Alternative Project Delivery Methods (APDM) Valley Schools Management Group

Size: px
Start display at page:

Download "Alternative Project Delivery Methods (APDM) Valley Schools Management Group"

Transcription

1 Alternative Project Delivery Methods (APDM) Valley Schools Management Group

2 Introduction Bill Munch Tim O Brien Ken Carter David Cantelme Skip Brown [email protected] (602) [email protected] (602) [email protected] (866) [email protected] (602) [email protected] (602)

3 Alternate Procurement Delivery Methods (APDM) Harder to find resources Ever increasing accountability Unexpected latitude in contracting Design Build CM at Risk Job Order Contracting Pre-qualified Contractors New design services selection rules Advertising requirements 3

4 Class Agenda Project Management and Alternative Project Delivery Methods 1. Identify the project 2. Acquire design professionals 3. Determine the most effective procurement process 4. The Request for Qualifications 5. Selection Process 6. Award 7. Control 8. Reporting 9. Case Study 4

5 Determine Process APDM Process Project Need Identified Funding Identified Capital Improvement Plan Emerging Ideas Legal/Emergency Bond/Override SFB Adjacent Ways Acquire Design Professional RFQ Publish and Award GC Architects Other Professionals Pre Construction Services develop GMP Award if in budget Bid if not in budget 5

6 APDM Choices Are Like Tools in Your Tool Chest (know how to use em) Size and scope of job Resources available Time Staff Funding Expertise available District Architect Firm PM 6

7 Procurement of Specified Professional Services (R ) Who are professionals? Single or multiple contracts Notice (R ) Amounts (R ) Procurement file requirements On-line help 7

8 Contracting Methods Design Bid Build Design Build Cooperative purchasing/state Contract Construction Manager at Risk Select Bidders List Job Order Contracting 8

9 Design Bid - Build Invitation for Bid Award to lowest responsive & responsible bidder Used in jobs with simple, easily measured specs PRO Well known and understood Emphasizes head-on competition CON Tight bid specs difficult to write/evaluate Low bidder may try to make money thru change orders Prone to protest 9

10 Design Build RFQ committee selects contractor by quality Selected contractor provides both design and construction services Award construction contract only if GC s bid fits within the district s budget PRO Qualification based selection Reduced finger pointing by the service provider, Single point of contact for project delivery Potential for continuous value engineering and feedback system CON Potential for ill-defined scope of the work. Potential for decreased accountability Potential that a less qualified owner may not have the expertise to evaluate the work the contractor has performed 10

11 Cooperative purchasing/state Contract Find appropriate services on a cooperative purchasing agreement Place your order (purchase order is the contract) PRO Reduced administration Faster response time CON Potential for increased cost Small number of contractors Lose the benefit of competition 11

12 Construction Manager at Risk Most prevalent method of construction contracting in schools today R Procurement of Construction Using Alternative Project Delivery Methods Very popular many districts have adopted this method as their standard Introduces quality up front, but behaves much like a typical design bid build project after award of GMP 12

13 Construction Manager at Risk RFQ committee selects pre-construction GC by quality Award construction contract only if GC s Guaranteed Maximum Price fits within the district s budget PRO Qualification based selection Encourages teamwork among owner, architect and GC Preconstruction services by GC and subcontractors reduce or eliminate change orders On-going value engineering helps contain costs and maximize build- ability CON May be more expensive than traditional procurement Owner must stay engaged 13

14 Construction Manager at Risk Pre Construction Services You pay for this (typically around 1% of projected construction costs) GC and subcontractor review design/approach Subcontractor list Continuous Value Engineering Develop alternatives Establish prior approvals Develop Guaranteed Maximum Price (GMP) Schedule of values Allowances Fees General Conditions 14

15 Qualified Select Bidders List RFQ committee reviews to determine short list Select 3-5 GC s by qualification based selection Invitation for Bid to pre-qualified bidders only Rest of the process similar to hard bid Award to lowest responsive & responsible bidder PRO Qualification based selection Bid process familiar and well understood Emphasizes head-on competition CON Fewer bidders may reduce competition Selected GC s may not feel the pressure to make lowest possible bid 15

16 Job Order Contracting Select a Job Order Contractor by quality Award construction contract based on an agreed unit price determination (e.g., RS Means and/or Unit Price Book) PRO Responsive to district needs Known quality contractor (depends on your good will for continued business) CON Unit price techniques may be more expensive than traditional bidding Need Board approval for project in excess of $1M 16

17 Paperwork Procurement File Contents (R ) If no interviews were held If interviews were held In what order should the contents of the file be? Debriefing unsuccessful responders Is it required? Is it smart? What are some effective techniques? 17

18 Once You Have Identified the Project Overview and scope of a project Funding Sources Choosing Delivery Method Control Points Notes and Discussion Review of Important Terms 18

19 Develop a Capital Plan Strategy (Vision) Funding Estimates Change in population Growth Decline New Construction Scheduled Maintenance Programs (life cycle) Boundary changes School Closings (gasp) Grade reconfiguration New programs (gifted, traditional, magnet) Community agreements 19

20 What is a Capital Plan? Forecast of capital needs (needs assessment) Search for and Identify All needs and wants Use multiple sources No filtering yet Prioritize needs Health/Safety Projects to avoid large, catastrophic losses Bond imperatives (pamphlet, promises) Essential projects Projects identified as valid need 20

21 What is a Capital Plan? Sort list by resources Funds Time Sort list by Facilities based on SFB PM areas Pupil Transportation Safety/Security Furniture Fixtures and Equipment Technology Curriculum 21

22 Phases of a Project Project initiation stage Project planning and design stage Project execution stage Project completion/closeout stage 22

23 Phases of a Project Project initiation stage Identify project CIP or Needs Assessment Emergency Emerging opportunities (good ideas) Identify a Funding source Procure a design professional Determine what project delivery method is best Description/Scope Purpose of the project Resources available Money Time Establish initial budget estimate 23

24 Overview of a Project Project planning and design stage Collaborate with stakeholders Procure Construction Services (Alt Proj Del Means) Develop specifications Wants Needs Sacred Cows Develop design documents Layouts Standards (e.g., flush valves, toilets, HVAC, sole source, etc.) Refine estimated project budget Request and receive permits Procure Construction Services (Traditional Means) 24

