Server Installation and Service Note"

Transcription

1 Cisco UCS B200 M3 Blade Server Installation and Service Note The Cisco UCS B200 M3 (shown in Figure 1) is the latest Cisco Intel-based, half-width blade supporting two CPU sockets using Intel E series CPUs and up to 24 DIMMs; it supports one modular LOM (dedicated slot for Cisco's Virtual Interface Card) and one mezzanine adapter. At this time, the UCS B200 M2 (second generation) server is still available and is documented elsewhere. You can install up to eight UCS B200 Blade Servers to a UCS chassis, mixing with other models or Cisco UCS blade servers in the chassis if desired. The Cisco UCS B200 M3 is managed by Cisco UCS Manager version 2.0(2m) and later. Figure 1 Cisco UCS B200 M3 Front Panel 4 5 UCS B200 M Asset tag 1 7 Network link status LED 2 Blade ejector handle 8 Blade health LED 3 Ejector captive screw 9 Console connector 4 Hard drive bay 1 10 Reset button access 5 Hard drive bay 2 11 Beaconing LED and button 6 Power button and LED 1.Each server has a blank plastic tag that pulls out of the front panel which is provided so that you can add your own asset tracking label without interfering with the intended air flow. Americas Headquarters: Cisco Systems, Inc., 170 West Tasman Drive, San Jose, CA USA

2 LEDs Server LEDs indicate whether the blade server is in active or standby mode, the status of the network link, the over all health of the blade server, and whether the server is set to give a flashing blue beaconing indication. See Table 1 for details. The removable hard disks also have LEDs indicating hard disk access activity and hard disk health. Table 1 Blade Server LEDs LED Color Description Power Off Power off. Green Normal operation. Amber Standby. Link Off None of the network links are up. Green At least one network link is up. Health Off Power off. Green Normal operation. Amber Minor error. Blinking Amber Critical error. Beaconing Off Beaconing not enabled. Activity (Disk Drive) Health (Disk Drive) Blinking blue 1 Hz Off Green Flashing Amber 4Hz Flashing Amber 4hz Off Flashing Amber 4hz Amber Beaconing to locate a selected blade If the LED is not blinking, the blade is not selected. You can initiate beaconing in UCS Manager or with the button. Inactive. Outstanding I/O to disk drive. Rebuild in progress. Health LED will flash in unison. Identify drive active. Can mean either no fault detected or the drive is not installed. Identify drive active. If the Activity LED is also flashing amber, a drive rebuild is in progress. Fault detected. Buttons The Reset button is just inside the chassis and must be pressed using the tip of a paper clip or a similar item. Hold the button down for five seconds, and then release it to restart the server if other methods of restarting are not working. 2

3 Connectors The beaconing function for an individual server may get turned on or off by pressing the combination button and LED. See Table 1 for details. The power button and LED allows you to manually take a server temporarily out of service but leave it in a state where it can be restarted quickly. If the desired power state for a service profile associated with a blade server or an integrated rack-mount server is set to "off", using the power button or Cisco UCS Manager to reset the server will cause the desired power state of the server to become out of sync with the actual power state and the server may unexpected shutdown at a later time. To safely reboot a server from a power-down state, use the Boot Server action in Cisco UCS Manager. The console port allows a direct connection to a blade server to allow operating system installation and other management tasks to be done directly rather than remotely. The port uses the KVM dongle cable (N20-BKVM shown in Figure 2) which provides a connection into a Cisco UCS blade server; it has a a DB9 serial connector, a VGA connector for a monitor, and dual USB ports for a keyboard and mouse. With this cable, you can create a direct connection to the operating system and the BIOS running on a blade server. A KVM cable ships standard with each blade chassis accessory kit. Figure 2 KVM Cable for Blade Servers Connector to blade server slot 3 VGA connection for a monitor 2 DB9 serial connector 4 2-port USB connector for a mouse and keyboard Conventions This document uses the following conventions for notes, cautions, and safety warnings. Notes and Cautions contain important information that you should know. Note Means reader take note. Notes contain helpful suggestions or references to material that are not covered in the publication. Caution Means reader be careful. You are capable of doing something that might result in equipment damage or loss of data. 3

4 Safety warnings appear throughout this publication in procedures that, if performed incorrectly, can cause physical injuries. A warning symbol precedes each warning statement. Warning IMPORTANT SAFETY INSTRUCTIONS This warning symbol means danger. You are in a situation that could cause bodily injury. Before you work on any equipment, be aware of the hazards involved with electrical circuitry and be familiar with standard practices for preventing accidents. Use the statement number provided at the end of each warning to locate its translation in the translated safety warnings that accompanied this device. Statement 1071 SAVE THESE INSTRUCTIONS Waarschuwing BELANGRIJKE VEILIGHEIDSINSTRUCTIES Dit waarschuwingssymbool betekent gevaar. U verkeert in een situatie die lichamelijk letsel kan veroorzaken. Voordat u aan enige apparatuur gaat werken, dient u zich bewust te zijn van de bij elektrische schakelingen betrokken risico's en dient u op de hoogte te zijn van de standaard praktijken om ongelukken te voorkomen. Gebruik het nummer van de verklaring onderaan de waarschuwing als u een vertaling van de waarschuwing die bij het apparaat wordt geleverd, wilt raadplegen. BEWAAR DEZE INSTRUCTIES Varoitus TÄRKEITÄ TURVALLISUUSOHJEITA Tämä varoitusmerkki merkitsee vaaraa. Tilanne voi aiheuttaa ruumiillisia vammoja. Ennen kuin käsittelet laitteistoa, huomioi sähköpiirien käsittelemiseen liittyvät riskit ja tutustu onnettomuuksien yleisiin ehkäisytapoihin. Turvallisuusvaroitusten käännökset löytyvät laitteen mukana toimitettujen käännettyjen turvallisuusvaroitusten joukosta varoitusten lopussa näkyvien lausuntonumeroiden avulla. SÄILYTÄ NÄMÄ OHJEET Attention IMPORTANTES INFORMATIONS DE SÉCURITÉ Ce symbole d'avertissement indique un danger. Vous vous trouvez dans une situation pouvant entraîner des blessures ou des dommages corporels. Avant de travailler sur un équipement, soyez conscient des dangers liés aux circuits électriques et familiarisez-vous avec les procédures couramment utilisées pour éviter les accidents. Pour prendre connaissance des traductions des avertissements figurant dans les consignes de sécurité traduites qui accompagnent cet appareil, référez-vous au numéro de l'instruction situé à la fin de chaque avertissement. CONSERVEZ CES INFORMATIONS 4

5 Warnung WICHTIGE SICHERHEITSHINWEISE Dieses Warnsymbol bedeutet Gefahr. Sie befinden sich in einer Situation, die zu Verletzungen führen kann. Machen Sie sich vor der Arbeit mit Geräten mit den Gefahren elektrischer Schaltungen und den üblichen Verfahren zur Vorbeugung vor Unfällen vertraut. Suchen Sie mit der am Ende jeder Warnung angegebenen Anweisungsnummer nach der jeweiligen Übersetzung in den übersetzten Sicherheitshinweisen, die zusammen mit diesem Gerät ausgeliefert wurden. BEWAHREN SIE DIESE HINWEISE GUT AUF. Avvertenza IMPORTANTI ISTRUZIONI SULLA SICUREZZA Questo simbolo di avvertenza indica un pericolo. La situazione potrebbe causare infortuni alle persone. Prima di intervenire su qualsiasi apparecchiatura, occorre essere al corrente dei pericoli relativi ai circuiti elettrici e conoscere le procedure standard per la prevenzione di incidenti. Utilizzare il numero di istruzione presente alla fine di ciascuna avvertenza per individuare le traduzioni delle avvertenze riportate in questo documento. CONSERVARE QUESTE ISTRUZIONI Advarsel VIKTIGE SIKKERHETSINSTRUKSJONER Dette advarselssymbolet betyr fare. Du er i en situasjon som kan føre til skade på person. Før du begynner å arbeide med noe av utstyret, må du være oppmerksom på farene forbundet med elektriske kretser, og kjenne til standardprosedyrer for å forhindre ulykker. Bruk nummeret i slutten av hver advarsel for å finne oversettelsen i de oversatte sikkerhetsadvarslene som fulgte med denne enheten. TA VARE PÅ DISSE INSTRUKSJONENE Aviso INSTRUÇÕES IMPORTANTES DE SEGURANÇA Este símbolo de aviso significa perigo. Você está em uma situação que poderá ser causadora de lesões corporais. Antes de iniciar a utilização de qualquer equipamento, tenha conhecimento dos perigos envolvidos no manuseio de circuitos elétricos e familiarize-se com as práticas habituais de prevenção de acidentes. Utilize o número da instrução fornecido ao final de cada aviso para localizar sua tradução nos avisos de segurança traduzidos que acompanham este dispositivo. GUARDE ESTAS INSTRUÇÕES Advertencia! INSTRUCCIONES IMPORTANTES DE SEGURIDAD Este símbolo de aviso indica peligro. Existe riesgo para su integridad física. Antes de manipular cualquier equipo, considere los riesgos de la corriente eléctrica y familiarícese con los procedimientos estándar de prevención de accidentes. Al final de cada advertencia encontrará el número que le ayudará a encontrar el texto traducido en el apartado de traducciones que acompaña a este dispositivo. GUARDE ESTAS INSTRUCCIONES 5

