1 Enhanced Water/Steam Cycle for Advanced Combined Cycle Technology Author: Patrick Bullinger Siemens AG; Energy Solutions, Product Line Marketing Plant Solutions Bangkok, October 3 5, 2012

2 Abstract The current energy market is driven by the request of further reducing CO 2 emissions. This accelerator for eco-friendly power generation is resulting in the necessity to integrate more renewable resources in the energy mix. The weather and daytime dependency of renewable energy causes highly fluctuating load profiles in the grid. A back up power generation with advantages in emissions, flexibility and low operational costs is required to ensure reliable electricity production. The catastrophe of Fukushima in March 2011 changed the direction of nuclear power generation in many regions. Combined cycle power plants can build a bridge towards the future when nuclear power plants have been switched off and the integration of renewable has been decelerated. Due to high availability of gas resources in certain regions and further extension via liquefied natural gas (LNG) supported by the economic growth especially in emerging countries, combined cycle power plants are expected to play a major role in the energy mix in the future. A new generation of gas turbines with combined cycle plant efficiencies of over 60% and enhanced operational flexibility entered the market with commercial operation in summer The key to implementation of those new features is overall plant optimization, since power plants have to be designed to accommodate the new performance parameters. A major driver for performance improvement is the optimization of the water/steam cycle in regard of temperature and pressure. Steam temperatures far above 565 C up to ~600 C and steam pressures above 170bar are used to attain highest efficiencies. These ambitious parameters cause huge challenges in regard of boiler materials, flexibility of the boiler and water chemistry. Siemens is the only company to have accumulated operational experience with raised steam parameters in the combined cycle power plant Ulrich Hartmann SCC5-8000H 1S; Irsching Unit No.4 with a net efficiency of 60,75%. Based on that experience this paper presents the issues to be taken into account when designing an advanced water/steam cycle. 1

3 Table of contents 1 Introduction The levers of Performance increase Challenges of the advanced cycle Impact on boiler materials Impact of steam side oxidation Spallation Application limits of the drum type boiler Water chemistry Technical solution Boiler material for the EN and ASME market application BENSON technology with 3 pressure Reheat Condensate Polishing the key element for minimized chemical wear and tear Operational experience - EON Ulrich Hartmann SCC5-8000H, 1S (Irsching No.4) Summary and Outlook References Copyright

4 1 Introduction Today s combined cycle power plants (CCPP) have to fulfill challenging requirements in order to comply with the boundary conditions requested by the energy politics, infrastructure and periphery. Although these requirements differ from region to region due to specific market environments, three major drivers can be determined. All of these requirements are necessary to ensure a successful operation of the power plant. - Investment - Efficiency - Operational flexibility Investment Most of today s power plant projects are purely economical driven. Naturally, the investor expects an attractive return of investment. Beside the margins generated by the revenues the investment is a key figure. It does not mean that the lowest price will result in the most attractive business model, as often reduced first investment result in additional cost during operation or reduce the capabilities of the proposed solution. The whole life cycle costs of a power plant have to be taken into account. Nevertheless, it is essential to optimize the solution to the lowest possible invest without jeopardizing the business model of the project. Efficiency The demand of highest efficiencies is a key requirement of today s and tomorrows combined cycle power plants. Current developments in the energy markets are requesting fuel consumption saving and therefore the need of higher efficiencies due to the following reasons: 1. High gas prices in some regions (especially in the Asian, European and Latin American markets) with the consequence of high electricity production cost. 2. The further reduction of CO 2 emissions in order to enable-eco friendly operation is indispensable. The contribution of combined cycles is to reduce emissions due to operation at higher efficiencies. To give an example, an efficiency improvement of 1.5%-pts. saves

5 tons of fuel gas per year while reducing CO 2 emissions by tons per year when a 600MW combined cycle power plant will be operated at base load. 3. A very simple but decisive effect is the higher profitability during operation with higher efficiencies. Furthermore a high efficiency results in a low merit order and increases the probability to be dispatched. Operational flexibility The need of operational flexibility has become more and more important in recent years and this need is expected to continue for the mid term. To become a prime candidate of the dispatcher today s combined cycle power plants have to be able to operate with fast fluctuating load profiles. Fluctuating load will occur more frequently in the future due to the following reasons: First is the above mentioned increase of renewable integration in the energy mix. The nonavailability of wind or solar energy has severe impact on the load profile. Figure 1.1 shows the forecasts for a typical day in Germany in 2020 with low versus high wind power feed-in. In the case of a high expected wind power input during the day as shown here, no further fossil power generation is required during the night, i.e. when demand is low, as there is a residual load (difference between demand and renewable feed-in) of zero or even overcapacity (that is to say negative residual load). Compared to a day with a low wind feed-in there is a continuous demand for about 20 GW of conventional base load capacity. The conclusion to be drawn is that the major part of the conventional power generating capacity will probably not be continuously required. This is the case in countries with growing renewable portfolio. 4

6 Low wind feed-in High wind feed-in Residual load [MW] Time [h] Peaks 6h 8h 9h h 11h 23h Residual load [MW] Overload Loadramps: Average: 56 MW/min Max.: 377 MW/min Min.: 0,028 MW/min Peaks 10h 11h Time [h] 6h 8h 9h Peak Load Peak 12 GW 6h 10 GW 8h Daily start-stop Peak 4 GW 2 GW 11h 2 GW 9h 2 GW Continuous 23h 20 GW 8 GW 10h 10 GW 11h 2 GW 6h 1 GW 8h 2 GW 9h 6 GW 10h 100% daily start-stop Source: joint study Siemens and VDE, AT40 scenario, March 2011 Up to 100% of the fossil fleet in daily start-stop operation Load ramps of about 200MW/min to be covered Figure 1.1 Residual load cycles in the year 2020 (examples of feed-in scenarios) for Germany Second is the highly fluctuating load caused by the changing demand during peak time. As an example for Singapore the load profile of a typical day is shown in figure 1.2. The required load varies between 4,5GW (night time) and 6,5GW (peak). This fluctuating load has to be captured by highly flexible combined cycle power plants. This is especially important in Asia where more than 50% of the energy supply is generated by less flexible coal fired power plants. Many energy markets already require and compensate providers for short term additional power generation. This minute reserve can be very profitable and can only be provided by highly flexible power plants. 5

7 6552MW Weekday Peak load: SPP and CCPP are operating Peak & Intermediate load: Predominantly CCPP Sunday Peak load: Mostly SPP and some CCPP are runing 4474MW Source: Enegy Market Authority, Singapore May 2010 Figure 1.2 Fluctuating load profile in Singapore Taking into account an increasing worldwide gross domestic product (GDP) and the growing availability of natural gas through the continuous extension of natural gas grids in combination with the uncertain outlook of nuclear power plants it s not surprising that combined cycle power plants will play a major role in the future energy mix. Considering the ASEAN region, a compound annular growth rate (CAGR) from of almost 6% is expected. LNG is becoming worlds new gas highway of choice with a potential of 10% CAGR capacity growth for the next 10 years. Especially for the ASEAN region with a global demand of LNG of almost 60% it clearly confirms the need of further extending of combined cycle power plants fleet. The application of an advanced cycle supports the necessary extension of combined cycle power plants in regard of required efficiency, operational flexibility and profitability. This paper describes the inherent challenges to be taken into account when designing such a cycle. 6

8 2 The levers of Performance increase Steam turbine Water steam cycle Gas turbine Improved sealing technologies Optimization of blade profiles (3DS) Increase of steam parameters Triple pressure reheat cycle Improved heat transfer Increase of turbine inlet temperature Reduction of cooling air consumption Optimization of flow path and blade profiles Fuel preheating Figure 2.1 Plant efficiency improvement areas There are several different approaches that can be used to increase efficiency of a combined cycle power plant. As shown in figure 2.1, in addition to optimization on a component level main driver is the optimization of the water/steam cycle. This paper will focus on the improving combined cycle capability through changes to the water/steam cycle, specifically increasing the steam temperature and pressure. The necessary increase in steam parameters is only feasible due to the steady improvement of the gas turbine and steam turbine. The constant increase of the turbine inlet temperature of the gas turbine led to exhaust temperatures far above 600 C and enabled the application of a 600 C water/steam cycle. Figure 2.2 shows the constant improvement of combined cycle efficiencies starting from 52% efficiency with low steam parameters in Siemens H-class combined cycle power plant technology has proven the capability to operate at efficiency levels far above 60% today. This development was enabled via a stringent application of total plant optimization. 7

