1 - Journal of Information Technology in Construction - ISSN TRUCK+ FOR EARTHMOVING OPERATIONS PUBLISHED: September 2014 at EDITOR: Rezgui Y. Ali Montaser, PhD, P.Eng., PMP Department of Building, Civil & Environmental Engineering, Concordia University, Montreal, Canada [email protected] Osama Moselhi, PhD, P.Eng., Professor Department of Building, Civil & Environmental Engineering, Concordia University, Montreal, Canada [email protected] SUMMARY: This paper presents an automated system that integrates Global Positioning System (GPS) and Geographical Information System (GIS) in a web-based platform named Truck+. It is utilized for estimating, monitoring and forecasting productivity of hauling trucks in earthmoving operations. The developed system consists of GPS for automated site data acquisition, GIS web-based system used as graphical user interface, relational database and Discrete Event Simulation (DES) for stochastic forecasting. The paper also highlights the benefit of utilizing the actual captured data supported by DES for stochastically forecasting productivity of earthmoving operation. DES was applied to forecast productivity in a stochastic approach that makes use of the project s captured data during the operations involved rather than data from past projects. This makes it more capable of capturing relevant factors that impact project conditions. Truck+ consists primarily of two modules: tracking/monitoring module and forecasting module. The developed system has been implemented in prototype software using object-oriented programming, ArcGIS APIs (Application Programming Interface) and deploys Microsoft Silverlight for creating and delivering rich internet web application and media. Truck+ is capable of generating graphical and tabular reports with various degrees of detail to suit the requirements of project teams. The developed system is applied to a construction project in Montreal area to demonstrate its use. KEYWORDS: Earth-moving Operations, Productivity, Progress Reporting, GPS, GIS, Web-Based System. REFERENCE: Ali Montaser, Osama Moselhi (2014). Truck+ for earthmoving operations, Journal of Information Technology in Construction (ITcon), Vol. 19, pg , COPYRIGHT: 2014 The authors. This is an open access article distributed under the terms of the Creative Commons Attribution 3.0 unported ( which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited. ITcon Vol. 19 (2014), Montaser & Moselhi, pg. 412
2 1. INTRODUCTION Estimating actual productivity of construction jobsites is essential in forecasting time and cost required to complete construction operations (Oglesby et al, 1989). Earthmoving operations are characterized by intensive use of equipment. Therefore, tracking this equipment is essential for tracking earthmoving operations (Alkass and Harris 1988, Eldin and Mayfield 2005, and Alshibani and Moselhi 2012). Hauling trucks are an important part of equipment fleets in earthmoving operations, which demand moving large amounts of soil and long travel distance within relatively short time (Marzouk and Moselhi 2004). Traditionally, site data collection used in earthmoving operations is carried out manually, which is time consuming and not necessarily accurate (Sacks et al, 2002). Consequently, some information ends up being not readily available to project teams to make timely decisions. Failure in effectively tracking construction progress and in retrieving the related information on demand may result in schedule delays and cost overruns (De la Garza and Howitt, 1998). Thus, earthmoving operation needs an automated system for capturing job-site data, with capability of handling a large volume of data in near real time and integrates time and cost for accurate performance measurement and forecasting. Recent advancements in automated data acquisition technologies made it feasible to track and monitor construction operations in near real time (Navon and Goldschmidt, 2002, Caldas et al., 2006, Goodrum et al, 2006 and Grau and Caldas, 2009). GPS has been used in many aspects of construction operations such as collision avoidance of equipment, calculation of durations of earthmoving activities (John et al, 2005). As well, GPS was used to monitor the compaction level of various layers of road construction (Bouvet et al. 2001). Oloufa et al (1997) proposed an automated system to monitor and record the areas compacted by an asphalt roller. That system used GPS to achieve a high degree of accuracy. The system guides the operator throughout the process so that the necessary passes are carried out. Jaroslaw and Karl (2002) developed a road construction system based on GPS. Their system is designed to detect and correct substantial compaction errors. GIS is a combination of computerized mapping and database management system (Hassanien, 2002). It is used to represent and analyze the geographic features present on the earth s surface. GIS database is a collection of information about objects and their spatial relationships to each other. Hassanien and Moselhi (2002) used GIS to develop a model to automate data collection and analysis for planning and scheduling highway construction projects. Their model utilizes GIS to analyze spatial data and to estimate cut and fill quantities. Spatial information utilizing GPS and GIS has proved to be an effective method to track construction operations since it provides data collection and graphical representation. Cheng et al (1996) developed a system by integrating GPS and GIS to track pavement compaction. The system collects data in real time using GPS devices attached to compactors and then transforms this data to a GIS map for graphical presentation. Moselhi and Alshibani (2009) presented a standalone desktop system for the tracking and control of earth moving operations. Their model uses spatial technologies (GPS/GIS) to facilitate automated data acquisition. Their proposed system is designed for highway construction projects. GPS was used to automate data collection, and GIS is used to analyze the collected data. However, their model was built on the assumption that loading and dumping areas are circular, which is not true in most cases. Additionally, did not get any benefit from the previously identified optimum travel and return road from the planning module. Computer vision-based systems were used also to track earthmoving operations but focusing mainly on loading process (Rezazadeh Azar and McCabe 2011). In addition, such technology has limitations specially in differentiating between hauling trucks if they have the same colour. It also suffers from dust obstruction to camera line of the sight and inability of calculating travel, dumping and return durations, which constitute complete hauling cycle. On Board Instrumentation System (OBIS) is the most widely used automated tracking and monitoring system in earthmoving operations. The system is based on automated data acquisition sensors attached to different parts of the equipment to give an alert in case of any abnormal conditions. Those sensors are responsible for mechanical health monitoring for equipment and measuring physical performance of equipment such as temperature and pressure. In addition, those sensors could be used to estimate onsite productivity (CAT Product Link, 2013). However, those systems are characterized by being expensive in cost. As well, the manufactures catalogues do not disclose its working methodology since it is the manufacturer s Know-How. In addition, those systems could not forecast fleet performance deterministically or stochastically. Discrete Event Simulation (DES) is the most common type of simulation in construction. It serves as a powerful tool in analyzing and breaking down complex problems. Consequently, it grabbed the biggest share of researchers attention (AbouRizk, 2010). DES models a system as a network of processes that are sometimes preceded by queues, where state changes occur at discrete points of time. In DES model, each unit flows through the system and reserves resources to complete a job. When, the job is accomplished, the unit releases those resources. Queues temporarily hold units in case resources are not readily available. These actions are ITcon Vol. 19 (2014), Montaser & Moselhi, pg. 413
