1 Evaluating Project Delivery Options Scot A. Bini Vice President, URS August 24, 2004 Design-Bid-Build Overview Design Build Construction Management at Risk Owner Representation
2 Terminology Project Manager Program Management CM Agency v. CM-at-Risk Fast Tracking Bridging Bidding Options Competitive sealed bid Competitive sealed proposal Competitive cost proposal Competitive qualifications proposal Design-Bid-Build Most common approach in the US Entirely sequential Can be single-prime or multi-prime District holds all contracts Cost is the only criteria for selection (low bid process)
3 Design-Bid-Build Flow Chart Design-Bid-Build Stakeholders
4 Owners in Design-Bid-Build Selects planner for Ed Specs Selects the Architect Serves as a single point of feedback during design Awards contract to low bid contractor Must oversee all contract relationships; active participation Architects in Design-Bid-Build Interprets and designs per Ed Specs Provides participatory feedback opportunities Prepares construction documents Manages bid process Provides some level of Construction Administration Approves pay applications and CO s
5 GC in Design-Bid-Build Coordinates subcontractors Delivers project at bid price Completes building on time Pros of Design-Bid-Build Everyone is familiar with this process. The owner has considerable control. It is low bid and that clearly defines the cost at the outset.
6 Cons of Design-Bid-Build Process is entirely sequential. If the bids come in over budget, considerable time is lost. There are no constructability reviews. The books are closed. Profitability is the goal for the GC. Construction Management at Risk The CM assumes the financial risk for construction in addition to consultation during design and construction. The selection is based on both cost and qualifications. CM is involved at onset of design.
7 CM-at-Risk Flow Chart CM-at-Risk Stakeholders
8 Owners in CM-at-Risk Selects planner for Ed. Spec. Selects architect. Determines CM-at-Risk selection criteria and makes selection. Negotiates the price. Architects in CM-at-Risk Designs project according to ED Spec. Provides participatory feedback Prepares construction documents Acts as owners rep during construction
9 CM-at-Risk Coordinates with subs and submits proposal (often a GMP). Works as a team member consulting during design and construction. Keeps the architect informed on costs, schedule and implications of alternative designs, systems, and materials used. Coordinates all work and completes building on time. Pros of CM-at-Risk Provides Owner greater control in selecting the CM through pre-qualifications Constructability reviews avoid delays. Management of change is more effective with team approach. Single point of responsibility during construction. Opportunities for fast tracking.
10 Cons of CM-at-Risk Potential exists for an adversarial relationship between Architect and CM. Owner must invest equal degrees of control to both parties. Design Build Owners contract with a single entity for both design and construction. Entity may be one company or a joint venture between architect and contractor. Design Builder may also perform general conditions and subcontract to a designer and builder.
11 Design Build Process Owner prepares design requirements. Owner issues a request for proposal. Selection is made and negotiations start. Project can be fast tracked. DB may self perform the work or only provide general conditions. Costs in DB Stipulated Sum A lump sum price to provide all design and to deliver a completed building to the owner. Cost-Plus Fee Cost is computed as the actual expense of design and construction plus a fee for overhead and profit. GMP Cost is computed the same as Cost-Plus Fee, but there is a stated maximum price. Shared savings below that maximum is an option.
12 Stakeholders in DB Roles in DB Owner Prepares project requirements in detail Issues RFP and negotiates costs Design/Builder Responds to RFP Works with, or is, the Architect and Contractor
13 Pros of DB Owner has great flexibility in selecting the DB that provides the best value and cost. One point of contact. Positive impact from team approach. The relationship between Architect and Contractor is not adversarial since they are the same entity. Cons of DB Since Architect and Contractor work under the same umbrella the checks and balances are lost. Program must be clearly defined by the owner prior to start. Owners should have extensive experience in construction.