25 Overview of a Project Project execution stage Financial Control Measures Notice to proceed Pay applications Retainage Documentation Control Measures Meeting minutes/notes Measuring the ongoing project activities (where we are) Week in review and three week look ahead Documenting issues Monitoring the project cost against the project baseline (where we should be) Change Control Measures Request for information (RFI, DIR, etc.) Change Order Request ~> Change Order Allowance Use Request ~> Allowance Use Authorization 25

26 Overview of a Project Project completion/closeout stage Documentation Warranty work tracking 26

27 Funding Sources Bond Adjacent Ways Capital Override Capital SFB new construction Building Renewal Grant Other Grants Gifts & Donations 27

28 Adjacent Ways, ARS Adjacent ways is a special property tax assessment Funds from adjacent ways may be used to construct, maintain or improve any public way adjacent to land owned by the school district sidewalks sewers utility lines roadways and other related improvements A school district shall not use adjacent ways funds for construction, maintenance or other improvements to the school district's property except Improvements necessary to assure the safe ingress and egress for buses and fire equipment. 28

29 Okay, CMAR is our choice, now what? List reasons APDM selected (R ) Issue RFQ (R ) Do we have to advertise? (R ) Pre proposal conference Changes Committee evaluation Negotiations & Notifications Award Preconstruction Services Guaranteed Maximum Price (GMP) 29

30 Project Control Points Project initiation stage Project identification/scope/budget Procuring Design Professional Project planning and design stage Choosing a delivery method/gc Project execution stage Contract/PO/Notice to proceed Approval for Change Orders and Use of Allowance Payment Requests Project completion/closeout stage Substantial/Final Completion release of retention Punch List Establish warranty date 30

31 When Should the District Superintendent Get Involved? Ground Breaking and Ribbon Cutting Initial Planning Priority Resources (time, people and funding) Educational mandate/philosophy Before any issue or decision is brought before the Governing Board GMP/PO/Contract Change Orders Before any substantive change to the project is made Bad news, unlike fine wine, does not get better with age 31

32 Notes and Discussion Match talent with project bigger firms may not be better on smaller projects The team is like a three legged stool General Contractor Design Professional Owner Another three legged stool Cost Schedule Quality Procurement by the numbers. Short cuts cost money and time 32

33 Notes and Discussion Notice to Proceed Contract Bonds Insurance Absolutely no work, mobilization or supplies before Notice to Proceed Pre Lien Notices Public property cannot be liened Lien releases & pre-lien notices provide info of subcontract amount 33

34 Notes and Discussion Who Do You Deal With? Contract is with the GC not sub contractors Dealing directly with subs can encourage change orders, add cost and let GC off the hook Deal through the team (PM, Contract Administrator architect, Weekly meetings Meetings: Architects take notes Contractor updates master schedule and provides three week look ahead Review a pencil version of a payment request a week before submission Discuss AUR s, AUA s, RFI s, COR, etc. 34

35 Notes and Discussion Timely Payment essential Lien releases - Lien releases & pre-lien notices provide info of subcontract amount Withholding Payment the ultimate hammer Affect only sub/division responsible Adjust individual lines on schedule of values Notify GC via Architect of deficiency and that payment was reduced to compensate 35

36 Review of Important Terms VE Schedule of Values GMP General Conditions Allowance Over head and Profit Retention Buy out Adjacent Ways/off sites Pre Lien Notice Lien Release RFI & ASI AUR & AUA COR & CO PR CofO & Temp CofO Substantial Completion Final Completion Punch list 36

37 Forms Notice to Proceed Request information/documents Respond to requests Requests to change the contract time scope unforeseen conditions Pay Applications Close out documents Substantial Completion Final Completion 37

38 Close out continued Punch list Warranty Documents Manuals Final pay application As builts 38

39 Pay Applications Pencil Copy one week prior (no surprises) Copy signed and notarized verified by architects Retention required by law. 10% for first half May be reduced to 5% if project is progressing satisfactorily Retention may be satisfied with a substitute 1. An assignment of time certificates of deposit 2. Share certificate of a savings and loan institution or credit union 3. Security issued or guaranteed as to principal and interest by federal, state or local government 39

40 Things Important to Understand Vendors are in business to make a profit that s why they are call for profit organizations. A great vendor who goes out of business is an unsuccessful vendor and we are unsuccessful clients. How does money figure in? 40

41 Profit Motive v. Cost Avoidance Max P R O F I T $0 Jul Public Sector Private Sector Oct Jan Apr 41

42 Profit Motive v. Cost Avoidance Contractor has 3 opportunities for profit GMP/Bid/Quote Allowance Change Orders Public has 3 opportunities for cost avoidance Pre contract negotiations Unused allowance Constructive change orders 42

43 Will APDM save you money? Difficult to quantify Open book GC walks in with profit established Some fees difficult to see Selection of subs Detailed Schedule of Values Time = Money Change Order avoidance 43

44 Palomino Elementary Case Study Situation: Palomino Elementary School has over 1,200 K-6 students. The area is growing rapidly, but there is no land to build a new school. There is an undeveloped city park across the street from the school 44

45 Palomino Elementary Case Study Task: New Construction 77,486 sf 2 story (nonprototypical) design on active playground Renovate 62,500 sf existing building (over summer break) Build playground on city park site (IGA) Demolish and remove public roadway Open for school August

46 Time Lines Begin construction Summer 02 Renovation Spring/Summer 03 Close/Demolish 30th Street July 03 Open new schools August 03 46

47 Palomino Elementary Case Study The nature of the project made a good strategy Complexity required pre-construction services Time Design Coordination Operational limitations Budget constraints Unknown issues with renovation Unknown issues with city collaboration 47

48 Palomino Elementary Case Study The project was on time and dramatically under budget because: General Contractor selection based on proven ability Early collaboration Value engineering Very accurate Guaranteed Maximum Price Open book review and GMP Continuous Value Engineering Enhanced trust among team members Partnering reduced General Conditions 48