6 Varning! VIKTIGA SÄKERHETSANVISNINGAR Denna varningssignal signalerar fara. Du befinner dig i en situation som kan leda till personskada. Innan du utför arbete på någon utrustning måste du vara medveten om farorna med elkretsar och känna till vanliga förfaranden för att förebygga olyckor. Använd det nummer som finns i slutet av varje varning för att hitta dess översättning i de översatta säkerhetsvarningar som medföljer denna anordning. SPARA DESSA ANVISNINGAR 6

7 Aviso INSTRUÇÕES IMPORTANTES DE SEGURANÇA Este símbolo de aviso significa perigo. Você se encontra em uma situação em que há risco de lesões corporais. Antes de trabalhar com qualquer equipamento, esteja ciente dos riscos que envolvem os circuitos elétricos e familiarize-se com as práticas padrão de prevenção de acidentes. Use o número da declaração fornecido ao final de cada aviso para localizar sua tradução nos avisos de segurança traduzidos que acompanham o dispositivo. GUARDE ESTAS INSTRUÇÕES Advarsel VIGTIGE SIKKERHEDSANVISNINGER Dette advarselssymbol betyder fare. Du befinder dig i en situation med risiko for legemesbeskadigelse. Før du begynder arbejde på udstyr, skal du være opmærksom på de involverede risici, der er ved elektriske kredsløb, og du skal sætte dig ind i standardprocedurer til undgåelse af ulykker. Brug erklæringsnummeret efter hver advarsel for at finde oversættelsen i de oversatte advarsler, der fulgte med denne enhed. GEM DISSE ANVISNINGER 7

8 8

9 Installing and Removing a Blade Server Hard Drive Installing and Removing a Blade Server Hard Drive There are up to two front-accessible, hot-swappable, 2.5-inch drives per blade. An LSI SAS 2004 RAID controller is embedded in the motherboard (it is not separately replaceable), and it supports RAID 0 and 1. You can remove blade server hard drives without removing the blade server from the chassis. All other component replacements for a blade server requires removing the blade from the chassis. Unused hard drive bays should always be covered with cover plates (N20-BBLKD) to ensure proper cooling and ventilation. The chassis is omitted from illustrations here to simplify the drawing. Caution To prevent ESD damage, wear grounding wrist straps during these procedures and handle modules by the carrier edges only. Caution RAID array migration between a B200 M1 or B200 M2 and a B200 M3 is not supported Replacing an HDD or SSD with a drive of the same size, model, and manufacturer should not cause any problems with UCS Manager. If the drive being replaced was part of a RAID array. we recommend using a newly ordered drive of identical size, model, and manufacturer to replace the failed drive. We recommend following industry standard practice of using drives of the same capacity when creating 9

10 Installing and Removing a Blade Server Hard Drive RAID volumes. If drives of different capacities are used, the useable portion of the smallest drive will be used on all drives that make up the RAID volume. Before upgrading or adding an HDD to a running system, check the service profile in UCS Manager to make sure that the new hardware configuration is within the parameters allowed by the service profile. Hard disk and RAID troubleshooting information is in the "Troubleshooting Server Hardware" chapter of the Cisco UCS Troubleshooting Guide. This provides a procedure for moving a RAID array between B200 M3 servers if needed. Table 2 shows the drives supported in this blade server. They are all hot pluggable and come with the drive sled attached. Spare drive sleds are not available. Table 2 Supported Drives Product ID HDDs A03-D1TBSATA UCS-HDD900GI2F106 A03-D600GA2 A03-D500GC3 UCS-HDD300GI2F105 A03-D300GA2 A03-D146GC2 SSDs UCS-SD300G0KA2-E UCS-SD200G0KA2-E UCS-SD100G0KA2-E Description 1 TB 6 Gb SATA 7.2K RPM SFF HDD 900GB 6Gb SAS 10K RPM SFF HDD 600 GB 6 Gb SAS transfer rate, 10K RPM SFF HDD 500GB 6Gb SATA 7.2K RPM SFF HDD 300 GB 6 Gb SAS transfer rate, 15K RPM SFF HDD 300 GB 6Gb SAS 10K RPM SFF HDD 146 GB 6 Gb SAS transfer rate, 15K RPM SFF HDD 300GB Std Height 15mm SATA SSD 200 GB Std Height 15 mm SATA SSD 100 GB Std Height 15 mm SATA SSD Removing a Blade Server Hard Drive To remove a hard drive from a blade server, follow these steps: Step 1 Push the button to release the ejector, and then pull the hard drive from its slot. 10

11 Installing and Removing a Blade Server Hard Drive Figure 3 Removing the Hard Drive Step 2 Step 3 Place the hard drive on an antistatic mat or antistatic foam if you are not immediately reinstalling it in another server. Install a hard disk drive blank faceplate (N20-BBLKD) to keep dust out of the blade server if the slot will remain empty. Installing a Blade Server Hard Drive To install a blade server hard drive in a blade server, follow these steps: Step 1 Place the hard drive lever into the open position by pushing the release button (see Figure 4). Figure 4 Installing a Hard Drive in a Blade Server Step 2 Gently slide the hard drive into the opening in the blade server until it seats into place. 11

12 Removing and Installing a UCS B200 M3 Blade Server Step 3 Push the hard drive lever into the closed position. You can use UCS Manager to format and configure RAID services. Refer to the UCS Manager configuration guide for your software release for details on RAID configuration. If you need to move a RAID cluster, refer to the Moving a RAID Cluster section of the "Troubleshooting Server Hardware" chapter of the Cisco UCS Troubleshooting Guide. Removing and Installing a UCS B200 M3 Blade Server Before performing any of the following internal operations on this blade server, you must remove it from the chassis. To prevent ESD damage, wear grounding wrist straps during these procedures and handle modules by the carrier edges only. Caution To prevent ESD damage, wear grounding wrist straps during these procedures and handle modules by the carrier edges only. Shutting Down and Powering Off a Blade Server The server can run in two power modes: Main power mode Power is supplied to all server components, and any operating system on your hard drives can run. Standby power mode Power is supplied only to the service processor and the cooling fans, and it is safe to power off the server from this mode. After establishing a connection to the blade server s operating system, you can directly shut down the blade server using the operating system. You can invoke a graceful shutdown or an emergency shutdown (hard shutdown) by using either of the following methods: Use the UCS Manager. See either the Cisco UCS Manager GUI Configuration Guide or the Cisco UCS Manager CLI Configuration Guide. Use the Power button on the server front panel. To use the Power button, follow these steps: Step 1 Step 2 Check the color of the Power Status LED. Green indicates that the server is in main power mode and must be shut down before it can be safely powered off. Go to Step 2. Amber indicates that the server is already in standby mode and can be safely powered off. Go to Step 3. Invoke either a graceful shutdown or a hard shutdown: 12

13 Removing and Installing a UCS B200 M3 Blade Server Caution Step 3 To avoid data loss or damage to your operating system, you should always invoke a graceful shutdown of the operating system. Graceful shutdown Press and release the Power button. The operating system performs a graceful shutdown and the server goes to standby mode, which is indicated by an amber Power Status LED. Emergency shutdown Press and hold the Power button for 4 seconds to force the main power off and immediately enter standby mode. If you are shutting down all blade servers in a chassis, you should now disconnect the power cords from the chassis to completely power off the servers. If you are only shutting down one server, you can skip unplugging the chassis and move to removing the server. Removing a Cisco UCS B200 M3 Blade Server Using UCS Manager, decommission the server before physically removing the server. To remove a blade server from the chassis, follow these steps: Step 1 Step 2 Step 3 Step 4 Step 5 Loosen the captive screw on the front of the blade. Remove the blade from the chassis by pulling the ejector lever on the blade until it unseats the blade server. Slide the blade part of the way out of the chassis, and place your other hand under the blade to support its weight. Once removed, place the blade on an antistatic mat or antistatic foam if you are not immediately reinstalling it into another slot. If the slot is to remain empty, install a blank faceplate (N20-CBLKB1) to keep dust out of the chassis. Installing a Cisco UCS B200 M3 Blade Server UCS B200 M3 blade servers are interoperable in a UCS chassis with any other UCS blade servers, including prior generation B200 M2 and B200 M1 servers, or other UCS B-Series blade servers. To install a blade server, follow these steps: Step 1 Grasp the front of the blade server and place your other hand under the blade to support it. See Figure 5. 13