14 Project/Program Management Useful when Owners do not have the expertise or staff to handle the management of a capital program. Provides a eyes and ears for owners that can concentrate on other responsibilities. Experts in Program Controls; cost, time, quality, safety, and change management Selecting a Delivery Method Time Quality Cost Risk Owner s Expertise
15 Delivery Method Options Delivery Method Options
16 Scot A. Bini URS Construction Services Vice President, Education Principal Office: Cell: Fax:
Program Management for School Construction
Program Management for School Construction Presented to: Pasadena Unified School District Board of Education January 13, 2009 Project Delivery Options Design Bid Build Design/Build Construction Management
More informationConstruction Delivery Methods for Texas school districts
Construction Delivery Methods for Texas school districts Pfluger Associates Architects, P.L.L.C. ARCHITECTS / PLANNING CONSULTANTS History Prior to 1995, public school districts were required to utilize
More informationProject Delivery Methods & Contract Types CSTM 102 Spring 2013
Project Delivery Methods & Contract Types CSTM 102 Spring 2013 Schedule February 16- Building Information Modeling February 21- Midterm Review February 23- Midterm In the industry the term Pre-Construction
More information1.040 Project Management
MIT OpenCourseWare http://ocw.mit.edu 1.040 Project Management Spring 2009 For information about citing these materials or our Terms of Use, visit: http://ocw.mit.edu/terms. Project Organization Project
More informationThe programming, design
Understanding Project Delivery for the Design and Construction of Public Buildings architecture The programming, design and construction of important public buildings require the coordinated efforts of
More informationLessons Learned/Best Practices: Case Study- Design-Build at SFO
Lessons Learned/Best Practices: Case Study- Design-Build at SFO Speaker(s): Clay Paslay Moderator Ivar Satero, SFO Steven Rule, Turner Bill Hooper, Jr., Gensler SFO s Delivery Options SELECTION TYPES Price
More informationSchool Construction Projects
The process of educating young people seems to be continually developing. New insights regarding how students most effectively receive retain and gain understanding of information and principles affect
More informationProject Organization. System and Project Management 1.040/1.401J Nathaniel Osgood
Project Organization System and Project Management 1.040/1.401J Nathaniel Osgood Center for Construction and Research Education Department of Civil and Environmental Engineering Massachusetts Institute
More informationFINDING AND UTILIZING QUALITY CONSTRUCTION LEADS. Kenneth Borah, Sr. Editor, CDCNews
FINDING AND UTILIZING QUALITY CONSTRUCTION LEADS Kenneth Borah, Sr. Editor, CDCNews FINDING AND UTILIZING QUALITY CONSTRUCTION LEADS Several years ago, the Associated Builders & Contractors surveyed their
More informationThe Construction Management Delivery System An Architect s Point of View
Session 1421 The Construction Management Delivery System An Architect s Point of View Daniel Davis, AIA University of Hartford Abstract There are at least three different building project delivery systems
More informationDesign-Build Options for Public Projects
Design-Build Options for Public Projects Mark C. Friedlander Schiff Hardin LLP TETRA TECH MPS Most Municipal Construction Design Bid Build OWNER A/E General Contractor Design Bid Build Reasons Why Municipal
More informationREQUEST FOR PROPOSALS (RFP) - Construction Management Services. Germantown School District Office
REQUEST FOR PROPOSALS (RFP) - Construction Management Services From: Germantown School District Project: Germantown School District Addition & Renovations to Rockfield Elementary School N132 W18473 Rockfield
More informationAn Owner s Guide To Construction Management Assuring Project Success Under Any Delivery Method
An Owner s Guide To Construction Management Assuring Project Success Under Any Delivery Method Reprinted with the permission of Construction Management Association of America, Inc. Copyright 2007 All Rights
More informationDesign-Bid-Build v. Guaranteed Maximum Price Contracting: The Basics for Owner's Counsel
Page 1 of 6 ALM Properties, Inc. Page printed from: New York Law Journal Back to Article Design-Bid-Build v. Guaranteed Maximum Price Contracting: The Basics for Owner's Counsel James E. Hughes New York
More informationRebuilding Ohio s Public Construction Law: Construction Reform in House Bill 153
Rebuilding Ohio s Public Construction Law: Construction Reform in House Bill 153 October 2011 E. Rod Davisson, Esq., Schottenstein Zox & Dunn Co., LPA 250 West Street Columbus, Ohio 43215 614.462.2700
More informationFundamentals of a Construction Audit. August 7, 2014
Fundamentals of a Construction Audit August 7, 2014 Agenda Definitions Risk Based Approach What Determines Risk Fraud Construction Risks What to Audit Red Flags Why Audit Prevention Wrap-up 1 Definitions
More informationBuilding Capital Projects in Tough Times John Lynch, State of Washington
Building Capital Projects in Tough Times John Lynch, State of Washington Published as a joint effort of the National Association of State Facilities Administrators (NASFA) and the Associated General Contractors
More informationRequest for Qualifications. Owner s Project Manager. Design and Construction of a New School Facility. K~8 Charter School
Request for Qualifications Owner s Project Manager Design and Construction of a New School Facility K~8 Charter School 26 Madeira Avenue New Bedford, MA 02746 REQUEST FOR QUALIFICATIONS (RFQ) Issued: 4/16/2014
More informationWhat s so Progressive about Progressive Design-Build? Mark Alpert, PE, DBIA CH2MHill & Peter Tunnicliffe, PE, DBIA CDM
What s so Progressive about Progressive Design-Build? Mark Alpert, PE, DBIA CH2MHill & Peter Tunnicliffe, PE, DBIA CDM Progressive design-build: A better way? Discussion topics: What is progressive design-build?