49 Palomino Elementary Case Study Category Pinnacle Liberty Palomino Procurement DBB DBB Square Ft 80,279 79,434 77,486 Project Bid/GMP $8,352,000 $7,341,560 $8,546,617 Less site work ($1,599,317) ($1,171,611) ($1,791,100) Inflation adj (3%) $ 202,580 $ 185,098 na Less 2d story cost na na ($ 200,000) Less renovation cost na na ($ 579,141) Adjusted const cost $6,955,263 $6,355,047 $5,976,376 Adjusted Cost sq ft $86.64 $80.00 $

50 Alternative Project Delivery Methods A Three legged stool Owner Design Professional Contractor The stool will fail if any leg is too short, wobbly or missing 50

51 Alternative Project Delivery Method What it is Contractor selection based on value Opportunity for reduction of errors Opportunity for time & cost savings What it is NOT A guarantee of success Insurance against fraud, waste or abuse For those who do not want to stay involved 51

52 Stuff you should remember It ain t new. Many school districts have used CMAR and Job Order Contracting successfully for years. Resources are available. The new procurement rules are out and pretty easy to use. Don t cut corners. It doesn t take any longer to do it right than to do it wrong. You are not alone. Help is only a phone call away. 52

53 Stuff You Should Remember All construction issues look pretty much the same once the contractor is selected No construction procurement method is fool proof you must stay involved Owners can help contain costs by: Good communications Comprehensive scope and specifications Clear vision no changes/good ideas 53

54 Keys to Success 1. Reduce/eliminate changes Clear scope of work Pre-construction involvement 2. Enhance team work Business partnership Develop team over time Establish trust 54

Building Capital Projects in Tough Times John Lynch, State of Washington

Building Capital Projects in Tough Times John Lynch, State of Washington Building Capital Projects in Tough Times John Lynch, State of Washington Published as a joint effort of the National Association of State Facilities Administrators (NASFA) and the Associated General Contractors

More information

REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES. Part I: Proposal Information

REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES. Part I: Proposal Information REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES Part I: Proposal Information A. General Information The Berwick Area School District is soliciting proposals for construction management services

More information

Evaluating Project Delivery Options

Evaluating Project Delivery Options Evaluating Project Delivery Options Scot A. Bini Vice President, URS August 24, 2004 Design-Bid-Build Overview Design Build Construction Management at Risk Owner Representation Terminology Project Manager

More information

REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGEMENT PROFESSIONAL SERVICES. Part I: Qualifications Information

REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGEMENT PROFESSIONAL SERVICES. Part I: Qualifications Information REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGEMENT PROFESSIONAL SERVICES A. General Information Part I: Qualifications Information The Tacoma School District is soliciting Qualifications for onsite

More information

To be used in conjunction with the Invitation to Tender for Consultancy template.

To be used in conjunction with the Invitation to Tender for Consultancy template. GUIDANCE NOTE Tendering for, choosing and managing a consultant Using this guidance This information is not intended to be prescriptive, but for guidance only. Appointing consultants for relatively small

More information

REQUEST FOR PROPOSALS (RFP) - Construction Management Services. Germantown School District Office

REQUEST FOR PROPOSALS (RFP) - Construction Management Services. Germantown School District Office REQUEST FOR PROPOSALS (RFP) - Construction Management Services From: Germantown School District Project: Germantown School District Addition & Renovations to Rockfield Elementary School N132 W18473 Rockfield

More information

REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGER-AT-RISK (CMAR)

REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGER-AT-RISK (CMAR) REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGER-AT-RISK (CMAR) For the Project: CITY OF KATY NEW KATY FIRE STATION #2 Issued: August 13, 2015 Katy Fire Station #2 August 13, 2015 Page 1 of 17 Request

More information

LESSONS LEARNED THROUGH SCHOOL CONSTRUCTION PROJECTS

LESSONS LEARNED THROUGH SCHOOL CONSTRUCTION PROJECTS LESSONS LEARNED THROUGH SCHOOL CONSTRUCTION PROJECTS RUSS KOCH, FREMONT PUBLIC SCHOOLS MIKE LUCAS, YORK PUBLIC SCHOOLS DAN ENDORF, NORTH BEND CENTRAL NBC AND YORK BOARD MEMBERS DESIGN BID BUILD CONSTRUCTION

More information

The UW Capital Projects Office and NW Construction Consumer Council

The UW Capital Projects Office and NW Construction Consumer Council The UW Capital Projects Office and NW Construction Consumer Council Present: Changing Project Delivery at the UW through Innovation, Integration, and Adoption of MC/CM and EC/CM PACCAR Hall, the Gordon

More information

Owner s project control review. 2014 Baker Tilly Virchow Krause, LLP

Owner s project control review. 2014 Baker Tilly Virchow Krause, LLP Owner s project control review 2014 Baker Tilly Virchow Krause, LLP About Baker Tilly > Established in 1931 > One of the top 20 largest accounting and advisory firms in the United States according to Accounting

More information

MONTGOMERY COLLEGE JOB CLASS SPECIFICATION

MONTGOMERY COLLEGE JOB CLASS SPECIFICATION MONTGOMERY COLLEGE JOB CLASS SPECIFICATION Title: Project Manager I (Facilities) Grade: J FLSA: Nonexempt Financial Disclosure: No Job Class Level: This includes performance level positions in the Project

More information

Construction Management vs. General Contractor Method of Contracting POINTS OF VALUE OF THE CONSTRUCTION MANAGEMENT METHOD

Construction Management vs. General Contractor Method of Contracting POINTS OF VALUE OF THE CONSTRUCTION MANAGEMENT METHOD Construction Management vs. General Contractor Method of Contracting POINTS OF VALUE OF THE CONSTRUCTION MANAGEMENT METHOD In an effort to take advantage of our opportunity to discuss with the Owner the

More information

ATTACHMENT A. Ozarks Technical Community College Pre-Established Criteria for Construction Management and Design Build Construction Projects

ATTACHMENT A. Ozarks Technical Community College Pre-Established Criteria for Construction Management and Design Build Construction Projects Ozarks Technical Community College Pre-Established Criteria for Construction Management and Design Build Construction Projects Pursuant to Revised Statute of Missouri Section 8.250(3), Ozarks Technical