9 SGT5-2000E SGT5-4000F SGT5-4000F SGT5-8000H 52 % Efficiency* Killingholme 2 x 470 MW, 2x(2+1) 56 % Efficiency* Didcot B1& MW, 2x(2+1) 58 % Efficiency* Mainz-Wiesbaden >400 MW, (1+1) >60% Efficiency* Irsching 4 SCC5-8000H 1S 570 MW T exh = 548 C T/p Life steam = 516 C/ 75bar T exh = 562 C T/p Life steam = 515 C/ 100bar T exh = 585 C T/p Life steam = 547 C/ 105bar T exh = 640 C T/p Life steam = 600 C/ 171bar Reduction of CO 2 emissions Basis % % % * Net efficiency achievable with this technology / project specific efficiencies may vary Advanced GT technology allows for significant improvement of competitiveness and serves as basis for CO 2 reduction of gas fired generation Figure 2.2 Product development of CCPP The increase in steam parameters coming from 565 C and 105 bar (typical SCC5-4000F application) is a design challenge especially for the Heat Recovery Steam Generator (HRSG) for the following three reasons: 1. Steam parameters above 565 C require special attention to the use of boiler materials. 2. Above a certain steam pressure level the natural circulation as realized in a natural circulation drum type boiler can not be sustained anymore. 3. High pressure steam increases the challenges to mainatain feed water chemistry within limits. Siemens engineering has developed designs to overcome these hurdles and achieve record breaking combined cycle efficiency. 8

10 3 Challenges of the advanced cycle The three challenges as described in chapter 2 defined by the application of raised steam parameters will be described in the following chapter. 3.1 Impact on boiler materials One of the most critical components of the advanced cycle is the Heat Recovery Steam Generator (HRSG), especially the HP-superheater and IP-reheater section. To enable operation conditions with steam temperatures of ~600 C and pressures above 170bar, materials for the critical sections need to have a combination of the following capabilities: - sufficient creep strength behaviour at design temperature (stable microstructure) - acceptable resistance to steam side oxidation (determined by Chrome content) - sufficient fatigue characteristics to resist to extreme thermal cycling requirements - acceptable cost of the design solution Impact of steam side oxidation A huge challenge caused by increased steam parameters is steam side oxidation of the affected components. Figure 3.1 provides an overview of typical tube inner and outer wall temperatures for the HP-final superheater fintubes. Temperatures marked in green are related to clean conditions without any oxidation layer on the tube inner wall. Temperatures marked in red represent the case that steam side oxidation occurs. The oxidation layer on the inner wall hinders the heat transfer due to its low thermal conductivity and results in an increase of the tube wall temperatures. The increased middle wall temperature results in reduced strength properties and has to be considered in the design by selection of appropriate temperature margins. Also a respective corrosion allowance should be considered to account for the loss of tube base material due to the oxidation. This effect would have to be considered in the design of the respective components. 9

11 Figure 3.1: Temperature behaviour based on steam side oxidtaion Oxidation rate The formation of oxide scale on the tube inner wall (oxidation kinetic) is mainly driven by: - Steam temperature, tube inner wall temperature - Material (esp. chrome content) - Grain size (esp. austenit) Steam temperature The influence of the steam temperature on the oxidation layer growth rate is shown in figure 3.2 for the application in the inner tube wall with the material P91. The higher the steam temperature the higher the oxidation rate. A disproportionate increase of the oxidation layer thickness can be seen in the temperature range of 600 C which is the crucial temperature for the advanced cycle. This effect has been evaluated and confirmed by different applications in steam plants and has to be considered for the design of the respective components. 10

12 Figure 3.2 Impact on oxidation layer thickness [2] Chrome content The oxidation rate is determined by the Chrome content of the material. The higher the Chrome content the better the oxidation resistance. Figure 3.3 shows the oxidation growth behaviour for different materials (based on a tube inner wall temperature of 600 C). The chart for 9% chrome content is representative for T91 and T92, whereby oxidation resistance of P91 is reported to be slighly better compared to T92. The chart provided for 12% chrome steels is typical for martensitic materials. 11

13 Figure 3.3 Oxidation behaviour based on Chrome content [2] A significant change in oxidation rate can be seen at a content above 12% (figure 3.4). A further increase of the Chrome content has only slight impact on the resistance of the oxidation rate. Below a Chrome content of 9% (e.g. P91/ T91) the oxidation rate behaviour is comparatively poor. This effect has to be considered for the design of the respective components. Oxidation rate Chrome content Figure 3.4 Chrome content over oxidation rate 12

14 3.1.2 Spallation The oxide scale on the tube inner surface has got different thermodynamic properties compared to the base material. Especially the thermal expansion coefficient is different. Especially in case of transient operation, e. g. start-up and shut-down resulting in mechanical stress between oxide scale and base material. Above a certain thickness of the oxidation layer spallation has to be unavoidably expected. Spallation has a major impact on the water/steam cycle due to the following reasons: 1. Solid particle erosion due to spallation especially during start-up and shut-down (highest strain load) 2. Material abrasion due to spalling (loss of base material, loss of strength) 3. The oxidation layer serves as protection of itself by limiting further oxidation growth. Spallation in a certain temperature and time range results in an uncontrolled growth behaviour of the oxide layer. As a consequence above a certain temperature range tube materials with chrome content >12% have to be considered to limit negative effects caused by the formation of oxide scales on the tube inner walls. Reference [1] Severe scale separation, cracking, and exfoliation were observed in T91 pendant reheater tubing in a Japanese utility boiler after around hours of operation. Separation occured at the interface between the inner and outer layers of scale (figure 3.5). 13

15 Figure 3.5 Spallation of inner surface tube 3.2 Application limits of the drum type boiler Drum type boiler A high-pressure drum in the HRSG is one of the most critical component with regard to limitation in the start-up and ramping procedure as a thick-walled component exposed to large temperature gradients and high operating pressures. Fatigue damage of the drum caused by alternating stress is increasing disproportionally with higher wall thickness. Typical approximate values for the drums are: Pressure level Wall thickness 180bar ~140mm --> SCC5-8000H 130bar ~100mm --> SCC5-4000F First calculation shows, that the impact on life time for a 160 bar solution is approximately 8 times higher then for a 125 bar solution when similar load gradients are considered 14

16 From a thermodynamical point of view, another effect is restricting the application of the drum boiler especially for increased steam pressures (figure 3.6). The natural circulation effect is driven by the difference in density of water and steam in the evaporator and downcomer tubes. As the difference in density decreases with the higher pressures there is a limit for drum pressure of about 180 to 190 bar for natural circulation boilers. In regard of a safety margin application, the practical limit will be maintained at ~170bar. Specific Density [kg/m3] Pressure [bara] Figure 3.6 Pressure limit for natural circulation Density Water Density Steam Difference The pressure limitation is counter productive to the requirement of raised steam parameters as described above. For that reason an application of a thick walled drum type HRSG is suitable for moderate steam parameters below 170 bar and base load operation only. 3.3 Water chemistry Impurities in the water/steam cycle can lead to deposits and corrosion phenomena of the affected components. It must be realized that this effect has negative impact on the lifetime of the components and that efficiency of the power plant might be decreased. The Water chemistry is a crucial topic for the successful operation of a power plant independent of the boiler type. In a once-through boiler design the complete evaporation of the feedwater occurs within the evaporator tubes. All salt impurities as well as corrosion products will deposit at the internal 15

17 heat exchanger tube surfaces especially in the evaporation area. It is also possible that these impurities and corrosion products will be transported into the super-heater and the steam turbine and may entail severe damages (e.g. stress corrosion cracking). In a drum type boiler application two different effects occur and have to be considered for the respective design. First is the transportation of impurities due to mechanical and vaporous carryover and the second is increasing solubility of silica at high pressure steam. It is important that mechanical carryover is controlled and well-known for each boiler. Vaporous carryover occurs due to the volatility of the substances present in the boiler water. The effect of carryover is intensified with raised steam pressures. Silica shows the highest solubility of feedwater contamination within high pressure steam Deposits of silica caue an efficiency reduction due to increased roughness of the steam turbine blading surface. These two effects are intensified at raised steam parameters which is challenging for the design of an advanced cycle. 16

