Development of V2I Safety Applications
|
|
|
- Sara Watson
- 9 years ago
- Views:
Transcription
1 Development of V2I Safety Applications Carl Andersen Federal Highway Administration, USDOT SIS13: C-ITS for Traffic Accident Avoidance
2 Application Development The CAMP V2I Consortium is developing three prototype safety applications for test and evaluation: 1. Red Light Violation Warning (RLVW) 2. Curve Speed Warning (CSW) 3. Reduced Speed/Work Zone Warning (RSZW) a. Reduced Speed in Work and School Zone (RSZW-RS) b. Reduced Speed in Work Zone with Lane Closure (RSZW-LC)
3 Application Algorithms ALGORITHMS FOR EACH APPLICATION CONSIST OF: Event Relevance Determine relevance of the upcoming event based on vehicle approach Map Matching Conduct map matching based on: o MAP data from RSE o Vehicle positioning Determination at road level Determination at lane level if RTCM correction available Warning Level Assessment Vehicle speed Posted speed Requirements for the event (e.g. Intersection, Curve, Work/School zone, etc.) Vehicle dynamics Inform/Warning Generation Inform Inform the driver of upcoming event (e.g. Curve, Work zone, etc.) Warnings Warning 1 (reduce speed) and Warning 2 (imminent reduce speed) Generate appropriate Inform/Warning(s) for DVI
4 Application Development - RLVW Event Relevance Use vehicle approach to evaluate relevance of upcoming intersection Select the closest relevant intersection Map Matching MAP data from RSU Vehicle positioning o When available use RTCM correction o Turn prediction algorithm to predict driver intent Warning Level Assessment Distance from the stop bar Vehicle speed, lane position, turn signal Time remaining for signal phase change Inform/Warning Generation Inform: upcoming traffic signal Warning: Warn driver to reduce speed for stopping at the stop bar (if necessary)
5 Application Development CSW Event Relevance Evaluate relevance of upcoming curve o Determination of relevant curve for the direction of travel o Is vehicle approaching the curve or passing on an adjacent lane? Map Matching Vehicle position with respect to curve approach road segment data points o Lane width o Reference position (start of curve) o Curve geometry Warning Level Assessment Distance from start of curve Vehicle speed Curve geometry Road surface material/condition (asphalt, concrete, icy, wet, etc.) Relevant event on curve (stopped traffic, low visibility) Inform/Warning Generation Inform: upcoming curve Warning 1: Reduce speed warning (if necessary) Warning 2: Imminent reduce speed warning (if necessary) Establish Relevance Map Matching In the case of multiple upcoming curves, informs and warnings will be suppressed for the next curve while the vehicle is travelling through the preceding curve
6 Application Development RSZW Event Relevance Evaluate relevance of surrounding work/school zones Determine work zones based on vehicle approach Map Matching Work/School zone map Determine vehicle position o Road level for Reduced Speed o Lane level for Lane Change Warning Level Assessment For Reduced Speed o Vehicle speed o Distance from start of work/school zone o Speed limit in work zone / presence of workers For Lane Closure o Vehicle lane position o Lane closure o Vehicle speed o Distance to start of lane closure o Vehicle turn signal status Inform/Warning Generation Inform: Presence of Work/School zone / Lane closure Warning: Reduce speed / Lane closure warning (if necessary)
7 Seven OEMs Building Test Vehicles GM Buick LaCrosse Honda Acura RLX Hyundai-Kia K-900 Nissan Infiniti M37 Subaru Legacy Volvo Truck VNL 670S VW / Audi Audi A4 All 7 vehicles will implement all 3 applications Two leaders Hyundai-Kia and VW Five evaluators GM, Honda, Nissan, Subaru and Volvo
