Asset Performance Management Best Practices. Joel A. Nachlas, Ph. D. Virginia Tech
|
|
|
- Eileen Fleming
- 9 years ago
- Views:
Transcription
1 Asset Performance Management Best Practices Joel A. Nachlas, Ph. D. Virginia Tech
2 Survey Project sponsored by Meridium, Inc. Roanoke, Virginia
3 Project Team Andrew Henry & Joel Nachlas Virginia Tech Bob Francis Meridium Mike Dunlap Dunlap Marketing
4 The overall project objective is to define a map of company feature dependent best practices in the management of production asset maintenance.
5 Operational strategy Identify a large set of companies and or facilities that rely on capital intensive production resources. Contact managers or other high level executives of those firms to request participation in the survey and identify the specific people who would responsible for providing survey responses. In this process, use a screening questionnaire in order to determine whether contact is to receive version A or B of the survey.
6 The two versions of the survey are identical except for the section dealing with analytical methods. Companies indicating that they use formal analytical techniques received version A in which the analytics section inquired the techniques used to manage maintenance. Companies indicating that they do not have formal analytical techniques received version B in which the analytics section inquired about needed data resources.
7 Initial contact with target companies, implementation of the screening questionnaire and follow-up reminder phone calls were performed by Dunlap Marketing. Completed survey questionnaires were sent directly to Virginia Tech.
8 The screening questionnaire included a question concerning the business sector of the target firms. Survey responses received represent: Aerospace & Defense Chemical/Petrochemical Consumer Products Forest Products Metals & Mining Oil & Gas Pharmaceutical Power/Utility Transportation
9 Screening questionnaire responses included 300 companies that indicated they would complete the survey. Actual final response set included 53 completed surveys. Of these, 46 completed version A and 7 completed version B.
10 300 Phone Respondent Industry Breakdown Aerospace & Defense Chemical/Petrochemical Consumer Products 15 Forest Products Metals & Mining Oil & Gas Pharmaceutical Power/Utility Transportation Other/Blank
11 53 Respondent Industry Breakdown Chemical/ Petrochemical Forest Products Metals & Mining Oil & Gas Power & Utility Other/Blank
12 Respondents represented firms located in: 38 US states the District of Columbia and 6 Canadian provinces
13 Screening questionnaire Insights that were not initially intended are obtained from the responses to the screening questionnaire. For example, when asked if their firms perform quantitative analysis of maintenance or reliability data, the responses differed between A and B groups % 80.00% 60.00% 40.00% 20.00% 0.00% A B
14 Screening questionnaire Similarly, when asked if asset purchase decisions are based on life cycle cost analysis: 80.00% 60.00% 40.00% 20.00% 0.00% A B
15 Screening questionnaire Is reliability in design analysis used for capital expenditures? % 80.00% 60.00% 40.00% 20.00% 0.00% A B
16 Screening questionnaire Does your company report return on assets to management? 80% 60% 40% 20% 0% A B
17 Survey general The survey design included questions organized into 8 sections dealing with: Management practices Asset awareness Analytics Maintenance practices Information management Asset purchasing and renewal Spare parts inventories Respondent identity
18 Survey general Questions were organized to allow us to evaluate corporate success and the degree to which risk based quantitative analyses are used to manage production assets. Because the surveys were identified as focusing on asset management, responding firms assigned responsibility for the survey to plant managers, maintenance managers or reliability managers.