More informationAN OWNER'S GUIDE TO PROJECT DELIVERY METHODS
AN OWNER'S GUIDE TO PROJECT DELIVERY METHODS Advancing Professional Construction and Program Management Worldwide ACKNOWLEDGMENTS CMAA gratefully acknowledges the time and efforts of those who served as
More informationCONSTRUCTION MANAGEMENT AT RISK A NEW CONSTRUCTION DELIVERY METHOD For PUBLIC SCHOOLS
CONSTRUCTION MANAGEMENT AT RISK A NEW CONSTRUCTION DELIVERY METHOD For PUBLIC SCHOOLS Senate Bill 914, ratified by the General Assembly December 6, 2001, made more changes to the public bidding and construction
More informationATTACHMENT A. Ozarks Technical Community College Pre-Established Criteria for Construction Management and Design Build Construction Projects
Ozarks Technical Community College Pre-Established Criteria for Construction Management and Design Build Construction Projects Pursuant to Revised Statute of Missouri Section 8.250(3), Ozarks Technical
More informationNOTICE TO CM/GC Companies
NOTICE TO CM/GC Companies Facilities and Construction Management Jefferson County School District R-1 (Jeffco) is pre-qualifying Construction Manager/General Contractors for CM/GC services for a new K-6
More informationDESIGN-BUILD PROCUREMENT AND ADMINISTRATION GUIDE
ARIZONA DEPARTMENT OF TRANSPORTATION INTERMODAL TRANSPORTATION DIVISION DESIGN-BUILD PROCUREMENT AND ADMINISTRATION GUIDE 3rd Edition December 2007 Published by: ADOT Construction Group 206 S. 17 th Ave.,
More informationLease-Leaseback 201:Lessons Learned in Dancing School. Our Agenda
Lease-Leaseback 201:Lessons Learned in Dancing School CASH Annual Conference February 26, 2013 Travis Kirk, Merced Union High School District Mark Quattrocchi, Quattrocchi Kwok Architects Glenn Gould,
More informationRecommended Best Practices for the Use of Construction Management/General Contractor on Highway and Transportation Projects in the Public Sector
Recommended Best Practices for the Use of Construction Management/General Contractor on Highway and Transportation Projects in the Public Sector Approved March 23, 2011 Purpose: While the traditional Design-Bid-Build
More informationREQUEST FOR PROPOSAL TO PROVIDE CONSTRUCTION MANAGEMENT AND GENERAL CONTRACTOR SERVICES SPRINGVILLE CITY NEW AQUATICS AND ACTIVITIES CENTER
RFP #2016-02 REQUEST FOR PROPOSAL TO PROVIDE CONSTRUCTION MANAGEMENT AND GENERAL CONTRACTOR SERVICES FOR SPRINGVILLE CITY NEW AQUATICS AND ACTIVITIES CENTER RELEASE DATE: January 29, 2016 DUE DATE: February
More informationDoniphan-Trumbull Public School BP 902.05 Page 1 of 6 CONSTRUCTION MANAGEMENT AT RISK SCHOOL CONSTRUCTION ALTERNATIVE
Page 1 of 6 CONSTRUCTION MANAGEMENT AT RISK SCHOOL CONSTRUCTION ALTERNATIVE The school district adopts this policy in the event it resolves to use the construction management at risk (CM at risk) construction
More informationAdvanced Water Treatment Facility Alternative Project Delivery A Better Way
Advanced Water Treatment Facility Alternative Project Delivery A Better Way Service Area = 420 Square Miles 43 Cities Population = 4 Million 720,000 acre feet used per year 40% Groundwater from local water
More informationTLHAMATSI AFRICA PROJECTS CONSTRUCTION MANAGEMENT PRESENTATION. PRESENTED BY: BAKANG MOENG info@tlhamatsi.co.za
TLHAMATSI AFRICA PROJECTS CONSTRUCTION MANAGEMENT PRESENTATION PRESENTED BY: BAKANG MOENG info@tlhamatsi.co.za CONSTRUCTION MANAGEMENT - DEFINED Act of managing the construction process Contractual arrangement
More informationAN OWNER'S GUIDE TO CONSTRUCTION AND PROGRAM MANAGEMENT. Enabling Project Success Under Any Delivery Method
