Public Employees Occupational Safety and Health Program
|
|
|
- Bethany Dean
- 9 years ago
- Views:
Transcription
1 Public Employees Occupational Safety and Health Program Public Employer s Guide and Model Written Program for The Indoor Air Quality Standard (N.J.A.C. 12:100-13) (2007) Fred M. Jacobs, M.D., J.D. Jon Corzine David J. Socolow Commissioner Governor Commissioner
2 Public Employer s Guide and Model Written Program for the Indoor Air Quality Standard Table of Contents About the Public Employer s Guide and Model Written Indoor Air Quality Program... ii Introduction... iii Executive Summary... iv-v Public Employer s Guide to Compliance with the Indoor Air Quality Standard (N.J.A.C. 12:100-13)(2007)...1 Read the IAQ Standard and Inspection Checklist...1 Understand Building Management Responsibilities...1 Owned Buildings...1 Leased Buildings...1 Select a Designated Person...2 Provide Designated Person Training...2 Understand the Responsibilities of the Designated Person...2 Prepare and Implement a Written Program...3 Establish a Preventive Maintenance Program...3 Maintain a Preventive Maintenance Log...4 Maintain Acceptable IAQ Indicators...4 Temperature...4 Carbon Dioxide...4 Conduct IAQ Complaint Investigations...5 Control Potential Contaminant Sources...6 Outside Air...6 Point Source Contaminants...6 General Source Contaminants...6 Manage Building Construction/Renovation Projects...7 Maintain Records...8 Model Indoor Air Quality Written Program Appendices A. PEOSH Indoor Air Quality Standard (N.J.A.C. 12:100-13)(2007) B. Summary of Revisions to PEOSH Indoor Air Quality Standard (1997) C. PEOSH Indoor Air Quality Inspection Checklist D. Sample HVAC Inspection Checklist E. Sample HVAC Preventive Maintenance Log F. Sample Renovation/Construction Project Checklist G. Sample Renovation/Construction Project Employee Notification Form Additional Resources i
3 About the Public Employer s Guide and Model Written Indoor Air Quality Program The Public Employer s Guide and Model Written Indoor Air Quality (IAQ) Program was developed by the New Jersey Department of Health and Senior Services, Public Employees Occupational Safety and Health (PEOSH) Program. Included in the Guide and Model Indoor Air Quality Program are: Guidance for Compliance with the IAQ Standard A copy of the IAQ Standard (N.J.A.C. 12:100-13)(2007) An overview of the major changes that have been made in the IAQ Standard (2007) A Model Written IAQ Program Sample IAQ checklists IAQ fact sheets, and IAQ Resources The Model Written Indoor Air Quality Program is provided to illustrate how to develop a written program. The format and content of the model program must be modified to reflect the specific ventilation system(s) and administrative policies at each building. Although this program is provided in print format, it is recommended that the employer download an electronic copy of the program from the NJDHSS-PEOSH website ( The electronic copy can be easily modified with word processing software. The model program was designed with common fields which can be amended with the find/replace function of the word processing software in order to simplify modification. It is important to note that this Guide was developed to assist employers with complying with the IAQ Standard (2007) at the most basic level and is not intended to be a state of the art IAQ program. The employer is encouraged to exceed the basic requirements of the IAQ standard with best practices as they evolve in the developing science and technology in the field of IAQ. The list of additional resources found at the end of this document should be utilized by the employer to enhance their IAQ program as much as their specific situation requires or allows. August 2007 ii
4 Introduction The New Jersey Public Employees' Occupational Safety and Health (PEOSH) Act, N.J.S.A. 34:6A-25 et seq., effective January 1984, was enacted to ensure that all public employees are provided with safe and healthful work environments free from recognized hazards. PEOSH is administered by the New Jersey Department of Labor and Workforce Development (NJDLWD) in conjunction with the New Jersey Department of Health and Senior Services (NJDHSS). The PEOSH Advisory Board, which is comprised of selected individuals representing public employer organizations, public employee organizations, and citizen groups, provides guidance to PEOSH in an advisory capacity. PEOSH first adopted an IAQ Standard on January 21, This standard was deleted in 1995 when the PEOSH Act was amended. A new standard was adopted March 3, In December 2004, the PEOSH Advisory Board was presented with a proposal to amend portions of the Indoor Air Quality (IAQ) Standard (N.J.A.C. 12:100-13)(1997). To that end, the PEOSH Advisory Board established an IAQ Subcommittee, comprised of experts and interested parties, to evaluate the existing standard. The subcommittee met nine times between January and October 2005 to review and discuss all sections of the PEOSH IAQ Standard. On December 1, 2005, the PEOSH Advisory Board received the recommendations for revisions to the IAQ Standard as proposed by the IAQ Subcommittee. These recommendations were endorsed by the PEOSH Advisory Board and presented to the NJDHSS and NJDLWD for consideration. On December 18, 2006, proposed revisions to the IAQ Standard were published in the New Jersey Register for public comment. A public hearing was held January 5, 2007 and the revised IAQ Standard was adopted on May 21, iii
5 Executive Summary The 2007 revisions to the PEOSH Indoor Air Quality (IAQ) Standard (N.J.A.C. 12:100-13)(1997) represent the consensus of stakeholders throughout the state and reflect changes in the field of occupational health and the evolving science of indoor air quality. The revision also clarifies certain terms and concepts that are used throughout the standard. Following is an abbreviated summary of substantive changes included in the PEOSH IAQ Standard: Employers are required to ensure that the Designated Person has the knowledge necessary to perform the job requirements. The New Jersey Department of Health and Senior Services (NJDHSS) PEOSH Program has prepared the Designated Persons Indoor Air Quality Training Course to assist employers in achieving compliance with this additional requirement. For additional information on this free training course, please contact the NJDHSS PEOSH Program at The employer is required to prepare a written plan describing how they will meet the obligations under the standard. The written program will include language that describes how the employer will achieve compliance with the standard. The Model Written Indoor Air Quality Program, included as part of this document was prepared to assist employers with compliance with this requirement. All requirements for the maintenance of indoor designated smoking areas have been deleted because smoking in public buildings is banned by the recently enacted New Jersey Smoke-Free Air Act (P.L. 2005, c. 383, N.J.A.C. 8:6). The term water leak was replaced with the broader term of water intrusion including, but not limited to, pipe leaks, condensation, flooding, plumbing backups, roof leaks. Language was also added to require the cleanup of damp or wet materials within 48 hours. Employers should establish a system that allows quick response to these situations or make provisions to promptly relocate employees whose workspaces are impacted by water intrusion. In order to reduce exposure to off-gassing of newly installed building materials, additional language requires employers to clean and air-out the work area prior to re-occupancy. The employer is required to evaluate product toxicity data before selection of the product, not just prior to use of the product. The revision also adds the Material Safety Data Sheet (MSDS) to the list of information that the employer is required to evaluate prior to selection of the product. iv
6 Modifications define a formal process of which employees can request compliance information in writing and employers must provide the requested documents within 10 working days of the request. The purpose of the change is to prevent unreasonable delay in providing information to employees and employee representatives. A copy of the complete promulgated standard is provided in Appendix A. A complete summary of the 2007 revisions to the IAQ Standard is provided in Appendix B of this document. The effective date of the revised IAQ Standard is May 21, v
7 Public Employer s Guide to Compliance with the Indoor Air Quality Standard (N.J.A.C. 12:100-13)(2007) Read the IAQ Standard and Inspection Checklist The most obvious, and often overlooked, first step in complying with the PEOSH Indoor Air Quality (IAQ) Standard is to read the Standard (Appendix A). The IAQ Inspection Checklist is an excellent summary of the standard and should also be read. Understand Building Management Responsibilities Public employers throughout the state utilize many facilities. In many of these facilities, the employer may not have direct control of the operation and maintenance of the building. These situations can impede the ability of the employer in providing prompt response to IAQ complaints. Regardless of the contractual hurdles, the public employer remains responsible for compliance with the PEOSH IAQ Standard. Owned Buildings For buildings that are owned by the employer, management of IAQ within the building is usually maintained by either in-house staff or by an outside maintenance contractor. If equipment is maintained by an outside Heating, Ventilation, and Air-Conditioning (HVAC) service contractor, the employer should ensure that the compliance with the IAQ Standard (i.e. recordkeeping, maintenance log) is included in the service contract and these records are maintained on-site. Leased Buildings Buildings that are leased from a private property manager are often a challenge for employers. Many lease contracts require the building owner to perform maintenance. Public employers may find themselves in a situation where they have little or no control of the HVAC system. In these cases, it is essential to have language included in the lease agreement that requires the property owner or manager to be responsive to IAQ complaints and to provide required recordkeeping documents to the employer s Designated Person. 1
8 Select a Designated Person The IAQ Standard requires that employers identify staff (Designated Person) who will be responsible for compliance with all aspects of the standard. The Designated Person should be in a position of authority and have the ability to effectively communicate with staff, management, and maintenance staff or contractors. Strong interpersonal and problem solving skills are a benefit to this position. The Designated Person should have the ability to understand all aspects of the building s heating, ventilation, and air conditioning system. The Designated Person should also be easily contacted during working hours and have the authority to initiate a corrective action for the HVAC system. The responsibilities of the Designated Person may be delegated to other individuals within the organization; however, the Designated Person will maintain overall responsibility. The Designated Person does not need to be located on-site, or be designated to only one site. There may be a Designated Person for multiple site locations occupied by the employer, however, the Designated Person should be familiar with all locations. Provide Designated Person Training The Indoor Air Quality Standard requires that the employer ensure that the Designated Person is familiar with the requirements of this standard. Training for the Designated Person is offered by the NJDHSS-PEOSH Program and will orient the Designated Person to the basics of IAQ and the requirements of the IAQ standard. The training is conducted free of charge by PEOSH staff. Understand the Responsibilities of the Designated Person The designated person shall assure that at least the following actions are implemented and documented: Establish and follow a preventive maintenance schedule, in accordance with the manufacturer's recommendations or accepted industry practice, for the HVAC system. Ensure that damaged or inoperable components are replaced or repaired promptly. Conduct periodic visual inspections of the components of the HVAC system. Identify potential sources of contamination affecting the fresh air intake. Promptly investigate employee complaints about indoor air quality. Maintain required records. Review and update the written program annually. 2
9 Prepare and Implement a Written Program The IAQ Standard requires that employers prepare and implement a written IAQ compliance program that describes how they will comply with the requirements of the IAQ Standard. The written program must include the following information: The identity and responsibilities of the designated person Procedures to follow a preventive maintenance schedule A description of process to maintain required records Location of IAQ compliance documents Procedure for investigating employee complaints made to the employer Procedure for addressing signed employee complaints to PEOSH Procedure to notify employees of work that may introduce air contaminants A description of how microbial contamination will be controlled Procedures to control air contaminants Methods for responding to temperature and/or carbon dioxide concentrations that are outside of the recommended range Plans for maintaining air quality during renovations and remodeling Methods to obtain permits and perform work as required by the New Jersey Uniform Construction Code, N.J.A.C. 5:23 Description of how natural ventilation is maintained in buildings without mechanical ventilation, if applicable (i.e. are windows operable?) Documentation of annual review and update, including new or modified procedures, tasks, and personnel. In order to assist employers with compliance with this section, the PEOSH Program has prepared a Model Written Indoor Air Quality Program. A print version of the model program is included with this document. An electronic copy is available on the PEOSH website ( that can be downloaded and edited to customize the program for your specific facility. Establish a Preventive Maintenance Program Many of the indoor air quality complaints that are investigated by PEOSH are caused by inadequate routine preventive maintenance. Due to the many types and configurations of HVAC systems, the IAQ standard does not have requirements for maintenance schedules, only that it be performed. The site-specific preventive maintenance program should be established based on the system s recommended maintenance schedule outlined by the manufacturer or HVAC professional. Regular preventive maintenance not only ensures that the system is operating properly, but also can result in cost savings in operating efficiency as well as increased employee productivity. In order to meet the minimum requirements of the standard, the preventive maintenance program should be in written form and include the following minimal items: 3