19 Survey general Success in asset management was also evaluated. The results described today are based on unplanned downtime as the measure of success. Related to this measure is the question of what events trigger maintenance effort. For the 53 survey respondents, we observed:
20 Survey general Maintenance triggers A Asset Failure (Reactive) Time Based Maintenance Schedule Asset Condition (Condition Monitoring) Predictive Modeling (Analytics)
21 Survey general Maintenance triggers B Asset Failure (Reactive) Time Based Maintenance Schedule Asset Condition (Condition Monitoring) Predictive Modeling (Analytics)
22 Survey A respondents Using unplanned maintenance as a measure of asset management effectiveness, we classified respondents and found that the 46 respondents to version A of the survey were distributed as: Unplanned downtime worst 28% best 33% moderate 39%
23 Survey A management practices Our management has a clear vision for physical asset performance and it is well known in our company % 80.00% 60.00% 40.00% 20.00% 0.00% yes
24 Survey A management practices Our organization enacts change: 1.Readily and effectively 2. Only with great expenditure of effort 3. Not well at all 80.00% 60.00% 40.00% 20.00% best moderate worst 0.00% 1 2 3
25 Survey A management practices Are problems addressed using a consistent methodology? % 80.00% 60.00% 40.00% 20.00% 0.00% yes
26 Survey A management practices Employee certification is: 1. A top management priority 2. Usually supported by management 3. Supported with sufficient justification 4. Rarely supported by management 5. Not supported by management 60.00% 50.00% 40.00% 30.00% 20.00% 10.00% 0.00% best moderate worst
27 Survey A management practices Compared to production, asset performance management is: 1. Less important 2. Equally important 3. More important % 80.00% 60.00% 40.00% 20.00% best moderate worst 0.00% 1 2 3
28 Survey A management practices An asset retirement plan is developed when? % of life % of life % of life 4. Beyond 75% of life 70.00% 60.00% 50.00% 40.00% 30.00% 20.00% 10.00% 0.00% best moderate worst
29 Survey A management practices Capital expenditures are based on reliability in design and/or life cycle costs for what percentage of assets? 1. 0% % % 4. more than 75% 60.00% 50.00% 40.00% 30.00% 20.00% 10.00% best moderate worst 0.00%
30 Survey A asset awareness Asset status monitoring 1. Automated 2. Hand measurements 3. Visual inspection 4. Not at all 80.00% 70.00% 60.00% 50.00% 40.00% 30.00% 20.00% 10.00% 0.00% best moderate worst
31 Survey A asset awareness Knowledge of the age of your assets 1. We are fully aware of the age of all assets in our plant 2. Interval age is well maintained for roughly 75% of plant assets 3. Asset age is documented for less than 50% of plant assets 4. Asset age is not tracked or documented for any plant assets 60.00% 50.00% 40.00% 30.00% 20.00% 10.00% 0.00% best moderate worst
32 Survey A asset awareness The probability of breakdown is forecast for what percent of your assets? 1. 0% % % 4. More than 75% 70.00% 60.00% 50.00% 40.00% 30.00% 20.00% best moderate worst 10.00% 0.00%
33 Survey A asset awareness The probability of failure is calculated: 1. For each production asset 2. For groups of similar assets 3. For the whole plant 4. Not at all 70% 60% 50% 40% 30% 20% best moderate worst 10% 0%
34 Survey A asset awareness Breakdown probabilities calculated using: 1. Historical data 2. Manufacturer s specs. 3. Current asset status measures 4. Educated guess 70.00% 5. Not at all 60.00% 50.00% 40.00% 30.00% 20.00% 10.00% 0.00% best moderate worst
35 Survey A analytics Rank the maturity of your analytical processes. 1. Fully developed and up to date 2. Well established and improving 3. Developing 4. Embryonic and weak 60.00% 50.00% 40.00% 30.00% 20.00% 10.00% best moderate worst 0.00%
36 Survey A maintenance practices Conditioning monitoring data for high cost production assets is: 1. Recorded and stored 2. Used to influence maintenance planning 3. Analyzed and used in a predictive or analytic model 70.00% 60.00% 50.00% 40.00% 30.00% 20.00% 10.00% 0.00% best moderate worst
37 Survey A maintenance practices The most recent update of your asset maintenance plan occurred: 1. During the current year 2. Within the past 2 years 3. Within the past 5 years 4. More than 5 years ago 45.00% 40.00% 35.00% 30.00% 25.00% 20.00% 15.00% 10.00% 5.00% 0.00% best moderate worst
38 Survey A information management Reports of unplanned breakdowns are: 1. Analyzed for root causes 2. Simply read and archived 3. Not generated or not reviewed % 80.00% 60.00% 40.00% 20.00% best moderate worst 0.00% 1 2 3
39 Survey A asset purchasing and renewal Does your firm have an asset retirement plan? 50.00% 40.00% 30.00% 20.00% 10.00% 0.00% yes
40 Survey A spare parts inventories Spare parts inventory levels are: 1. Computed using an analytical algorithm 2. Specified by the maintenance manager based on experience 3. Set by management based on experience 4. Set based on industry practices 5. Not formally set 80.00% 60.00% 40.00% 20.00% best moderate worst 0.00%
41 Conclusions caveats There are many more results than those presented here. Analysis of the survey data is continuing. Results for the B surveys are sparse but appear to conform to those for the A surveys. The full study results should be available for publication by the end of the year.