8 Integrated V2I Prototype Infrastructure Sensor Systems Position Correction Infra Data Systems Local Weather Infra Sensor Systems Ped & Bicycle Infra Sensor Systems CMV Virtual Weigh Station Sensor Systems Veh Detection Sensor Systems (radar, loop det) Local Road Surface Infra Sensor Systems CMV Oversize Vehicle Sensor Systems Integrated V2I Prototype Platform Infrastructure Sensor System Vehicle and Nomadic Device App Platform IVP Local/Back Office User Interface Traffic Management Entity Rail Crossing Signal Request Sensor Pedestrian Crossing Request Sensor Traffic Signal Controller INFLO TME App (incl SPD-HARM, Q-WARN) AERIS/Ecodriving TME App Infrastructure Sensor Systems Interface(s) Traffic Signal Controller Interface Roadside Signage Message Service/Arbitrator Dynamic Roadside Message System Road Weather Vehicle Data Translator Integrated V2I Prototype Platform Positioning Corr Traffic & Rail Signal Message Handler Local Weather & Road Surface INFLO Message Handler (incl SPD- HARM, Q-WARN) Road Weather (incl WRTM) AERIS/Ecodriving Traffic Management Entity Interface (IP) Traffic Management Entity Road Weather TME Appl (incl WRTM) FRATIS TME Appl Map Message Handler (incl static signage) Vehicle Detection/ BSM Data Aggregator Ped, Bicycle, Nomad Dev Data Aggregator V2I Safety Application Infra Platform MMITS Roadside Processor FRATIS Message Handler Local/Back Office User Systems Interface (IP) MMITS Central System Low Latency Wireless Message Service Corridor Peer-to-Peer Message Service High Latency Message Service IVP Local/Back Office User Interface Local/BO IVP Platform Install, Configure, Management Local/BO IVP User Interfaces Local/BO IVP Quasi-static Data File Upload (incl Map) GPS Positioning Low Latency Radio Communications (e.g. DSRC) Security Certificate Manager High Latency/ Quasi-Static Message Storage Low Latency Wireless Message Service (e.g. DSRC) High Latency Wireless Message Service (e.g. cellular IP) Vehicle and Nomadic Device App Platform(s) Basic Safety Message Generator Onboard Positioning Service Onboard Map Service Vehicle Weather Data Message Generator INFLO Message Generator (incl SPD-HARM, Q- WARN V2I Safety App Vehicle Platform AERIS/Ecodriving Application Driver/User Message Arbitrator
9 Integrated V2I Prototype Rail Crossing Signal Request Sensor Pedestrian Crossing Request Sensor Traffic Signal Controller Infrastructure Sensor Systems Interface(s) Traffic Signal Controller Interface Roadside Signage Message Service/Arbitrator Dynamic Roadside Message System Integrated V2I Prototype Platform Positioning Corr Traffic & Rail Signal Message Handler Local Weather & Road Surface INFLO Message Handler (incl SPD- HARM, Q-WARN) Road Weather (incl WRTM) AERIS/Ecodriving Traffic Management Entity Interface (IP) Map Message Handler (incl static signage) Vehicle Detection/ BSM Data Aggregator Ped, Bicycle, Nomad Dev Data Aggregator V2I Safety Application Infra Platform MMITS Roadside Processor FRATIS Message Handler Local/Back Office User Systems Interface (IP) Low Latency Wireless Message Service Corridor Peer-to-Peer Message Service High Latency Message Service GPS Positioning Low Latency Radio Communications (e.g. DSRC) Security Certificate Manager High Latency/ Quasi-Static Message Storage Low Latency Wireless Message Service (e.g. DSRC) High Latency Wireless Message Service (e.g. cellular IP) Vehicle and Nomadic Device App Platform(s) Basic Safety Message Generator Onboard Positioning Service Onboard Map Service Vehicle Weather Data Message Generator INFLO Message Generator (incl SPD-HARM, Q- WARN V2I Safety App Vehicle Platform AERIS/Ecodriving Application Driver/User Message Arbitrator Traffic Management Entity IVP Local/Back
10 Example IVP Support for RLVW RTCM/GPS position correction usage / support o RTCM v3.0 o Broadcast at 1Hz, over-the-air format o Broadcast on Ch. 172 SPaT + MAP support and interoperability testing o Broadcast on Ch, 172 o MAP: 1Hz, SPaT: 10Hz (ASN.1 encoded per J2735:2015) SCMS security certificates for RSE & OBE o Long term, location independent certificates for testing
11 Purpose of Application: Based on the Concept of Operations o Overview of intended actions and timing Data elements: Based on System Requirements Action: Objective Test Procedures o Are data flows appropriate and timely? o Are data correctly interpreted? Based on Performance Requirements o Does application provide appropriate inform/warning messages?