14 Secure Digital (SD) Card Access Figure 5 Positioning a Blade Server in the Chassis Step 2 Step 3 Step 4 Step 5 Step 6 Open the ejector lever in the front of the blade server. Gently slide the blade into the opening until you cannot push it any farther. Press the ejector lever so that it catches the edge of the chassis and presses the blade server all the way in. Tighten the captive screw on the front of the blade to no more than 3 in-lbs. Tightening with bare fingers only is unlikely to lead to stripped or damaged captive screws. Power on the server. UCS Manager automatically reacknowledges, reassociates, and recommissions the server, provided any hardware changes are allowed by the service profile. Figure 5 shows the positioning of a blade server in the chassis. Blade servers reside within the eight upper slots of the chassis. Secure Digital (SD) Card Access SD card slots are provided for future usage. Their use is not supported at product release. They will require a future software update to be used. 14

15 Secure Digital (SD) Card Access Figure 6 SD Card Slot Locations

16 Removing a Blade Server Cover Removing a Blade Server Cover To open a blade server, follow these steps: Step 1 Press and hold the button down as shown in Figure 7. Step 2 While holding the back end of the cover, pull the cover up and back. Figure 7 Opening a Cisco UCS B200 M3 Blade Server

17 Air Baffles Removing a Blade Server Cover The air baffles (shown in Figure 8) direct and improve air flow for the server components. Two identical baffles ship with each B200 M3 server. No tools are necessary to install them, just place them over the DIMMs as shown, with the holes in the center of the baffles aligned with the corresponding motherboard standoffs. Figure 8 Cisco UCS B200 M3 Air Baffles

18 Removing a Blade Server Cover Once installed, the air baffles direct the intake air into four distinct lanes as shown in Figure 9. Cisco UCS B200 M3 Air Flow Figure 9 Internal Components Figure 10 calls out the various components within the blade server. Figure 10 Inside View of a Blade Server C0 C1 C2 D0 D1 D2 8 E0 E1 E2 F0 F1 F2 CPU 2 H2 H1 H0 G2 G1 G0 B2 B1 B0 A2 A1 A0 1 Hard drive bays 2 Internal USB connector 1 3 Battery 4 CPU and heat sink 5 DIMM slots 6 Diagnostic button 7 Modular LOM (shown installed) 8 Adapter card connector (Adapter not shown installed) CPU 1 18

19 Working Inside the Blade Server 1. Cisco UCS-USBFLSH-S-4GB= is recommended, but if another USB drive will be used it must be no wider than.8 inches, and no more than inches long in order tp provide needed clearances to install or remove the USB drive. Note Use of this server may require an upgrade to the IOM in the chassis. This server only supports third generation adapter cards, which have features requiring a Cisco 2204 or 2208 IOM, and are not backward compatible with the Cisco 2104 IOM. Diagnostics Button and LEDs At blade start-up, POST diagnostics test the CPUs, DIMMs, HDDs, and adapter cards, and any failure notifications are sent to UCS Manager. You can view these notifications in the System Error Log or in the output of the show tech-support command. If errors are found, an amber diagnostic LED also lights up next to the failed component. During run time, the blade BIOS, component drivers, and OS all monitor for hardware faults and will light up the amber diagnostic LED for a component if an uncorrectable error or correctable errors (such as a host ECC error) over the allowed threshold occur. LED states are saved, and if you remove the blade from the chassis the LED values will persist for up to 10 minutes. Pressing the LED diagnostics button on the motherboard causes the LEDs that currently show a component fault to light for up to 30 seconds for easier component identification. LED fault values are reset when the blade is reinserted into the chassis and booted, and the process begins from its start. If DIMM insertion errors are detected, they may cause the blade discovery to fail and errors will be reported in the server POST information, which is viewable using the UCS Manager GUI or CLI. UCS blade servers require specific rules to be followed when populating DIMMs in a blade server, and the rules depend on the blade server model. Refer to the documentation for a specific blade server for those rules. HDD status LEDs are on the front face of the HDD. Faults on the CPU, DIMMs, or adapter cards also cause the server health LED to light solid amber for minor error conditions or blinking amber for critical error conditions. Working Inside the Blade Server This section describes how to perform the following tasks within a blade server: Installing a Motherboard CMOS Battery, page 19 Removing and Installing a CPU and Heat Sink, page 21 Installing Memory, page 26 Installing an Adapter Card, page 32 Installing a Motherboard CMOS Battery The B200 blade servers support the following Cisco component: 19

20 Working Inside the Blade Server Supported Components CR2032 battery Part Number N20-MBLIBATT Warning There is danger of explosion if the battery is replaced incorrectly. Replace the battery only with the same or equivalent type recommended by the manufacturer. Dispose of used batteries according to the manufacturer s instructions. Statement 1015 To install or replace a motherboard complementary metal-oxide semiconductor (CMOS) battery, follow these steps: Step 1 Step 2 Remove a motherboard CMOS battery: a. Power off the blade, remove it from the chassis, and remove the top cover as described in the Removing a Blade Server Cover section on page 16. b. Press the battery socket retaining clip toward the chassis wall (see Figure 11). c. Lift the battery from the socket. Use needle-nose pliers to grasp the battery if there is not enough clearance for your fingers. Install a motherboard CMOS battery: a. Press the battery socket retaining clip toward the chassis wall. b. Insert the new battery into the socket with the battery s negative ( ) marking toward the chassis wall. Ensure that the retaining clip clicks over the top of the battery. c. Replace the top cover. d. Replace the server in the chassis and power on the blade by pressing the Power button. 20

21 Working Inside the Blade Server Figure 11 Removing and Replacing a Motherboard CMOS Battery + C0 C1 C2 D0 D1 D2 CPU 1 B2 B1 B0 A2 A1 A Removing and Installing a CPU and Heat Sink You can only order your blade server with two CPUs, but at some point you may choose to upgrade them to a different type. Both CPUs must be of the same type, and memory in slots intended for the second CPU will not be recognized if the second CPU is not present (see Memory Arrangement). You may need to use these procedures to move a CPU from one server to another, or to replace a faulty CPU. Table 3 shows the available CPU options. Table 3 CPU Options for B200 M3 Servers Product ID Power Draw (W) Clock Speed (GHz) Cores DDR3 (MHz) Cache (MB) UCS-CPU-E W MB UCS-CPU-E W UCS-CPU-E W UCS-CPU-E W UCS-CPU-E W

22 Working Inside the Blade Server Table 3 CPU Options for B200 M3 Servers (continued) Product ID Power Draw (W) Clock Speed (GHz) Cores DDR3 (MHz) Cache (MB) UCS-CPU-E W UCS-CPU-E W MB UCS-CPU-E W UCS-CPU-E5-2630L 60 W 2.00 GHz MB UCS-CPU-E W To remove a CPU and heat sink, follow these steps: Step 1 Unscrew the four captive screws securing the heat sink to the motherboard. See Figure 12, callout 1. Step 2 Remove the heat sink (UCSB-HS-01-EP). See Figure 12, callout 2. Remove the old thermal compound from the bottom of the heat sink using the cleaning kit (UCSX-HSCK= ) available from Cisco. Follow the instructions on the two bottles of cleaning solvent. Step 3 Unhook the first socket hook, marked with an icon. See Figure 12, callout 3. Step 4 Unhook the second socket hook, marked with an icon. See Figure 12, callout 4. Step 5 Open the socket latch. See Figure 12, callout 5. Step 6 Press the central button on the provided CPU alignment tool to release the catch. See Figure 13. Step 7 Remove the old CPU as follows: a. Place the CPU alignment tool on the CPU bezel aligned with the A1 arrow pointing to the CPU registration mark as shown in Figure 13. b. Press the side lever on the tool to grasp the installed CPU. c. Lift the tool and CPU straight up. 22

23 Working Inside the Blade Server Figure 12 Removing the Heat Sink and Accessing the CPU Socket Figure 13 Using the CPU Alignment Tool Central button Side lever 23

24 Working Inside the Blade Server Installing a CPU and Heat Sink Before installing a new CPU in a server, verify the following: The CPU is supported for that model server. A BIOS update is available and installed that supports the CPU/DIMM and server combination. The service profile for this server in UCS Manager will recognize and allow the new CPU. Caution The CPU alignment tool shown in Figure 13 and Figure 14 is required to prevent damage to the connection pins between the motherboard and the CPU. Do not attempt this procedure without the required tool, which is included with each CPU option kit. To install a CPU and heat sink, follow these steps: Step 1 Prime the alignment tool by pressing the central button. Step 2 Remove the new CPU from the packaging, and place it into the alignment tool as shown in Figure 14. Only touch the CPU by the edges. Figure 14 Loading the Alignment Tool Step 3 Press the side lever on the alignment tool to grasp the CPU correctly aligned in the tool. 24