More information

New WMHS Construction Management Firm

New WMHS Construction Management Firm New WMHS Construction Management Firm RFQ Schedule November 5, 2013 Board Meeting Approval to Advertise and use revised RFQ Week December 9, 2013 Ad runs in local papers (Thursday Dec. 12 th ) Week December

More information

REQUEST FOR QUALIFICATIONS CONSTRUCTION MANAGER / GENERAL CONTRACTOR (CM/GC SERVICES)

REQUEST FOR QUALIFICATIONS CONSTRUCTION MANAGER / GENERAL CONTRACTOR (CM/GC SERVICES) REQUEST FOR QUALIFICATIONS CONSTRUCTION MANAGER / GENERAL CONTRACTOR (CM/GC SERVICES) Return Completed Qualifications To: Twin Falls School District No. 411 Administrative Office 201 Main Avenue West Twin

More information

Request for Qualifications. Owner s Project Manager. Design and Construction of a New School Facility. K~8 Charter School

Request for Qualifications. Owner s Project Manager. Design and Construction of a New School Facility. K~8 Charter School Request for Qualifications Owner s Project Manager Design and Construction of a New School Facility K~8 Charter School 26 Madeira Avenue New Bedford, MA 02746 REQUEST FOR QUALIFICATIONS (RFQ) Issued: 4/16/2014

More information

Please note that the attached forms will be used to evaluate the proposals as well as the interview itself.

Please note that the attached forms will be used to evaluate the proposals as well as the interview itself. CITY OF RAPID CITY RAPID CITY, SOUTH DAKOTA 57701 Public Works Department Engineering Services Division 300 Sixth Street Telephone: (605) 394-4154 FAX: (605) 355-3083 Web: www.rcgov.org November 12, 2013

More information

NOTICE TO CM/GC Companies

NOTICE TO CM/GC Companies NOTICE TO CM/GC Companies Facilities and Construction Management Jefferson County School District R-1 (Jeffco) is pre-qualifying Construction Manager/General Contractors for CM/GC services for a new K-6

More information

SUMMARY OF MECHANICS LIEN LAW FOR THE DISTRICT OF COLUMBIA

SUMMARY OF MECHANICS LIEN LAW FOR THE DISTRICT OF COLUMBIA SUMMARY OF MECHANICS LIEN LAW FOR THE DISTRICT OF COLUMBIA Section Contents Pre-lien Notice(s) Introduction Section Contents Mechanic s Lien Who is Entitled to a Lien? When to File/Record Where to File/Record

More information

Request for Qualifications (CM at Risk Contract) State of Ohio Standard Forms and Documents

Request for Qualifications (CM at Risk Contract) State of Ohio Standard Forms and Documents Request for Qualifications (CM at Risk Contract) State of Ohio Standard Forms and Documents Administration of Project: Local Higher Education Project Name Shideler Hall Renovation Response Deadline 12/20/13

More information

NEGOTIATING STRATEGIES

NEGOTIATING STRATEGIES NEGOTIATING STRATEGIES Career Services GSU 309 768-4287 www.hartford.edu/career An aspect of the job search process that people tend to have the most questions about is negotiating; how does one go about

More information

REQUEST FOR PROPOSAL TO PROVIDE CONSTRUCTION MANAGEMENT AND GENERAL CONTRACTOR SERVICES SPRINGVILLE CITY NEW AQUATICS AND ACTIVITIES CENTER

REQUEST FOR PROPOSAL TO PROVIDE CONSTRUCTION MANAGEMENT AND GENERAL CONTRACTOR SERVICES SPRINGVILLE CITY NEW AQUATICS AND ACTIVITIES CENTER RFP #2016-02 REQUEST FOR PROPOSAL TO PROVIDE CONSTRUCTION MANAGEMENT AND GENERAL CONTRACTOR SERVICES FOR SPRINGVILLE CITY NEW AQUATICS AND ACTIVITIES CENTER RELEASE DATE: January 29, 2016 DUE DATE: February

More information

Request for Qualifications (CM at Risk Contract) State of Ohio Standard Forms and Documents

Request for Qualifications (CM at Risk Contract) State of Ohio Standard Forms and Documents Request for Qualifications (CM at Risk Contract) State of Ohio Standard Forms and Documents Administration of Project: School District Board + OFCC Project Name Wellington New K-8 EM/MS Response Deadline

More information

Tel: (617) 727-4050 Fax: (617) 727-5363. OWNER S PROJECT MANAGER GUIDELINES M.G.L. c. 149, 44A1/2

Tel: (617) 727-4050 Fax: (617) 727-5363. OWNER S PROJECT MANAGER GUIDELINES M.G.L. c. 149, 44A1/2 The Commonwealth of Massachusetts Executive Office for Administration and Finance Division of Capital Asset Management One Ashburton Place Boston, Massachusetts 02108 Tel: (617) 727-4050 Fax: (617) 727-5363

More information

Notes. Score. 1 Basic Services 1.1. A few instances; could have been more proactive

Notes. Score. 1 Basic Services 1.1. A few instances; could have been more proactive Jacobs Contract performance Tracking spreadsheet = Excellent 2 = Meets performance standards 1 = Improvement needed 0= Unsatisfactory Report for the time period: Annual report 210 Total average score 2.86

More information

IDALIA SCHOOL DISTRICT RJ-3 REQUEST FOR QUALIFICATIONS (RFQ) CONSTRUCTION MANAGEMENT/GENERAL CONTRACTING (CM/GC) SERVICES DECEMBER 14, 2011

IDALIA SCHOOL DISTRICT RJ-3 REQUEST FOR QUALIFICATIONS (RFQ) CONSTRUCTION MANAGEMENT/GENERAL CONTRACTING (CM/GC) SERVICES DECEMBER 14, 2011 IDALIA SCHOOL DISTRICT RJ-3 REQUEST FOR QUALIFICATIONS (RFQ) CONSTRUCTION MANAGEMENT/GENERAL CONTRACTING (CM/GC) SERVICES DECEMBER 14, 2011 PROJECT: New PK-12 School Facility Idalia, Colorado Idalia School

