Segmental and one piece shafts Installation guide. Issue 1
|
|
|
- Marjory Griffith
- 9 years ago
- Views:
Transcription
1 Segmental and one piece shafts Installation guide Issue 1
2 Purpose of this guide This document is a guide to the safe and efficient installation of Humes' segmental and one piece shafts which should be reviewed by supervisory personnel prior to installation. The information in this guide is of a general nature only and is no substitute for professional engineering advice. This guide should be read in conjunction with project-specific documents including contracts and drawings. Where the contents of this guide differ from project specifications and drawings, supervisory personnel should consult a Humes engineer. Should the information in this guide conflict with local legislative requirements, the legislative requirements should take precedence provided safety or engineering requirements are not compromised. It is the responsibility of the site owner or consulting engineer to determine the site s suitability for construction, including possible site access problems for plant and other issues. Statements in this guide are not to be construed as representations, guarantees or warranties. Satisfactory adherence to this guide will not discharge the contractor from it's contractual and statutory obligations. For typical installation requirements, please refer to the general assembly standard drawings or project specific drawings supplied by Humes. The Humes drawings contained in this document are system assembly drawings only and do not constitute a site layout; the site layout should be specified in project documents provided by the consulting engineer who has been engaged by the asset owner.
3 Contents Segmental and one piece shafts 2 Applications 2 Features and benefits 2 Product range 3 Safety 4 Construction methods 5 Caisson method 5 Underpin method 6 Combination of the caisson and 6 underpin methods Shaft segment handling 7 Installation 8 Caisson method 8 Underpin method 15 One piece shafts 19 General assembly drawings 21 Contact information 24
4 Segmental and one piece shafts Applications Safer work environment Humes precast concrete shafts are an economical and safe solution for permanent and temporary underground structures. They are used for a variety of applications including: ventilation shafts escape shafts launch and receival shafts for pipe jacking applications storage overflow and pump stations (sewerage) water harvesting and reuse. Humes precast shafts can enable contractors to provide a safer environment for their workers as: the majority of work can be carried out above ground (caisson method) overhead service hazards are minimised as no large cranes are required the system has a built-in safety barrier created by the installation of the top ring. The shaft system suits a variety of soil conditions, and provides a soil and watertight solution. Humes offer segmental shafts in partnership with Buchan Concrete Solutions Limited (UK). Features and benefits Precast shafts provide installation contractors with a number of benefits over traditional shaft construction methods including the potential for greater installation efficiencies, cost benefits, and a safer work environment. Humes precast shafts can also help to reduce the environmental impact of construction. Minimal environmental impact An efficient design means shafts have minimal impact on project sites and the surrounding environment: Noise and ground vibration are virtually eliminated as no hammering is required. The excavation and site storage areas are minimal, as the precast units are relatively compact at less than 2.5 m wide. Shaft installation does not require the use of water or wet concrete (except for the base and collar). Innovative design Cost savings Installation time is significantly reduced as excavation and ring placement can be on a continuous cycle. The precast concrete segments provide a one-pass finished shaft, so no further concrete work is required to finish the structure. There is no requirement for specialist labour and a small team should be capable of managing the entire installation process. The shaft can be installed accurately due to the high degree of control over the rate and direction of installation. No bracing is required due to its structurally efficient circular shape. The shaft gains structural stability from the surrounding soil so tie-backs or ring-beams are not required to support the segments. The shaft is suited to a variety of soil conditions. The shafts provide a soil and watertight solution. The unique external fixing used to join the segments, eliminates the need for specialist trades, like welders, on site. There is an extensive diameter range with a full range of ancillary products. 2 Segmental and one piece shafts
5 Product range Segmental and one piece shafts Humes offer the following sizes in one piece and segmental shafts: 3 m one piece shaft 3.6 m one piece shaft 4.5 m segmental shaft 6 m segmental shaft 7.5 m segmental shaft 9 m segmental shaft 10.5 m segmental shaft 12.5 m segmental shaft 15 m segmental shaft Sizes up to 25 m are also available, please contact Humes for availability. Bottom: Caisson shaft installation Segmental and one piece shafts 3
6 Safety Safety is a priority at Humes. It is important for all parties to observe safety requirements and regulations during transportation, handling, storage and installation, including wearing appropriate personal protective equipment. It is the responsibility of the main contractor or installation contractor to produce a Safe Work Method Statement. The statement should comply with all relevant codes of practice, standards and safety regulations. The precast concrete component should only be lifted using the correct lifting clutches and from the designated lifting points, which are shown in the project specific drawings and product drawings. Each precast segment or one piece shaft is fitted with a number of Swiftlift foot anchors. All lifting equipment must be certified to lift the specific weight and approved for lifting heavy componentry. The weight of the segments or one piece shaft units vary and will be clearly marked on the precast units and in the relevant project drawings. All lifting and placement must proceed with caution and strictly in accordance with all relevant occupational health and safety standards. Bumping of segments can cause damage or injury and should be avoided. The advice in this publication is of a general nature only. Where any doubt exists as to the safety of a particular lift or installation procedure, seek advice from a professional engineer or contact Humes for assistance. 4 Segmental and one piece shafts