3 called events (Halpin, 1973 and Hajjar and AbouRizk, 1999). Halpin (1973) developed a powerful modeling element called CYCLONE, which simplified the simulation and modeling process for users with limited simulation background. CYCLONE was later used as a base for other simulation systems. In 1996, Martinez produced a more evolved simulation tool (STROBOSCOPE). This tool is capable of handling uncertainty not only in time, but also for different resource quantities. Table 1: common used DES modeling elements (Halpin 1973) Element Name COMBI NORMAL QUEUE FUNCTION COUNTER ARROW Modeling Element Symbol Simulation of earthmoving operations allows construction planners and estimator s prediction and assessment of operations productivity (Halpin and Riggs 1992). The literature reveals considerable work on simulation for modelling earthmoving operation (Shi and AbouRizk 1995 and Marzouk and Moselhi 2003). Despite the advantages of computer simulation, it requires trained staff for model development and data entry, specialized simulation software and past historical data to generate operations probability distributions. In order to rectify the limitations of the current systems, a new system is developed. This paper presents automated web-based system (Truck+) that has two modules, tracking/monitoring module and forecasting module, for estimating and forecasting productivity of earthmoving operations. The system uses spatial technologies (GPS/GIS) for automated site data acquisition, graphically display onsite data and supported by earned value analysis to measure actual performance. As well, Truck+ utilizes DES in forecasting module making use of captured data from tracking/monitoring module to take into account the uncertainty associated in the operation. The paper focuses in detail on the system overview and the tracking/monitoring module. This paper builds on earlier work and related developments made by the authors (Montaser et. al., 2011). 2. PROPOSED SYSTEM Truck+ is an integrated web-based system. It consists of two main modules for estimating and forecasting productivity during the execution of earthmoving operations as shown in Fig. 1. The first module is designed for automated tracking/monitoring of the operations involved, while the second is used for stochastically forecasting productivity and evaluating different fleet configurations. GPS units are mounted on hauling trucks to identify its locations during the earthmoving operation cycle. The data captured using GPS is automatically transferred to onsite server and subsequently to a central database. The central database is in the heart of Truck+. It is responsible for receiving, storing and data exchange with the two modules of the system and its simulation engine. The GIS web-based graphical interface is the shell of Truck+, where the user interacts and defines the spatial boundaries of the earthmoving operation and the type of performance reports. The data is processed automatically, without human intervention, to calculate total cycle time for each truck and its respective loading, travel, dumping and return durations. Truck characteristics and excavated soil properties are retrieved from the central database to calculate the productivity of hauling trucks. Then total productivity for the entire fleet is estimated. The cycle time information for each truck is added to the central database and is considered as truck current data. This current data is used afterward in the forecasting module where it is analysed stochastically to generate probability distribution for the cycle time four components. DES engine is linked to the central database to extract its respective data and use it subsequently to simulate earthmoving operation in order to stochastically forecast future productivity based on the actual collected data. The actual captured data inherits all the uncertainties encountered during the construction elapsed period and depicts operation bottlenecks. For example, the daily collected data via the tracking/monitoring module could be used at the end of the week as an input to the forecasting module to predict the fleet productivity and its performance for the next week. The collected data can also be used to evaluate the performance of trucks and its operator. The results will be reported to members of project teams via web-based reporting system. ITcon Vol. 19 (2014), Montaser & Moselhi, pg. 414
4 Hauling Truck GIS Web-Based System Wireless Data Transfer Central Database Simulation Engine GPS Unit Tracking/Monitoring Module Forecasting Module Reporting Smartphone Tablet PC PDA FIG. 1: Truck+ system components 1.Tracking & Monitoring Module This module is automated and works in near real time to track and monitor hauling trucks. It is capable of capturing large volume of data on daily basis; processing and analysing the captured data; calculating onsite productivity; measuring actual performance based on earned value concept and comparing the actual versus planned to derive variances if any; and deterministically forecast time and cost for the operation. Actual productivity is a function of the number of trips hauling trucks made over a certain period, which requires calculating the different cycle time durations for each truck. Consequently, calculating cycle time accurately is key element for estimating onsite actual productivity. The developed module estimates the fleet s onsite productivity using the spatial data captured by GPS receivers mounted on the hauling trucks Fig. (2-a).The GPS unit consists mainly of GPS chip and antenna for receiving the satellite signals. The GPS is connected to a microcontroller that has a processor that converts the signals into truck ID, date, time, longitude and latitude along its route as shown in Fig. (2-b). The GPS starts reporting the hauling truck location and its route related data stated above. GPS data are in the form of truck positions in over short time intervals such as 45 seconds. Then, the data is transferred to the main server in the contractor s head office, where the central database resides. Truck cycle time consists of four main components, which are loading, traveling, dumping and return. The loading time is the time when the truck is inside the loading area. Travel time is the time spent between and from loading area to dumping area. Dumping time is the time when the truck is inside the dumping area. Return time is the time required for the truck to travel back from dumping area to loading area to start new cycle. The user defines using the GIS web-based interface the spatial boundaries of the earthmoving operations. In order to allow the user to add layers to the GIS map, a drawing tool has been developed for each cycle component (i.e. loading, travel, dumping and return). Using the drawing tools, the user draws the polygon around the loading area. The drawing tool is flexible to enable the user to draw regular, irregular and circular shapes. If the GPS data point resides inside this polygon, it means that the truck is in the loading process. Similar procedure is done for the dumping area. For the travel and return road, the user draws poly line. This ploy line represents the travel and return roads. If the drawn ploy line inside streets, it will automatically retrieve the street dimensions (centreline and width) from the GIS map. Otherwise, the ploy line is on unpaved roads, an offset with predetermined value will be applied to the poly line to form a polygon. Figure 3 shows a diagrammatic sketch of the data capturing scheme and classification of the components of the earthmoving operation. The user defines the polygons and poly lines one time at the beginning of the project and its corresponding data will be saved automatically in the central database. ITcon Vol. 19 (2014), Montaser & Moselhi, pg. 415
5 (a) (b) FIG. 2: (a) Main components of the used GPS device (b) GPS raw captured data Each GPS data point is mapped on the GIS map, which is used to display geographically as a separate layer the moving truck. The system classifies the truck as it crosses from one polygon to another and the time that polygon was crossed is identified. Then, it is classified as loading, travel, dumping, or return. Truck+ starts identifying the cycles that the truck has done through a series of decisions, as shown in the flow chart (Fig. 4 & 5). The five main events in each cycle are identified to be used afterwards for cycle time calculations. Table 1 shows the GPS data after system processing. For each truck, Truck+ identifies five main events and its corresponding time. They are T1, T2, T3, T4 and T5.By identifying those five events the cycle time component could be calculated as following: Loading Time (L) = Registered time of Event 2 - Registered time of Event 1 Travel Time (T) = Registered time of Event 3 - Registered time of Event 2 Dumping Time (D) = Registered time of Event 4 - Registered time of Event 3 Returning Time (R) = Registered time of Event 5 - Registered time of Event 4 Truck loading time provides a clear picture of the number of trucks inside the loading area and whether it matches the number of loaders (excavators). It assists in identifying whether there are trucks queue or not. Similarly, dumping time could help in detecting dumping area congestion. Such information supports project managers in detect causes behind any unacceptable performance. It should be noted that loading (dumping) time include the exact direct loading (dumping) time in addition to the truck manoeuvring time in loading (dumping) area. Accordingly, the total cycle (C) time is calculated by the summation of loading time, travel time, dumping time and return time. If the truck is outside the optimum travel and return roads, another rule is applied to calculate the travel and return time. The rule is based on the truck direction. If the direction is from the loading area to dumping area, it is classified as travel and vice versa for return. The system calculates the times spent outside the optimum travel and return roads and considers it as cycle time inefficiencies of the operation and reports this to the project manager. The system provides for the user a capability to define if-then rules in the central database, which could help in situations such as driver break time or to fuel the truck. The productivity of the truck is determined knowing the number of trips and the cycle time of each trip that each truck makes within a particular period. For each hauling truck, Truck+ retrieves its capacity and project soil properties from the central database to calculate the truck productivity and to estimate the quantity of hauled excavation. In this module, it is assumed that the truck is loaded with its full capacity; according to truck manufacturer data and soil type. Those steps are repeated for each cycle and each truck and the total cycle time and its components is identified and appended to the central database as shown in Fig. 6. As this system works at company enterprise level, the first step is to identify the desired project. Central database provides the list of project working hauling trucks and retrieves all respective data. Since, the number of hauling trucks, the number of trips per truck and the capacity of each truck are known; the daily-excavated quantity could be calculated. This quantity is divided by the total excavation quantity to identify the actual percentage complete. Percentage complete is used afterwards in earned value analysis for progress reporting purpose and to estimate the actual cost and duration. ITcon Vol. 19 (2014), Montaser & Moselhi, pg. 416