12 RLVW Testing & Evaluation Application validation at test track Ensure reference application works, test scenarios are developed for: o Various speed profiles and maneuvers o Turn prediction Real-world interoperability evaluation 1 Dedicated lane for right turn 1 Lane for straight across and right turn 1 Lane for straight across only Right turn on red permitted during specific hours of the day No direct left turns are permitted. Left turns require first to execute a right turn then a U turn W. 12 Mile Road Test Track 2015 Google, Inc. Used with Permission
13 CSW Testing & Evaluation Application validation at test track: Variable speed approaches Warning suppression entering a curve Warning suppression when passing a curve Variable friction Variable super elevation Low visibility event Stopped vehicle (obstacle) in curve event Real-world interoperability evaluation Public road validation test
14 Validate time & location of the issuance and/or suppression of the application s Inform and Warning messages to the driver under various test conditions and approach speeds RSZW Testing & Evaluation
15 V2I Safety Applications: Project Schedule Objective: This project will develop and evaluate selected V2I Safety Applications Task Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Deliverables Status 1 Technical Project Management Quarterly progress report & risk log Ongoing 2 Coordination with Stakeholders Report on meetings with stakeholders Ongoing 3 & 4 Technical Assessment & Report on technical assessment and Selection Criteria selection criteria 4/21/ App Dev Plan Report on application development plan 4/24/ Application Development Application system documentation In progress 7 Vehicle Build Vehicle system documentation In progress 8 Infrastructure Build Infrastructure system documentation In progress 9 OTP Development & Testing OTP and test plan and final test report In progress 10 Map Generation Method to develop and validate intersection maps Not started
16 Connected Vehicle Pilot Deployment Program
AT&T Global Network Client for Windows Product Support Matrix January 29, 2015
AT&T Global Network Client for Windows Product Support Matrix January 29, 2015 Product Support Matrix Following is the Product Support Matrix for the AT&T Global Network Client. See the AT&T Global Network
COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*
COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) 2 Fixed Rates Variable Rates FIXED RATES OF THE PAST 25 YEARS AVERAGE RESIDENTIAL MORTGAGE LENDING RATE - 5 YEAR* (Per cent) Year Jan Feb Mar Apr May Jun
COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*
COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) 2 Fixed Rates Variable Rates FIXED RATES OF THE PAST 25 YEARS AVERAGE RESIDENTIAL MORTGAGE LENDING RATE - 5 YEAR* (Per cent) Year Jan Feb Mar Apr May Jun
Boston Traffic Management Center Activity Report for FY 2013 Real-time Traffic Signal Adjustments
Boston Traffic Management Center Activity Report for FY 2013 Real-time Traffic Signal Adjustments The mission of the Traffic Management Center (TMC) within the Boston Transportation Department is to monitor,
Securing Wireless Access for Vehicular Environments (WAVE)
Securing Wireless Access for Vehicular Environments (WAVE) May 7, 2009 CTST, New Orleans Tim Weil CISSP/CISA Security Architect ITS Engineering Booz Allen Hamilton 0 The concept of VII started upon the
Technical Report on Prototype Intelligent Network Flow Optimization (INFLO) Dynamic Speed Harmonization and Queue Warning
Technical Report on Prototype Intelligent Network Flow Optimization (INFLO) Dynamic Speed Harmonization and Queue Warning www.its.dot.gov/index.htm Final Report June 19, 2015 FHWA-JPO-15-213 Produced by
Connected Vehicles: New Directions and Opportunities. AASHTO Connected Vehicle Task Force December 3, 2014 Irvine, CA. Leidos. All rights reserved.
Connected Vehicles: New Directions and Opportunities AASHTO Connected Vehicle Task Force December 3, 2014 Irvine, CA N A T I O N A L S E C U R I T Y E N G I N E E R I N G H E A L T H S O L U T I O N S
Analysis One Code Desc. Transaction Amount. Fiscal Period
Analysis One Code Desc Transaction Amount Fiscal Period 57.63 Oct-12 12.13 Oct-12-38.90 Oct-12-773.00 Oct-12-800.00 Oct-12-187.00 Oct-12-82.00 Oct-12-82.00 Oct-12-110.00 Oct-12-1115.25 Oct-12-71.00 Oct-12-41.00
Safety Pilot Security System
Safety Pilot Security System Crash Avoidance II: Connected Vehicles (Session Code: G201) W L Fehr 1 Safety Pilot/Model Deployment Safety Pilot/Model Deployment is a U.S. DOT research program conducted
Case 2:08-cv-02463-ABC-E Document 1-4 Filed 04/15/2008 Page 1 of 138. Exhibit 8
Case 2:08-cv-02463-ABC-E Document 1-4 Filed 04/15/2008 Page 1 of 138 Exhibit 8 Case 2:08-cv-02463-ABC-E Document 1-4 Filed 04/15/2008 Page 2 of 138 Domain Name: CELLULARVERISON.COM Updated Date: 12-dec-2007
5 TH C-ITS PLUGTEST 2016 USE CASES V01. Contact [email protected]
5 TH C-ITS PLUGTEST 2016 USE CASES V01 Contact [email protected] Date, Location, Host and Scope Date: 7 18 November 2016 Location: Port of Livorno, Italy Host: CNIT, Livorno Port Authority Organized
Ashley Institute of Training Schedule of VET Tuition Fees 2015
Ashley Institute of Training Schedule of VET Fees Year of Study Group ID:DECE15G1 Total Course Fees $ 12,000 29-Aug- 17-Oct- 50 14-Sep- 0.167 blended various $2,000 CHC02 Best practice 24-Oct- 12-Dec-
USDOT Connected Vehicle Overview
USDOT Connected Vehicle Overview RWM Stakeholder Meeting August 8, 2012 Dale Thompson, Intelligent Transportation Systems Joint Program Office, RITA, U.S. DOT 1 Overview NHTSA Decision Safety Pilot Policy-Architecture
Enhanced Vessel Traffic Management System Booking Slots Available and Vessels Booked per Day From 12-JAN-2016 To 30-JUN-2017
From -JAN- To -JUN- -JAN- VIRP Page Period Period Period -JAN- 8 -JAN- 8 9 -JAN- 8 8 -JAN- -JAN- -JAN- 8-JAN- 9-JAN- -JAN- -JAN- -JAN- -JAN- -JAN- -JAN- -JAN- -JAN- 8-JAN- 9-JAN- -JAN- -JAN- -FEB- : days
PEDESTRIAN AND BICYCLE ACCIDENT DATA. Irene Isaksson-Hellman If Insurance Company P&C Ltd.