7 Construction methods Caisson method Left: Caisson method Segmental and one piece shafts The caisson method is generally used in softer soils with or without the presence of ground water. In the caisson method, the precast concrete elements are erected at the surface and are then lowered into the ground whilst excavation progresses. Caissons are either installed as a wet caisson where the water level inside the caisson is slightly higher than the external ground water level, or as a dry caisson where the inside of the caisson is open to the atmosphere. There are a number of features unique to Humes' caisson shaft systems which facilitate installation. These include: In-situ cast concrete collars These collars act as a guide ring to keep the caisson shaft vertical and, in larger diameter shafts, resist the force from the hydraulic jacks. Hydraulic jacks (gallows) These are installed to both steer the shaft and to add to the vertical force in addition to the self weight of the shaft lining (generally not required for one piece rings). Excavation should be slightly larger in diameter than the precast concrete shaft The annulus between the shaft and the excavated ground should be filled with suitable fluid (usually bentonite with additives as required to suit the ground conditions) which acts both as a lubricant but also supports the ground during installation. The bottom/choker ring is wider than the standard ring and the same diameter as the excavation The choker ring is designed to provide a seal diameter between the shaft and excavated ground so that the fluid in the annulus above the ring is retained. The choker segments are also designed to bolt the steel cutting edge to the shaft and connect the underpin segment, (refer to the combination method on the following page). A steel cutting edge underneath the bottom/ choker ring The steel cutting edge literally cuts through the ground. It also acts as a stiffener. All caisson units are provided with grout fittings This allows the exterior annulus to be filled with a cementitious grout at completion of the installation. Segmental and one piece shafts 5
8 Underpin method Top: Underpin method Bottom: Combined method The underpin method can be used in self supported soil where caisson installation is not possible. In this method, the precast concrete elements are progressively installed at the base of the excavation. Segmental rings are built and the annulus between their outside perimeter and the excavated ground is immediately grouted. Combination of the caisson and underpin methods A combination of both methods can be used if the soil condition varies. Installation commences with the caisson method (using a special choker ring) and then shifts to the underpin method when the hard soil ground is reached. A special choker/transition ring must be used to enable the shift to the underpin construction method. Once the caisson rings have been completely grouted and the steel cutting edge removed. The underpin method can commence as previously described 6 Segmental and one piece shafts
9 Shaft segment handling Humes precast segments are delivered to site on wooden pallets. Each pallet holds two segments which are separated by wooden strips to protect the units during shipping. Before the segments are removed from the pallet the following steps are recommended in order to prevent damage and to ensure a safe work environment: 1. Use heat to apply the bitumen packing to one cross joint face of each segment. 2. Place rubber mats between the two segments; one in each corner and one in the middle (total of three). 3. Place the mats on the side opposite to where the Swiftlift anchor is fitted. 4. Cut and remove the straps holding the two segments. 5. Hook the Swiftlift clutches into the Swiftlift anchors on the top segment. Each segment is provided with two 1.3 t x 120 mm long Swiftlift foot anchors (supplied by Reid Construction Systems). 6. Once the segments are securely fastened to the anchors, start lifting and tilting the top segment according to safe precast concrete lifting procedures. Efforts should be made by the crane crew to prevent the top unit from swinging. For underpin installations, place the segment into the lifting frame as per Humes general method statement for use of the lifting frame. Top: Rubber mats placed between the two segments Middle: Hooking the clutches into the Swiftlift anchors on the top segment; Lifting and tilting the top segment Bottom: Segment placed into the lifting frame (underpin installations) Segmental and one piece shafts Segmental and one piece shafts 7
10 Installation Caisson method Figure 1 Excavation and steel cutting edge 1. Excavate a circular area that is at least 800 mm wider (to allow for the collar) than the external diameter of the shaft and a minimum of 1,200 mm deep (refer to Figure 1). The actual width of the collar has to be determined by the shaft engineer but typically is no less than 800 mm. Once completed, level the base of the excavation using 50 mm of low strength concrete. 1,200 mm min. Steel cutting edge 2. Accurately position the first steel cutting edge unit for both positioning and leveling. The joining of the cutting edge units should be carried out in accordance with project specific drawings. 3. Using heat, apply bitumen packing to one cross joint face of each bottom/choker ring segment. Check that the EPDM gasket is fitted into the gasket groove of each segment. Step 2 Completed steel cutting edge Step 2 Detail of steel cutting edge 8 Segmental and one piece shafts
11 4. Begin installing the bottom/choker ring on top of the cutting edge (refer to Figures 2 and 3) all choker segments are ordinary (non-tapered) and of the same size. Segments are to be safely propped up making them stable until the first ring is complete. Where practical, the segments should be placed so that any inlet/outlet openings to the shaft avoid the vertical tie bars. Fixing the bottom/choker ring segments into the cutting edge has to be done in accordance with project drawings. Insert 2 x M16 curved bolts into the bolt hole recesses on the outside and inside of the choker segments, fix washers, gel grommets, and nuts and tighten to close the vertical joints; repeat procedure for each segment until the ring is complete. Ensure all joints are tightened and the ring diameter is within allowable tolerance. Figure 2 Bottom/choker ring in place Outside diameter of shaft Bottom/choker ring 1,200 mm min. Figure 3 Proposed connection of bottom/choker ring segments into the cutting edge Segmental and one piece shafts Segmental and one piece shafts 9
12 5. Fit the threaded M16 x 985 mm long tie bars to the M16 sockets in the top of the bottom/choker ring segments, screw in the thread to 25 mm. 6. Build the next ring on top of the bottom/choker ring (refer to Figure 4 below). Lift and position the first ordinary segment using the lifting chains and lifting clutches, lowering the segment over the vertical tie bars. The segment should be turned relative to the segment below to stagger the vertical joints by a third of a segment. Step 5 M16 socket in the top of bottom/choker ring segment Step 5 Threaded M16 x 985 mm tie bar fitted to M16 socket Step 6 Constructing first ring on top of bottom/choker ring segment Figure 4 The first ring on top of the bottom/choker ring 10 Segmental and one piece shafts
13 7. After the second ordinary segment is installed, insert 2 x M16 curved bolts through the bolt hole recesses on the outside of the segments. Fix the washers and nuts, then tighten the vertical joints to a torque of 100 N-m. Segmental and one piece shafts Fix the grommets, washers and M16 x 70 mm long hexagonal couplers to the vertical tie bars located in the recesses on top of the segments and tighten using a socket wrench to a torque of 100 N-m. 8. Continue installing ordinary segments until the last two units which are the tapered segments. Position the tapered left segment first (this has the longer edge along the bottom face) then finally complete the ring with the tapered right segment, these segments are fixed using the same tie rods and curved bolts as the ordinary segments. Step 7 Making vertical joints using curved bolts Step 8 Installing the tapered segments Tapered left segment Tapered right segment Ordinary segment Step 8 Installing the tapered segments Segmental and one piece shafts 11