6 According to earned value method, three main indicators are used for performance analysis; namely as: Budget Cost for Work Scheduled (BCWS), Actual Cost for Work Performed (ACWP), and Budget Cost for Work Performed (BCWP) (Moselhi, 1993). BCWS for earthmoving operation is known from the planning stage and saved in the central database. BCWP is calculated according to the percentage complete calculated on daily basis. The user enters ACWP from the actual on-site expenditures related to earthmoving operation. Upon the completion of estimating the BCWS, BCWP and ACWP, this module proceeds to calculate the activity performance indexes Cost Variance (CV), Schedule Variance (SV), Cost Performance Index (CPI) and Schedule Performance Index (SPI). Then, the system indicates whether the earthmoving operation status for time (behind schedule or on schedule or ahead of schedule) and cost (over budget or on budget or under budget). The system deterministically forecasts the cost Estimated at Completion (EAC) using two assumptions: (1) the established performance at the report date will continue until completion (EAC1) or (2) the remaining work will be performed as planned and the previous performance was exception (EAC2). These assumptions are providing practical scenarios for the project manager to select from. This module also generates progress reports in tabular and graphical format. The developed module allows project teams to check jobsite conditions remotely and study the efficiency of the planned operations. It provides them also with tools for detecting potential problems in loading areas, dumping areas and travel hauling and return roads. FIG. 3: Diagrammatic sketch for the GPS/GIS interaction ITcon Vol. 19 (2014), Montaser & Moselhi, pg. 417
7 Start Define Loading Area, Travel Road, Dumping Area, Return Road For Readings let i = 1 to n For i = 1 Is (Latitude, Longitude) In Loading Area Polygon? Yes Classify as Loading No Classify as Teavel Yes Is (Latitude, Longitude) In Travel Road Area Polygon? No Is (Latitude, Longitude) In Dumping Area Polygon? Yes Classify as Dumping Use Directions Rule No No Is (Latitude, Longitude) In Return Road Area Polygon? Yes Classify as Return Set i = i + 1 No Is I = n? Yes A FIG. 4: Flowchart for GPS captured data classification (part 1) ITcon Vol. 19 (2014), Montaser & Moselhi, pg. 418
8 FIG. 5: Flowchart for GPS captured data 5 events identification (part 2) ITcon Vol. 19 (2014), Montaser & Moselhi, pg. 419
9 Start Enter Project ID GPS Data File List All Project Hauling Units (i) Let i = 1 to n Central DB Enter Date Set i = 1 Let # of Hauling Unit Cycles j = 1 to m Set j = 1 Identify Events Append Let Loading Time (L)ij = Tij2 - Tij1 Let Travel Time (T)ij = Tij3 - Tij2 Let Dumping Time (D)ij = Tij4 - Tij3 Let Return Time (R)ij = Tij5 - Tij4 Let Cycle Time (C)ij = (L)ij + (T)ij + (D)ij + (R)ij Set j = j + 1 No Is j = m Set i = i + 1 No Yes Yes Is i = n Hauling Unit ID, # of Cycles, Cycle Time and Its Componanats Estimate Actual Productivity Generate Report % Complete, Cost, Duration & EV Analysis END FIG. 6: Flowchart for data flow in the tracking/monitoring module ITcon Vol. 19 (2014), Montaser & Moselhi, pg. 420
10 Table 2: GPS data an its system processing Date Time Latitude Longitude Classification Event Time (min) Cycle # Cycle Time 08/04/2010 8:12: Loading 1 1 0:25:05 08/04/2010 8:15: Loading 08/04/2010 8:15: Travel 2 0:03:05 08/04/2010 8:17: /04/2010 8:21: /04/2010 8:26: Travel 08/04/2010 8:26: Dump 3 0:11:09 08/04/2010 8:26: /04/2010 8:27: /04/2010 8:28: Dump 08/04/2010 8:29: Return 4 0:02:51 08/04/2010 8:30: /04/2010 8:37: /04/2010 8:37: Return 5 0:08:00 2.Forecasting Module Most forecasting techniques for earthmoving operations use deterministic approaches based on the average performance of elapsed period for the same project. However, those methods do not consider uncertainty or take into consideration fleet configurations different scenarios and its impact on productivity. For example, the cycle time varies from one cycle to other due dynamic factors such as weather conditions and operating conditions in the excavation and dumping areas. Additionally, the traffic on travel roads is another factor, which affects the travel and return durations. The other forecasting techniques are stochastic in nature but rely on historical data of similar past projects. Utilizing such data is an obstacle for accurately simulating the current earthmoving operation. Since, every project is unique in nature even with similar conditions. Also, current literature does not reveal systems that could integrate DES and near real time data acquisition for stochastic forecasting purpose. Therefore, this module demonstrates the stochastic value of hauling trucks captured data in elapsed period of the current earthmoving operation to forecast productivity of the fleet and consequently the duration and cost. In addition, if the elapsed period were suffering from delay, a corrective action would be taken based on generating different scenarios and fleet configurations using computer simulation. This module is automated but requires human intervention in selecting different scenarios such as the number of hauling units and capacity. It is built based on the interaction between the system and the central database where the past period cycles time and its component has been stored. Fig. 7 shows the module general flowchart, starting by generating the Probability Density Function (PDF) for cycle time components from the captured data retrieved earlier. PDF should be generated for each cycle time component (i.e. loading time, travel time and dumping time) that best fits the process including its associated parameters (e.g. mean value and standard deviation) as shown in Fig. 8. The fitted functions are then used as an input for the simulation model to generate and evaluate different scenarios. In this module STROBOSCOPE discrete event simulation engine was utilized, where it is installed on the web server. Specially designed simulation model for earthmoving operations is deployed as depicted in Fig. 9. This DES model will be the typical model used for data manipulation and processing to calculate the stochastic forecasted productivity and to experiment fleet different configuration in case of any corrective action. The DES model will retrieve the earthmoving operation data such as total quantity of earth work, number of hauling trucks and excavators, hauling truck capacity and PDF for different cycle time components from the central database. The system will report to the user the forecasted fleet productivity and its associated cost and time. The user could interact with the system to change the fleet configuration only. Then, a different scenario will be generated for the user, which could help in time or cost optimization and making informed decisions. ITcon Vol. 19 (2014), Montaser & Moselhi, pg. 421
11 Start Stochastic Forecasting Module Generate PDF for Cycle Time Components Retrieve Append Central DB Simulation Engine (STROBOSCOPE) Use Discrete Event Simulation Append Calculate Forecasted Productivity Generate Report Corrective Action (IF any), Forecasted Fleet Configuration, Duration & cost END FIG. 7: Flowchart for forecasting module FIG. 8: Cycle time components probability distribution ITcon Vol. 19 (2014), Montaser & Moselhi, pg. 422