AN OWNER'S GUIDE TO CONSTRUCTION AND PROGRAM MANAGEMENT Enabling Project Success Under Any Delivery Method Acknowledgments CMAA gratefully acknowledges the time and efforts of those who served as contributing
More informationTRAVIS UNIFIED SCHOOL DISTRICT REQUEST FOR QUALIFICATIONS CONSTRUCTION MANAGEMENT SERVICES CONSTRUCTION MANAGER MULTI-PRIME
TRAVIS UNIFIED SCHOOL DISTRICT REQUEST FOR QUALIFICATIONS CONSTRUCTION MANAGEMENT SERVICES CONSTRUCTION MANAGER MULTI-PRIME QUESTIONS PAGE 11 200.325 BONDING REQUIREMENTS Please confirm that construction
More informationDESIGN IS GOOD BUSINESS
COMPENSATING YOUR ARCHITECT The creature comforts are one thing, but for a house to become a home it s got to be elevated to the point that it s about raising one s spirits as well. SAMUEL MOCKBEE Building
More informationTel: (617) 727-4050 Fax: (617) 727-5363. OWNER S PROJECT MANAGER GUIDELINES M.G.L. c. 149, 44A1/2
The Commonwealth of Massachusetts Executive Office for Administration and Finance Division of Capital Asset Management One Ashburton Place Boston, Massachusetts 02108 Tel: (617) 727-4050 Fax: (617) 727-5363
More informationCommunity Program Directors, All Community Facilities Staff, State Architects and Engineers
TO: State Directors Rural Development RD AN No. 4794 (1942-A) September 28, 2015 ATTN: Community Program Directors, All Community Facilities Staff, State Architects and Engineers FROM: Tony Hernandez /s/
More informationCorrected Form: Revised Attachment 7B Cost Proposal Distribution Exhibits A1 and A2 Attached
ADDENDUM #1 RFP: 500 16 Design Build Maintenance & Operations Complex The following changes to the Request for Proposal and clarifications are provided based on questions received and must be added/considered
More informationCommissioning Large Public Projects Using Construction Manager at Risk (CM@R)
Commissioning Large Public Projects Using Construction Manager at Risk (CM@R) Greg Cunningham, AIA Enovity, Inc. Synopsis Over the past ten years, an alternative method of project delivery has evolved
More informationSchedule Acceleration Techniques Using a CM
College of Engineering Schedule Acceleration Techniques Using a CM By PI: Dr. Jesús M. de la Garza, Vecellio Professor Graduate Student: Ms. Daniela Escobar Hidrobo Final Report September 1, 2006 Invent
More informationAKA Which Is? Used When? Who s Responsible?
Open Proprietary Descriptive Performance Reference Cash Allowance Closed Prescriptive Base Bid Specifications AKA Which Is? Used When? Who s Responsible? Several (3-5) appropriate material/product/systems
More informationPROJECT MANAGEMENT BASICS
PROJECT MANAGEMENT BASICS Rick Panos AIA, CCM Director of Construction Management Totum Consulting Gary Cardamone, P.E., FCMAA Principal, G J Cardamone Consulting, LLC Program Management Is.... In the
More informationREQUEST FOR PROPOSALS FOR CONSTRUCTION MANAGEMENT AT-RISK FOR LOGANVILLE ELEMENTARY SCHOOL (REPLACEMENT) FOR THE WALTON COUNTY SCHOOL DISTRICT
ADVERTISEMENT: REQUEST FOR PROPOSALS FOR CONSTRUCTION MANAGEMENT AT-RISK FOR LOGANVILLE ELEMENTARY SCHOOL (REPLACEMENT) FOR THE WALTON COUNTY SCHOOL DISTRICT The WALTON COUNTY SCHOOL DISTRICT will receive
More informationDesign Build Institute of America (DBIA)
Design Build Institute of America (DBIA) 1 D E S I G N B U I L D L E S S O N S L E A R N E D J O S É D. N U Ñ E Z, L E E D A P V I C E C H A N C E L L O R F A C I L I T I E S P L A N N I N G, M A I N T
More informationA Guide to Building Delivery. Ready, Set, Build.
