1 FIELD WELDER QUALIFICATION PROCESS Office of Structures Metals Engineering Unit April 2007 Amended October 2008
2 Table of Contents Page Number Description 1 Introduction 2-6 Qualification Tests Requirements Appendix A Test Plate Diagrams & Position Descriptions Appendix B Appendix C Sample Field Welder Certification Card & Work Record Sample BR244(2/06) & Instructions Appendix D Appendix E Appendix F Instructions to Welders upon Acceptance of Welder Certification Card Responsibilities of Test Proctor Testing Facility Requirements Key for Revisions October 2008 indicates changes as amended Author: A. Scott Baker, P.E.
3 Field Welder Qualification Guidelines Introduction NYSDOT erects and performs repairs on many steel structures that require field welding to complete. The quality of these welds is critical to the safety and durability of these structures. To ensure the quality of its field welded products, the Department administers a field welder certification program. This program requires welder testing for initial certification and the proper documenting of work experience for recertification. These guidelines are being distributed to clarify the Department requirements for field welder certification and recertification. The guidelines in no way supersede the requirements of the NYS Steel Construction Manual (SCM). Any discrepancies between these guidelines and the SCM shall defer to the SCM. In the past, welders may have qualified for the flat (1G) or horizontal (2G) positions and received certification cards. These welders will still qualify for recertification provided that they submit their certification card and work record before the expiration date. Other welders received a letter stating that they were certified in the 1G or 2G position for a specific project. Welders who want to become certified in the future will have three options. They may take a vertical (3G), overhead (4G), or a fillet weld test as described in the NYSSCM Section 8. Welders who successfully complete the fillet weld test will receive a yellow certification card indicating that they are certified for fillet welding only. The certification process for the vertical (3G) and overhead (4G) positions will remain unchanged and is outlined on the following pages. Guidance is also provided to show how the Welder Qualification Test Form should be filled out by all parties involved: including the welders, the exam proctors, and the materials lab. A sample form and specific instructions are provided in this brochure. In the past, each region administered a Regional field welder qualification program that included being the direct contact for setting up the exams, reviewing testing paperwork, submitting work records for recertifications, proctoring exams and issuing cards. Recently, several regions have outsourced some of these tasks but they continue to be responsible for administering the program in their Region. 1
4 NEW YORK STATE DEPARTMENT OF TRANSPORTATION QUALIFICATION TEST FOR WELDER CERTIFICATION All welder qualification tests must be conducted at approved locations and witnessed by a designated State representative. The NYS Department of Transportation (NYSDOT) regional offices are responsible for administering field welder tests within the State unless otherwise directed. In cases where the Regions have delegated the proctoring to an outside agency, the agency personnel reporting to Main Office Structures will be the designated State representative. 1. Welding Processes Any welder may apply for certification testing in the Shielded Metal Arc Welding (SMAW) process. Welders on specific NYSDOT projects may apply for testing using alternate processes (SAW, FCAW) that may be approved for the project. Approvals for alternate processes will be project specific, and certified welder cards will not be issued. 2. Joint Configurations and Welding Positions All welders are required to test with a 1" vertical groove weld (3G), 1" overhead groove weld (4G), or both. See Figure 3 for welding position diagrams. Welders who only perform fillet welds (i.e. stay-in-place forms or girder flange to bearing sole plate welds) may take the fillet weld test as outlined in the SCM Section 811.2c. Those who qualify using the fillet weld test will be issued a yellow certification card which only qualifies the welder to perform fillet welds. Welders employed on NYSDOT projects may apply for testing in a specific joint configuration and position that is required for that project. The contract number and region must be shown on the welder test forms. Qualification requirements are described in the NYS Steel Construction Manual (SCM). 3. Eligibility for Retest An individual who has failed a welder qualification test may retest using a single test plate at any time, provided he or she produces a statement from a welding school or State certified welder indicating that he or she has had additional training. The minimum acceptable number of additional training hours is 50 hours of training using 1/8" or 5/32" E7018 electrodes on 1" plate in the vertical, overhead, or both positions depending on what position the welder wants to be qualified in. 2
5 Alternately, he or she may retest without a statement concerning additional training. This will require two test plates in each test position that failed, and both plates must pass. A certified welder whose work record has not been properly maintained will be required to retest. This includes welders who fail to submit their card and work record to the State at the time of expiration. The retest may be performed using either a 3/8" or 1" thick test plate, at the welder s option. Only one retest may be performed on 3/8" plate, and a failure will require that any further testing be done on 1" thick plate. 4. Preparation for Tests a. The welder should select sound base metal of a weldable grade. Visual inspection of edges and surfaces should show no indication of internal or surface discontinuities. Base metal discontinuities that appear in radiographs may result in failure of the test coupon. b. Edges shall be prepared as shown in Figure 1. Rust, mill scale and surface irregularities shall be removed by grinding within the area to be tested (Figure 2, Area 1). Mill scale shall be left in Area 2, and measurements made (in Area 2) to establish the original plate thickness. c. It is recommended that the test plates be tack welded as shown in Figure 2. It is essential that the backing bar fit tightly against the back of the weld joint. Sufficient tack welds should be employed to insure that the backing bar remains tight throughout fit-up and welding. d. After the test coupon has been assembled and tack welded, it shall be presented to the State representative or the testing facility personnel responsible for proctoring the exam who will inspect it for conformance with test requirements. The State representative may instruct welders as to the potential consequences of improper fit-up and assembly, but shall not reject the coupon unless the requirements for groove angle and root opening are not met. Any deficiency in fit-up or preparation should be noted on the test report. 5. Identification After the State representative has completed the inspection of the test assembly prior to welding, he or she shall die stamp one side of the test plate with numbers, letters, and/or distinctive marks on the test assembly which will clearly identify the welder by the code used in the test report. 3