25 Step 4 Place the CPU on the base with the registration marks aligned as shown in Figure 15. Step 5 Press the central button on the alignment tool to release the CPU into the socket. Working Inside the Blade Server Figure 15 Inserting the CPU and Replacing the Heat Sink Step 6 Close the socket latch. See Figure 15, callout 1. Step 7 Secure the first hook, marked with an icon. See Figure 15, callout 2. Step 8 Secure the second hook, marked with an icon. See Figure 15, callout 3. Step 9 Using the tube of thermal compound provided with replacement CPUs and servers (available separately as UCS-CPU-GREASE=), add a protective film of thermal compound to the bottom of the heat sink where it will contact the CPU. Step 10 Replace the heat sink (UCSB-HS-01-EP). See Figure 15, callout 4. Caution Step 11 The heat sinks are keyed to fit into the plastic baffle extending from the motherboard. Do not force a heatsink if it is not fitting well, rotate it and re-orient the heat sink. Secure the heat sink to the motherboard by tightening the four captive screws in an X pattern as shown in the upper right of Figure

26 Memory and Performance Installing Memory To install a DIMM into the B200 M3 blade server, follow these steps: Step 1 Open both DIMM connector latches. Figure 16 Installing DIMMs in the Blade Server Step 2 Step 3 Press the DIMM into its slot evenly on both ends until it clicks into place. DIMMs are keyed, if a gentle force is not sufficient, make sure the notch on the DIMM is correctly aligned. Press the DIMM connector latches inward slightly to seat them fully. Memory and Performance This section describes the type of memory that the B200 M3 blade server requires, and its effect on performance. The following topics are covered: Supported DIMMs, page 27 Memory Arrangement, page 27 Memory Performance, page 30 Memory Mirroring and RAS, page 30 26

27 Memory and Performance Supported DIMMs Table 4 lists the type of DIMMs that Cisco Systems makes available for use with this blade server: Table 4 Cisco Systems Supported DIMMs for B200 M3 Servers Cisco Product ID UCS-MR-1X162RY-A UCS-MR-1X082RX-A UCS-MR-1X082RY-A UCS-MR-1X041RY-A Description 16 GB DDR MHz RDIMM PC dual rank/low Voltage 8 GB DDR MHz RDIMM PC dual rank/low Voltage 8 GB DDR MHz RDIMM PC dual rank/low Voltage 4 GB DDR MHz RDIMM PC single rank/low Voltage Memory Arrangement The blade server contains 24 DIMM slots 12 for each CPU. Each set of 12 DIMM slots is arranged into four channels, where each channel has three DIMMs (see Figure 17 and Figure 18). Figure 17 Memory Slots within the Blade Server CPU 2 CPU Channels A-D for CPU 1 2 Channels E-H for CPU 2 27

28 Memory and Performance DIMMs and Channels Each channel is identified by a letter A, B, C, D for CPU1, and E, F, G, H for CPU 2. Each DIMM slot is numbered 0, 1, or 2. Note that each DIMM slot 0 is blue, each slot 1 is black, and each slot 2 is off-white or beige. Figure 18 shows how DIMMs and channels are physically laid out on the blade server. The DIMM slots in the upper and lower right are associated with the second CPU (CPU shown on right in the diagram), while the DIMM slots in the upper and lower left are associated with the first CPU (CPU shown on left). Figure 18 Physical Representation of DIMMs and Channels Battery C0 C1 C2 D0 D1 D2 E0 E1 E2 F0 F1 F2 CPU 2 CPU 1 B2 B1 B0 A2 A1 A0 H2 H1 H0 G2 G1 G

29 Memory and Performance Figure 19 shows a logical view of the DIMMs and channels. Figure 19 Logical Representation of DIMMs and Channels Channel A C2 B2 C1 B1 C0 B0 CPU D2 D1 A2 A1 A0 Logical DIMM 3 CPU 2 D0 H0 G0 F0 G1 F1 H1 H2 E0 E1 E2 Logical DIMM 2 Logical DIMM1 Logical DIMM 1 Logical DIMM 2 Logical DIMM 3 Channel E Channel B Channel F G2 F2 Channel C Channel G Channel D Channel H DIMMs can be used in the blade server in a one DIMM per Channel (1DPC) configuration, in a two DIMMs per Channel (2DPC) configuration, or a three DIMMs per Channel (3DPC) configuration. Each CPU in a Cisco UCS B200 M3 blade server supports four channels of three memory slots each. In a 1 DPC configuration, DIMMs are in slot 0 only. In a 2 DPC configuration, DIMMs are in both slot 0 and slot 1. In a 3 DPC configuration, DIMMs are in slot 0, slot 1, and slot 2. Table 5 shows the supported order for installing upgrade DIMMs. Table 5 Preferred DIMM Population Order DIMMs per CPU CPU 1 installed slots CPU 2 installed slots 1 A0 E0 2 A0, B0 E0, F0 3 A0, B0, C0 E0, F0, G0 29

30 Memory and Performance Table 5 Preferred DIMM Population Order DIMMs per CPU CPU 1 installed slots CPU 2 installed slots 4 (Blue slots) A0, B0, C0, D0 E0, F0, G0, H0 5 A0, B0, C0, D0 A1 6 A0, B0, C0, D0 A1, B1 7 A0, B0, C0, D0 A1, B1, C1 8 (Blue and black slots) A0, B0, C0, D0 A1, B1, C1, D1 9 A0, B0, C0, D0 A1, B1, C1, D1 A2 10 A0, B0, C0, D0 A1, B1, C1, D1 A2, B2 11 A0, B0, C0, D0 A1, B1, C1, D1 A2, B2, C2 12 (Blue, black and beige slots) A0, B0, C0, D0 A1, B1, C1, D1 A2, B2, C2, D2 E0, F0, G0, H0 E1 E0, F0, G0, H0 E1, F1 E0, F0, G0, H0 E1, F1, G1 E0, F0, G0, H0 E1, F1, G1, H1 E0, F0, G0, H0 E1, F1, G1, H1 E2 E0, F0, G0, H0 E1, F1, G1, H1 E2, F2 E0, F0, G0, H0 E1, F1, G1, H1 E2, F2, G2 E0, F0, G0, H0 E1, F1, G1, H1 E2, F2, G2, H2 Memory Performance When considering the memory configuration of your blade server, there are several things you need to consider. For example: When mixing DIMMs of different densities, the highest density DIMM goes in slot 0 then in descending density (ex: A0: UCS-MR-1X162RY-A, A1: UCS-MR-1X082RY-A, A2: UCS-MR-1X041RY-A) Your selected CPU(s) can have some affect on performance. DIMMs can be run in a 1DPC, a 2DPC, or a 3DPC configuration. 1 DPC and 2DPC can provide the maximum rated speed that the CPU and DIMMs are rated for. 3DPC causes the DIMMs to run at a slower speed. Memory Mirroring and RAS The Intel E CPUs within the blade server support memory mirroring only when an even number of Channels are populated with DIMMs. If one or three channels are populated with DIMMs, memory mirroring is automatically disabled. Furthermore, if memory mirroring is used, DRAM size is reduced by 50 percent for reasons of reliability. 30

31 Installing a Modular LOM Memory and Performance The modular LOM is a specialized I/O adapter providing 2 x 10 Gigabit of Ethernet/FCoE connectivity to each chassis IOM. The following option is available: Table 6 Modular LOM Options Cisco Product ID UCSB-MLOM-40G-01 Name Cisco VIC Gb mlom for UCS M3 Blade Servers. Plugs into the dedicated mlom connector only. It is the only card that can be plugged into the mlom connector. Note You must remove the adapter card to service the modular LOM. To install a modular LOM card on the blade server, follow these steps: Step 1 Step 2 Step 3 Position the modular LOM s board connector above the motherboard connector and align the captive screw to the standoff post on the motherboard. Firmly press the modular LOM s board connector into the motherboard connector. Tighten the captive screw. Tip Removing a modular LOM is the reverse of installing it. You may find it helpful when removing the connector from the motherboard to gently rock the board along the length of the connector until it loosens. 31

32 Memory and Performance Figure 20 Installing a Modular LOM Installing an Adapter Card The network adapters and interface cards all have a shared installation process. The following options are available: Table 7 Adapter Card Options Cisco Product ID Name UCS-VIC-M82-8P VIC Dual 40Gb capable Virtual Interface Card UCSB-MEZ-QLG-03 Cisco UCS CNA M73KR-Q Qlogic 1 UCSB-MLOM-PT-01 Port Expander Card for VIC a hardware option to enable an additional 4 ports of the VIC 1240, bringing the total capability to dual 4 x 10 GbE 1. If a VIC 1240 modular LOM card is not installed, you must have this adapter card installed. Note Use of this server may require an upgrade to the IOM in the chassis. This server only supports third generation adapter cards, which have features requiring a Cisco 2204 or 2208 IOM, and are not backward compatible with the Cisco 2104 IOM. 32

33 Memory and Performance If you are switching from one type of adapter card to another, before you physically perform the switch make sure that you have downloaded the latest device drivers and loaded them into the server s operating system. For more information, refer to the firmware management chapter of one of the UCS Manager software configuration guides. To install an adapter card on the blade server, follow these steps: Step 1 Step 2 Step 3 Position the adapter board connector above the motherboard connector and align the two adapter captive screws to the standoff posts on the motherboard. Firmly press the adapter connector into the motherboard connector. Tighten the two captive screws. Tip Removing an adapter card is the reverse of installing it. You may find it helpful when removing the connector from the motherboard to gently rock the board along the length of the connector until it loosens. Figure 21 Installing an Adapter Card