12 FIG. 9: Specific purpose earth moving operation simulation model The simulation model equations are as following: Excavator Idle Ratio = The time weighted average of the content of Excavator Queue / Number of Excavators Excavator Utilization = 1 Excavator Idle Ratio Truck Idle Ratio = The time-weighted average of the content of Truck Queue / Number of Trucks Truck Utilization = 1 Truck Idle Ratio Time of operation in hours = Simulation Time / 60 Production rate (m3/hr) = The current content of Dumped Soil Queue / Time of operation in hours Total cost of operation = [Truck cost ($/hr) * Number of Trucks + Excavator cost ($/hr) * Number of Excavators] * Time of operation (hr) Unit cost ($/m3) = Total cost of operation / The current content of Dumped Soil Queue 3.System Database Earthmoving operations are equipment intensive operations. The optimum monitoring of such equipment requires storing and retrieving a large amount of data. Therefore, a central database has been designed to support the management functions of the system and to minimize the user interaction. The system interacts with the central database specially designed to organize, store and manage GPS captured data from construction sites and other respective earthmoving operation data. The proposed system focuses on capturing data from the construction jobsite storing it in databases and then providing queries to retrieve the information needed for reporting the project status. Relational database management systems are better suited for this type of application (Fig. 10). Because it contains relatively structured data, relationships and schema design. The database consists of nine main entities. Resources entity consists of the main three resources in any construction projects that are equipment, labour and material. The main scope of this paper is the equipment entity that resembles the fleet configurations such as excavator and truck fleet. Both entities have the main attributes for the fleet configuration such as capacity. GPS entity has eight attributes, connected to the truck entity with one to one relationship, and in case of tracking all equipment this relationship could be connected to the equipment entity instead of only trucks. Project entity considered the central entity as it connects to the other five entities. Soil entity represents project soil characteristics as reported in the project geotechnical report. It is necessary for tracking modules and this entity has five main attributes. Soil entity is connected to the project entity with one to many relationship based on an assumption that each project has one soil type only. Road entity is created to represent travel and return road for the truck. In addition, it is essential for the GPS based tracking module to identify the travel and return polygons. ITcon Vol. 19 (2014), Montaser & Moselhi, pg. 423
13 RR GR Distance Capacity Owner Road N Return M Type Dump Area ID Location Segment ID N Travel Serve M Description Type Owner Density Start Date Soil 1 Description Has M Project M Swell Factor ID Budget ID Fill Factor Location 1 M Has Duration M Quantity Duration Budget Description Central Database ID Activity Start Date % Complete Has Work Date GPS ID Heading Eff. Factor N ID N Entity Time GPS Speed Equipment Relationship Information Latitude 1 Longitude Mounted Manufacturer ISA Primary Key Model # 1 Model # Bucket Capacity Attribute Empty Weight Max Weight Truck Heaped Capacity N Load M Max Digging Depth Excavator Max Dumping Height FIG. 10: Entity Relationship (ER) diagram for system database 3. COMPUTER IMPLEMENTATION & CASE STUDY Prototype software has been developed to automate the process of estimating, monitoring and forecasting productivity of hauling trucks as proof of concept. The software allows simultaneous use and easy mutual data exchange between the system modules, central database and other software such as DES engine. In this research, truck+ was implemented as web-based service. This web-based service is accessible over standard Internet protocols with two main roles, which are independent of platforms and programming languages. The first role is the service provider, which is the web server. The web server creates a web service and publishes its interface and access information over the World Wide Web. The components of the web server are the central database, tracking/monitoring module, forecasting module and the DES engine. The second role is the service consumer, which is the software user. The user could access the software via internet using desktop computer or mobile device such as smartphone, tablet PC or Personal Digital Assistance (PDA). Windows Communication Foundation (WCF) technology is deployed as a runtime and a set of APIs (Application Programming Interface) in the Microsoft.NET framework. WCF is a tool used as intermediate level between the web application and the web server. It also processes the main functionality of system. Microsoft Access is used as database management system to store and retrieve project respective data and GPS data as shown in Fig. 11. The GIS component of the software consists of ArcGIS bas map, ArcGIS template for Silverlight and ArcGIS APIs for Silverlight. ArcGIS Base Map is free map service provided by ESRI (Economic and Social Research Institute) containing the street and satellite layers. ArcGIS Template for Silverlight is a free template created using Silverlight technology and contains all basic functionality for any map viewer system such as map panning, zooming and navigation at any part of the selected GIS map. ArcGIS APIs for Silverlight is many DLLs (Dynamic-link library), which add many controls such as map controls that contain the base map (street and satellite map) and scale bar. It utilizes the powerful mapping, geocoding, and ITcon Vol. 19 (2014), Montaser & Moselhi, pg. 424
14 geoprocessing capabilities provided by ArcGIS server (ArcGIS, 2013). It is also used to facilitate communication with GPS spatial data and graphically representing them in the GIS map. In addition, Microsoft Silverlight is used as a web plug-in to give the web browser more functionality. This tool is implemented to enable ArcGIS APIs provide the mapping functionality of GPS points. Finally, Crystal Reports technology is used to develop and generate custom reports layout. It facilitates graphically design data extraction from different data sources such as MS Access database, ArcGIS base map and user inputs. The software was coded using Microsoft Visual C# programming language for the integration and development of various modules and algorithms. For validating the proposed system and demonstrating the use of its components, case study was conducted. Case study made use of the construction of the Centre for Structural and Functional Genomics at Concordia University (CSFG) at Concordia s Loyola campus located in the west end of Montreal (Fig. 12). The fleet used in this project consists of an excavator serving a number of hauling trucks. The soil to be excavated is sandy clay with density of 2900 lb/cy and a swell factor equals to 0.81 according to the geotechnical report. The total quantity of excavated soil is bcy. The system Graphical User Interface (GUI) is designed to be user friendly, straightforward data entry and eliminate redundancy of data. GUI accepts both graphic and nongraphic data entry. The graphic data entry will be through the GIS provided drawing tools. The non-graphic data entry will be through a set of buttons, dialog windows and radio buttons. The main screen of Truck+ web page layout consists of one main view in the centre displaying the world map as depicted in Fig. 13. The top right corner of the screen displays magnifying glasses button, overview map button, map legend button and hide/display map visualization options button. The lower right corner of the screens shows the scale bar and display-navigation controls. When the user press open project button, a dialog box appears. It requests the user to enter the project number. Upon entering the project number, the GIS interface start automatically contacting the web server to load the project respective data. Then, the system extracts the GPS data from the central database and displays it in the GIS map as a separate layer (blue points) for graphical representation. In addition, Truck+ zooms automatically to the extents of the GPS points as shown in Fig. 14. Under change project button, there are four buttons (L, D, T and R), which is the drawing tools for drawing loading polygon, dumping polygon, travel poly line and return poly line respectively. So, the user pushes the button and starts drawing it respective layer. Each layer will be added to map legend in lower right corner. These layers are utilized to classify each GPS point according to the algorithms mentioned earlier. At this stage, the user should select one of the radio buttons, which to choose whether reporting for specific data or reporting from project start to specific data. The project start data is extracted from the central database. According to the user selection, a calendar will appear to select dates. Then the user required entering the ACWP for each day, which represents the actual earthmoving operations expenditure to perform earned value analysis. FIG. 11: Entity Relationship (ER) diagram for the designed Microsoft Access central database ITcon Vol. 19 (2014), Montaser & Moselhi, pg. 425
15 FIG. 12: Construction of CSFG building (Case Study) The reporting module provides the user with online tabular and graphical reports. Tabular format reports have been used to present each truck cycle time and it respective components as shown in Fig. 15. Fig. 16 depicts the number of cycles each truck did in front of each date, which is utilized in conjunction with the truck capacity to calculate the excavated material percentage complete. Then, earned value analysis is conducted to determine the operation performance indices, variances from planned and different deterministic forecasts scenarios for the operation as shown in Fig. 17. Graphical format reports are developed to display information at varying degree of detail such as CPI per day as shown in Fig. 18. ITcon Vol. 19 (2014), Montaser & Moselhi, pg. 426
16 Map Legend Open Project Hel p Map Options Visualization Overview Map Magnifying Glasses Zoom Bar Zoom In Zoom Extent Reset Rotation Zoom Rotate Out Map Scale Bar Map FIG. 13: Developed software web page layout (Part 1) ITcon Vol. 19 (2014), Montaser & Moselhi, pg. 427
17 Change Project Dumping Area Loading Area Loading Area Return Ploy line GPS Points Travel Road Return Road Dumping Area Layer s FIG. 14: Developed software web page layout (Part 2) ITcon Vol. 19 (2014), Montaser & Moselhi, pg. 428
18 FIG. 15: Generated tabular report FIG. 16: Generated tabular report for hauling trucks cycles FIG. 17: Generated tabular report for earned value performance indices ITcon Vol. 19 (2014), Montaser & Moselhi, pg. 429