More information

Facility Services PROJECT MANAGEMENT METHODOLOGY FRAMEWORK

Facility Services PROJECT MANAGEMENT METHODOLOGY FRAMEWORK Facility Services PROJECT MANAGEMENT METHODOLOGY FRAMEWORK Facility Services Project Management Methodology Framework 1 - Executive Summary The purpose of this document is to introduce the University community

More information

How to Write the Construction Management RFQ/RFP

How to Write the Construction Management RFQ/RFP 2011-06-07 How to Write the Construction Management RFQ/RFP Setting Up a Project for Success Today's Objectives The Art of RFQ/RFP writing First things first Determining the optimum Project Delivery Method

More information

Fundamentals of a Construction Audit. August 7, 2014

Fundamentals of a Construction Audit. August 7, 2014 Fundamentals of a Construction Audit August 7, 2014 Agenda Definitions Risk Based Approach What Determines Risk Fraud Construction Risks What to Audit Red Flags Why Audit Prevention Wrap-up 1 Definitions

More information

PROJECT MANAGEMENT BASICS

PROJECT MANAGEMENT BASICS PROJECT MANAGEMENT BASICS Rick Panos AIA, CCM Director of Construction Management Totum Consulting Gary Cardamone, P.E., FCMAA Principal, G J Cardamone Consulting, LLC Program Management Is.... In the

More information

Covance Construction Management Staffing Plan Chandler, Arizona

Covance Construction Management Staffing Plan Chandler, Arizona INTRODUCTION: This Construction Management (CM) Staffing Plan has been prepared for Covance to identify the critical organizational structure necessary to successfully complete the Chandler project according

More information

Volume II- Project Development Processes

Volume II- Project Development Processes Volume II- Project Development Processes This section outlines the procedures that are expected of capital projects at The University of Chicago. These requirements supplement the planning procedures required

More information

Guidelines. for. Construction and Renovation. Parish Facilities

Guidelines. for. Construction and Renovation. Parish Facilities Guidelines for Construction and Renovation of Parish Facilities Building Commission Diocese of Des Moines 2014 Table of Contents Introduction.. 1 Pastoral Planning. 2 Approval of Bishop. 2 Needs Assessment

More information

Recommended Best Practices for the Use of Construction Management/General Contractor on Highway and Transportation Projects in the Public Sector

Recommended Best Practices for the Use of Construction Management/General Contractor on Highway and Transportation Projects in the Public Sector Recommended Best Practices for the Use of Construction Management/General Contractor on Highway and Transportation Projects in the Public Sector Approved March 23, 2011 Purpose: While the traditional Design-Bid-Build

More information

CONSTRUCTION MANAGEMENT AT RISK A NEW CONSTRUCTION DELIVERY METHOD For PUBLIC SCHOOLS

CONSTRUCTION MANAGEMENT AT RISK A NEW CONSTRUCTION DELIVERY METHOD For PUBLIC SCHOOLS CONSTRUCTION MANAGEMENT AT RISK A NEW CONSTRUCTION DELIVERY METHOD For PUBLIC SCHOOLS Senate Bill 914, ratified by the General Assembly December 6, 2001, made more changes to the public bidding and construction

More information

Distributed Generation: Frequently Asked Questions

Distributed Generation: Frequently Asked Questions Distributed Generation: Frequently Asked Questions 1) What is distributed generation (DG)? Generating technologies located close to where the electricity is being used that are connected to the electric

More information

Corrected Form: Revised Attachment 7B Cost Proposal Distribution Exhibits A1 and A2 Attached

Corrected Form: Revised Attachment 7B Cost Proposal Distribution Exhibits A1 and A2 Attached ADDENDUM #1 RFP: 500 16 Design Build Maintenance & Operations Complex The following changes to the Request for Proposal and clarifications are provided based on questions received and must be added/considered

More information

Eanes Independent School District

Eanes Independent School District EANES INDEPENDENT SCHOOL DISTRICT 601 Camp Craft Road Austin, Texas 78746 Request for Qualifications Construction Manager at Risk Services Eanes Independent School District Construct a District Operations

More information

Puget Sound Regional Council

Puget Sound Regional Council Puget Sound Regional Council PSRC Request for Qualifications for Legal Services Consultant Services Solicited by the Puget Sound Regional Council Released: November 12, 2009 Submissions Due: 4:30pm, November

More information

GENERAL CONTRACTOR PRE-QUALIFICATION 2014 - FOR PERIOD ENDING DEC 2017

GENERAL CONTRACTOR PRE-QUALIFICATION 2014 - FOR PERIOD ENDING DEC 2017 APPLICATION for PRE QUALIFICATION GENERAL CONSTRUCTION CONTRACTORS Construction Projects up to $3,000,000 Prequalified General Contractors will be invited to submit bids for various Renovation and Construction

More information

Assistant Project Management - Training Program A 3-year Program Beginning strategy places the new employee into a three-year program that provides

Assistant Project Management - Training Program A 3-year Program Beginning strategy places the new employee into a three-year program that provides Assistant Project Management - Training Program A 3-year Program Beginning strategy places the new employee into a three-year program that provides for experience in the Construction Company's three areas

More information

INSTRUCTIONS AND APPLICATION FOR CONTRACT BONDING

INSTRUCTIONS AND APPLICATION FOR CONTRACT BONDING Melwain Enterprises, Inc. 181 South Franklyn Avenue - Suite 603 Valley Stream, New York 11581 (516) 295-6081 Fax: (516) 569-1516 Email Address: [email protected] INSTRUCTIONS AND APPLICATION FOR CONTRACT

More information

REQUEST FOR PROPOSALS CONSTRUCTION MANAGEMENT SERVICES. PASSENGER SCREENING CHECKPOINT CONSOLIDATION PROJECT PROJECT No.