14 9. Surround the ring with mm thick polystyrene sheet to create an annulus. 10. Fix the locations of the jacking gallow anchors then prepare and cast the base (concrete collar around the shaft). The area between the completed bottom/choker ring and the outer perimeter of the excavation should be filled with concrete (min. grade 20 mpa) to form a complete concrete collar; this provides permanent support to the shaft excavation, lateral resistance to jacking forces, and acts as a guide for the shaft sinking. Once the concrete has hardened the polystyrene can be dissolved using a suitable chemical solvent. The concrete is usually sufficiently hardened to allow shaft sinking to begin the next day. Step 9 Surrounding ring with polystyrene to create an annulus Step 10 Base casting complete 12 Segmental and one piece shafts
15 11. Install the jacking gallows. 12. Build two more rings above ground level, repeating steps 5 to 8. Ensure one complete ring always remains above ground to act as a safety barrier during shaft construction. As additional rings are constructed ensure that vertical joints are staggered. Segmental and one piece shafts Step 11 Jacking gallow anchors in place Step 11 Jacking gallows in place 16. Step 12 Top ring acting as a safety barrier Segmental and one piece shafts 13
16 13. The rings are sunk by excavation inside the shaft using a suitable hydraulic grab mounted on an appropriate excavator. The rings will sink under their own weight in very soft ground but in harder ground, pressure will need to be applied to the top ring using hydraulic jacks. The grout socket assembly in each segment can be used to introduce bentonite slurry into the annulus between the shaft and the soil, to lubricate and reduce friction force when jacking rings into the ground. The bentonite slurry is normally filled from the top of the shaft as the rings are being pushed down Check the sinking shaft level by using a spirit level or plumb line; adjustments can be made by applying pressure to the high point. Selective excavation of the ground will also help level sinking. Step 13 Excavation inside the shaft 14. Excavate and construct rings until the required depth is reached. 15. Grout the annulus on completion to create an intimate contact between the shaft and the ground to provide additional watertightness. Using the grout sockets begin grouting from the bottom rings and fill upwards (if the grouting starts near the top, it may 'go off' or block before it reaches the lower rings, which could form a void pocket, which could allow the rings to be pushed out of shape when internal or external loads are applied at a later period). 14 Segmental and one piece shafts
17 Underpin method 1. Excavate a hole of sufficient diameter to build a complete ring and collar (refer to Figure 5). The actual width of the collar has to be determined by the shaft engineer. Depth of the excavation will vary, depending upon ground conditions, but should be at least one ring deep. Fix the shaft centre position with a pin. 2. Using heat, apply bitumen packing to one cross joint face of each segment. Check that the EPDM gasket is fitted into the gasket groove of each segment. Figure 5 Excavation with first two rings in place Outside diameter of shaft 1,000 mm min. Figure 6 Concrete collar cast around first two rings Outside diameter of shaft Segmental and one piece shafts 3. Install the first ring on timber blocks. Insert 2 x M16 curved bolts into the bolt hole recesses on the inside of the segments, fix washers, gel grommets, and nuts and tighten to close the vertical joints. Ensure the ring is level, all joints are tightened and the ring diameter is within allowable tolerance. 4. Secure the first installed ring(s) by casting a concrete base around the outside of the ring(s) (refer to Figure 6) prior to excavating underneath them to construct the next ring. Shear connection may be required. Ensure the base edge of the ring is kept clean. It is recommended to install one extra ring above ground to act as a safety barrier, alternatively a guardrail can be used. Step 4 Guardrails in place Segmental and one piece shafts 15
18 5. Prepare to construct the next ring by excavating below the first ring excavate the depth of a segment (refer to Figure 7) plus an additional 200 mm. Figure 7 Excavating for the next ring Outside diameter of shaft Extra ring above ground acting as a safety barrier 6. Place the first ordinary segment into the lifting frame and secure it via the grout socket assembly. Excavated area 7. Use the lifting frame to lower the segment into place underneath the first ring (refer to Figures 8 and 9). Figure 8 Fixing a segment into the lifting frame Detail Figure 9 Lowering the segment into place 16 Segmental and one piece shafts
19 8. Place eyebolts in the slots of the previously constructed ring and secure with sheradised dowels. The eyebolts should be hung with the notched end downwards (refer to Figure 10). Align the new segment so that the hanging eyebolts enter the slots on the horizontal and vertical joints. Correct positioning will automatically align the eyebolts, allowing the joints to be secured with sheradised dowels. If the dowel does not enter, check that the eyebolt slot has been adequately cleaned. Figure 10 Eyebolts attached to installed segments Segmental and one piece shafts 9. Tighten the joints with an open-ended spanner (refer to Figure 11). Figure 11 Securing eyebolts using sheradised dowels and tightening using an open-ended spanner Step 9 Tightening the joints Segmental and one piece shafts 17
20 10. After the second ordinary segment is installed, insert 2 x M16 curved bolts through the bolts holes recesses on the inside of the segments, fix washers, gel grommets, and nuts and tighten to close the vertical joints. 11. Continue installing ordinary segments until the last two units which are the tapered segments. Position the tapered right segment first (this has the longer edge along the top face) then finally complete the ring with the tapered left segment. 12. Close the gap behind the bottom of the installed ring and grout the ring up (refer to Figure 12 below). Step 10 Fixing the curved bolts Always excavate, install and grout one ring at a time. This reduces the risk of overloading the upper rings which could pull the whole ring build down due to lack of ground friction. Excavation of the following ring can commence once the grout reaches its recommended strength. Ordinary segment Tapered left segment Tapered right segment Step 11 Installing the tapered segments Figure 12 Complete ring installation before grouting 18 Segmental and one piece shafts