42 Conclusions There seem to be several conclusions that are well supported. Some of these seem obvious but it is nice that the data supports them. 1. Management practices have a strong influence on asset management effectiveness. 2. A firm with a clear vision of how assets should and do perform get the most from their equipment. 3. Organizations that are flexible and can adapt have better asset performance. 4. Firms that use consistent methods to addressing problems have better asset performance.
43 Conclusions 5. Firms that encourage expansion in employee knowledge have better asset performance. 6. Firms that monitor and record asset status and that use their knowledge of asset condition to guide maintenance plans have better asset performance. 7. Firms that use analytical methods to model and study asset failure probabilities and to set maintenance plans have better asset performance. 8. Implementation of the analytical methods at the individual asset level enhance benefits.
44 Conclusions 9. Firms that use data to solve problems have better asset performance. 10. Firms that use life cycle cost analysis as a basis for asset management derive significant benefits from this. 11. Firms that have asset retirement plans in place have better asset performance. 12. Firms that maintain records and use accumulated data to address new problems have better asset performance. 13. Firms that emphasize sensitivity to asset status and the use of analytical methods experience significantly better asset performance.
Industrial Roadmap for Connected Machines. Sal Spada Research Director ARC Advisory Group [email protected]
Industrial Roadmap for Connected Machines Sal Spada Research Director ARC Advisory Group [email protected] Industrial Internet of Things (IoT) Based upon enhanced connectivity of this stuff Connecting
Industrial Cyber Security Risk Manager. Proactively Monitor, Measure and Manage Industrial Cyber Security Risk
Industrial Cyber Security Risk Manager Proactively Monitor, Measure and Manage Industrial Cyber Security Risk Industrial Attacks Continue to Increase in Frequency & Sophistication Today, industrial organizations
Enterprise Asset Performance Management
Application Solution Enterprise Asset Performance Management for Power Utilities Using the comprehensive Enterprise Asset Performance Management solution offered by Schneider Electric, power utilities
A smarter approach to extracting natural resources in Canada
A smarter approach to extracting natural resources in Canada Data is the industry s untapped resource Highligbhts In many cases, information technology assets are underutilized in the Canadian natural
SAP pioneered the ERP software market. Five former IBM employees. Systemanalyse und Programmentwicklung
INTRODUCTION TO SAP Spring 2009 Enterprise Systems Who is SAP? SAP pioneered the ERP software market. Five former IBM employees Systemanalyse und Programmentwicklung Goals: Create software that would integrate
Collaborative Asset Lifecycle Management and PAM
Collaborative Asset Lifecycle Management and PAM Wil Chin Research Director ARC Advisory Group [email protected] 1 T h o u g h t L e a d e r s f o r M a n u f a c t u r i n g & S u p p l y C h a i n Millions
Bosch Rexroth. The Drive & Control Company
osch Rexroth. The Drive & Control Company Optimized Uptime and proactive Maintenance provided by osch Rexroth Stefan Saul Director Product Management Global Services, osch Rexroth 1 Agenda A C Life Cycle
Increase Equipment Uptime Through Robust Enterprise Asset Management. For the Upstream, Midstream & Downstream Sectors of the Oil & Gas Industry
Increase Equipment Uptime Through Robust Enterprise Asset Management For the Upstream, Midstream & Downstream Sectors of the Oil & Gas Industry The Oil & Gas industry is challenged with effectively maximizing
COMPUTERIZED MAINTENANCE MANAGEMENT SYSTEMS. Dr. Abdul-Mohsen Al-Hammad. I. Maintenance Management Systems
COMPUTERIZED MAINTENANCE MANAGEMENT SYSTEMS By Dr. Abdul-Mohsen Al-Hammad Outline I. Maintenance Management Systems II. Computerized Maintenance Management System. 2 1 I. Maintenance Management Systems
ENGINEERING LABOUR MARKET
ENGINEERING LABOUR MARKET in Canada Projections to 2025 JUNE 2015 ENGINEERING LABOUR MARKET in Canada Projections to 2025 Prepared by: MESSAGE FROM THE CHIEF EXECUTIVE OFFICER Dear colleagues: Engineers
Realizing the full potential of maintenance. Company Introduction
Realizing the full potential of maintenance Company Introduction CONTENTS Quant is a global leader in industrial maintenance. For over 25 years, we have been realizing the full potential of maintenance