6 6. Electrodes Testing for shielded metal arc welding shall be performed using either 1/8" or 5/32" diameter E7018 electrodes. Properly dried electrodes with sound coatings should be used. Electrodes which have been partially used, or with a damaged coating, are not recommended. Re-striking electrodes may result in indications in the radiograph. 7. Practice and Adjustment of Welding Machine Welders shall have the opportunity to practice on scrap steel and plates similar to the test plate. Ample time will be allowed to adjust the welding machine. It is suggested that the welder preheat the test plate and the plates on which he practices during adjustment of the machine. The suggested preheat and interpass temperature is 250 F. This is not a mandatory requirement. 8. Bad Starts A welder may discard a test coupon at any time before it is submitted for final identification. Another test may be performed immediately, or rescheduled, based upon the time commitments of the State representative or testing facility personnel responsible for proctoring the exam. 9. Technique Welds shall be made in passes and layers. Test coupons sectioned and etched to determine conformance with the SCM will be rejected if: a. The root pass of a 1" groove weld is greater than 3/8" thick. b. Any subsequent layer of 1" groove weld is greater than 3/16" thick. c. Any weave pass within a 1" groove weld is greater than 7/8" wide. d. A 3/8" groove weld test is welded in less than two layers. Vertical welds must be welded upwards, and the last 1/4" of weld thickness in 1" thick vertical test welds must be made by the multi-pass/split layer technique. 10. Cleaning between Weld Passes Careful cleaning between weld passes is recommended. Cleaning may be accomplished only by using hand chipping hammers, picks, and wire brushes or a mechanically powered wire wheel. Welders will not be allowed to use air carbon arc gougers, pneumatic chippers, needle scalers, cold chisels and hammers, 4
7 grinding wheels or any other equipment that may modify the weld profile. Removing test plates from welding position for slag removal will not be allowed. 11. Finish Grinding of Test Plates At the completion of welding, (groove) weld reinforcement shall be removed by grinding, machining or chipping. The final surface must be produced by grinding. The laboratory will make thickness measurements in the weld area and in unground areas of the base metal. Test plates reduced in thickness by 1/16" or more shall be rejected and will not be radiographed. 12. Inspection and Final Identification The designated State representative shall inspect the weld test plate before and after welding, and monitor the welding in process. Test plates that do not visually meet the requirements of this instruction and the SCM Section will not be accepted. After visual inspection of the completed weld test plate, the designated State representative shall die stamp the plate, indicating its acceptance. These test plates and all necessary paperwork shall be sent directly to the Department laboratory by a designated State representative. Test plates to be shipped to the laboratory by individual welders or contractors shall be die stamped and, in addition, must have tamper-proof tags or tape attached. Once a test plate has been submitted for acceptance, it becomes the property of the State and is not returnable. 13. Testing by the Department Laboratory The entire weld shall be radiographed. Three consecutive inches in the length of the test weld shall be evaluated by a State representative, and the evaluation shall be in accordance with the requirements for tension welds in bridges. The area to be examined shall be in the center of the weld length, selected to avoid discontinuities associated with starts and stops of passes at each end. In addition to the radiograph test, the laboratory may section and etch weld coupons to determine if they meet the SCM requirements for weld layer thickness and number of passes. 14. Time Limits The welder qualification tests shall be completed within a time span of four hours. This includes the time required for set-up and welding, but does not include grinding. Welds that were not completed within four hours shall be rejected. 5
8 15. Notice of Test Results and Issuance of Certification The region that witnessed the test will be notified of the results. They, in turn, shall inform the eligible individuals where to pick up their certificate and work record. Certificates for welders who tested successfully at facilities located outside of their (DOT) region may request that their certification cards be made available to them for pickup at the regional office of their choice. All welders will receive and sign a standard form stating that the welder understands the qualification process at the time he arrives at the Regional Office to receive his card and work record. The standard form to be signed by all qualified welders is included in Appendix D. 16. Recertification Only welders certified to weld in the 3G and 4G positions and those certified to perform fillet welds will be recertified. The welder s work record must contain a minimum of six (6) signatures from a PE, CWI, EIC working on a State contract, or NYSDOT Maintenance Supervisor. The welder must perform welding in each position in which he is qualified a minimum of every six (6) months. Welders having gaps greater than 6 months will not be recertified and will have to retest. PE s, CWI s, EIC s and NYSDOT Maintenance Supervisors shall print their names on the work record so that the names are legible. Work records shall not be signed after the expiration date on the front of the card nor shall they be signed if there are any gaps exceeding 6 months. Welders shall submit their card and work record at least one month prior to the expiration date. A warning will be issued for late submission one (1) time. The one time warning will be granted only for submissions received a maximum of 3 months after the expiration date on the card. Any welder who submits a card and work record later than 3 months beyond the expiration date must retest according to SCM Section 811.8(b). Recertifications will not be issued for second offenses. Welders who submit their work record late a second time will have to retest. 6
9 Appendix A
10
11
12
13
14 NYSSCM TABLE Position Qualified. The type and position of welds qualified by each test plate position shall be as described in Table TABLE WELDER QUALIFICATION TYPE AND POSITION LIMITATIONS Type of Weld and Position Qualification Test Of Welding Qualified* Test Plate Plate Position Groove Fillet Figure 1 3G Vertical 4G Overhead 3G& 4G 1F Flat Figure 5 2F Horizontal F. H, V F, OH F, H, V, OH - - F, H, V F, H, OH F, H, V, OH F F, H *Positions of Welding: F=Flat, H=Horizontal, V=Vertical, OH=Overhead -A5-
15 Appendix B
16 6D76d(vg6) STATEOFNEWYORK DEPARTMENT OF TRANSP6RTATION WELDER QUALIFICATION CERTIFICATE No. 0600"~xp pyle Aug WeIM=G Sample Welder ID S=0000 is qualified to u.e the Mznuaf$WMedMetal Are Welding process (LOwHydrogen)toth extert.hmvdonrsversesde. Aug np"(--lcd Issue Date PIASSL Deputy Chief Engr. (Structures) Signature of Welder Ou.Mwtion Is gamed on the basis of X-Ray examination of test welds interpreted to the requirements of the New Yark Sate Steel Construction Manual. VALID ONLY AS INDICATED Must be accompanied by welders work records (SD 141a) GROOVE WELDS FILLET WELDING WELDS A"mu. Unlimited PROCESS thickness thickness Manual-SMAW 0 ~ '~ 36d (1106) Rrcmne WELDE(QUALIFICATION _ CERT~F~CATE eo,nah10s) WELDER QUALIFICATION CERTIFICATE WORK RECORD Welder G. Sample I I so,-la oms) REVERSE NAME (PRINT) CONTRACTPE OR CWI NO DATE INITIALS No Exp. Date Aun This work record must be presented to the Engineer before beginning work. A State of New York Engineer-In-Charge, licensed Professional Engineer, or AWS certified welding Inspector must sign this Certificate at least once every six months for the Certificate to remain valid. The parson signing this Card shall have personal knowledge of the welder's satisfactory performance. NAME (PRIM) CONTRACT,PE OR CWI NO. DATE INITIALS I