21 One piece shafts 1. Excavate an area at least 1 m deep and 200 mm greater than the external diameter of the shaft. Figure 13 Proposed connection of first ring into cutting edge Segmental and one piece shafts 2. Position the cutting edge accurately and level inside the excavation (refer to Figure 13). Lift and fit the first one piece ring into the cutting edge. Where practical, the units should be positioned so that inlet/outlet openings to the shaft avoid the vertical tie bars. A common method of fixing the steel cutting edge to the first ring is by bolting it to the equally spaced M16 x 1,030 mm long tie rods. 3. Surround the base section (immediately above the cutting edge) with mm thick polystyrene sheet to provide an annulus. Figure 14 Tie bars fitted to first ring 4. Fill the area between the first ring and the outer perimeter of the excavation with concrete (min. grade 20 mpa) to form a complete concrete collar; this provides permanent support to the shaft excavation, lateral resistance to jacking forces, and acts as a guide for the shaft sinking. Once the concrete has hardened the polystyrene can be dissolved using a suitable chemical solvent. The concrete is usually sufficiently hardened to allow shaft sinking to begin the next day. 5. Fit threaded tie bars into the hexagonal couplers on the top of the first ring (refer to Figure 14). Screw in the thread 25 mm. Clean the top surface of the ring and the rubber sealing strip positioned in the groove provided. Overlap the strip vertically by 50 mm at the ends. Segmental and one piece shafts 19
22 6. Lift and position the next ring using a leg chain and lifting clutches fitted into the lifting anchors on the upper surface (refer to Figure 15). The lower surface of the ring should be cleaned. Ensure that the joint arrows provided on the inside surfaces line up. Figure 15 Placement of the second ring 7. Fit the steel washers and hexagonal couplers over the tie bars and tighten to a torque of 100 N-m. 8. Sink the rings by excavating inside the shaft using a hydraulic grab mounted on a suitable excavator. The shaft will sink under its own weight in very soft ground but in harder ground pressure may need to be applied to the top section. 9. Check the shaft for accuracy of sinking, by using a spirit level or plumb line; adjustments can be made by applying pressure to the high point. Selective excavation of the ground will also help to control the sinking. Proceed with excavation and add rings until the required depth is reached. 10. Fit a standard M16 nut instead of the hexagonal coupler on the last ring. This allows a cover slab to seat correctly on the shaft and provide a seal. At shallow depths it is not normally necessary to grout the annulus except when the shaft is to be used as jacking pit. Complete one piece shaft installation 20 Segmental and one piece shafts
23 Indicative only
24 Indicative only
25 Indicative only
26 Contact information National sales humes.com.au Head Office 18 Little Cribb St Milton QLD 4064 Ph: (07) Fax: (07) Queensland Brisbane/Gold Coast Ph: (07) Fax: (07) New South Wales Canberra Ph: (02) Fax: (02) Grafton Ph: (02) Fax: (02) Kempsey Ph: (02) Fax: (02) Melbourne Ph: (03) Fax: (03) Tasmania Launceston Ph: (03) Fax: (03) South Australia Bundaberg Ph: (07) Fax: (07) Lismore Ph: (02) Fax: (02) Adelaide Ph: (08) Fax: (08) Rockhampton Ph: (07) Fax: (07) Sunshine Coast Ph: (07) Fax: (07) Toowoomba Ph: (07) Fax: (07) Townsville Ph: (07) Fax: (07) Newcastle Ph: (02) Fax: (02) Sydney Ph: (02) Fax: (02) Tamworth Ph: (02) Fax: (02) Victoria Echuca Ph: (03) Fax: (03) Western Australia Gnangara Ph: (08) Fax: (08) Perth Ph: (08) Fax: (08) Northern Territory Darwin Ph: (08) Fax: (08)
27 National sales humes.com.au A Division of Holcim Australia This guide supersedes all previous literature on this subject. As the specifications and details contained in this guide may change please check with Humes Customer Service for confirmation of current issue. This guide provided general information only and is no substitute for professional engineering advice. No representations or warranty is made regarding the accuracy, completeness or relevance of the information provided. Users must make their own determination as to the suitability of this information for their specific circumstances. Humes accepts no liability for any loss or damage resulting from any reliance on the information provided in this guide. Humes is a registered business name and registered trademark of Holcim (Australia) Pty Ltd (Holcim). "Strength. Performance. Passion." is a trademark of Holcim. Swiftlift is a registered trademark of ITW Construction Products Australia Pty Ltd. September 2012 Holcim (Australia) Pty Ltd ABN All rights reserved. This guide or any part of it may not be reproduced without prior written consent of Holcim.
Access chambers and maintenance shafts. Issue 1
Access chambers and maintenance shafts Issue 1 Contents Access chambers (worker-entry) 1 Applications 2 Benefits 2 Design information 3 Components 3 Precast base 3 Shaft 3 Taper top (option one) 3 Squat
Materials. Estimating Steel. Players. Materials. Shop Drawings. Detailing Process. Standard shapes. Fabricated members, Built-up sections
Materials Standard shapes W sections, C channels, Structural T, Angles, Pipes, Tubes, Rods and Plates Fabricated members, Built-up sections Adding plates to beam flanges, Stiffeners to beam webs Built
Chapter 10 - Scaffolding Systems
Chapter 10 - Scaffolding Systems Contents Chapter 10 - Scaffolding Systems... 10-1 Check and Oil the Pump Jacks... 10-4 Set Pump Jack Brackets... Error! Bookmark not defined. Set Pump Jack Poles... 10-5
7. Installation. installation 7.1.1. CAST-IN WINDOW SYSTEM 7.1. INSTALLATION OF WINDOW MAIN FRAME
7. Installation Window involves the fixing of window frame at an earlier construction stage and subsequent of the window sashes. This is a highly workmanship dependent process. Only trained and approved
PART E SPECIFICATIONS
PART E SPECIFICATIONS Page 1 of 5 PART E - SPECIFICATIONS GENERAL E1. APPLICABLE SPECIFICATIONS, STANDARD DETAILS AND DRAWINGS E1.1 The City of Winnipeg Works and Operations Division Standard Construction
BUTE Department of Construction Management and Technology
BUTE Department of Construction Management and Technology 02.10.2012 Definition 1: Foundation: The structure, that transmits the load of the building to the soil Definition 2: Load bearing soil (strata):
Round Housing with Side Ports
Power Steering Steering Control Unit (SCU) Parts and Repair Information 5 Series Steering Control Units 001 Square Housing with Side Ports Round Housing with Side Ports T E L RP Round Housing with End
Drive shaft, servicing
Volkswagen Passat B6 - Drive shaft, servicing Стр. 1 из 41 40-7 Drive shaft, servicing Drive shafts, overview I - Assembly overview: Drive axle with CV joint VL100 40-7, Drive axle with CV joint VL100,
Front axle components, overview
just a test. Front axle components, overview 40-1 General Information Load bearing components and parts of the suspension must not be welded or straightened. Vehicles without drive axle must not be moved,
Lenntech. 1000 psi End port pressure vessels 2.5. User s Guide to: Phoenix Vessel Technology Limited. Model number: 1503
1 User s Guide to: Phoenix Vessel Technology Limited 1000 psi End port pressure vessels 2.5. Model number: 1503 Lenntech [email protected] Tel. +31-152-610-900 www.lenntech.com Fax. +31-152-616-289 Phoenix
OWNER S MANUAL Table Tennis Table Patent Pending
OWNER S MANUAL Table Tennis Table Patent Pending Be sure to write your model number and serial number here for future reference. You can find these numbers printed on the bottom of the table. MODEL # T8179
Corrosion protection linings. Issue 1
Corrosion protection linings Issue 1 Introduction While Humes sewerage pipes and products are designed to serve over 100 years in accordance with AS/NZS 4058, we offer corrosion protection linings to increase
Chapter. Restoration of Damaged Structures
5 Chapter Restoration of Damaged Structures Bringing back a damaged structure to its pre-earthquake state and original strength is called restoration. This is the first step of building rehabilitation.