10 Checking filtration system/changing air filters/cleaning precipitators Checking/changing drive belts Lubrication of moving parts Inspection of motor function Ensuring that all equipment is operating within specifications Visual inspection of condensate drain pans for improper drainage or standing water or microbial growth See Appendix D for a sample HVAC inspection checklist. Maintain a Preventive Maintenance Log Most modern buildings rely heavily on a mechanical ventilation system to handle heating, cooling, and ventilation needs. If the system is adequately maintained, many IAQ complaints can be avoided. A key intention of the standard is that staff and inspectors can quickly assess the state of the mechanical system and whether it may be the cause of IAQ complaints. The employer is required to maintain a log of preventive maintenance activities. At a minimum, the log requires the date, activity performed, and the initials of the maintenance person. This log must be maintained on site for a period of 3 years. The log must be available at the time of a compliance inspection. If the HVAC system is serviced by an outside contractor, arrange for the service technician to update the on-site preventive maintenance log to ensure compliance with the standard. See Appendix E for a copy of a sample preventive maintenance log. Maintain Acceptable IAQ Indicators Compliance with the IAQ standard requires that employers evaluate ventilation with two (2) indicator parameters, temperature and carbon dioxide. Temperature: If the indoor environment is outside of the range of 68 F to 79 F degrees Fahrenheit, the employer is required to ensure that the ventilation system is operating as designed. The standard does not require employers to modify or upgrade existing systems to achieve this range; however, if the employer finds that the ventilation system is operating as designed and the temperature is still out of the required range, PEOSH recommends that the employer consider utilizing alternative methods to achieve a comfortable temperature range, such as using fans, shades, or reflective film on windows. Carbon dioxide: Carbon dioxide (CO 2 ) is a gas that is exhaled by building occupants. Because the gas is generated in an occupied building as a byproduct of normal human respiration, it is a convenient gas to measure as an indicator of the amount 4
11 of outside air exchange. If CO 2 concentration exceeds 1,000 parts per million (ppm) the employer is required to ensure that the system is operating as designed. The standard does not require employers to modify or upgrade existing systems to achieve this range. In many older buildings, ventilation is achieved through a non-mechanical ventilation system such as operable windows or ventilation shafts. If operable windows are present, the employer is obligated to ensure that windows are maintained in an operable condition and vent shafts are not blocked. Employees should be informed that the building was designed for employees to utilize windows to provide fresh outside air as necessary. However, using untempered outside air from windows to achieve adequate ventilation may result in temperature complaints. Conduct IAQ Complaint Investigations The IAQ standard requires that employers promptly investigate employee complaints concerning sick building syndrome (SBS), building-related illness (BRI), and complaints made by employees or employee representatives to either the employer or the PEOSH Program. The IAQ standard does not mandate a specific course of action regarding IAQ investigations. IAQ investigations can be simple or very complex and technical to a degree that is beyond this compliance guide. Considering the high variability of building layouts and employee complaints, each investigation has to be customized to each unique situation. Additional resources for conducting IAQ investigations are provided at the end of this document. Employee complaint investigations should include detailed interviews with some of the affected employees. The investigation should also include a thorough inspection of the building for known irritants and allergens including chemicals/pesticides, mold, pollenproducing plants, rodent, bird, or insect infestation. The HVAC system that handles areas of the building where complaints are made by employees should be thoroughly inspected to ensure that it is clean and operating properly (See IAQ Inspection Checklist, Appendix C). It is recommended that one individual, such as a school nurse or designated person, keep a log of employee complaints. This is useful in establishing the time and spatial extent of complaints so that patterns can be identified. Also, it is important for the employer to understand which employees are experiencing symptoms so that the employer can arrange for employees to seek medical attention, if needed. If an employer receives notification from PEOSH of an employee or employee representative complaint, they have several obligations under the IAQ standard. Within 15 working days, the employer must respond to PEOSH in writing describing either how they will investigate and/or remediate the underlying cause of the complaint or a statement that the complaint is unfounded. 5
12 Control of Potential Contaminants Sources Outside air Make-up air is the term used to describe the outside air that enters a building. The location of the make-up air intake should be in an area that is free of contaminants. Occasionally, intakes are located in areas where they can draw in contaminants such as exhaust vents, cooling towers, vehicle exhaust, cigarette smoke, or mold spores. The employer should identify the location of outside air intakes and identify potential contamination sources such as loading docks or other areas where vehicles idle, nearby exhaust stacks, or vegetation. If contamination occurs, the standard requires that the employer eliminate the contaminant source or relocate the intake. Point Source Contaminants In most buildings, it is common to have sources of contaminants that affect indoor air. Point sources of contaminants can include sources such as large photocopiers and printers, bathrooms, chemical storage cabinets, and art classrooms. The employer should identify point sources and make attempts to capture and exhaust these sources from the building using local exhaust ventilation. For example, exhaust fans can be installed and ducted to chemical storage cabinets and photocopying equipment to draw contaminants directly from the source and exhaust them outside of the building. Existing exhaust fans should be periodically inspected to ensure that they are functioning properly and exhausting to areas located away from outside air intakes. General Source Contaminants General sources of contamination are more difficult to capture. These sources can include activities such as routine maintenance activities (i.e. floor stripping and waxing, painting) and off-gassing of building materials and furniture. The effective capture of these contaminants at a point source is usually not feasible. Adequate ventilation is accomplished by general exhaust ventilation, which requires large amounts of air to be exhausted from the building. Potential employee exposures to these contaminants can be reduced by selecting materials that contain minimal amounts of potentially toxic ingredients. Alternatively, the potential exposures can be reduced by conducting routine maintenance work during time of minimal building occupancy or utilizing general exhaust ventilation during use. 6
13 Manage Building Construction/Renovation Projects Building construction and renovation projects are, by nature, a significant disruption to both employers and employees. These projects have the potential to create significant but preventable chemical exposures. Proper planning can help avoid potential problems. Employers should schedule building renovation work during periods when the building is minimally occupied, such as during the evening or holidays. When construction/renovation work is done, the IAQ standard requires employers to implement the following administrative and engineering controls prior to and during the project: Prior to the selection and use of materials that contain potentially hazardous ingredients, such as paints, adhesives, insulation, particle board, or floor coverings, the employer must check product labels and obtain Material Safety Data Sheets. If the use of products that contain potentially hazardous ingredients is planned, the employer must notify employees at least 24 hours in advance. During construction/renovation work, the employer must ensure that the construction/renovation work area is physically isolated from occupied portions of the building by using a combination of physical barriers (i.e. temporary walls, plastic sheeting) and local exhaust ventilation that maintains a negative pressure in the construction/renovation work area relative to the occupied portions of the building. It is important to note that in cases even where employers do not have direct control of the project because it is being managed by a third-party general contractor or landlord, the public employer retains the obligation for compliance with the IAQ Standard. The employer must maintain direct and constant communication with the landlord, general contractor, and/or sub-contractors in order to meet the requirements of the standard. A sample Renovation/Construction Project Checklist is provided in Appendix F. 7
14 Maintain Records The recordkeeping provision of the IAQ standard requires that the following items be maintained and available to employees within 10 days of a request, and immediately to PEOSH inspectors during an inspection: Written indoor air quality program Documentation of designated person training Written preventive maintenance program 36 months of preventive maintenance log The employer also should maintain several IAQ compliance documents including: As-built construction documents HVAC system commissioning reports HVAC systems testing, adjusting and balancing reports Operations and maintenance manuals Water treatment logs Operator training materials 8
15 Model Written Indoor Air Quality Program [Employer] [Location] [Date] 9
16 Policy and Administration This notice is to inform employees that our agency complies with the Public Employees Occupational Safety and Health (PEOSH) Program, Indoor Air Quality (IAQ) Standard (N.J.A.C. 12:100-13)(2007), which was proposed on December 18, 2006 and adopted on May 21, We recognize that good indoor air quality is essential to employee s health and productivity. We have established the following policies to promote good indoor air quality for employees in our buildings. These policies follow the requirements established by the PEOSH IAQ Standard as it applies to our workplace. This Written Indoor Air Quality Program applies to the following buildings/locations: Designated Person As required by the New Jersey PEOSH Indoor Air Quality Standard, a person has been designated as the person responsible for [Employer] s compliance with the standard. This person is: Designated Person Phone # The designated person is the person who has been trained and given the responsibility by [Employer] to make routine visual inspections, oversee preventive maintenance programs, and maintain required records in order to ensure compliance with the IAQ Standard. The designated person is also assigned to receive employee concerns/complaints about indoor air quality, conduct investigations, facilitate repairs or further investigation as necessary, maintain required records, and update the written program annually. Preventive Maintenance Schedule Preventive maintenance schedules that follow manufacturers specifications are in place for heating, ventilation and air conditioning systems (HVAC) systems in this workplace. A copy of the preventive maintenance schedule is attached. Damaged and inoperable components will be repaired or replaced as appropriate and a work order to show actions taken will be completed. 10
17 Recordkeeping Documentation of preventive maintenance and repairs to the ventilation system are retained for at least 3 years and include the following information: - Date that preventive maintenance or repair was performed - Person or company performing the work - Documentation of: Checking and/or changing air filters Checking and/or changing belts Lubrication of equipment parts Checking the functioning of motors Confirming that equipment is in operating order Checking for microbial growth in condensate pans or standing water Documentation of preventive maintenance and work orders for repairs are maintained by [Designated Person]. Indoor Air Quality Compliance Documents Our agency will make reasonable efforts to obtain and maintain copies of IAQ compliance documents. Available IAQ compliance documents will be maintained by the Designated Person and will be available to PEOSH during an inspection. These documents include: 1. As-built construction documents 2. HVAC system commissioning reports 3. HVAC systems testing, adjusting, and balancing reports 4. Operations and maintenance manuals 5. Water treatment logs 6. Operator training materials Investigating Complaints If employees begin to experience health symptoms that they believe are related to poor indoor air quality, they should notify the Designated Person so that their concerns can be investigated. The Designated Person has been trained and given the authority to conduct basic indoor air quality complaint investigations. In many cases IAQ complaints can be resolved by the Designated Person. 11