18 4 Technical solution Based on the challenges described above this chapter addresses the technical solution for the application of raised steam parameters in the advanced cycle. 4.1 Boiler material for the EN and ASME market application To find the best possible design solution for the material of the HP-superheater and IP-reheater heating surfaces the effects as described in chapter 3.1 have to be considered for the respective design. A detailed design study on that topic has been performed by Siemens. The programm target was to find the best technical solution for the application in an HRSG with 600 C steam temperatures for both the EN (former DIN) and ASME market requirements. Solutions are identified for regions which use EN requirements and those that use ASME requirements. Material choice for EN Material VM12-SHC from Vallourec Mannesmann has been selected for the application in the EN market. This material has a chrome content of 12% and is considered the best technical solution to fulfill all requirements in regard of creep, steam side oxidation, fatigue and cost. VM12-SHC has been applied in Siemens SCC5-8000H power plant Ulrich Hartmann (Unit No.4; Irsching) for the high temperature superheater and reheater section up to 600 C. During design, manufacturing and installation valueable experience has been obtained for future applications. As of August 2012 the plant is operating for more than EOH in CCPP operation without any issues. Material choice for ASME According to Vallourec Mannesmann the issue of a Code Case for the use of VM12-SHC within ASME stamped boilers is still uncertain and will take a minimum of one year. Therefore VM12- SHC cannot currently be used at this time for ASME stamped applications. VM12-SHC is the technical solution for the EN market only. Based on that issue and with the support of operational experience from Ulrich Hartmann power plant (SCC5-8000H; 1S; Irsching No.4) a design study of the different feasible material combinations has been conducted. Various sophisticated detailed design solutions have been 17

19 20% chrome content has been found as the best technical and economical solution for the advanced cycle to meet ASME market requirements. 4.2 BENSON technology with 3 pressure Reheat The main feature of BENSON boiler technology is once-through steam generation. In this type of boiler, the conventional separation of steam and boiling water inside a boiler drum is not necessary. Steam is generated directly within the evaporator tubes of the boiler. As shown in figure 4.1 the high pressure drum can be omitted and replaced by a steam separator. Principal Diagrams of Evaporator Systems Drum Boiler Once-Through Boiler Steam Steam evaluated in regard to creep, steam side oxidation, fatigue and cost. An alloy on a basis of a 18- Feedwater Heating Heating Feedwater Figure 4.1 BENSON vs. drum type boiler A temperature-controlled start-up process which uses optimized high-capacity de-superheaters to limit steam temperatures during the startup process has been developed for warm and cold starts. This reduces thermal stress in critical components of the steam turbine. The application of a BENSON HRSG allows an increased number of permissable starts and cycling events over the lifetime, by reducing stress induced fatigue in the high pressure section of the HRSG. 18

20 Since the limiting component of the HP drum is omitted, and due to a thin walled separator with wall thickness of only ~55mm at 180bar increased load gradients and highest operational flexibility can be realized. To further improve the water/steam process with regard to combined cycle efficiency, a three pressure reheat process has been applied. Figure 4.2 shows a typical Q-T (transfered heat, temeperature) diagram for HRSG comparing the different reheat processes in order to explain the advantage of a three pressure reheat process. The exhaust gas temperature limits the maximum achievable steam temperature. The exhaust gas thermal heat defines the limit for overall heat transfer to the water/steam cycle. The area between the exhaust gas temperature line (pink) and the corresponding water/steam process line defines the amount of energy losses. The thermodynamical target is to reduce this area in order to generate the highest possible heattransfer between the exhaust gas and the water/steam cycle. This improvement can be achieved by increasing the heat exchange surface or by the application of an improved three pressure reheat process. Due to the high cost impact of increasing heat exchange surfaces, a theoretical optimum for the corresponding process has been defined for the application in a three pressure reheat process. Figure 4.2 Temperature curve of a typical Heat Recovery Steam Generator (HRSG) The definition of economically optimized heat exchange surface is based on economical criteria and rules the process design as well as achievable water/ steam temperature, pressure and flow rates. As this component is of major importance for boosing efficiency and operational 19

21 flexibility this sophisticated design solution has been developed Siemens in-house on the basis of the available experience with previous BENSON boilers Condensate Polishing the key element for minimized chemical wear and tear The operation of the Condensate Polishing Plant ensures the required feedwater purity for a once-through boiler. Because of the concept of mixed bed filter with upstream mechanical treatment process (one way cartridge filters) the main condensate is cleaned from corrosion products and ionic impurities. Siemens recomends to use a condensate polishing plant for oncethrough boiler in order to keep the contamination of feedwater within the limits (e.g. VGB or EPRI). The evaporation of the drum boiler circulating water causes a continuous concentration of trace impurities introduced by the feedwater. In order to achieve the recommended values for steam purity and boiler water quality the operation of the boiler blow-down has to be performed. With increased temperature and pressure the volatility of the impurities is increased and a higher boiler water quality and respectively higher feedwater quality may be required. Therefore the usage of a condensate polishing plant has to be considered. Additionally the main advantages of a condensate polishing plant are: Waiting time for steam purity is reduced (shorter start up times especially for cold and warm starts) Impurities concentrations will stay well beyond the critical limits No operational limitations of the power plant Higher flexibility Lower blow down rates (reduced loss of water and heat) Reduced duration of commissioning time Minor contamination due to leakages will be removed 20

22 5 Operational experience EON Ulrich Hartmann SCC5-8000H, 1S (Irsching No.4) The Siemens combined cycle power plant Ulrich Hartmann (SCC5-8000H; 1S; Irsching No.4) is the first power plant in commercial operation with a proven net efficiency far above 60% (60,75% confirmed by the independent technical inspection authority TÜV SÜD ). This power plant was extended and converted to a combined cycle power plant and was restarted in January The simple cycle operation with the new H-class technology had first fire in December The single shaft design was developed in the early 1990s and has been successfully implemented since then in the SCC5-4000F 1S. More than 100 units using the single shaft design are currently in commercial operation. The H-class gas turbine design is a common development that integrates Westinghouse and Siemens design experience and combines the best technologies out of both established product lines to ensure a best available and reliable solution. Siemens is the first and only manufacturer who realized the operation of a combined cycle power plant with the application of an advanced cycle. All relevant requirements necessary for the advanced cycle has been applied. - raised steam parameters - BENSON Technology with three pressure reheat - Application of VM12- SHC for boiler materials This overall plant optimization led to the world record net efficiency of 60,75% without sacrificing operational flexibility. Figure 5.1 shows the plant layout of Irsching Unit No.4. 21

23 Figure 5.1 Plant Layout of Ulrich Hartmann BENSON Technology development and delivery by Siemens E.ON s Ulrich Hartmann combined cycle power plant is characterized by the application of the proven BENSON design technology with a three pressure reheat process. This power plant is the first unit in commercial operation (> EOH and >330 starts; CCPP operation) with raised steam parameters: GT exhaust temperature Life steam temperature Reheat temperature Life steam pressure ~625 C ~600 C ~600 C ~170bar This combination enables the breakthrough of highest sustained efficiency with great operational flexibility. The once through Boiler with BENSON Technology as applied in Irsching No.4 with all the advantages of approved design concepts is shown in figure 5.2. The design principles are based on the proven F-class plant design with high operational experience. 22

24 11-Nov-2010 Approved Design Concept 3-Pressure with Reheat Horizontal Arrangement, Top Supported Cold Casing Construction Standard Plant Arrangement Concept Standard Process Engineering Equipment Figure 5.2 BENSON HRSG The application of the boiler material VM12-SHC was applied in Irsching No.4 in order to apply the best technical solution in regard to creep, steam side oxidation, fatigue and cost. Operational Flexibility Although Irsching No.4 was designed and sold as a base load unit the current dispatch situation requires a daily start/stop cycle (figure 5.3). This high fluctuating load profile can be matched due to the high capacity of operational flexibility of this combined cycle power plant. This advantage of exceptional flexibility required by current market environments will be described in the following. Figure 5.3 typical daily load profile of Irsching No.4 23

25 The application of the FACY TM (FAst CYcling) Technology facilitates an overnight shut-down and helps further reducing CO 2 emission and saving fuel cost. Figure 5.4 shows an extract of the test results of the start-up procedure in Irsching No.4. The FACY TM technology was tested successfully on the basis of raised steam parameters (~170bar; 600 C) Plant start-up time < 30 min. CC full load Plant Output GT speed ST speed Plant output Turbine Speed GT load GT ignition Time [min] base load load conventional hot start Hot start with FACY Improved start up Improvement Conventional start up Fuel consumption (start up only) Average efficiency (time frame for conventional start) ~514 MWh ~36% ~326 MWh ~50% ~30 min. time Figure 5.4 fast start up with FACY TM FACY TM enables the first steam generated to be delivered directly to the steam turbine. The shorter start-up time and the ability to utilize the steam from the very beginning improve the formerly inefficient start-up process by 14% points. That enables the participation in the highly 24