Frost & Sullivan. http://www.marketresearch.com/frost-sullivan-v383/ Publisher Sample
Frost & Sullivan http://www.marketresearch.com/frost-sullivan-v383/ Publisher Sample Phone: 800.298.5699 (US) or +1.240.747.3093 or +1.240.747.3093 (Int'l) Hours: Monday - Thursday: 5:30am - 6:30pm EST
www.pwc.com Balancing Uptime and Working Capital: Maintenance and Inventory Strategies in Mining
www.pwc.com Balancing Uptime and Working Capital: Maintenance and nventory Strategies in Mining Session Agenda ntroduction Overview of Maintenance Strategies in Mining Overview nventory Management Strategies
Using the Safety Perception Survey to Assess Your Organization s Safety Culture
Using the Safety Perception Survey to Assess Your Organization s Safety Culture Robert S. Krzywicki Michael B. Keesey April 21, 2011 1 Agenda Safety Contact Grounding - Definition of Culture - 12 Elements
process Preventing Unplanned Downtime through Alarm Management: The Five Most Important Alarm Management Techniques for Preventing Unplanned Downtime
Preventing Unplanned Downtime through Alarm Management: The Five Most Important Alarm Management Techniques for Preventing Unplanned Downtime The Cost of Bad Alarm Management Alarm management within process
Maintenance, Repair, and Operations (MRO) in Asset Intensive Industries. February 2013 Nuris Ismail, Reid Paquin
Maintenance, Repair, and Operations (MRO) in Asset Intensive Industries February 2013 Nuris Ismail, Reid Paquin Maintenance, Repair, and Operations (MRO) in Asset Intensive Industries The impact Maintenance,
With the tools provided by modern automation, pulp and paper makers can produce more with less
Article With the tools provided by modern automation, pulp and paper makers can produce more with less "In automation, new applications featuring the latest control technology enable papermakers to reach
Life Cycle Asset Management
Rx Whitepaper CONTENTS PAGE 1: Overview PAGE 1-2: Foundational Elements Management Strategy Development Organizational Design Long-term Asset Planning PAGE 2-7: Risk Management Concept and Design Construction
Predictive Asset Maintenance
Predictive Asset Maintenance Role of Business Analytics Intelligence Framework ASSET INTELLIGENCE Optimisation What is the best that could happen? Business Maturity & Value DCS Historian Vibration Data
City of Cambridge and IBM Build a Smarter City
City of Cambridge and IBM Build a Smarter City September 8, 2010 Presented by Mike Hausser, P.Eng Director of Asset Management and Support Services City of Cambridge Infrastructure Asset Life Cycle Install
Planning/Budgeting System & Chart of Accounts Redesign
Planning/Budgeting System & Chart of Accounts Redesign 1 Today s Agenda 1. Project Vision 2. Project Organization 3. Project Schedule 4. Hierarchy Structure 5. Chart of Accounts Redesign 6. Reporting 7.
Seradex White Paper A newsletter for manufacturing organizations April, 2004
Seradex White Paper A newsletter for manufacturing organizations April, 2004 Using Project Management Software for Production Scheduling Frequently, we encounter organizations considering the use of project
Turbine Optimization Programs to Extend Outage Periods and Manage Equipment Breakdown Risk
Turbine Optimization Programs to Extend Outage Periods and Manage Equipment Breakdown Risk by John A. Latcovich, Jr. Fleet Manager, Rotating Equipment The Hartford Steam Boiler Inspection and Insurance
2012 Americas School of Mines
www.pwc.com 2012 Americas School of Mines Maximizing Asset Management From Work Plan to Financial Performance Doug Stretton, Paul Ingram May 17, 2012 Presentation Summary Maximizing mining assets is often
Proactive Asset Management with IIoT and Analytics
Proactive Asset Management with IIoT and Analytics by Ralph Rio in Industrial Internet of Things, Analytics & Big Data Summary The Industrial Internet of Things (IIoT) with advanced analytics, offers new
SAP Enterprise Asset Management Enabling Maintenance Professionals
SAP Enterprise Asset Management Enabling Maintenance Professionals Pieter van Daal SAP Nederland Product Manager Enterprise Asset Management empower Operational Excellence in the Utility Industry Groningen
Asset Management: Using Analytics to Drive Predictive Maintenance
Asset Management: Using Analytics to Drive Predictive Maintenance As seen in Aberdeen's December 2012 report, Asset Management: Building the Business Case for the Executive, lingering uncertainty around
Maintenance Assessment Questionnaire. Please Print and Complete this Document.