A Guide to Building Delivery Ready, Set, Build. Getting Started So You Want to Build a Building? For many individuals faced with the responsibility of administering the construction of a building, the
More informationCM at Risk. process of design-bid-build as an established method of project delivery. a 3D/International essay
a 3D/International essay CM at Risk Management at Risk (CM at Risk), similar to established private sector methods of construction contracting, is gaining popularity in the public sector. It is a process
More informationCovance Construction Management Staffing Plan Chandler, Arizona
INTRODUCTION: This Construction Management (CM) Staffing Plan has been prepared for Covance to identify the critical organizational structure necessary to successfully complete the Chandler project according
More informationProject Name: Project No.: CONTRACTOR BID FORM. BID FROM: Name: Address:
This bid form must be filled out but is for MPOWER processing purposes only. It does not replace the contractors bid. Your contractors bid should additionally be attached. Project Name: Project No.: CONTRACTOR
More informationRequest for Proposal No. RFP02658. Project Construction Management Services. for. Capital Levy BTA IV Project: Ingraham High School Classroom Addition
Seattle Public Schools Contracting Services 2445 Third Avenue South Seattle, WA 98134 Telephone: (206) 252-0566 Fax: (206) 743-3018 contractingservices@seattleschools.org Request for Proposal No. RFP02658
More informationAIA Contract Documents, by Family as of 10/20/2015
A101 2007 A101 1997 Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum A101 2007 SP A102 2007 A111 1997 A103 2007 A114 2001 Agreement Between Owner and Contractor, for
More informationProfessional Practice Commission: March 2013. Alternative Project Delivery Systems
Professional Practice Commission: March 2013 Alternative Project Delivery Systems UIA Accord Building project delivery systems. Definition Building project delivery systems are defined as the contractual
More informationContracting Practices in Mega Projects
CEM 520 Term Paper Contracting Practices in Mega Projects EPC and EPCM A L I A B D U L L A H A L - S A L E M 2 0 0 3 4 2 5 1 0 Outline Introduction Types of Contracts Contracting Strategies The Difference
More informationON-TIME AND ON-BUDGET: KEY ISSUES IN NEGOTIATING CONSTRUCTION CONTRACTS
ON-TIME AND ON-BUDGET: KEY ISSUES IN NEGOTIATING CONSTRUCTION CONTRACTS ACC REAL ESTATE COMMITTEE PRESENTATION SEPTEMBER 17, 2009 SEAN T. BOULGER, ESQ. WILMER CUTLER PICKERING HALE AND DORR LLP I. Introduction
More informationHow to Write the Construction Management RFQ/RFP
2011-06-07 How to Write the Construction Management RFQ/RFP Setting Up a Project for Success Today's Objectives The Art of RFQ/RFP writing First things first Determining the optimum Project Delivery Method
More informationMassachusetts Public School Procurement Process. M a y 2 1, 2 0 1 4 S p r i n g f i e l d, M a s s a c h u s e t t s
Massachusetts Public School Procurement Process M a y 2 1, 2 0 1 4 S p r i n g f i e l d, M a s s a c h u s e t t s Massachusetts Public School Procurement Process Presenter Profiles A R C A D I S U S
More informationVerification of need. Assessment of options. Develop Procurement Strategy. Implement Procurement Strategy. Project Delivery. Post Project Review
Who should read this fact sheet? Many construction clients are not regular purchasers of construction work. This fact sheet is an introduction to construction procurement for occasional clients with a
More informationConstruction Management at Risk: An Innovative Project Delivery Method at Stormwater Treatment Area in the Everglades, Florida
Construction Management at Risk: An Innovative Project Delivery Method at Stormwater Treatment Area in the Everglades, Florida Young H. Kwak, Ph.D. 1 and Randall Bushey, P.E. 2 Abstract The traditional
More informationBROWN UNIVERSITY PROJECT DELIVERY PROCESS GUIDELINES D EPARTMENT OF F ACILITIES M ANAGEMENT
BROWN UNVERSTY PROJECT DELVERY PROCESS GUDELNES D EPARTMENT OF F ACLTES M ANAGEMENT Facilities Management Mission Statement The mission of Facilities Management is to support the University by enhancing
More informationProject Document Manager
Network Project Document Manager Learn more about PDM 3.0 and how its connected components can help you better run your projects... PDM Plan Room PDM Bid Management PDM Pro PDM Enterprise PDM Collaboration
More informationConstruction Management and project process
Construction Management and project process Presented by: Vourvoutsiotis Apostolos GSO University of Applied Science Nürnberg 06.04.2000 Table of Contents Construction Management and project process Construction