19 FIG. 18: Generated graphical report for Cost Performance Index (CPI) on daily basis The variables in the DES model are the number of hauling trucks, truck capacity, number of loaders, the quantity of remaining excavation, truck cost per hour and the loader cost per hour. The system retrieves all this data from the database. To generate PDF for each cycle time component, the user specifies the data range (i.e. start date and finish date). Then, the system extracts the cycle time components from the database and filters it to the specified data range. In addition, there is an option to exclude dates from this data range. This enables removing specific time periods during which exceptional conditions are known to have prevailed and are not likely to be repeated. Oracle Crystal Ball is utilized afterwards to generate best fit PDF for each cycle time component based on the captured data specified date range, as shown in Fig. 19. When the user presses simulation reporting, the results is send to an excel file on the user computer desktop. The results are the operation forecasted loader utilization, truck utilization, production rate, time, total cost and the unit cost of excavated material. Since, the forecasting process was done stochastically through PDFs. Then, the results is not crisp values, it is in the form of average, standard deviation, maximum and minimum values, as shown in Fig. 19. In case, the user wants to experiment with the different fleet configuration but with the same PDFs. Then the user could enter the minimum and maximum number of trucks and loaders in the form. Similarly, the same procedure is followed but with different scenarios. FIG. 19: Stochastic forecasting overview ITcon Vol. 19 (2014), Montaser & Moselhi, pg. 430
20 With the continual development of automated data acquisition technologies and its integration, a significant amount of data can be captured at construction sites. To make informed decisions and objective assessments of the progress on a construction site, data from a number of sources must be fused, since it is not possible for all of the necessary information to be captured using a single sensor. Truck+ could be integrated with other technologies to provide more information regarding the loading, travel, dumping and return areas. Regarding the assumption of hauling truck is loaded with it is full capacity; a weighting sensor could be attached under the hauling truck to estimate the weight of soil in truck. Also, a digital camera could be used at the project gates to take picture for the truck and estimate the volume of excavated material in truck. The other assumption is regarding the loading and dumping times; both are calculated once the truck enters/exists the loading or dumping areas. This assumption adds to exact direct loading or dumping time additional time for truck manoeuvring. Other sensors such as low range passive RFID could be utilized to detect truck proximity to excavator for loading, which will improve system accuracy for loading time. Also, switch limit could be utilized to detect the movement of truck bed in dumping process to calculate the exact dumping time. The system accuracy will be enhanced considerably if integrated with other proximity-based and motion-based systems (Montaser and Moselhi, 2012 and Montaser and Moselhi 2013). Other machine-based sensors could be integrated with Truck+ to identify idle time and broken equipment time, which will provide alerting system for project team. The proposed system is part of an undergoing research that integrates diverse data acquisition technologies. It also automates the process of data collection from construction sites comparing it to the planned ones. Subsequently, progress reports are generated. 4. CONCLUSION The paper presents an integrated web-based system to calculate hauling truck productivity. The system consists of two main modules interacting with central database. In addition, construction computer simulation was used to account for uncertainty and to forecast the productivity based on actual captured data. Manual site data acquisition in earthmoving operations is time consuming and may result in tardy corrective actions with undesirable cost consequences. Therefore, in tracking and monitoring module, GPS/GIS spatial technologies were introduced to capture the hauling truck data and to report captured data in near-real-time. Data storage, processing and reporting, are done by the system without human intervention. The developed method utilizes automated site data acquisition in a step ahead of regular GPS tracking and expands upon its use in the construction industry. The proposed system presents practical and easy to use method for estimating productivity of earthmoving operations during planning stage and construction stage. In addition, Truck+ uses computer simulation to demonstrate the fleet configuration bottlenecks. The developed system will facilitate productivity estimation and predication during construction. Near-real-time, control of on-site earthmoving operations facilitates early detection of discrepancies between actual and planned performances to assist project managers in taking appropriate corrective measures. REFERENCES AbouRizk, S. (2010). Role of simulation in construction engineering and management. Journal of Construction Engineering and Management (ASCE), Vol. 126, No. 10, Alkass S. and Harris F. (1988). Expert system for earthmoving equipment selection in road construction, Journal of Construction Engineering and Management (ASCE), Vol. 114, No. 3, Alshibani A. and Moselhi O. (2012). Least cost optimization of scraper pusher fleet operations, Canadian Journal of Civil Engineering, Vol. 39, ArcGIS API for Silverlight (2013). Available at: (Accessed at 5 April 2014). Bouvet D., Froumentin M. and Garcia G. (2001). A real-time localization system for compactors, Journal of Automation in Construction, Vol. 10, No. 4, Caldas C., Grau, D. and Haas C. (2006). Using global positioning systems to improve materials locating processes on industrial projects, Journal of Construction Engineering and Management (ASCE), Vol. 132, No. 7, Caterpillar, Product Link (2013). Available at: (Accessed at 5 April 2014). Cheng C., Oloufa A. and Randolph H. (1996). A GIS-Based system for tracking pavement compaction, Journal of Automation in Construction, Vol. 5, No. 1, ITcon Vol. 19 (2014), Montaser & Moselhi, pg. 431
21 De la Garza J. and Howitt I. (1998). Wireless communication and computing at the construction jobsite, Journal of Automation in Construction, Vol. 7, No. 4, Eldin N. and Mayfield J. (2005). Determination of most economical scrapers fleet, Journal of Construction Engineering and Management (ASCE), Vol. 131, No. 10, Goodrum P., McLaren M. and Durfee A. (2006). The application of active radio frequency identification technology for tool tracking on construction job sites, Journal of Automation in Construction, Vol. 15, No. 3, Grau D. and Caldas C. (2009). Methodology for automating the identification and localization of construction components on industrial projects, Journal of Computing in Civil Engineering (ASCE), Vol. 23, No. 1, Hajjar D. and AbouRizk S. (1999). Symphony: an environment for building special purpose simulation, 31st Winter Simulation Conference, Phoenix, AZ, USA, Halpin, D. (1973). An investigation of the use of simulation networks for modeling construction operations. Ph.D. Thesis presented to University of Illinois at Urbana-Champaign, USA. Halpin D.W. and Riggs L.S. (1992). Planning and analysis of construction operations. John Wiley & Sons, Inc., New York. Hassanien A. (2002). Planning and scheduling highway construction using GIS and dynamic programming, Ph.D. Dissertation, Department of Building, Civil and Environmental Engineering, Concordia University, Montreal, Quebec. Hassanien A. and Moselhi O. (2002). Automated data acquisition and planning of highway construction, Proc. of 19th ISARC Conference, Gaithersburg, Maryland, USA September Jaroslaw J. and Karl L. (2002). A cost effective positioning solution for asphalt rollers based on low cost DGPS receivers, Proc. of 19th ISARC Conference, Maryland, USA, September 23-25, John H., Michael V. and Julio M. (2005). Reduction of short-interval GPS data for construction operations analysis, Journal of Construction Engineering and Management (ASCE), Vol. 131, No. 8, Martinez J.C. (1996). STROBOSCOPE: state and resource based simulation of construction processes, Ph.D. Dissertation, University of Michigan, Ann Arbor, MI, USA. Marzouk M. and Moselhi O. (2003). Object-oriented simulation model for earthmoving operations, Journal of Construction Engineering and Management (ASCE), Vol. 129, No. 2, Marzouk M. and Moselhi O. (2004). Multi-objective optimization of earthmoving operations, Journal of Construction Engineering and Management (ASCE), Vol. 130, No. 1, Montaser A. and Moselhi O. (2012). RFID+ for tracking earthmoving operations, Proceedings of Construction Research Congress (CRC 2012), ASCE Construction Institute and Construction Engineering and Management, West Lafayette, Indiana, United States, Montaser A. and Moselhi O. (2013). Tracking hauling trucks for cut-fill earthmoving operations, Proceedings of 30th ISARC Conference (ISARC 2013), Montreal, Quebec, Canada. Montaser A., Bakry I., Alshibani A. and Moselhi O. (2011). Estimating productivity of earthmoving operations using spatial technologies, proceedings of Canadian Society for Civil Engineering Annual Conference (CSCE 2011), 3rd International/9th Construction Specialty Conference, Ottawa, Ontario, Canada, June 14-17, Vol. 3, Moselhi O. (1993). Applied earned value for control, International Symposium of CIB W-65, Sept., St. Augustine, Trinidad and Tobago. Moselhi O. and Alshibani A. (2009). Optimization of earthmoving operations in heavy civil engineering projects, Journal of Construction Engineering and Management (ASCE), Vol. 135, No. 10, Navon R. and Goldschmidt E. (2002). Monitoring labor inputs: automated-data collection model and enabling technologies, Journal of Automation in Construction, Vol. 12, Oglesby H., Parker W. and Howell A. (1989). Productivity Improvement in Construction, McGraw Hill Companies, New York, NY, USA. ITcon Vol. 19 (2014), Montaser & Moselhi, pg. 432