Please Print and Complete this Document. When finished, you may mail this to our offices and we will be in contact with our recommendations. Manufacturing Solutions International Chattanooga Office 7704
Predictive Maintenance
Predictive Maintenance A smarter way to manage assets Tim Ricketts Smarter Infrastructure Team September 2014 Traditional Way of Doing Asset Management IBM Software Group Challenges Assets are managed
The Role of CMMS. A white paper on the selection and implementation of computerized maintenance management systems. Prepared by:
A white paper on the selection and implementation of computerized maintenance management systems Prepared by: Mike Crain Manager, Industrial Technologies Northern Digital, Inc. [email protected]
CORL Dodging Breaches from Dodgy Vendors
CORL Dodging Breaches from Dodgy Vendors Tackling Vendor Security Risk Management in Healthcare Introductions Cliff Baker 20 Years of Healthcare Security experience PricewaterhouseCoopers, HITRUST, Meditology
Solution. Smartplant. Reducing CAPEX and Improving ROCE
Solution Smartplant Enterprise Reducing CAPEX and Improving ROCE Industry Pressures Significant growth especially in economic hot-spots such as China and India will continue to drive global demand for
Industrial Engineering Roles In Industry. (Institute of Industrial Engineers Industry Advisory Board) www.iienet.org
Industrial Engineering Roles In Industry Prepared by the IIE-IAB IAB (Institute of Industrial Engineers Industry Advisory Board) www.iienet.org What Do IEs Do? Industrial Engineers work to make things
The digital future and dealing with disruption
The digital future and dealing with disruption Dr Giles Nelson, Senior Vice President of Product Marketing and Strategy May 2015 1 BIG CHANGE due to digitization 2 2 billion internet users worldwide 40%
Industrial Cyber Security Risk Manager. Proactively Monitor, Measure and Manage Cyber Security Risk
Industrial Cyber Security Risk Manager Proactively Monitor, Measure and Manage Cyber Security Risk With Today s Cyber Threats, How Secure is Your Control System? Today, industrial organizations are faced
Intelligent Process Management & Process Visualization. TAProViz 2014 workshop. Presenter: Dafna Levy
Intelligent Process Management & Process Visualization TAProViz 2014 workshop Presenter: Dafna Levy The Topics Process Visualization in Priority ERP Planning Execution BI analysis (Built-in) Discovering
The Role of Information Technology in Plant Reliability
The Role of Information Technology in Plant Reliability From P/PM Technology, June, 1999 By Robert Matusheski, Meridium, Inc. Information technologies (IT), in the context of this paper, include all computer
TEXT ANALYTICS INTEGRATION
TEXT ANALYTICS INTEGRATION A TELECOMMUNICATIONS BEST PRACTICES CASE STUDY VISION COMMON ANALYTICAL ENVIRONMENT Structured Unstructured Analytical Mining Text Discovery Text Categorization Text Sentiment
Master big data to optimize the oil and gas lifecycle
Viewpoint paper Master big data to optimize the oil and gas lifecycle Information management and analytics (IM&A) helps move decisions from reactive to predictive Table of contents 4 Getting a handle on
Modernize your Monitor Pro software with less risk, less cost and less effort
Modernize your Monitor Pro software with less risk, less cost and less effort Schneider Electric announces end of life for Monitor Pro With the release of Monitor Pro version 7.6, Schneider Electric has
siemens.com/scada SIMATIC SCADA Systems Efficient to a new level Answers for industry.