26 profitable spot market (tertiary reserve). Table 5.5 shows a reference of successful installed FACY TM technology in commercial operation. Table 5.5 References of FACY TM Technology Not of less importance is the opposite direction in regard of fast shut-down due to grid failures or sudden oversupply of renewable (negative residual load). A fast shutdown has been validated in Irsching Unit No.4 within less than 30 minutes. Despite a world class efficiency and power the plant can be parked at less than 100MW (20% CCPP power) with an efficiency typical for high end open cycle applications. For that reason the SCC-8000H is the perfect choice for high efficient applications in all relevant operation regimes (Peaker, Intermediate or Base Load) and the guarantee of high operational flexibility in order to meet all necessary market requirements.. 25

27 6 Summary and Outlook There is a clear expectation that combined cycle power plants will play a major role in the energy mix in the future. This is driven by the following factors There is a high availability of gas resources in certain regions and the further extension via LNG or gas grid is supported by the economic growth especially in the emerging countries. A drive for eco-friendly power is resulting in a need to integrate more renewable resources, which drive the need for fast, flexible operation. Low emissions and low operational costs demand high efficiencies. The Optimization of the power plant as a whole unit is thereby mandatory to achieve these ambitious targets. The application of an advanced cycle with raised steam parameters and the application of the requested materials for highest technical loads enable the combined cycle power plant to realize efficiencies beyond 60% while enabling fast starting, fast cycling and dependable operation. This paper described how this optimization has been realized in the benchmark power plant Ulrich Hartmann, SCC5-8000H, 1S (Irsching No.4). The application of the flexible BENSON technology with raised steam parameters to enable highest efficiencies beyond 60% is the ideal reference for an advanced cycle. Figure 6.1 shows the evolution of combined cycle power plants during the last 20 years. This constant development will also be necessary for future applications and the demand of higher efficiencies in combination with affordable electricity will further drive the combined cycle power plant developments. 26

28 Figure 6.1Evolution of combined cycle power plants The sophisticated design solution as applied in the power plant in Irsching No.4 means the highest degree of reliable and proven innovation due to an integrated development of all relevant components from one hand. Siemens technology gives answers to the regional specific requirements and offers innovative design concepts for combined cycle power plant applications to the customer. A world-class efficiency with operational experience of more than EOH; CCPPoperation without any issues, excellent start-up and operational reliability emphasize the success story of Irsching No. 4. These outstanding references are highly appreciated by our customers. As of today more than 15 SGT-8000H gas turbines has been sold in the 50& 60Hz market. It s tested, it s validated, it s commercially available and it s running... 27

29 7 References [1] Japanese with steam oxidation of advanced heat resistant steel tubes in power boilers; N.Nishimura [2] Oxidschichtwachstum Bereich HD- Endüberhitzer, Stefan Rasche, [3] ASME material concept for HRSG with main steam parameters of 600 C/180bar; Christoph Schmitt, [4] Hochflexible BENSON Abhitzedampferzeuger Erfahrungen aus Irsching 4; Jan ^ Brückner, VDI Wissensforum [5] L. Balling, Dr. U. Tomschi, A. Pickard, G. Meinecke, Fast Cycling and Grid Support Capability of Combined Cycle Power Plants to optimize the Integration of Renewable Generation into the European Grid: Live examples from projects in NL, F, UK, D, PowerGen Europe, Amsterdam, June [6] The Future Role of Fossil Power Generation; Andreas Pickard, Gero Meinecke, Power GEN [7] Beauftragung von FANP für AHDE-Materialuntersuchung bei 600 C FD für GUD; Tanja Seibert, Rainer Hardt; AREVA NP GmbH; 2006 [8] Dr. R. Fischer, P. Ratliff, W. Fischer, SGT5-8000H Product Validation at Irsching Test Center 4 Power-Gen Asia 2008 [9] Dr. S. Abens, Dr. F. Eulitz, I. Harzdorf, M. Jeanchen, W. Fischer, R. Rudolph, P. Garbett, P. Ratliff, Planning for Extensive Validation of the Siemens H-Class Gas Turbine SGT5-8000H at the Power Plant Irsching, ASME Power Conference, July 2009, POWER [10] Gas Fired Power Generation Outlook to 2020; Siemens Marketing; August 2012 [11] Ein Jahr Betrieb im Ulrich-Hartmann-Kraftwerk (Irsching 4); Lothar Balling; BKW; June

30 8 Copyright The content of this paper is copyrighted by Siemens AG Energy Sector and is licensed only to PennWell for publication and distribution. Any inquiries regarding permission to use the content of this paper, in whole or in part, for any purpose must be addressed to Siemens AG Energy Sector directly. 29

Power Plants. BENSON Once-Through Heat Recovery Steam Generator. Power Generation

Power Plants. BENSON Once-Through Heat Recovery Steam Generator. Power Generation Power Plants BENSON Once-Through Heat Recovery Steam Generator Power Generation BENSON Once-Through technology for Heat Recovery Steam Generators New application of proven technology Siemens development

More information

The SGT5-8000H proven in commercial operation

The SGT5-8000H proven in commercial operation www.siemens.com/energy The SGT5-8000H proven in commercial operation Answers for energy. 2 375 MW Output of the Siemens Gas Turbine SGT5-8000H.* * Gross: ISO ambient conditions 375 MW Rated output of 375

More information

Operational Flexibility Enhancements of Combined Cycle Power Plants. Dr. Norbert Henkel, Erich Schmid and Edwin Gobrecht

Operational Flexibility Enhancements of Combined Cycle Power Plants. Dr. Norbert Henkel, Erich Schmid and Edwin Gobrecht Operational Flexibility Enhancements of Combined Cycle Power Plants Dr. Norbert Henkel, Erich Schmid and Edwin Gobrecht Siemens AG, Energy Sector Germany POWER-GEN Asia 2008 Kuala Lumpur, Malaysia October

More information

Fast cycling and rapid start-up: new generation of plants achieves impressive results

Fast cycling and rapid start-up: new generation of plants achieves impressive results Fast cycling and rapid start-up: new generation of plants achieves impressive results Reprint from: Modern Power Systems, January 2011 Author: Lothar Balling, Siemens AG, Erlangen, Germany Answers for

More information

SRS: THE STANDARDIZED REPOWERING SOLUTION FOR 300MW STEAM POWER PLANTS IN RUSSIA. Matthias Fränkle Siemens Power Generation (PG), Germany

SRS: THE STANDARDIZED REPOWERING SOLUTION FOR 300MW STEAM POWER PLANTS IN RUSSIA. Matthias Fränkle Siemens Power Generation (PG), Germany SRS: THE STANDARDIZED REPOWERING SOLUTION FOR 300MW STEAM POWER PLANTS IN RUSSIA Matthias Fränkle Siemens Power Generation (PG), Germany Page 1 of 11 1 Introduction Deregulation and competition are further

More information

The new Gas Turbine Portfolio to meet the market requirements for Distributed Generation

The new Gas Turbine Portfolio to meet the market requirements for Distributed Generation PowerGen Europe, 9-11 June 2015 The new Gas Turbine Portfolio to meet the market requirements for Distributed Generation Nicholas Muntz, Dr. Thorsten Krol Security classification Siemens AG 2015 All rights

More information

Steam Power Plants as Partners for Renewable Energy Systems

Steam Power Plants as Partners for Renewable Energy Systems Steam Power Plants as Partners for Renewable Energy Systems Hans-Joachim Meier Head of VGB Competence Centre 4 Environmental Technology, Chemistry, Safety and Health VGB PowerTech e.v., Essen, Germany

More information

CSP-gas hybrid plants: Cost effective and fully dispatchable integration of CSP into the electricity mix

CSP-gas hybrid plants: Cost effective and fully dispatchable integration of CSP into the electricity mix CSP-gas hybrid plants: Cost effective and fully dispatchable integration of CSP into the electricity mix Erik Zindel Director Marketing CSP (Power Block) Siemens AG PowerGen Europe 2012 Köln Messe, 12-14

More information

SGT5-8000H SCC5-8000H 1S. Experience of Commercial Operation at Irsching 4. ANIMP-ATI, Sesto San Giovanni 26 June 2012

SGT5-8000H SCC5-8000H 1S. Experience of Commercial Operation at Irsching 4. ANIMP-ATI, Sesto San Giovanni 26 June 2012 SGT5-8000H SCC5-8000H 1S Experience of Commercial Operation at Irsching 4 ANIMP-ATI, Sesto San Giovanni 26 June 2012 Massimo Gianfreda 8000H Overview Validation Status Summary Fig. 2 Siemens Large Scale

More information

Steam Turbine Concepts for the Future Volatile Power Market

Steam Turbine Concepts for the Future Volatile Power Market Steam Turbine Concepts for the Future Volatile Power Market Power-Gen Europe June 12 14, 2012 Michael Wechsung Thomas Loeper Radim Znajda Siemens AG - Energy Sector Fossil Power Generation Agenda Situation