17 Appendix C
18 BR 244 (2/06) Region T Project STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION WELDER QUALIFICATION TEST Lab. Test No. Lab. Test No. Owl Date Received Name of Welder ID number Address Employer's Name WELDING PROCESSES AWS-ASTM Manual Metal Arc Welding : Electrode Mfg. Diam. 5/32" Classification E7018 AWS-ASTM Semi-Auto. Gas-Metal Arc Welding : Wire Mfg. Diam. Classification. Shielding Gas Gas Flow Rate c.f.h. AWS-ASTM Semi-Auto Submerged Arc Welding : Wire Mfg Diam. Classification - AWS-ASTM Flux Mfg. Flux Classification- MACHINE USED Phone Ampere Rating AC DC Polarity: Neg 0 Pos 0 Serial Number Manufactured by List the following additional material for semi-automatic welding processes : 1. Ammeter reading during welding 2. Voltmeter reading during welding 3. Rate of welding - inches per minute Remarks WELD TYPE POSITION PLATE THICK. MARK SW NO. LABORATORY TEST RESULTS Tests Conducted By Tests Conducted By Title Title TTTT I ITT Identification Mark Date of Tests FOR MATERIALS BUREAU USE ONLY No. of Samples X-Rayed By X-Ray Plate No. X-Ray Plate No. Bridge Engineer Date Reviewed By Date Checked & Reported By Date DISTRIBUTION INSTRUCTIONS : WHITE to Main Office YELLOW-to Materials Bureau PINK-Retain
19 THE FOLLOWING INFORMATION IS REQUIRED ON THE BR244 (2/06) Region : (Filled in by the designated State representative/test proctor) This is the 2 digit region location 01 thru 11 that relates to where the exam is being proctored. Project : (Disregard) Welders will no longer be certified on a project-specific basis. Lab Test No s. : (Filled in by the NYSDOT lab personnel) This is the test number for each individual exam given in the different weld positions. The first two boxes indicate the last digits of the year of the each test followed by the designation of M W. The remaining four boxes are the x-ray lab numbers assigned for the specified exam test plates. (i.e., 0 6 M W ) Date Received : (Filled in by the NYSDOT lab personnel) This is the date that the test plate arrives at the NYSDOT lab facility to be logged and recorded. Name of Welder : (Filled in by the welder and or the designated State representative/test proctor) The first name first, followed by the middle initial then the individual s last name. This should be the legal name of the welder and clearly legible. Identification No. : (Filled in by the designated State representative/test proctor) This is the first letter of the welder s first name, followed by the middle initial and then the first letter of the last name. The boxes after the dash indication are the last four digits of the welder s social security number. Address : (Filled in by the welder and or the designated State representative/test proctor) This is the complete mailing address, including state and zip code of the individual s residence. Leave one blank space between each word. Employer s Name : (Filled in by the welder and or the designated State representative/test proctor) This is the student college name, local union, company name, (i.e. NYS or Thruway Authority) by which the welder taking the exam is employed. Phone No. : (Filled in by the welder and or the designated State representative/test proctor) The first three boxes are for the welder s area code, followed by the dash mark and then the remaining 7 digits where the individual can be contacted. Manual Metal Arc Welding Electrode Mfg. : (Filled in by the designated State representative/test proctor) This is the name of the welding machine being used for the welding test. (i.e. Lincoln Welding Machine) -C2-
20 The items below under WELDING PROCESSES are to be filled in when this form is being used for a Shop Weld Test only. Semi-Auto Gas Metal Arc Welding : Wire Manufacturer : Diameter : Shielding Gas : Gas Flow Rate : Semi-Auto Submerged Arc Welding : Wire Manufacturer : Diameter : Flux Manufacturer : Flux Type : -C3-
21 The items listed below are in the MACHINE USED section of the test form. Ampere Rating : (Filled in by the designated State representative/test proctor) This is the digital setting set by the welder on the welding machine. (i.e. 250 or 300 amps) AC : (Filled in by the designated State representative/test proctor) This is checked off if Alternate Current is being used. DC : (Filled in by the designated State representative/test proctor) This is checked off if Direct Current is being used. Polarity : Negative or Positive (Filled in by the designated State representative/test proctor) This is checked off indicating the polarity being used. Serial Number : (Filled in by the designated State representative) (i.e., : L C ) Manufactured By : ( filled in by the designated State representative) (i.e., M I L L E R) Ammeter Reading During Welding : Voltmeter Reading During Welding : Rate of Welding (inches per minute) : Remarks : Weld Type : (Filled in by the designated State representative/test proctor) This is the type of weld that the welder is testing. (i.e. GROOVE ) Position : (Filled in by the designated State representative/test proctor) This is the welding position that the welder is testing. (i.e. V for vertical (3G), O for overhead (4G)) Plate Thickness : (Filled in by the designated State representative/test proctor) This is the thickness material of the weld plate test. (i.e. 1 thickness or 3/8 (re-qualifications only)) Mark : (Filled in by the designated State representative/test proctor) This is the first letter of the first name of the administrator (test proctor) followed by the first letter of their last name and then the number 1 or 2 depending on how many tests are indicated on the BR-244 form. (i.e. W B 1 for a vertical test & W B 2 for an overhead test) SW No. : (Filled in by the designated State representative/test proctor) This is the four digit welders plate identification mark that relates to the Lab Test Number. (i.e ) -C4-
22 Laboratory Test Results : (Filled in by NYSDOT Lab personnel) This space is provided to indicate the reasons why a test plate may be rejected by the lab facility based on visually failing to meet the specification requirements of the NYSSCM. (i.e. rejected due to over-grinding resulting in plate thickness less than the minimum allowed) Test Conducted By : (Filled in by the designated State representative/test proctor) This is the full name of the administrator who is proctoring the exam tests. Title : (Filled in by the designated State representative/test proctor) This is the professional job title of the administrator proctoring the exam. Identification Mark : (Filled in by the designated State representative/test proctor) This is the identification stamp made by using the steel die punch indentation in the exam plate. The marking relates to the regional location to which the test was proctored and is usually the same identification information in the MARK column. (i.e. D O T 2) Date of Tests : (Filled in by the designated State representative/test proctor) This is the date that the exam was given. (i.e ) Bridge Engineer : This is the signature authorization made by the supervisor of the administrator proctoring the exam. The below items are to be filled in by the NYSDOT Lab Materials Bureau No. of Samples : This is the quantity of the total number of tests that an individual welder is submitting. X-Ray Plate No. : (Film No.) This is the four digit identification number assigned to the envelope containing the x-rays to be radiographed in the Lab. The designation is generally referred to as the X-Ray Jacket No. The first set of numbers are the year the film was taken. One test jacket can contain up to three individual weld exam tests. (i.e ) Reviewed By : (Initials) Date : Checked & Reported By : (Initials) Date : -C5-