18 Responding to Signed Employee Complaints to PEOSH If we receive a written notification from PEOSH that a signed employee complaint has been filed with PEOSH, we will conduct an inquiry into the allegations. The findings of the initial inquiry and any planned actions will be provided in a written response to PEOSH within fifteen (15) working days of receipt. Copies of all responses to PEOSH will be maintained by the Designated Person. Notification of Employees The Designated Person will notify employees at least 24 hours in advance, or promptly in emergency situations, of work to be performed on a building that may introduce air contaminants into their work area. This notification will be in writing and will identify the planned project and the start date. The notification will also include information on how to access Material Safety Data Sheets (MSDS) or other hazard information. The Designated Person will maintain records of this notification for compliance recordkeeping purposes. Controlling Microbial Contamination Uncontrolled water intrusion into buildings (roof leaks, flooding, pipe condensation, plumbing leaks, or sewer backups) has the potential to support microbial growth. All employees should routinely observe their workplace for evidence of water intrusion (i.e. roof leaks, pipe leaks). Employees should notify the Designated Person immediately if they observe evidence of water intrusion so that corrective action can be taken. Ceiling tiles, carpet, and wall boards not dried within 48 hours may be removed as directed by the Designated Person. Controlling Air Contaminants Outside air The Designated Person will identify the location of outside air intakes and identify potential contamination sources nearby, such as loading docks or other areas where vehicles idle, nearby exhaust stacks, or vegetation. Periodic inspections will be conducted to ensure that the intakes remain clear of potential contaminants. If contamination occurs, the Designated Person will eliminate the contaminant source or make arrangements to relocate the intake. Point Source Contaminants The Designated Person will identify point sources of contaminants and arrange to capture and exhaust these sources from the building using local exhaust ventilation. Exhaust fans will be periodically inspected to ensure that they are functioning properly and exhausting to areas located away from outside air intakes. 12
19 Response to Temperature and Carbon Dioxide Temperature Where a mechanical ventilation system capable of regulating temperature is present, facilities personnel strive to maintain office building temperatures within the range of 68 to 79 degrees Fahrenheit. If outside this range, the Designated Person should be contacted. The Designated Person will ascertain whether the HVAC system is operating properly. If not, the system must be repaired. The IAQ Standard does not require the installation of new HVAC equipment to achieve this temperature range. Carbon Dioxide If the room is equipped with non-mechanical ventilation systems such as operable windows, stacks, louvers, the Designated Person should ensure that these areas are clear and operable to allow the flow of air. If carbon dioxide (CO 2 ) concentrations exceed 1,000 parts per million (ppm), and the room is not equipped with operable windows, the Designated Person will conduct an inspection to ensure that the mechanical HVAC system is operating properly. Maintaining Indoor Air Quality During Renovation and Construction Projects Renovation work and/or new construction projects that have the potential to result in the diffusion of dust, stone and other small particles, toxic gases or other potentially harmful substances into occupied areas in quantities hazardous to health will be controlled in order to minimize employee exposure. The Designated Person will utilize the following protocol to assure that employees exposure to potentially harmful substances is minimized: Obtain MSDS for all products to be utilized on the project and maintain on-site throughout the duration of the project. Choose the least toxic product that is technically and economically feasible. Consider performing the renovation/construction project when building is least occupied. Consider temporarily relocating employees to an alternate worksite. Notify potentially affected employees, in writing, at least 24 hours prior to commencement of chemical use or dust generation. Isolate the work area from occupied areas. Use mechanical ventilation and local exhaust ventilation to maintain a negative pressure gradient between the work area and occupied areas. 13
20 Before selection and use of paints, adhesives, sealants, solvents or installation of insulation, particle board, plywood, floor coverings, carpet backing, textiles, or other materials in the course of renovation or construction, the designated person will check product labels or seek and obtain information from the manufacturer of those products on whether or not they contain volatile organic compounds such as solvents, formaldehyde or isocyanates that could be emitted during regular use. This information should be used to select the least volatile/hazardous products and to determine if additional necessary measures need to be taken to comply with the objectives of this section. The Designated Person will maintain records of this evaluation for compliance recordkeeping purposes. Management and the Designated Person will consider the feasibility of conducting renovation/construction work using appropriate barriers, during periods when the building is unoccupied, or temporarily relocating potentially affected employees to areas of the building that will not be impacted by the project. Temporary barriers will be utilized to provide a physical isolation between the construction area and occupied areas of the building. Mechanical ventilation (i.e. fans, portable blowers, or existing HVAC equipment) will be used to maintain a negative pressure gradient between the work area and occupied areas to ensure the safety of employees. Renovation areas in occupied buildings will be isolated and dust and debris shall be confined to the renovation or construction area. If work is being performed by an outside contractor, the Designated Person will maintain communication with contractor personnel to ensure they comply with the requirements of the PEOSH IAQ standard. Employees who have special concerns about potential exposures during or after renovation/construction/repair work should consult with their supervisor. If despite these preventive actions, employees are exposed to air contaminants resulting in health effects, employees will be instructed to report any work-related health symptoms to one person (e.g., the nurse, human resources, designated person) so that they can be accurately assessed and investigated when indicated. All exposures should also be reported to their supervisor and the designated person. Obtaining Permits and Performing Work in Accordance with the New Jersey Uniform Construction Code (N.J.A.C. 5:23) Permits for renovation and construction-related work will be obtained as required by the New Jersey Uniform Construction Code (NJUCC), (N.J.A.C. 5:23). All work requiring a permit will be performed in compliance with N.J.A.C. 5:23. Additional information concerning the NJUCC can be obtained from the NJ Department of Community Affairs, Division of Codes and Standards ( ) 14
21 Maintaining Natural Ventilation in Buildings without Mechanical Ventilation In buildings not equipped with mechanical ventilation, the Designated Person will identify the location of non-mechanical ventilation systems, such as stacks and operable windows. Periodic inspections will be conducted to ensure that these systems are operable and the surrounding areas remain clear of obstructions and potential contaminants. Employee Responsibilities Employees have a role in maintaining good indoor air quality within their workplace. Employees should ensure that they do not introduce unauthorized chemicals (i.e. fragrances, air fresheners, cleaning solvents, ozone generators) into the workplace. In addition, if employees observe situations which may lead to poor indoor air quality(i.e. inoperable windows, water leaks, visible mold) they should notify [DESIGNATED PERSON] at [Phone #] of the situation so that it can be addressed promptly. Employees are responsible for maintaining mechanical and passive ventilation systems by ensuring that louvers and diffusers remain clear to allow the free flow of air. Intentionally blocking, diverting, or otherwise manipulating components (i.e. thermostat,) of the ventilation system may result in disruption of the ventilation system in the immediate area or other occupied areas of the building. Periodic Review and Update The Written Indoor Air Quality Program will be updated at least annually to reflect changes in policies, procedures, responsibilities, and contact information. This plan will be reviewed prior to [Expiration Date]. Certifications: Reviewed and Approved: [Name] [Title] [Date] [Name] Designated Person [Date] 15
22 Appendix A PEOSH Indoor Air Quality Standard (N.J.A.C. 12:100-13)(2007) 16
23 TITLE 12. DEPARTMENT OF LABOR CHAPTER 100. SAFETY AND HEALTH STANDARDS FOR PUBLIC EMPLOYEES SUBCHAPTER 13. INDOOR AIR QUALITY STANDARD 12: Scope N.J.A.C. 12: (2007) This subchapter shall apply to matters relating to indoor air quality in buildings occupied by public employees during regular work hours. 12: Definitions The following words and terms, when used in this subchapter, have the following meaning unless the context clearly indicates otherwise. "Air contaminants" refers to substances contained in the vapors from paint, cleaning chemicals, pesticides, solvents, particulates, outdoor air pollutants and other airborne substances which together may cause material impairment to employees working within the enclosed workplace. "Building-related illness" describes specific medical conditions of known etiology which can be documented by physical signs and laboratory findings. Such illnesses include sensory irritation when caused by known agents, respiratory allergies, asthma, nosocomial infections, humidifier fever, Legionnaires' disease, and the signs and symptoms characteristic of exposure to chemical or biologic substances such as carbon monoxide, formaldehyde, pesticides, endotoxins, or mycotoxins. "Building systems" includes the heating, ventilation and air-conditioning (HVAC) system, the energy management system and all other systems in a facility which may impact indoor air quality. "Department" means the Department of Health and Senior Services. "Designated person" means a person who has been given the responsibility by the employer to take necessary measures to assure compliance with this subchapter. "Employee" means the term as defined at N.J.A.C. 12: "Employer" means the term as defined at N.J.A.C. 12: "HVAC system" means the collective components of the heating, ventilation and airconditioning system including, but not limited to, filters and frames, cooling coil condensate drip pans and drainage piping, outside air dampers and actuators, humidifiers, air distribution ductwork, automatic temperature controls, and cooling towers. "HVAC System Commissioning Report" means a document normally prepared by an architect or engineer that provides verification that the HVAC system is operating in conformity with the design intent. 17
24 "Office building" means a building in which administrative, clerical or educational activities are conducted. Examples of facilities and/or operations, which are not office buildings, include repair shops, garages, print shops and warehouses. "Renovation and remodeling" means building modification involving activities that include but are not limited to: removal or replacement of walls, roofing, ceilings, floors, carpet, and components such as moldings, cabinets, doors, and windows; painting; decorating; demolition; surface refinishing; and removal or cleaning of ventilation ducts. "Sick Building Syndrome" describes a situation in which a workplace is characterized by a substantial number of building occupants experiencing health and comfort problems that can be related to working indoors. Additionally the reported symptoms do not fit the pattern of any particular illness, are difficult to trace to any specific source and relief from these symptoms occurs upon leaving the building. It is important to distinguish Sick Building Syndrome from problems of building-related illness. The latter term is reserved for situations in which signs and symptoms of diagnosable illness are identified and can be attributed directly to specific airborne contaminants. 12: Compliance program (a) The employer shall identify a designated person who is given the responsibility to assure compliance with this section. The employer shall assure that the designated person is familiar with the requirements of this subchapter. The designated person shall assure that at least the following actions are implemented and documented: 1. Establishing and following a preventive maintenance schedule in accordance with the manufacturer's recommendations or with accepted practice for the HVAC system. Scheduled maintenance of the HVAC system shall include checking and/or changing air filters, checking and/or changing belts, lubrication of equipment parts, checking the functioning of motors and confirming that all equipment is in operating order. Damaged or inoperable components shall be replaced or repaired as appropriate. Additionally, any parts of this system with standing water shall be checked visually for microbial growth; 2. Implementing the use of general or local exhaust ventilation where housekeeping and maintenance activities involve use of equipment or products that could reasonably be expected to result in hazardous chemical or particulate exposures, above the applicable Permissible Exposure Limit (PEL), as adopted by reference under N.J.A.C. 12: , to employees working in other areas of the building or facility; 3. When the carbon dioxide level exceeds 1,000 parts per million (ppm), the employer shall check to make sure the HVAC system is operating as it should. If it is not, the employer shall take necessary steps as outlined in (a)1 above; 4. When temperatures in office buildings are outside of the range of 68 to 79 degrees Fahrenheit, the employer shall check to make sure the HVAC system is in proper operating order. If it is not, the employer shall take necessary steps as outlined in (a)1 above; 5. If contamination of the make-up air supply is identified and documented, then the make-up inlets and/or exhaust air outlets shall be relocated or the source of the contamination eliminated. Sources of make-up air contamination may include contaminants from sources such as, but not limited to, cooling towers, vents, and vehicle exhaust; 18