More informationHow To Be A Construction Manager
THE RISK IN CM AT-RISK BY WARNER STRANG INTRODUCTION The objective of professional construction managers should be to give their clients the best possible experience with design and construction, without
More informationHow To Get Construction Procurement Services
Construction Procurement William C. Charvat, AIA, CSI Excerpt from The Architect s Handbook of Professional Practice, 13th edition 2000 The procurement of construction services brings together the team
More informationC.A.S.H. WORKSHOP Planning for the Building Season: Exploring and Understanding Project Delivery Methods
C.A.S.H. WORKSHOP Planning for the Building Season: Exploring and Understanding Project Delivery Methods Friday, December 3, 2010 9:00 a.m. to 3:00 p.m. Ontario Airport Radisson 2200 East Holt Boulevard
More informationCONSTRUCTION MANAGER AT RISK
CONSTRUCTION MANAGER AT RISK A REFERENCE DOCUMENT FOR TEXAS K-12 EDUCATIONAL CONSTRUCTION PROJECTS Prepared by a Joint Committee of The Associated General Contractors of America Houston, Texas Chapter
More informationADDENDUM #1 To Public Notice dated April 5, 2002 Construction Management Services East County Hall of Justice Project #5155
April 22, 2002 ADDENDUM #1 To Public Notice dated April 5, 2002 Construction Management Services East County Hall of Justice Project #5155 Please note the following change to the Public Notice dated April
More informationConstruction Management
Construction Management Robert C. Mutchler, FAIA, and Christopher R. Widener, AIA Excerpt from The Architect s Handbook of Professional Practice, 13th edition 2000 The construction manager is responsible
More informationASSOCIATION OF INDEPENDENT SCHOOLS OF NSW BLOCK GRANT AUTHORITY GUIDE TO PROCUREMENT PROCESSES
ASSOCIATION OF INDEPENDENT SCHOOLS OF NSW BLOCK GRANT AUTHORITY GUIDE TO PROCUREMENT PROCESSES CAPITAL GRANTS PROGRAM / BUILDING GRANTS ASSISTANCE SCHEME Background Non government schools accepting the
More informationPolicy Number: 3-804 Policy Name: Professional Services and Construction Services Procurement
Page 1 3-804 Professional Services and Construction A. Project Delivery Methods 1. A university may procure design services, construction and construction services, as applicable, under any of the following
More informationCONTRACTOR QUALIFICATION APPLICATION for
BOARD OF WATER COMMISSIONERS 1600 WEST 12TH AVENUE DENVER, COLORADO 80204 CONTRACTOR QUALIFICATION APPLICATION for South Boulder Diversion Canal Access Bridge for Ralston Landslide Repair General Contractor
More informationMembers, Council of Presidents. Advertisements for Architect/Engineer and Construction Manager Services and Calls for Bid
July, 2003 MEMORANDUM UCF-05.01-07/03 TO: Members, Council of Presidents FROM: SUBJECT: Advertisements for Architect/Engineer and Construction Manager Services and Calls for Bid AUTHORITY: Sections 240.209(3)(p),
More informationNew WMHS Construction Management Firm
New WMHS Construction Management Firm RFQ Schedule November 5, 2013 Board Meeting Approval to Advertise and use revised RFQ Week December 9, 2013 Ad runs in local papers (Thursday Dec. 12 th ) Week December
More informationOffice of the Inspector General
Office of the Inspector General Commonwealth of Massachusetts Gregory W. Sullivan Inspector General Experience of Massachusetts Public Agencies with Construction Management at Risk Under M.G.L. c. 149A
More informationCM/GC Guidelines FOR PUBLIC OWNERS. A Joint Publication Building Your Quality of Life. AGC Publication Number 2912 NASFA Publication Number F-3007
CM/GC Guidelines FOR PUBLIC OWNERS AGC Publication Number 2912 NASFA Publication Number F-3007 A Joint Publication Building Your Quality of Life Building Your Quality of Life Nothing contained in this
More informationAMENDMENT TO AGREEMENT PARTIES
AMENDMENT TO AGREEMENT PARTIES This [FIRST] Amendment to Agreement ( Amendment ) is entered into between Solano Community College District ( District ) and Swinerton Management and Consulting ( Consultant
More informationREPORT TO THE UTAH LEGISLATURE. A Performance Audit of School Building Construction. November 2008. Number 2008-14. Audit Performed By:
REPORT TO THE UTAH LEGISLATURE Number 2008-14 A Performance Audit of School Building Construction November 2008 Audit Performed By: Audit Manager Audit Supervisor Audit Staff Tim Osterstock Wayne Kidd
More informationDesign Build Procurement Guide
Design Build Procurement Guide DESIGN BUILD PROCUREMENT GUIDE Page 1 of 29 TABLE OF CONTENTS Abbreviations... 4 Chapter 1 Design Build Introduction.. 1.1 Purpose 1.2 Authority 1.3 Scope 1.4 Background
More informationAIA Contract Documents, by Series as of 10/20/2015