34 Trusted Platform Module Trusted Platform Module The Trusted Platform Module (TPM, Cisco Product ID UCSX-TPM1-001) is a component that can securely store artifacts used to authenticate the server. These artifacts can include passwords, certificates, or encryption keys. A TPM can also be used to store platform measurements that help ensure that the platform remains trustworthy. Authentication (ensuring that the platform can prove that it is what it claims to be) and attestation (a process helping to prove that a platform is trustworthy and has not been breached) are necessary steps to ensure safer computing in all environments. TPM is a factory-configurable option for this server. It is a requirement for the Intel Trusted Execution Technology (TXT) security feature, which must be enabled in the BIOS settings for a server equipped with a TPM. A TPM can not be added later by customers, or moved from one server to another. To enable the TPM: Step 1 Step 2 Step 3 Step 4 Step 5 Step 6 Enable Quiet Mode in the BIOS policy of the server s Service Profile. Establish a direct connection to the server, either by connecting a keyboard, monitor, and mouse to the front panel using a KVM dongle (N20-BKVM shown in Figure 2) or by other means. Reboot the server. Press F2 during reboot to enter the BIOS setup screens. On the Advanced tab, select Trusted Computing and press Enter. Set the TPM Support optionto Enable. Press F10 to save and exit. Allow the server to finish booting. Server Troubleshooting For general server troubleshooting information, refer to the "Troubleshooting Server Hardware" chapter of the Cisco UCS Troubleshooting Guide. Server Configuration UCS servers are intended to be configured and managed using UCS Manager. Refer to the UCS Manager Configuration Guide appropriate for your UCS Manager version. Server Specifications Table 8 Physical Specifications for the Cisco UCS B200 M3 Blade Server Specification Value Height 1.95 inches (50 mm) Width 8.00 inches (203 mm) Depth 24.4 inches (620 mm) Weight 15.0 lbs (6.8 kg) 1 34

35 Related Documentation 1. The system weight listed here is an estimate for a fully configured system and will vary depending on peripheral devices installed. Related Documentation The documentation set for the Cisco Unified Computing System environment is described in full at: Obtaining Documentation and Submitting a Service Request For information on obtaining documentation, submitting a service request, and gathering additional information, see the monthly What s New in Cisco Product Documentation, which also lists all new and revised Cisco technical documentation, at: Subscribe to the What s New in Cisco Product Documentation as an RSS feed and set content to be delivered directly to your desktop using a reader application. The RSS feeds are a free service. Cisco currently supports RSS Version 2.0. Cisco and the Cisco logo are trademarks or registered trademarks of Cisco and/or its affiliates in the U.S. and other countries. To view a list of Cisco trademarks, go to this URL: Third-party trademarks mentioned are the property of their respective owners. The use of the word partner does not imply a partnership relationship between Cisco and any other company. (1110R) Any Internet Protocol (IP) addresses and phone numbers used in this document are not intended to be actual addresses and phone numbers. Any examples, command display output, network topology diagrams, and other figures included in the document are shown for illustrative purposes only. Any use of actual IP addresses or phone numbers in illustrative content is unintentional and coincidental Cisco Systems, Inc. All rights reserved. 35

36 Related Documentation 36

Cisco UCS B200 M3 Blade Server Installation and Service Note

Cisco UCS B200 M3 Blade Server Installation and Service Note Cisco UCS B200 M3 Blade Server Installation and Service Note The Cisco UCS B200 M3 (shown in Figure ) is the latest Cisco Intel-based, half-width blade supporting two CPU sockets using Intel E5-2600 series

More information

Cisco Unified IP Conference Station 7936

Cisco Unified IP Conference Station 7936 Phone Guide Cisco Unified IP Conference Station 7936 License and Warranty 1 Getting Started 2 Installation 3 Features and Functions 4 Cisco Unified IP Conference Station 7936 Web Interface 5 Using the

More information

Cisco IP Phone 7911G for Cisco CallManager 4.1(3)

Cisco IP Phone 7911G for Cisco CallManager 4.1(3) Phone Guide Cisco IP Phone 7911G for Cisco CallManager 4.1(3) Corporate Headquarters Cisco Systems, Inc. 170 West Tasman Drive San Jose, CA 95134-1706 USA http://www.cisco.com Tel: 408 526-4000 800 553-NETS

More information

Cisco UCS B230 Blade Server Installation and Service Note

Cisco UCS B230 Blade Server Installation and Service Note Cisco UCS B230 Blade Server Installation and Service Note The Cisco UCS B230 Blade Server (shown in Figure 1) is one of the industry's highest-density two-socket blade server platforms, providing performance,

More information

Compaq Presario Desktop Products. Upgrading and Servicing Guide

Compaq Presario Desktop Products. Upgrading and Servicing Guide Compaq Presario Desktop Products Upgrading and Servicing Guide The information in this document is subject to change without notice. Hewlett-Packard Company makes no warranty of any kind with regard to

More information

Catalyst 2984G, 2948G-GE-TX, and 2980G Switch Hardware Installation Guide

Catalyst 2984G, 2948G-GE-TX, and 2980G Switch Hardware Installation Guide Catalyst 2984G, 2948G-GE-TX, and 2980G Switch Hardware Installation Guide October 2003 Corporate Headquarters Cisco Systems, Inc. 170 West Tasman Drive San Jose, CA 95134-1706 USA http://www.cisco.com

More information

HP ProLiant DL165 G7 Server. Installation Instructions

HP ProLiant DL165 G7 Server. Installation Instructions HP ProLiant DL165 G7 Server Installation Instructions Identifying server components Front panel components Figure 1 Front Panel Components / 4 3.5 HDD Item 1 Thumbscrews for rack mounting 2 Drive status

More information

4x3.5" Hot-Swap Drive Cage Kit Installation Guide for Intel Server Chassis/System

4x3.5 Hot-Swap Drive Cage Kit Installation Guide for Intel Server Chassis/System 4x3.5" Hot-Swap Drive Cage Kit Installation Guide for Intel Server Chassis/System Order Number: G23758-002 G23758-002 This document provides instructions for installing the following accessory kit: FUP4X35HSDK

More information

Upgrading and Servicing Guide

Upgrading and Servicing Guide Upgrading and Servicing Guide The only warranties for Hewlett-Packard products and services are set forth in the express statements accompanying such products and services. Nothing herein should be construed

More information

Cisco 1800 Series Integrated Services Routers (Modular) Hardware Installation Guide

Cisco 1800 Series Integrated Services Routers (Modular) Hardware Installation Guide Cisco 1800 Series Integrated Services Routers (Modular) Hardware Installation Guide Americas Headquarters Cisco Systems, Inc. 170 West Tasman Drive San Jose, CA 95134-1706 USA http://www.cisco.com Tel:

More information

Backup Battery Kit Install Guide: Intel Storage Controller AXXSCM3S

Backup Battery Kit Install Guide: Intel Storage Controller AXXSCM3S Backup Battery Kit Install Guide: Intel Storage Controller AXXSCM3S A Guide for Technically Qualified Assemblers of Intel Identified Subassemblies/ Products Intel Order Number: E13860-004 Disclaimer Information

More information

UPGRADING AND SERVICING GUIDE

UPGRADING AND SERVICING GUIDE UPGRADING AND SERVICING GUIDE HPTouchSmart 610 PC Computer features may vary by model. Removing and Replacing a CD/DVD Drive...2 Removing the CD/DVD Drive... 2 Installing a New CD/DVD Drive... 5 Removing

More information

HP SATA/SAS hard drive and Solid State Drive installation

HP SATA/SAS hard drive and Solid State Drive installation HP SATA/SAS hard drive and Solid State Drive installation This document describes how to install Serial ATA (SATA) and Serial Attached SCSI (SAS) hard drives or Solid State Drives (SSD) in an internal

More information

StorTrends 3400 Hardware Guide for Onsite Support

StorTrends 3400 Hardware Guide for Onsite Support StorTrends 3400 Hardware Guide for Onsite Support MAN-3400-SS 11/21/2012 Copyright 1985-2012 American Megatrends, Inc. All rights reserved. American Megatrends, Inc. 5555 Oakbrook Parkway, Building 200

More information

HP Pavilion All-in-One MS200 series PC. Upgrading and Servicing Guide. Printed in

HP Pavilion All-in-One MS200 series PC. Upgrading and Servicing Guide. Printed in HP Pavilion All-in-One MS200 series PC *579907-001* *579907-001* Printed in Upgrading and Servicing Guide Replacing a Wireless Keyboard or Mouse...2 Before You Begin... 2 Replacing the Keyboard or Mouse...