PEDESTRIAN AND BICYCLE ACCIDENT DATA Irene Isaksson-Hellman If Insurance Company P&C Ltd. Vulnerable road users 2 Number Number Official accident statistics 45 35 4 3 35 25 3 25 2 2 15 15 1 1 5 5 5 4 5
Space-Based Position Navigation and Timing National Advisory Board
Space-Based Position Navigation and Timing National Advisory Board Intelligent Transportation System (ITS) Evolution GPS/GNSS Role in Emerging Vehicle Fleets and Highway Infrastructure Brian P. Cronin,
Open Source Solution for IVI: Tizen IVI. Brett Branch Tizen IVI Product Marketing
Open Source Solution for IVI: Tizen IVI Brett Branch Tizen IVI Product Marketing Agenda The Connected Car ecosystem Connected Car Usages what drives us? Key Requirements Tizen in Automotive Open Standards
Connected Vehicles as things on the Internet. big data, the cloud, and advanced automotive research
Connected Vehicles as things on the Internet big data, the cloud, and advanced automotive research Clark Gaylord Chief Information Officer Virginia Tech Transportation Institute [email protected] Bingo card
The Vision of Vehicle Infrastructure Integration (VII)
The Vision of Vehicle Infrastructure Integration (VII) Ralph L. Robinson ITS Integration Office September, 2007 Cooperative Highways SAFETY MOBILITY Collision Avoidance Signal Control Emergency Alerts
Connected Vehicle Security
Connected Vehicle Security ITS Advisory Committee May 24, 2012 Valerie Briggs ITS Joint Program Office, RITA, USDOT Need for Security Trust Message Validity Defense Against Attacks 2 Goals for Security
INTELLIGENT TRANSPORTATION SYSTEMS. Vehicle-to- Infrastructure Technologies Expected to Offer Benefits, but Deployment Challenges Exist
United States Government Accountability Office Report to Congressional Requesters September 2015 INTELLIGENT TRANSPORTATION SYSTEMS Vehicle-to- Infrastructure Technologies Expected to Offer Benefits, but
22 nd ITS World Congress Towards Intelligent Mobility Better Use of Space. GPS 2: Big Data The Real Value of Your Social Media Accounts
22 nd ITS World Congress Towards Intelligent Mobility Better Use of Space GPS 2: Big Data The Real Value of Your Social Media Accounts October 7, 2015 Kenneth Leonard Director, Intelligent Transportation
Securing Wireless Access in Vehicular Environments (WAVE) Infrastructure and Operations Support Systems(OSS) Architecture
IEEE GLOBECOM Design and Developers Forum Securing Wireless Access in Vehicular Environments (WAVE) Infrastructure and Operations Support Systems(OSS) Architecture Tim Weil CISSP, CISA Booz Allen Hamilton
Car Connections. Johan Lukkien. System Architecture and Networking
Car Connections Johan Lukkien System Architecture and Networking 1 Smart mobility, TU/e wide Cooperative Driving (platooning), A270: Helmond-Eindhoven, 2011 (Mechanical Engineering/TNO) Full electric:
VEHICLE SAFETY COMMUNICATIONS IN THE UNITED STATES
VEHICLE SAFETY COMMUNICATIONS IN THE UNITED STATES Michael Shulman Ford Motor Company United States Richard Deering General Motors Corporation United States Paper Number 07-0010 ABSTRACT In the United
CENTERPOINT ENERGY TEXARKANA SERVICE AREA GAS SUPPLY RATE (GSR) JULY 2015. Small Commercial Service (SCS-1) GSR
JULY 2015 Area (RS-1) GSR GSR (LCS-1) Texarkana Incorporated July-15 $0.50690/Ccf $0.45450/Ccf $0.00000/Ccf $2.85090/MMBtu $17.52070/MMBtu Texarkana Unincorporated July-15 $0.56370/Ccf $0.26110/Ccf $1.66900/Ccf
GATEWAY CITIES TECHNOLOGY PROGRAM FOR GOODS MOVEMENT OVERVIEW OF EMERGING CONNECTED COMMERCIAL VEHICLES PROGRAM
GATEWAY CITIES TECHNOLOGY PROGRAM FOR GOODS MOVEMENT OVERVIEW OF EMERGING CONNECTED COMMERCIAL VEHICLES PROGRAM Presented May 8, 2014 GATEWAY CITIES LOGISTICS CORRIDOR Anchored by Ports of Long Beach and
BOSTON CRASH REPORT. http://www.attorneysheehan.com/
2013 BOSTON CRASH REPORT Although rates have declined in recent years, motor vehicle crashes (MVCs) remain a leading cause of injury death in the United States. This data has been visualized to raise awareness
VEHICLE INFRASTRUCTURE INTEGRATION (VII) U.S. DOT DAY-1 APPLICATION DEVELOPMENT PLANS
VEHICLE INFRASTRUCTURE INTEGRATION (VII) U.S. DOT DAY-1 APPLICATION DEVELOPMENT PLANS McLean, VA November 2006 VERSION 1.2 Revision History REVISION HISTORY Date Version Description July 2006 1.0 Initial
Driving Safety Support Systems Utilizing ITS Radio System