25 6. Assuring that building without mechanical ventilation are maintained so that windows, doors, vents, stacks and other portals designed or used for natural ventilation are in operable condition; 7. Promptly investigating all employee complaints of signs or symptoms that may be associated with building-related illness or sick building syndrome; 8. The employer shall have a written plan describing how it will achieve compliance with this subchapter, which plan shall list the identity and responsibilities of the designated person referred to in (a) above and which shall include procedures which, at a minimum, address the following issues: i. Following of a preventive maintenance schedule; ii. Keeping of required records; iii. Locating of Indoor Air Quality compliance documents; iv. Investigating of employee complaints; v. Responding to signed employee complaints that have been submitted to the State alleging violation of the Public Employees' Occupational Safety and Health Act, N.J.S.A. 34:6A-25 et seq.; vi. Notifying employees of work that may introduce air contaminants; vii. Controlling microbial contamination; viii. Controlling air contaminants; ix. Responding to temperature and/or carbon dioxide exceedences; x. Maintaining air quality during renovations and remodeling; xi. Obtaining permits and performing work as required by the New Jersey Uniform Construction Code, N.J.A.C. 5:23; and xii. Maintaining natural ventilation in buildings without mechanical ventilation; and 9. The employer shall review and update the written compliance plan referred to in (a)8 above at least annually, and whenever necessary to reflect new or modified tasks and procedures and to reflect new or revised employee positions. 12: Controls of specific contaminant sources (a) Regarding other indoor air contaminants, when general ventilation is inadequate to control air contaminants emitted from point sources within work spaces to below the applicable PEL, as adopted by reference under N.J.A.C. 12: , the employer shall implement other control measures such as local source capture exhaust ventilation or substitution. (b) The employer shall control microbial contamination in the building by promptly repairing water intrusion that can promote growth of biologic agents. (c) The employer shall remediate damp or wet materials by drying, replacing, removing or cleaning same within 48 hours of discovery and shall continue such remediation until the water intrusion is eliminated. 19
26 (d) The employer shall take measures to remove visible microbial contamination in areas such as ductwork, humidifiers, dehumidifiers, condensate drip pans, heat exchange components, other HVAC and building system components, or on building surfaces, such as carpeting and ceiling tiles, when found during regular or emergency maintenance activities or during visual inspection. 12: Air quality during renovation and remodeling (a) Renovation work and/or new construction that results in the diffusion of dust, stone and other small particles, toxic gases or other harmful substances in quantities hazardous to health shall be safeguarded by means of local ventilation or other protective devices to ensure the safety of employees. Renovation and/or new construction work in occupied buildings shall be isolated and air contaminants, dust and debris shall be confined to the renovation or construction area by use of measures such as, but not limited to, physical barriers, pressure differentials, and/or performing the work during periods of minimal occupancy. 1. Before re-occupancy, work areas shall be cleaned and aired out as necessary. 2. Hazard information shall be used to select products and to determine necessary measures to be taken to comply with (a) above. (b) Before selection and use of paints, adhesives, sealants, solvents, or installation of insulation, particle board, plywood, floor coverings, carpet, textiles, or other materials in the course of renovation or construction, the employer shall check product labels and Material Safety Data Sheets or seek and obtain information from the manufacturers of those products on whether or not they contain volatile organic compounds such as solvents, formaldehyde or isocyanates that could be emitted during regular use. (c) The employer shall notify employees at least 24 hours in advance, or promptly in emergency situations, of work to be performed on the building that may introduce air contaminants into their work area. 12: Recordkeeping a) The maintenance schedule shall be updated to show all maintenance performed on the building systems. The schedule shall include the date that such maintenance was performed and the name of the person or company performing the work. (b) The records required to be maintained by this section shall be retained for at least three years. (c) The records required to be maintained by this section shall be available on request to Department representatives for examination and copying. (d) The records required to be maintained by this section shall be made available to employees and employee representatives for examination and copying upon written request as soon as possible after receipt by the employer of the written request, but no later than 10 working days from the date upon which the employer has received the request. 20
27 12: Employer's response to a signed PEOSH complaint (a) Within 15 working days of receipt by the employer of notification from the Department that a complaint has been filed against the employer under the Public Employees' Occupational Safety and Health Act, N.J.S.A. 34:6A-25 et seq., the employer shall respond in writing to the Department. The response may include any combination of the following: 1. A statement that the complaint is unfounded; 2. A description of any remedial action already taken; 3. An outline of any remedial measures planned but not yet taken with a timetable for completion; and/or 4. A statement that a study of the problem, with a timetable for completion of the study, has been initiated. (b) Where remedial measures are planned or a study initiated, they shall be completed as soon as feasible. The employer shall submit, to the Department, a written report describing the remedial measures implemented and/or a copy of a study's report within 15 working days of completion. (c) Permits for remedial work shall be obtained as required by N.J.A.C. 5:23 (the New Jersey Uniform Construction Code). All work requiring a permit shall be performed in compliance with N.J.A.C. 5:23. 12: Indoor air quality (IAQ) compliance documents (a) In response to an employee complaint to the Department, the employer shall provide any of the following documents, if available, and requested by the Department: 1. As-built construction documents; 2. HVAC system commissioning reports; 3. HVAC systems testing, adjusting and balancing reports; 4. Operations and maintenance manuals; 5. Water treatment logs; and 6. Operator training materials. 21
28 Appendix B Summary of Revisions to 1997 PEOSH Indoor Air Quality Standard 22
29 Summary of 2007 Revisions to the 1997 PEOSH Indoor Air Quality Standard In January 2005, the PEOSH Advisory Board was presented with a proposal to amend portions of the Indoor Air Quality (IAQ) Standard (N.J.A.C. 12:100-13)(1997). To that end, the PEOSH Advisory Board established an IAQ Subcommittee, comprised of experts and interested parties, to evaluate the existing standard. The subcommittee met nine times between January and October 2005 to review and discuss all sections of the PEOSH IAQ Standard. It was the consensus of the IAQ Subcommittee that the suggested changes to the PEOSH IAQ Standard would not result in any increased costs to employers. On December 1, 2005, the PEOSH Advisory Board received the recommendations for revisions to the IAQ Standard as proposed by the IAQ Subcommittee. These recommendations were presented by the PEOSH Advisory Board to the NJDHSS and NJDLWD for consideration. A summary of the proposed revisions to N.J.A.C. 12:100-13, Indoor Air Quality Standard, is as follows: N.J.A.C. 12: This section was modified to provide clarification by the removal of the term existing to describe buildings included in the standard. The term existing was determined to be redundant and unnecessary in defining the scope of the standard. N.J.A.C. 12: Designated Smoking Area This term was removed from the definition section. The term was referred to in section 13.4(a) of the standard. Section 13.4(a) was removed because it is pre-empted by the recently enacted New Jersey Smoke- Free Air Act (P.L. 2005, c. 383, N.J.A.C. 8:6). N.J.A.C. 12: Office Building This section was modified to include educational facilities and exclude warehouses from the definition of office building. Considering the similarity of the educational environment to office buildings and the administrative office work that is done in an educational facility, it was decided to specifically include educational facilities in the standard. Due to the open, industrial environment of warehouses, it was determined that warehouses are not structurally or functionally similar to office buildings, therefore, a specific exclusion was made for warehousing operations. N.J.A.C. 12: The definition for Sick Building Syndrome was added to this section for the purpose of including the commonly-used term to a list of employee complaints for which an employer is required to investigate indoor air quality within the building. The inclusion of this term is consistent with U.S. EPA guidance for health professionals on indoor air quality 1. This term is referred to in section 13.3(a)(7) of the standard. N.J.A.C. 12: (a) This section was modified by adding language requiring employers to ensure that the Designated Person has the knowledge necessary to perform the job requirements. A training program is being prepared by the NJDHSS-PEOSH Education and Training Project to assist employers in meeting the additional training 1 U.S. EPA, Indoor Air Pollution: An Introduction for Health Professionals, U.S. Government Printing Office Publication No /81322, 1994:17. 23
30 requirements of this revision. This Education and Training Program will be conducted in a manner consistent with previous training conducted for other standards that require a written program, including the Bloodborne Pathogens Standard, Respiratory Protection Standard, and the Hazard Communication Standard. N.J.A.C. 12: (a)(1) This section was modified to provide clarification by removing the term reservoir in the list of components of the HVAC system that shall be inspected as part of the preventive maintenance program. Reservoir, is included in the overall term parts of this system, and it was the consensus of the IAQ subcommittee that this term was not needed to convey the intent of this section. N.J.A.C. 12: (a)(5) This section was modified to provide clarification about contaminants in make-up air. The original list was often misinterpreted by the regulated community as a comprehensive list of sources. The modified language clarifies that the list of types of vents are examples, not a comprehensive list. The specific sources listed in the original standard were omitted and general language was added to include all types of vents. N.J.A.C. 12: (a)(7) This section was modified by adding a category of Sick Building Syndrome health effects to reasons for an employer to investigate IAQ concerns. The definition of Sick Building Syndrome includes a broad list of non-specific buildingrelated symptoms that was not included in the original standard language. It was determined that buildings that meet this definition should be promptly investigated by employers to determine what action, if any, is necessary. N.J.A.C. 12: (a)(8) This section was added to require the employer to prepare a written plan describing how they will meet their obligations under the standard. The written program will include language that describes how the employer will achieve compliance with the standard. A model written program is being prepared by the NJDHSS-PEOSH Education and Training Project to assist employers in meeting the additional requirements of this revision. N.J.A.C. 12: (a) This section and all references thereunto have been deleted because it is pre-empted by the recently enacted New Jersey Smoke-Free Air Act (P.L. 2005, c. 383, N.J.A.C. 8:6). N.J.A.C. 12: (c) This section was modified in three ways: To provide clarification, the term water leak was replaced with the broader term of water intrusion including, but not limited to, pipe leaks, condensation, flooding, plumbing backups, roof leaks. It was agreed that the original term was too narrow and failed to include most common types of water intrusion into a building that may lead to microbial growth. Language was also added to define a time frame for the cleanup of damp or wet materials. It was agreed that the existing language was too vague and did not require remediation within a time period when experts state that microbial growth begins to occur in wet building materials 2. 2 U.S. Department of Health and Human Services, Centers for Disease Control and Prevention, Mold Prevention Strategies and Possible Health Effects in the Aftermath of Hurricanes and Major Floods, Morbidity and Mortality Weekly Report (MMWR), June 9, 2006; 55:3. 24