A101 2007 A101 1997 A101 2007 SP Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum Standard Form of Agreement Between Owner and Contractor, for use
More informationNUCLEAR SUPPLY CHAIN SYMPOSIUM
NUCLEAR SUPPLY CHAIN SYMPOSIUM Canadian Contracting Models Darryl J. Brown Gowling Lafleur Henderson LLP November 10, 2015 Suite 1600 1 First Canadian Place 100 King Street West Toronto, Ontario Canada
More informationFREDERICK COUNTY INTERAGENCY INTERNAL AUDIT AUTHORITY FREDERICK COUNTY PUBLIC SCHOOLS CONSTRUCTION MANAGEMENT PHASE II
FREDERICK COUNTY INTERAGENCY INTERNAL AUDIT AUTHORITY FREDERICK COUNTY PUBLIC SCHOOLS CONSTRUCTION MANAGEMENT PHASE II Report #12-03 September 21, 2011 Frederick County Internal Audit Division TABLE OF
More informationInfrastructure Contract Management: Key Issues and Best Practices
Infrastructure Contract Management: Key Issues and Best Practices Kevin Sampson OAA/EGAT Fred Guymont EGAT/I & E USAID Infrastructure Workshop Washington, DC December, 2009 What is contracting? con tract
More informationCONSTRUCTION RISK MANAGEMENT. TABLE of CONTENTS:
CONSTRUCTION RISK MANAGEMENT TABLE of CONTENTS: 1. Introduction 2 2. Project Start Up Risk Exposure Analysis 3 3. Insurance 5 4. Additional Advice 8 5. Bonding 9 6. Subcontractor Default Insurance 11 1
More informationDesign-Build Projects and Right-of Way Acquisition: Benefits, Challenges and Pitfalls
Design-Build Projects and Right-of Way Acquisition: Benefits, Challenges and Pitfalls Presented by: Mark Lancaster, Riverside Co. Transportation Comm. Joey Mendoza, Overland, Pacific & Cutler, Inc. Artin
More informationAppendix A Alternative Contracting General Engineering Consultant RFP. Appendix A
Appendix A 1 1.0 Requirements and Minimum Qualifications This section outlines requirements and minimum qualifications for the GEC. It is anticipated that the GEC will be used to support and supplement
More informationiowa school construction best practices
iowa school construction best practices WHAT IS A DELIVERY METHOD? A delivery method is a way of assigning authority and responsibility to move a project from an idea to a functioning facility. Master
More informationConstruction Management At-Risk
Oconee County Schools P.O. Box 146, 34 School Street Watkinsville, GA 30677 706-769-5130 706-769-3513 REQUEST FOR PROPOSALS ISSUE DATE: March 10, 2016 RFP REF: Construction Management At-Risk Construction
More informationesi ning and Constructing ublic acilities
esi ning and Constructing ublic acilities.. Legal Requirements.. Recommended Practices.. Sources of Assistance Commonwealth of Massachusetts Office of the Inspector General Glenn A. Cunha Inspector General
More informationRequest for Qualifications (CM at Risk Contract) State of Ohio Standard Forms and Documents
Request for Qualifications (CM at Risk Contract) Administration of Project: School District Board + OFCC Project Name Groveport Madison High School Response Deadline 10/17/2014 4:00pm local time Project
More informationESCO BASE CONTRACT FOR AS-NEEDED ENERGY PERFORMANCE CONTRACTING SERVICES
ATTACHMENT A ESCO BASE CONTRACT FOR AS-NEEDED ENERGY PERFORMANCE CONTRACTING SERVICES The Energy Services Coalition offers a collection of model procurement and contracting documents that represent Best
More informationBest Practices and Trends in Design-Build and Construction Management at-risk from The Municipal Water and Wastewater Design-Build Handbook
Best Practices and Trends in Design-Build and Construction Management at-risk from The Municipal Water and Wastewater Design-Build Handbook Water Design-Build Council March 31, 2011 Kansas City, MO Presentation
More informationREQUEST FOR PROPOSAL
REQUEST FOR PROPOSAL Risk Management Consulting and Brokerage Services, Including Owner Controlled Insurance Program RFP SUMMARY AND KEY DATES 1. Purpose. Victor Valley Community College District ( District
More informationCity of Portland Job Code: 30000313. CLASS SPECIFICATION Landscape Architect
City of Portland Job Code: 30000313 CLASS SPECIFICATION Landscape Architect FLSA Status: Union Representation: Exempt City of Portland Professional Employees Association (COPPEA) GENERAL PURPOSE Under
More informationAlternative Project Delivery Methods for Public Works Projects in California by David S. Gehrig Hanson Bridgett LLP March 25, 2009
Alternative Project Delivery Methods for Public Works Projects in California by David S. Gehrig Hanson Bridgett LLP March 25, 2009 I. Introduction Public agencies in California have long been restricted
More informationThe BASICS of CONSTRUCTION ACCOUNTING Workshop GLOSSARY
The BASICS of CONSTRUCTION ACCOUNTING Workshop GLOSSARY From Financial Management & Accounting for the Construction Industry, CFMA. 2014 Matthew Bender and Company, Inc., a member of the LexisNexis Group.