23 Appendix D
24 TO BE GIVEN TO WELDER WHEN NEW CARD IS ISSUED TO: All Welders Receiving a New or Renewed NYSDOT Welder Qualification Certificate FROM: Name of Regional Field Welder Qualification Program Administrator New York State Department of Transportation Region This is your new Welder Qualification Certificate. Please sign the back of your card and make a copy for your records. The back of the identification card indicates the welding positions which you are qualified to weld. Any box that is blackened out indicates that you are not qualified for that welding position. This card is valid for three years. It is your responsibility to obtain the appropriate signatures as stated on your card. The original record must be signed at least once every six months by either a State of New York Engineer in Charge (EIC), a Licensed Professional Engineer (PE) or a Certified Welding Inspector (C.W.I). If a P.E. or C.W.I. signs your card, make sure that the person writes his/her PE or C.W.I. number legibly and fills in the date of service. **RENEWAL OF YOUR WELDING CERTIFICATE IS CONTINGENT ON A QUALIFIED PERSON SIGNING YOUR WORK HISTORY WITHIN EVERY SIX MONTH PERIOD AND THAT A MINIMUM OF SIX SIGNATURES IS RECORDED. ** **NO WELDER IS CONSIDERED CERTIFIED NOR WILL ANY SIGNATURE BE ACCEPTED AFTER THE EXPIRATION DATE. ** **IF YOU LOSE YOUR CARD AND REQUEST A REPLACEMENT IT IS STILL YOUR RESPONSIBILTY TO PROVIDE A WORK HISTORY WITH QUALIFIED SIGNATURES FROM THE DATE THE ORIGINAL CERTIFICATE WAS ISSUED TO THE DATE OF EXPIRATION OF THE NEW WELDING CERTIFICATE.** When it is time to renew your card you may make a copy and utilize it until its expiration date. Please send both parts of the original certificate with all appropriate signatures at least six(6) weeks prior to expiration to: NYSDOT Regional Office address Attn: Name of Administrator REQUEST RENEWAL OF WELDING CARD I have read and understand the above mentioned requirements and have received a copy of these instructions. Name of Welder Signature of Certified Welder Please Print First, Middle Initial, Last Name Cc: Welding File Date -D1-
25 Appendix E
26 Responsibilities Of NYS Weld Test Proctor The Proctor is responsible for completing the portions of the BR 244 as indicated in Appendix C of this brochure prior to the start of welding. The Proctor shall also explain to the welder which sections of the BR 244 form he/she needs to fill out and how. After the test coupon has been assembled and tack welded, it is the responsibility of the Proctor to inspect it for conformance with test requirements and Figures 1 & 2 in this brochure. The Proctor may instruct welders as to the potential consequences of improper fit-up and assembly, but shall not reject the coupon unless the requirements for groove angle and root opening are not met. Any deficiency in fit-up or preparation should be noted on the test report. After Proctor has completed the inspection of the test assembly prior to welding, he or she shall die stamp one side of the test plate with numbers, letters, and/or distinctive marks on the test assembly which will clearly identify the welder by the code used in the test report. The Proctor will inspect the root pass before any subsequent passes are made. There must be 3 of weld with no lack of fusion or trapped slag in the side wall greater in size than that which is allowed by figure 1605a for the applicable weld size. The proctor shall reject any plates which do not meet the requirements and shall terminate the test. The Proctor shall inspect the weld test plate before and after welding, and monitor the welding in process. Test plates that do not visually meet the requirements of this instruction and the SCM Section will not be accepted. The weld shall contain no cracks and there must be three continuous inches of weld where there is no trapped slag, undercut, lack of fusion, or cluster porosity greater than 5/16 either as a single defect or accumulation of defects with there lengths added together as stated in Section 16 of the SCM. After visual inspection of the completed weld test plate, the designated State representative shall die stamp the plate, indicating its acceptance. These test plates and all necessary paperwork shall be sent directly to the Department laboratory by the Proctor in a timely manner. If the coupon is rejected, the welder shall be asked to sign the BR244 acknowledging the coupon has failed a visual inspection and will not be submitted for x-ray testing. -E1-
27 The following is a list of items the Proctor shall explain to each candidate before starting the test: Proctor shall explain to persons taking the welding test what is expected during the test: No grinding between weld passes for any reason. Weld cleaning may only be performed by means of a hand held, non-mechanical chipping hammer and/or wire brush. In lieu of a chipping hammer and/or wire brush, a mechanical wire wheel may be used. No grinding wheels will be allowed. Any problems with equipment must be brought to the attention of the Proctor. Test plates may not be moved from the test position, vertical or overhead, until the test is complete. For any reason. Only the person taking the test is allowed in the weld booth. The Proctor is the only other person allowed in the booth during the test session. The cover pass must be multiple passes. The cover pass may be a weave or stringer beads however the maximum width for a weave is 7/8. The cover pass shall not be done in one pass. All welding rods must be either 1/8" or 5/32" and they must come from the rod oven. When the test is completed the weld is ground flush with the base metal. No surface depressions (lines, gouges, nicks, etc.) may remain. The thickness of the test plate and weld shall not be reduced by more than 1/16 during grinding. Excessively ground plates are rejected. When grinding is complete the plate is to be presented to Proctor for a visual inspection. The completed weld shall conform to Section of the New York State Steel Construction Manual. Plates not meeting the requirements of SCM section shall be rejected and not forwarded to the laboratory for testing. A violation of any of the above requirements is cause for rejection of the plate. The Proctor shall remain in close proximity of the weld booths to observe the welders during welding to insure that these procedures are followed. -E2-
28 Appendix F
29 Testing Facility Minimum Requirements Rod oven capable of holding 30 lbs. of welding rods. Fixtures for clamping test plates in position. Welding machines capable of 250 amps minimum. If multiple welders are testing at one time their work station must be substantial enough so a welder working on a test plate does not affect another welder. Each welding machine shall ground to the work station. The grounds from several machines shall not be clamped to a metal strap that is welded to work station. This causes arc blow. Separate work areas shall be provided for grinding test coupons. Several grinders shall be available so that welders do not have to wait to finish grinding coupons. Impression stamps for marking test plates shall be provided. 2 lbs. ball peen hammer. Fire extinguishers. Mechanical wire wheel. The following items shall be provided by the welder: Welding shield Gloves Chipping hammer Wire brush -F1-
FIELD ACCEPTANCE OF FIELD WELDING GUIDE
Page 1 of 17 Oklahoma DOT Materials & Testing January 14, 2004 Publication: GFA-FW (Updated to reference current Structural Materials Branch of the ODOT Materials Division URL 07/06/2016) FIELD ACCEPTANCE