MGB Chrome Bumper Conversion
MGB Chrome Bumper Conversion Installation Instructions For 1974 1/2-1980 MGB This kit requires cutting, welding, and painting. Professional installation recommended. Note: Every MGB body is slightly different
Owner s Manual Gantry Cranes
Owner s Manual Gantry Cranes Fixed Height Gantry Crane MODEL NUMBER: SERIAL NUMBER: CAPACITY IN TONS: Telescoping Gantry Crane Bushman AvonTec 262-790-4200, 800338-7810, Fax 262-790-4200 www.bushmanavontec.com
James M. Pleasants Company
James M. Pleasants Company SUBMITTAL DATA GAINESVILLE MECHANICAL DECEMBER 20, 2013 PROJECT: GSU: J-183 HUMANITIES LAW BLDG. QUOTE NO:12116 ENGINEER: STEVENS & WILKINSON GASKETED PLATE HEAT EXCHANGER Tag:
GENERAL SPECIFICATION FOR CIVIL ENGINEERING WORKS SECTION 13 WORK FOR ELECTRICAL AND MECHANICAL INSTALLATIONS
GENERAL SPECIFICATION FOR CIVIL ENGINEERING WORKS SECTION 13 WORK FOR ELECTRICAL AND MECHANICAL INSTALLATIONS 13.1 13.2 2006 Edition SECTION 13 WORK FOR ELECTRICAL AND MECHANICAL INSTALLATIONS GENERAL
LEGACY REPORT ER-5110. www.icc-es.org. ICC Evaluation Service, Inc. Reissued November 1, 2003. Legacy report on the 1997 Uniform Building Code
LEGACY REPORT Reissued November 1, 2003 ICC Evaluation Service, Inc. www.icc-es.org Business/Regional Office # 5360 Workman Mill Road, Whittier, California 90601 # (562) 699-0543 Regional Office # 900
INSTRUCTIONS: LocknCharge Laptop Carts
INSTRUCTIONS: LocknCharge Laptop Carts www.lockncharge.com Extra Tools required: Hammer, Philips head screwdriver, medium adjustable spanner. (Allen key supplied) (Panel colours for illustration purposes
Flat Bottom Long Ram Hydraulic Jack
Flat Bottom Long Ram Hydraulic Jack 3 Ton 8 Ton 36468 36469 ASSEMBLY & OPERATING INSTRUCTIONS 349 Mission Oaks Blvd., Camarillo, CA 930 Visit our Web site at http://www.harborfreight.com TO PREVENT SERIOUS
Designed and Engineered to Perform
History EARTH CONTACT PRODUCTS, L.L.C., is a family owned company, based in Olathe, Kansas. This company was built upon Don May s U.S. Patented fourth-generation Steel Piering System that has led to the
Installation information. METTLER TOLEDO MultiRange Floor scales / Pit scales
Installation information METTLER TOLEDO MultiRange Floor scales / Pit scales KC300/KCS300 KC600/KCS600 KD600/KD1500 KE1500/KE3000 KES1500/KES3000 KG3000/KG6000 KN1500 Floor scales / Pit scales Contents
STEADYfast Stabilizer Installation Notes Fifth Wheel and Travel Trailers 11/23/13
STEADYfast Stabilizer Installation Notes Fifth Wheel and Travel Trailers 11/23/13 (See Supplemental Instructions for trailers with heavy duty round footplates and/or Power Leveling Systems) PHONE SUPPORT
Connection Solutions
Connection Solutions DESIGN BUILD SYSTEM Connection Solutions for Cold formed Steel Construction Complies with; AS/NZS 4600:2005 AISI S100:2007 AS/NZ 1397 ASTM A653 DESIGN & BUILD SYSTEM FRAMECAD Construction
Model No: VS4815 1. SAFETY INSTRUCTIONS VS4800 2. INTRODUCTION & APPLICATIONS VS4815 3. CONTENTS. 2.1 Introduction. 2.
Instructions for: Petrol Engine Twin Camshaft Setting / Locking Tool Kit - (incorporating Vanos Alignment) - BMW N42 & N46 Engines Model No: VS4800 Associated kit: Camshaft/Carrier Bracket Remover & Installer
RATCHET RELEASE SHACKLE
RATCHET RELEASE SHACKLE INNOVATIVE PILING EQUIPMENT HYDRAULIC PILING HAMMERS EURO RATCHET RELEASE SHACKLE FOR STEEL ERECTION OPERATORS INSTRUCTIONS & SPARE PARTS LIST EXCAVATOR MOUNTED VIBRATORS EXCAVATOR
5800 Temperature Sensor Cable Assembly
5800 Temperature Sensor Cable Assembly Removal and Replacement Instruction Sheet #60-4702-070 Revision D, January 14, 2013 Overview The 5800 has two refrigeration temperature sensors, one attached to the
INSTALLATION INSTRUCTION - INSTRUCCIONES DE INSTALACION FOR DOUBLE-HUNG VENT REPLACEMENT WINDOW
Vinyl Windows and Doors Manufactured by Pella Corporation INSTALLATION INSTRUCTION - INSTRUCCIONES DE INSTALACION FOR DOUBLE-HUNG VENT REPLACEMENT WINDOW Lea las instrucciones en español en el reverso.
SELF-STEERING AXLE TABLE OF CONTENTS
SELF-STEERING AXLE TABLE OF CONTENTS Section 1 - Introduction Section 2 - Pre-Installation Check List Section 3 - Ride Height Adjustments Section 4 - Suspension Mount Section 5 - Axle Mount Section 6 -
SECTION 02630 STORM DRAINAGE SYSTEM
SECTION 02630 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes specifications for storm drainage systems including modifications and connections to existing storm drainage systems. 1.02 REFERENCE
Speed-Mat Rectangle Cutter
Speed-Mat Rectangle Cutter 1 Honeycomb baseboard. 2 Left hold down. 14 3 Bottom hold down. 4 4 Left / right rule. 8 5 8 5 Left / right rule pointer. 1 6 Top / bottom rule. 7 Top / bottom rule pointer.
39HQ Airovision Air Handling Units
39HQ Airovision Air Handling Units Mounting instructions CONTENTS 1 - TRANSPORT AND LIFTING INSTRUCTIONS... 3 1.1 - General... 3 1.2 - Transport and storage... 3 1.3 - Roof edge protection during transport
TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE
TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE TECHNICAL SPECIFICATION PART 8000 - PRECAST CONCRETE TABLE OF CONTENTS Item Number Page 8100 PRECAST CONCRETE CONSTRUCTION - GENERAL 8-3 8101 General
Embedded Parts Introduction - Anchors
In the plant construction or process plants such as chemical, petrochemical, gas or power plants various disciplines are brought into contact and built on each other. Civil, mechanical, electro technical
Char-Lynn Hydraulic Motor. Repair Information. 10 000 Series. October, 1997
Char-Lynn Hydraulic Motor October, 1997 Repair Information Geroler Motor Two Speed 001 27 Retainer inside bore of valve plate bearingless motors only 4 15 16 3 6 35 Parts Drawing 25 2 2 1 19 17 36 40 47
Service Manual Rol-Lift
R 2000 Service Manual Rol-Lift Series: T and E Developed by Generic Parts Service This manual is intended for basic service and maintenance of the Rol-Lift pallet jack. The pallet jacks you are servicing
Pole Lathe and Shave Horse Design
Pole Lathe and Shave Horse Design These pictures and accompanying words are Copyright Michael Hughes February 2002. They are not to be re-produced, in part or whole, without permission from the author.