FEATURED TOPIC Driving Safety Support Systems Utilizing ITS Radio System Yuichi TANIGUCHI*, Toshifumi OOTA, Masafumi KOBAYASHI, Hirofumi URAYAMA and Yoshiteru KOREEDA We are striving to develop the Driving
September 8th 8:30 AM 10:00 AM PL1: Reinventing Policy to Support the New ITS
September 8th 8:30 AM 10:00 AM PL1: Reinventing Policy to Support the New ITS September 8th 10:30 AM 12:00 PM AM01: Sustainable Transportation Performance Measures: Best Practices September 8th 10:30 AM
Media Planning. Marketing Communications 2002
Media Planning Marketing Communications 2002 Media Terminology Media Planning - A series of decisions involving the delivery of messages to audiences. Media Objectives - Goals to be attained by the media
The LYNX Transit Master Plan. METROPLAN Orlando Presentation
2030 Paw Print: The LYNX Transit Master Plan D b 2010 December 2010 METROPLAN Orlando Presentation Project Partners Project Overview 18 Corridors Bridge between 5 Year Service Plan and Long Range Transportation
Guidelines for Virtual Transportation Management Center Development. National Rural ITS Meeting August 27, 2014
Guidelines for Virtual Transportation Management Center Development National Rural ITS Meeting August 27, 2014 1 Project Purpose Overview To develop a guidebook that provides technical guidance on planning
AAA AUTOMOTIVE ENGINEERING
AAA AUTOMOTIVE ENGINEERING Evaluation of Blind Spot Monitoring and Blind Spot Intervention Technologies 2014 AAA conducted research on blind-spot monitoring systems in the third quarter of 2014. The research
Computing & Telecommunications Services Monthly Report March 2015
March 215 Monthly Report Computing & Telecommunications Services Monthly Report March 215 CaTS Help Desk (937) 775-4827 1-888-775-4827 25 Library Annex [email protected] www.wright.edu/cats/ Last Modified
Efficiency/Accuracy Challenges in the Tolling Adjudication Process
STATE ROAD AND TOLLWAY AUTHORITY Efficiency/Accuracy Challenges in the Tolling Adjudication Process IBTTA Summit on All Electronic Tolling, Managed Lanes & Operability July 21-23, 2013 Merryl Mandus, General
INTERNET FOR VANET NETWORK COMMUNICATIONS -FLEETNET-
ABSTRACT INTERNET FOR VANET NETWORK COMMUNICATIONS -FLEETNET- Bahidja Boukenadil¹ ¹Department Of Telecommunication, Tlemcen University, Tlemcen,Algeria Now in the world, the exchange of information between
LTE-V: A Cellular-Assisted V2X Communication Technology
LTE-V: A Cellular-Assisted V2X Communication Technology Yi Shi Research Engineer, Wireless Research Department [email protected] ITU Workshop, July 28-29th 2015, Beijing, China www.huawei.com Contents
ELMHURST SPEEDWAY A STUDY OF LAWBREAKING IN ELMHURST
ELMHURST SPEEDWAY A STUDY OF LAWBREAKING IN ELMHURST INTRODUCTION TWENTY-THIRD AVENUE IS AN EAST-WEST FOUR-LANE ARTERIAL ROAD running through East Elmhurst, Queens. With two lanes of traffic in either
Automated road transport in Finland
Automated road transport in Finland Anna Schirokoff Trafiksäkerhetsverket Responsible traffic. Bravely together. Content Recent studies on automation Automation in Finland vision and goals Vantaa demonstration
ROAD SAFETY GUIDELINES FOR TAH ROAD INFRASTRUCTURE SAFETY MANAGEMENT
I. GENERAL ROAD SAFETY GUIDELINES FOR TAH ROAD INFRASTRUCTURE SAFETY MANAGEMENT ANNEX III B i. The setting up and implementing of appropriate management procedures is an essential tool for improving the
Stock Market Indicators: Historical Monthly & Annual Returns
Stock Market Indicators: Historical Monthly & Annual Returns July 31, 1 Dr. Edward Yardeni 51-97-73 eyardeni@ Joe Abbott 7397-53 jabbott@ Please visit our sites at blog. thinking outside the box Table
Independent Accountants Report on Applying Agreed-Upon Procedures
Independent Accountants Report on Applying Agreed-Upon Procedures Board of Trustees We have performed the procedures, as discussed below, with respect to the employer contributions remitted by to the in
CAFIS REPORT 2015.10
CAFIS REPORT 2015.10 INDEX Message CAFIS Inbound 03-06 07-08 CAFIS Arch 09-10 CAFIS Brain 11-12 CAFIS Global 13-14 What We Do 15-16 About CAFIS 17-18 Services for Member Stores 19-34 Services for Card
City & County of San Francisco Permit & Project Tracking System
City & County of San Francisco Permit & Project Tracking System PPTS Sneak Preview March 20, 2013 Welcome & Opening Statements AGENDA 1. Opening Statements Department Directors 2. Project Background 3.