More informationMarketing Subcontractor Services
Marketing Subcontractor Services Part I Winning That Big Contract is More Than Just Low Bid Today By Greg Hoyle, Consultant Fails Management Institute Often subcontractors come to our consultants and say,
More informationRevised 4-13-2013 Subject to Change
HARVARD GRADUATE SCHOOL OF DESIGN Course Title: PRO 7415 Project Delivery Department of Architecture Lecture 4 credits Spring 2013 Time: Mondays, 3:00-6:00 pm Room: Gund 124 Instructor: Dr. Richard W.
More informationT34 - PUBLIC WORK IN MASSACHUSETTS, UNDERSTANDING CHAPTER 149 AND CHAPTER 149A
T34 - PUBLIC WORK IN MASSACHUSETTS, UNDERSTANDING CHAPTER 149 AND CHAPTER 149A PANELISTS: Deborah Anderson, Esq. Office of the Attorney General Laura Wernick, FAIA, REFP, LEED AP HMFH Architects, Inc.
More informationDOCUMENT 009113 - ADDENDA ADDENDUM NUMBER ONE (1) A. Project Name: BHFC 16-001 New Single Family Dwelling Unit 1. 7264 Dahlia Circle
DOCUMENT 009113 - ADDENDA ADDENDUM NUMBER ONE (1) 1.1 PROJECT INFORMATION A. Project Name: BHFC 16-001 New Single Family Dwelling Unit 1. 7264 Dahlia Circle B. Owner: Brownsville Housing Finance Corporation.
More informationInvitation to Bid and Instructions to Bidders (This is Phase I of the project please note on any Bid that it Applies to Phase I only) May 1, 2015
Invitation to Bid and Instructions to Bidders (This is Phase I of the project please note on any Bid that it Applies to Phase I only) May 1, 2015 For PROJECT : Renovation and Repair of Atlanta Jewish Academy
More informationRTD S SUBCONTRACTOR PERFORMANCE SELF-INSURED PROGRAM. Presenter: Marla Lien, General Counsel Regional Transportation District Denver, Colorado
RTD S SUBCONTRACTOR PERFORMANCE SELF-INSURED PROGRAM Presenter: Marla Lien, General Counsel Regional Transportation District Denver, Colorado PURPOSE OF THE PROGRAM To eliminate bonding as an obstacle
More informationIntegrating Sustainability into Conventional Construction Contracts in Egypt
IOSR Journal of Engineering (IOSRJEN) e-issn: 2250-3021, p-issn: 2278-8719 Vol. 3, Issue 10 (October. 2013), V4 PP 38-48 Integrating Sustainability into Conventional Construction Contracts in Egypt Manal
More informationPOLICY: 8071 Capital Construction; Contracts; Design-Build; Construction Management At Risk Page 1 of 7
At Risk Page 1 of 7 BOARD POLICY For contracts related to construction projects, the System will follow the procedures established by the Political Subdivisions Construction Alternatives Act (RRS 13-2901
More informationREQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES
REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES Prepared & Issued by: Middleton-Cross Plains Area School District 7106 South Avenue Middleton, Wisconsin 53562 January 9, 2012 Request for Proposal
More information