22 Oloufa A.A., Do W. and Thomas W. R. (1997). Automated monitoring of compaction using GPS, Proceedings of 1997 Construction Congress (ASCE), Reston, VA, Rezazadeh Azar E. and McCabe B. (2012). Automated visual recognition of dump trucks in construction videos, Journal of Computing in Civil Engineering (ASCE), Vol. 26, No. 6, Sacks R., Navon R., Shapira A. and Brodetzky I. (2002). Monitoring construction equipment for automated project performance control, International Symposium on Automation and Robotics in Construction (ISARC 2002), Washington, DC. Shi J. and AbouRizk S. (1995). An optimization method for simulating large complex system, Engineering Optimization, Vol. 25, No. 3, ITcon Vol. 19 (2014), Montaser & Moselhi, pg. 433
TRACKING HAULING TRUCKS FOR CUT-FILL EARTHMOVING OPERATIONS
TRACKING HAULING TRUCKS FOR CUT-FILL EARTHMOVING OPERATIONS *Ali Montaser, and Osama Moselhi Department of Building, Civil and Environmental Engineering, Concordia University, Montreal, Quebec, Canada
RFID+ for Tracking Earthmoving Operations
1011 RFID+ for Tracking Earthmoving Operations Ali MONTASER 1 and Osama MOSELHI 2 1 Department of Building, Civil & Environmental Engineering, Concordia University, 1455 De Maisonneuve Blvd. W., Montreal,
Fleet Features Contents
Cat Fleet Fleet Features Real-time monitoring of mobile equipment and material movement Advanced truck assignment capabilities to optimize fleet productivity Material tracking supports precise blending
IFS-8000 V2.0 INFORMATION FUSION SYSTEM
IFS-8000 V2.0 INFORMATION FUSION SYSTEM IFS-8000 V2.0 Overview IFS-8000 v2.0 is a flexible, scalable and modular IT system to support the processes of aggregation of information from intercepts to intelligence
Zorba Asset Tracking Solution
Asset Tracking Solution State-of-the art fleet management and vehicle tracking solution to increase your productivity. Affordable installation and operating costs Easy to install and operate User friendly
Remote Monitoring of Dynamic Construction Processes Using Automated Equipment Tracking
1360 1 Remote Monitoring of Dynamic Construction Processes Using Automated Equipment Tracking Reza AKHAVIAN 1 and Amir H. BEHZADAN 2 M.S.C.E. Student, Department of Civil, Environmental, and Construction
Construction Equipment Fleet Management
International OPEN ACCESS Journal Of Modern Engineering Research (IJMER) Construction Equipment Fleet Management Sujay Dandwate *(Civil Engineering Department, D.Y.Patil College of Engineering, Akurdi,
STOCHASTIC SIMULATION MODEL FOR A LONG DISTANCE SAND TRANSPORTATION PROCESS
STOCHASTIC SIMULATION MODEL FOR A LONG DISTANCE SAND TRANSPORTATION PROCESS *J. Kang Texas A&M University 3137 TAMU College Station, TX 77845 (*Corresponding author: [email protected]) S. Ahn Samsung
Zigbee-Based Wireless Distance Measuring Sensor System
Zigbee-Based Wireless Distance Measuring Sensor System Ondrej Sajdl 1, Jaromir Zak 1, Radimir Vrba 1 1 Department of Microelectronics, Brno University of Technology, FEEC, Udolni 53, 602 00 Brno, Czech
Applying the Chronographical Approach to the Modelling of Multistorey Building Projects
Applying the Chronographical Approach to the Modelling of Multistorey Building Projects A. Francis, E. T. Miresco Department of Construction Engineering, École de technologie supérieure, University of
An Esri White Paper June 2010 Tracking Server 10
An Esri White Paper June 2010 Tracking Server 10 Esri 380 New York St., Redlands, CA 92373-8100 USA TEL 909-793-2853 FAX 909-793-5953 E-MAIL [email protected] WEB www.esri.com Copyright 2010 Esri All rights
Implementation of CVIS ITS Application in a Driving Simulator Environment Kenneth Sørensen, [email protected] SINTEF
Denne artikel er publiceret i det elektroniske tidsskrift Artikler fra Trafikdage på Aalborg Universitet (Proceedings from the Annual Transport Conference at Aalborg University) ISSN 1603-9696 www.trafikdage.dk/artikelarkiv
Rotorcraft Health Management System (RHMS)
AIAC-11 Eleventh Australian International Aerospace Congress Rotorcraft Health Management System (RHMS) Robab Safa-Bakhsh 1, Dmitry Cherkassky 2 1 The Boeing Company, Phantom Works Philadelphia Center
AUTOMATED PRODUCTIVITY ASSESSMENT OF EARTHMOVING OPERATIONS
www.itcon.org - Journal of Information Technology in Construction - ISSN 1874-4753 AUTOMATED PRODUCTIVITY ASSESSMENT OF EARTHMOVING OPERATIONS SUBMITTED: March 2014 REVISED: July 2014 PUBLISHED: July 2014
Software for Supply Chain Design and Analysis
Software for Supply Chain Design and Analysis Optimize networks Improve product flow Position inventory Simulate service Balance production Refine routes The Leading Supply Chain Design and Analysis Application
Developing Fleet and Asset Tracking Solutions with Web Maps
Developing Fleet and Asset Tracking Solutions with Web Maps Introduction Many organizations have mobile field staff that perform business processes away from the office which include sales, service, maintenance,
Quareo ICM Server Software
The Quareo Infrastructure Configuration Manager (ICM) is a server software application designed to document and administer both passive and active network connectivity infrastructure. ICM enables management
Data Visualization. Prepared by Francisco Olivera, Ph.D., Srikanth Koka Department of Civil Engineering Texas A&M University February 2004
Data Visualization Prepared by Francisco Olivera, Ph.D., Srikanth Koka Department of Civil Engineering Texas A&M University February 2004 Contents Brief Overview of ArcMap Goals of the Exercise Computer
All-in-One Asset Management Tool
APEX-RU0781 All-in-One Asset Management Tool Final Report October 2012 Submitted by Mansooreh Mollaghasemi, Ph.D. Chairman and CEO Productivity Apex, Inc 3505 Lake Lynda Drive, Suite 206 Orlando, FL 32817
Project Control. 1. Schedule Updating
Project Control During the execution of a project, procedures for project control and record keeping become indispensable tools to managers and other participants in the construction process. These tools
SuperNav for Heavy Equipment
SuperNav for Heavy Equipment Supervised Navigation System for Heavy Equipment Supervised Navigation (SuperNav) is an option for Raveon Technology s RavTrack GPS tracking system. RavTrack SuperNav is a
AUTOMATED PROJECT SCHEDULE AND INVENTORY MONITORING USING RFID
24th International Symposium on on Automation & Robotics in in Construction (ISARC 2007) Construction Automation Group, I.I.T. Madras AUTOMATED PROJECT SCHEDULE AND INVENTORY MONITORING USING RFID Geetha
FAQ s 1. What is GPS? 2. How does GPS work? 3. What is GPRS? 4. How does your device communicate?
1. What is GPS? GPS is an acronym that stands for Global Positioning System. GPS is one of a few satellite navigational systems; however it is the only fully functional system currently in service. GPS
Mapping Mashup/Data Integration Development Resources
Mapping Mashup/Data Integration Development Resources David Hart GIS Specialist University of Wisconsin Sea Grant Institute October 6, 2008 Virtual Globes A virtual globe is a 3D software model or representation
PREFETCH VIDEO CONFERENCE OVER LAN THROUGH PC S OR LAPTOPS
International Journal of Innovation and Applied Studies ISSN 2028-9324 Vol. 7 No. 2 Aug. 2014, pp. 588-592 2014 Innovative Space of Scientific Research Journals http://www.ijias.issr-journals.org/ PREFETCH
A STRATEGIC PLANNER FOR ROBOT EXCAVATION' by Humberto Romero-Lois, Research Assistant, Department of Civil Engineering
A STRATEGIC PLANNER FOR ROBOT EXCAVATION' by Humberto Romero-Lois, Research Assistant, Department of Civil Engineering Chris Hendrickson, Professor, Department of Civil Engineering, and Irving Oppenheim,
State-Based Probabilistic Scheduling Using STROBOSCOPE s CPM Add-On
Proceedings, Construction Congress V, ASCE Stuart D. Anderson,ed State-Based Probabilistic Scheduling Using STROBOSCOPE s CPM Add-On by Julio C. Martinez 1 and Photios G. Ioannou 2 Abstract Critical path
A Geographic Information Systems (GIS) Hazard Assessment Application for Recreational Diving within Lake Superior Shipwrecks
A Geographic Information Systems (GIS) Hazard Assessment Application for Recreational Diving within Lake Superior Shipwrecks Nathan Graham Department of Resource Analysis, Saint Mary s University of Minnesota,
Global Positioning System (GPS) Automated Vehicle Location (AVL) Geographic Information System (GIS) and Routing/Scheduling System
Global Positioning System (GPS) Automated Vehicle Location (AVL) Geographic Information System (GIS) and Routing/Scheduling System Jeff Tsai Program Director Institute for Transportation Research and Education
3D Interactive Information Visualization: Guidelines from experience and analysis of applications