More information

USC Steam Turbine technology for maximum efficiency and operational flexibility. Dr. Rainer Quinkertz Andreas Ulma Edwin Gobrecht Michael Wechsung

USC Steam Turbine technology for maximum efficiency and operational flexibility. Dr. Rainer Quinkertz Andreas Ulma Edwin Gobrecht Michael Wechsung USC Steam Turbine technology for maximum efficiency and operational flexibility Dr. Rainer Quinkertz Andreas Ulma Edwin Gobrecht Michael Wechsung Siemens AG POWER-GEN Asia 2008 Kuala Lumpur, Malaysia October

More information

EFFICIENT ENERGY SUPPLY (ELECTRICITY AND DISTRICT HEAT) FOR THE CITY OF LINZ

EFFICIENT ENERGY SUPPLY (ELECTRICITY AND DISTRICT HEAT) FOR THE CITY OF LINZ Parallel session Producing more with less: Efficiency in Power Generation EFFICIENT ENERGY SUPPLY (ELECTRICITY AND DISTRICT HEAT) FOR THE CITY OF LINZ Johann Gimmelsberger Linz Strom GmbH EFFICIENT ENERGY

More information

Best Choice BENSON BOILER. Excellent performance features make the Benson boiler the most widely used type of once-through boiler

Best Choice BENSON BOILER. Excellent performance features make the Benson boiler the most widely used type of once-through boiler BENSON BOILER Best Choice Excellent performance features make the Benson boiler the most widely used type of once-through boiler by JOACHIM FRANKE and RUDOLF KRAL Power for generations BENSON BOILER Best

More information

Siemens Gas Turbines over 100 MW

Siemens Gas Turbines over 100 MW Siemens Gas Turbines over 100 MW Proven and reliable Answers for energy. State-of-the-art and innovative gas turbines to meet today s energy needs Changes in today s energy markets are presenting power

More information

The soot and scale problems

The soot and scale problems Dr. Albrecht Kaupp Page 1 The soot and scale problems Issue Soot and scale do not only increase energy consumption but are as well a major cause of tube failure. Learning Objectives Understanding the implications

More information

Low Load Operational Flexibility for Siemens G-class Gas Turbines

Low Load Operational Flexibility for Siemens G-class Gas Turbines Low Load Operational Flexibility for Siemens G-class Gas Turbines Power-Gen International 2008 Orlando, Florida www.siemens.com Power-Gen International Orlando, Florida December 2008 2 Low Load Operational

More information

CONTENTS. ZVU Engineering a.s., Member of ZVU Group, WASTE HEAT BOILERS Page 2

CONTENTS. ZVU Engineering a.s., Member of ZVU Group, WASTE HEAT BOILERS Page 2 WASTE HEAT BOILERS CONTENTS 1 INTRODUCTION... 3 2 CONCEPTION OF WASTE HEAT BOILERS... 4 2.1 Complex Solution...4 2.2 Kind of Heat Exchange...5 2.3 Heat Recovery Units and Their Usage...5 2.4 Materials

More information

SGT5-4000F Trusted Operational Excellence

SGT5-4000F Trusted Operational Excellence Power Gen Europe, Cologne / June 2014 SGT5-4000F Trusted Operational Excellence Dr. Eberhard Deuker, Siemens Energy siemens.com/answers Table of Content SGT5-4000F Trusted Operational Excellence Fleet

More information

NAWTEC18-3541 CONCEPTS AND EXPERIENCES FOR HIGHER PLANT EFFICIENCY WITH MODERN ADVANCED BOILER AND INCINERATION TECHNOLOGY

NAWTEC18-3541 CONCEPTS AND EXPERIENCES FOR HIGHER PLANT EFFICIENCY WITH MODERN ADVANCED BOILER AND INCINERATION TECHNOLOGY Proceedings of the 18th Annual North American Waste-to-Energy Conference NAWTEC18 May 11-13, 2010, Orlando, Florida, USA NAWTEC18-3541 CONCEPTS AND EXPERIENCES FOR HIGHER PLANT EFFICIENCY WITH MODERN ADVANCED

More information

How To Power A Power Plant With Waste Heat

How To Power A Power Plant With Waste Heat Power Generation Siemens Organic Rankine Cycle Waste Heat Recovery with ORC Answers for energy. Table of Contents Requirements of the Future Power Supply without extra Fuel Siemens ORC-Module Typical Applications

More information

BIOMASS LOOKING FOR EFFICIENT UTILIZATION THE REHEAT CONCEPT. Jaroslav Lahoda Olaf Arndt Walter Hanstein. Siemens Power Generation (PG)

BIOMASS LOOKING FOR EFFICIENT UTILIZATION THE REHEAT CONCEPT. Jaroslav Lahoda Olaf Arndt Walter Hanstein. Siemens Power Generation (PG) BIOMASS LOOKING FOR EFFICIENT UTILIZATION THE REHEAT CONCEPT Jaroslav Lahoda Olaf Arndt Walter Hanstein Siemens Power Generation (PG) Brno, Czech Republic & Görlitz, Germany BIOMASS LOOKING FOR EFFICIENT

More information

Improving Flexibility of the Combined Cycle Power Plant Hamm Uentrop to Cover the Operational Profiles of the Future

Improving Flexibility of the Combined Cycle Power Plant Hamm Uentrop to Cover the Operational Profiles of the Future in cooperation with siemens.com/energy Improving Flexibility of the Combined Cycle Power Plant Hamm Uentrop to Cover the Operational Profiles of the Future Reprint from Track 6, Session 4, Wednesday June

More information

Adapting Gas-Power Generation to New Role in Low-Carbon Energy Systems

Adapting Gas-Power Generation to New Role in Low-Carbon Energy Systems Adapting Gas-Power Generation to New Role in Low-Carbon Energy Systems Sandra Scalari Enel Ingegneria e Ricerca SpA Copenhagen, May 27-28 th 2014 Enel Presentation Generation Shift & Market in Europe Enel

More information

ANCILLARY SERVICES SUPPLIED TO THE GRID: THE CASE OF THISVI CCGT POWER PLANT (GREECE)

ANCILLARY SERVICES SUPPLIED TO THE GRID: THE CASE OF THISVI CCGT POWER PLANT (GREECE) Claudio Cavandoli, Alessandro Crippa EDISON S.p.A., Engineering Department ANCILLARY SERVICES SUPPLIED TO THE GRID: THE CASE OF THISVI CCGT POWER PLANT (GREECE) 1 ANCILLARY SERVICES SUPPLIED TO THE GRID:

More information

Design and Test Operation Performance of 1,500 C Class Gas Turbine Combined-Cycle Power Plant:

Design and Test Operation Performance of 1,500 C Class Gas Turbine Combined-Cycle Power Plant: 31 Design and Test Operation Performance of 1,500 C Class Gas Turbine Combined-Cycle Power Plant: Construction of Group 1 of the Tokyo Electric Power Company s Kawasaki Thermal Power Station KIYOSHI KAWAKAMI

More information

Boiler Calculations. Helsinki University of Technology Department of Mechanical Engineering. Sebastian Teir, Antto Kulla

Boiler Calculations. Helsinki University of Technology Department of Mechanical Engineering. Sebastian Teir, Antto Kulla Helsinki University of Technology Department of Mechanical Engineering Energy Engineering and Environmental Protection Publications Steam Boiler Technology ebook Espoo 2002 Boiler Calculations Sebastian

More information

O&M and Lifecycle Management for CCGT Power Plants Flex Power Services Enhancing a plant s market capability

O&M and Lifecycle Management for CCGT Power Plants Flex Power Services Enhancing a plant s market capability International Conference: 17-18 May, 2016 Birmingham, UK O&M and Lifecycle Management for CCGT Power Plants Flex Power Services Enhancing a plant s market capability siemens.com/energy Flex Power Services

More information

Steam turbines for solar thermal power plants. Industrial steam turbines. Answers for energy.

Steam turbines for solar thermal power plants. Industrial steam turbines. Answers for energy. Steam turbines for solar thermal power plants Industrial steam turbines Answers for energy. Power without carbon dioxide The advantage of solar energy is that the fuel is free, abundant and inexhaustible.

More information

Wärtsilä modular power plant comprised of multiple ICE generating units provides output flexibility.