siemens.com/scada SIMATIC SCADA Systems Efficient to a new level Answers for industry. SIMATIC SCADA systems The right SCADA system for every application The course for the industrial world of tomorrow
Asset Integrity - Process Safety Management
Asset Integrity - Process Safety Management Commit to Process Safety Understand Hazards & Risks Manage Risk Learn from experience Process safety culture Compliance with standards Process safety competency
Asset Management 101
Asset Management 101 Part 1: Maintenance Strategy Overview Larry Covino Product Line Leader, Strategic Partnerships Bently Nevada Asset Condition Monitoring, GE Energy, [email protected] Michael Hanifan
Scheduled Maintenance
Scheduled Maintenance Scheduled Maintenance Scheduled maintenance is planned component repair or replacement, often triggered by preventive maintenance inspections, pre- trip and post- trip inspections,
QAD Enterprise Asset Management BI Metrics Demonstration Guide. May 2015 BI 3.11
QAD Enterprise Asset Management BI Metrics Demonstration Guide May 2015 BI 3.11 Overview This demonstration focuses on one aspect of QAD Enterprise Asset Management Business Intelligence Metrics and shows
Preparing and Evaluating A Request for Proposals: How to Select a Vendor Andrew Ness, Mercer Investment Consulting
Preparing and Evaluating A Request for Proposals: How to Select a Vendor Andrew Ness, Mercer Investment Consulting Although sometimes thought of as a necessary evil for sponsors of defined contribution
Real-time asset location visibility improves operational efficiencies
Real-time asset location visibility improves operational efficiencies Offering smart capabilities for asset tracking to dramatically improve efficiency and lower cost Highlights Improve asset utilization
Chapter 9 Reliability Centered Maintenance
Chapter 9 Reliability Centered Maintenance Marvin Rausand [email protected] RAMS Group Department of Production and Quality Engineering NTNU (Version 0.1) Marvin Rausand (RAMS Group) System Reliability
Building a Business Case for Industrial Software Projects Helps Ensure Success
APRIL 18, 2013 Building a Business Case for Industrial Software Projects Helps Ensure Success By Ralph Rio Keywords EAM, CMMS, Business Case Overview To get executive support for your next project, tie
Picture of health. An integrated approach to asset health management
Picture of health An integrated approach to asset health management KAREN SMILEY, SHAKEEL MAHATE, PAUL WOOD, PAUL BOWER, MARTIN NAEDELE -intensive industries face increasing pressure to improve how well
Agile Manufacturing for ALUMINIUM SMELTERS
Agile Manufacturing for ALUMINIUM SMELTERS White Paper This White Paper describes how Advanced Information Management and Planning & Scheduling solutions for Aluminium Smelters can transform production
Avantis Enterprise Asset Management Suite
Avantis Enterprise Asset Management Suite The Avantis Enterprise Asset Management Suite (EAM) of offerings represent the core of the Asset Performance Management (APM) solution set. APM will help you deliver
Data Collection Strategies 1. Bonus Table 1 Strengths and Weaknesses of Tests
Data Collection Strategies 1 Bonus Table 1 Strengths and Weaknesses of Tests Strengths of tests (especially standardized tests) Can provide measures of many characteristics of people. Often standardized
Copyright 11/1/2010 BMC Software, Inc 1
Copyright 11/1/2010 BMC Software, Inc 1 Copyright 11/1/2010 BMC Software, Inc 2 Copyright 11/1/2010 BMC Software, Inc 3 The current state of IT Service How we work today! INCIDENT SERVICE LEVEL DATA SERVICE
Seradex White Paper. Using Project Management Software for Production Scheduling. Software Selection Spectrum
Seradex White Paper A Discussion of Issues in the Manufacturing OrderStream Using Project Management Software for Production Scheduling Frequently, we encounter organizations considering the use of project
Maintenance Plan. Many of the individual components of a comprehensive maintenance program are listed below, along with brief descriptions.
Maintenance Plan Introduction Maintenance is the cornerstone of asset sustainability. An effective preventive maintenance program, combined with good operational practices, will reduce the need for much
Predictive Maintenance
PART ONE of a predictive maintenance series Predictive Maintenance Overview Predictive maintenance programs come in all shapes and sizes, depending on a facility s size, equipment, regulations, and productivity
Comparison of CMS Preventive Maintenance Regulations
Comparison of CMS Preventive Maintenance Regulations CMS Regulations Before December 2, 2011 From: State Operations Manual - Appendix A - Survey Protocol, Regulations and Interpretive Guidelines for Hospitals
Predictive Maintenance for Government
Predictive Maintenance for How to prevent asset failure, control maintenance costs and anticipate budget needs Highlights Predictive maintenance helps government agencies automatically detect equipment
Asset Management: A Best Practice
Asset Management: A Best Practice Purpose Introduction This guide will help you understand: The definition of Asset Management. Why asset management is important to your utility. The best practices in
TIG XP 5 Maintenance Software. Simplify the management of your maintenance operations
TIG XP 5 Maintenance Software Simplify the management of your maintenance operations Increase your productivity with our advanced maintenance program Organizing maintenance and lubrication is a highly
ABB Drive Services Your choice, your future
ABB Drive Services Your choice, your future Your choice, your future The future of your drives depends on the service you choose. Whatever you choose, it should be a well-informed decision. No guesswork.