PITCHED ROOF STRUCTURES
PITCHED ROOF STRUCTURES for framed and frameless photovoltaic modules Needed tools and materials: cordless screwdriver 10mm and 13mm spanners 5mm Allen key bolts, screws and tools for fixing the system
DeZURIK 3-20" BAW AWWA BUTTERFLY VALVES WITH TRANSFER MOLDED SEAT
3-20" BAW AWWA BUTTERFLY VALVES WITH TRANSFER MOLDED SEAT Instruction D10386 August 2013 Instructions These instructions provide installation, operation and maintenance information for BAW Butterfly Valves.
FRONT BUMPER INSTALLATION INSTRUCTIONS 2007-2011 DODGE / MERCEDES SPRINTER
Aluminess Products Inc 9402 Wheatlands Ct. #A Santee, CA 92071 619-449-9930 FRONT BUMPER INSTALLATION INSTRUCTIONS 2007-2011 DODGE / MERCEDES SPRINTER Please read before beginning Stainless steel hardware
INSTALLATION INSTRUCTIONS IMPERVIA (Vent and Fixed) AWNING, CASEMENT, and LARGE AWNING WINDOW WITH FINS
2009 Pella Corporation INSTALLATION INSTRUCTIONS IMPERVIA (Vent and Fixed) AWNING, CASEMENT, and LARGE AWNING WINDOW WITH FINS Part Number: 80WH0100 Installation Instructions for Typical Wood Frame Construction.
Installation Instructions
Installation Instructions READ BEFORE INSTALLING UNIT For Low Profile Window Air Conditioner INSTALLATION WARNINGS AND CAUTION Carefully read the installation manual before beginning. Follow each step
INSTALL/REMOVAL INSTRUCTIONS: WINDOW REGULATOR
REMOVAL/INSTALL OF WINDOW REGULATOR (741-306) Honda Accord 2003 07 General Tech Tips: Use painter s tape rather than duct tape to secure window. It will not damage paint or leave sticky residue. A plastic
Cooling system components, removing and installing
Engine BHW Cooling system components, removing and installing Page 1 / 24 19-1 Cooling system components, removing and installing Warning! When doing any repair work, especially in the engine compartment,
Procedures and Intervals to Inspect the Wheel Ends and Tighten the Spindle Nuts on Meritor TL Series Trailer Axles with Unitized Wheel Ends
Technical Bulletin Revised 1 Technical 02-11 Bulletin Revised 02-11 Procedures and Intervals to Inspect the Wheel Ends and Tighten the Spindle Nuts on Meritor TL Series Trailer Axles with Unitized Wheel
DiscPlus DX195 and DX225 Air Disc Brakes
Revised 11-04 Technical Bulletin Revised 1 Technical 11-04 Bulletin DiscPlus DX195 and DX225 Air Disc Brakes Inspection, Installation and Diagnostics Air Disc Brake Inspection Intervals and Procedures
Installation instructions, accessories - Handsfree for cellular phone, system B, entry level
XC90 Section Group Weight(Kg/Pounds) Year Month 3 39 0.5/1.1 2006 07 XC90 2003, XC90 2004 IMG-249663 Page 1 of 18 Required tools A0000162 A0000163 IMG-239664 M0000232 IMG-253123 IMG-252223 Page 2 of 18
AA Solar and Sun Power Plus
AA Solar and Sun Power Plus www.aasolar.co.nz www.sunpowerplus.co.nz -1- Contents Chapter Title Page 1 General information 3 2 Safety and Installer Responsibilities 4 3 Technical Specifications 5 4 Tools
Elo Touch Solutions Wall-mounting Kit for the 5501L IDS Touchmonitors
Installation Manual Elo Touch Solutions Wall-mounting Kit for the 5501L IDS Touchmonitors SW602206 Rev B Table of Contents Chapter 1: Safety Warning... 3 Chapter 2: Kit Contents... 4 Included in Kit...
March 14, 2007. Installation of Bay, Bow and Garden Windows
March 14, 2007 Re: Installation of Bay, Bow and Garden Windows Attached are the Atrium Companies, Inc recommendation for the installation of bay, bow and garden windows. These instructions were developed
Wastewater Capital Projects Management Standard Construction Specification
CITY AND COUNTY OF DENVER ENGINEERING DIVISION Wastewater Capital Projects Management Standard Construction Specification 10.1 Precast Concrete Pipe 10.1.1 General This section covers material requirements,
Awning Instructions. Standard Manual 1.5m to 4.5m
Awning Instructions Standard Manual 1.5m to 4.5m English Standard Manual Instructions Contents Warning 1.5m 3.0m Awnings 4 x Expansion bolts (2 per bracket)** 2 x brackets 1 x Awning 1 x Winder handle
INSTALLATION INSTRUCTIONS for Bifold Doors (JII103)
Thank you for selecting JELD-WEN products. Attached are JELD-WEN s recommended installation instructions for premium composite, hollow and solid core molded Bifold Doors. Bifolds are designed for fast
149mm. Walk-Thru Assembly Gate. MODEL NO: 1161, 1167 Owner s Manual. www.regalo-baby.com
149mm 210mm Walk-Thru Assembly Gate MODEL NO: 1161, 1167 Owner s Manual READ ALL INSTRUCTIONS BEFORE ASSEMBLY AND USE OF GATE. KEEP INSTRUCTIONS FOR FUTURE USE. www.regalo-baby.com... Regalo International,
4-600, 1000 psi. User s Guide to: Phoenix Vessel Technology Limited. End port pressure vessels Model numbers: 1386, 1384.