REQUEST FOR PROPOSALS CONSTRUCTION MANAGEMENT SERVICES. PASSENGER SCREENING CHECKPOINT CONSOLIDATION PROJECT PROJECT No. REQUEST FOR PROPOSALS CONSTRUCTION MANAGEMENT SERVICES PASSENGER SCREENING CHECKPOINT CONSOLIDATION PROJECT PROJECT No. FY15-805-67 Manchester-Boston Regional Airport is soliciting Proposals from qualified

More information

How to best position your construction company to a surety in 2013

How to best position your construction company to a surety in 2013 How to best position your construction company to a surety in 2013 Table of Contents Surety 2013 market forecast... 3 Criteria used by construction surety underwriters... 3 Five key areas for best construction

More information

REQUEST FOR PROPOSAL CONSTRUCTION MANAGEMENT SERVICES PINE TRAIL ELEMENTARY HVAC, CEILING & LIGHTING PROJECT NO. 164514

REQUEST FOR PROPOSAL CONSTRUCTION MANAGEMENT SERVICES PINE TRAIL ELEMENTARY HVAC, CEILING & LIGHTING PROJECT NO. 164514 REQUEST FOR PROPOSAL CONSTRUCTION MANAGEMENT SERVICES FOR PINE TRAIL ELEMENTARY HVAC, CEILING & LIGHTING PROJECT NO. 164514 Contact: Mr. Tom Brown, Senior Construction Project Manager Facilities Services,

More information

Design-Bid-Build v. Guaranteed Maximum Price Contracting: The Basics for Owner's Counsel

Design-Bid-Build v. Guaranteed Maximum Price Contracting: The Basics for Owner's Counsel Page 1 of 6 ALM Properties, Inc. Page printed from: New York Law Journal Back to Article Design-Bid-Build v. Guaranteed Maximum Price Contracting: The Basics for Owner's Counsel James E. Hughes New York

More information

BOND MEASURE E CONTRACTOR OUTREACH

BOND MEASURE E CONTRACTOR OUTREACH FREMONT UNIFIED SCHOOL DISTRICT BOND MEASURE E CONTRACTOR OUTREACH May 4, 2015 INTRODUCTIONS Therese Gain, Director of Facilities, Fremont Unified School District Carol Lemos, Administrative Assistant

More information

Nebraska Public Schools: Statutes Related to the Construction of Improvements to Real Property

Nebraska Public Schools: Statutes Related to the Construction of Improvements to Real Property Nebraska Public Schools: Statutes Related to the Construction of Improvements to Real Property 73-101. Public lettings; how conducted. Whenever the State of Nebraska, or any department or any agency thereof,

More information

REQUEST FOR QUALIFICATIONS (RFQ) FOR CONSTRUCTION MANAGEMENT SERVICES

REQUEST FOR QUALIFICATIONS (RFQ) FOR CONSTRUCTION MANAGEMENT SERVICES REQUEST FOR QUALIFICATIONS (RFQ) FOR CONSTRUCTION MANAGEMENT SERVICES (Construction Manager At-Risk) FOR PROJECTS IN THE CENTER UNIFIED SCHOOL DISTRICT April 7, 2005 The ( District ) is seeking Statements

More information

Dancing Willows Condominium HOA, Inc.

Dancing Willows Condominium HOA, Inc. Dancing Willows Condominium HOA, Inc. October 28, 2013 C/O Stillwater Community Management 15400 W 64 th Ave Suite 9E53 Arvada, CO 80007 p. (303) 872-9224 f. (303) 309-0468 [email protected] RE:

More information

What s so Progressive about Progressive Design-Build? Mark Alpert, PE, DBIA CH2MHill & Peter Tunnicliffe, PE, DBIA CDM

What s so Progressive about Progressive Design-Build? Mark Alpert, PE, DBIA CH2MHill & Peter Tunnicliffe, PE, DBIA CDM What s so Progressive about Progressive Design-Build? Mark Alpert, PE, DBIA CH2MHill & Peter Tunnicliffe, PE, DBIA CDM Progressive design-build: A better way? Discussion topics: What is progressive design-build?

More information

MANAGING THE PROJECT RECORD

MANAGING THE PROJECT RECORD MANAGING THE PROJECT RECORD Project Record Filing System 2 Agency Submittals 2 Site Acquisition 3 Planning 3 Pre-Qualification of Bidders 3 Bidding 4 Construction 4 Inspection 4 Legal 5 Contracts 5 Accounting

More information

Los Angeles Community College District PROGRAM MANAGEMENT SERVICES. Terri Mestas Program Director

Los Angeles Community College District PROGRAM MANAGEMENT SERVICES. Terri Mestas Program Director Los Angeles Community College District PROGRAM MANAGEMENT SERVICES Terri Mestas Program Director CMAA Southern California Chapter February 13, 2015 1 LACCD Overview Established in 1969 Governed by seven-member

More information

Doniphan-Trumbull Public School BP 902.05 Page 1 of 6 CONSTRUCTION MANAGEMENT AT RISK SCHOOL CONSTRUCTION ALTERNATIVE

Doniphan-Trumbull Public School BP 902.05 Page 1 of 6 CONSTRUCTION MANAGEMENT AT RISK SCHOOL CONSTRUCTION ALTERNATIVE Page 1 of 6 CONSTRUCTION MANAGEMENT AT RISK SCHOOL CONSTRUCTION ALTERNATIVE The school district adopts this policy in the event it resolves to use the construction management at risk (CM at risk) construction

More information

Mechanical Contractor Pre-Qualification Packet. SPSC N180 Computer Data Room Phase II. Project No. CP 159313. Notice No. Notice 13-11.