Calculating ROI for Automation Projects
Douglas C. White, Emerson Process Management Emerson Process Management 1996 2007 All rights reserved. DeltaV, the DeltaV design, SureService, the SureService design, SureNet, the SureNet design, and PlantWeb
Uniformance Asset Sentinel. Advanced Solutions. A real-time sentinel for continuous process performance monitoring and equipment health surveillance
Uniformance Asset Sentinel Advanced Solutions A real-time sentinel for continuous process performance monitoring and equipment health surveillance What is Uniformance Asset Sentinel? Honeywell s Uniformance
Utilizing Real-Time Information in Enterprise Asset Management Systems
Utilizing Real-Time Information in Enterprise Asset Management Systems Jason Barath Matrikon Inc. December 2006 Utilizing Real-Time Information in Enterprise Asset Management Systems Today, industries
2016 Asset Management & Maintenance Priorities Survey
2016 Asset Management & Maintenance Priorities Survey An Original Study from 2016 Asset Management & Maintenance Priorities Survey Copyright 2016 Assetivity Pty Ltd. All Rights Reserved. Published by Assetivity
CHAPTER 12 AUDITING LONG-LIVED ASSETS: ACQUISITION, USE, IMPAIRMENT, AND DISPOSAL
A U D I T I N G A RISK-BASED APPROACH TO CONDUCTING A QUALITY AUDIT 9 th Edition Karla M. Johnstone Audrey A. Gramling Larry E. Rittenberg CHAPTER 12 AUDITING LONG-LIVED ASSETS: ACQUISITION, USE, IMPAIRMENT,
14 Ways a CMMS / EAM can help your organization become more OSHA, Environmental, Health, and Safety compliant
14 Ways a CMMS / EAM can help your organization become more OSHA, Environmental, Health, and Safety compliant Who or what is OSHA? OSHA stands for Occupational Safety and Health Administration and is the
QAD EAM - Maintenance Demonstration Guide. August 4, 2015 EAM 2015
QAD EAM - Maintenance Demonstration Guide August 4, 2015 EAM 2015 Overview This demonstration focuses on one aspect of QAD Enterprise Asset Management (EAM) Maintenance and shows how this functionality
INTERNAL AUDIT DIVISION AUDIT REPORT 2013/073
INTERNAL AUDIT DIVISION AUDIT REPORT 2013/073 Audit of maintenance and building services provided by the Office of Central Support Services at Headquarters Overall results relating to the Office of Central
Using Predictive Maintenance to Approach Zero Downtime
SAP Thought Leadership Paper Predictive Maintenance Using Predictive Maintenance to Approach Zero Downtime How Predictive Analytics Makes This Possible Table of Contents 4 Optimizing Machine Maintenance
ECONOMIC JUSTIFICATION
ECONOMIC JUSTIFICATION A Manufacturing Engineer s Point of View M. Kevin Nelson, P.E. President Productioneering, Inc. www.roboautotech.com Contents: I. Justification methods a. Net Present Value (NPV)
Best Practices in Workforce Demand Forecasting
Best Practices in Workforce Demand Forecasting The Vision for Intelligent Performance TM In 1997, Dr. Jac Fitzenz published the book The Eight Practices of Exceptional Companies based on his studies at
SAP CRM 2007 - Campaign Automation
SAP CRM 2007 - Campaign Automation Applies to: SAP CRM 7.0 For more information, visit the Customer Relationship Management homepage Summary Campaign Automation is designed to help you in the increasingly
SURVEY REPORT DATA SCIENCE SOCIETY 2014
SURVEY REPORT DATA SCIENCE SOCIETY 2014 TABLE OF CONTENTS Contents About the Initiative 1 Report Summary 2 Participants Info 3 Participants Expertise 6 Suggested Discussion Topics 7 Selected Responses
Disease Prevention to Reduce New Hampshire Healthcare Claims and Costs: A Data Mining Approach
Disease Prevention to Reduce New Hampshire Healthcare Claims and Costs: A Data Mining Approach Disease Prevention to Reduce New Hampshire Healthcare Claims and Costs: A Data Mining Approach Rakesh Karn,
GLOBAL PROPERTY Loss Prevention Engineering. Next