31 To provide clarification, common examples of areas of HVAC systems to be inspected for visible mold as part of HVAC preventive maintenance program were added. The addition of examples helps illustrate the various areas within the HVAC system that require regular inspection. N.J.A.C. 12: (a) This section was modified to reduce exposure to contaminants during construction and renovation activities. The modification includes a description of isolation methods utilized when renovation and remodeling work is being performed in an occupied building. The isolation methods described in the modification provide the employer with examples of options that can be used in combination to control employee exposures, but also does not limit the employer from using alternative means to achieve isolation of the work area. The modification also requires employers to clean and air-out the work area prior to re-occupancy. The purpose of the modification is to attempt to reduce employee exposure to construction dust and volatile organic compounds from the drying and curing of newly installed materials. This modification was requested by the IAQ Subcommittee because of concern that more should be done to ensure that renovated spaces do not present any health hazards. This requirement is similar to requirements, such as the PEOSH Sanitation Standard (29 CFR (a)(3)(i) All places of employment shall be kept clean to the extent that the nature of the work allows. ), which are regularly enforced by PEOSH. N.J.A.C. 12: (b) To provide clarification, this section was modified by rearranging the language. The revised language clarifies that information on the chemical content of potentially hazardous products is to be checked before selection of the product, not just prior to use of the product. The revision also adds the Material Safety Data Sheet (MSDS) to the list of information that the employer is required to evaluate prior to selection of the product. The term carpet backing was replaced with the term carpet. N.J.A.C. 12: (b) This section was modified to establish time frames for which employers are required to must make records available to employees and employee representatives. The revised language also defines a formal process of which employees can request compliance information in writing and employers must provide the requested documents within 10 working days of the request. The purpose of the change is to prevent unreasonable delay in providing information to employees and employee representatives. The process is consistent with similar standards requiring access to medical and exposure data such as 29 CFR Access to Employee Exposure and Medical Records Standard. The time period was chosen, by consensus of the IAQ Subcommittee, to be reasonable for compliance records which must be maintained and available for inspection as required by the recordkeeping provision of the standard. N.J.A.C. 12: This section was modified to provide clarification. The revised language specifies that complaints for which an employer must respond to PEOSH is limited to complaints made by employee or employee representatives to PEOSH. (see N.J.S.A. 34:6A-38a). 25
32 Appendix C PEOSH Indoor Air Quality Standard Inspection Checklist 26
33 PEOSH Indoor Air Quality Standard Inspection Checklist Location: Inspection #: Inspector: Date: COMPLIANCE PROGRAM - GENERAL REQUIREMENTS Y N N/A Has a designated person been identified to handle the implementation and N.J.A.C. documentation of the New Jersey indoor air quality standard? 12:100- Name/Title/Phone #: 13.3(a) 13.3(a) 13.3(a)1 13.3(a)1 13.3(a)1 13.3(a)1 13.3(a)2 13.3(a)3 13.3(a)4 13.3(a)5 13.3(a)6 13.3(a)7 13.3(a)8 13.3(a)9 Has the employer ensured that the designated person is familiar with all the requirements of the standard? Is there an established, operating and documented preventive maintenance schedule for the heating, ventilation and air conditioning (HVAC) system in accordance with the manufacturer's recommendations or accepted practice for the HVAC system? Does the HVAC preventive maintenance schedule include: checking and/or changing air filters, checking and/or changing belts, lubrication of equipment parts, checking the functioning of motors and confirming that all equipment is in operating order? Are damaged or inoperable components of the HVAC system replaced or repaired as appropriate? Are parts of the HVAC system with standing water checked visually for microbial growth? Is general or local exhaust ventilation used where housekeeping and maintenance activities could reasonably be expected to result in exposure to hazardous substances above applicable exposure limits? When the carbon dioxide level exceeds 1,000 parts per million, is the HVAC system checked and repaired as necessary to ensure the system is operating properly? In office buildings/schools, when the temperature is outside of the range of 68 to 79 degrees Fahrenheit, is the HVAC system checked and repaired as necessary to ensure the system is operating properly? When a contaminant is identified in the make-up air supply, is the source of the contaminant eliminated or the make-up inlets and/or exhaust air outlets relocated to avoid entry of the contaminant into the air system? If buildings do not have mechanical ventilation, are windows, doors, vents, stacks, and other portals used for natural ventilation operating properly? Are complaints promptly investigated that involve signs or symptoms that may be associated with Building-Related Illness or Sick Building Syndrome? Does the employer have a written plan that meets the requirements of the subchapter? Is the written compliance plan reviewed and updated annually to reflect new or updated procedures? Aug
34 PEOSH Indoor Air Quality Standard Inspection Checklist (cont.) CONTROLS OF SPECIFIC CONTAMINANTS Y N N/A When point sources generate airborne levels of contaminants above applicable limits, 13.4(a) is local exhaust ventilation or substitution used to reduce the exposure levels to below the limits? 13.4(b) Does the employer control microbial contamination by promptly repairing water intrusion that can promote growth of biologic agents? 13.4(c) 13.4(d) Does the employer remediate damp or wet materials by drying, replacing, removing, or cleaning same within 48 hours of discovery and continue remediation until water intrusion is eliminated? Are visible microbial contaminants removed from ductwork, humidifiers, dehumidifiers, condensate drip pans, heat exchange components, and other HVAC and building system components, or on building surfaces, such as carpeting and ceiling tiles, when found during regular or emergency maintenance activities or during visual inspection? RENOVATION/REMODELING Y N N/A During renovation work and/or new construction, are local ventilation or other 13.5(a) protective devices used to safeguard employees and students from dust, stone and other small particles, toxic gases or other harmful substances in quantities hazardous to health? 13.5(a) 13.5(a)(1) 13.5(a)(2) 13.5(b) 13.5(c) Are renovation areas in occupied buildings isolated so that air contaminants, dust, and debris are confined to the renovation or construction area by use of measures such as physical barriers, pressure differentials, and/or performing work during periods of minimal occupancy? Are work areas cleaned and aired out as necessary prior to re-occupancy? Is hazard information used to select products and to determine necessary measures to be taken? Before selection and use, are product labels and MSDS sheets checked or is information obtained on whether the use of paints, adhesives, sealants, solvents or installation of insulation, particle board, plywood, floor coverings, carpet backing, textiles or other materials contain volatile organic compounds such as solvents, formaldehyde, or Isocyanates that could be emitted during regular use? Are employees notified at least 24 hours in advance, or promptly in emergency situations, of work to be performed on the building that may introduce air contaminants into their work area? Aug
35 PEOSH Indoor Air Quality Standard Inspection Checklist (cont.) RECORDKEEPING Y N N/A Is the maintenance schedule updated to show all maintenance performed on the 13.6(a) building systems? 13.6(a) 13.6(b) 13.6(b) 13.6(b) Does the maintenance schedule include the dates that the building systems maintenance was performed and the names of the persons or companies performing the work? Are maintenance schedules with the information required by the indoor air quality standard retained for at least three years? Are the records required to be maintained by this section available for inspection by PEOSH? Are the records required to be maintained by this section available for inspection by employees and employee representatives for examination and copying within 10 working days of request? EMPLOYER S RESPONSE TO A SIGNED COMPLAINT Y N N/A If the employer receives a complaint notification from the PEOSH Program about an indoor air quality problem, is a written response sent back to PEOSH within 15 working 13.7(a) days? 13.7(a) 13.7(b) 13.7(c) 13.8(a) Do the employer s written responses to complaint notifications received from the PEOSH Program about an indoor air quality problem include any combination of the following: 1) A statement that the complaint is unfounded; 2) A description of any remedial action already taken; 3) An outline of any remedial measures planned but not yet taken with a timetable for completion; and/or 4) A statement that a study of the problem, with a timetable for completion of the study, has been initiated? If the employer plans remedial measures or a study initiated in response to a complaint notification received from the PEOSH Program, is a written report describing the remedial measures implemented and/or a copy of a study's report submitted to the PEOSH Program within 15 working days of completion? If remedial work is initiated in response to a complaint notification from the PEOSH Program, are permits obtained and work performed as required by N.J.A.C. 5:23 (the New Jersey Uniform Construction Code)? If available, are the following documents provided to the PEOSH Program when requested in response to an employee complaint: 1) As-built construction documents; 2) HVAC system commissioning reports; 3) HVAC systems testing, adjusting and balancing reports; 4) Operations and maintenance manuals; 5) Water treatment logs; and 6) Operator training materials? Aug
36 Appendix D Sample HVAC Inspection Checklist 30
37 HVAC Inspection Checklist Employer Name: Facility Name: Air Handling Unit: Area Served: Item Inspected Fresh Air Intake: Area near intake free of contaminant sources (leaves, vehicle exhaust, etc.) Bird screen in place and unobstructed Outside Air damper setting appropriate Fans: Motor operating Belts in good condition and adjusted Coils: Coil free of significant corrosion or leaks Clean and free of accumulated dust or debris Filter: Filter in place Free of accumulated contaminants Condensate Drain Pan: Free of significant corrosion Draining properly Free of visible biofilm Biocide used (note requires MSDS sheet) Vents/Ducting: Visually clean and free of accumulated dust Insulation/lining intact Free of obstructions Other: OK Needs Attn. Comment Inspection Performed by: Name: Date: 31
38 Appendix E Sample HVAC Preventive Maintenance Log 32
39 HVAC Preventive Maintenance (PM) Log Employer Name: Facility Name: Air Handling Unit Area Served Date PM Action Initials Note: N.J.A.C. 12: requires that this maintenance log be maintained on site by the employer s designated person for3 years and must be made available to PEOSH, employees, and employee representatives upon request. 33
40 Appendix F Sample Renovation/Construction Project Checklist 34
41 Renovation/Construction Project IAQ Compliance Checklist Employer Name: Facility Name: Project Name: Estimated Time Period: Area(s) Affected General Contractor Name/Phone #: Pre-Construction/Planning Phase: Complete N/A Notified the Designated Person of the project. Considered performing work during periods of minimal or non-occupancy and included requirements in bid specification (if applicable). Reviewed hazard information (labels, MSDS) with contractor(s) and approved selected products.* In buildings constructed prior to 1981: Reviewed Asbestos Survey. Ensured that all Asbestoscontaining materials (ACM)/and Presumed Asbestos-containing materials (PACM) are labeled, Employees and Contractors notified of presence of ACM/PACM. Notified affected employees at least 24 hours in advance, or promptly in emergency situations, of work to be performed on the building that may introduce air contaminants into their work area.* Reviewed hazard information (labels, MSDS) to determine necessary measures to be taken.* Reviewed product labels and MSDS sheets to determine whether the use of paints, adhesives, sealants, solvents or installation of insulation, particle board, plywood, floor coverings, carpet backing, textiles or other materials contain volatile organic compounds that could be emitted during regular use.* Construction Phase: Local ventilation or other protective devices used to safeguard employees and students from dust, stone and other small particles, toxic gases or other harmful substances in quantities hazardous to health are in place. Renovation/Construction areas in occupied buildings are isolated so that air contaminants, dust, and debris are confined to the renovation or construction area by use of measures such as physical barriers and pressure differentials. Re-occupancy Phase: Inspected that the work areas are cleaned and aired out as necessary prior to re-occupancy.* Re-occupancy authorized by: (Name/Title) Name: Title: Signature: Date: * N.J.A.C.12: requires that documentation of this action be maintained in accordance with recordkeeping requirements. 35