Mechanical Contractor Pre-Qualification Packet. SPSC N180 Computer Data Room Phase II. Project No. CP 159313. Notice No. Notice 13-11. Mechanical Contractor Pre-Qualification Packet SPSC N180 Computer Data Room Phase II Project No. CP 159313 Notice No. Notice 13-11 Issued by Department of Facilities Management Delivery address: Research

More information

Independent School District No. 1 Strive Achieve Succeed Go Beyond Lewiston, Idaho

Independent School District No. 1 Strive Achieve Succeed Go Beyond Lewiston, Idaho Independent School District No. 1 Strive Achieve Succeed Go Beyond Lewiston, Idaho REQUEST FOR QUALIFICATIONS Independent School District No. 1, Lewiston, Idaho ( District ) is seeking responses from individuals

More information

Request of Qualification Proposal for Construction Management Services

Request of Qualification Proposal for Construction Management Services Request of Qualification Proposal for Construction Management Services Dated June 10, 2014 Table of Contents Overview 3 Introduction 4 Scope of Construction Managers Services 4 Submission of Qualifications

More information

proactive contract management

proactive contract management TM proactive contract management Six Reasons Why Contract Management Matters Table of Contents Why Contract Management Matters 2 How Contracts Impact Your Business 2 Contract Data Determines Revenue and

More information

Introduction/Background. Competitive Bidding- Statutory Requirements. Competitive Bidding- Charter/Code Requirements

Introduction/Background. Competitive Bidding- Statutory Requirements. Competitive Bidding- Charter/Code Requirements Public Works Contracts in Missouri Presented September 8, 2008 by Joe Lauber 2008 Missouri Municipal League Annual Conference Introduction/Background Bidding the project New construction safety training

More information

10 Steps to Building a More Profitable Construction Business. Leslie Shiner, MBA Sage Certified Consultant

10 Steps to Building a More Profitable Construction Business. Leslie Shiner, MBA Sage Certified Consultant 10 Steps to Building a More Profitable Construction Business Leslie Shiner, MBA Sage Certified Consultant Introduction is a pragmatic approach to developing business practices that result in greater profitability.

More information

The purpose of the policy is to establish guidelines for the administration of the School Planning and the School Construction programs.

The purpose of the policy is to establish guidelines for the administration of the School Planning and the School Construction programs. SCHOOL PLANNING/SCHOOL CONSTRUCTION PROGRAMS Effective: August 14, 2014 I. Policy Statement The Board of Education is responsible for providing safe, engaging and supportive educational and work environments

More information

GREENFIELD MIDDLE SCHOOL ROOF PROJECT

GREENFIELD MIDDLE SCHOOL ROOF PROJECT CITY OF GREENFIELD GREENFIELD, MASSACHUSETTS RFQ TITLE: GREENFIELD MIDDLE SCHOOL ROOF PROJECT RFQ #: 12-03 Date of Issuance: June 22, 2011 9:00 a.m. Deadline for Receipt Of Bids: July 8, 2011 2:00 p.m.

More information

CHAPTER 48-01.2 PUBLIC IMPROVEMENT BIDS AND CONTRACTS

CHAPTER 48-01.2 PUBLIC IMPROVEMENT BIDS AND CONTRACTS CHAPTER 48-01.2 PUBLIC IMPROVEMENT BIDS AND CONTRACTS 48-01.2-01. Definitions. In this chapter, unless the context otherwise requires: 1. "Agency construction management" means a public improvement delivery

More information

GORDON COUNTY BOARD OF COMMISSIONERS REQUEST FOR QUALIFICATIONS FOR AN ARCHITECT FAMILIAR WITH COMMUNITY DEVELOPMENT BLOCK GRANT APPLICATIONS

GORDON COUNTY BOARD OF COMMISSIONERS REQUEST FOR QUALIFICATIONS FOR AN ARCHITECT FAMILIAR WITH COMMUNITY DEVELOPMENT BLOCK GRANT APPLICATIONS GORDON COUNTY BOARD OF COMMISSIONERS REQUEST FOR QUALIFICATIONS FOR AN ARCHITECT FAMILIAR WITH COMMUNITY DEVELOPMENT BLOCK GRANT APPLICATIONS DATE RFQ RELEASED July 13, 2013 1 PURPOSE OF THIS REQUEST FOR

More information

Marketing Subcontractor Services

Marketing Subcontractor Services Marketing Subcontractor Services Part I Winning That Big Contract is More Than Just Low Bid Today By Greg Hoyle, Consultant Fails Management Institute Often subcontractors come to our consultants and say,

More information

Step 1 Getting Pre-Qualified

Step 1 Getting Pre-Qualified Step 1 Getting Pre-Qualified Now that you ve made the decision to purchase a home, the next step is to get pre-qualified from a lending institution, like Michigan Mortgage Solutions, to determine how much

More information

DGS Prolog Manager & Prolog Converge User Manual

DGS Prolog Manager & Prolog Converge User Manual DGS Prolog Manager & Prolog Converge User Manual Table of Contents Prolog Overview Flowchart 1 Entering a New Project 2 Solicitations 7 Contracts Module 14 Change Orders 21 Change Order Workflow Diagram

More information

What You Need to Know Before Your Business Insurance Renews

What You Need to Know Before Your Business Insurance Renews What You Need to Know Before Your Business Insurance Renews by Scott Kirby Shopping for commercial insurance is easy when prices are falling. Need to save money? Need broader coverage? Get another quote.

More information

REQUEST FOR QUALIFICATIONS ARCHTECTURAL SERVICE FEBRUARY 20, 2015 JACKSONVILLE PUBLIC SCHOOL DISTRICT 117

REQUEST FOR QUALIFICATIONS ARCHTECTURAL SERVICE FEBRUARY 20, 2015 JACKSONVILLE PUBLIC SCHOOL DISTRICT 117 Introduction The Board of Education for Jacksonville School District 117 is soliciting Statements of Interest and Qualifications pursuant to 50 ILCS 510/0.01 from qualified firms to provide comprehensive

More information

REQUEST FOR PROPOSALS For. Kelowna and Vernon Hospitals Project

REQUEST FOR PROPOSALS For. Kelowna and Vernon Hospitals Project REQUEST FOR PROPOSALS For The Kelowna and Vernon Hospitals Project VOLUME 2 of 4 Instructions to Proponents Closing Time: Delivery Address: 3:00 pm (local time) Thursday, March 6,2008 Kelowna and Vernon

More information

C.A.S.H. WORKSHOP Planning for the Building Season: Exploring and Understanding Project Delivery Methods

C.A.S.H. WORKSHOP Planning for the Building Season: Exploring and Understanding Project Delivery Methods C.A.S.H. WORKSHOP Planning for the Building Season: Exploring and Understanding Project Delivery Methods Friday, December 3, 2010 9:00 a.m. to 3:00 p.m. Ontario Airport Radisson 2200 East Holt Boulevard

More information

T34 - PUBLIC WORK IN MASSACHUSETTS, UNDERSTANDING CHAPTER 149 AND CHAPTER 149A

T34 - PUBLIC WORK IN MASSACHUSETTS, UNDERSTANDING CHAPTER 149 AND CHAPTER 149A T34 - PUBLIC WORK IN MASSACHUSETTS, UNDERSTANDING CHAPTER 149 AND CHAPTER 149A PANELISTS: Deborah Anderson, Esq. Office of the Attorney General Laura Wernick, FAIA, REFP, LEED AP HMFH Architects, Inc.