Wärtsilä modular power plant comprised of multiple ICE generating units provides output flexibility. [ ENERGY / IN DETAIL ] [ ENERGY / IN DETAIL ] Wärtsilä modular power plant comprised of multiple ICE generating units provides output flexibility. Defining true flexibility a comparison of gas-fired power

More information

The Lodi Energy Center, owned

The Lodi Energy Center, owned Lodi s 300MW Flex 30 plant ushers in a new era for the US By Junior Isles The Siemens Flex Plant 30 at Lodi designed to deliver 200MW of power to the grid within 30 minutes of startup is capable of daily

More information

The Problem Solving of Exhaust Frame Air Cooling System Pressure Low in GE Frame 9 Gas Turbine

The Problem Solving of Exhaust Frame Air Cooling System Pressure Low in GE Frame 9 Gas Turbine The Problem Solving of Exhaust Frame Air Cooling System Pressure Low in GE Frame 9 Gas Turbine Author: Nattapon Pinitchan, Kanyarat Tankong, EGAT (Bangpakong Power Plant), Thailand 1 of 10 ABSTRACT EGAT's

More information

A Review on Power Generation in Thermal Power Plant for Maximum Efficiency

A Review on Power Generation in Thermal Power Plant for Maximum Efficiency International Journal of Advanced Mechanical Engineering. ISSN 2250-3234 Volume 4, Number 1 (2014), pp. 1-8 Research India Publications http://www.ripublication.com/ijame.htm A Review on Power Generation

More information

Siemens Steam Turbine-Generator SST-5000 Series. for combined cycle and subcritical steam applications. Answers for energy.

Siemens Steam Turbine-Generator SST-5000 Series. for combined cycle and subcritical steam applications. Answers for energy. Siemens Steam Turbine-Generator SST-5000 Series for combined cycle and subcritical steam applications Answers for energy. SST-5000 series steam turbine-generator For combined cycle and subcritical steam

More information

Water Efficiency. Water Management Options. Boilers. for Commercial, Industrial and Institutional Facilities. Boiler Water Impurities

Water Efficiency. Water Management Options. Boilers. for Commercial, Industrial and Institutional Facilities. Boiler Water Impurities Water Efficiency Water Management Options Boilers for Commercial, Industrial and Institutional Facilities Boiler Water Impurities All boiler make-up water contains impurities. As clean steam is released

More information

How To Prevent Corrosion In A Steam Electric Power Plant

How To Prevent Corrosion In A Steam Electric Power Plant Keeping corrosion at bay Analysis in ultra-supercritical power plants Corrosion is the natural enemy of steam-electric power plants, eating away at pipes, turbine blades, and rotors. The lack of a separation

More information

Torino Nord. Cogeneration Plant. The gas turbine. The steam generator. The Torino Nord cogeneration plant produces electricity and heat for district

Torino Nord. Cogeneration Plant. The gas turbine. The steam generator. The Torino Nord cogeneration plant produces electricity and heat for district PLANT TORINO NORD Iren Energia is the company in the Iren Group whose core businesses are the production and distribution of electricity, the production and distribution of thermal energy for district

More information

ENERGY EFFICIENCY IN POWER PLANTS

ENERGY EFFICIENCY IN POWER PLANTS Plenary session Producing more with less: Efficiency in Power Generation ENERGY EFFICIENCY IN POWER PLANTS Frans van Aart, Wim Kok, Pierre Ploumen KEMA Power Generation & Sustainables ENERGY EFFICIENCY

More information

I. STEAM GENERATION, BOILER TYPES

I. STEAM GENERATION, BOILER TYPES I. STEAM GENERATION, BOILER TYPES and BOILER PLANT SYSTEMS 1 Steam Generation Water s Unique Properties: High Thermal Capacity (Specific Heat) High Critical Temperature Ideal Medium for Heat Delivery High

More information

ERCOT Analysis of the Impacts of the Clean Power Plan Final Rule Update

ERCOT Analysis of the Impacts of the Clean Power Plan Final Rule Update ERCOT Analysis of the Impacts of the Clean Power Plan Final Rule Update ERCOT Public October 16, 2015 ERCOT Analysis of the Impacts of the Clean Power Plan Final Rule Update In August 2015, the U.S. Environmental

More information

Power Island. Industrial Power Plants. www.siemens.com / energy

Power Island. Industrial Power Plants. www.siemens.com / energy Power Island Industrial Power Plants www.siemens.com / energy Flexible combined-cycle power plants With today s increasing demands for flexible power plants, intensified by the increased amount of electricity

More information

Thermodynamical aspects of the passage to hybrid nuclear power plants

Thermodynamical aspects of the passage to hybrid nuclear power plants Energy Production and Management in the 21st Century, Vol. 1 273 Thermodynamical aspects of the passage to hybrid nuclear power plants A. Zaryankin, A. Rogalev & I. Komarov Moscow Power Engineering Institute,

More information

APPLIED THERMODYNAMICS TUTORIAL 1 REVISION OF ISENTROPIC EFFICIENCY ADVANCED STEAM CYCLES

APPLIED THERMODYNAMICS TUTORIAL 1 REVISION OF ISENTROPIC EFFICIENCY ADVANCED STEAM CYCLES APPLIED THERMODYNAMICS TUTORIAL 1 REVISION OF ISENTROPIC EFFICIENCY ADVANCED STEAM CYCLES INTRODUCTION This tutorial is designed for students wishing to extend their knowledge of thermodynamics to a more

More information

SAMPLE CHAPTERS UNESCO EOLSS

SAMPLE CHAPTERS UNESCO EOLSS STEAM TURBINE OPERATIONAL ASPECTS R.A. Chaplin Department of Chemical Engineering, University of New Brunswick, Canada Keywords: Steam Turbines, Operation, Supersaturation, Moisture, Back Pressure, Governing

More information

HOW TO SELECT A LOW VOLUME (L.V ) BOILER

HOW TO SELECT A LOW VOLUME (L.V ) BOILER HOW TO SELECT A LOW VOLUME (L.V ) BOILER FREQUENTLY ASKED QUESTIONS OR COMMENTS ON BOILERS Dear Potential Customer: Low Volume Operator Exempt boilers have been marketed in Ontario to eliminate the requirement

More information

Levelized Cost of New Electricity Generating Technologies

Levelized Cost of New Electricity Generating Technologies Levelized Cost of New Electricity Generating Technologies The Energy Information Administration (EIA) produces forecasts of energy supply and demand for the next 20 years using the National Energy Modeling

More information

Source: EIA Natural Gas Issues and Trends 1998

Source: EIA Natural Gas Issues and Trends 1998 7.0 System Redesign Analysis 7.1 Emissions Natural gas is a clean burning fossil fuel. It consists of a mixture of hydrocarbon gases, primarily Methane (CH 4 ). In analyzing the combustion process, it

More information

Energy Productivity & Pricing

Energy Productivity & Pricing Energy Productivity & Pricing Markets for energy, renewable energy and carbon Dr Jenny Riesz February 2014 2 Average electricity retail prices Electricity price rises CSIRO Future Grid (2013) Change and

More information

CSP. Feranova Reflect Technology. klimaneutral natureoffice.com DE-296-558771 gedruckt

CSP. Feranova Reflect Technology. klimaneutral natureoffice.com DE-296-558771 gedruckt RENEWABLE SOURCES RENEWABLE SOURCES CSP Feranova Reflect Technology klimaneutral natureoffice.com DE-296-558771 gedruckt Gedruckt auf 100% Recyclingpapier Circlesilk Premium White 200/150 g/m 2 2012 Feranova

More information

Making power plants energy efficient

Making power plants energy efficient Making power plants energy efficient The Italian utility Enel has transformed its Torrevaldaliga Nord thermal power plant from heavy fuel to clean coal with the help of ABB power and automation technologies,

More information

Siemens H: uprate and commercial release follow design validation

Siemens H: uprate and commercial release follow design validation Siemens H: uprate and commercial release follow design validation Update on the Siemens SGT5-8000H, currently the world s largest gas turbine Reprint from Modern Power Systems, September 2009 Authors:

More information

MHI s Energy Efficient Flue Gas CO 2 Capture Technology and Large Scale CCS Demonstration Test at Coal-fired Power Plants in USA

MHI s Energy Efficient Flue Gas CO 2 Capture Technology and Large Scale CCS Demonstration Test at Coal-fired Power Plants in USA MHI s Energy Efficient Flue Gas CO 2 Capture Technology and Large Scale CCS Demonstration Test at Coal-fired Power Plants in USA 26 MASAKI IIJIMA *1 TATSUTO NAGAYASU *2 TAKASHI KAMIJYO *3 SHINSUKE NAKATANI

More information

Providing reliable energy-efficient boilers B O I L E R S

Providing reliable energy-efficient boilers B O I L E R S Providing reliable energy-efficient boilers B O I L E R S Offering economically viable and sustainable solutions As the overall market sets on the path of environmental sustainability and energy costs

More information

A macro-economic viewpoint. What is the real cost of offshore wind? siemens.com / wind

A macro-economic viewpoint. What is the real cost of offshore wind? siemens.com / wind A macro-economic viewpoint What is the real cost of offshore wind? siemens.com / wind in the cost debate A broader view of the value of renewables. Globally, installed power generation capacity currently

More information

Boiler Preparation, Start-Up and Shutdown

Boiler Preparation, Start-Up and Shutdown Boiler Preparation, Start-Up and Shutdown Learning Outcome When you complete this module you will be able to: Describe the basic preparation of a boiler for start-up, and the start-up and shutdown procedures.