More information

Rack Mount Kit Install Guide: Intel Entry Server Chassis SC5295-E UP/DP/WS/BRP Intel Entry Server Chassis SC5299-E DP/WS/BRP

Rack Mount Kit Install Guide: Intel Entry Server Chassis SC5295-E UP/DP/WS/BRP Intel Entry Server Chassis SC5299-E DP/WS/BRP Rack Mount Kit Install Guide: Intel Entry Server Chassis SC5295-E UP/DP/WS/BRP Intel Entry Server Chassis SC5299-E DP/WS/BRP A Guide for Technically Qualified Assemblers of Intel Identified Subassemblies/Products

More information

McAfee Data Loss Prevention

McAfee Data Loss Prevention Hardware Guide Revision B McAfee Data Loss Prevention 1650, 3650, 4400, 5500 This guide describes the features and capabilities of McAfee Data Loss Prevention (McAfee DLP) appliances to help you to manage

More information

Intel NUC Kit DC3217IYE User Guide. Intel NUC Kit DC3217IYE

Intel NUC Kit DC3217IYE User Guide. Intel NUC Kit DC3217IYE Intel NUC Kit DC3217IYE User Guide 1 Before You Begin CAUTIONS The procedures in this user guide assume familiarity with the general terminology associated with personal computers and with the safety practices

More information

Dell Inspiron 660s Owner s Manual

Dell Inspiron 660s Owner s Manual Dell Inspiron 660s Owner s Manual Computer model: Inspiron 660s Regulatory model: D06S Regulatory type: D06S001 Notes, Cautions, and Warnings NOTE: A NOTE indicates important information that helps you

More information

High Density RocketRAID 2711 + Rocket EJ220 Device Board Data RAID Installation Guide

High Density RocketRAID 2711 + Rocket EJ220 Device Board Data RAID Installation Guide High Density RocketRAID 2711 + Rocket EJ220 Device Board Data RAID Installation Guide Introduction The HighPoint High Density Storage Solutions hammer down high density storage cost over a single mini-

More information

Power Supply Guide Version 1.0 for D-Show

Power Supply Guide Version 1.0 for D-Show Power Supply Guide Version 1.0 for D-Show Digidesign 2001 Junipero Serra Boulevard Daly City, CA 94014-3886 USA tel: 650 731 6300 fax: 650 731 6399 Technical Support (USA) tel: 650 731 6100 fax: 650 731

More information

Service Guide. Gateway M275

Service Guide. Gateway M275 Service Guide Gateway M275 Contents Replacing Gateway M275 Components.................................... 1 Identifying the convertible tablet PC model...................................... 2 Identifying

More information

Cisco Unified Wireless IP Phone 7921G Administration Guide for Cisco Unified CallManager Release 4.1, 4.2, 5.0 and Later

Cisco Unified Wireless IP Phone 7921G Administration Guide for Cisco Unified CallManager Release 4.1, 4.2, 5.0 and Later Cisco Unified Wireless IP Phone 7921G Administration Guide for Cisco Unified CallManager Release 4.1, 4.2, 5.0 and Later Cisco Unified Wireless IP Phone 7921G Americas Headquarters Cisco Systems, Inc.

More information

Small form factor bay converter and hard drive installation

Small form factor bay converter and hard drive installation Small form factor bay converter and hard drive installation HP xw6600 and HP xw8600 Workstations This document describes how to convert HP xw6600 and HP xw8600 Workstation 3.5-inch hard drive bays to hold

More information

Inspiron 15. Service Manual. 3000 Series

Inspiron 15. Service Manual. 3000 Series Inspiron 15 3000 Series Service Manual Computer Model: Inspiron 15 3541/Inspiron 15 3542/Inspiron 15 3543 Regulatory Model: P40F Regulatory Type: P40F001/P40F002 Notes, Cautions, and Warnings NOTE: A NOTE

More information

Quick Start Turning on the Tablet PC for the First Time

Quick Start Turning on the Tablet PC for the First Time User s Manual DL46 Getting Started Congratulations on your purchase of a Tablet PC. The Tablet PC is a fully functional PC with built-in LAN, and wireless connectivity. With your Tablet PC you will be

More information

Installing Cisco IP Phone 7960G/7940G Hardware on the Desktop or Wall

Installing Cisco IP Phone 7960G/7940G Hardware on the Desktop or Wall CHAPTER 2 Installing Cisco IP Phone 7960G/7940G Hardware on the Desktop or Wall This chapter explains how to install the Cisco IP Phone 7960G/7940G on the desktop or how to mount it to the wall. It provides

More information

Express5800/120Ed. Rack Mount Kit Installation Procedures PN: 455-01607-001

Express5800/120Ed. Rack Mount Kit Installation Procedures PN: 455-01607-001 Express5800/120Ed Rack Mount Kit Installation Procedures PN: 455-01607-001 Proprietary Notice and Liability Disclaimer The information disclosed in this document, including all designs and related materials,

More information

Rail Kit Install Guide: Intel Modular Server System MFSYS25 A Guide for Technically Qualified Assemblers of Intel Identified Subassemblies/ Products

Rail Kit Install Guide: Intel Modular Server System MFSYS25 A Guide for Technically Qualified Assemblers of Intel Identified Subassemblies/ Products Rail Kit Install Guide: Intel Modular Server System MFSYS25 A Guide for Technically Qualified Assemblers of Intel Identified Subassemblies/ Products Intel Order Number: E12567-002 Disclaimer Information

More information

HQP-1072 Series System User Guide

HQP-1072 Series System User Guide HQP-1072 Series System User Guide Table of Contents HQP-1072 Hardware User Guide...3 1. HQP-1072 system Introduction...4 1.1 Box Contents...4 1.2 Specification...6 1.3 Appearance...8 2. Setting Up...10

More information

Contents. Installing the upgrade memory kit in the G450 and G430 Media Gateway May 2014 1

Contents. Installing the upgrade memory kit in the G450 and G430 Media Gateway May 2014 1 Contents Installing the upgrade memory kit in the G450 / G430 Media Gateway... 3 Equipment ordering... 3 Inserting or replacing a RAM card... 4 Inserting or replacing a RAM card in the G450... 4 Replacing

More information

HP 22-in-1 Media Card Reader

HP 22-in-1 Media Card Reader HP 22-in-1 Media Card Reader Introduction This document describes how to install the HP 22-in-1 Media Card Reader into an HP Workstations adapter bracket, and then install the media card reader and bracket

More information

Cisco Unified Computing System Hardware

Cisco Unified Computing System Hardware Cisco Unified Computing System Hardware C22 M3 C24 M3 C220 M3 C220 M4 Form Factor 1RU 2RU 1RU 1RU Number of Sockets 2 2 2 2 Intel Xeon Processor Family E5-2400 and E5-2400 v2 E5-2600 E5-2600 v3 Processor

More information

Reboot the ExtraHop System and Test Hardware with the Rescue USB Flash Drive

Reboot the ExtraHop System and Test Hardware with the Rescue USB Flash Drive Reboot the ExtraHop System and Test Hardware with the Rescue USB Flash Drive This guide explains how to create and use a Rescue USB flash drive to reinstall and recover the ExtraHop system. When booting

More information

Cisco UCS B200 M3 Blade Server

Cisco UCS B200 M3 Blade Server Spec Sheet Cisco UCS B200 M3 Blade Server CISCO SYSTEMS PUBLICATION HISTORY 170 WEST TASMAN DR. SAN JOSE, CA, 95134 REV A.8 JUNE 15, 2012 WWW.CISCO.COM CONTENTS OVERVIEW...............................................

More information

Quick Start Guide. WAP371 Wireless AC/N Dual Radio Access Point with Single Point Setup Quick Start Guide. Cisco Small Business

Quick Start Guide. WAP371 Wireless AC/N Dual Radio Access Point with Single Point Setup Quick Start Guide. Cisco Small Business Quick Start Guide Cisco Small Business WAP371 Wireless AC/N Dual Radio Access Point with Single Point Setup Quick Start Guide Versión en Español para México en el CD Version en français sur CD Versione

More information

EVGA Z97 Classified Specs and Initial Installation (Part 1)

EVGA Z97 Classified Specs and Initial Installation (Part 1) User Guide EVGA Z97 Classified Specs and Initial Installation (Part 1) - 1 - Table of Contents Before you Begin 3 Parts Not in the kit.4 Intentions of the kit 4 Motherboard Specifications 5 Unpacking and

More information

A+ Guide to Managing and Maintaining Your PC, 7e. Chapter 1 Introducing Hardware

A+ Guide to Managing and Maintaining Your PC, 7e. Chapter 1 Introducing Hardware A+ Guide to Managing and Maintaining Your PC, 7e Chapter 1 Introducing Hardware Objectives Learn that a computer requires both hardware and software to work Learn about the many different hardware components

More information

Inspiron 13. Service Manual. 7000 Series. Computer Model: Inspiron 13 7348 Regulatory Model: P57G Regulatory Type: P57G001

Inspiron 13. Service Manual. 7000 Series. Computer Model: Inspiron 13 7348 Regulatory Model: P57G Regulatory Type: P57G001 Inspiron 13 7000 Series Service Manual Computer Model: Inspiron 13 7348 Regulatory Model: P57G Regulatory Type: P57G001 Notes, Cautions, and Warnings NOTE: A NOTE indicates important information that helps

More information

HP ProLiant BL460c Gen9 Server Blade User Guide

HP ProLiant BL460c Gen9 Server Blade User Guide HP ProLiant BL460c Gen9 Server Blade User Guide Abstract This document is for the person who installs, administers, and troubleshoots servers and storage systems. HP assumes you are qualified in the servicing

More information

SERVICE GUIDE. Gateway Notebook

SERVICE GUIDE. Gateway Notebook SERVICE GUIDE Gateway Notebook Contents Replacing Gateway Notebook Components...................................1 Identifying the notebook model......................................... 2 Identifying

More information

Cisco UCS B22 M3 Blade Server

Cisco UCS B22 M3 Blade Server Spec Sheet Cisco UCS B22 M3 Blade Server CISCO SYSTEMS PUBLICATION HISTORY 170 WEST TASMAN DR. SAN JOSE, CA, 95134 REV A.2 JULY 5, 2012 WWW.CISCO.COM CONTENTS OVERVIEW...............................................