3D Interactive Information Visualization: Guidelines from experience and analysis of applications Richard Brath Visible Decisions Inc., 200 Front St. W. #2203, Toronto, Canada, [email protected] 1. EXPERT
PHASE 2_3 RD SESSION REPORT KU GIS LABS ARCGIS TRAINING: USING ARCGIS (APPLICATIONS) 18 TH - 22 ND AUGUST 2014 SCHOOL OF ENGINEERING COMPUTER LAB
PHASE 2_3 RD SESSION REPORT KU GIS LABS ARCGIS TRAINING: USING ARCGIS (APPLICATIONS) 18 TH - 22 ND AUGUST 2014 SCHOOL OF ENGINEERING COMPUTER LAB PHASE 2_3 rd SESSION REPORT ARCGIS TRAINING: 18 TH - 22
Commercial Motor Vehicle Safety and Security Systems Technology Wireless Mobile Communications
Commercial Motor Vehicle Safety and Security Systems Technology Wireless Mobile Communications Objective Satellite- and cellular-based mobile two-way communication tracking systems for commercial motor
Building & Developing the Environmental
Building & Developing the Environmental Web Explorer for Riyadh City Authors: Engineer Yousef Bin Othman Al-Fariheedi Manager of Environmental Data Unit Environmental Management and Protection Department
Implementing a Web-based Transportation Data Management System
Presentation for the ITE District 6 Annual Meeting, June 2006, Honolulu 1 Implementing a Web-based Transportation Data Management System Tim Welch 1, Kristin Tufte 2, Ransford S. McCourt 3, Robert L. Bertini
Latin American and Caribbean Flood and Drought Monitor Tutorial Last Updated: November 2014
Latin American and Caribbean Flood and Drought Monitor Tutorial Last Updated: November 2014 Introduction: This tutorial examines the main features of the Latin American and Caribbean Flood and Drought
ArcGIS Viewer for Silverlight An Introduction
Esri International User Conference San Diego, California Technical Workshops July 26, 2012 ArcGIS Viewer for Silverlight An Introduction Rich Zwaap Agenda Background Product overview Getting started and
Kodiak Island Borough GIS Online Tools
Kodiak Island Borough GIS Online Tools The Kodiak Island Borough website is located at http://www.kodiakak.us/ You can access the GIS resources by clicking on the MAP CENTER icon in the middle of the page,
AUTOMATED CONSTRUCTION PLANNING FOR MULTI-STORY BUILDINGS
AUTOMATED CONSTRUCTION PLANNING FOR MULTI-STORY BUILDINGS Tang-Hung Nguyen 1 ABSTRACT This paper outlines a computer-based framework that can assist construction planners and schedulers in automatically
Model, Analyze and Optimize the Supply Chain
Model, Analyze and Optimize the Supply Chain Optimize networks Improve product flow Right-size inventory Simulate service Balance production Optimize routes The Leading Supply Chain Design and Analysis
Tracking Anomalies in Vehicle Movements using Mobile GIS
Tracking Anomalies in Vehicle Movements using Mobile GIS M.Saravanan Ericsson Research India Ericsson India Global Services Pvt.Ltd. Chennai, India Abstract--- Detecting fraud activities and anomalies
GIS/GPS/GPRS and Web based Framework for Fleet Tracking
GIS/GPS/GPRS and Web based Framework for Fleet Tracking Michael Medagama 1, Dilusha Gamage 1, Lanka Wijesinghe 1, Nadeeka Leelaratna 1, Indika Karunaratne 2 and Dileeka Dias 3 1 Dialog-University of Moratuwa
Cat Detect. for Surface Mining Applications
Cat Detect for Surface Mining Applications Enhance Your Site s Safety through Increased Operator Awareness Configurable to suit your operation s needs, Cat MineStar System is the industry s broadest suite
A Real Time Tracking and Alerting System Using LabVIEW
A Real Time Tracking and Alerting System Using LabVIEW J Jyothirmai Joshi Assistant Professor, Dept. of EIE, VNR Vignan Jyothi Institute of Engineering and Technology, Hyderabad, Telangana, India ABSTRACT:
Buffer Operations in GIS
Buffer Operations in GIS Nagapramod Mandagere, Graduate Student, University of Minnesota [email protected] SYNONYMS GIS Buffers, Buffering Operations DEFINITION A buffer is a region of memory used to
NAVMAN WIRELESS GPS FLEET AND ASSET MANAGEMENT SOLUTIONS A BETTER WAY TO MANAGE YOUR FLEET AND ASSETS
NAVMAN WIRELESS GPS FLEET AND ASSET MANAGEMENT SOLUTIONS A BETTER WAY TO MANAGE YOUR FLEET AND ASSETS HOW REAL-TIME CONTROL CAN INCREASE EFFICIENCY, LOWER COSTS AND IMPROVE CUSTOMER SERVICE Navman Wireless
Seeing by Degrees: Programming Visualization From Sensor Networks
Seeing by Degrees: Programming Visualization From Sensor Networks Da-Wei Huang Michael Bobker Daniel Harris Engineer, Building Manager, Building Director of Control Control Technology Strategy Development
ArcGIS online Introduction... 2. Module 1: How to create a basic map on ArcGIS online... 3. Creating a public account with ArcGIS online...
Table of Contents ArcGIS online Introduction... 2 Module 1: How to create a basic map on ArcGIS online... 3 Creating a public account with ArcGIS online... 3 Opening a Map, Adding a Basemap and then Saving
CMR Journal of Engineering and Technology Vol.1 Issue.1 January 2016
VEHICLE TRACKING SYSTEM WITH ANDROID APP SUPPORT ABSTRACT M. Sudhakar Professor Dept of ECE CMR College of Engineering & Technology Kandlakoya, Medchal Rd, Hyderabad e-mail: [email protected] K.Kalyani PG
Multi-Touch Ring Encoder Software Development Kit User s Guide
Multi-Touch Ring Encoder Software Development Kit User s Guide v2.0 Bulletin #1198 561 Hillgrove Avenue LaGrange, IL 60525 Phone: (708) 354-1040 Fax: (708) 354-2820 E-mail: [email protected] On the
Business Value Reporting and Analytics
IP Telephony Contact Centers Mobility Services WHITE PAPER Business Value Reporting and Analytics Avaya Operational Analyst April 2005 avaya.com Table of Contents Section 1: Introduction... 1 Section 2:
An Assessment of Nominal and Actual Hourly Production of the Construction Equipment Based on Several Earth-Fill Dam Projects in Iran
74 The Open Civil ering Journal, 2009, 3, 74-82 Open Access An Assessment of Nominal and Actual Hourly Production of the Construction Equipment Based on Several Earth-Fill Dam Projects in Iran Hamed Nabizadeh
Construction Equipment Fleet Management: Case Study of Highway Construction Project
Construction Equipment Fleet Management: Study of Highway Construction Project 1 Saurabh Rajendra Kadam, 2 Prof. Dhananjay S Patil 1 P.G.Scholar, Department of Civil Engineering, Rajarambapu Institute
GIS: Geographic Information Systems A short introduction
GIS: Geographic Information Systems A short introduction Outline The Center for Digital Scholarship What is GIS? Data types GIS software and analysis Campus GIS resources Center for Digital Scholarship
GEOGRAPHIC INFORMATION SYSTEMS CERTIFICATION
GEOGRAPHIC INFORMATION SYSTEMS CERTIFICATION GIS Syllabus - Version 1.2 January 2007 Copyright AICA-CEPIS 2009 1 Version 1 January 2007 GIS Certification Programme 1. Target The GIS certification is aimed
Realist A Quick Start Guide for New Users
Realist A Quick Start Guide for New Users Realist is a service from: First American Real Estate Solutions 4 First American Way Santa Ana, CA 92707 Contents 1. Welcome to Realist... 2 2. How to Access Realist...
GPS Insight Newsletter. Featured customer success story: Contact GPS Insight:
November 2008 GPS Insight Newsletter GPS Insight completed several key business and technology initiatives over the past two months. We have moved into our new Headquarters in Scottsdale, opened our newest
SYSTEM DEVELOPMENT AND IMPLEMENTATION
CHAPTER 6 SYSTEM DEVELOPMENT AND IMPLEMENTATION 6.0 Introduction This chapter discusses about the development and implementation process of EPUM web-based system. The process is based on the system design
ESTIMATION AND PLANNING TOOL FOR INDUSTRIAL CONSTRUCTION SCAFFOLDING. *C. Kumar, S. M. AbouRizk, and Y. Mohamed
ESTIMATION AND PLANNING TOOL FOR INDUSTRIAL CONSTRUCTION SCAFFOLDING *C. Kumar, S. M. AbouRizk, and Y. Mohamed Department of Civil and Environmental Engineering University of Alberta Edmonton, AB, Canada,
WFP Liberia Country Office
1 Oscar Gobbato [email protected] [email protected] WFP Liberia Country Office GIS training - Summary Objectives 1 To introduce to participants the basic concepts and techniques in using Geographic
Magnum AVL GPS Fleet Tracking User Interface Help Guide
2011 Magnum AVL GPS Fleet Tracking User Interface Help Guide Contents: Recent Technical Bulletins and Website Updates, Overview of Control Panel and Software Menus and Quick Reference How To Guide Magnum
Implementing Geospatial Data in Parametric Environment Elçin ERTUĞRUL*
Proceedings of the International Association for Shell and Spatial Structures (IASS) Symposium 2015, Amsterdam 17-20 August 2015, Amsterdam, The Netherlands Implementing Geospatial Data in Parametric Environment
A framework for Itinerary Personalization in Cultural Tourism of Smart Cities
A framework for Itinerary Personalization in Cultural Tourism of Smart Cities Gianpaolo D Amico, Simone Ercoli, and Alberto Del Bimbo University of Florence, Media Integration and Communication Center
Ovation Operator Workstation for Microsoft Windows Operating System Data Sheet
Ovation Operator Workstation for Microsoft Windows Operating System Features Delivers full multi-tasking operation Accesses up to 200,000 dynamic points Secure standard operating desktop environment Intuitive
Exploring GIS Integration Options for SAP BusinessObjects
Exploring GIS Integration Options for SAP BusinessObjects Introduction In conversations with various individuals and businesses over the years, I hear a common question being raised: How do I integrate
Motion & The Global Positioning System (GPS)
Grade Level: K - 8 Subject: Motion Prep Time: < 10 minutes Duration: 30 minutes Objective: To learn how to analyze GPS data in order to track an object and derive its velocity from positions and times.