Field Welding Inspection Guide
Field Welding Inspection Guide Assistance in interpretation of any specification or questions concerning field welding issues can be obtained from the Office of Materials Management, Structural Welding
9. QUALITY CONTROL/QUALITY ASSURANCE
Interim Guidelines: Chapter 9 - Quality Control/Quality Assurance 9. QUALITY CONTROL/QUALITY ASSURANCE Quality control is principally the responsibility of the contractor, while Quality Assurance is performed
Welding of Boilers, Pressure Vessels and Pressure Piping
WELDING OF BOILERS, PRESSURE VESSELS 1 Welding of Boilers, Pressure Vessels and Pressure Piping Repealed by Chapter B-5.1 Reg 1 (effective January 1, 2007) Formerly Saskatchewan Regulation 61/78 (effective
COASTAL BEND COLLEGE WELDING SYLLABUS (Revise 11/13) Intermediate Shielded Metal Arc Welding (SMAW)
COASTAL BEND COLLEGE WELDING SYLLABUS (Revise 11/13) WLDG 1457: Intermediate Shielded Metal Arc Welding (SMAW) Semester Hours: 4 Textbook: Course Description: Course Learning Outcomes: Supplementary Materials:
Reproduced with the permission of the American Welding Society (AWS), Miami, Florida - 09/15/2011. 7. Stud Welding
7. Stud Welding 7.1 Scope Section 7 contains general requirements for welding steel studs to steel (see 7.2.7 and 1.2.2 for approved steels). In addition, it stipulates specific requirements for the following:
11. NONDESTRUCTIVE TESTING
11. NONDESTRUCTIVE TESTING Nondestructive testing includes magnetic particle testing (MT), Liquid Dye Penetrant testing (PT), Radiographic Testing (RT) and Ultrasonic Testing (UT). The purpose of nondestructive
Examination. Performance Test. Candidate Information Booklet
Examination Performance Test Candidate Information Booklet Name Test Site Test Date (Please Print) (City/State) CRAW-T Examiner CRAW-T NUmber (Please Print) 1 Table of Contents 1.0 Introduction and Purpose
GMAW Aluminum Plate Annotated Instructor s Guide
GMAW Aluminum Plate Annotated Instructor s Guide Module 29401-10 Module Overview This module covers the basics of aluminum metallurgy. It also explains how to make fillet and V-groove welds on aluminum
WHAT EVERY ENGINEER SHOULD KNOW ABOUT WELDING
WHAT EVERY ENGINEER SHOULD KNOW ABOUT WELDING From amperage to preheat, there s more to welding procedures than meets the eye By Duane K. Miller, P.E. WITHIN THE WELDING INDUS- TRY, THE TERM WELDING PROCEDURE
Application of Welding Standards in Hong Kong. S. K. Babu Laboratory Manager - Foundation Techniques Ltd
Application of Welding Standards in Hong Kong S. K. Babu Laboratory Manager - Foundation Techniques Ltd Introduction: This paper summarizes the current welding standards practiced in Hong Kong & also outlines
Job Ready Assessment Blueprint. Welding. Test Code: 4172 / Version: 01. Copyright 2013. All Rights Reserved.
Job Ready Assessment Blueprint Welding Test Code: 4172 / Version: 01 Copyright 2013. All Rights Reserved. General Assessment Information Blueprint Contents General Assessment Information Written Assessment
Summary of Changes in. ASME Section IX, 2000 Addenda
Summary of Changes in ASME Section IX, 2000 Addenda Prepared by Walter J. Sperko, P.E. Sperko Engineering Services, Inc 4803 Archwood Drive Greensboro, NC 27406 USA Voice: 336-674-0600 FAX: 336-674-0600
Welding Procedure Guide
Welding Procedure Guide An easy to follow guide covering the preparation of welding procedure data sheets Copyright 2008 CWB Group - Industry Services Copyright CWB Group - Industry Services Revised September
WORD DEFINITION WORD (NATIONAL LANGUAGE)
WELDING GLOSSARY The Glossary has been created as part of the Migration for Development in the Western Balkans (MIDWEB) project, which received financial assistance from the European Commission IPA 2009
Welding Fire Protection Piping 101
By Walter J. Sperko, P.E. Sperko Engineering Services, Inc. 4803 Archwood Drive Greensboro, NC 27406 USA www.sperkoengineering.com 336-674-0600 FAX 336-674-0202 [email protected] Part 1 Welding Procedures
Structural welding is a process by which the parts that are to be connected are heated and
CHAPTER 6. WELDED CONNECTIONS 6.1 INTRODUCTORY CONCEPTS Structural welding is a process by which the parts that are to be connected are heated and fused, with supplementary molten metal at the joint. A
Chapter 5 - Aircraft Welding
Chapter 5 - Aircraft Welding Chapter 5 Section A Study Aid Questions Fill in the Blanks 1. There are 3 types of welding:, and, welding. 2. The oxy acetylene flame, with a temperature of Fahrenheit is produced
WELDING TECHNOLOGY DEGREES AND CERTIFICATES. Welding Technology Degree. Shielded Metal Arc Plate and Pipe (270 hours) Certificate
Area: Technical Education Dean: Dr. Trish Caldwell Phone: (916) 484-8354 Counseling: (916) 484-8572 www.arc.losrios.edu/~welding/ The American Welding Society (AWS) nationally accredits American River
A Beginners Guide to Flux Cored Arc Welding
A Beginners Guide to Flux Cored Arc Welding When it comes to Flux cored arc welding or FCAW many people think it is a different welding process when in reality it is not! Even though there are books, classes
External Visual Inspection Form
Tank ID Code Part 1 (a): Information on Registered Facility Name of Registered Facility: Address: Town: Postal Code: Province: Phone Number: Person Conducting the Inspection: Transport Canada Facility
POLYURETHANE LINING AND COATING ON PIPE RAW WATER
POLYURETHANE LINING AND COATING ON PIPE RAW WATER PART 1 -- GENERAL 1.1 THE REQUIREMENT A. The CONTRACTOR shall provide pipe coating, complete and in place, in accordance with the Contract Documents. 1.2
Unit Plan. General Learning Target. Formative Assessment
Unit Plan Course: Ag Tech B Grade Level: 9 Course Description: In this course, the students will learn about the mechanical aspects of agriculture including, but not limited to alternate current electricity,
Structural Steel Welding
PDH Course S150 Structural Steel Welding Semih Genculu, P.E. 2007 PDH Center 2410 Dakota Lakes Drive Herndon, VA 20171-2995 Phone: 703-478-6833 Fax: 703-481-9535 www.pdhcenter.com An Approved Continuing
SECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE
SECTION 15076 CEMENT-MORTAR LINED AND COATED (CML&C) STEEL PIPE PART 1 GENERAL 1.01 DESCRIPTION This section designates the requirements for steel pipe fabrication, test in shop, installation of steel
TIG WELDING TIPS by Tom Bell
(This is a two-part document, with general tig welding first followed by one aluminum-specific.) TIG WELDING TIPS by Tom Bell 1. The bigger the rod, the easier it is to feed. Use larger diameter rods (3/32
A Beginner s Guide to MIG Welding
A Beginner s Guide to MIG Welding MIG Welding Names MIG welding, or MIG, is an acronym for Metal Inert Gas welding. MIG is a commonly used and accepted slang term that was appropriate when the process
www.klmtechgroup.com TABLE OF CONTENT
Page : 1 of 45 Project Engineering Standard www.klmtechgroup.com KLM Technology #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor Bahru Malaysia TABLE OF CONTENT 1.0 SCOPE 2 2.0 CONFLICTS
ACCREDITATION CRITERIA FOR FABRICATOR INSPECTION PROGRAMS FOR STRUCTURAL STEEL. AC172 February 2015 (Effective April 1, 2015)
ACCREDITATION CRITERIA FOR FABRICATOR INSPECTION PROGRAMS FOR STRUCTURAL STEEL AC172 February 2015 (Effective April 1, 2015) Requirements related to the Designated Accreditation Representative (DAR) and
NDT Procedure for Liquid Penetrant Inspection TRINITY NDT. An ISO 9001:2008 Certified Company
NDT Procedure for Liquid Penetrant Inspection A Nondestructive testing (NDT) Procedure suitable for General Liquid/Dye Penetrant Inspections. This is a sample LPT procedure and may be required to be modified