More information

Siemens Steam Turbine SST-600

Siemens Steam Turbine SST-600 Power and Gas Siemens Steam Turbine SST-600 This PDF offers an advanced interactive experience. This symbol indicates interactive content. For the best viewing experience, please use Acrobat Reader X or

More information

steam centre of excellence Steam Boiler System Optimization

steam centre of excellence Steam Boiler System Optimization Steam Boiler System Optimization Introduction Gas Cost Metering Fluids Fuel, Water, Steam Steam Costs Boiler House Stack Losses Boiler Waterside Surfaces Blowdown Current Natural Gas Cost Projected Cost

More information

VeMet, Utrecht, NL «Solution in Wear Protection» 26.10.2011 Dipl.-Ing. Wolfgang Leichnitz. Quit

VeMet, Utrecht, NL «Solution in Wear Protection» 26.10.2011 Dipl.-Ing. Wolfgang Leichnitz. Quit VeMet, Utrecht, NL «Solution in Wear Protection» 26.10.2011 Dipl.-Ing. Wolfgang Leichnitz Quit Theory and Practice of Wear Definition In materials science, wear is the erosion of material from a solid

More information

Gas-Fired Power HIGHLIGHTS

Gas-Fired Power HIGHLIGHTS Gas-Fired Power HIGHLIGHTS PROCESS AND TECHNOLOGY STATUS Approximately 21% of the world s electricity production is based on natural gas. The global gas-fired generation capacity amounts to 1168 GW e (2007).

More information

Improved Modern Control Station for High Pressure Bypass System in Thermal Power Plant

Improved Modern Control Station for High Pressure Bypass System in Thermal Power Plant Improved Modern Control Station for High Pressure Bypass System in Thermal Power Plant P.Karthikeyan 1, A.Nagarajan 2, A.Vinothkumar 3 UG Student, Department of EEE, S.A. Engineering College, Chennai,

More information

SGT5-4000F Gas Turbine and Combined Cycle Power Plant Evolution reflecting the changing Market Requirements

SGT5-4000F Gas Turbine and Combined Cycle Power Plant Evolution reflecting the changing Market Requirements SGT5-4000F Gas Turbine and Combined Cycle Power Plant Evolution reflecting the changing Market Requirements Eberhard Deuker Siemens AG, Energy Sector, Germany Mike H. Koenig Siemens Energy Inc, U.S.A.

More information

Your Partner for Concentrated Solar Power Generation The Heart of Your Process

Your Partner for Concentrated Solar Power Generation The Heart of Your Process 1 Sulzer Pumps Your Partner for Concentrated Solar Power Generation The Heart of Your Process 2 Experience and Solutions You Can Rely on Around the world, the power industry is taking on the challenge

More information

Solar, storage and mining: New opportunities for solar power development. By Thomas Hillig (THEnergy) and James Watson (SolarPower Europe)

Solar, storage and mining: New opportunities for solar power development. By Thomas Hillig (THEnergy) and James Watson (SolarPower Europe) Solar, storage and mining: New opportunities for solar power development By Thomas Hillig (THEnergy) and James Watson (SolarPower Europe) SolarPower Europe / Solar, storage and mining: New opportunities

More information

Long-Term Demonstration of CO2 Recovery from the Flue Gas of a Coal-Fired Power Station

Long-Term Demonstration of CO2 Recovery from the Flue Gas of a Coal-Fired Power Station Long-Term Demonstration of CO2 Recovery from the Flue Gas of a Coal-Fired Power Station MASAKI IIJIMA* 1 SHOJIRO IWASAKI* 1 SHINYA KISHIMOTO* 1 TORU TAKASHINA* 2 SUSUMU OKINO* 2 There is now a growing

More information

World Class Water Chemistry By Accident? BRO Chemistry Session 8/5/2014

World Class Water Chemistry By Accident? BRO Chemistry Session 8/5/2014 World Class Water Chemistry By Accident? BRO Chemistry Session 8/5/2014 From Safe by Accident? by Judy Agnew & Aubrey Daniels Despite decades of reduction in safety related deaths and injuries on the job,

More information

Outlook on Integrated Gasification Combined Cycle (IGCC) Technology

Outlook on Integrated Gasification Combined Cycle (IGCC) Technology The IGCC Process: From Coal To Clean Electric Power Outlook on Integrated Gasification Combined Cycle (IGCC) Technology Testimony of Edward Lowe Gas Turbine-Combined Cycle Product Line Manager General

More information

Carbon Dioxide Membrane Separation for Carbon Capture using Direct FuelCell Systems

Carbon Dioxide Membrane Separation for Carbon Capture using Direct FuelCell Systems Carbon Dioxide Membrane Separation for Carbon Capture using Direct FuelCell Systems DFC Technology Used as Electrochemical Membrane for CO 2 Purification and Capture during Power Generation FCE s Direct

More information

Adaptation of the SGT6-6000G to a Dynamic Power Generation Market

Adaptation of the SGT6-6000G to a Dynamic Power Generation Market Adaptation of the SGT6-6000G to a Dynamic Power Generation Market Ed Bancalari - Manager, SGT6-6000G Frame Pedy Chan - Project Engineer, SGT6-6000G Frame POWER-GEN International 2005 Las Vegas, Nevada

More information

FULL ELECTRICAL LNG PLANTS: HIGHEST AVAILABILITY AND ENERGY EFFICIENCY THROUGH OVERALL SYSTEM DESIGN

FULL ELECTRICAL LNG PLANTS: HIGHEST AVAILABILITY AND ENERGY EFFICIENCY THROUGH OVERALL SYSTEM DESIGN FULL ELECTRICAL LN PLANTS: HIHEST AVAILABILITY AND ENERY EFFICIENCY THROUH OVERALL SYSTEM DESIN Dr. Edwin Lerch Siemens A Infrastructure and Cities Sector, IC S SE PTI, ermany Phone: 49-9131-7-34052 Fax:

More information

Hochflexible GUD-Kraftwerke für die Anforderungen der Energiewende

Hochflexible GUD-Kraftwerke für die Anforderungen der Energiewende Hochflexible GUD-Kraftwerke für die Anforderungen der Energiewende TÜV Nord - Kraftwerkssymposium Klaus Eurich Sales Director CCPP Central Europe Duisburg, 7. November 2012 Siemens AG 2012. All rights

More information

Volatility, risk and risk premium in German and Continental power markets

Volatility, risk and risk premium in German and Continental power markets Volatility, risk and risk premium in German and Continental power markets Stefan Judisch / Andree Stracke RWE Supply & Trading GmbH 22 nd January 2015 RWE Supply & Trading PAGE 0 Agenda 1. What are the

More information

Steam Generator Boilers Compact Steam Boilers. Rapid Start-Up Safe in Operation

Steam Generator Boilers Compact Steam Boilers. Rapid Start-Up Safe in Operation Steam Generator Boilers Compact Steam Boilers Rapid Start-Up Safe in Operation AB&CO TT BOILERS The boiler maker AB&CO TT BOILERS LTD. have since the middle sixties produced industrial boilers and heaters

More information

5.2. Vaporizers - Types and Usage

5.2. Vaporizers - Types and Usage 5.2. Vaporizers - Types and Usage 5.2.1. General Vaporizers are constructed in numerous designs and operated in many modes. Depending upon the service application the design, construction, inspection,

More information

Abstract. emails: [email protected], [email protected], phone: 860-429-6508, fax: 860-429-4456

Abstract. emails: ronderby@earthlink.net, splazzara@aol.com, phone: 860-429-6508, fax: 860-429-4456 SOLAR THERMAL POWER PLANT WITH THERMAL STORAGE Ronald C. Derby, President Samuel P. Lazzara, Chief Technical Officer Cenicom Solar Energy LLC * Abstract TM employs 88 parabolic mirrors (concentrating dishes)

More information

SKI Coal Gasification Technology. Feb. 23, 2012

SKI Coal Gasification Technology. Feb. 23, 2012 SKI Coal Gasification Technology Feb. 23, 2012 1 Contents Overview of SK Organization Coal SKI Coal Gasification Technology 2 SK Group [ Sales ] Unit: USD Billion SK Telecom SK C&C SK Broadband SK Telesys