Accidents with Pedestrians and Cyclists in Germany Findings and Measures
Accidents with Pedestrians and Cyclists in Germany Findings and Measures Siegfried Brockmann Unfallforschung der Versicherer (UDV) May 7th, Geneva 2 Content 2 Accident situation in Germany based on National
Preventing road crash injuries involving children
Preventing road crash injuries involving children Experience of Slovenia Robert Štaba, AMZS Road Safety Comission Secretary SOL Road Safety Conference - Budapest 2011 SLOVENIA 2 million people Capital
Office of Emergency Management Santa Monica, CA October 2014 Page 1. Public Safety Consolidation Communications Implementation Plan
Page 1 Public Safety Consolidation Communications Implementation Plan Page 2 Overview The mission of the is to protect the community of Santa Monica from the loss of life and property in the event of a
Supply Chain Trends in Intermodal
Supply Chain Trends in Intermodal Ken Miller VP Operations 1 SERVICE REVIEW: MARKET SHARE Market overview (segment specific) Market size: $12 Billion Capacity: 205,000 53 foot Containers Industry outlook:
Applying ICT and IoT to Multifamily Buildings. U.S. Department of Energy Buildings Interoperability Vision Meeting March 12, 2015 Jeff Hendler, ETS
Applying ICT and IoT to Multifamily Buildings U.S. Department of Energy Buildings Interoperability Vision Meeting March 12, 2015 Jeff Hendler, ETS ETS is an Energy Technology, Behavior Management, and
ROAD SIGNS IN JAPAN PARKING SIGNS. No Parking or Stopping Anytime SIZE & WEIGHT LIMIT SIGNS SPEED LIMIT SIGNS
ROAD SIGNS IN JAPAN Stop Slow & all Do Not Enter & Motorcycles Road Large Sized Trucks & Special Duty Road All Except Two Wheeled Light Except Bicycles Large Passenger No Right Turn No Passing No U-Turn
COOPERATIVE INTERSECTION COLLISION AVOIDANCE SYSTEM FOR VIOLATIONS (CICAS-V) FOR AVOIDANCE OF VIOLATION-BASED INTERSECTION CRASHES
COOPERATIVE INTERSECTION COLLISION AVOIDANCE SYSTEM FOR VIOLATIONS (CICAS-V) FOR AVOIDANCE OF VIOLATION-BASED INTERSECTION CRASHES Michael Maile Luca Delgrossi Mercedes-Benz Research & Development North
Performance Measures. First Quarter 2012
Performance Measures First Quarter 2012 1Q2012 Earn & Retain Community Trust 6 Performance Measures: Ridership Cost Efficiency (Cost per Revenue Hour) Cost Effectiveness (Cost per Passenger) Service Effectiveness
TomTom HAD story How TomTom enables Highly Automated Driving
TomTom HAD story How TomTom enables Highly Automated Driving Automotive World Webinar 12 March 2015 Jan-Maarten de Vries VP Product Marketing TomTom Automotive Automated driving is real and it is big Image:
California PATH, University of California at Berkeley, Building 452, Richmond Field Station 1357 South 46 th Street, Richmond, CA 94804
1. Report No. CA14-2146B 2. Government Accession No. 3. Recipient s Catalog No. 4. Title and Subtitle Executive Summary for the UC Berkeley, California PATH s Augmented Speed Enforcement Project 5. Report
BILD and WELT: Two successful Paid Content Strategies Capital Markets Day Berlin, December 10, 2014. Donata Hopfen, Publishing Director BILD Group
BILD and WELT: Two successful Paid Content Strategies Capital Markets Day Berlin, December 10, 2014 Donata Hopfen, Publishing Director BILD Group Paid content is key to Axel Springer s strategy Start of
FIELD SERVICE TRANSFORMATION AT NORTHUMBRIAN WATER
FIELD SERVICE TRANSFORMATION AT NORTHUMBRIAN WATER James Robbins, CIO, Northumbrian Water Group Tim Burfoot, Programme Director, Northumbrian Water Group Surya Chavali, Principal Consultant, Infosys Oracle
Lossless Compression of Cloud-Cover Forecasts for Low-Overhead Distribution in Solar-Harvesting Sensor Networks
Lossless Compression of Cloud-Cover Forecasts for Low-Overhead Distribution in Solar-Harvesting Sensor Networks Christian Renner and Phu Anh Tuan Nguyen ENSsys 14, Memphis, TN, USA November 6 th, 2014
PEDESTRIAN PLANNING AND DESIGN MARK BRUSSEL
PEDESTRIAN PLANNING AND DESIGN MARK BRUSSEL CONTENT OF LECTURE a) Walking as a transport mode b) Walking in Sub Sahara Africa c) Policies for pedestrians d) Pedestrian characteristics e) Network planning
TRAINER NOTES FOR LESSON PLAN 2012 13 School Bus Instructors Inservice TITLE OF LESSON: TRAINING UPDATES FOR A CDL
TRAINER NOTES FOR LESSON PLAN 2012 13 School Bus Instructors Inservice TITLE OF LESSON: TRAINING UPDATES FOR A CDL Length of Lesson: 30 minutes TRAINER NOTES: Hand out lesson plan at the beginning of the
SEO Presentation. Asenyo Inc.