More information

Members, Council of Presidents. Advertisements for Architect/Engineer and Construction Manager Services and Calls for Bid

Members, Council of Presidents. Advertisements for Architect/Engineer and Construction Manager Services and Calls for Bid July, 2003 MEMORANDUM UCF-05.01-07/03 TO: Members, Council of Presidents FROM: SUBJECT: Advertisements for Architect/Engineer and Construction Manager Services and Calls for Bid AUTHORITY: Sections 240.209(3)(p),

More information

How to do Business with the Province of British Columbia

How to do Business with the Province of British Columbia How to do Business with the Province of British Columbia Every year, the B.C. Government buys a wide range of goods and services from businesses of all sizes and types. Your business could be one of them.

More information

Contracts, agreements and tendering

Contracts, agreements and tendering Contracts, agreements and tendering 1) Introduction This guidance note provides an overview of the types of contracts and other agreements you might need to use in setting up and running a local energy

More information

Average producers can easily increase their production in a larger office with more market share.

Average producers can easily increase their production in a larger office with more market share. The 10 Keys to Successfully Recruiting Experienced Agents by Judy LaDeur Understand whom you are hiring. Don t make the mistake of only wanting the best agents or those from offices above you in market

More information

GENERAL CONTRACTOR / CONSTRUCTION MANAGER SERVICES

GENERAL CONTRACTOR / CONSTRUCTION MANAGER SERVICES REQUEST FOR QUALIFICATIONS GENERAL CONTRACTOR / CONSTRUCTION MANAGER SERVICES NEW DINING HALL MONTANA STATE UNIVERSITY Bozeman, Montana PPA NO. 15-0103 Campus Planning, Design & Construction Plew Building

More information

Request for Qualifications Construction Management at Risk Services. Bismarck Public Schools Bismarck, North Dakota

Request for Qualifications Construction Management at Risk Services. Bismarck Public Schools Bismarck, North Dakota Request for Qualifications Construction Management at Risk Services Bismarck Public Schools Bismarck, North Dakota December 1, 2014 Request for Qualifications Construction Management at Risk Services Bismarck

More information

Program Management for School Construction

Program Management for School Construction Program Management for School Construction Presented to: Pasadena Unified School District Board of Education January 13, 2009 Project Delivery Options Design Bid Build Design/Build Construction Management

More information

COMMISSIONING SUMMARY TEMPLATE

COMMISSIONING SUMMARY TEMPLATE COMMISSIONING SUMMARY TEMPLATE The following template shall be completed and submitted for permit review. Provide additional attachments as appropriate. SECTION 1 PROJECT DESCRIPTION Name of Project Project

More information

AUSTIN INDEPENDENT SCHOOL DISTRICT INTERNAL AUDIT DEPARTMENT CONSTRUCTION AUDIT PROGRAM

AUSTIN INDEPENDENT SCHOOL DISTRICT INTERNAL AUDIT DEPARTMENT CONSTRUCTION AUDIT PROGRAM GENERAL: Some of the Districts largest capital expenditures are from new construction, facility upgrades, and renovations. A single project can run into the millions of dollars, involving engineering,

More information

Joint Bidding Guide. 9. Opportunity Assessment. prepared for Leaders of Potential Consortia and Bid Managers

Joint Bidding Guide. 9. Opportunity Assessment. prepared for Leaders of Potential Consortia and Bid Managers Joint Bidding Guide 9. Opportunity Assessment prepared for Leaders of Potential Consortia and Bid Managers Figure 1.1 The Joint Bidding Cycle Key Chapter for Both Sides 1. Introduction Chapter for Supply

More information

The BASICS of CONSTRUCTION ACCOUNTING Workshop GLOSSARY

The BASICS of CONSTRUCTION ACCOUNTING Workshop GLOSSARY The BASICS of CONSTRUCTION ACCOUNTING Workshop GLOSSARY From Financial Management & Accounting for the Construction Industry, CFMA. 2014 Matthew Bender and Company, Inc., a member of the LexisNexis Group.

More information

FOR USE WITH PPP PROJECTS 1 SAMPLE GUIDELINES FOR PRE-QUALIFICATION AND COMPETITIVE BIDDING PROCESS 2

FOR USE WITH PPP PROJECTS 1 SAMPLE GUIDELINES FOR PRE-QUALIFICATION AND COMPETITIVE BIDDING PROCESS 2 FOR USE WITH PPP PROJECTS 1 SAMPLE GUIDELINES FOR PRE-QUALIFICATION AND COMPETITIVE BIDDING PROCESS 2 1. PRE-QUALIFICATION 1.1 The requirements for pre-qualifications will be reasonable and efficient and

More information

San Diego Gas & Electric

San Diego Gas & Electric San Diego Gas & Electric Diverse Business Enterprises Yan Fei, Supplier Diversity Advisor 2002 San Diego Gas and Electric Co. and Southern California Gas Company. All copyright and trademark rights reserved.

More information

REQUEST FOR PROPOSALS FOR PINE GROVE ELEMENTARY SCHOOL PLAYGROUND REPLACEMENT PROJECT TOWN OF AVON, CONNECTICUT

REQUEST FOR PROPOSALS FOR PINE GROVE ELEMENTARY SCHOOL PLAYGROUND REPLACEMENT PROJECT TOWN OF AVON, CONNECTICUT REQUEST FOR PROPOSALS FOR PINE GROVE ELEMENTARY SCHOOL PLAYGROUND REPLACEMENT PROJECT TOWN OF AVON, CONNECTICUT The Town of Avon and Avon Board of Education are seeking written responses to a Request for

More information

School Construction Projects

School Construction Projects The process of educating young people seems to be continually developing. New insights regarding how students most effectively receive retain and gain understanding of information and principles affect

More information