User s Guide to: Phoenix Vessel Technology Limited 4-600, 1000 psi End port pressure vessels Model numbers: 1386, 1384. Phoenix Vessel Technology Limited Unit 2, The Old Bakery, Lower Tuffley Lane, Gloucester
Combination Unit 5'6" Windows a i o P t
for Andersen 5'6" Double-Hung Venting s Windows a i o P t o rs D o Congratulations You have just purchased one of the many fine Andersen products. For ease of assembly and installation and continued enjoyment
HOME GYM. Model. Retain This Manual for Reference OWNER'S MANUAL. www.hyper-extension.com
NOTE: Please read all instructions carefully before using this product Table of Contents Safety Notice www.hyper-extension.com HOME GYM 50036 Hardware Identifier Assembly Instruction Parts List Warranty
Lunette 2 Series. Curved Fixed Frame Projection Screen. User s Guide
Lunette 2 Series Curved Fixed Frame Projection Screen User s Guide Important Safety and Warning Precautions Please follow these instructions carefully to ensure proper maintenance and safety with your
Operations and Instruction Manual Might Swivel - Part # 310273 Concrete and Steel Anchorage Connector ANSI Z359.1 10,000 lbs / 44kn
Safety.. Operations and Instruction Manual Might Swivel - Part # 310273 Concrete and Steel Anchorage Connector ANSI Z359.1 10,000 lbs / 44kn Description: Technical: Zinc plated forged heat treated steel,
CONCRETE FLOOR SLAB & CASTING BED CONSTRUCTION
CONCRETE FLOOR SLAB & CASTING BED CONSTRUCTION General 7 www.meadowburke.com 877-518-7665 MB1109 CONCRETE FLOOR SLAB AND CASTING BED CONSTRUCTION Quality Construction Begins at Ground Level Everything
Installation Instructions
85-3976 rev. 05 08-13 Installation Instructions Thank you for purchasing this antisway bar kit. Please read through these instructions before installation. Rear Anti-Sway Bar Kit for Dodge Ram Pick-Up
WINDOW INSTALLATION GUIDE FOR NEW CONSTRUCTION - WOOD FRAMING
WINDOW INSTALLATION GUIDE FOR NEW CONSTRUCTION - WOOD FRAMING IMPORTANT NOTICES AND INFORMATION Read these instructions in their entirety prior to installing windows. Any local building code requirements
3/4 PIPE CLAMP WITH STAND
3/4 PIPE CLAMP WITH STAND Model 94053 ASSEMBLY AND OPERATING INSTRUCTIONS (3/4 DIAMETER PIPE NOT INCLUDED.) 3491 Mission Oaks Blvd., Camarillo, CA 93011 Visit our Web site at: http://www.harborfreight.com
Installation Manual. SKU# 21000 series (Base Rails) SKU# 22000 series (Overhead Racks)
Installation Manual SKU# 21000 series (Base Rails) SKU# 22000 series (Overhead Racks) Welcome to the world of TracRac! We re delighted that you have chosen TracRac, the ultimate sliding truck rack system.
SECTION 1 GENERAL REQUIREMENTS
Page 1 of 6 SECTION 1 GENERAL REQUIREMENTS 1. SCOPE OF WORK: The work to be performed under the provisions of these documents and the contract based thereon includes furnishing all labor, equipment, materials,
DE Frame with C Series Sidelight
TOOLS REQUIRED Tape measure 6' magnetic level 3' magnetic level Screw gun with clutch adjusted #2 phillips tip #3 phillips tip Screwdriver (used to adjust frame on will using oval slots) Pry Bar Powder
Volkswagen Jetta, Golf, GTI 1999, 2000 Brake System 47 Brakes - Hydraulic Components (Page GR-47)
47 Brakes - Hydraulic Components (Page GR-47) FS III front brake calipers, servicing Front brake caliper piston, removing and installing FN 3 front brake calipers, servicing Front caliper piston, removing
METHOD OF STATEMENT FOR STATIC LOADING TEST
Compression Test, METHOD OF STATEMENT FOR STATIC LOADING TEST Tension Test and Lateral Test According to the American Standards ASTM D1143 07, ASTM D3689 07, ASTM D3966 07 and Euro Codes EC7 Table of Contents
ASSEMBLY DIAGRAM AND ASSEMBLY REFERENCE ULTIMA OLD SCHOOL 2 EVO & TC BELT DRIVE UNITS
ASSEMBLY DIAGRAM AND ASSEMBLY REFERENCE ULTIMA OLD SCHOOL 2 EVO & TC BELT DRIVE UNITS BELT DRIVE ASSEMBLIES Part# 58-850 2 Old School Belt Drive Assembly - Polished Part# 58-851 2 Old School Belt Drive
INSTALLATION RECOMMENDATIONS. Outdoor Rubber Tiles
INSTALLATION RECOMMENDATIONS Outdoor Rubber Tiles Prior to Installation: The Outdoor Rubber Tiles and accessory transition pieces intended for this installation have been shipped to you via a freight carrier
SHAFT CONSTRUCTION IN TORONTO USING SLURRY WALLS
SHAFT CONSTRUCTION IN TORONTO USING SLURRY WALLS Vince Luongo Petrifond Foundation Co., Ltd. PROJECT DESCRIPTION The York Durham Sanitary System (YDSS) Interceptor in the Town of Richmond Hill located
SECTION 33 11 00.15 DUCTILE IRON PIPE AND FITTINGS
SECTION 33 11 00.15 DUCTILE IRON PIPE AND FITTINGS PART 1: GENERAL 1.01 COORDINATION OF WORK Connection to existing pipelines may require shutdown of AW facilities. Closely coordinate construction work
Ceiling Mounted Folding Attic Ladders Installation Instructions
Ceiling Mounted Folding Attic Ladders Installation Instructions WARNING Before you start installing your new Louisville Ceiling Mounted Folding Attic Ladder, you must read and understand the following:
MODEL G300 BRAKE BLEEDER
MODEL G300 BRAKE BLEEDER Installation, Operation & Repair Parts Information Branick Industries, Inc. 4245 Main Avenue P.O. Box 1937 Fargo, North Dakota 58103 REV060616 P/N: 81-0035G 1 THIS PAGE INTENTIONALLY
Combination Unit (shown from interior) WARNING
for Andersen Double-Hung Venting s Windows a i o P t o rs D o Congratulations You have just purchased one of the many fine Andersen products. For ease of assembly and installation and continued enjoyment
Chelsea Loft Bed WARNING:
Chelsea Loft Bed WARNING: Failure to follow these warnings and assembly instructions could result in serious injury or death. Read all instructions before assembling bunk bed. KEEP INSTRUCTIONS FOR FUTURE
Cardok Sàrl CP37 CH-1295 Tannay Switzerland Phone: 0041 22 77 66 051 [email protected]
CARDOK CARLIFT Fast access to underground garages Fast, Silent, Discreet, Design, High-Tech Installation to replace an access ramp on private property Dimensions: (Built to measure, all dimensions can
How To Launch A Rocket From A Formica
Building the Basic Bottle Rocket Launch Pad Materials: -Formica double-sink countertop cutout. This can be easily and cheaply obtained from a local company that manufactures and/or installs countertops.