A. The CONTRACTOR shall provide pipe coating, complete and in place, in accordance with the Contract Documents.
POLYURETHANE COATING ON STEEL PIPE PART 1 -- GENERAL 1.1 THE REQUIREMENT A. The CONTRACTOR shall provide pipe coating, complete and in place, in accordance with the Contract Documents. 1.2 REFERENCE SPECIFICATIONS,
COLLISION REPAIR TECHNOLOGY CONTEST DESCRIPTION
COLLISION REPAIR TECHNOLOGY CONTEST DESCRIPTION PURPOSE To evaluate each contestant s preparation for employment and to recognize outstanding students for excellence and professionalism in the field of
North Carolina FFA Association Agricultural Mechanics Career Development Event
North Carolina FFA Association Three (3) of the following Agricultural Mechanics Performance Skills will be selected for the state competition. North Carolina FFA Association Agricultural Mechanics Performance
WELDING INSPECTION REPORT
STATE OF CALIFORNIA--BUSINESS,TRANSPORTACTION AND HOUSING AGENCY Arnold Schwarzenegger, Governor DEPARTMENT OF TRANSPORTATION DIVISION OF ENGINEERING SERVICES Office of Structural Materials Quality Assurance
SOLDERING PROCEDURE SPECIFICATIONS PROCEDURE QUALIFICATION RECORDS. and SOLDERER PERFORMANCE QUALIFICATION RECORDS
SOLDERING PROCEDURE SPECIFICATIONS PROCEDURE QUALIFICATION RECORDS and SOLDERER PERFORMANCE QUALIFICATION RECORDS COPPER DEVELOPMENT ASSOCIATION INC. 260 Madison Avenue New York, NY 10016 (212) 251-7200
Sample Career Ladder/Lattice for Advanced Manufacturing
Click on a job title to see examples of descriptive information about the job. Click on a link between job titles to see the critical development experiences needed to move to that job on the pathway.
NDT Procedure for Liquid Penetrant Inspection
NDT Procedure for Liquid Penetrant Inspection A Nondestructive testing (NDT) Procedure suitable for General Liquid/Dye Penetrant Inspections. This is a sample LPT procedure and may be required to be modified
Copies of this document shall be classified either as Controlled or Uncontrolled, and shall be identified as such on the cover sheet.
INTRODUCTION This document describes an inspection system broken down into four separate levels. When Inspection Level IV is invoked, this system meets the requirements of former MIL-I-45208A. The primary
FINAL REPORT WELDING SUPERVISOR TRAINING AND CERTIFICATION
FINAL REPORT WELDING SUPERVISOR TRAINING AND CERTIFICATION Sponsor National Shipbuilding Research Program Sponsoring Committee SP-7 Welding Panel Project Period: September 2002 July 2003 Project Value:
INDIAN STANDARDS (BIS) ON WELDING
** IS 82:957 Glossary of terms relating to welding and cutting of Sep 2008 metals 2 IS 83:986 Scheme of symbols for welding (revised) Sep 2008 3 IS 84:2004 Covered electrodes for manual metal arc welding
ACCREDITATION CRITERIA FOR INSPECTION PROGRAMS FOR MANUFACTURERS OF METAL BUILDING SYSTEMS AC472
ACCREDITATION CRITERIA FOR INSPECTION PROGRAMS FOR MANUFACTURERS OF METAL BUILDING SYSTEMS AC472 August 2012 (Effective September 1, 2012) (Editorially revised September 4, 2013) (Editorially revised February
QUALIFICATION OF PROCEDURE AND WELDER. (19 February 2014)
QUALIFICATION OF PROCEDURE AND WELDER (19 February 2014) QUALIFICATION OF PROCEDURE AND WELDER The most important tasks prior production welding Welding qualifications are statements by which the welding
GENERAL WELDING & FABRICATING, INC. 991 Maple Road Elma, New York 14059
QUALITY MANUAL GENERAL WELDING & FABRICATING, INC. 991 Maple Road Elma, New York 14059 Distribution: Position Location Copy # President / CEO Office 1 Operations Manager Office 2 Quality Assurance Office
Structural Failures Cost Lives and Time
Structural Failures Cost Lives and Time Recent failures of storage bins, silos and other structures highlight the need to increase awareness of hazards associated with these structures. Since 2010, one
Weld Cracking. An Excerpt from The Fabricators' and Erectors' Guide to Welded Steel Construction. The James F. Lincoln Arc Welding Foundation
Weld Cracking An Excerpt from The Fabricators' and Erectors' Guide to Welded Steel Construction The James F. Lincoln Arc Welding Foundation Weld Cracking Several types of discontinuities may occur in welds
TECHNICAL ADVANCED PLACEMENT (T.A.P.) Horry-Georgetown Technical College and Hemingway Career Center/Georgetown County Articulation Agreements 2010-12
TECHNICAL ADVANCED PLACEMENT (T.A.P.) Horry-Georgetown Technical College and Hemingway Career Center/Georgetown County Articulation Agreements 2010-12 HGTC Course ACR 106 CET 120 COS 130 COS 222 EGT 101
Welding & Fabrication Industry Certification Programs
FALL 2013 Welding & Fabrication Industry Certification Programs Co-Sponsored by: Rochester Arc + Flame Center 125 Fedex Way, Rochester, NY 14624 www.rocafc.com Welding Industry Opportunities Welders are
CONTRACT SPECIFICATIONS - SEISMIC ISOLATION BEARINGS
CONTRACT SPECIFICATIONS - SEISMIC ISOLATION BEARINGS 1.0 DESIGN 1.1 Scope of Work 1.1.1 This work shall consist of furnishing Isolation Bearings and installing Isolation Bearing Assemblies at the locations
Helical Products Co., Inc.