42 Appendix G Sample Renovation/Construction Project Employee Notification Form 36
43 NOTICE Dear Employee: In accordance with the requirement of the NJ Indoor Air Quality Standard (N.J.A.C. 12:100-13)(2007), you are hereby notified that a construction/renovation project will take place at from through. Materials will be utilized which contain ingredients that may be potentially offensive or harmful. Efforts will be made to minimize employee exposure to these chemicals and other constructionrelated dusts and odors. The Material Safety Data Sheets for these materials are attached. If you have any questions please contact at. 37
44 Additional Resources: STATE AGENCIES WITH MAJOR INDOOR RESPONSIBILITIES FOR PUBLIC BUILDINGS: New Jersey Department of Health and Senior Services Public Employees Occupational Safety and Health (PEOSH) Program PO Box 360 Trenton, NJ (609) Promulgates health standards, facilitates training and consultation and enforces regulations to ensure that workers in the public sector are provided with safe and healthful working conditions. PEOSH IAQ Publications and Fact Sheets: PEOSH Policy on Building Renovations Information Bulletin Renovation & Construction in Schools-Controlling Health and Safety Hazards Information Bulletin Indoor Air Quality Information Bulletin Bioaerosols Information Bulletin Mold in The Workplace, Prevention and Control Information Bulletin New Jersey Department of Health and Senior Services Worker and Community Right-to-Know (RTK) Program PO Box 368 Trenton, NJ (609) Prepares Hazardous Substance Fact Sheets, Enforces Container Labeling Requirements, Maintains Database of Annual Employer RTK Surveys. New Jersey Department of Health and Senior Services Consumer and Environmental Health Services (CEHS) Indoor Environments Program PO Box 369 Trenton, NJ (609) The mission of the Program is to protect the health of the public by reducing exposures to indoor environmental pollutants and contaminants, asbestos containing materials and 38
45 lead-based paint hazards. Additionally, the Project handles issues related to school construction, Brownfields redevelopment and related activities. Administers federal grants including U.S. EPA Tools for Schools Program. Maintains a list of Private Mold Consultants, Laboratories, and Remediation Firms. New Jersey Department of Treasury Office of Lease Compliance PO Box 34 Trenton, NJ (609) State agency responsible for managing contracts on state leased buildings, liaison with property owner, coordinates building maintenance issues. New Jersey Department of Treasury Office of Building Management and Operations PO Box 38 Trenton, NJ (609) State agency responsible for overall management of state-owned buildings. FEDERAL AGENCIES WITH MAJOR INDOOR AIR RESPONSIBILITY FOR PUBLIC AND COMMERCIAL BUILDINGS: US Environmental Protection Agency Conducts a non-regulatory indoor air quality program that emphasizes research, information dissemination, technical guidance, and training. Issues regulations and carries out other activities that affect indoor air quality under the laws for pesticides, toxic substances, and drinking water. US Environmental Protection Agency Office of Radiation and Indoor Air Indoor Environments Division 1200 Pennsylvania Avenue, NW Mail Code 6609J Washington, DC (202) Fax: (202) or (202)
46 EPA Regional Office Address inquiries to the contacts in the EPA Regional Offices at the following address: (NJ, NY, PR, VI) EPA Region Broadway New York, NJ (212) (Main) (212) (indoor air, asbestos, NESHAP) (212) (radon) U.S. EPA IAQ PUBLICATIONS AND PROGRAMS: Tools for Schools (TfS) Kit, ( The Indoor Air Quality Tools for Schools (IAQ TfS) Kit shows schools how to carry out a practical plan of action to improve indoor air problems at little or no cost using straightforward activities and in-house staff. The Kit provides best practices, industry guidelines, sample policies, and a sample IAQ management plan. The voluntary guidance can save schools time and money so that resources can be directed toward educating children. The IAQ TfS Kit is co-sponsored by the National Parent Teacher Association, National Education Association, Association of School Business Officials, American Federation of Teachers, and the American Lung Association. Healthy Seat Health School Environments Assessment Tool, ( The Healthy School Environments Assessment Tool is a free software tool to help school systems more effectively manage all of their environmental issues. HealthySEAT is designed to be customized by school systems to conduct and manage self- assessments of their school facilities for a wide range of environmental, health, and safety issues. IAQ Building Education and Assessment Model (I-BEAM), ( The Indoor Air Quality Building Education and Assessment Model (I-BEAM) is a guidance tool designed for use by building professionals and others interested in indoor air quality in commercial buildings. I-BEAM updates and expands EPA's Building Air Quality guidance and is designed to be a comprehensive state-of-the-art guidance for managing IAQ in commercial buildings. I-BEAM contains text, animation/visual, and interactive/calculation components that can be used to perform a number of diverse tasks. I-BEAM consists of many individual modules which explain different aspects of IAQ including how to manage, operate, and maintain your building for IAQ, and how to insure that your energy efficiency projects are compatible with IAQ. I-BEAM also contains modules that are interactive, allowing you to set up maintenance and housekeeping tasks for IAQ, and to calculate budgetary impacts of IAQ. 40
47 Building Air Quality: A Guide for Building Owners and Facility Managers (BAQ Guide) and the Building Air Quality Action Plan, ( The Building Air Quality (BAQ) guide, developed by the EPA and the National Institute for Occupational Safety and Health (NIOSH), provides practical suggestions on preventing, identifying, and resolving indoor air quality (IAQ) problems in public and commercial buildings. This guidance provides information on factors affecting indoor air quality; describes how to develop an IAQ profile of building conditions and create an IAQ management plan; describes investigative strategies to identify causes of IAQ problems; and provides criteria for assessing alternative mitigation strategies, determining whether a problem has been resolved, and deciding whether to consult outside technical specialists. Mold Remediation in Schools and Commercial Buildings ( This document presents guidelines for the remediation/cleanup of mold and moisture problems in schools and commercial buildings; these guidelines include measures designed to protect the health of building occupants and remediators. It has been designed primarily for building managers, custodians, and others who are responsible for commercial building and school maintenance. INDUSTRY CONSENSUS STANDARD ORGANIZATIONS: American Society of Heating Ventilation and Air-Conditioning Engineers (ASHRAE) 1791 Tullie Circle, N.E. Atlanta, GA Toll-free for Customer Service: (800) (U.S. and Canada only) Phone: (404) [email protected] The American Society of Heating, Refrigerating and Air-Conditioning Engineers advances the arts and sciences of heating, ventilation, air conditioning and refrigeration. Establishes consensus standards for many aspects of the HVAC industry. ASHRAE Standards related to the NJ IAQ Standard: Standard Thermal Environmental Conditions for Human Occupancy Specifies environmental conditions that will produce acceptable thermal environmental conditions for 80% or more of the occupants. Standard Ventilation for Acceptable Indoor Air Quality Specifies minimum ventilation rates for indoor air quality that will be acceptable to human occupants and minimize adverse health effects. 41
48 HEALTHY SCHOOL FACILITY ENVIRONMENTS WEBSITE. A gateway to resources to help address environmental health issues in schools such as indoor air quality, mold contamination, hazardous substances, and construction dust and noise. Features links to the resources of six New Jersey state agencies, federal agencies, and many advocacy groups. NATIONAL CLEARINGHOUSE FOR EDUCATIONAL FACILITIES AT THE NATIONAL INSTITUTE OF BUILDING SCIENCES 1090 Vermont Ave. NW Suite 700 Washington, D.C Information on planning, designing, building, and maintaining safe, healthy, high performance schools. Funded by a grant from the U.S. Department of Education. 42
PEOSH. Indoor Air Quality Training for Asthma-Friendly Schools Part I PEOSH Indoor Air Quality Standard Overview. Eric Weren, MSIH
PEOSH Indoor Air Quality Training for Asthma-Friendly Schools Part I PEOSH Indoor Air Quality Standard Overview Eric Weren, MSIH Public Employees Occupational Safety and Health Unit IAQ Asthma-Friendly
Radford University. Indoor Air Quality Management Plan
Radford University Indoor Air Quality Management Plan Spring 2015 Introduction Concerns with Indoor Air Quality (IAQ) have increased since energy conservation measures were instituted in office buildings
DESERT RESEARCH INSTITUTE MOLD ASSESSMENT AND REMEDIATEION PROCEDURE
1.0 Introduction DESERT RESEARCH INSTITUTE This Desert Research Institute (DRI) Mold Assessment and Remediation Procedure was established to assure that consistent and uniform information is provided to
Mould Mould A Basic Guide
Mould A Basic Guide Summary Mould is a fact of life. Moulds will grow practically everywhere people live and work. Mould is recognized as an occupational hazard for indoor workers as well as outdoor workers
INDOOR AIR QUALITY INTRODUCTION WHAT ARE THE SYMPTOMS OF SICK BUILDING SYNDROME? WHEN DID POOR INDOOR AIR QUALITY BECOME A PROBLEM?
INDOOR AIR QUALITY Public Employees Occupational Safety and Health Program Richard J. Codey Acting Governor November, 2004 INTRODUCTION The average person sends approximately 90% of their time indoors.
Staff shall ensure that airflow is not obstructed by the blocking of ventilators with posters, furniture, books, or other obstacles.
1 Environmental Safety AR 3514 The Superintendent may designate and train one or more employees to oversee and coordinate the district's environmental safety program(s). The responsibilities of the coordinator(s)
Specification. Indoor Air Quality Management
GREENGUARD Environmental Institute 2211 Newmarket Parkway, Suite 110 Marietta, GA 30067 1.800.427.9681 Specification Indoor Air Quality Management This Master Specification section is intended for use
Building and Grounds Maintenance Checklist
Building and Grounds Maintenance Checklist Name: School: Room or Area: Date Completed: Signature: Instructions 1. Read the IAQ Backgrounder and the Background Information for this checklist. 2. Keep the
IEQ Management Plan. Denver Museum of Nature and Science ECF Addition
IEQ Management Plan GH Phipps Construction Companies 5995 Greenwood Plaza Blvd., Suite 100 Greenwood Village, Colorado 80111-4710 303.571.5377 PHONE www.ghphipps.com Denver Museum of Nature and Science
KEY ELEMENTS IN PREVENTING AND MITIGATING MOLD CLAIMS
KEY ELEMENTS IN PREVENTING AND MITIGATING MOLD CLAIMS By Jerome E. Spear, CSP, CIH Effective January 1, 2005, consultants who prepare mold management plans for buildings located in Texas must be licensed
How To Prevent And Manage A Flood And Mold
Flood Response and Mold Prevention Program Prepared by the Berea College Department of Environmental Health and Safety Revised May 2010 Contents I. Introduction II. III. IV. Flood and Mold Hazards Roles
Walkthrough Inspection Checklist
Walkthrough Inspection Checklist This checklist is to aid during an IAQ Walkthrough of the school. The checklist includes considerations both inside and outside the school building: Instructions: 1. Read
Fungal Assessment. Smith Recreation Community Centre 1019 Hwy 2A, Smith, Alberta
Top Q A DIVISION OF TOP QUALITY INSPECTIONS INC. Fungal Assessment Smith Recreation Community Centre 1019 Hwy 2A, Smith, Alberta 2012 P. O. B o x 8 3 0 2 4, E d m o n t o n, A B T 5 T 6 S 1 P h o n e :
WATER DAMAGE INVESTIGATION. Massachusetts Department of Public Utilities 1 South Station Boston, Massachusetts
WATER DAMAGE INVESTIGATION Massachusetts Department of Public Utilities 1 South Station Boston, Massachusetts Prepared by: Massachusetts Department of Public Health Bureau of Environmental Health Indoor
Old Dominion University Mold Management Plan
OFFICE OF ENVIRONMENTAL HEALTH AND SAFETY 5255 Hampton Blvd. Spong Hall, suite 2501 Norfolk, Virginia 23529 Phone: (757) 683-4495 Fax: (757) 683-6025 Occupational Safety & Health Environmental Health Laboratory
Construction Indoor Air Quality Management Plans for LEED. Matt Gregg, PE, LEED AP
Construction Indoor Air Quality Management Plans for LEED Matt Gregg, PE, LEED AP Agenda What is a Construction IAQ Management Plan? What are the LEED Requirements? What is the Mechanical Contractor s
Risk Bulletin. Mold Prevention and Control for Mechanical and HVAC Contractors. XL Group Insurance
XL Group Insurance Risk Bulletin Mold Prevention and Control for Mechanical and HVAC Contractors Mechanical contractors have an inherent risk of mold claims arising out of the heating, ventilation, and
BUILDING ASSESSMENT QUESTIONNAIRE. B. TENANTS Is there more than one tenant in the building? YES
Department of Health and Human Services, Division of Public Health Occupational and Environmental Epidemiology Branch 1912 Mail Service Center, Raleigh, North Carolina 27699-1912 BUILDING ASSESSMENT QUESTIONNAIRE
Mold Questions and Answers Questions and Answers on Stachybotrys chartarum and other molds
Questions and Answers on Stachybotrys chartarum and other molds Questions and Answers 1. I heard about "toxic molds" that grow in homes and other buildings. Should I be concerned about a serious health
Indoor Air Quality Issues for Hotels
Indoor Air Quality Issues for Hotels Chai chen Chao DEA 670 Spring, 2000 Thermal Control Relative Humidity Winter Temperature Summer Temperature 30% 68.5 F - 76.0 F 74.0 F - 80.0 F 40% 68.5 F - 75.5 F
There are several types of air cleaning devices available, each designed to remove certain types of pollutants.