SEO Presentation What is Search Engine Optimization? Search Engine Optimization (SEO) : PPC and Organic Results Pay Per Click Ads The means of achieving top search engine results without having to incur
STATUS REPORT FOR THE SUBMERGED REEF BALL TM ARTIFICIAL REEF SUBMERGED BREAKWATER BEACH STABILIZATION PROJECT FOR THE GRAND CAYMAN MARRIOTT HOTEL
STATUS REPORT FOR THE SUBMERGED REEF BALL TM ARTIFICIAL REEF SUBMERGED BREAKWATER BEACH STABILIZATION PROJECT FOR THE GRAND CAYMAN MARRIOTT HOTEL performed by Lee E. Harris, Ph.D., P.E. Consulting Coastal
How To Understand The Traffic Patterns In Coronado
CITY OF CORONADO ANNUAL TRAFFIC REPORT - 2010 PREPARED BY THE CITY OF CORONADO ENGINEERING AND PROJECT DEVELOPMENT DEPARTMENT TABLE OF CONTENTS SECTION PAGE EXECUTIVE SUMMARY i Quick Facts i Traffic Volume
CHAPTER 2 TRAFFIC SIGNS AND HIGHWAY MARKINGS
CHAPTER 2 TRAFFIC SIGNS AND HIGHWAY MARKINGS This chapter summarizes traffic signs, signals and road markings that control the flow of traffic, making streets and highways safer for motorists, bicyclists
SULTANATE OF OMAN SPECIAL ECONOMIC ZONE AUTHORITY AT DUQM
SULTANATE OF OMAN SPECIAL ECONOMIC ZONE AUTHORITY AT DUQM www.duqm.gov.om 1. INTRODUCTION 2. ACCESSIBILITY TO DUQM 3. SEZAD PREVIOUS MASTERPLAN 4. DUQM URBAN PLANNING 5. SPECIAL ECONOMIC ZONE DISTRICTS
APPENDIX A Dallas-Fort Worth Region Transportation System Management Strategies and Projects
APPENDIX A Transportation System Management Strategies and Projects Transportation System Transportation System Management Projects Management Strategies Traffic Signalization and Control New Signal Installation
Centers of Academic Excellence in Cyber Security (CAE-C) Knowledge Units Review
Centers of Academic Excellence in Cyber Security (CAE-C) Knowledge Units Review Review Process The Knowledge Unit (KU) Review Calendar divides the entire CAE-C KU list into 12 months for the purposes of
Next Stage of ITS Development in Taiwan
ITS Promotion Forum, ITS Japan, Nov 21, 2012 Next Stage of ITS Development in Taiwan S.K. Jason Chang Professor, National Taiwan University Vice President, ITS Taiwan [email protected] Background Outline
Stop The stop sign, a red octagon with white lettering, means come to a full stop and be sure the way is clear before proceeding.
Tr a f f i c S i g n s 7 7. TRAFFIC SIGNS Many collisions and near crashes occur as a result of drivers who ignore or fail to respond appropriately to traffic signs. It is essential that the meaning of
Key Trends in Mobile Content Usage & Mobile Advertising. February 12, 2009. Kevin Muoio
Key Trends in Mobile Content Usage & Mobile Advertising February 12, 2009 Kevin Muoio Agenda About comscore M:Metrics Mobile Handset Landscape Mobile Content Consumption State of Mobile Advertising Mobile
siemens.com/mobility Radar detectors of the Heimdall family High detection rate, easy installation
siemens.com/mobility Radar detectors of the Heimdall family High detection rate, easy installation Heimdall radar detectors from Siemens: A family that provides valuable benefits, Heimdall is the watchman
INTELLIGENT TRANSPORTATION SYSTEMS. Vehicle-to-Vehicle Technologies Expected to Offer Safety Benefits, but a Variety of Deployment Challenges Exist
United States Government Accountability Office Report to Congressional Requesters November 2013 INTELLIGENT TRANSPORTATION SYSTEMS Vehicle-to-Vehicle Technologies Expected to Offer Safety Benefits, but
Intelligent Transportation System for Vehicular Ad-Hoc Networks
Intelligent Transportation System for Vehicular Ad-Hoc Networks T. Sujitha 1, S. Punitha Devi 2 1,2 Department of CSE, P.A College of Engineering and Technology, Coimbatore, Tamilnadu Abstract - Vehicular
Channels of Delivery of Travel Information (Static and Dynamic On-Trip Information)
Channels of Delivery of Travel Information (Static and Dynamic On-Trip Information) Index Purpose Description Relevance for Large Scale Events Options Technologies Impacts Integration potential Implementation
Energy Efficiency, Clean Power as Engine for Sustainable Growth
Energy Efficiency, Clean Power as Engine for Sustainable Growth Rakesh Kumar Bhatnagar, Advisor (Technology), & P K Panigrahi, Sr. DDG, Department of Telecommunications, Government of India. 1 Agenda 2
HAVEit. Reiner HOEGER Director Systems and Technology CONTINENTAL AUTOMOTIVE
HAVEit Reiner HOEGER Director Systems and Technology CONTINENTAL AUTOMOTIVE HAVEit General Information Project full title: Project coordinator: Highly Automated Vehicles for Intelligent Transport Dr. Reiner
ITU-T. FG Distraction. Report on Use Cases. ITU-T Focus Group on Driver Distraction. Focus Group Technical Report. Version 1.