Q01 GENERAL REQUIREMENTS 1. Supplier Responsibilities 1.1. Delivery Certification By delivering products or services on the Contract, the Supplier certifies that such products or services are in compliance
WATERJET VISUAL TECHNICAL INSPECTION REPORT
WATERJET VISUAL TECHNICAL INSPECTION REPORT TYPE OF INSPECTION: PREREPAIR [ ] POST REPAIR/MANUFACTURE [ ] IN-SERVICE [ ] SHIP CLASS IDENTIFICATION DATA HULL NUMBER WATERJET IS INSTALLED? YES [ ] NO [ ]
Section 8.1 Volume I QUALITY ASSURANCE PROGRAM OF PRECAST PRESTRESSED CONCRETE PRODUCTS
Section 8.1 Volume I QUALITY ASSURANCE PROGRAM OF PRECAST PRESTRESSED CONCRETE PRODUCTS 8.1.1 PURPOSE This procedure provides guidelines related to the implementation of quality control and quality assurance
IHSS-N1 WELDED HONEYCOMB CORE SPECIFICATION. Generated: Sergiy Papyshev Engineering. Approved: Don Prysi Manufacturing. Approved: Merzuk Ramic Quality
IHSS-N1 WELDED HONEYCOMB CORE SPECIFICATION Generated: Sergiy Papyshev Engineering Approved: Don Prysi Manufacturing Approved: Merzuk Ramic Quality Approved: Steven Barnett Administrative DATE DATE DATE
SECTION 11014 WINDOW WASHING SYSTEMS
SECTION 11014 WINDOW WASHING SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. Section includes, but is not limited to, design and furnishing portable davits, davit sleeves, dvit bases, four (4) removable outriggers,
1.2 For piping systems that operate at hoop stress of 20% or more of the Specified Minimum Yield Strength the following shall apply.
1.0 JOINT FIT-UP AND ALIGNMENT 1.1 For piping systems that operate at hoop stress of less than 20% and the internal adjoining ends do not vary more than 1 / 8 in. and adequate penetration and fusion can
UNCONTROLLED COPY FOR REFERENCE ONLY
CLOVER MACHINE AND MFG. 800 MATHEW ST. #101 SANTA CLARA, CA 95050 727-3380 727-7015 fax REVISION: DATE: PAGE 1 OF 45 QUALITY POLICY MANUAL DISTRIBUTION LIST: President Purchasing Manager Vice President
3.3 Welding and welded connections
3.3 Welding and welded connections Welding is the process of joining two pieces of metal by creating a strong metallurgical bond between them by heating or pressure or both. It is distinguished from other
SERIES NG 1800 STRUCTURAL STEELWORK
MANUAL OF CONTRACT DOCUMENTS FOR HIGHWAY WORKS VOLUME 2 NOTES FOR GUIDANCE ON THE SPECIFICATION FOR HIGHWAY WORKS SERIES NG 1800 STRUCTURAL STEELWORK Contents Clause Title Page NG 1800 (08/14) General
Apprenticeship Training Standard. Welder. Trade Code: 456A. Development Date: October 2007
Apprenticeship Training Standard Welder Trade Code: 456A Development Date: October 2007 This document is the property of the apprentice named inside and represents the official record of his/her training
ABOUT CWB CERTIFICATION/ QUALIFICATION The work CWB does on behalf of our clients can be divided into five main categories:
CWB CERTIFICATION/ CWB CERTIFICATION/ QUALIFICATION QUALIFICATION SERVICES SERVICES CANADIAN WELDING CERTIFICATION AN OVERVIEW Canada, like many countries around the world, has specific rules and regulations
SECTION 1 GENERAL REQUIREMENTS
Page 1 of 6 SECTION 1 GENERAL REQUIREMENTS 1. SCOPE OF WORK: The work to be performed under the provisions of these documents and the contract based thereon includes furnishing all labor, equipment, materials,
81000 Series Aluminum Gate Valve Installation and Repair Manual
High Vacuum Valves Leader in Quality and Value 81000 Series Aluminum Gate Valve Installation and Repair Manual Dear Customer, Thank you for choosing HVA as your vacuum valve supplier. Your valve will give
Guide to understanding Welding Procedure Specification (WPS), Procedure Qualification Record (PQR), and Welder Performance Qualification Record (WPQR)
An AEIS White Paper 265 Birdsall Dr. Yorktown Heights, NY 10598 914 214 8460 www.aeis.us Guide to understanding Welding Procedure Specification (WPS), Procedure Qualification Record (PQR), and Welder Performance
Section 1. The title of Section 101-07 of Subchapter A of Chapter 100 of Title 1 of the Rules of the City of New York is amended to read as follows:
Section 1. The title of Section 101-07 of Subchapter A of Chapter 100 of Title 1 of the Rules of the City of New York is amended to read as follows: 101-07 [Inspections and] [a] Approved [a] Agencies.