More information

Cisco IP Phone Administration Guide for Cisco CallManager 4.0

Cisco IP Phone Administration Guide for Cisco CallManager 4.0 Cisco IP Phone Administration Guide for Cisco CallManager 4.0 Cisco IP Phone Models 7960G and 7940G Corporate Headquarters Cisco Systems, Inc. 170 West Tasman Drive San Jose, CA 95134-1706 USA http://www.cisco.com

More information

Building A Computer: A Beginners Guide

Building A Computer: A Beginners Guide Building A Computer: A Beginners Guide Mr. Marty Brandl The following was written to help an individual setup a Pentium 133 system using an ASUS P/I- P55T2P4 motherboard. The tutorial includes the installation

More information

HP ProLiant BL660c Gen9 Server Blade User Guide

HP ProLiant BL660c Gen9 Server Blade User Guide HP ProLiant BL660c Gen9 Server Blade User Guide Abstract This document is for the person who installs, administers, and troubleshoots servers and storage systems. HP assumes you are qualified in the servicing

More information

Tyan Computer. Transport PX22. Service Engineer s Manual

Tyan Computer. Transport PX22. Service Engineer s Manual Tyan Computer Transport PX22 Service Engineer s Manual 1 Precaution To read through the user manual, check all assembly and follow setup process before any operation on this server To keep paper clips,

More information

Getting Started. Chapter 1

Getting Started. Chapter 1 Chapter 1 Getting Started Thank you for choosing the 7728 v2.x Series Micro-ATX mainboard. The 7728 v2.x Series mainboards are based on Intel H61 chipsets for optimal system efficiency. Designed to fit

More information

apple Service Source Power Mac G4 Cube Updated June 2, 2003 2002 Apple Computer, Inc. All rights reserved.

apple Service Source Power Mac G4 Cube Updated June 2, 2003 2002 Apple Computer, Inc. All rights reserved. apple Service Source Power Mac G4 Cube Updated June 2, 2003 2002 Apple Computer, Inc. All rights reserved. apple Service Source Take Apart Power Mac G4 Cube 2002 Apple Computer, Inc. All rights reserved.

More information

TS500-E5. Configuration Guide

TS500-E5. Configuration Guide TS500-E5 Configuration Guide E4631 Second Edition V2 March 2009 Copyright 2009 ASUSTeK COMPUTER INC. All Rights Reserved. No part of this manual, including the products and software described in it, may

More information

Set Up Your MXI -Express x4 System

Set Up Your MXI -Express x4 System Set Up Your MXI -Express x4 System Terminology This document explains what you will need to set up various MXI-Express x4 hardware configurations. The products covered by this guide are the NI PCIe-8371/8372

More information

Cisco TelePresence VCR MSE 8220

Cisco TelePresence VCR MSE 8220 Cisco TelePresence VCR MSE 8220 Getting started 61-0008-05 Contents General information... 3 About the Cisco TelePresence VCR MSE 8220... 3 Port and LED location... 3 LED behavior... 4 Installing the VCR

More information

Mini-EPic System of RAID

Mini-EPic System of RAID Mini-EPICa USB/IEEE 1394-to-SATA II RAID Subsystem Revision 1.2 Contents Preface... 3 Before You Begin... 4 Chapter 1 Introduction... 6 1.1 Technical Specification... 7 1.2 Identifying Parts of the RAID

More information

Internal Modem Installation with Windows 95

Internal Modem Installation with Windows 95 Internal Modem Installation with Windows 95 You will need these items from your U.S. Robotics modem box: modem phone cord Plus: a screwdriver (not included) Determining Available Resources Your U.S. Robotics

More information

430 Power/Electronics Replacement

430 Power/Electronics Replacement Replacing the main board WARNING Before proceeding, turn off the main power switch and unplug the power cord. Caution Make sure you are properly grounded with an ESD strap before continuing. The main printed

More information

Intel RAID Module RMS3CC080/ RMS3CC040 and Intel RAID Maintenance Free Backup Unit 5 Quick Installation User's Guide

Intel RAID Module RMS3CC080/ RMS3CC040 and Intel RAID Maintenance Free Backup Unit 5 Quick Installation User's Guide Intel RAID Module RMS3CC080/ RMS3CC040 and Intel RAID Maintenance Free Backup Unit 5 Quick Installation User's Guide Thank you for buying an Intel RAID Module. Your Intel RAID Module provides reliability,

More information

3.5 Dual Bay USB 3.0 RAID HDD Enclosure

3.5 Dual Bay USB 3.0 RAID HDD Enclosure 3.5 Dual Bay USB 3.0 RAID HDD Enclosure User Manual August 11, 2011 v1.1 MFG Part # MT2U3-MP BARCODE Introduction 1 Introduction 1.1 System Requirements 1.1.1 PC Requirements Minimum Intel Pentium III

More information

ReadyNAS OS 6 Desktop Storage Systems

ReadyNAS OS 6 Desktop Storage Systems ReadyNAS OS 6 Desktop Storage Systems Hardware Manual Models: ReadyNAS 102 ReadyNAS 104 ReadyNAS 312 ReadyNAS 314 ReadyNAS 316 ReadyNAS 516 ReadyNAS 716X EDA 500 October 2013 202-11206-04 350 East Plumeria

More information

DD670, DD860, and DD890 Hardware Overview

DD670, DD860, and DD890 Hardware Overview DD670, DD860, and DD890 Hardware Overview Data Domain, Inc. 2421 Mission College Boulevard, Santa Clara, CA 95054 866-WE-DDUPE; 408-980-4800 775-0186-0001 Revision A July 14, 2010 Copyright 2010 EMC Corporation.

More information

Quick Start Guide. Cisco SPA232D Mobility Enhanced ATA

Quick Start Guide. Cisco SPA232D Mobility Enhanced ATA Quick Start Guide Cisco SPA232D Mobility Enhanced ATA Package Contents Analog Telephone Adapter Ethernet Cable Phone Cable Power Adapter Quick Start Guide Product CD-ROM Welcome Thank you for choosing

More information

MaxAttach NAS 4000 Series OS 2.2 Hard Disk Drive Replacement

MaxAttach NAS 4000 Series OS 2.2 Hard Disk Drive Replacement MaxAttach NAS 4000 Series MaxAttach NAS 4000 Series OS 2.2 Hard Disk Drive Replacement DOCUMENT OVERVIEW Who Should Use This Instruction Set This MaxAttach NAS 4000 Series by Maxtor HDD Replacement Instruction

More information

Installation Guide. Wyse C Class Conversion to WES7. Wyse USB Firmware Tool TM Release 1.10. Issue: 102910 PN: 883887-17L Rev. B

Installation Guide. Wyse C Class Conversion to WES7. Wyse USB Firmware Tool TM Release 1.10. Issue: 102910 PN: 883887-17L Rev. B Installation Guide Wyse C Class Conversion to WES7 Wyse USB Firmware Tool TM Release 1.10 Issue: 102910 PN: 883887-17L Rev. B Copyright Notices 2010, Wyse Technology Inc. All rights reserved. This manual

More information

Dell PowerVault MD3400 and MD3420 Storage Arrays Owner's Manual

Dell PowerVault MD3400 and MD3420 Storage Arrays Owner's Manual Dell PowerVault MD3400 and MD3420 Storage Arrays Owner's Manual Regulatory Model: E03J and E04J Series Regulatory Type: E03J001 and E04J001 Notes, Cautions, and Warnings NOTE: A NOTE indicates important

More information

HP AD397A rx2660 SAS Smart Array P400 Controller Installation Guide Manufacturing Part Number: AD397-9001A February 2007

HP AD397A rx2660 SAS Smart Array P400 Controller Installation Guide Manufacturing Part Number: AD397-9001A February 2007 HP AD397A rx2660 SAS Smart Array P400 Controller Installation Guide Manufacturing Part Number: AD397-9001A February 2007 United States Copyright 2007 Hewlett-Packard Development Company L.P.. Legal Notices