More information

EVALUATION OF GEOTHERMAL ENERGY AS HEAT SOURCE OF DISTRICT HEATING SYSTEMS IN TIANJIN, CHINA

EVALUATION OF GEOTHERMAL ENERGY AS HEAT SOURCE OF DISTRICT HEATING SYSTEMS IN TIANJIN, CHINA EVALUATION OF GEOTHERMAL ENERGY AS HEAT SOURCE OF DISTRICT HEATING SYSTEMS IN TIANJIN, CHINA Jingyu Zhang, Xiaoti Jiang, Jun Zhou, and Jiangxiong Song Tianjin University, North China Municipal Engineering

More information

Vogt Power Emission Control Solutions

Vogt Power Emission Control Solutions ONE SOURCE ONE PURPOSE MANY SOLUTIONS Vogt Power Emission Control Solutions Kelly Flannery Kristen Cooper Andrew Heid Chief Thermal Engineer Simple Cycle Design Lead Emission Catalyst Design Lead Presented

More information

Ernst Rauch Munich Re 29 June 2010

Ernst Rauch Munich Re 29 June 2010 WORKSHOP A: REDUCING RISKS OF GREEN INVESTMENT IN DEVELOPING COUNTRIES Riskmanagement for Green Investments BMU-KfW Conference 29 June 2010, Berlin Ernst Rauch Head Corporate Climate Centre, Munich Re

More information

5. State the function of pulveriser. The pulverisers are the equipments which are used to powdered coal.

5. State the function of pulveriser. The pulverisers are the equipments which are used to powdered coal. 413 POWER PLANT ENGINEERING PART-A 1. Define Power. Power is the rate at which energy is used (or) Energy/time. 2. What are the types of fuels? Solid fuel Liquid fuel Gaseous fuel (Any one among the above

More information

4 th EU Sout Africa Clean Coal Working Group Meeting

4 th EU Sout Africa Clean Coal Working Group Meeting 4 th EU Sout Africa Clean Coal Working Group Meeting Hybrid Concentrated Solar Power (CSP) Concept Case Study for the Medupi Power Stationy Falk Hoffmeister Head of Sales and Business Development. Dr.

More information

HIGH STANDARD VALVES FOR NON-STANDARD CONDITIONS.

HIGH STANDARD VALVES FOR NON-STANDARD CONDITIONS. HIGH STANDARD VALVES FOR NON-STANDARD CONDITIONS. ZWICK: MANUFACTURER OF HIGH STANDARD TRIPLE OFFSET VALVES. 100% ZERO-LEAKAGE 100% MADE IN GERMANY 100% QUALITY Zwick is a leading manufacturer of valves

More information

Half the cost Half the carbon

Half the cost Half the carbon Half the cost Half the carbon the world s most efficient micro-chp What is BlueGEN? The most efficient small-scale electricity generator BlueGEN uses natural gas from the grid to generate electricity within

More information

DEGASSED CATION CONDUCTIVITY MEASUREMENT

DEGASSED CATION CONDUCTIVITY MEASUREMENT (Presented at EPRI's 8th International Conference on Cycle Chemistry in Fossil and Combined Cycle Plants with Heat Recovery Steam Generators - June 20-23, 2006 Calgary, Alberta Canada) DEGASSED CATION

More information

Merit Order of Energy Storages by 2030 The Impact of Technological Megatrends on Future Electricity Prices. Berlin, November 27, 2012

Merit Order of Energy Storages by 2030 The Impact of Technological Megatrends on Future Electricity Prices. Berlin, November 27, 2012 Merit Order of Energy Storages by 2030 The Impact of Technological Megatrends on Future Electricity Prices Berlin, November 27, 2012 1 Agenda Project Structure The Concept of the Functional Energy Storage

More information

Ozone in Cooling Towers : Hygiene for us

Ozone in Cooling Towers : Hygiene for us Ozone in Cooling Towers : Hygiene for us Dr. Matthias Hoffmann BWT Wassertechnik GmbH, Industriestrasse 7, D-69198 Schriesheim, Germany Keywords: Ozone, Cooling Tower, Legionella, Hygiene, Air conditioning,

More information

GENERAL PROPERTIES //////////////////////////////////////////////////////

GENERAL PROPERTIES ////////////////////////////////////////////////////// ALLOY 625 DATA SHEET //// Alloy 625 (UNS designation N06625) is a nickel-chromium-molybdenum alloy possessing excellent resistance to oxidation and corrosion over a broad range of corrosive conditions,

More information

FUNDAMENTALS OF ENGINEERING THERMODYNAMICS

FUNDAMENTALS OF ENGINEERING THERMODYNAMICS FUNDAMENTALS OF ENGINEERING THERMODYNAMICS System: Quantity of matter (constant mass) or region in space (constant volume) chosen for study. Closed system: Can exchange energy but not mass; mass is constant

More information

Pre-designed Steam Turbines

Pre-designed Steam Turbines Industrial Power Pre-designed Steam Turbines The comprehensive product range up to 12 megawatts Scan the QR code with the QR code reader in your mobile! siemens.com / energy / steamturbines A Full Range

More information

Fact Sheet on China s energy sector and Danish solutions

Fact Sheet on China s energy sector and Danish solutions Fact Sheet on China s energy sector and Danish solutions 1. EXPANSION WITH RENEWABLE ENERGY: China focuses on a massive expansion with non fossil energy that is renewable energy and nuclear energy. The

More information

Deliverable 3.a (Combining former deliverables 3.1; 3.2; 3.5)

Deliverable 3.a (Combining former deliverables 3.1; 3.2; 3.5) City Supporting partner LOMBARDY REGION (ITALY) A2A CALORE & SERVIZI SRL Map showing local heating and cooling demand and supply MILANO, STREET MAP: MILANO, ANNUAL HEAT DEMAND EXTRACT FROM PETA (STRATEGO

More information

High-performance steam boiler and hot water boiler plants for industry

High-performance steam boiler and hot water boiler plants for industry High-performance steam boiler and hot water boiler plants for industry Information 2/3 HKB leading manufacturer of industrial boiler plants in Europe and Asia Steam boilers with outputs up to 120 t/h and

More information

Mathematical Modelling and Design of an Advanced Once-Through Heat Recovery Steam Generator

Mathematical Modelling and Design of an Advanced Once-Through Heat Recovery Steam Generator Mathematical Modelling and Design of an Advanced Once-Through Heat Recovery Steam Generator Abstract Marie-Noëlle Dumont, Georges Heyen LASSC, University of Liège, Sart Tilman B6A, B-4000 Liège (Belgium)

More information

The control of corrosive conditions caused by concentration of low-volatility solutes in boilers and steam generators

The control of corrosive conditions caused by concentration of low-volatility solutes in boilers and steam generators P R E P R I N T ICPWS XV Berlin, September 8 11, 2008 The control of corrosive conditions caused by concentration of low-volatility solutes in boilers and steam generators Geoffrey J Bignold GJB Chemistry

More information

Loviisa 3 unique possibility for large scale CHP generation and CO 2 reductions. Nici Bergroth, Fortum Oyj FORS-seminar 26.11.

Loviisa 3 unique possibility for large scale CHP generation and CO 2 reductions. Nici Bergroth, Fortum Oyj FORS-seminar 26.11. Loviisa 3 unique possibility for large scale CHP generation and CO 2 reductions Nici Bergroth, Fortum Oyj FORS-seminar 26.11.2009, Otaniemi Loviisa 3 CHP Basis for the Loviisa 3 CHP alternative Replacement

More information

Efficiency on a large scale CFB Steam Boilers

Efficiency on a large scale CFB Steam Boilers Efficiency on a large scale CFB Steam Boilers Circulating Fluidized Bed Steam Boiler The Circulating Fluidized Bed Steam Boiler is an offering from Bosch Thermotechnology a member of the worldwide Bosch

More information

VGB Congress Power Plants 2001 Brussels October 10 to 12, 2001. Solar Power Photovoltaics or Solar Thermal Power Plants?

VGB Congress Power Plants 2001 Brussels October 10 to 12, 2001. Solar Power Photovoltaics or Solar Thermal Power Plants? VGB Congress Power Plants 2001 Brussels October 10 to 12, 2001 Solar Power Photovoltaics or Solar Thermal Power Plants? Volker Quaschning 1), Manuel Blanco Muriel 2) 1) DLR, Plataforma Solar de Almería,

More information

Improving Energy Efficiency through Biomass Drying

Improving Energy Efficiency through Biomass Drying Improving Energy Efficiency through Biomass Drying Gilbert McCoy, Senior Energy Systems Engineer Northwest CHP Technical Assistance Partnership International District Energy Association Woody Biomass CHP

More information