Please Note: EPA neither certifies nor recommends particular brands of home air cleaning devices. While some home air cleaning devices may be useful in some circumstances, EPA makes no broad endorsement
Before You Start an Energy Efficiency Retrofit The Building Envelope
ABOUT YOUR HOUSE Before You Start an Energy Efficiency Retrofit The Building Envelope The building envelope is the outer layer of the building that separates the indoor living space from the outdoor environment,
WATER DAMAGE INVESTIGATION. Massachusetts Gaming Commission 101 Federal Street Boston, Massachusetts
WATER DAMAGE INVESTIGATION Massachusetts Gaming Commission 101 Federal Street Boston, Massachusetts Prepared by: Massachusetts Department of Public Health Bureau of Environmental Health Indoor Air Quality
Safety Policy Manual Policy No. 112
Policy: Mold Prevention, Assessment and Remediation Program Page 1 of 9 APPLICATION NYU Langone Medical Center (NYULMC) POLICY SUMMARY NYULMC is committed to protecting employees, patients, and visitors
Mold. Guidelines for New Jersey Residents. Understanding Mold Investigations & Remediation
Mold Guidelines for New Jersey Residents Understanding Mold Investigations & Remediation What Services Should I Ask For? What Are Important Inspection Procedures? Is Mold Sampling Helpful? What Information
Indoor Environmental Quality Management Plan
RILLION PUBLIC SCHOOL BOARD OF EDUCATION SERIES 700: SUPPORT SERVICES FILE: 737 Indoor Air Quality Management Brillion Public Schools Indoor Environmental Quality Management Plan 1. Mission Statement School
UNIVERSITY OF TOLEDO
UNIVERSITY OF TOLEDO SUBJECT: INTERIM LIFE SAFETY MEASURES AND INFECTION Procedure No: LS-08-008 CONTROL PROCEDURE STATEMENT Interim life safety and infection control measures will be implemented to protect
Now that Your Building Experienced Water Damage What Must You and Your Water Damage Restoration Contractor Agree On?
w that Your Building Experienced Water Damage What Must You and Your Water Damage Restoration Contractor Agree On? By Completing a Building and Occupant Survey Hopefully Your Questions will be Answered
"An Office Building Occupant's Guide to Indoor Air Quality"
"An Office Building Occupant's Guide to Indoor Air Quality" Office of Air and Radiation (OAR) Indoor Environments Division (6609J) Washington, DC 20460 EPA-402-K-97-003, October 1997 Contents A Summary
ASTACEA4 Inspect complex/central air conditioning systems
Overview This Unit covers the competences required to inspect complex/central air conditioning systems as defined by the CIBSE TM 44 Figure 1.1: Summary of system types and their component parts. The air
IAQ - indoor ventilation Air contaminants Molds Requirements for growth Health effects Mold prevention - moisture EH&S mold checks & removal
Indoor Air Quality & Mold Class Spring 2012 Building Monitors Meeting Presentation Agenda IAQ - indoor ventilation Air contaminants Molds Requirements for growth Health effects Mold prevention - moisture
HVAC Checklist - Long Form
HVAC Checklist - Long Form Page 1 of 14 Appendix B discusses HVAC system components in relation to indoor air quality. utside Air Intake Location pen during occupied hours? Unobstructed? Standing water,
Components HVAC General Standards HVAC Guidelines HVAC System Selection Life Cycle Cost Analysis
Components HVAC General System Selection Life Cycle Cost Analysis Outdoor Air Design Values Indoor Air Design Values Outdoor Air Ventilation Welding Ventilation Temperature Control Systems Ductwork HVAC
INDOOR AIR QUALITY ASSESSMENT
INDOOR AIR QUALITY ASSESSMENT Massachusetts Criminal Justice Training Council at the Boylston Town Offices Building 221 Main Street Boylston, Massachusetts Prepared by: Massachusetts Department of Public
University of Vermont
University of Vermont Department of Physical Plant Burlington, Vermont WATER INTRUSION GUIDELINES In accordance with: IIRC S500 IIRC S520 EPA Document 402-K-01-001 REVISED AND DISTRIBUTED BY: THE UNIVERSITY
TO TEST OR. NOT TO TEST Redefining the Role of Third-party Consultants CLEANING & RESTORATION A PUBLICATION OF THE RESTORATION INDUSTRY ASSOCIATION
CR & CLEANING & RESTORATION May 2014 Vol. 51 No. 4 $9.00 A PUBLICATION OF THE RESTORATION INDUSTRY ASSOCIATION TO TEST OR NOT TO TEST Redefining the Role of Third-party Consultants Underdog Leadership
Indoor Air Quality- What You Need to Know
Indoor Air Quality- What You Need to Know Overview Indoor air quality (IAQ) concerns present ever-mounting problems to facility managers and health and safety personnel. From toxic mold to carbon dioxide
NYU Safety Policy Manual
NYU Safety Policy Manual Page 1 of 6 Subject: Mold Prevention, Assessment, and Remediation Program Policy No. 167 ISSUE DATE REPLACES ORIGINATOR APPLICATION NYU Washington Square Campus PURPOSE The purpose
A Breath of Poor Air: Inspecting Indoor Air Quality in the Classroom Ashley Schopieray
INTRODUCTION A Breath of Poor Air: Inspecting Indoor Air Quality in the Classroom Ashley Schopieray In this lesson students will learn about IAQ (indoor air quality) and the substances that could be polluting
PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES
PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES ADDRESS: 123 MAIN ST MIAMI, FL CLIENT: BUYER ID No: 2014193 DATE: 5/13/2014 INSPECTION OR ASSESSMENT BY: GAIA CONSTRUCTION INC. CGC 1516136 FLORIDA HI-2792
IEQ-15 Air Distribution System
AIM OF CREDIT To encourage and recognise the design and maintenance of air distribution systems that minimise the risk of particulate and microbial contamination to the internal air supply. CREDIT CRITERIA
Mold Basics. Why is mold growing in my home?
Mold Basics The key to mold control is moisture control. If mold is a problem in your home, you should clean up the mold promptly and fix the water problem. It is important to dry water-damaged areas and
ASBESTOS SCIENCE TECHNOLOGIES, INC.
ASBESTOS SCIENCE TECHNOLOGIES, INC. P.O. Box 505 Bangor, CA 95914 Phone (530) 518-0934 Email - [email protected] Report for Lincoln Elementary School 1582 Lincoln Road Yuba City, Ca. 95993 Mold Report
ASBESTOS MANAGEMENT PROGRAM
ASBESTOS MANAGEMENT PROGRAM Prepared By: Triumvirate Environmental Program Approval Developed: August 2011 Updated: June 2015 Associate Vice President of Public Safety & Administrative Services Date Associate
NADCA GENERAL SPECIFICATIONS FOR THE CLEANING OF COMMERCIAL HEATING, VENTILATING AND AIR CONDITIONING SYSTEMS
NADCA GENERAL SPECIFICATIONS FOR THE CLEANING OF COMMERCIAL HEATING, VENTILATING AND AIR CONDITIONING SYSTEMS National Air Duct Cleaners Association 1518 K Street, N.W. Suite 503 Washington, DC 20005 (202)
School Renovation and Construction: What you Need to Know to Protect Child and Adult Environmental Health
School Renovation and Construction: What you Need to Know to Protect Child and Adult Environmental Health Healthy Schools Network, Inc. www.healthyschools.org 2000, 2012 www.cleaningforhealthyschools.org
Controlling Condensation On CWP Insulation BY ED LIGHT, MEMBER ASHRAE; JAMES BAILEY, P.E., MEMBER ASHRAE; AND ROGER GAY
This article was published in ASHRAE Journal, Decemeber 2014. Copyright 2014 ASHRAE. Posted at www.ashrae.org. This article may not be copied and/or distributed electronically or in paper form without
STANDARD OPERATING PROCEDURES FOR MOLD REMEDIATION
West Virginia University Environmental Health and Safety STANDARD OPERATING PROCEDURES FOR MOLD REMEDIATION Origination Date August 2013. Contents Purpose:... 2 Job Scope... 2 Definitions... 2 Roles/Responsibilities:...
Restoring your Property: How to be prepared for Rapid Response to Flood Damage
Restoring your Property: How to be prepared for Rapid Response to Flood Damage After a flood, the restoration process can be long and complex, particularly for large commercial properties. Failure to apply
Facilities Maintenance Standards rev 9-1-2015
Facilities Maintenance Standards rev 9-1-2015 Purpose The purpose of these standards is to outline the minimum requirements for maintaining state owned facilities and infrastructures in a manner that will
AIR CONDITIONING EFFICIENCY F8 Energy eco-efficiency opportunities in Queensland Foundries
AIR CONDITIONING EFFICIENCY F8 Energy eco-efficiency opportunities in Queensland Foundries Hot tips and cool ideas to save energy and money! Air conditioning units or systems are often used by foundries
Mold Response and Remediation Plan
1.0 Policy Statement The University of New Haven has developed a mold response and remediation plan in accordance with best practices set forth by the Environmental Protection Agency (EPA), Occupational
MOLD RESPONSE AND REMEDIATION PLAN
MOLD RESPONSE AND REMEDIATION PLAN Prepared By: Triumvirate Environmental Developed: April 2011 Last Revised: March 2015 Program Approval Associate Vice President of Public Safety & Administrative Services
DEPARTMENT OF CODES AND BUILDING SAFETY FLOOD RECOVERY INFORMATION
May 2010 DEPARTMENT OF CODES AND BUILDING SAFETY FLOOD RECOVERY INFORMATION GUIDELINES FOR PERMITS ASSOCIATED WITH THE REPAIR OF FLOOD DAMAGED HOMES AND BUILDINGS The Department of Codes and Building Safety
Mold and Mildew Mold and mildew can be detected by sight, smell and touch.