More information

Wall-Mounting your HP computer. User Guide

Wall-Mounting your HP computer. User Guide Wall-Mounting your HP computer User Guide The only warranties for Hewlett-Packard products and services are set forth in the express statements accompanying such products and services. Nothing herein should

More information

EVGA X99 Classified Specs and Initial Installation (Part 1)

EVGA X99 Classified Specs and Initial Installation (Part 1) User Guide EVGA X99 Classified Specs and Initial Installation (Part 1) - 1 - Table of Contents Before you Begin 3 Parts Not in the kit.4 Intentions of the kit 4 Motherboard Specifications 5 Unpacking and

More information

Intel RAID Maintenance Free Backup Unit 4 Quick Installation User's Guide

Intel RAID Maintenance Free Backup Unit 4 Quick Installation User's Guide Intel RAID Maintenance Free Backup Unit 4 Quick Installation User's Guide Thank you for buying an Intel RAID Maintenance Free Backup Unit 4. The Intel RAID Maintenance Free Backup Unit 4 supports the Intel

More information

Cisco IP Phone 7961G/7961G-GE and 7941G/7941G-GE for Cisco CallManager 4.2

Cisco IP Phone 7961G/7961G-GE and 7941G/7941G-GE for Cisco CallManager 4.2 Phone Guide Cisco IP Phone 7961G/7961G-GE and 7941G/7941G-GE for Cisco CallManager 4.2 INCLUDING LICENSE AND WARRANTY Corporate Headquarters Cisco Systems, Inc. 170 West Tasman Drive San Jose, CA 95134-1706

More information

Intel RAID Controller Troubleshooting Guide

Intel RAID Controller Troubleshooting Guide Intel RAID Controller Troubleshooting Guide A Guide for Technically Qualified Assemblers of Intel Identified Subassemblies/Products Intel order number C18781-001 September 2, 2002 Revision History Troubleshooting

More information

Taurus Super-S3 LCM. Dual-Bay RAID Storage Enclosure for two 3.5-inch Serial ATA Hard Drives. User Manual March 31, 2014 v1.2 www.akitio.

Taurus Super-S3 LCM. Dual-Bay RAID Storage Enclosure for two 3.5-inch Serial ATA Hard Drives. User Manual March 31, 2014 v1.2 www.akitio. Dual-Bay RAID Storage Enclosure for two 3.5-inch Serial ATA Hard Drives User Manual March 31, 2014 v1.2 www.akitio.com EN Table of Contents Table of Contents 1 Introduction... 1 1.1 Technical Specifications...

More information

Cisco FlexFlash: Use and Manage Cisco Flexible Flash Internal SD Card for Cisco UCS C-Series Standalone Rack Servers

Cisco FlexFlash: Use and Manage Cisco Flexible Flash Internal SD Card for Cisco UCS C-Series Standalone Rack Servers Cisco FlexFlash: Use and Manage Cisco Flexible Flash Internal SD Card for Cisco UCS C-Series Standalone Rack Servers White Paper February 2014 What You Will Learn The Cisco UCS C220 M3, C240 M3, C420 M3,

More information

QNAP RAID Expansion Enclosure Hardware User Manual. 2014. QNAP Systems, Inc. All Rights Reserved.

QNAP RAID Expansion Enclosure Hardware User Manual. 2014. QNAP Systems, Inc. All Rights Reserved. QNAP RAID Expansion Enclosure Hardware User Manual 2014. QNAP Systems, Inc. All Rights Reserved. Thank you for choosing QNAP products! This user manual provides descriptions of the hardware of the QNAP

More information

HP Integrity rx2660 Server Installation Guide

HP Integrity rx2660 Server Installation Guide HP Integrity rx2660 Server Installation Guide HP Part Number: AB419-9000C Published: November 2007 Copyright 2007 Hewlett-Packard Development Company, L.P Legal Notices The information contained herein

More information

How to Set Up Your NSM4000 Appliance

How to Set Up Your NSM4000 Appliance How to Set Up Your NSM4000 Appliance Juniper Networks NSM4000 is an appliance version of Network and Security Manager (NSM), a software application that centralizes control and management of your Juniper

More information

Quick Start Guide. Cisco Small Business. 300 Series Managed Switches

Quick Start Guide. Cisco Small Business. 300 Series Managed Switches Quick Start Guide Cisco Small Business 300 Series Managed Switches Welcome Thank you for choosing the Cisco 300 Series Managed Switch, a Cisco Small Business network communications device. This device

More information

ProLiant DL380 Generation 2 Server Maintenance and Service Guide

ProLiant DL380 Generation 2 Server Maintenance and Service Guide ProLiant DL380 Generation 2 Server Maintenance and Service Guide Second Edition (June 200) Part Number 203840-002 Spare Part Number 228520-00 Compaq Computer Corporation Notice 200 Compaq Computer Corporation

More information

USB3.0/eSATA/1394b-to-SATA II RAID SUBSYSTEM

USB3.0/eSATA/1394b-to-SATA II RAID SUBSYSTEM USB3.0/eSATA/1394b-to-SATA II RAID SUBSYSTEM Revision 1.0 Contents Preface... 3 Before You Begin... 4 Chapter 1 Introduction... 6 1.1 Technical Specification... 7 1.2 Identifying Parts of the RAID Subsystem...

More information

Using GIGABYTE Notebook for the First Time

Using GIGABYTE Notebook for the First Time Congratulations on your purchase of the GIGABYTE Notebook. This manual will help you to get started with setting up your notebook. The final product configuration depends on the model at the point of your

More information

Quick Start Guide. RV0xx Series Routers

Quick Start Guide. RV0xx Series Routers Quick Start Guide RV0xx Series Routers RV042 Dual WAN VPN Router RV042G Gigabit Dual WAN VPN Router RV082 Dual WAN VPN Router RV016 Multi-WAN VPN Router Package Contents VPN Router Power Adapter (Cisco

More information

Cisco IP Phone 7961G/7961G-GE and 7941G/7941G-GE for Cisco CallManager 4.1(3)

Cisco IP Phone 7961G/7961G-GE and 7941G/7941G-GE for Cisco CallManager 4.1(3) Phone Guide Cisco IP Phone 7961G/7961G-GE and 7941G/7941G-GE for Cisco CallManager 4.1(3) INCLUDING LICENSE AND WARRANTY Corporate Headquarters Cisco Systems, Inc. 170 West Tasman Drive San Jose, CA 95134-1706

More information

Cisco Unified Communications on the Cisco Unified Computing System

Cisco Unified Communications on the Cisco Unified Computing System Cisco Unified Communications on the Cisco Unified Computing System Cisco is introducing software application versions from the Cisco Unified Communications portfolio (Versions 8.0(2) and later) that are

More information

Cisco UCS Director Payment Gateway Integration Guide, Release 4.1

Cisco UCS Director Payment Gateway Integration Guide, Release 4.1 First Published: April 16, 2014 Americas Headquarters Cisco Systems, Inc. 170 West Tasman Drive San Jose, CA 95134-1706 USA http://www.cisco.com Tel: 408 526-4000 800 553-NETS (6387) Fax: 408 527-0883

More information

How To Replace A Hard Drive On A Dll Dll 2.2.2 (Dell) With A Harddrive (Dll) And Power Supply (Power Supply) (Power) (Delt) (Black) (White)

How To Replace A Hard Drive On A Dll Dll 2.2.2 (Dell) With A Harddrive (Dll) And Power Supply (Power Supply) (Power) (Delt) (Black) (White) Dell Vostro 3900/3902 Owner's Manual Regulatory Model: D17M Regulatory Type: D17M001 Notes, Cautions, and Warnings NOTE: A NOTE indicates important information that helps you make better use of your computer.

More information

Chapter 5 Cubix XP4 Blade Server

Chapter 5 Cubix XP4 Blade Server Chapter 5 Cubix XP4 Blade Server Introduction Cubix designed the XP4 Blade Server to fit inside a BladeStation enclosure. The Blade Server features one or two Intel Pentium 4 Xeon processors, the Intel

More information

Replacing the Gateway M320 Keyboard

Replacing the Gateway M320 Keyboard Replacing the Gateway M320 Keyboard This package includes a replacement keyboard for your Gateway M320 notebook and these printed instructions. Tools you need You need a small Phillips and a small flat-blade

More information

Front Panel Board Cable Replacement Instructions

Front Panel Board Cable Replacement Instructions apple Mac Pro Front Panel Board Cable Replacement Instructions First Steps 1 Shut down computer. Note: Follow these instructions carefully. Failure to do so could damage your equipment and void its warranty.

More information

Cascade Profiler Fibre Channel SAN Attached Storage Installation Guide. Version 8.2 March 2009

Cascade Profiler Fibre Channel SAN Attached Storage Installation Guide. Version 8.2 March 2009 Cascade Profiler Fibre Channel SAN Attached Storage Installation Guide Version 8.2 March 2009 Trademarks Riverbed, the Riverbed logo, Riverbed Cascade, and Cascade are trademarks of Riverbed Technology,

More information