GLOBAL PROPERTY 1 (CONT.) About AIG s division brings sophisticated and extensive capabilities to our clients risk management programs. AIG s unrivalled worldwide network provides a superior platform to
The Travel and Expense Management Guide for 2014
The Travel and Expense Management Guide for 2014 Trends for the Future March 2014 Louis Berard The Travel and Expense Management Guide for 2014: Trends for the Future In December 2013 and January 2014,
SAP MRS Multiresource Scheduling Info session - 2013. Atul Wakankar May 2013
SAP MRS Multiresource Scheduling Info session - 2013 Atul Wakankar May 2013 MRS: Foundation for the End-to-end Scheduling Process Resource Management for various Industries and different Scenarios Oil
The Top 5 Software Capabilities for Ensuring Food Safety
The Top 5 Software Capabilities for Ensuring Food Safety How can manufacturers minimize food safety risks? We ve all seen the headlines: Contaminated peanut butter. Metal fragments in cereal. Undeclared
Strategic Data Governance
Authoring Success into Your Data Strategic Data Governance Strategic Data Advisory Data Cleansing, Enrichment, Migration Data Governance Advisory About Strategic Data Governance LLP SDG is a global data
Optimization of Clinical Engineering in Private Healthcare
Optimization of Clinical Engineering in Private Healthcare Speaker: James Herbert Organisation: Medi-Clinic Southern Africa Job Title: Technical Specialist - Clinical Engineering About the Speaker: James
HVAC System Optimization
UNITED TECHNOLOGIES CARRIER CORPORATION HVAC System Optimization MAXIMIZING PERFORMANCE, ENERGY SAVINGS & COMFORT Revitalize Your Building s System Sometime between the initial purchase and the need to
«COSWIN 7i helps you increase your return on assets while boosting their productivity.»
COSWIN 7i is the new generation asset and facilities management software developed by SIVECO GROUP. COSWIN 7i helps companies to increase their profitability - by improving the management of corporate
Maximizing return on plant assets
Maximizing return on plant assets Manufacturers in nearly every process industry face the need to improve their return on large asset investments. Effectively managing assets, however, requires a wealth
I NTERNATIONAL. Why industry specific?
ISO/TS 29001 set to become oil and gas industry s unique QMS standard Photo Hydro A successful partnership between ISO and the international oil and gas industry has resulted in the publication of a new
PricewaterhouseCoopers Health and Well-Being Touchstone Survey Executive Summary June 2010. PwC
Health and Well-Being Touchstone Survey Executive Summary June 2010 PwC Table of Contents Pages Survey background 3 Key findings 4-12 Summary of survey participants 13-14 Contact information 15 Survey
Reliability. The Essentials of Eliminating Downtime of your Electric Motor. Asset Management? Or, Maintenance Management, Re-branded?
for maintenance reliability and asset management professionals feb/march 14 Reliability The Essentials of Eliminating Downtime of your Electric Motor Asset Management? Or, Maintenance Management, Re-branded?
Proficy Monitoring & Analysis. Software to harness the industrial internet
Proficy Monitoring & Analysis Suite Software to harness the industrial internet Prepare for the Industrial Internet Massive amounts of equipment and process GE, as one of the largest and most successful
Assessing, Maintaining & Replacing Fluid Filled Cable Systems at PEPCO
April 2, 2014 Assessing, Maintaining & Replacing Fluid Filled Cable Systems at PEPCO Todd Goyette, P.E., POWER Engineers Mousa Hejazi, P.E., Pepco Holdings Inc. 1 Pepco Quick Facts First incorporated in
A Study of Systems Engineering Effectiveness. Building a Business Case for Systems Engineering
Building a Business Case for Systems Engineering NO WARRANTY THIS CARNEGIE MELLON UNIVERSITY AND SOFTWARE ENGINEERING INSTITUTE MATERIAL IS FURNISHED ON AN AS-IS" BASIS. CARNEGIE MELLON UNIVERSITY MAKES