Assembly and Usage Instructions
Assembly and Usage Instructions A Product 5885 West Van Horn Tavern Road Columbia, MO 65203 www.caldwellshooting.com Instruction #1001667 Limited Warranty Every Caldwell product is warrantied to be free
Jacking pipes. Issue 1
Jacking pipes Issue 1 Contents Jacking pipes 1 The jacking technique (microtunnelling) 1 Benefits of pipe jacking 2 Technical 2 Safety 2 Economic 2 Environmental 2 Steel reinforced concrete pipes (SRCP)
Since it was established in 1989, with a small manufacturing base in Qwa Qwa and a hire yard in Botswana, Uni-Span
formwork formwork Since it was established in 1989, with a small manufacturing base in Qwa Qwa and a hire yard in Botswana, Uni-Span has grown to become one of the major players in the scaffolding and
Operating Instructions Parts List Manual Scissor Lift Pallet Truck
Operating Instructions Parts List Manual Scissor Lift Pallet Truck Note: Operator MUST read and understand this operating instructions before use this Hand Scissor Lift. Thank you for using this hand scissors
WARNING! DO NOT ATTEMPT TO INSTALL THIS KIT IN A POWERED CONVEYOR.
Model: Document Number: 64058111 Kit Number: 64058112 Revision: 02 Description: Release Date: 04/08 Introduction This kit allows a PS90 scale to be integrated into a standard gravity conveyor. The kit
300 SERIES 331, 332, 333, 344, 356 AND 367 MODELS
Section: MOYNO 500 PUMPS Page: 1 of 8 Date: March 1, 1998 SERVICE MANUAL MOYNO 500 PUMPS 300 SERIES 331, 332, 333, 344, 356 AND 367 MODELS Mechanical Seal Models Packing Gland Models MODELS DESIGN FEATURES
Two most common lock nut groups: 1-Prevailing Torque Type Lock Nuts:
Two most common lock nut groups: 1. PREVAILING TORQUE a design feature of the lock nut produces friction between threads of mated components thereby increasing the force needed to tighten as well as loosen
Rating when used as a weight carrying hitch without spring bars:
BOLT-TOGETHER WEIGHT DISTRIBUTING HITCH SYSTEM Rating when used as a weight distributing hitch with spring bars: Part Number 48051 4805 48053 48054 Max Tongue Weight 550 Ibs. 750 Ibs. 1000 Ibs. 1400 lbs.
Installation, Operating and Maintenance Instructions for AEON Metal Seated Gate Valve (MSGV) Water
1 Foreword 1.1 Thank you for choosing one of the range of AEON's BS standard valves. For safety purposes, the user shall read this instruction to fully understand the operation of the product. 2 AEON Design
50AI01oe 02/15. Labko GRP cesspools. Instructions for installation, operation and maintenance
02/15 Labko GRP cesspools Instructions for installation, operation and maintenance Reliable solutions Wastewater treatment systems Contents 1 LABKO CESSPOOLS... 3 1.1 GENERAL... 3 1.2 IMPORTANT TO KNOW
Auxiliary Rams USERS MANUAL
Auxiliary Rams 2007 Chief Automotive Technologies, Inc. Chief s Limited One-Year Warranty & Liability CHIEF'S LIMITED ONE-YEAR WARRANTY & LIABILITY Chief Automotive Technologies, Inc. warrants for one
CAST IRON THE BASICS. Heatline - Cast Iron Radiators SMOOTH FLAT FILE TO REMOVE ANY SWARF. ONE TIME. ASSEMBLY. JOINTS SHOULD BE TIGHTENED.
CAST IRON THE BASICS 1. DO NOT LIFT ON YOUR OWN. 2. ONLY LIFT THE RADIATOR VERTICALLY. 3. DO NOT LIFT MORE THAN 8/10 SECTIONS AT ANY ONE TIME. 4. POSITION THE RADIATOR BEFORE FINAL ASSEMBLY. 5. THIS PRODUCT
Section A. GENERAL INFORMATION
Section A. GENERAL INFORMATION I. Description The information and instructions for attaching the sidecar to the right-hand side of the motorcycle are contained in this handbook and must be carefully observed.
BETTIS CONVERSION INSTRUCTIONS TO CONVERT HD SERIES ACTUATORS TO HD-M3, HD-SR-M3 HD-M3HW OR HD-SR-M3HW SERIES PNEUMATIC ACTUATORS
BETTIS CONVERSION INSTRUCTIONS TO CONVERT HD SERIES ACTUATORS TO HD-M3, HD-SR-M3 HD-M3HW OR HD-SR-M3HW SERIES PNEUMATIC ACTUATORS PART NUMBER: 132581 REVISION: A RELEASE DATE: 24 March 2000 Page 1 of 10
Go-kart for little race-drivers
Go-kart for little race-drivers Drill and drive. Go-kart What it lacks in speed, it more than makes up for in fun: the go-kart will excite little race-drivers. 1 Introduction It s only a go-kart, but it
SUPERCHIPPER CASTING MAINTENANCE
INTRODUCTION By design, the Superchipper Rotor is clad in castings which wear during crushing. The castings wear at different rates depending on their location on the rotor, material feed rate, material
Rear wheel brakes, servicing. Стр. 1 из 45. Note:
Volkswagen Touareg - Rear wheel brakes, servicing Стр. 1 из 45 46-2 Rear wheel brakes, servicing Rear brakes, FN 44 brake caliper, servicing Note: After replacing brake pads, depress brake pedal firmly
NORSOK Compact Flange Installation and Assembly Procedure
NORSOK Compact Flange Installation and Assembly Procedure Hytorc Norway www.hytorc.no P.Nødland. Page 2 INTRODUCTION Scope The following main operations are covered in this section: Assembly/disassembly
»Product» Safety Warning
C1200 Installation Instructions 2007-2016 Chevy/GM 1500 2/4wd 2" Strut Spacer Lift Read and understand all instructions and warnings prior to installation of product and operation of vehicle. Zone Offroad
COMPACT ELITE MAT CUTTER
INSTRUCTION MANUAL MODEL 350-1 COMPACT ELITE MAT CUTTER INSTRUCTIONS AND OPERATION MANUAL 32in (81cm) mat cutting system with bevel & straight cutters, production stops and 20 in (51 cm) squaring bar.
Cylinder head, removing and replacing
15-1 Cylinder head, removing and replacing WARNING! Do not re-use any fasteners that are worn or deformed in normal use. Some fasteners are designed to be used only once, and are unreliable and may fail
INSTALLATION OF A BAY WINDOW
INSTALLATION OF A BAY WINDOW Installation of a Bay Window These instructions relate to the replacement of an existing bay window or replacement of a straight window with a new bay window, in an opening