Cross Platform Mobile Gis System For Data Collection Based On Gps And Emerging Gis Technologies
International Conference of Advance Research and Innovation (-2014) Cross Platform Mobile Gis System For Data Collection Based On Gps And Emerging Gis Technologies Mohammad Nasim a,*, Prashant Kumar b
CASE STUDY LANDSLIDE MONITORING
Introduction Monitoring of terrain movements (unstable slopes, landslides, glaciers, ) is an increasingly important task for today s geotechnical people asked to prevent or forecast natural disaster that
Geocortex HTML 5 Viewer Manual
1 FAQ Nothing Happens When I Print? How Do I Search? How Do I Find Feature Information? How Do I Print? How can I Email A Map? How Do I See the Legend? How Do I Find the Coordinates of a Location? How
Amr A. Oloufa, Won-seok Do, and H. Randolph Thomas. Penn State University aoloufa@psu. eclu
iautomation and Robotics in Construction XVI 1999 by UC3M An Automated System for Quality Control of Compaction Operations : Receiver Tests & Algorithms Amr A. Oloufa, Won-seok Do, and H. Randolph Thomas
IMPROVING ON-SITE MATERIALS TRACKING FOR INVENTORY MANAGEMENT IN CONSTRUCTION PROJECTS
IMPROVING ON-SITE MATERIALS TRACKING FOR INVENTORY MANAGEMENT IN CONSTRUCTION PROJECTS Narimah Kasim 1, Siti Radziah Liwan 2, Alina Shamsuddin 3, Rozlin Zainal 4, and Naadira Che Kamaruddin 5 Faculty of
DataPA OpenAnalytics End User Training
DataPA OpenAnalytics End User Training DataPA End User Training Lesson 1 Course Overview DataPA Chapter 1 Course Overview Introduction This course covers the skills required to use DataPA OpenAnalytics
IBM Cognos TM1 Executive Viewer Fast self-service analytics
Data Sheet IBM Cognos TM1 Executive Viewer Fast self-service analytics Overview IBM Cognos TM1 Executive Viewer provides business users with selfservice, real-time, Web-based access to information from
Utilizing spatial information systems for non-spatial-data analysis
Jointly published by Akadémiai Kiadó, Budapest Scientometrics, and Kluwer Academic Publishers, Dordrecht Vol. 51, No. 3 (2001) 563 571 Utilizing spatial information systems for non-spatial-data analysis
Use of a Web-Based GIS for Real-Time Traffic Information Fusion and Presentation over the Internet
Use of a Web-Based GIS for Real-Time Traffic Information Fusion and Presentation over the Internet SUMMARY Dimitris Kotzinos 1, Poulicos Prastacos 2 1 Department of Computer Science, University of Crete
Empirical Application of GPS Fleet Tracking Technology to a Soil Excavation Process
Empirical Application of GPS Fleet Tracking Technology to a Soil Excavation Process Kang, J. Texas A&M University (email: [email protected]) Ahn, S.M. Samsung C&T Corporation (email: [email protected])
Planning and Scheduling Your Project Using Microsoft Project 2003
Planning and Scheduling Your Project Using Microsoft Project 2003 Sridhar Pandurangiah Director - Engineering [email protected] Meeting Protocol Agenda Project File Project Calendar Creating
DATA VISUALIZATION GABRIEL PARODI STUDY MATERIAL: PRINCIPLES OF GEOGRAPHIC INFORMATION SYSTEMS AN INTRODUCTORY TEXTBOOK CHAPTER 7
DATA VISUALIZATION GABRIEL PARODI STUDY MATERIAL: PRINCIPLES OF GEOGRAPHIC INFORMATION SYSTEMS AN INTRODUCTORY TEXTBOOK CHAPTER 7 Contents GIS and maps The visualization process Visualization and strategies
Getting Started With LP360
Getting Started With LP360 10/30/2014 1 Contents What is LP360?... 3 System Requirements... 3 Installing LP360... 4 How to Enable the LP360 Extension... 4 How to Display the LP360 Toolbar... 4 How to Import
Smart Thermostat page 1
Smart Thermostat page 1 3. APPROACH In today s home appliances market, automation is becoming the norm and Smart Thermostat is a typical automation appliance able to be applied easily at home. With Smart
Step 2: Learn where the nearest divergent boundaries are located.
What happens when plates diverge? Plates spread apart, or diverge, from each other at divergent boundaries. At these boundaries new ocean crust is added to the Earth s surface and ocean basins are created.
plans based on actual cost, schedule and technical progress of work [1, 9].
An Analysis on Resource Planning, Estimation and Tracking of Project by Earned Value Management SHAIK MOHAMMAD MASOOD, DEVANAND.R, HARSHA H.N PG Student, Department of Civil Engineering, G.E.C, Hassan
Autos Limited Ghana Vehicle Tracking Business Proposal
Autos Limited Ghana Vehicle Tracking Business Proposal Executive Summary Our Understanding of Your Goals We understand that you or your business needs to monitor all your vehicles or company's to minimize
Truck Automation for the Ready Mixed Concrete Industry. Michael J. Hoagland (205) 879-3282 ext. 1164 [email protected]
Truck Automation for the Ready Mixed Concrete Industry Michael J. Hoagland (205) 879-3282 ext. 1164 [email protected] Session Agenda What is GPS and How does it work? Auto Signaling Explained
MOBILE GEOGRAPHIC INFORMATION SYSTEMS: A CASE STUDY ON MANSOURA UNIVERSITY, EGYPT
MOBILE GEOGRAPHIC INFORMATION SYSTEMS: A CASE STUDY ON MANSOURA UNIVERSITY, EGYPT Asmaa Ahmed Hussein 1, Elkhedr Hassan Eibrahim 2, Aziza Asem 1 1 Faculty of Computer Sciences and information systems,
GIS-Based Road Inventory Application for the USDOT FHWA. Bobby Harris Senior Manager bd Systems, Spatial Division
GIS-Based Road Inventory Application for the USDOT FHWA Bobby Harris Senior Manager bd Systems, Spatial Division Overview of Presentation Background Objectives of Pilot Project Challenges Review of Web-Based
Discrete Wireless MARCUS Product Overview
Discrete Wireless MARCUS Product Overview Company Background Discrete Wireless, Inc. is a dynamic leader in GPS Fleet Management products and services. Discrete Wireless was incorporated May 12, 2000.
LOCAL FLEET TRACKING. GPS Fleet Tracking Help Guide
LOCAL FLEET TRACKING GPS Fleet Tracking Help Guide Table of Contents HOW TO SET UP THE CONTROL PANEL... 3 HOW TO SET UP A BOOKMARK... 5 HOW TO SET UP A GEOFENCE... 7 HOW TO DISPLAY VEHICLE HISTORY... 9
GEOGRAPHIC INFORMATION SYSTEMS
GIS GEOGRAPHIC INFORMATION SYSTEMS FOR CADASTRAL MAPPING Chapter 7 2015 Cadastral Mapping Manual 7-0 GIS - GEOGRAPHIC INFORMATION SYSTEMS What is GIS For a long time people have sketched, drawn and studied
TCP/IP MODULE CA-ETHR-A INSTALLATION MANUAL
TCP/IP MODULE CA-ETHR-A INSTALLATION MANUAL w w w. c d v g r o u p. c o m CA-ETHR-A: TCP/IP Module Installation Manual Page Table of Contents Introduction...5 Hardware Components... 6 Technical Specifications...