I n t e r n a t i o n a l T e l e c o m m u n i c a t i o n U n i o n ITU-T TELECOMMUNICATION STANDARDIZATION SECTOR OF ITU FG Distraction Version 1.0 (03/2013) ITU-T Focus Group on Driver Distraction
Climatography of the United States No. 20 1971-2000
Climate Division: CA 4 NWS Call Sign: Month (1) Min (2) Month(1) Extremes Lowest (2) Temperature ( F) Lowest Month(1) Degree s (1) Base Temp 65 Heating Cooling 1 Number of s (3) Jan 59.3 41.7 5.5 79 1962
Energy Savings from Business Energy Feedback
Energy Savings from Business Energy Feedback Behavior, Energy, and Climate Change Conference 2015 October 21, 2015 Jim Stewart, Ph.D. INTRODUCTION 2 Study Background Xcel Energy runs the Business Energy
2015-16 BCOE Payroll Calendar. Monday Tuesday Wednesday Thursday Friday Jun 29 30 Jul 1 2 3. Full Force Calc
July 2015 CM Period 1501075 July 2015 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 August 2015 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
Integrated Data System Structure for Active Traffic Management - Planning and Operation
Integrated Data System Structure for Active Traffic Management - Planning and Operation NATMEC 2010 Dr. Xiao-Yun Lu, Research Engineer California PATH, U. C. Berkeley J. Palen, Caltrans DRI 1 Outlines
INTELLIGENT TRANSPORTATION SYSTEMS IN WHATCOM COUNTY A REGIONAL GUIDE TO ITS TECHNOLOGY
INTELLIGENT TRANSPORTATION SYSTEMS IN WHATCOM COUNTY A REGIONAL GUIDE TO ITS TECHNOLOGY AN INTRODUCTION PREPARED BY THE WHATCOM COUNCIL OF GOVERNMENTS JULY, 2004 Whatcom Council of Governments 314 E. Champion
Performance Measures for RIDOT s Traffic Management Center
Performance Measures for RIDOT s Traffic Management Center Catherine Burns, EIT Transportation Engineer Sudhir Murthy, PE, PTOE President 5/2011 Presentation Outline RIDOT Performance Measures Public Outreach
Proposal to Reduce Opening Hours at the Revenues & Benefits Coventry Call Centre
Proposal to Reduce Opening Hours at the Revenues & Benefits Coventry Call Centre Proposal To change the opening hours of the Revenues & Benefits Call Centre to 9am until 5pm Monday to Friday with effect
Choosing a Cell Phone Plan-Verizon
Choosing a Cell Phone Plan-Verizon Investigating Linear Equations I n 2008, Verizon offered the following cell phone plans to consumers. (Source: www.verizon.com) Verizon: Nationwide Basic Monthly Anytime
IR Best Practice & the Tools Needed to Achieve it
IR Best Practice & the Tools Needed to Achieve it Belgrade March 2011 Andrew Crockett Senior Specialist Corporate Services Thomson Reuters INTRODUCING THOMSON REUTERS We provide intelligent information
Traffic Management Centers
Traffic Management Centers IN A CONNECTED VEHICLE ENVIRONMENT Task 2. Investigation of Expected Changes in TMCs Final Report Prepared for: CTS Pooled Fund Study, University of Virginia Prepared By: November
Architectural Services Data Summary March 2011
Firms Typically Small in Size According to the latest U.S. Census Survey of Business Owners, majority of the firms under the description Architectural Services are less than 500 in staff size (99.78%).
Climatography of the United States No. 20 1971-2000
Climate Division: CA 6 NWS Call Sign: SAN Month (1) Min (2) Month(1) Extremes Lowest (2) Temperature ( F) Lowest Month(1) Degree s (1) Base Temp 65 Heating Cooling 100 Number of s (3) Jan 65.8 49.7 57.8