WELDING PRESSURE PIPELINES & PIPING SYSTEMS. Procedures and Techniques
WELDING PRESSURE PIPELINES & PIPING SYSTEMS Procedures and Techniques Table of Contents Introduction....................................3 Vertical Down vs. Vertical Up.....................3-4 Cross Country
STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1078
STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1078 QUALIFICATION AND EVALUATION OF STRUCTURAL STEEL FABRICATORS December 31, 2012 1078.01 General 1078.02 Levels of Fabricator Qualification 1078.03
OD1651 WELDING OPERATIONS, I
SUBCOURSE OD1651 EDITION 8 WELDING OPERATIONS, I WELDING OPERATIONS, I SUBCOURSE NO. OD1651 United States Army Combined Arms support Command Fort Lee, Virginia 23801-1809 6 Credit Hours GENERAL The purpose
Duplex Stainless Steel Fabrication. Gary M. Carinci TMR Stainless Consultant for International Molybdenum Association
Duplex Stainless Steel Fabrication Gary M. Carinci TMR Stainless Consultant for International Molybdenum Association 1 Promoting molybdenum - as a material with superior properties and performance in a
NATIONAL INSTITUTE OF BIOLOGICALS
Short Term Notice Inviting Quotations Quotations No. S.1-36/07/NIB/Engg. (Civil) Invitation to short term quotations for Repairing of damaged gypsum board false ceiling and painting with epoxy paint in
CLEAR-DIVISIONS CENTERFOLD
CLEAR-DIVISIONS CENTERFOLD Introduction: The following three (3) part specification offers the Standard and Optional features for the CLEAR-DIVISIONS CENTERFOLD moveable The yellow highlighted areas in
Part B Repair Quality Standard for Existing Ships
Part B Repair Quality Standard for Existing Ships PART B SHIPBUILDING AND REPAIR QUALITY STANDARD FOR EXISTING SHIPS CONTENTS: 1. Scope 2. General requirements to repairs and repairers 3. Qualification
Repair of a Hull 15 m below the Waterline
Repair of a Hull 15 m below the Waterline Fig. 1 This 189 m vessel required an underwater repair after it had its hull pierced sufficiently enough to let seawater enter its water ballast tank. Since circumstances
Auditing a Printed Circuit Board Fabrication Facility Greg Caswell
Auditing a Printed Circuit Board Fabrication Facility Greg Caswell Introduction DfR is often requested to audit the PCB fabrication process of a customer s supplier. Understanding the process variations
READ THE INSTRUCTIONS SEVERAL TIMES BEFORE STARTING ASSEMBLY
1954-87 CHEV BED INSTRUCTIONS (Revised Nov 2002) Thank you and congratulations on your purchase of the finest Street Rod Pickup Bed on the market today. The following instructions should help you assemble
TEST REPORT. Rendered to: HOMELAND VINYL PRODUCTS, INC. For:
TEST REPORT Rendered to: HOMELAND VINYL PRODUCTS, INC. For: PRODUCT: Gorilla Column PVC Porch Post System with PVC Base / Cap Plates, PVC Bushings and 2-3/8 in Diameter and 3-1/2 in Diameter Galvanized
Surveillance Report. Bascule span to the Railway bridge Jernbanebroen over Limfjorden
Transportudvalget 2013-14 TRU Alm.del endeligt svar på spørgsmål 192 Offentligt Surveillance Report Package / Item: Bascule span to the Railway bridge Jernbanebroen over Limfjorden Supplier: Purpose of
Mandan Public Schools
Mandan Public School District Career & Technical Education 2010 1 Table of Contents Table of Contents...2 Preface...4 Writing Committee Members...5 Vision, Mission, Slogan and Philosophy...5 Philosophy
Supplier Quality Assurance Requirements Manual
12716 EAST PINE STREET TULSA, OK 74116 Supplier Quality Assurance Requirements Manual Approved: Mike Collins Quality Assurance Manager Precise Machining & Manufacturing 1 Record of Revisions Revision D
Gas Tungsten Arc Welding GTAW (40 Hours Course)
Gas Tungsten Arc Welding GTAW (40 Hours Course) Table of Contents Gas Tungsten Arc Welding GTAW (40 Hours Course)...1 GENERAL SURVEY...1 1. SHORT DISCRIPTION OF THE MOST COMMON WELDING PROCESSES...3 1.1
Pennsylvania Vehicle Emissions Inspection and Maintenance Program Northern Region
Pennsylvania Vehicle Emissions Inspection and Maintenance Program Northern Region 1 2 Table of Contents Introduction...1-4 Login Process...1-4 Facility ID Number...1-6 Proctor ID Number and Password...1-6
SAFE HANDLING OF PRECAST CONCRETE PRODUCTS
SAFE HANDLING OF PRECAST CONCRETE PRODUCTS Safety Handling of Precast Concrete Products The lifting of any precast product requires the use of special equipment and substantial planning and knowledge.
TECHNICAL SPECIFICATION FOR PROJECTION WELDING MACHINE (Qty. 2 Nos.)
TECHNICAL SPECIFICATION FOR PROJECTION WELDING MACHINE (Qty. 2 Nos.) 1. Requirement: Two (02) Nos. DC Type, 3 phase, 3 wire Projection Welding Machine is required for welding of ventilation M.S. / Stainless
Specification for Pipe Coating Repairs Offshore
Specification for Pipe Coating Repairs Offshore Specification for Pipe Coating Repairs Offshore 1 of 6 Table of Contents 1.0 SCOPE... 3 2.0 REFERENCE DOCUMENTS... 3 3.0 MATERIALS... 3 4.0 EQUIPMENT AND
PRE INSTALLATION MANUAL
REINFORCED CONCRETE PIPE PRE INSTALLATION INSPECTION & REPAIR MANUAL Kentucky Transportation Cabinet Kentucky Department of Highways Division of Materials 1227 Wilkinson Boulevard Frankfort, KY 40601 (502)
APPENDIX 2-3 PCAPP EDS INSPECTION LOG SHEETS
APPENDIX 2-3 PCAPP EDS INSPECTION LOG SHEETS Pueblo Chemical Depot Pueblo Chemical Depot (This page intentionally left blank.) PCAPP EDS Daily (When in Use) Operational Inspection Checklist EXAMPLE Inspected
CLEAR-DIVISIONS APERTO
CLEAR-DIVISIONS Introduction: The following three (3) part specification offers the Standard and Optional features for the CLEAR-DIVISIONS moveable glass wall system. The yellow highlighted areas in the
STEEL fabrication quality SySTEmS guideline
STEEL fabrication quality systems guideline Copyright 2002 by Canadian Institute of Steel Construction All rights reserved. This book or any part therof must not be reproduced in any form without written
Georgia Department of Transportation. Office of Materials and Research. Standard Operating Procedure (SOP) 19
Laboratory SOP 19 Revised July 1, 2003 Georgia Department of Transportation Office of Materials and Research Standard Operating Procedure (SOP) 19 This Standard Operating Procedure provides a means whereby
Operating instructions. 3-in. x 6-ft. Anchor Strap for Skyline Horizontal Lifeline
Reliance Industrial Products, LLC Operating instructions for 3-in. x 6-ft. Anchor Strap for Skyline Horizontal Lifeline Model # 6095 Reliance Industrial Products PO Box 140008 Denver, CO 80214 Ph. (800)
CLEAR-DIVISIONS VARIOFOLD
CLEAR-DIVISIONS VARIOFOLD Introduction: The following three (3) part specification offers the Standard and Optional features for the CLEAR-DIVISIONS VARIOFOLD moveable The yellow highlighted areas in the
STATEMENT OF WORK (SOW) On-Call Certified Welding Inspections and Nondestructive Testing
1.0 INTRODUCTION Colorado Springs Utilities (UTILITIES) is seeking qualified firms to provide verification welding inspection services, nondestructive testing services, and technical reporting to Colorado