Mold and Mildew Mold and mildew can be detected by sight, smell and touch. Molds are usually black (not unlike the molds that grow in showers and between grout), green or tan in color, but can be in various
MOLD FAQs. 1. What is mold and where does it live? 2. How can mold affect my health?
MOLD FAQs 1. What is mold and where does it live? Molds are microscopic fungi that are part of the natural environment. They can grow almost anywhere (inside and out), but live especially in the soil outside.
Biological Contamination in the HVAC System
Biological Contamination in the HVAC System by Chin S. Yang, Ph.D. P & K Microbiology Services, Inc. Cherry Hill, New Jersey The heating, ventilating, and air-conditioning system (HVAC) in a building is
Moisture in Buildings A Practical Guide to Avoiding Moisture & Mold
Moisture in Buildings A Practical Guide to Avoiding Moisture & Mold The National Academy of Sciences recently released a report, Damp Indoor Spaces and Health, examining the link between dampness, health
MOISTURE MANAGEMENT DURING THE CONSTRUCTION PROCESS
MOISTURE MANAGEMENT DURING THE CONSTRUCTION PROCESS Ed Light 1,*, James Bailey 1, and Roger Gay 1 1 Building Dynamics, LLC, Ashton, MD (USA) *Corresponding email: [email protected] Published
Moisture Management. Infection Prevention and Corporate Safety. Contents. Posttest... 12
Moisture Management Infection Prevention and Corporate Safety This self-directed learning module contains information you are expected to know to protect yourself, our patients, and our guests. Target
Why is my air conditioner dripping on my customers?
De-Mystifying HVAC Why is my air conditioner dripping on my customers? By Ron Prager One of the most frequent emergency service requests is a call for an air conditioner leaking water into the store. These
Indoor air quality monitoring made easy
Indoor air quality monitoring made easy with the Fluke 985 Particle Counter Application Note Introduction Energy savings is top of facilities owners agenda. HVAC system tends to be the largest contributor
Indoor Environmental Quality Checklist Including Background Information in Comment Section
Department of Employee Relations Indoor Environmental Quality Checklist Including Background Information in Comment Section Building Description Original construction date Renovation dates Number of floors
Guidelines for Mold Remediation (Removal)
Guidelines for Mold Remediation (Removal) Indoor mold growth, water damage, or musty odors should be addressed quickly. Removing mold growth and correcting the underlying cause of water accumulation can
Gramercy Place Condo Association, Inc.
Gramercy Place Condo Association, Inc. UNIT MODIFICATION REQUEST Date of Application: Name of Owner (s): Telephone: (Home) (Cell) E-Mail: Anticipated start date: Anticipated ending date: Permission is
Mold Management Plan Operations & Maintenance
Document #: SAFETY_015 Revision Date: October 4, 2010 Mold Management Plan Operations & Maintenance Developed by: Environmental Health & Safety Approved by: Associate VP of Facilities & Campus Services
The University of Texas at San Antonio Office of Environmental Health, Safety and Risk Management. Mold & Water Intrusion Safety Plan
The University of Texas at San Antonio Office of Environmental Health, Safety and Risk Management Mold & Water Intrusion Safety Plan i. Signature Page This Mold and Water Intrusion Safety Plan has been
PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES
PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES ADDRESS: Somewhere, FL CLIENT: GAIA GC ID No: 2015000 DATE: 12/31/2015 INSPECTION OR ASSESSMENT BY: GAIA CONSTRUCTION INC. CGC 1516136 FLORIDA HI-2792 FLORIDA
Terms of Reference Air Handling Unit (HVAC System) Cleaning
Terms of Reference Air Handling Unit (HVAC System) Cleaning Introduction General cleaning of the air handling units is currently undertaken by the Mechanical Division staff composing of 3 personnel. Cleaning
Facts About Moulds. Should I be concerned about mould in my building?
Introduction This information has been developed by Saskatchewan Health and the Occupational Health and Safety Division of Saskatchewan Labour and is intended to apply to private residences, public buildings
Innovation #9/12. of all Formaldehyde for up to
Innovation #9/12 of all Formaldehyde for up to Gyproc Activ Air Benefits of Activ Air Improves the indoor air quality, providing healthier interior environments Permanently reduces Formaldehyde and other
Energy Efficiency in Industrial HVAC Systems
Energy Efficiency in Industrial HVAC Systems Heating, ventilation and air conditioning (HVAC) constitutes up to 35 percent of energy used in manufacturing facilities. This fact sheet is geared towards
Asbestos Management & Abatement
Asbestos Management & Abatement Latest revised date: October 29, 2012 Page 1 of 18 1.0 LEGAL & LEGISLATIVE REQUIREMENTS This standard provides guidance to meeting the minimum requirements of the Act &
Water Incursion Standard Operating Procedure
Water Incursion Standard Operating Procedure Purpose: To provide a standardized procedure in the event of water incursion into any Penn State University facility. References: A Brief Guide to Mold, Moisture
Charles McCammon, Ph.D., CIH
This Health Hazard Evaluation (HHE) report and any recommendations made herein are for the specific facility evaluated and may not be universally applicable. Any recommendations made are not to to be considered
250 St Georges Tce, Perth, WA (QV1)
250 St Georges Tce, Perth, WA (QV1) Building Profile Building Construction date 1991 Refurbishment date Owner Building Size Refurbishment Team Building Management Awards Ratings QV.1, 250 St Georges Terrace,
University of Pittsburgh Safety Manual. EH&S Guideline Number: 01-007 ASBESTOS
Page 1 of 5 The inhalation of asbestos fibers in excess amounts can lead to chronic lung disease. Our knowledge of these health effects comes from studies of workers exposed routinely to high concentrations
Wellesley College Mold Management Program March 2009
Mold Management Program March 2009 Table of Contents Page I. Policy...2 II. Objectives....2 III. Roles and Responsibilities... 2 IV. Operational Controls Standard Operating Procedures.. 3 A. Addressing
University of Nevada, Reno Facilities Services Department STANDARD OPERATING PROCEDURE. Facilities Maintenance Services
University of Nevada, Reno Facilities Services Department STANDARD OPERATING PROCEDURE Facilities Maintenance Services Indoor Flood Cleanup and Mold Prevention DATE: 6/24/15 REVISED: PURPOSE This University
SECTION 23 05 12 GENERAL PROVISIONS FOR HVAC WORK
SECTION 23 05 12 GENERAL PROVISIONS FOR HVAC WORK 1 GENERAL 1.1 GENERAL REQUIREMENTS A. This Section is coordinated with and complementary to the General Conditions and Supplementary General Conditions
Nick s Inspection Services
Nick s Inspection Services 909 Shorthorn Grain Valley Mo. 64029 Phone: 816-355-0368 Cell: 816-225-5783 Email: [email protected] Building Inspection Report and Protocol Inspection Date: 08-20-14
March 2007. Get The Mold Out: Mold Clean-Up Guidance for Residences. Introduction
March 2007 Connecticut Department of Public Health Environmental Health Section Environmental & Occupational Health Assessment Program 410 Capitol Avenue MS # 11EOH, PO Box 340308 Hartford, CT 06134-0308
Liabilities of Vented Crawl Spaces And Their Impacts on Indoor Air Quality in Southeastern U.S. Homes
Liabilities of Vented Crawl Spaces And Their Impacts on Indoor Air Quality in Southeastern U.S. Homes Jonathan Coulter, Bruce Davis, Cyrus Dastur, Melissa Malkin-Weber and Tracy Dixon Advanced Energy,
Arbor Heights Indoor Air Quality Investigation Interim Report
Arbor Heights Indoor Air Quality Investigation Interim Report Arbor Heights Elementary PTSA 3701 SW 104 Street Seattle, WA 98146 ENVIROTEST RESEARCH INC. 1108 NE 200 th, St. Suite 100 Shoreline, WA 98155-1136
Part 2: Drying Out Your Home
Part 2: Drying Out Your Home Now you're ready to begin drying out your home and establishing your plan for rebuilding. The information contained in this section will help you to dry out and decontaminate
HVAC Systems and Indoor Air Quality. Douglas K. Spratt, M.Sc., P.Eng.
HVAC Systems and Indoor Air Quality Douglas K. Spratt, M.Sc., P.Eng. The 5 Senses Architecture Electrical Structural Mechanical Hearing Seeing Smelling Feeling Tasting HVAC Systems are Dynamic Heat Gains
SECTION 23 01 30.51 HVAC AIR-DISTRIBUTION SYSTEM CLEANING
SECTION 23 01 30.51 HVAC AIR-DISTRIBUTION PART 1 - GENERAL 1.1 SUMMARY A. Section includes cleaning of interior surfaces of HVAC equipment. The HVAC equipment cleaning work includes the following: 1. Air
Attachment #23 Health Safety Table. Client Education Inform issue and document. How to clean & maintain gutters. How to adjust sprinklers
Exterior Visual Health & Safety Issue Allowable Action Site Drainage Exterior grade does not slope 2% within the first 10' Site drainage causing bulk moisture in crawl space or basement Repairs to existing
HUD Healthy Homes Grantee Program Sample Program Evaluation Plan
HUD Healthy Homes Grantee Program Sample Program Evaluation Plan Project Definition A. State goals and objectives Goals 1. To implement and evaluate cost-effective improvements in homes that reduce the
RULE 1102. DRY CLEANERS USING SOLVENT OTHER THAN PERCHLOROETHYLENE
(Adopted January 6, 1978)(Amended August 3, 1979)(Amended July 11, 1980) (Amended August 3, 1990)(Amended December 7, 1990) (Amended November 17, 2000) RULE 1102. DRY CLEANERS USING SOLVENT OTHER THAN
Get The Mold Out: Mold Clean-Up Guidance for Residences. Introduction
Connec cut Department of Public Health Environmental & Occupa onal Health Assessment Program Environmental Health Sec on 410 Capitol Avenue, MS # 11EOH, PO Box 340308 Har ord, CT 06134-0308 Telephone:
Department of Environmental Health and Safety & Emergency Management
Date: February 2014 Revision: 02 Page: 1 of 13 This Guideline is issued jointly by the Department of Environmental Health and Safety & (EHSEM) and Facilities Management to provide guidance and consistency
Facilities Operations Customer Service Standards WORK ORDER PRIORITIES
Facilities Operations Customer Service Standards WORK ORDER PRIORITIES In order to provide fair and consistent maintenance service to all University faculty, staff and students, a work priority system
Request for Reasonable.Accommodations/Modifications for Avenue,- Brooklyn, NY-
l J ECONOMIC JUSTICE December 18, 2012 Department of Equal Opportunity New York City Housing Authority (NYCHA) 250 Broadway - 27th Floor New York, NY 10007 Re: Request for Reasonable.Accommodations/Modifications
An Informational Pamphlet. 416 South East Street Lebanon, OH 45036
An Informational Pamphlet 416 South East Street Lebanon, OH 45036 What is Mold? Mold is a type of fungus that is present in our natural environment. Mold spores, which are tiny microscopic seeds, can
